Form 16 — 하천법 시행규칙
279021 · 2025-10-01
■ Enforcement Rules of the River Act [Attachment Form No. 16] <Amended Aug. 27, 2021>
River Status Register Survey (River Improvement)
┏━━━━━━━┯━━━┯━━━━━━━━━━┯━━━━━━━━┯━━━━━━━━━━━━━━━━━━━━━━━━┯━━━━━━━━━━━┯━━┓
┃River improvement section │Main river and│Left bank and │River improvement district │Point(Measurement Point) │Water supply area │Remarks┃
┃ │by branch│By right bank │Name (of levee) ┝━━━━━━━━┯━━━━━━━━━━━━━━━┥ │ ┃
┃ │ │ │ │Starting point (upstream) │Ending point (downstream) │ │ ┃
┃ ┝━━━┿━━━━━━━━━━┿━━━━━━━━┿━━━━━━━━┿━━━━━━━━━━━━━━━┿━━━━━━━━━━━┿━━┫
┃ │ │ │ │ │ │ha │ ┃
┣━━━━━━━┿━━━┷━━━━━━━━━━┿━━━━━━━━┿━━━━━━━━┷━━━━━━━━━━━━━━━┿━━━━━━━━━━━┿━━┫
┃Improvement plan │From the river mouth │Plan │Design flood level elevation │Design river width │Remarks┃
┃Flood Level · River Width │to the end of the levee │Flood discharge ┝━━━━━━━━┯━━━━━━━━━━━━━━━┥ │ ┃
┃ㆍ │Distance │ │Levee starting point (upstream)│Levee ending point (downstream) │ │ ┃
┃Other ┝━━━━━━━━━━━━━━┿━━━━━━━━┿━━━━━━━━┿━━━━━━━━━━━━━━━┿━━━━━━━━━━━┿━━┫
┃ │㎞ │㎥/sec │EL. m │EL. m │m │ ┃
┣━━━━━━━┿━━━━━━━━━━━━━━┷━━━━━━━━┿━━━━━━━━┷━━━━━━━┯━━━━━━━┷━━━━━━━━━━━┿━━┫
┃Embankment, revetment │My Room │Ho An │Major Facilities (Excluding Water Retention Facilities) │Remarks┃
┃and ┝━━━━┯━━━━━━━━━┯━━━━━━━━┿━━┯━━━━━━━━━━┯━━┿━━━┯━━━┯━━┯━━┯━━━━━┿━━┫
┃MajorFacilities │Length │Dukmaru elevation Mushrooms │of the ridge and ledge │format│구간 │Length│Name │Position │Structure│Scale│InstallationYear │ ┃
┃ │ │ │Width │ │ │ │or │(station)│ │ │and │ ┃
┃ │ ┝━━━━┯━━━━┿━━┯━━━━━┥ ┝━━━━━┯━━━━┥ │Type │ │ │ │Installer │ ┃
┃ │ │Embankment │Embankment │Maru│chin │ │Starting point │Ending point │ │ │ │ │ │ │ ┃
┃ │ │Starting point │Ending point │ │ │ │(Upstream) │(downstream side)│ │ │ │ │ │ │ ┃
┃ │ │(upstream side)│(downstream side)│ │ │ │ │ │ │ │ │ │ │ │ ┃
┃ ┝━━━━┿━━━━┿━━━━┿━━┿━━━━━┿━━┿━━━━━┿━━━━┿━━┿━━━┿━━━┿━━┿━━┿━━━━━┥ ┃
┃ │m │EL. m │EL. m │m │m │ │ │ │m │ │ │ │ │ │ ┃
┣━━━━━━━┿━━━━┷━━━━┷━━━━┷━━┷━━━━━┷━━┷━━━━━┷━━━━┷━━┷━━━┷━━━┷━━┷━━┷━━━━━┷━━┫
┃Main Maintenance │ ┃
┃MaintenanceItems │ ┃
┣━━━━━━━┿━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┫
┃DateCreated │ *Attached Books ┃
┣━━━━━━━┥1. Plan showing the completed district ┃
┃ Year month day│2. Standard Cross-section of Embankment ┃
┃ │3. Drawings of Revetment and Major Facilities ┃
┃ │ ┃
┃ │ Prepare one sheet for each river improvement section to add records, and write the construction contractor and construction period in the remarks column. ┃
┗━━━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛
364㎜×257㎜[White paper(80g/㎡)]