ENFORCEMENT DECREE OF THE WATER QUALITY CONSERVATION ACT

14658 · 1996-07-31

ENFORCEMENT DECREE OF THE WATER QUALITY CONSERVATION ACT  Wholly Amended by Presidential Decree No. 15129, Jul. 31, 1996   Wholly Amended by Presidential Decree No. 15129, Jul. 31, 1996 법령보기 화면  Article 1 (Purpose) The purpose of this Decree is to provide the matters delegated by the Water Quality Conservation Act (hereinafter referred to as the “Act”) and the matters necessary for the enforcement thereof. 법령보기 화면  Article 2 (Permit for and Notification on, etc. Establishment of Discharge Facilities) The discharge facilities, for the establishment of which the permit need be obtained in accordance with the provisions of Article 10 (1) of the Act , are as follows: 1. The discharge facilities which discharge the specified substances hazardous to the water quality as provided in subparagraph 3 of Article 2 of the Act (hereinafter referred to as the “specified substances hazardous to the water quality”); 2. The discharge facilities which are to be established within the special countermeasure area as provided in Article 22 of the Framework Act on Environmental Policy (hereinafter referred to as the “special countermeasure area”); 3. The discharge facilities which are to be established within the area given a public notice of by the Minister of Environment in accordance with the provisions of Article 3 ; 4. The discharge facilities which are to be established within 10 km of flow-distance towards the upper stream from the boundary of the water-source protection sphere as provided in Article 5 of the Water Supply and Waterworks Installation Act (hereinafter referred to as the “water-source protection sphere”); 5. In the case of an area, among the areas in which no water-source protection sphere has been designated, where the water-intake structures are installed, the discharge facilities which are to be established within 15 km of flow-distance towards the upper stream from the said water-intake structures; and 6. The discharge facilities the establishment of which was notified in accordance with the provisions of Article 10 (1) of the Act and which newly begin to discharge the specified substances hazardous to the water quality, as provided in subparagraph 1, because of changes in the relevant raw materials, subsidiary raw materials, manufacturing methods, etc. (2) In one of the following cases, the establishment of the discharge facilities shall be notified in accordance with the provisions of Article 10 (1) of the Act : 1. In the cases other than those as prescribed by the provisions of paragraph (1); and 2. In such case as that of paragraph (1) 1 or 6 and where the total quantity of the relevant wastewater is treated on consignment. (3) In one of the following cases, the person who obtained the permit on establishment of the discharge facilities shall obtain the permit on modification of the discharge facilities : Provided , That in a case where the said person went through the consultation on wastewater treatment and on the matter of sharing the expenses therefor with the representative of the joint preventive facilities as provided in Article 13 (1) of the Act (hereinafter referred to as the “joint preventive facilities”) or with the manager of the wastewater terminal treatment facilities as provided in Article 25 of the Act (hereinafter referred to as the “wastewater terminal treatment facilities”): Provided , That ,and the said person modifies the discharge facilities within the limit of the original wastewater treatment capacity or quantity, report on modification of the discharge facilities may replace the above-mentioned permit on modification of the discharge facilities: 1. In a case where the wastewater discharge quantity is increasing by not less than 50/100 (or, 30/100 in the case of the discharge facilities which discharge the specified substances hazardous to the water quality) of the wastewater discharge quantity determined at the time of the permit, or where the wastewater discharge quantity is increasing by not less than 700 ㎥ a day; 2. In a case where an improvement is required of the discharge facilities or of the water-pollution preventive facilities as provided in Article 11 (1) of the Act (hereinafter referred to as the “preventive facilities”) due to the discharge of new pollutants to such extent as exceeds the permissible discharge standards; 3. In a case where the wastewater treatment method of the preventive facilities attached to the discharge facilities is being altered from a physical treatment method into a chemical or bio-chemical one or from a chemical treatment method into a bio-chemical one; and 4. In a case where the preventive facilities are being newly attached to the discharge facilities for which the exemption authorization with respect to installation of the preventive facilities as provided in Article 11 (1) of the Act (hereinafter referred to as the “exemption authorization with respect to installation of the preventive facilities) was obtained. (4) In a case where the person, who runs a workplace designated as the one working in harmony with the natural environment in accordance with the provisions of Article 10-2 of the Act , desires to obtain the permit on establishment of the discharge facilities (including, hereinafter, the permit on modification of the discharge facilities) as provided in paragraph (1) 1 or 6, he may make a report upon the establishment of the discharge facilities instead of obtaining the said permit (or, make a report upon modification of the discharge facilities in the case of the permit on modification thereof). (5) The cases for which the report on modification should be made in accordance with the provisions of Article 10 (2) of the Act and the procedures, etc., for the said report shall be determined by the Ministerial Decree of Environment. (6) The person who desires to obtain the permit on establishment of the discharge facilities or to make the report on establishment thereof, in accordance with the provisions of Article 10 (1) of the Act , shall submit to the Minister of Environment the application form for the permit on establishment of the discharge facilities or the report form on establishment thereof together with the following documents. But such documents, of the following ones, as overlap with those submitted at the time the authorization of design and construction of one’s own preventive facilities was applied for, or the authorization of establishment or modification of the joint preventive facilities was applied for, or the report on modification of the joint preventive facilities was made, may not be submitted: 1. A map showing the