Form 5 — 군사기지 및 군사시설 보호법 시행규칙

259363 · 2024-01-22

■ Enforcement Rules of the Military Base and Military Facilities Protection Act [Attachment Form No. 5] <Amended Feb. 3, 2020> <Front> Name of Administrative Agency Receive (Diesel) Title Consultation regarding dispositions, etc. by administrative agencies ────┬─────────────┬──────────── Applicant│ ①Name │ ②DateOfBirth ├─────────────┴──────────── │ ③Address │ ────┴────────────────────────── ────┬────────────────────────── Consultation │ ④Location Overview ├────────────────────────── │ ⑤Business Objective │ ├────────────────────────── │ ⑥Project Scale │ ├────────────────────────── │ ⑦Project Period ────┴────────────────────────── Pursuant to Article 13 of the Military Bases and Military Facilities Protection Act and Article 7 of its Enforcement Rule, I hereby request the consultation described above and ask that the results be communicated. Drafting Officer Approver Cooperator Enforcement ( . . ) Receipt ( . . ) 210mm×297mm[White paper 80g/㎡ or medium paper 80g/㎡] <Back> ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ───┬────────────────────────────────────────────┬───── equipped│ 1. One copy of a location map (a topographic map at a scale of 1:50,000, 1:25,000, or 1:5,000; or, for fisheries, │Fee Documents│ a fishing-ground map at a scale of 1:25,000). │None │ 2. Business Plan Overview (1 copy) │ │ 3. One copy of the cadastral map or forest map showing the planning area │ │ 4. Layout plan and floor plan (summary) 1 copy (limited to housing or other structures) │ │ 5. One copy of the elevation (summary) of the facility (limited to houses or other structures, including all obstacles │ │ Maximum height must be indicated) │ │ 6. Plan for Change of Ground Surface (Elevation) 1 copy │ ───┴────────────────────────────────────────────┴───── ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ How to fill out ────────────────────────────────────────────────────── ⑥ The Business Scale section is completed as follows. 1. Construction of new or expanded housing or installation of structures: Site area, building area (floor plan), etc. 2. Installation or alteration of roads, railways, bridges, canals, tunnels, waterways, buried structures, etc., and their ancillary structures: width, length, height (depth) from the existing area, change After magnitude 3. Reclamation and dredging of rivers or sea surfaces and construction or alteration of harbors: width, length, height (depth) from the existing area, scale after alteration 4. Extraction of minerals, soil, or sand: Regional area, types extracted, quantity extracted 5. Coastal Excavation: Area, Scale After Change 6. Afforestation or Timber Harvesting: Area, Tree Species, Number of Planted Trees, Number of Harvested Trees 7. Reclamation of land or alteration of topography: Area, elevation from existing area 8. Installation or alteration of submarine structures: Width, length, depth, dimensions after alteration 9. Installation and Use of Communication Facilities: Area, Facilities, or Distance of Use 10. Firing of firearms or explosion of explosives: Amount of explosives, number of rounds fired 11. Shipping Operations: Operating Routes, Frequency of Operations (Daily, Monthly) 12. Establishment of fishing rights, capture or harvesting of aquatic animals and plants: Area, daily catch, harvesting amount 13. Installation or alteration of buoys, standing markers, and other signs: area, height, scale, scale after alteration ────────────────────────────────────────────────────── ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ProcessingProcedure ────────────────────────────────────────────────────── ┌─────────┐ ┌──────────────┐ ┌─────┐ │Request for Consultation │?│Protection of Military Bases and Facilities │?│Result Notification │ │ │ │Decision │ │ │ └─────────┘ └──────────────┘ └─────┘ Head of relevant administrative agency Commander of the competent unit etc. ────────────────────────────────────────────────────── 210mm×297mm[White paper 80g/㎡ or Medium paper 80g/㎡]