Form 39 — 광업법 시행규칙

278699 · 2025-10-01

[Form No. 39] <Revised Jan. 21, 2022> ┏━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓ ┃ ┃ ┃Underground Survey Map ┃ ┃ ┃ ┃ (a) Plan View ┃ ┃ Mining Right Registration No. 호 ┃ ┃ Address: ┃ ┃Mining Right Holder (Mining Leaseholder), Mining Agent ?? ┃ ┃ Mining Area Location and Mine Name: ┃ ┃ ┃ ┃ Scale of Underground Survey Plan (1: ) ┃ ┃ ┃ ┃ Remarks: 1. The upper and lower ends of the tunnel must be distinguished by color. ┃ ┃ 2. The scale shall be 1:1,200; where tracks or machinery are installed and such a scale is impracticable, an appropriate scale may be used ┃ ┃for those portions of the drawing. ┃ ┃. ┃ ┃ Wooden embankments must be distinguished by color using yellow, and brick embankments by color using red. ┃ ┃ ┃ ┃A–B Cross-Section ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┗━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ 190㎜×268㎜[Newspaper paper 54g/㎡ (recycled)] ┏━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓ ┃ ┃ ┃Underground Survey Map ┃ ┃ ┃ ┃ (b) Sectional View ┃ ┃ Mining Right Registration No. 호 ┃ ┃ Address: ┃ ┃Mining Right Holder (Mining Leaseholder), Mining Agent ?? ┃ ┃ Mining Area Location and Mine Name: ┃ ┃ ┃ ┃ Scale of Underground Sectional Survey (1: ) ┃ ┃ ┃ ┃ Remarks: 1. The upper and lower ends of tunnels shall be distinguished by color. ┃ ┃ 2. The sectional scale shall be 1:1,200; however, a suitable scale may be used for locations where tracks or machinery are installed┃ ┃if they cannot be represented clearly at that scale. ┃ ┃. ┃ ┃ Wooden embankments are marked in yellow and brick embankments in red to distinguish them by color. ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┗━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ 190㎜×268㎜[Newspaper paper 54g/㎡ (recycled)] ┏━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓ ┃ ┃ ┃Underground Survey Map ┃ ┃ ┃ ┃ ┃ ┃ (c) For Coal Mines ┃ ┃ Mining Right Registration No. 호 ┃ ┃ Address: ┃ ┃ ┃ ┃Mining Right Holder (Mining Leaseholder), Mining Agent ?? ┃ ┃ Mine Location and Mine Name: ┃ ┃ ┃ ┃ Scale of Underground Survey Map (1: ) ┃ ┃ ┃ ┃ Remark: 1. This form must be submitted only in the case of a coal mine. ┃ ┃ ┃ ┃ 2. In the plan view, the tunnels shall be colored to distinguish the different coal seams. ┃ ┃ ┃ ┃ 3. Mined portions shall be shown with lines parallel to the tunnels and contour lines. ┃ ┃ ┃ ┃ 4. Where a fault contains intercalated material, it shall be indicated on the survey drawing. ┃ ┃ ┃ ┃ 5. Plan drawings shall be surveyed at a scale of 1:1200, and columnar drawings at a scale of 1:200. ┃ ┃ ┃ ┃ 6. Wooden embankments must be marked yellow and brick embankments red to distinguish them by color. ┃ ┃ ┃ ┃ 7. Hoisting machinery, air ducts, ventilation fans, tracks and other equipment shall be indicated using suitable symbols┃ ┃on the drawing. ┃ ┗━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ 190㎜×268㎜[Newspaper paper 54g/㎡ (recycled)] ┏━━━━━━━━━━━━━━━━━━━━━━━━━━━┓ ┃ ┃ ┃ ┃ ┃ The square symbol denotes compressed-air operation, the circular symbol denotes electric operation, and ┃ ┃ the equilateral triangle denotes steam operation. ┃ ┃ Uppercase letters indicate matters requiring authorization or submission, while lowercase letters indicate those that do not require approval or ┃ ┃ notification. ┃ ┗━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ 190㎜×268㎜[Newspaper paper 54g/㎡ (recycled)]