locations of the wastewater discharge facilities and a map showing the legitimate flow-course of the discharged wastewater; 2. A detailed statement of the types of the raw materials to be used (including the industrial water to be used), the amounts of the goods to be produced, and the types of pollutants anticipated to be discharged; 3. A detailed statement of the establishment of the preventive facilities and a blueprint thereof (the blueprint here may be replaced by a plotplan in a case where only a report is made); 4. The application form for the exemption authorization with respect to installation of the preventive facilities (applicable only to the person who applied for the exemption of installation of the preventive facilities); and 5. The permit certificate on installation of the discharge facilities (applicable only to the case of the permit on modification). (7) Having given the permit on installation of the discharge facilities or having received the report form on installation of the discharge facilities, the Minister of Environment shall issue to the relevant applicant the permit certificate on installation of the discharge facilities or the report certificate on installation of the discharge facilities: Provided , That when the Minister of Environment has given the permit on modification of the installation of the discharge facilities, he shall fill out the relevant column on the back side of the permit certificate already issued with the permitted contents of modification. (8) In a case where the person, who obtained the permit on installation of the discharge facilities or made the report thereon in accordance with the provisions of Article 10 (1) and (2) of the Act , thinks he cannot complete the installation of the discharge facilities within the scheduled date for the completion of the installation of the discharge facilities, he shall submit to the Minister of Environment the application form for prolongation of the installation period of the discharge facilities fifteen days prior to the scheduled date for the completion of the installation. 법령보기 화면  Article 3 (Putting Limitation on Installation of Discharge facilities) (1) In one of the following cases, the Minister of Environment may put a limitation on installation of the discharge facilities in accordance with the provisions of Article 10 (4) of the Act : 1. In a case where the water-quality environmental standards of the special countermeasure area are acknowledged to be difficult to be observed or achieved due to a new installation or enlargement of the discharge facilities; and 2. In a case where the possibility of the water source, of the upper stream of a water-source protection sphere or the upper stream of an area which has not been designated as a water-source protection sphere but where the water-intake structures have been installed, to be polluted by the specified substances hazardous to the water quality to be discharged is acknowledged to exist (2) Intending to put a limitation on installation of the discharge facilities on account of one of the reasons as specified in the subparagraphs of paragraph (1), the Minister of Environment shall determine the objects, contents, methods, etc. of the said limitation in consultation with the head of the relevant central administrative agency and then give a public notice thereof. This provision shall also apply to the case where alterations are to be made to the contents of the determined matters. 법령보기 화면  Article 4 (Criteria, etc. for Exemption of Establishment of Preventive Facilities) (1) The phrase, “the cases which fall under the criteria as prescribed by the Presidential Decree,” as it appears in the conditional provision of Article 11 (1) of the Act , refers to the following cases: 1. In a case where pollutants are always discharged below the permissible discharge standards thanks to the function of and the work procedures of the discharge facilities; 2. In a case where all of the wastewater as prescribed by the Ministerial Decree of Environment is treated, on consignment, by a person who obtained the permit on the wastewater treatment business or by a relevant professional agency acknowledged and publicly announced by the Minister of Environment in accordance with the provisions of Article 43 of the Act ; and 3. Other cases where a proper treatment of pollutants is possible, without installing the preventive facilities, in such a way as, for instance, recycling of all of the wastewater to occur and, at the same time, which are determined by the Ministerial Decree of Environment. (2) The person, who desires to obtain the exemption authorization with respect to establishment of the preventive facilities in accordance with the proviso of Article 11 (1) of the Act , shall submit the application form for the exemption authorization with respect to establishment of the preventive facilities to the Minister of Environment. Provided , That this provision shall not apply in the case where the exemption authorization with respect to establishment of the preventive facilities is applied for together with the application for the permit on installation of the discharge facilities or the installation report and the modified-installation report as prescribed by the provisions of Article 10 (1) through (3) of the Act . (3) Having received the application for the exemption authorization with respect to establishment of the preventive facilities as provided in paragraph (2), the Minister of Environment shall first examine whether the case under consideration conforms to the criteria as prescribed in paragraph (1), and decide, thereby, whether to authorize the case under consideration or not, and then notify the result of the decision to the applicant. 법령보기 화면  Article 5 (Scales, etc. of Discharge Facilities Subject to Report, Coming after Modification Report is Made, on Starting to Operate) The phrase, “modifications to such extents as exceed the scales as prescribed by the Presidential Decree,” referred to in Article 14 (1) of the Act , means the cases of the following specifications: 1. In a case where the quantity of the discharged waste water increases by not less than 50/100 of the quantity of the waste water discharged at the time the report was made; 2. In a case where the discharge facilities or preventive facilities need be improved because new pollutants exceeding the permissible discharge standards are discharged from the discharge facilities concerned; 3. In a case where the wastewater treatment method of the preventive facilities attached to the discharge facilities is to be altered from a physical method into a chemical or bio-chemical one or from a chemical method into a bio-chemical one; and 4. In a case where the preventive facilities are to be newly attached to the discharge facilities for which the exemption authorization concerning installation of the preventive facilities was obtained. 