■ Enforcement Rules of the Act on Repair, etc. of National Heritage [Attachment Form No. 26] <Amended May 24, 2024>
Orderer : Evaluator: (Signature or seal)
(Front)
┌──────────────────────────────────────────────────────────┐
│National Heritage Restoration Assessment Table │
├───────┬┬────────────────────────┬────────────────────────┤
│National Heritage Repair Name││National Heritage Repair Contractor │Representative: , Registration No.: │
├───────┼┼────────────────────────┼────────────────────────┤
│Repair Overview ││Location │ │
│ │├────────────────────────┼───────────┬─────────┬──┤
│ ││Repair Amount │ │Construction Period │ │
│ │├────────────────────────┼───────────┼─────────┼──┤
│ ││current Process │ │Evaluation │ │
│ ││ │ │Date │ │
├───────┴┴────────────────────────┴───────────┴─────────┴──┤
│ │
├───────┬─────────────────────────┬──┬──────────────────┬──┤
│Category minute │Detailed Evaluation Items │Distribution│Rating Grade │Score│
│ │ │ ├───┬────┬────┬────┤ │
│ │ │ │Excellent │Good │Normal │Defective │ │
│ │ │ │(×1) │(×0.9) │(×0.8) │(×0.6) │ │
├───────┼─────────────────────────┼──┼───┼────┼────┼────┼──┤
│1. Current Status Survey │○ Preliminary Survey Before National Heritage Restoration and National Heritage Characteristics Survey │10 │ │ │ │ │ │
│ │ - Preliminary design document review status │ │ │ │ │ │ │
│ │ - Status of National Heritage, Traditional Techniques and Styles, Traditional Materials, etc. │ │ │ │ │ │ │
│ │ - Investigation of surrounding environment affected by national heritage restoration, etc. │ │ │ │ │ │ │
├───────┼─────────────────────────┼──┼───┼────┼────┼────┼──┤
│2. Construction Management │○ Establishment and Implementation of National Heritage Repair Plans │30 │ │ │ │ │ │
│ │○ National Heritage Repair Status │ │ │ │ │ │ │
│ │ - Whether construction is appropriate according to design documents │ │ │ │ │ │ │
│ │ - Appropriateness of construction and finishing status of major work items │ │ │ │ │ │ │
│ │ - Whether disassembly and assembly are appropriate │ │ │ │ │ │ │
│ │ - Preparation and Utilization of Construction Detail Drawings │ │ │ │ │ │ │
├───────┼─────────────────────────┼──┼───┼────┼────┼────┼──┤
│3. Quality Control │○ Establishment and Implementation of Quality Management Plan │15 │ │ │ │ │ │
│ │○ Quality Control Status │ │ │ │ │ │ │
│ │ - Whether various tests have been conducted │ │ │ │ │ │ │
│ │ -Appropriate material usage and management status │ │ │ │ │ │ │
│ │ - Whether residual parts are reused │ │ │ │ │ │ │
│ │ - Use of traditional tools and implementation of traditional techniques │ │ │ │ │ │ │
├───────┼─────────────────────────┼──┼───┼────┼────┼────┼──┤
│4. Process Control │○ Process Control │15 │ │ │ │ │ │
│ │ - Whether to prepare and manage work schedules │ │ │ │ │ │ │
│ │ - Actual Performance Compared to Overall Plan During National Heritage Restoration Period │ │ │ │ │ │ │
│ │ - Difficulty of the process, including surrounding conditions of the national heritage repair site │ │ │ │ │ │ │
├───────┼─────────────────────────┼──┼───┼────┼────┼────┼──┤
│5. Safety and Environment │○ Establishment and Implementation of Safety Management Plan │10 │ │ │ │ │ │
│Management │ - Implementation of safety management training, installation of danger and safety signs │ │ │ │ │ │ │
│ │ - Number of safety accidents │ │ │ │ │ │ │
│ │○ Establishment and Implementation of Environmental Management Plan │ │ │ │ │ │ │
│ │ - Current Status of Waste Management Generated on-site │ │ │ │ │ │ │
│ │ - Whether the surrounding environment is damaged │ │ │ │ │ │ │
├───────┼─────────────────────────┼──┼───┼────┼────┼────┼──┤
│6. Site Management │○ Site Management │10 │ │ │ │ │ │
│ │ - Status of Implementation of Instructions by the Client and National Heritage Supervisor │ │ │ │ │ │ │
│ │ - Whether the personnel deployment for site management is appropriate │ │ │ │ │ │ │
│ │ - Condition of materials and site organization │ │ │ │ │ │ │
│ │ - Whether complaints occurred due to negligence in on-site management │ │ │ │ │ │ │
├───────┼─────────────────────────┼──┼───┼────┼────┼────┼──┤
│7. Report │○ Report Writing │10 │ │ │ │ │ │
│ Write │ - Completeness of investigation records, including surveys of current conditions, original form, and structural components │ │ │ │ │ │ │
│ │Status │ │ │ │ │ │ │
│ │ - Completeness of records regarding detailed construction contents, etc. │ │ │ │ │ │ │
│ │ - Status of various data organization │ │ │ │ │ │ │
├───────┴─────────────────────────┴──┴───┴────┴────┴────┼──┤
│sum Total │ │
└───────────────────────────────────────────────────────┴──┘
210mm×297mm[White paper (120g/㎡) or White paper (80g/㎡)]
(Back)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
◎ Criteria for Assigning Bonus and Subtraction Points
┌──────────────────────────┬────┬────┬───────┬──────┐
│RED For 기 jun │Distribution │Retrospective Period│Fact of Disposition · Date│Deduction and │
│ │ │ │and disposal agency │Additional point │
├──────────────────────────┼────┼────┼───────┼──────┤
│"Act on Contracts to Which the State is a Party" and "Local │- 2.5 points │3Year │ │ │
│Pursuant to the "Act on Contracts to Which Local Governments Are Parties" │ │ │ │ │
│Points are deducted for each time a bidder is restricted from participating in the bid. │ │ │ │ │
├──────────────────────────┼────┼────┼───────┼──────┤
│If national heritage repair work was previously evaluated and its │+1 point │3Year │ │ │
│evaluation score was 90 points or higher, bonus points are awarded for each national heritage repair project │ │ │ │ │
│that received a score of 90 or higher. │ │ │ │ │
├──────────────────────────┼────┼────┼───────┼──────┤
│flat Point │ │ │ │ │
└──────────────────────────┴────┴────┴───────┴──────┘
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Remarks
─────────────────────────────────────────────────────
1. The head of the contracting agency may evaluate by adjusting the scoring and detailed evaluation items according to the characteristics of the national heritage repair.
2. The evaluation score shall be the average of the evaluation scores plus additional and deduction points based on the integrity of the national heritage repair contractor.
─────────────────────────────────────────────────────