Form 7 — 하수도법 시행규칙

287447 · 2026-06-22

■ Enforcement Rules of the Sewerage Act [Attachment Form No. 7] <Amended Oct. 1, 2025> Drainage Facility Installation Report ──────┬───────────────┬─────────────┬──────────────────────────── Receipt Number │Date of Receipt │ │Processing Period 5 days ──────┴───────────────┴─────────────┴──────────────────────────── ─────┬─────────────────────────────────────────────────────────── Installer │Name of Corporation ├────────────────────────────┬────────────────────────────── │Representative Name │Date of Birth ├────────────────────────────┼────────────────────────────── │Address │Telephone Number ─────┴────────────────────────────┴────────────────────────────── ─────┬────────┬────────────────────────────────────────────────── Install │Installation Purpose │Discharge of domestic sewage, industrial wastewater, and livestock wastewater Report ├────────┼────┬─────────────┬─────────┬───────────────────── │of drainage facilities │Material │Polyvinyl Chloride (PVC) Pipes, Cast Iron Pipes, Hume Concrete Pipes, │Connection Method │Machine drilling, Manual drilling, │Materials and Quantities │ │Precast Concrete (PC), Ceramic, Other │ │Manhole Connection │ ├────┼─────────────┼─────────┼───────────────────── │ │Average Pipe Diameter│? mm │To the Public Sewerage │m │ │ │ │Length of Drainage Facilities │ ├────────┼────┴─────────────┴─────────┴───────────────────── │Installation Location │ City·County·District RoadName Building Number(Legal Dong) ├────────┼────────────────────────────────────────────────── │Discharge Volume │ ㎥/day ├────────┼────────┬───────────┬───────────────────────────── │Date of Construction Commencement │Year month day │ Estimated Construction Completion Date │Year month day ├────────┼────────┼───────────┼───────────────────────────── │Construction Implementation Method │ │Relevant Construction Industry │ │and contractor │ │and Registration Number │ ├────────┼────────┴───────────┴───────────────────────────── │Public Sewerage │Full Restoration, Partial Restoration, Temporary Restoration │Restoration Method │ ─────┴────────┴────────────────────────────────────────────────── ─────┬────────┬──────┬─────────────────────────────────────────── USE │Discharge Volume │Quantity │(㎥/day) Commencement │and Water Quality ├──────┼─────────────────────────────────────────── Report │ │Water Quality (mg/L) │ BOD: , COD: , SS: ├────────┼──────┴─────────────────────────────────────────── │Start Date │Year month day ─────┴────────┴────────────────────────────────────────────────── Pursuant to Article 27, Paragraph 3 of the Sewerage Act and Article 22, Paragraph 1 of the Enforcement Decree of the same Act, the installation of drainage facilities and as above . Year month day Reporting Person (Signature or seal) To the Governors of Cities and Provinces, and Mayors, County Heads, and District Heads ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ─────┬───────────────────────────────────────┬─────────────────── Required Documents│Drainage Facility Design Documents for Installation Report (Drawing showing drainage facility connection points, 1/200) │Fee │ │None ─────┴───────────────────────────────────────┴─────────────────── ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ Instructions for Completion ───────────────────────────────────────────────────────────────── 1. For Discharge Volume, enter the total sewage amount calculated by building use under the calculation method publicly notified by the Minister of Climate, Energy and Environment pursuant to Article 35(2) of the Sewerage Act and Article 24(5) of its Enforcement Decree, or the wastewater discharge volume of facilities permitted or reported under Article 33 of the Water Environment Conservation Act. Enter the calculated amount. 2. For Discharge Volume and Water Quality, a person filing commencement of use shall enter the quantities specified in the discharge facility installation permit under Article 33 of the Water Environment Conservation Act and the corresponding water quality data. 3. When reporting the installation of drainage facilities, if a contractor has not been designated, leave the fields for construction method and contractor, and relevant construction industry and registration number blank. You must submit it, and after the contractor is selected, supplement the relevant details and report it. 4. In cases where a private sewage treatment facility is to be closed due to the installation of drainage facilities, the latter part of Article 34, Paragraph 2 of the Sewerage Act and Article 28 of the Enforcement Rules of the same Act You must report the closure of private sewage treatment facilities accordingly. ───────────────────────────────────────────────────────────────── 210mm×297mm[White Paper 80g/㎡]