법령보기 화면  Article 6 (Scales, etc. of Discharge Facilities Subject to Confirmation Procedure Coming after Modification Report) The phrase, “the persons who modified to such extents as exceed the scales as prescribed by the Presidential Decree,” referred to in Article 14 (2) 2 of the Act , means the persons of the following specifications: 1. The person who modifies the discharge facilities so that the quantity of the discharged wastewater increases by not less than 200 ㎥ a day; and 2. The person who replaced the modification permit by the modification report in accordance with the provisions of Article 2 (4). 법령보기 화면  Article 7 (Persons Entrusted with Confirmation Work) The phrase, “the persons as prescribed by the Presidential Decree,” referred to in Article 14 (3) of the Act , means the persons of the following specifications: 1. The Environmental Management Corporation as prescribed by the Environmental Management Corporation Act; 2. The Environmental Preservation Association as prescribed by the provisions of Article 38 of the Framework Act on Environmental Policy ; and 3. Other persons the Minister of Environment acknowledges to have the necessary technical capabilities, and therefore, determines for the purpose under consideration. 법령보기 화면  Article 8 (Workplaces, etc., Subject to Requirement to Attach Apparatus to Confirm Whether Discharge and Preventive Facilities Are Working Properly) The types of workplaces subject to the requirement to attached the apparatus to confirm whether the discharge and preventive facilities are working properly or not, as prescribed in Article 15 (3) of the Act , and the types of the said apparatuses shall be determined and given a public notice of by the Minister of Environment. 법령보기 화면  Article 9 (Reasons for Reporting Cases of Improper Operations of Discharge or Preventive Facilities) The phrase, “the unavoidable reasons as prescribed by the Presidential Decree,” as it appears in Article 15 (5) of the Act , means the cases of the following specifications: 1. In a case where improper operation of the discharge or preventive facilities is unavoidable in order to improve, modify or repair the said discharge or preventive facilities; 2. In a case where proper operation of the discharge or preventive facilities is not possible on account of a sudden accident which occurred to a major machinery part of the discharge or preventive facilities; 3. In a case where proper operation of the discharge or preventive facilities is not possible on account of suspension of power or water supply; 4. In a case where proper operation of the discharge or preventive facilities is not possible on account of a natural disaster, fire or other unavoidable reasons; and 5. In a case where proper operation of the discharge or preventive facilities is not possible on account of weather changes or inflow of strange substances occurring on the course of the bio-chemical treatment of pollutants. 법령보기 화면  Article 10 (Improvement Period) (1) Having decided to issue the improvement order in accordance with the provisions of Article 16 , the Minister of Environment shall determine the improvement period within the range of one year, having taken into consideration necessary measures to be taken for the improvement or installation period for necessary facilities. (2) The person who received the improvement order as provided in Article 16 of the Act , in a case where he cannot complete execution of the ordered measures within the period as prescribed in paragraph (1) on account of a disaster or other reasons acknowledged to be unavoidable, may file an application, before the improvement period ends, with the Minister of Environment for prolongation of the improvement period within the range of six months. 법령보기 화면  Article 11 (Submittance of Improvement Plan and Movement Plan) The enterpriser who received the improvement order as provided in Article 16 of the Act or the movement order as provided in Article 18 of the Act shall submit, within fifteen days after the date on which he received the relevant order, an improvement plan or a movement plan including information on following subject matters to the Minister of Environment under the conditions as prescribed by the Ministerial Decree of Environment: Provided , That in a case where the Minister of Environment thinks prolongation of the submittance period is necessary in consideration of the type and scale of the discharge facilities concerned, he may prolong the submittance period upon receiving the relevant application from the enterpriser: 1. In a case where the enterpriser concerned is planning to improve or move before the end of the improvement period as provided in Article 16 of the Act or the movement period as provided in Article 18 of the Act (referred to, hereinafter in this Article, “the improvement or movement period”), the planned improvement or movement period; 2. In a case where the enterpriser concerned is planning to stop or put a limitation on operation of the discharge facilities during the improvement or movement period, the period during which the stop or limitation is to be put on and the contents of the limitation; and 3. In a case where the enterpriser concerned is planning to decrease discharged quantity of pollutants, etc., through improvement of necessary technologies, etc., the contents of the planned improvement. (2) In a case where the enterpriser concerned did not submit the improvement or movement plan as provided in paragraph (1) or did not include information on the subject matters as prescribed in the subparagraphs of paragraph (1) in the improvement or movement plan submitted, he shall be regarded as having continually operated, during the Improvement or Movement Period, the discharge facilities discharging pollutants in such a polluted state as prescribed in the improvement or movement order. 