Form 27 — 전력기술관리법 시행규칙
278995 · 2025-10-01
■ Enforcement Rules of the Electric Power Technology Management Act [Form No. 27-3] <Amended Oct. 5, 2012>
Construction Supervision Completion Report
※ The submitter does not fill out sections with a dark background. (Front)
────────┬───────────────────────┬─────────────────────
Receipt Number │Date of Receipt │Processing Period 3days
────────┴───────────────────────┴─────────────────────
───────┬─────────────────────┬────────────────────────
Client │ Company Name │ Representative
├─────────────────────┴────────────────────────
│ Location
│(Phone Number: )
───────┼─────────────────────┬────────────────────────
Submitted by │ Company Name │ Corporate Registration Number (Business Registration Number)
(Supervision Firm, etc.)├─────────────────────┼────────────────────────
│ Representative │ Supervision Business Registration Number
├─────────────────────┴────────────────────────
│ Location
│(Phone Number: )
───────┼─────────────────────┬────┬───────────────────
Construction Contractor │ Company Name │ Representative │Construction Business Registration Number
├─────────────────────┴────┴───────────────────
│ Location
│(Phone Number: )
───────┴──────────────────────────────────────────────
───────┬───────┬─────────────┬────────────────────────
Construction Supervision │ ConstructionClassification │[ ] New Construction [ ] Repair Work│ Field of Participation
Status of Supervision Services ├───────┴─────────────┴────────────────────────
│ Service Name
├──────────────────────────────────────────────
│ Site Address
│(Phone Number: )
├───────┬──────────────────────────────────────
│ ServiceClassification │ [ ] Independent Supervision [ ] Integrated Supervision [ ] Annual Supervision
│ │ [ ] Joint or Successor Supervision (Supervision Performance Ratio: %)
│ │ (Registration Number and Name of the Joint or Successor Supervision Firm: )
├───────┼──────────────────────────────────────
│ Service Overview │ ○ Electrical Installations: Power Received ( ㎾, V); Other Installations, Including Off-peak Power ( ㎾, V),
│ │ Power Generation (Normal) ( ㎾, V); Power Generation (Emergency) ( ㎾, V)
│ │ ○ Details: Total Floor Area ( m²); Number of Floors Above/Below Ground ( / floors);
│ │ Multi-family Housing ( households; buildings); Length of Line ( ㎞)
│ │ ○ Other Details:
├───────┼───────────────┬──────────────────────
│ Period and Amount │ Construction Period: ~ │ Construction Cost: thousand won
│ ├───────────────┼──────────────────────
│ │ Construction Supervision Period: ~ │ Construction Supervision Fee: thousand won
│ ├───────────────┴──────────────────────
│ │ Construction Supervision Completion Date:
───────┴───────┴──────────────────────────────────────
───────┬────────┬───┬──────────┬────┬─────────────────
Supervisor │Duties │Grade │Name │Date of Birth│Supervisor Assignment Period (Days)
Batch Status ├────────┼───┼──────────┼────┼─────────────────
│ │ │ │ │~ ( )
├────────┼───┼──────────┼────┼─────────────────
│ │ │ │ │~ ( )
├────────┼───┼──────────┼────┼─────────────────
│ │ │ │ │~ ( )
───────┴────────┴───┴──────────┴────┴─────────────────
───────┬──────────────────────────────────────────────
Confirmation by Client │ I hereby certify that the information stated above is true.
│
│ Client Company Name
│
│ RepresentativeName (Signature or seal)
│
│ Verifier Name and Contact
───────┴──────────────────────────────────────────────
Under Article 12-2(3) of the Electric Power Technology Management Act and the main text of Article 21-3(1) of its Enforcement Rule,
I hereby submit this Construction Supervision Completion Report.
