Form 7 — 산지관리법 시행규칙
287565 · 2026-06-24
■ Enforcement Rules of the Mountain Area Management Act [Form No. 7-2] <Amended June 24, 2026>
TTTTTTTTTTTT [ ]Permit Application [ ]Application for Permission to Change [ ]Application for Permission to Extend Period [
(Front)
───────┬──────┬────────┬────────────────────────────────────────────────────
Receipt Number │Reception Date │Processing Date │Processing Period 25 days
│ │ │
│ │ │* Application for Permission to Extend Period 5 days
───────┴──────┴────────┴────────────────────────────────────────────────────
──────┬─────────────┬───────────────────────────────────────────────────────
Applicant │Name │Date of Birth
├─────────────┼───────────────────────────────────────────────────────
│Address │Telephone Number
├─────────────┴───────────────────────────────────────────────────────
│Rights regarding the relevant mountainous area
──────┴─────────────────────────────────────────────────────────────────────
──────┬─────────────┬───────────────────────────────────────────────────────
Mountain land │Name │Date of Birth
Owner ├─────────────┼───────────────────────────────────────────────────────
│Address │Telephone Number
──────┴─────────────┴───────────────────────────────────────────────────────
──────┬───┬──┬──┬───────────────────────────────────────────────────────────
TTemporary Reasonse │Location│Lot No.│Point│Area(㎡)
Mountain Area Details │ │ │ ├──┬────┬─────┬─────────────────────────────────────────────
│ │ │ │Total │For forestry use │For public-interest use │Quasi-conservation
│ │ │ │ │mountainous land │mountainous land │mountainous ST
├───┼──┼──┼──┼────┼─────┼─────────────────────────────────────────────
│Total │ │ │ │ │ │
├───┼──┼──┼──┼────┼─────┼─────────────────────────────────────────────
│ │ │ │ │ │ │
├───┼──┼──┼──┼────┼─────┼─────────────────────────────────────────────
│ │ │ │ │ │ │
──────┼───┴──┴──┴──┴────┴─────┴─────────────────────────────────────────────
TTTTTRT │
Thursday Red │
──────┼──────────┬──────────────────────────────────────────────────────────
TTTTT │Original(New) │Change
Qa 간 ├──────────┼──────────────────────────────────────────────────────────
│ │
──────┼──────────┴──────────────────────────────────────────────────────────
Replacement │ [ Payment prior to permit (Article 19, Paragraph 1 of the Mountain Area Management Act)
Forestry │ [ Payment after permit is granted on the condition that payment is made within the payment deadline (Article 19, Paragraph 2, Subparagraph 1 of the Mountain Area Management Act)
ResourceCreation │ ※ Mark with ∨ in the corresponding box
Payment │
──────┼────┬──────────┬─────────────────────────────────────────────────────
Changes │Before change │after change │Company Reason
├────┼──────────┼─────────────────────────────────────────────────────
│ │ │
├────┼──────────┼─────────────────────────────────────────────────────
│ │ │
──────┴────┴──────────┴─────────────────────────────────────────────────────
Pursuant to Article 15-2, Paragraph 1 of the Mountain Area Management Act and Articles 15-2 and 15-4, Paragraph 2 of the Enforcement Rules of the same Act, the above
T Temporary use at the source [ ]Grant [ ]Change Permit [ ]I am applying for permission to extend the period.
Year month day
Applicant (Signature or seal)
Minister of the Korea Forest Service, City/Provincial Governors, Mayors/County Heads/District Heads,
Director of Regional Forest Service, Director of National Arboretum,
Director of the National Forest Seed Management Center, President of the National Institute of Forest Science, Director of the National Natural Recreation Forest Management Office To
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
* Documents to be submitted by the applicant, matters to be verified by the responsible public official, fees, consent to the joint use of administrative information, and important notes: See reverse.
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Processing Procedure
────────────────────────────────────────────────────────────────────────────
┌───┐ ┌───┐ ┌──┐ ┌───────────┐ ┌──────────┐ ┌─────────┐ ┌───┐ ┌───┐
│Application│ ?│Reception │ ?│Local│ ?│Charge for creation of alternative forest resources and │ ?│Replacement Forest Resource Creation Cost │ ?│Replacement of Forest Resources │ ?│Permit│ ?│Permit│
│ ├─ │ ├─ │Investigation├─ │(Additional)Recovery Cost Calculation ├─ │Payment Notice and (Additional) ├─ │Payment of fees and (additional) ├─ │work last├─ │From Grade│
│ │ │ │ │Confirm│ │※ Application for Permission to Extend Period │ │Recovery Fee Deposit Notice │ │Recovery Fee Deposit │ │ │ │ │
│ │ │ │ │ │ │:Calculation of additional recovery costs only │ │ │ │ │ │ │ │ │
└───┘ └───┘ └──┘ └───────────┘ └──────────┘ └─────────┘ └───┘ └───┘
Applicant Department in charge Applicant Department in charge Applicant
────────────────────────────────────────────────────────────────────────────
210mm×297mm [White paper (80g/㎡) or medium-weight paper (80g/㎡)]
(Rear)
───────┬──────────────────────────────────────────────────────────
Applicant │1. Temporary Reasonse Permit for Mountain Land
Documents to be submitted │ a. Project Plan (Purpose of temporary use of mountain land, project period, land use plan for the mountain land to be temporarily used, timber disposal plan, soil and rock disposal plan
│(Must include plans and damage prevention plans, etc.) 1 copy
│ b. One copy of the report on the results of the feasibility study for forest land conversion pursuant to Article 18-2 of the Mountain Area Management Act. In this case, the said report is subject to the permit
│Refers to the report on the results of a feasibility study for forest land conversion completed within 5 years prior to the application date.
