Form 9 — 하천법 시행규칙
279021 · 2025-10-01
■ Enforcement Rules of the River Act [Attachment Form No. 9] <Amended Dec. 28, 2021>
River Facility Management Register (Estuary Dam)
┏━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓
┃□ General Status ┃
┠──────┬───┬─────────┬───────┬─────────────┬────┬───────┨
┃Facility name │Name of river│River class │Location │Project implementer │Construction contractor│Start Date and ┃
┃ │ │ │ │ │ │Date of completion ┃
┠──────┼───┼─────────┼───────┼─────────────┼────┼───────┨
┃○○ Drainage sluice gate│○○ Stream│ │ │ │ │Construction Start: ┃
┃ │ │ │ │ │ │Completion: ┃
┣━━━━━━┷━━━┷━━━━━━━━━┷━━━━━━━┷━━━━━━━━━━━━━┷━━━━┷━━━━━━━┫
┃□ Freshwater Lake Status ┃
┠──────┬───────┬─────┬──────┬───────┬──────┬───────┬────┨
┃Main river │Drainage basin area │Flood discharge │Design frequency │Approximate highest high tide level │Reference mean tide level│Mean sea level │Mean tidal range ┃
┃ ├───────┼─────┼──────┼───────┼──────┼───────┼────┨
┃ │㎢ │㎥/sec │ │ │ │ │ ┃
┠──────┼───────┼─────┼──────┼───────┼──────┼───────┼────┨
┃Freshwater Lake │Full-supply water surface area │Total storage volume │Effective storage volume │Flood-water level │Full-supply level │Death Level│ ┃
┃ ├───────┼─────┼──────┼───────┼──────┼───────┼────┨
┃ │㎢ │㎥ │㎥ │EL. m │EL. m │EL. m │ ┃
┣━━━━━━┷━━━━━━━┷━━━━━┷━━━━━━┷━━━━━━━┷━━━━━━┷━━━━━━━┷━━━━┫
┃□ Status of Seawalls and Sluice Gates ┃
┠──────┬───────┬─────┬──────┬───────┬──────┬────────────┨
┃Main river │Extension of seawall │m │Freeboard │m │Establishment Evidence │EL. m ┃
┃ ├───────┼─────┼──────┼───────┼──────┼────────────┨
┃ │Embankment Top Width │m │Bridge bottom width │m │Embankment Slope │Media: ┃
┃ │ │ │ │ │ │Lateral: ┃
┠──────┼───────┼─────┼──────┼───────┼──────┼───────┬────┨
┃Drainage Sluice │Extension of Drainage Sluice Gate │DoorType │Door Specifications │Door Structure │ExclusionAbility │Sill Elevation │ControlMethod┃
┃ ├───────┼─────┼──────┼───────┼──────┼───────┼────┨
┃ │m │ │ │ │ │EL. m │ ┃
┣━━━━━━┷━━━━━━━┷━━━━━┷━━━━━━┷━━━━━━━┷━━━━━━┷━━━━━━━┷━━━━┫
┃□ Facility Registration and Management Manager ┃
┠──────────┬─────────┬──────┬───────────────────────────┨
┃Registrar │RegistrationDate │Facility Manager │* Attached Book ┃
┠──────────┼─────────┼──────┤ 1. Location Map and Photos ┃
┃○○ Environmental Agency │ │ │ 2. Note: Harmonic and anharmonic constants ┃
┃ │ │ │ 3. Standard Drawing of Major Facilities ┃
┃ │ │ │ 4. Maintenance Status ┃
┗━━━━━━━━━━┷━━━━━━━━━┷━━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━┛
364㎜×257㎜[White Paper (80g/㎡)]