Form 19 — 산지관리법 시행규칙
287565 · 2026-06-24
■ Enforcement Rules of the Mountain Area Management Act [Form No. 19-2] <Amended June 24, 2026>
Request for Consultation on Soil and Rock Extraction, etc.
※ [ Mark the applicable box [ ] with a check (√), and leave dark-shaded fields blank. (Front)
────────┬───────────┬───────────┬───────────────────
Receipt Number │Reception Date │Processing Date │Processing Period
│ │ │ Soil and Rock Extraction Permit (Amendment Permit): 30 days
│ │ │ Notification of Soil and Sand Extraction · Notification of Change in Soil and Rock Extraction · Soil
│ │ │Notification of Change in Soil and Sand Extraction: 15 days
│ │ │ Permit for Extension of Soil and Rock Extraction Period · Soil and Sand Extraction Period
│ │ │Change Report: 10 days
────────┴───────────┴───────────┴───────────────────
───────┬───────────────────────┬────────────────────
Consultation │Institution Name │Contact
Requesting Agency │ │Telephone Number
├───────────────────────┴────────────────────
│Administrative Disposition and Legal Basis
───────┴────────────────────────────────────────────
───────┬───────────────────────┬────────────────────
Consultation │Name │Date of Birth
Requested ├───────────────────────┼────────────────────
business's │Address │Telephone Number
Subject ├───────────────────────┴────────────────────
│Rights regarding the relevant mountain area
───────┴────────────────────────────────────────────
───────┬───────────────────────┬────────────────────
Mountain land │Name │Date of Birth
Owner ├───────────────────────┼────────────────────
│Address │Telephone Number
───────┼───────────────────────┴────────────────────
Location of Mountain Area │
───────┴────────────────────────────────────────────
───────┬──────┬──────────────────────────┬──────────
Mountain Area Included │Soil and Rock (Soil and Sand) │Facilities │Buffer Zone
Area │Extraction Site ├───┬──────┬────┬──────┬───┤
│ │Total │Waste Treatment Plant │Access Road │Management Office │Other │
├──────┼───┼──────┼────┼──────┼───┼──────────
│㎡ │㎡ │㎡ │㎡ │㎡ │㎡ │㎡
───────┴──────┴───┴──────┴────┴──────┴───┴──────────
───────┬─────────────────┬────┬─────────────────────
Extractionㆍ │ │Tree Felling│
Removal Period │ │(Excavation) Period│
───────┴─────────────────┴────┴─────────────────────
───────┬───────┬─────────┬───────────────┬──────────
Soil and Rock (Soil and Sand) │Usage │Types of soil and rock │Quantity Applied For │Extraction Method
Extraction Plan │ │ ├───┬──────┬────┤
│ │ │Reserves│Recoverable Reserves │Incoming Quantity │
├───────┼─────────┼───┼──────┼────┼──────────
│ │ │㎥ │㎥ │㎥ │
───────┴───────┴─────────┴───┴──────┴────┴──────────
───────┬─────────┬────────┬───────────┬─────────────
Tree Felling │Logging (Uprooting) Area│Types of Trees │Number │Wood Volume
(Uprooting) ├─────────┼────────┼───────────┼─────────────
│㎡ │ │Number of Stems │㎥
───────┴─────────┴────────┴───────────┴─────────────
────────────────────────────────────────────────────
Pursuant to Article 25, Paragraph 7 of the Mountain Area Management Act and Article 27 of the Enforcement Rules of the same Act, consultation regarding the extraction of soil and rock, etc., as stated above is required.
Request.
Year month day
Subject of the project for which consultation was requested (Signature or seal)
Name of Institution Requesting Consultation Local governments requested for consultation
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
* Attached documents, matters to be verified by the public official in charge, and fees: See reverse.
