Form 36 — 하수도법 시행규칙

287447 · 2026-06-22

■ Enforcement Rules of the Sewerage Act [Form No. 36] <Amended June 27, 2016> [ ] Wastewater Treatment Facility Material Inspection Report [ ] Septic Tank ┏━━━━┯━━━━━━━━━┯━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓ ┃Applicant │Company Name (Name) │ ┃ ┃ ├─────────┼──────────┬───────┬────────────┨ ┃ │Representative Name │ │Date of Birth │ ┃ ┃ ├─────────┼──────────┴───────┴────────────┨ ┃ │Address │(Phone ) ┃ ┠────┼─────────┼──────────┬───────┬────────────┨ ┃Facility Details│Treatment Method │ │Specification │ ┃ ┃ ├─────────┼──────────┼───────┼────────────┨ ┃ │Material and manufacturing method │ │Processing Capacity │m³/day (person capacity) ┃ ┃ │ │ │(Number of Persons Served)│ ┃ ┃ ├─────────┼──────────┴───────┴────────────┨ ┃ │Facility Location │ ┃ ┠────┼─────────┼───────────────────────────────┨ ┃Use │ [ ] Manufactured/Registered │Manufacturer Name (Representative) Location ┃ ┃ ├─────────┼───────────────────────────────┨ ┃ │ [ ] Completion Inspection │Manufacturer Name (Representative) Location ┃ ┃ │ ├───────────────────────────────┨ ┃ │ │Design & Construction Company Name (Representative) Location ┃ ┠────┴─────────┴───────────────────────────────┨ ┃Inspection Details ┃ ┠─────────┬─────┬─────────┬────────┬───────────┨ ┃Inspection Items │Unit │Inspection Results │Compliance │Remarks ┃ ┃ │ ├────┬────┤ │ ┃ ┃ │ │Before burial │After burial │ │ ┃ ┠─────────┼─────┼────┼────┼────────┼───────────┨ ┃shape │ │ │ │ │ ┃ ┃Hardness │ │ │ │ │ ┃ ┃Thickness(Internal Partition) │ │ │ │ │ ┃ ┃Thickness(Body) │ │ │ │ │ ┃ ┃Reinforcement strip or reinforcement ring│ │ │ │ │ ┃ ┃Reinforcement Support │ │ │ │ │ ┃ ┃Chemical resistance │ │ │ │ │ ┃ ┃Watertightness │ │ │ │ │ ┃ ┃Internal pressure strength │ │ │ │ │ ┃ ┃Partition Strength │ │ │ │ │ ┃ ┃Contact Material Strength │ │ │ │ │ ┃ ┃Loading Strength │ │ │ │ │ ┃ ┃Tensile Strength │ │ │ │ │ ┃ ┃Bending Strength │ │ │ │ │ ┃ ┃Izod Impact Strength │ │ │ │ │ ┃ ┃Stiffness │ │ │ │ │ ┃ ┃Capacity │ │ │ │ │ ┃ ┃Noise │ │ │ │ │ ┃ ┃structure │ │ │ │ │ ┃ ┃Glass fiber content │ │ │ │ │ ┃ ┃Falling Impact │ │ │ │ │ ┃ ┃Watertightness after drop impact │ │ │ │ │ ┃ ┃Tensile load of joint │ │ │ │ │ ┃ ┠─────────┴─────┴────┴────┴────────┴───────────┨ ┃ ※ If inspection items are added due to changes in the Korean Industrial Standard, the added inspection items must be inspected.┃ ┠─────┬────────────────────────────────────────┨ ┃ Inspection Results │Compliant or Non-compliant ┃ ┠─────┴────────────────────────────────────────┨ ┃In accordance with Article 52, Paragraph 4 of the Sewerage Act and Article 58, Paragraph 2 of the Enforcement Rules of the same Act, the material inspection report is hereby notified.┃ ┃ ┃ ┃Year month day ┃ ┃ ┃ ┃Inspection Agency (Signature or seal) ┃ ┗━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ 210mm×297mm[White Paper 80g/㎡]