Form 41 — 위험물안전관리법 시행규칙
287841 · 2026-07-01
■ Enforcement Rules of the Dangerous Goods Safety Management Act [Form No. 41] <Amended July 13, 2021>
Application for Extension of Structural Safety Inspection Period for Specific and Semi-Specific Outdoor Tank Storage Facilities
(Situation regarding storage management of hazardous materials, etc.)
※ Please read the instructions on the back before filling out the form, and [ ] mark the applicable box with a check mark. (front)
──────────────┬─────┬────────────────┬───────────────────────────────
Receipt Number │Reception Date │Processing Date │Processing Period TestPeriod
│ │ │ +15 days
──────────────┴─────┴────────────────┴───────────────────────────────
──────────┬──────────────────────────────────────────────────────────
Installer │Name
├──────────────────────┬───────────────────────────────────
│Address │Telephone Number
──────────┼──────────────────────┼───────────────────────────────────
InstallationLocation │ │Tank Number
│ │
──────────┼──────────────────────┴───────────────────────────────────
CompletionDate │Year month day
──────────┼──────────────────────────────────────────────────────────
InstallationPermit │Year month / First 호
Date and provisional number │
──────────┼──────────────────────────────────────────────────────────
Storage of hazardous materials │
Type, Product Name, Chemical Name│
──────────┼──────────────────────────────────────────────────────────
MaximumStorageQuantity │ ℓ
──────────┼──────────────────────────────────────────────────────────
Management of moisture, etc. │Roof type (Fixed [ ] ㆍ Non-fixed [ ]) / *Management of moisture, etc. (Presence [ ]ㆍAbsence [ ])
──────────┼──────────────────────────────────────────────────────────
Storage of hazardous materials │U[ ] No[ ]
Corrosive │
──────────┼─────────────────────────────────┬────────────────────────
SaveCondition │Oil type, storage temperature, inert gas sealing, etc., have a significant influence on the occurrence of corrosion │U[ ] No[ ]
│Scheduled change to affecting storage conditions │
──────────┴─────────────────────────────────┴────────────────────────
──────────┬───┬─────────────────┬───┬────────────────────────────────
*Tank Corrosion Rate │Annula│Design Plate Thickness │bottom version│Design Plate Thickness
│plate thickness│mm │two To│mm
│ ├─────────────────┤ ├────────────────────────────────
│ │MinimumPlateThickness │ │Average value of minimum measured plate thickness
│ │mm │ │mm
│ ├─────────────────┤ ├────────────────────────────────
│ │Years elapsed of plate with maximum corrosion rate │ │of the plate with the maximum corrosion rate
│ │Year │ │YearsElapsed Year
│ ├─────────────────┤ ├────────────────────────────────
│ │Corrosion rate │ │Corrosion rate
│ │mm/year │ │mm/year
──────────┼───┴─────────────────┼───┴────────────────────────────────
*Outer surface of tank bottom │External surface protection measure │Rainwater Infiltration Prevention Measures
Corrosion Prevention Measures │Asphalt Sand[ ] Electrical Catalytic Reduction[ ] Others[ ]│Conformed[ ] Nonconformed[ ]
──────────┼─────────────────────┴────────────────────────────────────
Next Open Circuit Board │Next scheduled opening date
ThicknessEstimate ├─────────────────────┬────────────────────────────────────
│Estimated thickness of annular plate │Estimated thickness of the base plate
│mm │mm
──────────┼─────────────────────┼────────────────────────────────────
*Maintenance ㆍ Modification │Verification of the appropriateness of remuneration │Presence or absence of harmful deformation
│ Conforms[ ] Nonconforms[ ] │U[ ] No[ ]
──────────┼─────────────────────┴────────────────────────────────────
*Bu Etc. Subside Lower │Ratio to maximum tank diameter
──────────┼──────────────────────────────────────────────────────────
*Bearing Capacity·Settlement │Average settlement
│㎜/year
──────────┼──────────────────────────────────────────────────────────
MaintenanceSystem │Occurrence of accidents attributable to the maintenance of specific or semi-specific outdoor tanks over the past 3 years U[ ] No[ ]
├──────────────────────────────────────────────────────────
│Orders for measures under Article 14, Paragraph 2 of the "Dangerous Goods Safety Management Act" for the past 3 years U[ ] No[ ]
├──────────────────────────────────────────────────────────
│Violation of Article 17 or 18 of the "Dangerous Goods Safety Management Act" U[ ] No[ ]
├──────────────────────────────────────────────────────────
│*Suitability of Education and Training for Safety Management Personnel U[ ] No[ ]
├──────────────────────────────────────────────────────────
│* Patrols and Inspections for Safety Management U[ ] No[ ]
──────────┴──────────────────────────────────────────────────────────
Pursuant to Article 65(3) of the Enforcement Rules of the Dangerous Goods Safety Management Act, I hereby apply for an extension of the time for the structural safety inspection of the specified or quasi-specified outdoor tank storage facility
.
Year month day
Applicant (Signature or seal)
To the President of the Korea Fire Industry & Technology Institute
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
210mm×297mm[White paper (80g/㎡) or medium paper (80g/㎡)]
(rear)
━━━━━━━━━━━━━━━━━━━━━━━━
━━━━━━━━━━━━━━━━━━━━━━━━
WritingMethod
────────────────────────
1. For a corporation, enter the company name (including the corporate registration number and the name of the representative) in the name field and the location of the principal office in the address field.
2. For fields marked with "*", attach drawings, materials, etc. necessary to verify the relevant content.
────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━
processing procedure
────────────────────────
This application will be processed as follows.
─────────┬──────────────
Applicant │ProcessingInstitution
├──────────────
│Korea Fire Industry & Technology Institute (Hazardous Materials Department)
─────────┼──────────────
│
┌──┐ │ ┌─────────┐
│Application│ │ ▶│Receipt │
│ ├───┼─ │ │
│ │ │ │ │
└──┘ │ └───────┬─┘
│ │
│
│ ▼
│ ┌─────────┐
│ │Review │
│ └────────┬┘
│ │
│
│ ▼
│ ┌─────────┐
│ │SiteVerification │
│ └────────┬┘
│ │
│
│ ▼
┌────┐ │ ┌─────────┐
│Notify │◀ │ │Decision on extension │
│ │ ─┼──┤ │
│ │ │ │ │
└────┘ │ └─────────┘
│
─────────┴──────────────