│ c. Documents proving ownership or the right to use and benefit from the mountain land intended for temporary use (where such rights cannot be verified
│Limited to cases where it is not possible, the scope and period of the right to use and profit must be specified in the documents proving the right to use and profit.
│must be specified) 1 copy
│ d. A topographic map with a cadastral scale of 1:25,000 or larger indicating a planned site for temporary mountain use (「Framework Act on Land Reasonse Regulation」
│Pursuant to Article 12, if a database of topographic maps displaying cadastral information has not been established in the National Land Reasonse Information System, or
│and cadastral records, 1 copy of the cadastral map)
│ e. A person who has registered for a surveying business pursuant to Article 44, Paragraph 3 of the "Act on the Establishment and Management of Spatial Information, etc." or a "National Public
│Scales from 1:6,000 to 1:1,200 surveyed by the Korea Land and Geospatial Informatics Corporation, established pursuant to Article 12 of the Framework Act on Geospatial Informatics
│Actual Survey Map of Planned Temporary Mountain Reasonse Site (1 Copy)
│ f. As a forestry technician affiliated with a forestry technology service provider or a forestry project implementing business operator, under the "Act on the Promotion and Management of Forestry Technology"
│A forest survey report surveyed and prepared by a person meeting the placement standards for forest survey projects in Annex 5 of the Enforcement Decree (type of forest, forest type,
│Includes tree types, forest age, average tree height, and timber volume, surveyed and prepared within 2 years prior to the permit application date.
│, and pursuant to Article 4, Paragraph 2, Subparagraph 4 of the Enforcement Rules of the Mountain Area Management Act, the forest survey report
│In cases where [it] has been submitted and the area of the forest land intended for temporary use (in cases where the same person applies for multiple temporary forest land use permits, the purpose of the project
│refers to the aggregate area of mountain land covered by permit applications where the identity of the proposed projects is recognized) is less than 660 square
│meters, submission is not required) 1 copy.
│ g. One copy of a restoration plan containing longitudinal and cross-sectional drawings of the mountain area to be restored, the types and methods of restoration work, and a perspective drawing (where there is land requiring restoration
│Limited to cases where mountainous land exists, and in the case of intending to submit a restoration design plan pursuant to the first part of Article 40, Paragraph 2 of the Mountain Area Management Act
│in lieu of a restoration plan, the restoration design in the application for approval of the restoration design in Annex 40 of the Enforcement Rules of the Mountain Area Management Act
│may be submitted by attaching the restoration design plan).
│ h. An elevation survey report investigated and prepared by a person falling under any of the following (submit only in the case of a solar energy generation facility
│) and average slope survey report (in cases where elevation and average slope were calculated using a digital topographic map, the original saved
│(including storage devices such as disks) 1 copy. However, in accordance with Article 4, Paragraph 2, Subparagraph 5 of the Enforcement Rule of the Mountain Area Management Act, the average slope
│Cases where a survey report has been submitted and the area of forest land intended for temporary use (in cases where the same person has applied for multiple temporary forest land use permits)
│refers to the area calculated by summing the areas of the mountain land for which a permit has been applied, within the scope where the identity of the purpose project is recognized.
│If the area is less than 660 square meters, an average slope survey report is not required.