법령보기 화면  Article 12 (Reasons, etc. for Issuing Movement Order) (1) The reasons for issuing the movement order concerning a workplace, as prescribed in Article 18 (1) of the Act , are as follows: 1. In a case where improvement, enlargement or modification of the preventive facilities at the present workplace is impossible because such activity goes against Acts and subordinate statutes, even when an improvement order pertaining the present workplace is issued as provided in Article 16 of the Act ; 2. In a case where an appropriate treatment of pollutants consistent with the permissible discharge standards is judged to be impossible for such workplaces as are located within the special countermeasure area or the specified lakes and marshes water quality management area as provided in the provisions of Article 33 (1) of the Act ; and 3. In a case where the Minister of Environment admits the movement is particularly necessary in order to prevent potential danger or damage against the health of the residents concerned or against the environment contiguous to the workplace concerned. (2) In a case where the workplace subject to the movement order for such reasons as specified in the provisions of paragraph (1) 3 is located within a national or local industrial complex among the urban areas as prescribed by the Act on the Utilization and Management of the National Territory or within an agro-industrial complex among the semi-urban areas as prescribed by the said Act or within an industrial area as prescribed by the Urban Planning Act , the Minister of Environment shall in advance consult with the head of the relevant central administrative agency. 법령보기 화면  Article 13 (Types of Discharge Dues, etc.) (1) The discharge dues as prescribed in Article 19 (1) of the Act (hereinafter referred to as the “dues”) shall be imposed in two different types: one is the excessive discharge dues (hereinafter referred to as the “excessive dues”) and the other, the basic discharge dues (hereinafter referred to as the “basic dues”). (2) The excessive dues as provided in paragraph (1) shall be imposed when the permissible discharge standards as prescribed in Article 8 of the Act are exceeded: the excessive dues shall be divided into the dues by types of the workplaces imposed differently according to different scales of the workplaces as shown on Table 1 attached at the end of this Decree and the treatment dues imposed as much as the expenses necessary for treatment of the pollutants discharged exceeding the permissible discharge standards: the amount of the excessive dues shall be what is derived from the dues by types of the workplaces added by the treatment dues. (3) The basic dues as provided in paragraph (1) shall be imposed when the discharged waste water does not exceed the permissible discharge standards as prescribed in Article 8 of the Act but exceeds the quality standards for the water let out into the public waterways as prescribed in Article 32 (2) of the Act (referring to, hereinafter, the quality standards for the water let out from the waste water terminal treatment facilities): the amount of the basic dues shall be determined according to the quantity of the discharged pollutants, the density of the discharged pollutants, etc. 법령보기 화면  Article 14 (Kinds of Pollutants Subject to Imposition of Dues) (1) The kinds of the pollutants subject to imposition of the excessive dues as prescribed in the provisions of Article 13 (2) are as follows: 1. Organic matter; 2. Floating matter; 3. Cadmium and its compound; 4. Cyanogen compound; 5. Organophosphoric compound; 6. Lead and its compound; 7. Chromic(Ⅵ) compound; 8. Arsenic and its compound; 9. Mercury and its compound; 10. Polychlorinatedbiphenyl; 11. Copper and its compound; 12. Chrome and its compound; 13. Phenol; 14. Trichloroethylene; 15. Tetrachloroethylene; 16. Manganese and its compound <Enforcement date; Jan. 1, 1998>; and 17. Zinc and its compound. <Enforcement date; Jan. 1, 1998> (2) The kinds of the pollutants subject to imposition of the basic dues as prescribed in Article 13 (3) are as follows: 1. Organic matter; and 2. Floating matter 법령보기 화면  Article 15 (Computation Method and Criteria of Excessive Dues) (1) The computation criteria for the dues by the types of workplaces as provided in Article 13 (2) shall be as shown on Table 2 attached at the end of this Decree: Provided , That for the enterpriser who made the report as prescribed in the provisions of Article 15 (5) of the Act (hereinafter referred to as the “Report on Improper Operation”), the dues by the types of workplaces shall not be imposed on him in so far as the case of the relevant report is concerned. (2) The amount of the treatment dues as provided in Article 13 (2) shall be what is derived from multiplication of the quantity of the pollutants discharged beyond the permissible discharge standards (hereinafter referred to as the “quantity discharged beyond the standards”) by the imposition amount per 1 kilogram of pollutants by the imposition figure contingent on the ratio of the discharged pollutants exceeding the permissible discharge standards by the relevant local imposition figure by the relevant yearly figure for calculating the imposition amount by the imposition figure contingent on the frequency of violations : Provided , That in a case where the report on improper operation is made, the amount of the treatment dues for the case of the report shall be derived by the same multiplication method excepting for the fact that the imposition figure contingent on the ratio of the discharged pollutants exceeding the permissible discharge standards and the imposition figure contingent on the frequency of violations shall not be applied in the process of the computation. (3) The imposition amount per 1 kilogram of pollutants, the imposition figures contingent on the ratio of the discharged pollutants exceeding the permissible discharge standards and the local imposition figures necessary for computation of the amount of the treatment dues as provided in paragraph (2) are as shown on Table 3 attached at the end of this Decree. 법령보기 화면  Article 16 (Computation of Quantity of Discharged Pollutants for Excessive Dues, etc.) (1) The quantity discharged beyond the standards necessary for computation of the treatment dues as provided in Article 15 (2) shall be the quantity of pollutants discharged on the course of operating the relevant facilities in such a state as exceeds the permissible discharge standards during such discharge period as falls under one of the following specifications; and shall be computed by multiplication of the quantity discharged beyond the standards per day by the number of the days of the discharge period concerned: 1. In a case where the person concerned made the report on improper operation as provided in Article 15 (5) of the Act , from the first day of the improper operation to the day of completion of the improvement as specified on the form of the report on improper operation; 2. In cases other than that of paragraph (1), from the day on which pollutants began to be discharged (or, the day on which pollutants are collected for an examination to find out whether the permissible discharge standards are exceeded or not, in a case where