Year month day
Submitted by (Signature or seal)
To the Head of the Power Engineering Association
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
210mm×297mm(White paper 80g/㎡)
(Rear)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
─────┬───────────────────────────────────────
Attached Documents│ One copy of the statement explaining any delay in submitting a completion report (Form No. 27-4; where applicable)
─────┴───────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Instructions for Completing the Form
─────────────────────────────────────────────
1. In the Client field, enter the original Client for the supervision services.
2. In the Reporting Party field, enter the supervision firm or in-house supervision operator.
3. In the Contractor field, where two or more electrical contractors are involved, enter the principal contractor.
4. In Construction Supervision Services, enter the following:
a. Construction Type: Check the applicable construction work and enter the facility code for its field of participation; if none applies,
enter the closest code according to the main work involved.
┌──┬─────────┬──┬──────────┬──┬────────┬──┬───────────┬──┬──────┐
│From │10. Nuclear │gun │20. Public Buildings │empty │30. Road Facilities │to │40. Energy Supply Facility │san │50. Industrial Facilities│
│Song │11. Thermal Power Generation │axis │21. Residential Facilities │empty │31. Bridge Facilities │You │41. Waste Incineration Facilities │UP │(Manufacturing, │
│variation │12. Hydropower and Small-Scale Hydropower │Water │22. Office Facilities │START │32. Tunnels │Z │42. Sewage and Wastewater Treatment Facilities │Time │PlantEquipment │
│ship │13. Combined Heat and Power │START │23. Retail Facilities │Section │33. Dams │ㆍ │43. Water Supply and Sewerage │Section │Included) │
│Previous │14. Wind Power │Section │24. Lodging Facilities │[3] │34. Port Facilities │Hwan │ and Water Purification Facilities │[5] │ │
│START │15. Solar Power │[2] │25. Healthcare Facilities │ │35. Airport Facilities │circa │44. Park Facilities │ │ │
│Story │16. Electric Power Transmission │ │26. Religious Facilities │ │36. Electric Railway Facilities│START │45. Hazardous Materials Facilities │ │ │
│[1] │17. Substations │ │27. Sports Facilities │ │37. Railway Signal Facilities│Section │49. Other │ │ │
│ │18. Distribution Facilities │ │28. Education and Research Facilities │ │39. Other │[4] │ Energy and Environmental Facilities │ │ │
│ │19. Other │ │29. Other Building Facilities│ │ Public Facilities │ │ │ │ │
│ │ Transmission, Substation, and Distribution Facilities │ │ │ │ │ │ │ │ │
└──┴─────────┴──┴──────────┴──┴────────┴──┴───────────┴──┴──────┘
b. Service Name: Enter the name exactly as stated in the construction supervision contract.
c. Service Type: Enter as follows:
1) Annual Supervision: One supervision firm supervises one construction site under an annual contract.
2) Integrated Supervision: One supervision firm supervises two or more construction sites together.
3) Joint or Successor Supervision: Two or more supervision firms jointly or successively supervise one site under contract (enter the supervision performance share
)
d. Period and Amount: Enter the construction cost excluding VAT, the supervision fee including VAT, and
the actual date on which construction supervision was completed.
5. In Supervisor Assignment, complete the following:
a. Duties: Classify supervisors as resident (principal or assistant) or non-resident.
b. Grade: Classify supervisors as entry-level, intermediate, advanced or special.
c. Assignment Period: Enter the full period from the start to the end of supervision and the actual assignment days.
─────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Processing Procedure
─────────────────────────────────────────────
This report is processed as follows.
┌────────┬──────────────────────────────────┐
│No. mis- (Seal) │Processing Procedure 기 Tube │
│ ├──────────────────────────────────┤
│ │Power Engineering Association │
├────────┼──────────────────────────────────┤
│ │ │
│┌──────┐│ ┌──────────┐ │
││Prepare Report ││ ▶│Contact 수 │ │
││ ├┼─ │ │ │
││ ││ │ │ │
│└──────┘│ └┬─────────┘ │
│ │ │ │
│ │ │
│ │ ▼ │
│ │ ┌──────────┐ │
│ │ │Check Attachments │ │
│ │ └─┬────────┘ │
│ │ │ │
│ │ │
│ │ ▼ │
│ │ ┌──────────┐ │
│ │ │Data Input·Management │ │
│ │ └──────────┘ │
│ │ │
└────────┴──────────────────────────────────┘