│ Forest engineering technologist pursuant to Annex 3 of the Enforcement Decree of the Act on the Promotion and Management of Forest Technology
│ 2) A person who has obtained a qualification of Forestry Engineer, Civil Engineer, Surveying and Geospatial Information Engineer or higher pursuant to the National Technical Qualifications Act
│ 3) After acquiring the qualifications of Industrial Engineer in Forestry, Industrial Engineer in Civil Engineering, or Industrial Engineer in Surveying and Geospatial Information pursuant to the National Technical Qualifications Act
│Person with more than 10 years of experience in the relevant field
│ i. Documents corresponding to subparagraph 2) or 3) of Article 10, Paragraph 2, Item 1, Item J of the Enforcement Rules of the Mountain Area Management Act (Article 10, Paragraph 2, Subparagraph 1 of the Enforcement Rules of the Mountain Area Management Act
│(Applicable only in cases where proof of being an agricultural worker under Article 7, Subparagraph 1 is required) 1 copy
│ j. A forestry technician affiliated with a forestry technology service provider who meets the staffing standards for disaster risk
│review projects under Attached Table 5 of the Enforcement Decree of the Act on the Promotion and Management of Forestry Technology and who has surveyed and prepared an opinion pursuant to attached Form No. 4-2 of the Enforcement Rules of the Mountain Area Management Act
│1 copy of the disaster risk review opinion (where the area of mountain land for which temporary use permission is sought is at least 660 square meters but less than 5,000 square
│meters, or where the area of mountain land for which temporary use permission is sought is at least 5,000 square meters and the Natural
│Limited to cases not subject to disaster impact assessment consultation pursuant to Note 1 of Item 2 of Annex 1 of the Enforcement Decree of the Disaster Countermeasures Act
│, provided that if a person applying for a temporary forest land use permit applies for two or more such permits, the temporary forest land use permit
│(It is calculated by summing the areas of adjacent mountainous lands among the applied mountainous lands). However, in any of the following cases:
│a disaster risk review opinion need not be submitted.
│ 1) In the case where documents required for disaster impact assessment consultation under the "Natural Disaster Countermeasures Act" have been submitted
│ 2) Installation of solar energy generation facilities pursuant to Article 2, Subparagraph 2, Item (a) of the "Act on Promotion of Development, Reasontilization, and Dissemination of New and Renewable Energy"
│In the case of seeking a temporary use permit for mountain land to do so, regarding the installation of mountain solar power generation facilities pursuant to Form No. 4-3
│If a disaster risk review opinion has been submitted
│ k. One copy of the documents required for consultation on disaster impact assessment pursuant to the "Natural Disaster Countermeasures Act" (for the mountain land for which a temporary mountain land use permit is to be obtained
│Limited to cases where the area is 5,000 square meters or more, provided that the applicant for a temporary forest land use permit [applies to] two or more temporary forest land use permits
│where two or more temporary mountain area use permits are applied for, the area is calculated by adding together the areas of adjoining mountain land covered by those applications).
│However, cases not subject to disaster impact assessment consultation under the "Natural Disaster Countermeasures Act" are excluded.
│ l. One copy of the Disaster Risk Review Opinion Statement regarding the installation of mountain solar power generation facilities pursuant to Form No. 4-3 (「New Energy and Re
│To install solar energy generation facilities pursuant to Article 2, Subparagraph 2, Item (a) of the Act on the Promotion of Development, Reasontilization, and Dissemination of Renewable Energy, the site
│(Limited to cases where you intend to obtain a trial use license)
│ m. Mountain land intended for temporary use (where the area is at least 300,000 square meters or where wind power generation facilities are to be installed
│One copy of landscape damage mitigation measures prepared by conducting a simulation of the impact on mountain landscapes regarding (limited to cases where ).
│However, if deliberation has been conducted pursuant to Article 28, Paragraph 2 of the Natural Environment Conservation Act, it is not required to be submitted.
│ n. One copy of a pine wilt disease control plan under Article 13-2 of the Special Act on the Control of Pine Wilt Disease (where the relevant mountain land is within a restricted removal zone under Article 9 of the same Act
│Limited to cases where temporary use of mountainous land including a district zone is intended)
├──────────────────────────────────────────────────────────
│2. Permit for Change of Temporary Reasonse of Mountain Land: One copy each of documents proving the fact of change (cases that cannot be confirmed by the Certificate of Land Registration
│(Applies only to Reason)
├──────────────────────────────────────────────────────────
│3. Permit for Extension of Temporary Use Period of Forest Land: One copy of documents proving ownership or the right to use and profit from the forest land (only if this cannot be verified through the
│Land Registration Certificate)
───────┼──────────────────────────────────────────────────────────
Public official in charge │1. Certificate of Land Registration (Applicable only if the applicant is the landowner)
Checklist │2. Livestock Industry Registration Certificate (Applicable only if the applicant must prove they are a farmer)
───────┼──────────────────────────────────────────────────────────
Fee │1. Temporary Use Permit for Mountain Land
│ a. If the permit application area is 10,000 square meters or less: 20,000 won
│ b. If the area for which permission is applied exceeds 10,000 square meters: 20,000 won plus 2,000 won for every 1,000 square meters exceeding that area
│2. Permit for Change of Temporary Use of Mountain Area: None
│2. Permit for Extension of Temporary Use Period: None
───────┴──────────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Consent Form for Joint Use of Administrative Information
──────────────────────────────────────────────────────────────────
I, the undersigned, in relation to the processing of this matter, consent to the public official in charge verifying, through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act,
the Livestock Industry Registration Certificate under Item 2 among the above items to be verified by the public official.
* If the declarant does not consent to verification, a copy of the Livestock Business Registration Certificate must be attached.
Applicant (Signature or seal)
──────────────────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Important Notes
──────────────────────────────────────────────────────────────────
The details of mountain land subject to temporary use may be prepared and submitted as a separate sheet.
──────────────────────────────────────────────────────────────────