the day, on which pollutants began to be discharged, cannot be ascertained for sure) to the scheduled day on which the improvement order, the order for temporary suspension of operation, the movement order, the order for suspension of the use or the order for permanent closure, as provided in Articles 16 through 18 of the Act or Article 21 of the Act , is completely executed, or, to the day on which the permit is revoked as prescribed in Article 20 of the Act , or, in one of the following cases where the permissible discharge standards come to be exceeded because the discharge facilities and preventive facilities are not properly operated in violation of the provisions of Article 15 (1) of the Act , to the day on which the act of improperly operating the facilities ceased to be: (a) In a case where the preventive facilities are not put into operation or where necessary treatment chemicals are not put in; (b) In a case where pollutants are discharged through a secret discharge channel; (c) In a case where only the degree of pollution of wastewater is lowered, that is, without the relevant pollutants gotten rid of, by means of adding pure water or only slightly polluted water to the wastewater on the course of discharge processes; and then discharged as such (excepting for such cases where the Minister of Environment acknowledges the dilution with pure or slightly polluted water is the only way of properly treating pollutants in view of the waterpollution preventive technology); and (d) In a case where pollutants are discharged without having gone through the preventive facilities. (2) The quantity discharged beyond the standards per day as provided in paragraph (1) shall be what is derived, and then indicated in the measuring unit of kilogram, from the degree of pollution, beyond the permissible discharge standards, of the pollutants, collected on the day of collecting the discharged pollutants or the day of collecting pollutants as determined by the Ministerial Decree of Environment in a case where the report on improper operation is made, which constitute a cause for issuing the improvement order, the order for temporary suspension of the operation, the movement order, the permit revocation, the order for suspension of the use or the order for permanent closure, as prescribed in Articles 16 through 18, 20 or 21 of the Act , multiplied by the total quantity, calculated on the basis of the quantity of wastewater at the time when the degree of pollution is measured (hereinafter referred to as the “measured quantity”), of the waste water for the day concerned (hereinafter referred to as the “daily quantity”). (3) The quantity discharged beyond the standards per day and the daily quantity as prescribed in paragraph (2) shall be computed in such a way as shown on Table 4 attached at the end of this Decree; and the measured quantity, in the official testing method with respect to water pollution processes as prescribed in the provisions of Article 7 of the Act : Provided , That as for the measured quantity, in a case where its computation is impossible or the result of its computation is far from the reality, it shall be computed in one of the following methods: 1. Computation by means of an industrial flowmeter; 2. In a case where the method as prescribed in subparagraph 1 is deemed to be inappropriate, computation on the basis of the average quantity of the wastewater for the recent thirty days of operation right before the day for collection of the test materials as shown on the daily record of operation of the preventive facilities; and 3. In a case where the methods as prescribed in subparagraphs 1 and 2 are deemed to be inappropriate, computation by means of subtracting the quantity of water for everyday living, the quantity of water contained in goods and the other quantity of water which has not been turned into wastewater, out of the total quantity of water used at the workplace concerned (including all the water used at the workplace concerned such as the tap water, water used for industrial purposes, groundwater, river water or ocean water, etc.). (4) The discharge period as provided in paragraph (1) shall be indicated by the number of the days concerned; and computation of the discharge period shall be done in accordance with the relevant provisions of the Civil Act : Provided , That it shall include the number of the days exceeding the original limit. 법령보기 화면  Article 17 (Yearly Figures for Calculating Imposition Amounts and Imposition Figures Contingent on Frequencies of Violations) (1) Each of the yearly figure for calculating the imposition amount as provided in Article 15 (2) shall be what is derived from the figure for calculating the imposition amount for each previous year multiplied by the price-difference figure for the relevant year decided and publicly announced by the Minister of Environment after having taken into consideration the inflation rate for each previous year, etc. (2) The imposition figures contingent on frequencies of violations as provided in Article 15 (2) shall be as shown on Table 5 attached at the end of this Decree. (3) The frequency of violations as provided in paragraph (2) shall be the number of having received the improvement order, the order for temporary suspension of the operation, the movement order, the permit revocation, the order for suspension of the use or the order for permanent closure, as prescribed in the provisions of Articles 16 through 18, 20 or 21 of the Act , issued on account of having discharged, exceeding the permissible discharge standards, the pollutants, etc., subject to imposition of the dues as provided in Article 14 of the Act . The frequency of violations, in this case, shall be calculated for each workplace with two fiscal years as a unit. 법령보기 화면  Article 18 (Imposition Period, etc. of Basic Dues) The basic dues as provided in Article 13 (3) shall be imposed every half year; the day as of which the amount of the imposition is calculated and the imposition period shall be as shown on Table 6 attached at the end of this Decree. 