Form 13 — 하수도법 시행규칙
287447 · 2026-06-22
■ Enforcement Rules of the Sewerage Act [Attachment Form No. 13] <Amended Nov. 6, 2015>
[ ] Wastewater Treatment Facility [ ]Install Report
[ ] Septic Tank [ ]Change
(front)
─────────┬────┬─────┬────────────────────────────────────────
Receipt Number │Date of Receipt │ │Processing Period 5 days
─────────┴────┴─────┴────────────────────────────────────────
────────┬──────┬─────────────────────────────────────────────
Reporting Person │①Name │②DateOfBirth
├──────┴─────────────────────────────────────────────
│③Address (Phone Number: )
────────┴────────────────────────────────────────────────────
────────┬──────┬─────────────────────────────────────────────
InstallationLocation │④Gross Floor Area (㎡)│⑤Building Use
├──────┼─────────────────────────────────────────────
│⑥Location │⑦Wastewater generation volume (㎥/day) or number of people served (persons)
────────┴──────┴─────────────────────────────────────────────
────────┬──────┬─────────────────────────────────────────────
Construction │⑧Company Name (Representative)│⑨Registration Number
Prospective ├──────┴─────────────────────────────────────────────
│⑩Workplace Location (Phone Number: )
────────┴──────┬─────────────────────────────────────────────
⑪Scheduled Start Date │⑫Scheduled Completion Date
───────────────┴─────────────────────────────────────────────
⑬Processing Method and Overview
─────────────────────────────────────────────────────────────
⑭Treatment Capacity (㎥/day) or Number of Persons Served (For 00 people)
─────────────────────────────────────────────────────────────
────────┬───────┬────────────────────────────────────────────
Changes │⑮Before change │?After change
├───────┼────────────────────────────────────────────
│ │
────────┴───────┴────────────────────────────────────────────
I hereby report as above in accordance with Article 34, Paragraph 2 of the Sewerage Act and Article 27 of the Enforcement Rules of the same Act.
Year month day
Reporting Person (Signature or seal)
To the Mayor of a Special Self-Governing City, Governor of a Special Self-Governing Province, Mayor, County Head, or District Head
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
───────┬────────────────────────────────────────────────┬────
Reporting Person │1. Design documents for the relevant facility (in the case of installing a private sewage treatment facility manufactured by a private sewage treatment facility manufacturer, that │Fee
SubmissionDocuments │Design documents clearly recording the main dimensions of the facility) 1 copy (limited to installation notification) │None
│2. One copy of the drainage system diagram for buildings, etc. (limited to installation notification) │
│3. If the facility is changed, one copy of the amended design drawings for the private sewage treatment facility (if changed to a private sewage treatment facility made by a registered manufacturer, │
│drawings clearly showing the main dimensions of that facility) shall be submitted. │
│4. Other documents proving changes to private sewage treatment facilities (limited to cases of change notification) │
───────┼────────────────────────────────────────────────┤
Official in charge │1 copy of Building Register │
Checklist │ │
───────┴────────────────────────────────────────────────┴────
210mm×297mm[White Paper 80g/㎡]
(Back)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
WritingMethod
──────────────────────────────────────────────────────────────
1. Write the person to perform the work in columns ⑧~⑩.
2. In the case of installing a private sewage treatment facility manufactured by a private sewage treatment facility manufacturer, in section ⑬ Treatment Method and Overview, the
Enter the manufacturer's trade name, registration number, and processing method.
──────────────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Important Notes
──────────────────────────────────────────────────────────────
1. Targets for Installation of Private Wastewater Treatment Facilities
A. Targets for Installation of Wastewater Treatment Facilities
ㆍ Buildings and other facilities discharging wastewater exceeding 2㎥ per day
B. Targets for Septic Tank Installation
ㆍBuildings or other facilities that install flush toilets or discharge 2㎥ or less of wastewater per day
2. Once the installation of a private sewage treatment facility is completed, you must apply for a completion inspection, and to close it, you must file a closure report.
3. Disadvantageous measures, etc. for failure to install
ㆍAny person who fails to install a private sewage treatment facility or increase its treatment capacity shall be punished by imprisonment for up to two years or a fine not exceeding 20 million won.
However, if the treatment capacity of the private sewage treatment facility to be increased is 2 cubic meters or less per day, imprisonment for up to 1 year or
You will be subject to a fine of 10 million won or less.
4. Disadvantageous Measures for Failure to Report Installation
ㆍYou will be subject to an administrative fine of 1 million won or less.
──────────────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
ProcessingProcedure
──────────────────────────────────────────────
┌─────┐ ┌──────┐ ┌────┐ ┌────────┐ ┌────┐ ┌──┐
│DeclarationFormPrep│?│Receipt (Civil Service Office)│?│Review │?│Local verification (if necessary)│?│Approval │?│Notification│
└─────┘ └──────┘ └────┘ └────────┘ └────┘ └──┘
Reporting Person Processing Agency Processing agency Processing agency Processing Agency
──────────────────────────────────────────────