Form 1 — 학교시설사업 촉진법 시행규칙
210529 · 2019-09-17
■ Enforcement Rules of the Act on the Promotion of School Facilities Projects [Attachment Form No. 1] <Amended June 10, 2014>
Application for Approval of School Facility Construction and Approval Certificate
※ Please refer to the instructions and completion guidelines on pages 2 and 3. Do not fill in the dark-colored boxes or the squares. (Page 1 of 3)
─────────────┬───────┬────────────┬────────────────────────────
Receipt Number │Date of Receipt │IssuanceDate │ApprovalNumber □□-□-□□□
─────────────┴───────┴────────────┴────────────────────────────
─────┬───────────────────┬─────────────────────────────────────
BuildingOwner │①Name (Signature or seal) │Date of Birth
├───────────────────┴─────────────────────────────────────
│Address (Phone Number )
─────┴─────────────────────────────────────────────────────────
─────┬───────────────────┬─────────────────────────────────────
Designer │②Name (Signature or seal) │LicenseNumber
├───────────────────┼─────────────────────────────────────
│Office Name │Registration number
├───────────────────┴─────────────────────────────────────
│Address (Phone Number )
─────┴─────────────────────────────────────────────────────────
─────┬─────────────────────────────────────────────────────────
Site Conditions│Position □□-□□□-□□-□□
├───────────────────┬─────────────────────────────────────
│Region □□□ │District □□□
├───────────────────┼─────────────────────────────────────
│Land Category □□ │Area ㎡
─────┴───────────────────┴─────────────────────────────────────
─────┬───────────────────┬─────────────────────────────────────
Use │③Main Use □□□ │④Accessory Use
─────┴───────────────────┴─────────────────────────────────────
─────┬────────────┬─────────┬──────────────────────────────────
Scale │⑤Building Area ㎡ │⑥Gross Floor Area ㎡ │Underground Area ㎡
├────────────┼─────────┼──────────────────────────────────
│⑦Building Coverage Ratio % │⑧Floor Area Ratio % │MaximumBuildingHeight m
├────────────┴─────────┴──────────────────────────────────
│Number of Floors(Above Ground, Underground)
─────┴─────────────────────────────────────────────────────────
────────────────────┬──────────────────────────────────────────
⑨Structure │TypeOfConstruction □
────────────────────┼──────────────────────────────────────────
Scheduled Start Date │ScheduledDateOfCompletionInspection
────────────────────┼───┬──┬───────────────────────────────────
Sewage Treatment Facility │Parking Lot│Indoor│self-propelled Vehicles ㎡
────────────────────┤ │ │Mechanical Vehicles ㎡
BuildingForm │ ├──┼───────────────────────────────────
│ │Outdoor│self-propelled Vehicles ㎡
│ │ │Mechanical Vehicles ㎡
────────────┬───────┴───┴──┴───────┬───────────────────────────
⑩Subject to verification by a Professional Engineer│Structural Engineer Name (Signature or seal) │(Phone )
case ├──────────────────────┼───────────────────────────
│Professional Engineer in Facilities Name (Signature or seal) │(Phone )
────────────┼──────────────────────┴───────────────────────────
BatchProcessingContent │Consultation or approval for the installation of public facilities pursuant to the National Land Use Management Act [ ]
├──────────────────────────────────────────────────
│Permission for acts under the "Urban Planning Act," designation of urban planning project implementers and
│ Approval of Urban Planning Project Implementation Plan [ ]
├──────────────────────────────────────────────────
│Permission for occupation and use of a park under the "Natural Parks Act",
│ Permission for activities within park protection areas and consultation on state projects [ ]
────────────┴──────────────────────────────────────────────────
I hereby apply for approval of the construction of school facilities pursuant to Article 5-2 of the "Act on the Promotion of School Facilities Projects."
Year month day
Applicant (Signature or seal)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
210mm×297mm[White Paper 80g/㎡(Recycled)]
(Page 2 of 3)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
───────┬──────────────────────────────┬────
Applicant │ 1. One copy of the cadastral map proving the scope of the building site │Fee
Submission Documents │ 2. 1 copy of Land Use Plan Confirmation │
│ 3. One copy each of the documents specified in Classification Columns 1 and 3 of Annex 2 of the "Enforcement Rules of the Building Act" │
───────┼──────────────────────────────┼────
Public Official in Charge │ 1. Land (Forest) Register │No ne
Items to Be Verified │ 2. Certified Copy of Land Register │
───────┴──────────────────────────────┴────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Approval Certificate
───────────────────────────────────────────
Approval No. 호
The construction or erection of school facilities specified in this approval certificate and its attachments complies with Article 5-2 of the Act on the Promotion of School Facilities Projects;
accordingly, the construction or erection of the school facilities is hereby approved.
