■ Enforcement Rules of the Dangerous Goods Safety Management Act [Attachment Form No. 18] <Amended May 20, 2024>
Outdoor Tank Storage[ ] Technical Review Application
Rock Tank Storage[ ]
※ Please read the instructions on the back before filling out the form, and [ ] with a check mark (√). (front)
────────────┬─────────────────┬────────────────────────────
Receipt Number │Date of Receipt │Processing Period For installation permit: 30 days
│ │ For permission to change: 20 days
────────────┼─────────────────┼────────────────────────────
ReviewNumber │ReviewDate │
────────────┴─────────────────┴────────────────────────────
────────────┬──────────────────────────────────────────────
Installer │Name
├──────────────────────────────────────────────
│Address
│ (Phone Number : )
────────────┴──────────────────────────────────────────────
────────────┬──────────────────────────────────────────────
InstallationLocation │
────────────┼────────────────┬─────────────────────────────
Tank Identification and Specifications │Facility Number │Internal volume of the tank
────────────┼────────────────┼─────────────────────────────
Classification and Name of Hazardous Materials │ │Multiplier of specified quantity ship
(Specified Quantity) and Max Quantity│ │
────────────┼────────────────┴─────────────────────────────
of location, structure and facilities │
Based │
────────────┼──────────────────────────────────────────────
of location, structure and facilities │
Overview │
────────────┼──────────────────────────────────────────────
Storage and Handling of Hazardous Materials │
Overview of the Method │
────────────┼────────────────┬─────────────────────────────
Scheduled Start Date │ Year month day │ScheduledCompletionYearMonthDate
│ │ Year month day
────────────┼────────────────┴─────────────────────────────
Other Matters │
────────────┴──────────────────────────────────────────────
I hereby apply for a technical review pursuant to Article 6, Paragraph 3 of the Enforcement Decree of the Dangerous Goods Safety Management Act.
Year month day
Applicant Address
(PhoneNumber )
Name (Signature or seal)
President of Korea Fire Industry Technology Institute Your
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
─────┬────────────────────────────────────┬────────────────
Attached Documents│See back │Fee
│(If you intend to change the repository that underwent technical review at the time of installation approval, the changed part and │
│(Limited to related documents) │「Enforcement Rules of the Dangerous Goods Safety Management Act」
│ │To Item 2(a) or (b) of Attached Table 25
│ │따른 금액
─────┴────────────────────────────────────┴────────────────
210mm×297mm[White paper (80g/㎡) or medium paper (80g/㎡)]
(rear)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Attached Documents
─────────────────────────────────
1. In the case of an outdoor tank storage facility with a capacity of 500,000 liters or more, the foundation, ground, and
Design drawings of the tank body, construction plan, construction schedule, geological survey data, and other necessary materials regarding the foundation and ground, and specifications regarding welded parts
and other documents concerning the tank
2. In the case of a rock cavern tank storage facility, design documents, construction plans, and construction work for the tank body, tunnels, piping, and other facilities of the rock cavern tank said thereis
Markers and Geological and Hydraulic Survey Reports
3. Underground tank (cylindrical tank in which the bottom is below the ground surface and the top is above the ground surface, and the highest liquid level of hazardous materials within the tank is below the ground surface
In the case of a vertical type hazardous material tank) the design documents, construction plan, construction schedule, and of the ground and tank body of the relevant underground tank
Ground data such as geological survey data
4. Marine tank [referring to a hazardous materials tank stationary at the same location at sea and connected to facilities and piping installed on land]
In the case of the tank body, stationary facilities (referring to facilities for stationaryizing the offshore tank in the same location), and other facilities of the offshore tank, the installation of the tank body, stationary facilities (referring to facilities for stationaryizing the offshore tank in the same location)
General Drawings, Construction Plan and Construction Schedule
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
How to write
─────────────────────────────────
1. For a corporation, write the company name (including corporate registration number and representative's name) in the name field, and the location of the principal office in the address field.
2. When specifying the product name (designated quantity), if the designated quantity of the relevant hazardous material is not clear from the product name alone ( ) corresponding to the designation within
Enter the quantity.
3. When applying for a technical review related to a change permit, write an overview of the changes in the "Other Matters" section.
4. The shaded parts are not written.
─────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
ProcessingProcedure
─────────────────────────────────
This application will be processed as follows.
───────┬─────────────────────────
Applicant │ProcessingInstitution
├─────────────────────────
│Korea Fire Industry & Technology Institute (Hazardous Materials Department)
───────┼─────────────────────────
│
┌──┐ │ ┌────────┐
│Application│ │ ▶│Receipt │
│ ├──┼───────────── │ │
│ │ │ │ │
└──┘ │ └┬───────┘
│ │
│
│▼
│ ┌────────┐
│ │Technical Review │
│ │ │
│ │ │
│ └┬───────┘
│ │
│
│▼
│ ┌────────┐
│ │Suitability Decision │
│ │ │
│ │ │
│ └┬───────┘
│ │
│
│▼
┌──┐ │ ┌────────┐
│Issuance│◀ │ │Preparation of Technical Review Report │
│ │ ─┼──────────────┤ │
│ │ │ │ │
└──┘ │ └────────┘
│
───────┴─────────────────────────