법령보기 화면  Article 19 (Computation Methods and Criteria for Basic Dues) (1) The basic dues as provided in Article 13 (3) shall be the amount derived from multiplication of the quantity of pollutants discharged beyond the quality standards of the water to be let out into public waterways but within the range of the permissible discharge standards (hereinafter referred to as the “quantity discharged within the range of the permissible discharge standards”) by the imposition amount per 1 kilogram of pollutants by the relevant yearly figure for calculating the imposition amount by the relevant local imposition figure by the imposition figure contingent on the ratio of the discharged pollutants exceeding the quality standards of the water to be let out into public waterways. (2) The provisions of Article 15 (3) and Article 17 (1) shall apply mutatis mutandis to the case of the imposition amount per 1 kilogram of pollutants necessary for computation of the basic dues as prescribed in the provisions of paragraph (1) and to the case of the yearly figure for calculating the imposition amount respectively; the local imposition figures and the imposition figures contingent on the ratio of pollutants exceeding the quality standards of the water to be let out into public waterways shall be as shown, respectively, on Tables 7 and 8 attached at the end of this Decree. 법령보기 화면  Article 20 (Identifying Quantity of Discharged Pollutants Necessary for Computation of Basic Dues, etc.) (1) If it is necessary for identification of the quantity discharged within the range of the permissible discharge standards needed for computation of the amount of the basic dues as provided in Article 19 (1), the Minister of Environment may have the relevant enterpriser submit the following documents in accordance with the provisions of Article 49 (1) of the Act : 1. Documents concerning the quantity of pollutants (hereinafter referred to as the “quantity anticipated to be discharged”) within the range of the permissible discharge standards anticipated to be discharged during the imposition period of the basic dues(The said documents shall be submitted within thirty days after the first day of the imposition period, but in a case where the relevant enterpriser newly obtains the permit or makes the report, during the imposition period, on installation of the discharge facilities as prescribed in Article 10 of the Act , he may submit the said documents within thirty days after the day on which the report on starting to operate the discharge facilities, etc., is made in accordance with Article 14 of the Act . If, in this case, the day on which the report on starting to operate the discharge facilities, etc., falls within thirty days backwards from the last day of the imposition period, the said documents may not be submitted in so far as the relevant imposition period is concerned.); 2. Documents concerning the quantity of pollutants (hereinafter referred to as the “quantity actually discharged”) within the range of the permissible discharge standards actually discharged during the imposition period of the basic dues (The said documents shall be submitted within thirty days after the day on which the imposition period is completed); and 3. As for the enterpriser who installs and operates the joint preventive facilities, the documents, in addition to those as prescribed in the provisions of subparagraphs 1 and 2, concerning the quantity of discharged pollutants indicated by individual enterprisers who flow their waste water into the joint preventive facilities. (2) The quantity anticipated to be discharged and the quantity actually discharged as prescribed in paragraph (1) shall be calculated in one of the following ways: 1. The discharged quantity of pollutants shall be what is derived, and then indicated in the measuring unit of kilogram, from multiplication of the daily average of the quantity discharged within the range of the permissible discharge standards by the number of working days during the imposition period; 2. The daily average of the quantity discharged within the range of the permissible discharge standards as provided in paragraph (1) shall be calculated on the basis of the results of the self-measurements, etc., as prescribed in Article 22 (1) of the Act and in the ways of the following specifications: (a) The daily average of the quantity discharged within the range of the permissible discharge standards shall be what is derived from subtraction of the discharged quantity, derived from multiplication of the density of the quality standards of the water to be let out into public waterways by the daily average of the flow quantity, out of the daily average of the discharged quantity; (b) The daily average of the discharged quantity shall be calculated by, first, adding each of the daily quantity of discharged pollutants measured as often as the frequency of self-measurements determined for each discharge outlet, and then, dividing the result of the adding by the frequency of self-measurements: Provided , That in a case where the result of the measurement as prescribed in Article 49 of the Act is reported during the imposition period, the daily average of the discharged quantity shall be calculated by, first, adding the daily average of the discharged quantity calculated on the basis of the results of the self-measurements to the reported quantity of discharged pollutants per day, and then, dividing the result of the adding by the figure derived from adding 1 to the number of the measurements; (c) The quantity of discharged pollutants per day shall be calculated by multiplication of the discharge density at the time of measurement by the flow quantity per day; As for calculation of the flow quantity per day, the provisions of Article 16 (3) shall be applied mutatis mutandis: and (d) As for calculation of the daily average of the flow quantity per day, the computation method as prescribed in item (b) shall be applied mutatis mutandis . 3. The quantity anticipated to be discharged shall be calculated by multiplying the number of the scheduled working days of the relevant imposition period to the daily average of the quantity discharged within the range of the permissible discharge standards of the imposition period right before the one under consideration; the quantity actually discharged shall be calculated by multiplying the number of the actual working days of the relevant imposition period to the daily average of the quantity discharged within the range of the permissible discharge standards of the imposition period under consideration. (3) Matters concerning the evidential materials that can prove the truthfulness of the documents submitted in accordance with the provisions of paragraph (1) shall be determined by the Ministerial Decree of Environment. 