Year month day
(Superintendent of Education / Head of Local Office of Education) (Signature or seal)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Building Approval Application Guide
───────┬────┬─────┬────────────────────────
Submission Location │ │Processing Department │
───────┼────┼─────┼────────────────────────
Fee │NO ne │Processing Period │
───────┼────┴─────┴────────────────────────
Legal Basis │Article 5-2 of the "School Facilities Project Promotion Act" and Article 8 of the Enforcement Decree of the same Act
───────┴───────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
ProcessingProcedure
───────────────────────────────────────────
This application will be processed as follows.
───────────┬───────────────────────────────
Applicant │ProcessingAgency
├───────────────────────────────
│City/Provincial Office of Education
───────────┼───────────────────────────────
│
┌──────┐ │ ┌───────────────────────┐
│Fill out application form │ │ ▶│Receipt 수 │
│ ├──┼── │ │
│ │ │ │ │
└──────┘ │ └────┬──────────────────┘
│ │
│
│ ▼
│ ┌───────────────────────┐
│ │Verification and Review of Required Documents │
│ │ │
│ │ │
│ └────┬──────────────────┘
│ │
│
│ ▼
│ ┌───────────────────────┐
│ │Approval Re │
│ └────┬──────────────────┘
│ │
│
│ ▼
┌──────┐ │ ┌───────────────────────┐
│Notice │◀ │ │Issuance of Approval Certificate │
│ │ ─┼───┤ │
│ │ │ │ │
└──────┘ │ └───────────────────────┘
│
───────────┴───────────────────────────────
(Page 3 of 3)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Overview of the Applied-for School Facilities by Building
─────────────────────────────────
( of pages
────────────┬────────────────────
Main Purpose │Major Structure
───────┬────┴────────────────────
floors │Underground( ) / Above Ground ( )floor
───────┼─┬─┬──────┬─┬─┬───────┬──
Classification │Total│floor│floor │floor│floor│floor │floor
───────┼─┼─┼──────┼─┼─┼───────┼──
Floor Area(㎡)│ │ │ │ │ │ │
───────┼─┼─┼──────┼─┼─┼───────┼──
Usage │ │ │ │ │ │ │
───────┼─┼─┼──────┼─┼─┼───────┼──
Section │floor│floor│floor │floor│floor│floor │floor
───────┼─┼─┼──────┼─┼─┼───────┼──
Floor Area(㎡)│ │ │ │ │ │ │
───────┼─┼─┼──────┼─┼─┼───────┼──
Usage │ │ │ │ │ │ │
───────┼─┼─┼──────┼─┼─┼───────┼──
Section │floor│floor│floor │floor│floor│floor │floor
───────┼─┼─┼──────┼─┼─┼───────┼──
Floor Area(㎡)│ │ │ │ │ │ │
───────┼─┼─┼──────┼─┼─┼───────┼──
Use │ │ │ │ │ │ │
───────┼─┼─┴──────┼─┼─┴───────┼──
Number of direct stairs │units│Number of Passenger Elevators │units│Number of Emergency Elevators │units
───────┴─┴────────┴─┴─────────┴──
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Important Notes
─────────────────────────────────
※ Instructions (Please complete the overview by building for each building separately)
1. Please write your name in columns ①, ②, ⑩ and the applicant section. You may use a signature instead of a seal.
2. The uses in fields ③ and ④ shall be specified under Attached Table 1 of the Enforcement Decree of the Building Act. 'Ancillary use' means a use
essential to a building's main function, occupying less than 50% of the floor area devoted to its principal use and falling within any of the following categories.
These are the relevant uses.
a. Use of building facilities, evacuation and sanitation, and other similar facilities
b. Use of facilities for offices, work, assemblies, goods storage, parking, and other similar purposes
c. Use of employee welfare facilities such as cafeterias, workplace childcare centers, and on-site sports facilities, and on-site incinerators or similar facilities
d. The use of facilities mandated by relevant laws and regulations as ancillary facilities to the primary use
3. 'Building area' in field ⑤ means the projected area enclosed by the centerlines of a building's outer walls or columns; parts of a building not more than 1 meter above ground level
are excluded from building area. Where eaves, awnings, or similar structures project at least 1 meter, the area shall be calculated using a line set back by 1 meter horizontally.
4. ⑥ "Gross floor area" refers to the sum of the floor areas of each floor of a single building.
5. ⑦ "Building Coverage Ratio" is calculated as Building Area ÷ Site Area × 100(%).
6. ⑧ "Floor Area Ratio" is calculated as Gross Floor Area (excluding basement area and ancillary parking area on ground floors) ÷ Site Area × 100 (%).
7. ⑨ "Structure" shall be described as wooden, masonry, reinforced concrete, steel frame, steel-reinforced concrete, or others; provided, however, that in cases where the structures of the walls and the roof are different
should be entered separately.
─────────────────────────────────