Form 27 — 전력기술관리법 시행규칙
278995 · 2025-10-01
■ Enforcement Rules of the Electric Power Technology Management Act [Attachment Form No. 27] <Amended 2012.10.5>
Status of Supervisor Assignment [ ] Report
[ ] Change Report
( [ ] Supervision Firm [ ] In-house Supervision)
※ The reporter must not fill out sections with a dark background, and [ ]. (front)
─────────────┬─────────────────┬──────────────────────
Receipt Number │Date of Receipt │Processing Period 3days
─────────────┴─────────────────┴──────────────────────
───────┬───────────────┬──────────────────────────────
Client │ Company Name │ Representative
├───────────────┴──────────────────────────────
│ Location
│(Phone Number: )
───────┼───────────────┬──────────────────────────────
Reporting Person │ Company Name │ Corporate Registration Number (Business Registration Number)
(Supervision Firm, etc.)├───────────────┼──────────────────────────────
│ Representative │ Supervision Business Registration Number
├───────────────┴──────────────────────────────
│ Location
│(Phone Number: )
───────┼───────────────┬──────────┬───────────────────
Construction Contractor │ Company Name │ Representative │ Construction Business Registration Number
├───────────────┴──────────┴───────────────────
│ Location
│(Phone Number: )
───────┴──────────────────────────────────────────────
───────┬───────┬──────────────┬───────────────────────
Construction Supervision │ ConstructionClassification │[ ] New Construction [ ] Repair Work │Field of Participation
Status of Supervision Services ├───────┴──────────────┴───────────────────────
│ Service Name
├──────────────────────────────────────────────
│ Site Address
│(Phone Number: )
├───────┬──────────────────────────────────────
│ ServiceClassification │ [ ] Independent Supervision [ ] Integrated Supervision [ ] Annual Supervision
│ │ [ ] Joint or Successor Supervision (Supervision Performance Ratio: %)
│ │ (Registration Number and Name of the Joint or Successor Supervision Firm: )
├───────┼──────────────────────────────────────
│ Service Overview │ ○ Electrical Installations: Power Received ( ㎾, V); Other Installations, Including Off-peak Power ( ㎾, V),
│ │ Power Generation (Normal) ( ㎾, V); Power Generation (Emergency) ( ㎾, V)
│ │ ○ Details: Total Floor Area ( m²); Number of Floors Above/Below Ground ( / floors);
│ │ Multi-family Housing ( households; buildings); Length of Line ( ㎞)
│ │ ○ Other Details:
├───────┼─────────────┬────────────────────────
│ Period and Amount │ Construction Period: ~ │ Construction Cost: thousand won
│ ├─────────────┼────────────────────────
│ │ Construction Supervision Period: ~ │ Construction Supervision Fee: thousand won
───────┴───────┴─────────────┴────────────────────────
───────┬────────┬────┬───────┬─────┬──────────────────
Supervisor │Duties │Grade │Name │Date of Birth │Supervisor Assignment Period (Days)
Status of Assignment ├────────┼────┼───────┼─────┼──────────────────
│ │ │ │ │ ~ ( )
├────────┼────┼───────┼─────┼──────────────────
│ │ │ │ │ ~ ( )
├────────┼────┼───────┼─────┼──────────────────
│ │ │ │ │ ~ ( )
───────┴────────┴────┴───────┴─────┴──────────────────
───────┬───────────┬────────────┬─────────────────────
Changes │Classification │Before change │,
├────┬──────┼────────────┼─────────────────────
│Changes│ │ │
├────┴──────┴────────────┴─────────────────────
│※ If a supervisor has been replaced, check the applicable reason below.
│ [ ] Military Enlistment [ [ ] Hospitalization or Medical Treatment for Four Weeks or More [ ] Retirement due to bankruptcy/business closure [
│ [ ] Immigration [ ] Death [ ] Request for Replacement by the Client
│ [ ] Resignation Due to Transfer, Acquisition or Corporate Merger [ ] Delay in Commencement or Suspension of Construction for Two Months or More
───────┴──────────────────────────────────────────────
Under Article 12-2(2) of the Electric Power Technology Management Act and Article 21-2(1) of its Enforcement Rule, I hereby submit the following
[ ] Supervisor Assignment Report or [ ] Report on Changes to Supervisor Assignment.
