Form 3 — 소방시설 설치 및 관리에 관한 법률 시행규칙

287831 · 2026-07-01

■ Enforcement Rules of the Act on the Installation and Management of Firefighting Facilities [Attachment Form No. 3] Performance-Based Design Review and Evaluation Report ※ [ ]. ────────────────────────────────────────────────── ──────┬────────────────┬────────────────────────── Object │Object │Use Status ├────────────────┴────────────────────────── │Location ├─────────────────────────────────────────── │Site Area ㎡ Gross Floor Area ㎡ Building Area ㎡ ├─────────────────────────────────────────── │Scale Underground Floor, Ground floor, buildings ──────┴─────────────────────────────────────────── ──────┬─────────────────────────────────────────── Review·Evaluation│ Field │ ──────┼─────────────────────────────────────────── Review·Evaluation│ Opinion │ │ Result │Acceptance │(Adoption of Original) If there are no modifications or the modifications to the contents of the report (drawings, etc.) are minor, it is accepted as originally submitted Classification │ │(Supple mentation) If the performance-based design evaluation team or Central Fire Technology Deliberation Committee requires supplementation after review and evaluation, │ │the report shall be accepted upon completion of supplementation (within a supplementation period of 21 days). ├───┼─────────────────────────────────────── │Non-acceptance│(Reconsideration) Where the evaluation team or committee's review and evaluation │ │requires supplementation that cannot be completed within a short period. │ │(Re jection) Where the evaluation team or committee's review and evaluation │ │finds that the design violates firefighting or building laws or does not meet evaluation criteria. │ │. ──────┼───┴───────────┬─────────────────────────── Result │Acceptance │Non-acceptance │ │ │[ ] Original Proposal Adopted [ ]Bo Completion │[ ] Reconsideration [ ] Rejected ──────┴───────────────┴─────────────────────────── ────────────────────────────────────────────────── These are the results of the review and evaluation of performance-based design under Article 8(5) of the Act on the Installation and Management of Firefighting Facilities and Article 5(2) of its Enforcement Rules. Year month day ───────────┬────────────────────────────────────── Head (Member) of Evaluation Team │(Signature or seal) ───────────┴────────────────────────────────────── ────────────────────────────────────────────────── 210mm×297mm[White paper (80g/㎡) or medium paper (80g/㎡)]