Form 16 — 하천법 시행규칙

279021 · 2025-10-01

■ Enforcement Rules of the River Act [Attachment Form No. 16] <Amended Aug. 27, 2021> River Status Register Survey (River Improvement) ┏━━━━━━━┯━━━┯━━━━━━━━━━┯━━━━━━━━┯━━━━━━━━━━━━━━━━━━━━━━━━┯━━━━━━━━━━━┯━━┓ ┃River improvement section │Main river and│Left bank and │River improvement district │Point(Measurement Point) │Water supply area │Remarks┃ ┃ │by branch│By right bank │Name (of levee) ┝━━━━━━━━┯━━━━━━━━━━━━━━━┥ │ ┃ ┃ │ │ │ │Starting point (upstream) │Ending point (downstream) │ │ ┃ ┃ ┝━━━┿━━━━━━━━━━┿━━━━━━━━┿━━━━━━━━┿━━━━━━━━━━━━━━━┿━━━━━━━━━━━┿━━┫ ┃ │ │ │ │ │ │ha │ ┃ ┣━━━━━━━┿━━━┷━━━━━━━━━━┿━━━━━━━━┿━━━━━━━━┷━━━━━━━━━━━━━━━┿━━━━━━━━━━━┿━━┫ ┃Improvement plan │From the river mouth │Plan │Design flood level elevation │Design river width │Remarks┃ ┃Flood Level · River Width │to the end of the levee │Flood discharge ┝━━━━━━━━┯━━━━━━━━━━━━━━━┥ │ ┃ ┃ㆍ │Distance │ │Levee starting point (upstream)│Levee ending point (downstream) │ │ ┃ ┃Other ┝━━━━━━━━━━━━━━┿━━━━━━━━┿━━━━━━━━┿━━━━━━━━━━━━━━━┿━━━━━━━━━━━┿━━┫ ┃ │㎞ │㎥/sec │EL. m │EL. m │m │ ┃ ┣━━━━━━━┿━━━━━━━━━━━━━━┷━━━━━━━━┿━━━━━━━━┷━━━━━━━┯━━━━━━━┷━━━━━━━━━━━┿━━┫ ┃Embankment, revetment │My Room │Ho An │Major Facilities (Excluding Water Retention Facilities) │Remarks┃ ┃and ┝━━━━┯━━━━━━━━━┯━━━━━━━━┿━━┯━━━━━━━━━━┯━━┿━━━┯━━━┯━━┯━━┯━━━━━┿━━┫ ┃MajorFacilities │Length │Dukmaru elevation Mushrooms │of the ridge and ledge │format│구간 │Length│Name │Position │Structure│Scale│InstallationYear │ ┃ ┃ │ │ │Width │ │ │ │or │(station)│ │ │and │ ┃ ┃ │ ┝━━━━┯━━━━┿━━┯━━━━━┥ ┝━━━━━┯━━━━┥ │Type │ │ │ │Installer │ ┃ ┃ │ │Embankment │Embankment │Maru│chin │ │Starting point │Ending point │ │ │ │ │ │ │ ┃ ┃ │ │Starting point │Ending point │ │ │ │(Upstream) │(downstream side)│ │ │ │ │ │ │ ┃ ┃ │ │(upstream side)│(downstream side)│ │ │ │ │ │ │ │ │ │ │ │ ┃ ┃ ┝━━━━┿━━━━┿━━━━┿━━┿━━━━━┿━━┿━━━━━┿━━━━┿━━┿━━━┿━━━┿━━┿━━┿━━━━━┥ ┃ ┃ │m │EL. m │EL. m │m │m │ │ │ │m │ │ │ │ │ │ ┃ ┣━━━━━━━┿━━━━┷━━━━┷━━━━┷━━┷━━━━━┷━━┷━━━━━┷━━━━┷━━┷━━━┷━━━┷━━┷━━┷━━━━━┷━━┫ ┃Main Maintenance │ ┃ ┃MaintenanceItems │ ┃ ┣━━━━━━━┿━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┫ ┃DateCreated │ *Attached Books ┃ ┣━━━━━━━┥1. Plan showing the completed district ┃ ┃ Year month day│2. Standard Cross-section of Embankment ┃ ┃ │3. Drawings of Revetment and Major Facilities ┃ ┃ │ ┃ ┃ │ Prepare one sheet for each river improvement section to add records, and write the construction contractor and construction period in the remarks column. ┃ ┗━━━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ 364㎜×257㎜[White paper(80g/㎡)]