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Processing Procedure
────────────────────────────────────────────────────
┌───┐ ┌──┐ ┌──┐ ┌──────┐ ┌──────┐ ┌──────┐ ┌──┐ ┌──┐
│Consultation │ ?│Receipt│ ?│Local│ ?│Restoration Cost Calculation │ ?│Deposit of Restoration Costs │ ?│Deposit of Restoration Costs │ ?│Decision│ ?│Notification│
│Request├─ │ ├─ │Investigation├─ │ ├─ │Notice ├─ │ ├─ │ ├─ │ │
│ │ │ │ │Confirm│ │ │ │ │ │ │ │ │ │ │
└───┘ └──┘ └──┘ └──────┘ └──────┘ └──────┘ └──┘ └──┘
Requesting Agency Local Government Project Entity Requesting Agency Project Entity
────────────────────────────────────────────────────
210㎜×297㎜(White paper 80g/㎡)
(Back)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
──────┬───────────────────────────────────────────────────────
Attached Documents │1. Stone and Soil Extraction Permit (Amendment Permit)
│ a. Business Plan {Current status of permitted soil and rock extraction areas, extraction methods, current status of equipment and technical personnel (limited to stone materials), soil and rock treatment
│the plan (limited to stone materials), annual production and utilization plan, annual soil and rock import plan, and damage prevention plan}
│one copy
│ b. Documents proving ownership or the right to use and profit from the forest land for which permission is sought (which can be verified by a Certificate of Land Registration
│limited to cases where ownership cannot be verified, and the documents proving the right to use and benefit must specify the scope and period of that right
│) one copy. However, where the land is expropriated or used pursuant to Article 19 of the Act on Acquisition of and Compensation for Land, etc. for Public Works
│the documents proving ownership or the right to use and benefit from the mountain area need not be submitted.
│ c. Where two or more persons apply jointly, one copy of a document proving the representative's authority
│ d. Copy of the Aggregate Extraction Business Registration Certificate regarding forest aggregate extraction business (in the case of excavation and extraction of stone for crushed aggregate and extraction of soil for aggregate
│Limited) one copy
│ e. One copy of the Stone Quarrying Business Registration Certificate (limited to the excavation and extraction of stone for construction, crafts, landscaping, and civil engineering purposes)
│ f. A person who has registered for a surveying business pursuant to Article 44, Paragraph 3 of the "Act on the Establishment and Management of Spatial Information, etc." or the "National Spatial Information
│Areas permitted for soil and rock extraction surveyed by the Korea Land and Geospatial Informatics Corporation established pursuant to Article 12 of the Framework Act and the “Enforcement Decree of the Mountain Area Management Act”
│Annual measured maps of quarrying areas with scales from 1:6,000 to 1:1,200, showing buffer zones pursuant to Subparagraph 4 of Attached Table 8
│one copy
│ g. For the volume of soil and rock extraction, a land-area calculation map surveyed by a registered surveying business operator in accordance with Article 44(1)1 of the Act on the Establishment and Management of Spatial Data
│A person registered as a public surveying business or general surveying business pursuant to Article 34, Paragraph 1, Subparagraph 1 or 2 of the Enforcement Decree of the same Act (hereinafter “general
│One copy of the sectional map surveyed by a surveyor (hereinafter referred to as "surveyor, etc.")
│ h. As a forestry technician affiliated with a forestry technical service provider or a forestry project implementing business operator, [regarding] the "Enforcement of the Act on the Promotion and Management of Forestry Technology"
│A forest survey report surveyed and prepared by a person meeting the placement standards for forest survey projects in Annex 5 of the [Ordinance] (type, shape, and b of the forest
│This includes the type of tree, average tree height, and timber volume, and was prepared within two years prior to the permit application date, and there are trees
│is limited to cases) 1 part. However, excavating soil and rocks incidentally produced during the process of mountain land conversion or temporary use
│· Do not submit if you intend to obtain a permit for soil and rock extraction.
│ i. One copy of the restoration plan including restoration work types, methods, and design drawings.
│ j. One copy of an access road design document prepared according to the forest road design and installation standards in Attached Table 2 of the Enforcement Rules of the Act on the Creation and Management of Forest Resources
│One copy of the access road design document
│ k. Quarrying Economic Feasibility Assessment Report (Limited to cases where a quarrying economic feasibility assessment is required pursuant to Article 26, Paragraph 1 of the Mountain Area Management Act
│) one copy
│ l. One copy of an elevation survey report and an average slope survey report prepared by a qualified person (including originals stored on electronic media where elevations and slopes were calculated from digital topographic maps)
│In cases where elevation and average slope have been calculated, it includes storage devices such as disks where the originals are stored) 1 copy. However, mountain land
│To obtain a permit for the extraction of soil and rocks in order to excavate and collect soil and rocks produced incidentally during the process of temporary use of mountain land or mountain land
│, it is not submitted.
│ Forest engineering technologist pursuant to Annex 3 of the Enforcement Decree of the Act on the Promotion and Management of Forest Technology
│ 2) A person who has obtained a qualification of Forestry Engineer, Civil Engineer, Surveying and Geospatial Information Engineer or higher pursuant to the National Technical Qualifications Act
│ 3) After acquiring the qualifications of Industrial Engineer in Forestry, Industrial Engineer in Civil Engineering, or Industrial Engineer in Surveying and Geospatial Information pursuant to the National Technical Qualifications Act
│Person with more than 10 years of experience in the relevant field
│ m. One copy of measures to mitigate landscape damage where a soil and rock extraction permit or modified permit is sought
│One copy of the landscape damage mitigation measures. However, if additional excavation or extraction of soil and rock occurs underground in the permitted area where soil and rock were previously excavated or extracted...
