Form 13 — 지하수법 시행규칙
287441 · 2026-06-22
■ Enforcement Rules of the Groundwater Act [Attachment Form No. 13]
Notification of Completion of Groundwater Development and Use Facilities
※ Refer to the procedure on the reverse side; applicants must leave shaded fields blank. (front)
─────────┬────────────┬──────────────────────────────────
Receipt Number │Date of Receipt │Processing Period 7days
─────────┴────────────┴──────────────────────────────────
────────┬───────────┬────────────────────────────────────
Reporting Person │Name(Corporate Name) │Date of Birth(Corporate Registration Number)
├───────────┴────────────────────────────────────
│Address (In the case of a corporation, the location of the principal office)
│
│(Phone Number: )
────────┴────────────────────────────────────────────────
────────┬────────────────────────────────────────────────
Development·Utilization │Position
content ├───────────┬──────────────────────────┬─────────
│Coordinates(Longitude, Latitude) │Purpose (Detailed Purpose) │Whether to use drinking water
│ ,│ │
────────┴───────────┴──────────────────────────┴─────────
────────┬───────────┬────────────────────────────────────
Facility Installation │Excavation Depth m│Excavation Diameter ㎜
content ├───────────┴────────────────────────────────────
│Water intake plan quantity ㎥/day
├──────┬─────┬───────────────────────────────────
│Water Discharge Device │Cumulative Flow Meter│Groundwater Level Measurement Pipe
────────┴──────┴─────┴───────────────────────────────────
────────┬───────────┬────────────────────────────────────
Pumping Equipment │Power Unit (HP) │Inner diameter of discharge pipe ㎜
content ├───────────┼────────────────────────────────────
│Installation Depth m│Pumping capacity m³/day
────────┴───────────┴────────────────────────────────────
────────┬───────────┬────────────────────────────────────
Pollution Prevention Facilities │Upper Protective Structure │Subsurface Protection Wall
Details of Installation ├───────────┴────────────────────────────────────
│Grouting Thickness cm
────────┴────────────────────────────────────────────────
────────┬─────┬─────────┬────────────────────────────────
Details of Completed Works │Name of Construction Contractor│Representative(Address) │Registration Number (Phone Number)
├─────┴────┬────┴────────────────────────────────
│start date │Completion date
├──────────┴─────────────────────────────────────
│Construction Work Details (Equipment and Pollution Prevention Works, etc.)
────────┴────────────────────────────────────────────────
Under Article 9(1) of the Groundwater Act, Article 14(2) of its Enforcement Decree and Article 14(1) of its Enforcement Rules,
I report completion of the construction and installation of the groundwater development and use facility.
Year month day
Reporting Person (Signature or seal)
Mayor/County Governor/District Head Your
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
210㎜×297㎜[White Paper 80g/㎡ (Recycled)]
(rear)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
─────┬───────────────────────────────────────┬────
Reporting Person │1. As-built Drawings │Fee
Attached Documents│2. Water quality test report prepared by a specialized testing institution under Article 20(1) of the Act │None
│(if a groundwater impact assessment was carried out within six months before the completion notification, │
│the water quality test report in that assessment may be used instead). │
│3. On-site Photos │
─────┴───────────────────────────────────────┴────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Processing Procedure
This report will be processed as follows.
┌───────────┬────────────────────────────────────┐
│Reporting Person │Processing Agency │
│ ├────────────────────────────────────┤
│ │City·County·District │
├───────────┼────────────────────────────────────┤
│ │ │
│┌────────┐ │ ┌───────────────────────────────┐ │
││Fill out report │ │ │Receipt │ │
││ │ │ │ │ │
││ │ │ │ │ │
││ ├─┼─┤ │ │
││ │ │ │ │ │
││ │ │ │ │ │
││ │ │ │ │ │
│└────────┘ │ └──┬────────────────────────────┘ │
│ │ │ │
│ │ │
│ │ │ │
│ │ ┌─┴─────────────────────────────┐ │
│ │ │On-Site Inspection and Review │ │
│ │ └──┬────────────────────────────┘ │
│ │ │ │
│ │ │
│ │ │ │
│┌────────┐ │ ┌─┴─────────────────────────────┐ │
││Receipt of Completion Confirmation │ │ │Approval │ │
││ │ │ │ │ │
││ │ │ │ │ │
││ ├─┼─┤ │ │
││ │ │ │ │ │
││ │ │ │ │ │
││ │ │ │ │ │
│└────────┘ │ └───────────────────────────────┘ │
│ │ │
└───────────┴────────────────────────────────────┘