■ Enforcement Rules of the Mountain Area Management Act [Attachment Form No. 4-3] <Newly Inserted Dec. 16, 2021>
┏━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓
┃ ┃
┃Opinion on Disaster Risk Review Regarding Installation of Mountain Solar Power Generation Facilities ┃
┃ ┃
┃ ┃
┃ (Front) ┃
┠─────┬──────┬────────────┬──────────┬───────────┨
┃Hazard │Serial number │ │Catchment area (ha) │ ┃
┃Survey Standard Land│ │ │ │ ┃
┠─────┼──────┼────┬───────┼──┬───────┼──┬────────┨
┃General Status │investigation and │Affiliation │ │Qualification│ │Position │ ┃
┃ │Reviewer │ │ │Proof│ │ │ ┃
┃ │ │ │ ├──┼───────┼──┼────────┨
┃ │ │ │ │Qualification│ │Name│ (Seal) ┃
┃ │ │ │ │Number│ │ │ ┃
┃ ├──────┴────┼───────┼──┴───────┼──┴────────┨
┃ │Survey date │ │Contact details │ ┃
┃ ├──────┬────┼───────┴──────────┴───────────┨
┃ │Location │Administrative district│ ┃
┃ │ ├────┼──────────────────────────────┨
┃ │ │GPS │ ┃
┠─────┼──────┼────┼────┬──┬─────┬────┬───┬───────┨
┃Subject to Protection │Protection Facility │[ ] Yes │Protection Facility│ │or │[ ] Yes │Number of Houses│ ┃
┃ │ ├────┤Number of Locations │ │ ├────┤ │ ┃
┃ │ │[ ] No │ │ │ │[ ] No │ │ ┃
┃ ├──────┴────┴────┼──┴─────┴────┴───┴───────┨
┃ │Major Protection Facilities Reasonpstream of Stream (Details)│ ┃
┃ ├────────────────┼─────────────────────────┨
┃ │Major Protection Facilities Downstream of the Stream (Details) │ ┃
┃ ├────────────────┼─────────────────────────┨
┃ │Residential dwellings upstream (details) │ ┃
┃ ├────────────────┼─────────────────────────┨
┃ │Residential dwellings downstream (details) │ ┃
┠─────┼────────────────┴──┬──────────────────────┨
┃Judgment table │Survey on the Status of Areas at Risk of Debris Flows │Survey of Landslide-Prone Areas ┃
┃etc Grade ├─────┬───┬──────┬──┼─────┬────┬───┬───────┨
┃ │On-site Survey │ │Grade │ │On-site Survey │ │Grade │ ┃
┃ │Score │ │ │ │Score │ │ │ ┃
┃ ├─────┼───┤ │ ├─────┼────┤ │ ┃
┃ │Simulation │ │ │ │Slope│ │ │ ┃
┃ │tion Score │ │ │ │Stability Analysis │ │ │ ┃
┃ │ │ │ │ │Score │ │ │ ┃
┠─────┼─────┼───┴──────┼──┴─────┴────┴───┴───────┨
┃Review Opinion │Hazardous Area │Area at Risk of Debris Flow│ ┃
┃ │Reason for Selection ├──────────┼─────────────────────────┨
┃ │ │Area at Risk of Landslides│ ┃
┃ ├─────┼──────────┴─────────────────────────┨
┃ │Specifics │ ┃
┃ ├─────┼────────────────────────────────────┨
┃ │Comprehensive opinion │ ┃
┠─────┼─────┴───┬────────────────────────────────┨
┃Disaster Prevention │Disaster Prevention Facilities │[ ] Yes [ ] No ┃
┃Facility │Installation Required │ ┃
┃ Opinion on Installation ├─────────┼────────────────────────────────┨
┃ │Disaster Prevention Facilities │[ ] Stream Conservation [ ] Erosion Control Dam [ ] Mountain Area Erosion Control ┃
┃ │Types of Installation Projects │ ┃
┃ ├─────────┼────────────────────────────────┨
┃ │Disaster prevention facilities │ ┃
┃ │Reason for Selection of Installation Project │ ┃
┗━━━━━┷━━━━━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛
210mm×297mm[White Paper (80g/㎡)]
(rear)
┏━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓
┃ ┃
┃<How to Write> ┃
┃ ┃
┃1. Regarding mountain land intended for temporary use Landslides pursuant to Item 5 of Attached Table 1-3 and Note 4 ┃
┃An experiential survey is conducted. However, regarding the mountain land intended for conversion within the area subject to the landslide risk assessment survey... ┃
┃In unavoidable cases, such as when the selection is equal to the area, fewer than 4 locations may be selected. ┃
┃ ┃
┃2. As a result of conducting a landslide risk survey, areas with high landslide risk and surrounding slopes and ┃
┃Conduct an additional landslide risk assessment for the valley. ┃
┃ ┃
┃3. The landslide risk assessment must be prepared including the slope stability analysis. ┃
┃ ┃
┃4. In cases where the horizontal projection area of the landslide risk assessment survey target area is less than 100 square meters, the ┃
┃Regarding the entire area of mountain land intended for temporary use without preparing a landslide risk assessment criteria table, disaster ┃
┃A standard site for risk investigation must be selected and prepared. ┃
┗━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛
210mm×297mm[White Paper (80g/㎡)]