│Cases where deliberation has been conducted pursuant to Article 28, Paragraph 2 of the Natural Environment Conservation Act are excluded.
├───────────────────────────────────────────────────────
│2. Report of Soil Extraction
│ a. Business Plan (including current status of soil extraction reporting area, extraction method, annual production and utilization plan, and damage prevention plan) 1 copy
│ b. Documents proving ownership or the right to use and profit from the forest land to be reported (which cannot be verified by a Certificate of Land Registration
│Limited to cases where the right to use and profit is proven, the scope and period of such right must be specified in the documents.
│) 1 copy. However, to expropriate or use pursuant to Article 19 of the “Act on Acquisition and Compensation of Land, etc. for Public Projects
│excludes documents proving ownership or the right to use and profit in the case of mountainous land.
│ c. In cases where two or more persons file jointly, one copy of a document proving status as the representative
│ d. One copy of the area map surveyed by a general surveyor, etc. regarding the volume of soil and sand to be extracted
├───────────────────────────────────────────────────────
│3. Notification of Change in Soil and Rock Extraction: Documents specified in Annex 3 of the Enforcement Rules of the Mountain Area Management Act. However, "Acquisition and Compensation of Land, etc. for Public Projects
│Proving ownership or the right to use and profit regarding mountain land intended for expropriation or use pursuant to Article 19 of the Act on [Law]
│documents proving ownership or the right to use and profit from mountain land subject to expropriation or use are excluded.
├───────────────────────────────────────────────────────
│4. Notification of Change in Soil Extraction: Documents specified in Annex 3-2 of the Enforcement Rules of the Mountain Area Management Act. However, "Acquisition of land, etc. for public projects and
│documents proving ownership or the right to use and profit from mountain land subject to expropriation or use under Article 19 of that Act are
│documents proving ownership or the right to use and profit are excluded.
├───────────────────────────────────────────────────────
│5. Permit for Extension of Soil and Rock Extraction Period
│ a. One copy of documents proving ownership or the right to use and profit from the forest land for which permission is sought (which can be verified with a Certificate of Land Registration
│Limited to cases where it is not possible, and documents proving the right to use and profit include the scope of the right to use and profit and the period of use and profit
│must be specified)
│ b. One copy of the area map surveyed by a general surveyor, etc. regarding the volume of unextracted earth and stone
│ c. Owners and residents of houses and livestock facilities located within a radius of 300m from the boundary of the project area (those actually residing
│refers to the head of household under the "Resident Registration Act"), owners and representatives of factories and representatives of religious facilities, and one-third of the total number of personnel
│Consent forms from two or more people (if the City/Provincial Governor or Mayor/County Head/District Head extends the soil and rock extraction period, the residents of the nearby area
│Limited to cases where the consent of residents, etc. is deemed necessary due to the anticipated occurrence of disasters such as the sea, and in accordance with the "Environmental Impact Assessment Act"
│, a consent form is not required.)
├───────────────────────────────────────────────────────
│6. Notification of Change in Soil Extraction Period
│ a. One copy of documents proving ownership or the right to use and profit from the forest land to be reported (can be verified with a Certificate of Land Registration
│, documents proving the right to use and profit must include the scope of the right to use and profit and the period of use and profit
│must be specified)
│ b. One copy of the area map surveyed by a general surveyor, etc. regarding the amount of soil that could not be extracted
──────┼───────────────────────────────────────────────────────
Fee │1. Stone Extraction Permit
│ a. If the mountainous area for which a permit is applied is 10,000 square meters or less: 20,000 won
│ b. If the mountainous land area for which a permit is applied exceeds 10,000 square meters: 20,000 won plus 2,000 won for every 1,000 square meters exceeding that area
│Amount added
│2. Report of Soil Extraction: 5,000 won
│3. Permit for Change of Soil and Rock Extraction · Notification of Change of Soil and Rock Extraction · Notification of Change of Soil and Sand Extraction · Permit for Extension of Soil and Rock Extraction Period · Notification of Change of Soil and Sand Extraction Period: None
──────┼───────────────────────────────────────────────────────
Public official in charge│Certificate of Land Registration (Applicable only if the applicant or declarant is the owner of the land)
Items to Be Checked │
──────┴───────────────────────────────────────────────────────