Form 17 — 위험물안전관리법 시행규칙
287841 · 2026-07-01
■ Enforcement Rules of the Dangerous Goods Safety Management Act [Form No. 17-2] <Amended Jan. 27, 2016>
[ ] Manufacturing Facility Application for Technical Review
[ ] General Handling Facility
Note: Read the instructions on the reverse before completing the form; mark the applicable [ ] box. ] with a check mark (√). (front)
────────────┬─────────────────┬────────────────────────────
Receipt Number │Date of Receipt │Processing Period For installation permit: 30 days
│ │ For permission to change: 20 days
────────────┼─────────────────┼────────────────────────────
Review Number │Date of Review │
────────────┴─────────────────┴────────────────────────────
────────────┬──────────────────────────────────────────────
Installer │Name
├──────────────────────────────────────────────
│Address
│ (Phone Number : )
────────────┴──────────────────────────────────────────────
────────────┬──────────────────────────────────────────────
Installation Location │
────────────┼────────────────┬─────────────────────────────
Classification and Name of Hazardous Materials │ │Multiple of the Designated Quantity times
(Designated Quantity) and Maximum Quantity│ │
────────────┼────────────────┴─────────────────────────────
Standards for the Location, Structure and Equipment. │
│
────────────┼──────────────────────────────────────────────
Location, Structure and Equipment │
Overview │
────────────┼──────────────────────────────────────────────
Storage and Handling of Hazardous Materials │
Overview of the Method │
────────────┼────────────────┬─────────────────────────────
Scheduled Start Date │ Year month day │ScheduledCompletionYearMonthDate
│ │ Year month day
────────────┼────────────────┴─────────────────────────────
Other Matters │
────────────┴──────────────────────────────────────────────
I hereby apply for a technical review pursuant to Article 6, Paragraph 3 of the Enforcement Decree of the Dangerous Goods Safety Management Act.
Year month day
Applicant Address
(PhoneNumber )
Name (Signature or seal)
President of Korea Fire Industry Technology Institute To the Addressee
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
─────┬────────────────────────────────────┬────────────────
Attached Documents│See back │Fee
│(When applying to change a storage facility for which a technical review was performed in connection with installation permission, only documents relating to the changes shall be submitted.) │
│ │Fee: The amount prescribed in Annex 25, item 2(a) or (b), of the Enforcement Rules of the Dangerous Goods Safety Management Act.
│ │
│ │
─────┴────────────────────────────────────┴────────────────
210mm×297mm[White paper (80g/㎡) or medium paper (80g/㎡)]
(rear)
━━━━━━━━━━━━━━━━━━
━━━━━━━━━━━━━━━━━━
Attached Documents
──────────────────
1. Drawings relating to the location, structure, and facilities of a manufacturing plant, etc., specifying the matters of each of the following items
a. In cases where there is a part within the building where the relevant manufacturing facility, etc. is installed that is not used for the purpose of the manufacturing facility, etc., the layout and structure of such part
b. The arrangement of the buildings, structures, machinery, equipment and other facilities constituting the manufacturing facility or general handling facility, including an outline of the process.
c. The structures of buildings, structures, machinery, equipment and other facilities used to store or handle hazardous materials at the relevant establishment (in the case of a refueling station, including the structures of the buildings and other works prescribed in each item of item 1 of Annex 13 to the Enforcement Rules of the Dangerous Goods Safety Management Act).
d. Overview of electrical equipment, lightning protection equipment, fire extinguishing equipment, alarm equipment, and evacuation equipment installed in the relevant manufacturing facility, etc.
e. An outline of emergency-response equipment, including pressure safety devices, leak inspection equipment and emergency shutoff valves
2. Specification of Structure and Equipment in accordance with Forms No. 3 through No. 15 of the Enforcement Rules of the Dangerous Goods Safety Management Act corresponding to the relevant manufacturing facility, etc.
3. In the case of manufacturing facilities, etc., where fire extinguishing equipment (excluding fire extinguishing devices) is installed, the design documents of the relevant equipment
4. In the case of manufacturing facilities, etc. where fire detection equipment is installed, the design documents of the said equipment
──────────────────
━━━━━━━━━━━━━━━━━━
Instructions for Completing the Form
──────────────────
1. For a corporation, write the company name (including corporate registration number and representative's name) in the name field, and the location of the principal office in the address field.
2. When entering the name (designated quantity) of hazardous materials, if the designated quantity cannot be determined from the name alone, enter the applicable designated quantity in parentheses.
3. When applying for a technical review related to a change permit, write an overview of the changes in the "Other Matters" section.
4. Do not write in the shaded fields.
──────────────────
━━━━━━━━━━━━━━━━━━
Processing Procedure
──────────────────
This application will be processed as follows.
───────┬──────────
Applicant │Processing Agency
├──────────
│Korea Fire Industry & Technology Institute (Hazardous Materials Department)
───────┼──────────
│
┌──┐ │ ┌─────┐
│Application│ │ ▶│Receipt │
│ │ │ │ │
│ ├──┼─ │ │
│ │ │ │ │
└──┘ │ └───┬─┘
│ │
│
│ ▼
│ ┌─────┐
│ │Technical Review │
│ │ │
│ │ │
│ └───┬─┘
│ │
│
│ ▼
│ ┌─────┐
│ │Determination of Compliance │
│ │ │
│ │ │
│ └───┬─┘
│ │
│
│ ▼
┌──┐ │ ┌─────┐
│Issuance│◀ │ │Preparation of Technical Review Report│
│ │ ─┼──┤ │
│ │ │ │ │
└──┘ │ └─────┘
│
───────┴──────────