법령보기 화면  Article 21 (Adjustment, etc. of Quantity Discharged within Range of Permissible Discharge Standards) In a case where the documents as prescribed in Article 20 are not submitted or the said documents having been submitted are deemed to be unsatisfactory, the Minister of Environment may adjust the quantity discharged within the range of the permissible discharge standards under the conditions as prescribed in the following subparagraphs: 1. In a case where the enterpriser concerned does not submit documents concerning the quantity anticipated to be discharged and the quantity actually discharged as prescribed in Article 20 , the quantity discharged within the range of the permissible discharge standards shall be calculated, substituting the discharge density with the dischargepermit standards, the flow quantity per day with the maximum quantity of wastewater to be discharged submitted at the time of the permit given on installation of the discharge facilities or the report or the modification report made thereon in accordance with the provisions of Article 10 of the Act , and the number of working days with the number of the total days of the imposition period concerned; 2. In a case where the enterpriser concerned submitted documents concerning the quantity actually discharged instead of the documents concerning the quantity anticipated to be discharged as provided in Article 20 (1), the discharged quantity equivalent to 110/100 of the quantity actually discharged shall be determined as the quantity discharged within the range of the permissible discharge standards; 3. In a case where the enterpriser concerned submitted the documents concerning the quantity anticipated to be discharged as provided in Article 20 (1) but not the documents concerning the quantity actually discharged, the discharged quantity of pollutants (hereinafter referred to as the “discharged quantity in view of the inspection”) shall be calculated as prescribed in following items, based upon the presumption that pollutants have been, so far, discharged in the same state as the discharge density and the daily flow quantity at the time of the inspection as prescribed in Article 49 of the Act ; and the discharged quantity equivalent to 120/100 of the said discharged quantity in view of the inspection shall be regarded as the quantity discharged within the range of the permissible discharge standards. (a) The discharged quantity in view of the inspection a day shall be calculated by multiplying the discharge density at the time of inspection to the daily flow quantity at the time of inspection; (b) The daily average of the discharged quantity in view of the Inspection shall be calculated by, first, adding the daily discharged quantity in view of the Inspection computed according to the provisions of item (a), and then, dividing the result of the adding by the number of the inspections carried out; and (c) The discharged quantity in view of the Inspection shall be calculated by multiplying the number of working days to what is derived from subtraction of the discharged quantity of not higher than the quality standards of the water to be let out into public waterways out of the daily average of the discharged quantity in view of the Inspection; of the following specifications. 4. In a case where the quantity actually discharged submitted by the enterpriser concerned in accordance with the provisions of Article 20 (1) is smaller than the discharged quantity in view of the inspection as prescribed in the provisions of subparagraph 3 by not less than 20/100 of the latter, the discharged quantity in view of the inspection shall overrule the other; and the discharged quantity equivalent to 120/100 of the said discharged quantity in view of the Inspection shall be regarded as the quantity discharged within the range of the permissible discharge standards. 법령보기 화면  Article 22 (Submittance of Documents and Examination Thereof) (1) In a case where the adjustment, etc. of the quantity discharged within the range of the permissible discharge standards as prescribed in the provisions of Article 21 is necessary on account of the fact that the quantity anticipated to be discharged or the quantity actually discharged submitted by the enterpriser concerned in accordance with the provisions of Article 20 is different far from those of other workplaces of similar scales or is deemed to be unsatisfactory, the Minister of Environment may have the relevant enterpriser submit relevant materials in accordance with the provisions of Article 49 (1) of the Act . (2) In order to confirm the matters concerning the discharged quantity of pollutants, etc., submitted by the enterpriser concerned in accordance with the provisions of Article 20 , the Minister of Environment shall carry out the inspection of the degree of pollution under the conditions as prescribed by the Ministerial Decree of Environment or shall entrust the inspection of the degree of pollution to an inspection agency as designated by the Ministerial Decree of Environment. 법령보기 화면  Article 23 (Decreasing and Exempting, etc. of Dues) (1) The phrase, “the enterprisers who discharge water-pollutants below the quantity as determined by the Presidential Decree and the enterprisers who shared the expenses for treatment of water pollutants in accordance with the provisions of other Acts,” as it appears in the provisions of Article 19 (3) of the Act , refers to the enterprisers of the following specifications: 1. The enterpriser the scale of whose workplace is classified as the fifth type as shown on Table 1 attached at the end of this Decree; and 2. The enterpriser who has his wastewater flow into the wastewater terminal treatment facilities as prescribed in subparagraph 5 of Article 2 of the Sewerage Act . (2) The kinds of the dues subject to the disposition of decrease or exemption as prescribed in Article 19 (3) of the Act shall be limited to the basic dues as provided in Article 13 (3); and the details of the disposition of decrease or exemption are as follows: 1. In the case of the enterpriser as prescribed in paragraph (1) 1, the dues shall be exempted; and 2. In the case of the enterpriser as prescribed in paragraph (1) 2, the whole amount of the sewerage-system usage fee imposed in accordance with the provisions of Article 21 (1) of the Sewerage Act shall be exempted. (3) Under the conditions as prescribed by the Ministerial Decree of Environment, the enterpriser who desires to be exempted from the imposition of the dues in accordance with the provisions of Article 19 (3) of the Act shall submit relevant documents that can prove his qualification for being exempted as such no later than the last day of the month coming right after the month in which the imposition period is completed: Provided , That this provision shall not apply to the case of the enterpriser as prescribed in paragraph (2) 1. 