Form 5 — 군사기지 및 군사시설 보호법 시행규칙
259363 · 2024-01-22
■ Enforcement Rules of the Military Base and Military Facilities Protection Act [Attachment Form No. 5] <Amended Feb. 3, 2020>
<Front>
Name of Administrative Agency
Receive
(Diesel)
Title Consultation regarding dispositions, etc. by administrative agencies
────┬─────────────┬────────────
Applicant│ ①Name │ ②DateOfBirth
├─────────────┴────────────
│ ③Address
│
────┴──────────────────────────
────┬──────────────────────────
Consultation │ ④Location
Overview ├──────────────────────────
│ ⑤Business Objective
│
├──────────────────────────
│ ⑥Project Scale
│
├──────────────────────────
│ ⑦Project Period
────┴──────────────────────────
Pursuant to Article 13 of the Military Bases and Military Facilities Protection Act and Article 7 of its Enforcement Rule,
I hereby request the consultation described above and ask that the results be communicated.
Drafting Officer Approver
Cooperator
Enforcement ( . . ) Receipt ( .
. )
210mm×297mm[White paper 80g/㎡ or medium paper 80g/㎡]
<Back>
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
───┬────────────────────────────────────────────┬─────
equipped│ 1. One copy of a location map (a topographic map at a scale of 1:50,000, 1:25,000, or 1:5,000; or, for fisheries, │Fee
Documents│ a fishing-ground map at a scale of 1:25,000). │None
│ 2. Business Plan Overview (1 copy) │
│ 3. One copy of the cadastral map or forest map showing the planning area │
│ 4. Layout plan and floor plan (summary) 1 copy (limited to housing or other structures) │
│ 5. One copy of the elevation (summary) of the facility (limited to houses or other structures, including all obstacles │
│ Maximum height must be indicated) │
│ 6. Plan for Change of Ground Surface (Elevation) 1 copy │
───┴────────────────────────────────────────────┴─────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
How to fill out
──────────────────────────────────────────────────────
⑥ The Business Scale section is completed as follows.
1. Construction of new or expanded housing or installation of structures: Site area, building area (floor plan), etc.
2. Installation or alteration of roads, railways, bridges, canals, tunnels, waterways, buried structures, etc., and their ancillary structures: width, length, height (depth) from the existing area, change
After magnitude
3. Reclamation and dredging of rivers or sea surfaces and construction or alteration of harbors: width, length, height (depth) from the existing area, scale after alteration
4. Extraction of minerals, soil, or sand: Regional area, types extracted, quantity extracted
5. Coastal Excavation: Area, Scale After Change
6. Afforestation or Timber Harvesting: Area, Tree Species, Number of Planted Trees, Number of Harvested Trees
7. Reclamation of land or alteration of topography: Area, elevation from existing area
8. Installation or alteration of submarine structures: Width, length, depth, dimensions after alteration
9. Installation and Use of Communication Facilities: Area, Facilities, or Distance of Use
10. Firing of firearms or explosion of explosives: Amount of explosives, number of rounds fired
11. Shipping Operations: Operating Routes, Frequency of Operations (Daily, Monthly)
12. Establishment of fishing rights, capture or harvesting of aquatic animals and plants: Area, daily catch, harvesting amount
13. Installation or alteration of buoys, standing markers, and other signs: area, height, scale, scale after alteration
──────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
ProcessingProcedure
──────────────────────────────────────────────────────
┌─────────┐ ┌──────────────┐ ┌─────┐
│Request for Consultation │?│Protection of Military Bases and Facilities │?│Result Notification │
│ │ │Decision │ │ │
└─────────┘ └──────────────┘ └─────┘
Head of relevant administrative agency Commander of the competent unit etc.
──────────────────────────────────────────────────────
210mm×297mm[White paper 80g/㎡ or Medium paper 80g/㎡]