Year month day
Reporting Person (Signature or seal)
To the Head of the Power Engineering Association
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
210mm×297mm(White paper 80g/㎡)
(Rear)
─────┬───────────────────────────────────────────────────────
Attached Documents│ 1. For the Initial Assignment Report:
│ a. One copy of the supervisor assignment plan confirmed by the Client
│ b. One copy of the scheduled construction progress chart for the power facilities
│ c. One copy of a summary of estimated construction costs
│ d. One copy of the supervision services contract
│ e. One copy of the employment certificate for each relevant supervisor (only for persons under Article 12-2(1)2) of the Act and Article 20(2)6) of its Enforcement Decree)
│ f. One copy of drawings showing distances between sites (only where the work is supervised on an integrated basis under Article 20(3) of the Enforcement Decree)
│ 2. For a Report on Changes to Assignment:
│ a. Where a supervision services contract has changed:
│ 1) One copy of evidence of changes to the supervision services contract
│ 2) One copy of the scheduled construction progress chart (only where the supervision fee or period has changed)
│ 3) One copy of the amended supervisor assignment plan confirmed by the Client
│ b. Where supervisors have changed:
│ 1) One copy of the amended assignment plan confirmed by the Client
│ 2) One copy of the employment certificate for each relevant supervisor
─────┴───────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Instructions for Completing the Form
─────────────────────────────────────────────────────────────
1. In the Client field, enter the original commissioning client for the construction supervision service.
2. In the Reporting Party field, enter the supervision firm or in-house supervision operator.
3. In the Contractor field, if there are two or more electrical contractors, enter the principal contractor.
4. In the Construction Supervision Services section, complete the following:
a. Construction Type: Check the applicable work type and enter the facility code for the field of participation from the table below. If none applies,
enter the closest code based on the main work process.
┌──┬─────────┬──┬──────────┬──┬────────┬──┬───────────┬──┬──────┐
│From │10. Nuclear │gun │20. Public Buildings │empty │30. Road Facilities │to │40. Energy Supply Facility │san │50. Industrial Facilities│
│Song │11. Thermal Power Generation │axis │21. Residential Facilities │empty │31. Bridge Facilities │You │41. Waste Incineration Facilities │UP │(Manufacturing, │
│variation │12. Hydropower and Small-Scale Hydropower │Water │22. Office Facilities │START │32. Tunnels │Z │42. Sewage and Wastewater Treatment Facilities │Time │PlantEquipment │
│ship │13. Combined Heat and Power │START │23. Retail Facilities │Section │33. Dams │ㆍ │43. Water Supply and Sewerage │Section │Included) │
│Previous │14. Wind Power │Section │24. Lodging Facilities │[3] │34. Port Facilities │Hwan │ and Water Purification Facilities │[5] │ │
│START │15. Solar Power │[2] │25. Healthcare Facilities │ │35. Airport Facilities │circa │44. Park Facilities │ │ │
│Story │16. Electric Power Transmission │ │26. Religious Facilities │ │36. Electric Railway Facilities│START │45. Hazardous Materials Facilities │ │ │
│[1] │17. Substations │ │27. Sports Facilities │ │37. Railway Signal Facilities│Section │49. Other │ │ │
│ │18. Distribution Facilities │ │28. Education and Research Facilities │ │39. Other │[4] │ Energy and Environmental Facilities │ │ │
│ │19. Other │ │29. Other Building Facilities│ │ Public Facilities │ │ │ │ │
│ │ Transmission, Substation, and Distribution Facilities │ │ │ │ │ │ │ │ │
└──┴─────────┴──┴──────────┴──┴────────┴──┴───────────┴──┴──────┘
b. Service Name: Enter the name exactly as stated in the construction supervision contract.
c. Service Type: Enter as follows:
1) Annual Supervision: One supervision firm supervises one construction site under an annual contract.
2) Integrated Supervision: One supervision firm supervises two or more construction sites together.
3) Joint or Successor Supervision: Two or more supervision firms jointly or successively supervise one site under contract (enter the supervision performance share
and the business registration numbers and names of the joint or successor firms).
d. Period and Amount: Enter construction cost excluding VAT and supervision fees including VAT.
5. In the Supervisor Assignment section, enter the following:
a. Duties: Classify each assigned supervisor as resident (principal or assistant) or non-resident.
b. Grade: Specify entry-level, intermediate, advanced or special grade.
c. Assignment Period: Enter the full period between the start and end dates of each supervisor's assignment and the actual number of assignment days
(specific assignment dates shall appear separately in the assignment plan).
6. In Changes, identify changes in the Client, Contractor, supervision services or supervisors and describe the situation before and after each change.
※ Where a supervisor is replaced, attach evidence of the reason for replacement. If there is no applicable grounds or supporting evidence,
the replacement shall be counted in the frequency of replacements.
─────────────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Processing Procedure
┌────────┬──────────────────────────────────────────────────┐
│Shin port IN │Processing Procedure Agency Agency: Power Engineering Association │
├────────┼──────────────────────────────────────────────────┤
│ │ │
│┌──────┐│ ┌──────────┐ │
││Prepare Report ││ ▶│Re- 수 │ │
││ ├┼─ │ │ │
││ ││ │ │ │
│└──────┘│ └──────────┘ │
│ │ ? │
│ │ ┌──────────┐ │
│ │ │Check Attachments │ │
│ │ └──────────┘ │
│ │ ? │
│ │ ┌──────────┐ │
│ │ │Data Input·Management │ │
│ │ └──────────┘ │
│ │ │
└────────┴──────────────────────────────────────────────────┘