Form 30 — 폐기물관리법 시행규칙
287445 · 2026-06-22
■ Enforcement Rules of the Waste Management Act [Attachment Form No. 30] <Amended Oct. 1, 2025>
Landfill Facility [ ] Installation Application for Inspection
[ ]Regular
[ ] Termination of Use / Closure
[ ] Periodic Post-Closure Management
※ [ Mark the appropriate box with a check mark. (front)
───────┬───────────┬─────────────────────────────
Receipt Number │Date of Receipt │Processing Period 20 days(Termination of use/Closure inspection 80 days)
───────┴───────────┴─────────────────────────────
────┬─────────────┬──────────────────────────────
Applicant│①Company Name (Title) │②Business Registration Number
├─────────────┼──────────────────────────────
│③Name(Representative) │④DateOfBirth
├─────────────┴──────────────────────────────
│⑤Address (Office)
│ (Phone Number: )
────┴────────────────────────────────────────────
──────────────┬───┬──────────────┬───────────────
⑥Industry │ │⑦Approval/Permission Number │No. 호
│ │호 │
─────┬────────┼───┴──────────────┴───────────────
⑧ │Waste Subject to Landfill │
Approved ├────────┼───┬──────────────┬───────────────
(Permit) │Landfill area │(㎡) │Landfill Capacity │(㎥)
Contents ├────────┼───┼──────────────┴───────────────
│Leachate Treatment Facility │Treatment Method│
├────────┼───┼──────────────────────────────
│Other │Processing Capacity│(㎥/day)
─────┴────────┼───┼──────────────┬───────────────
⑨Scheduled Date of Commencement of Use │ │⑩Scheduled date of termination of use │
──────────────┼───┴──────────────┴───────────────
⑪ Desired Inspection Date │ . . .
──────────────┼──────────────────────────────────
⑫FacilityType │[ ]Managed Landfill Facility [ ] Barrier-type landfill facility
──────────────┼──────────────────────────────────
⑬Installation Location (Address) │(Phone Number: )
──────────────┼───┬──────────────┬───────────────
⑭Landfill Area │(㎡) │Landfill Capacity │(㎥)
──────────────┼───┼──────────────┼───────────────
⑮Leachate Treatment Facility │(㎥/day)│Other Matters │
──────────────┼───┴──────────────┴───────────────
Area Planned for Final Cover │(㎡)
(Complete only for installation inspection)│
──────────────┴──────────────────────────────────
Under Article 30 (1) and (2) and Article 50 (1) and (6) of the Waste Management Act,
and Article 41 (7) and Article 69-2 (3) of its Enforcement Rules,
I hereby apply for an installation, periodic, closure or post-closure inspection of the landfill facility, as indicated above.
Year month day
Applicant: (Signature or seal)
○○○ Head of the Inspection Agency To
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
─────────────────────────────────────────────────
210mm×297mm[White Paper 80g/㎡(Recycled)]
(rear)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
─────┬───────────────────────────────────────────┬────
Attached Documents│ 1. In the case of installation and periodic inspection │Fee
│ a. Copies of design documents and structural calculations │
│ B. Copies of specifications and material test reports │
│ . Installation and Equipment Acquisition Specification │
│ d. Environmental survey report on facility installation, including matters publicly notified by the Minister of Climate, Energy and Environment│
│(submit only for landfills with an area of at least 10,000 m² or landfill volume of at least 30,000 m³); │
│where the project requires strategic, ordinary or small-scale environmental impact assessment │
│under the Environmental Impact Assessment Act, the corresponding report │
│may be substituted. │
│ E. Copy of previously received periodic inspection results (limited to cases where an inspection was previously received) │
│ 2. In the case of termination of use/closure inspections and periodic post-management inspections │
│ a. Copies of design documents and structural calculation reports │
│ B. Copies of specifications and material test reports │
│ c. Post-Closure Management Plan (only for periodic post-closure inspections) │
│ d. A copy of the results of the previously received periodic follow-up inspection (limited to cases where an inspection was previously received, and│
│Submit only for post-management periodic inspections) │
─────┴───────────────────────────────────────────┴────
──────────────────────────────────────────────────────
Processing Procedure
──────────────────────────────────────────────────────
┌──────┐ ┌──┐ ┌──┐ ┌──┐ ┌──────┐
│Fill out application form │?│Reception│?│Inspection│?│Approval│?│Inspection Report │
│ │ │ │ │ │ │ │ │Issuance │
└──────┘ └──┘ └──┘ └──┘ └──────┘
Applicant Inspection Agency
──────────────────────────────────────────────────────