Form 43 — 하수도법 시행규칙

287447 · 2026-06-22

■ Enforcement Rules of the Sewerage Act [Form No. 43-2] <Newly Inserted 2012.5.15> Sewage Retention Facility Inventory ┎──┬──┬────┬─────┬─────┬────┬───────────┬────────┬─────────┬─────┬──┒ ┃Name│Position│Site Area│Date Operations Began│Catchment Area │Planned Population│Storage Capacity │Discharge Capacity │Installation Purpose │Landscaping facilities etc.│Summary┃ ┃ │ │ │Month/Day ├──┬──┤ │ │ │ │ │ ┃ ┃ │ │ │ │Wastewater│Stormwater│ │ │ │ │ │ ┃ ┠──┼──┼────┼─────┼──┼──┼────┼───────────┼────────┼─────────┼─────┼──┨ ┃ │ │㎡ │ │ha │ha │Persons │㎥ │㎥/min │ │㎡ │ ┃ ┠──┴──┴────┴─────┴──┼──┴────┴───────────┼───────┬┴─┬───────┼─────┼──┨ ┃Sewage Retention Facility Layout │Facility Name │Structure or Type│Specification│capability or capacity│Quantity │Remarks┃ ┃ ├───────────────────┼───────┼──┼───────┼─────┼──┨ ┃ │Inlet Pipe │ │ │㎥/sec │m │ ┃ ┃ ├───────────────────┼───────┼──┼───────┼─────┼──┨ ┃ │Screen │ │ │ │Unit(s) │ ┃ ┃ ├───────────────────┼───────┼──┼───────┼─────┼──┨ ┃ │Pump Facility │ │ │m³/min │Unit(s) │ ┃ ┃ ├───────────────────┼───────┼──┼───────┼─────┼──┨ ┃ │Washing Facility │ │ │ │set(s) │ ┃ ┃ ├───────────────────┼───────┼──┼───────┼─────┼──┨ ┃ │Power Transformation and Distribution Equipment │ │ │KVA │set(s) │ ┃ ┃ ├───────────────────┼───────┼──┼───────┼─────┼──┨ ┃ │Outlet Pipe │ │ │㎥/sec │m │ ┃ ┃ ├───────────────────┼───────┴──┴───────┴─────┴──┨ ┃ │Method of Treating Discharged Sewage (Joint │ ┃ ┃ │Treatment or On-site Treatment) │ ┃ ┃ ├───────────────────┼───────────────────────────┨ ┃ │Time Required for Joint Treatment │hr ┃ ┗━━━━━━━━━━━━━━━━━━━┷━━━━━━━━━━━━━━━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ Remarks: 1. Briefly state the purpose of installation, such as flood prevention, pollution load reduction, or water reuse. 2. In the remarks column, write the name of the manufacturer of the machine, etc. 364㎜×257㎜[White Paper (Grade 2) 80g/㎡]