Form 5 — 하천법 시행규칙

279021 · 2025-10-01

■ Enforcement Rules of the River Act [Attachment Form No. 5] <Amended Dec. 28, 2021> River Facility Management Register (Embankments and Revetments) (Front) ┏━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓ ┃□ General Status ┃ ┠──────┬──────┬────┬─────┬─────────────┬────────┨ ┃Levee name │Name of river │River class│Left bank and right bank│Location │Protected area (㎡) and ┃ ┃ │ │ │ ├──┬──────────┤Facility ┃ ┃ │ │ │ │Starting point│ │ ┃ ┠──────┼──────┼────┼─────┼──┼──────────┼────────┨ ┃ │ │ │ │Ending point│ │ ┃ ┣━━━━━━┷━━━━━━┷━━━━┷━━━━━┷━━┷━━━━━━━━━━┷━━━━━━━━┫ ┃□ Installation Status and Facility Status ┃ ┠─────┬───────┬──────┬──────┬────┬┬────┬────────┨ ┃Installation Project Name│ │Implementing Agency │○○ Environmental Agency │Construction contractor││Construction period│ ┃ ┠─┬───┼───────┼──────┴──────┼────┴┴────┼────────┨ ┃ST│No. │Length (m) │Levee crest elevation (EL, m) │Levee crest width (m) │Side slope ┃ ┃Section│room │ ├──────┬──────┤ │ ┃ ┃Water│ │ │Point(Upstream)│Ending point (downstream)│ │ ┃ ┃gyu│ ├───────┼──────┼──────┼──────────┼────────┨ ┃Special│ │ │ │ │ │ ┃ ┃ ├───┼──┬────┼──────┴──────┼──────────┼────────┨ ┃ │호 │Category│Length (m) │Section(No) │Format │Remarks ┃ ┃ │An │ │ ├──────┬──────┤ │ ┃ ┃ │ │ │ │Point(Upstream)│Ending point (downstream)│ │ ┃ ┃ │ ├──┼────┼──────┼──────┼──────────┼────────┨ ┃ │ │ │ │ │ │ │ ┃ ┃ │ ├──┼────┼──────┼──────┼──────────┼────────┨ ┃ │ │ │ │ │ │ │ ┃ ┃ │ ├──┼────┼──────┼──────┼──────────┼────────┨ ┃ │ │ │ │ │ │ │ ┃ ┗━┷━━━┷━━┷━━━━┷━━━━━━┷━━━━━━┷━━━━━━━━━━┷━━━━━━━━┛ 364㎜×257㎜[White Paper (80g/㎡)] (Back) ┎───────────────────────────────────────────────┒ ┃□ Current Status of Hydraulics and Hydrology ┃ ┠────────────┬─────┬──────────┬──────┬──────────┨ ┃From the river mouth │Design flood discharge│Planned Flood Level(EL. m) │Planned width (m) │Remarks ┃ ┃Distance to Embankment Endpoint (km) │(㎥/sec) ├─────┬────┤ │ ┃ ┃ │ │Embankment Start Point │JebangTerminal│ │ ┃ ┃ │ │(upstream side) │(downstream)│ │ ┃ ┠────────────┼─────┼─────┼────┼──────┼──────────┨ ┃ │ │ │ │ │ ┃ ┠────────────┼─────┼─────┼────┼──────┼──────────┨ ┃ │ │ │ │ │ ┃ ┠────────────┼─────┼─────┼────┼──────┼──────────┨ ┃ │ │ │ │ │ ┃ ┠────────────┴─────┴─────┴────┴──────┴──────────┨ ┃□ Status of Major Facilities ┃ ┠──────┬───────────┬─────┬─────┬─────┬──────────┨ ┃Category │DrainageCustomsClearance │Drainage Culvert │Bo │fall ball │Others (Handmade, Sluice Gate, etc.) ┃ ┠──────┼───────────┼─────┼─────┼─────┼──────────┨ ┃Number of locations │ │ │ │ │ ┃ ┣━━━━━━┷━━━━━━━━━━━┷━━━━━┷━━━━━┷━━━━━┷━━━━━━━━━━┫ ┃□ Facility Registration and Management Manager ┃ ┠──────┬───────────┬─────┬──────────────────────┨ ┃Registrar │RegistrationDate │Facility Manager│* Attached Book ┃ ┠──────┼───────────┼─────┤ 1. Floor Plan ┃ ┃○○ Environmental Agency │ │ │ 2. Standard Cross-section Drawing of Embankment and Current Status Photos ┃ ┃ │ │ │ 3. Ancillary Facilities and General Drawings ┃ ┃ │ │ │ 4. Flood Damage Status and Maintenance Status ┃ ┗━━━━━━┷━━━━━━━━━━━┷━━━━━┷━━━━━━━━━━━━━━━━━━━━━━┛