Form 16 — 낙동강수계 물관리 및 주민지원 등에 관한 법률 시행규칙
282043 · 2025-12-26
[Attachment Form No. 16] <Revised Jan. 19, 2017>
Pipe Inspection and Repair Results
1. Pipe Inspection
<Pipe Inspection Status>
┌───────┬──────────────┬──────┬──────┬──────┬────┐
│Treatment (Drainage) Zone│ │TestingRegion │ │Target Treatment Plant │ │
├───────┼──────────────┼──────┼──────┼──────┼────┤
│InspectionPeriod │ │Inspector │ │Water system inspected │ │
├───────┼────┬─────────┼──────┼──────┼──────┼────┤
│old minute │Region Name│Treatment (drainage) subdistrict name │TestSubject(m) │Length inspected (m) │Inspection method │Inspection cost│
├───────┼────┼─────────┼──────┼──────┼──────┼────┤
│ │ │ │ │ │ │ │
└───────┴────┴─────────┴──────┴──────┴──────┴────┘
※ The subject treatment plant refers to a public wastewater treatment facility
<Pipe Inspection Results>
┌───────────────────────────────────────────────────────────┐
│Sword tion Conclusion and │
├─┬──┬────┬────┬───┬────┬──┬────┬───┬───┬──┬───┬──┬───┬──┬──┤
│Total│Average│Pipe corrosion │Pipe breakage │Joint│joint │Public│Joint │Manhole section│Infiltration │Adhesion│pipe protrusion│Pipe bend│Intruder│Leak│Sedimentation│
│ │ │and wear │ │Exit │misalign │step│Material Anomaly│or more │Obstacle│ │ │ │ │ │ │
├─┼──┼────┼────┼───┼────┼──┼────┼───┼───┼──┼───┼──┼───┼──┼──┤
│ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │
└─┴──┴────┴────┴───┴────┴──┴────┴───┴───┴──┴───┴──┴───┴──┴──┘
※ The inspection result items are examples and are subject to the selection criteria of the Basin Environmental Office or Regional Environmental Office
※ Average inspection result = number of defective locations / length inspected (m)
2. Repair results
┌───────┬────┬─────┬────┬──────────┬┬─────┬──┐
│Treatment (Drainage) Zone│ │Maintenance Area │ │Treatment plant inspected ││Target Water System │ │
├───────┼────┴─────┴────┼──────────┼┴─────┴──┤
│Maintenance Section │ │Repair personnel │ │
├───────┼────┬─────┬────┼──────────┼────┬────┤
│District minute │Region Name│Processing(Drainage)│MaintenanceTarget│Maintenance Performance │Repair Method│Project cost│
│ │ │Treatment (drainage) │(m) ├─────┬────┤ │ │
│ │ │ │ │Type of work │Performance (m) │ │ │
├───────┼────┼─────┼────┼─────┼────┼────┼────┤
│ │ │ │ │Dredging │ │ │ │
│ │ │ │ │Subdistrict name │ │ │ │
│ │ │ │ │Rehabilitation and repair│ │ │ │
└───────┴────┴─────┴────┴─────┴────┴────┴────┘
※ The classification column of Item 2 must match the classification column of Item 1
3. Expected Effects
┌────────┬──────────────────┬─────────────────┬────────────────────┐
│Category │Maintenance Previous │Maintenance After │Improvement Effect │
│ ├──────┬───────────┼─────┬───────────┼───────┬────────────┤
│ │Target Treatment Plant │End of treatment area (subdistrict) │TargetTreatmentPlant│End of treatment area (subdistrict) │TargetTreatmentPlant │End of treatment area (subdistrict) │
├────────┼──────┼───────────┼─────┼───────────┼───────┼────────────┤
│Unaccounted-for water (L/day) │ │ │ │ │ ( %) │ ( %) │
├────────┼──────┼───────────┼─────┼───────────┼───────┼────────────┤
│Water Quality(BOD mg/L) │ │ │ │ │ ( %) │ ( %) │
└────────┴──────┴───────────┴─────┴───────────┴───────┴────────────┘
※ Improvement in unaccounted-for water equals the quantity before repair minus the quantity after repair; the improvement percentage is that difference divided by the quantity before repair.
※ Improvement in water quality equals the value before repair minus the value after repair; the improvement percentage is that difference divided by the value before repair.
Year month day
Public official in charge (Signature or seal)
Verifying public official (Signature or seal)
297㎜×210㎜(Standard Paper 60g/㎡ (Recycled))