Form 3 — 소방시설 설치 및 관리에 관한 법률 시행규칙
287831 · 2026-07-01
■ Enforcement Rules of the Act on the Installation and Management of Firefighting Facilities [Attachment Form No. 3]
Performance-Based Design Review and Evaluation Report
※ [ ].
──────────────────────────────────────────────────
──────┬────────────────┬──────────────────────────
Object │Object │Use
Status ├────────────────┴──────────────────────────
│Location
├───────────────────────────────────────────
│Site Area ㎡ Gross Floor Area ㎡ Building Area ㎡
├───────────────────────────────────────────
│Scale Underground Floor, Ground floor, buildings
──────┴───────────────────────────────────────────
──────┬───────────────────────────────────────────
Review·Evaluation│
Field │
──────┼───────────────────────────────────────────
Review·Evaluation│
Opinion │
│
Result │Acceptance │(Adoption of Original) If there are no modifications or the modifications to the contents of the report (drawings, etc.) are minor, it is accepted as originally submitted
Classification │ │(Supple mentation) If the performance-based design evaluation team or Central Fire Technology Deliberation Committee requires supplementation after review and evaluation,
│ │the report shall be accepted upon completion of supplementation (within a supplementation period of 21 days).
├───┼───────────────────────────────────────
│Non-acceptance│(Reconsideration) Where the evaluation team or committee's review and evaluation
│ │requires supplementation that cannot be completed within a short period.
│ │(Re jection) Where the evaluation team or committee's review and evaluation
│ │finds that the design violates firefighting or building laws or does not meet evaluation criteria.
│ │.
──────┼───┴───────────┬───────────────────────────
Result │Acceptance │Non-acceptance
│ │
│[ ] Original Proposal Adopted [ ]Bo Completion │[ ] Reconsideration [ ] Rejected
──────┴───────────────┴───────────────────────────
──────────────────────────────────────────────────
These are the results of the review and evaluation of performance-based
design under Article 8(5) of the Act on the Installation and Management of Firefighting Facilities and Article 5(2) of its Enforcement Rules.
Year month day
───────────┬──────────────────────────────────────
Head (Member) of Evaluation Team │(Signature or seal)
───────────┴──────────────────────────────────────
──────────────────────────────────────────────────
210mm×297mm[White paper (80g/㎡) or medium paper (80g/㎡)]