법령보기 화면  Article 24 (Payment Notification of Dues) (1) The payment notification of the excessive dues shall be made at the time an occasion for imposition of the excessive dues occurred; and that of the basic dues shall be made within sixty days after the day on which the submittance period for the documents concerning the quantity actually discharged of the relevant imposition period expired. (2) As for the payment notification of the dues (including the Adjusted dues as prescribed by in of Article 25 ) in accordance with the provision of paragraph (1), it shall be made in a written form indicating the quantity of pollutants subject to the imposition of the dues under consideration, the amount of the dues, the payment period, the payment place and other necessary matters. The payment period of the dues, in this case, shall be within thirty days after the date on which the written payment notification is issued. 법령보기 화면  Article 25 (Adjustment of Dues) (1) In one of the following cases, the Minister of Environment shall calculate the amount of the dues again for an adjustment of the dues; in a case where there is a difference between the already paid amount of the dues and the adjusted amount thereof, the Minister of Environment shall reimpose or refund the amount equivalent to the difference: 1. In a case where the discharge period of pollutants or discharged substances on the basis of which the computation of the excessive dues is made has changed on account of the fact that, until the last day of the improvement period or the last day of the scheduled period for completing execution of orders as provided in Article 10 (1), the relevant improvement or execution of the relevant order has not been completed or the fact that, before the last days of the said periods, the relevant improvement or execution of the relevant order was completed; 2. In a case where the discharged quantity of pollutants or discharged substances turned out to have changed from the discharged quantity of the original measurement as a result of its remeasurement done according to the acknowledgement of the fact that the state of pollutants, etc. being discharged after imposition of the excessive dues changed from the state thereof at the time of the original measurement; and 3. In a case where a mistake is detected in the computation of the quantity actually discharged submitted by the enterpriser concerned in accordance with the provisions of Article 20 (1) or where a mistake is detected in the adjustment of the quantity discharged within the Range of the permissible discharge standards done by the Minister of Environment in accordance with the provisions of Article 21 . (2) The last day of the discharge period of pollutants or discharged substances necessary for computation of the excessive dues in the case of adjustment of the excessive dues for such reason as prescribed in paragraph (1) 1 shall be the day of completion of the relevant improvement as determined by the Ministerial Decree of Environment or the day on which the report on execution of the relevant order is made in accordance with the provisions of Article 29 (1). (3) The amount of the excessive dues in the case of adjustment of the excessive dues for such reason as prescribed in paragraph (1) 2 shall be computed on the basis of the remeasured discharged quantity in so far as the period after the day of remeasurement is concerned. (4) The reimpositions or refund coming after the adjustment of the excessive dues as prescribed in paragraph (1) 1 shall be made within thirty days after the date on which the confirmation whether the improvement, movement, temporary suspension of operation or permanent closure of the relevant discharge facilities or preventive facilities is completely executed or not. (5) The basic dues, in a case where it has to be adjusted for such reason as prescribed in paragraph (1) 3, shall be computed on the basis of the documents submitted at the time the permit on installation of the discharge facilities was applied for or the report or the modification report thereon was made in accordance with the provisions of Article 10 (1) through (3) of the Act , the record on operation of the discharge facilities and preventive facilities as prescribed in Article 15 (2) of the Act , the record on the self-measurement as prescribed in Article 22 (1) of the Act and the result of the inspection as prescribed in Article 49 of the Act , etc. (6) Having decided to reimpose or refund the difference in accordance with the provisions of paragraph (1), the Minister of Environment shall send to the person concerned a written notification indicating the relevant amount, date, place and other necessary matters. 법령보기 화면  Article 26 (Application for an Adjustment of Dues) (1) In such cases as fall under one of the subparagraphs of Article 25 (1), the enterpriser who is ordered to pay the dues (hereinafter referred to as the “payer of the dues”) may apply for an adjustment of the dues concerned. (2) The application for an adjustment of the dues as prescribed in paragraph (1) shall be made within thirty days after the date on which the written notification for payment of the dues is received. (3) Having received the application for an adjustment of the dues, the Minister of Environment shall notify the applicant of his decision on the matter under consideration within thirty days after the date on which the application was received. (4) The application for an adjustment of the dues as provided in paragraph (1) shall not affect the payment period of the dues. 법령보기 화면  Article 27 (Deferment of Collection, Installment Payment and Procedures of Collection of Dues) (1) In a case where the Minister of Environment acknowledges, before the relevant payment period is over, that the payer of the dues cannot pay the dues for such a reason as falls under one of the following specifications, he may defer the relevant collection or may have the Payer of the dues pay the dues in installments. This provision shall also apply to the case of delinquent dues: 1. In a case where the property of the relevant enterpriser is severely damaged on account of a natural disaster or other types of disasters; 2. In a case where the relevant enterpriser is in a crisis because of apparent losses in his business enterprise; and 3. Deferment of collection or installment payment of the dues is acknowledged to be unavoidable on account of such reasons as are similar to those as prescribed in subparagraphs 1 and 2. (2) The period for the deferment of collection as provided in paragraph (1) shall be within one year from the day right after the date on which the deferment of collection is decided upon; the number into which the installment payment is divided within the said period shall be not more than six. (3) In a case where the amount of the dues exceeds the capital or the total equity investment of the person who is responsible to pay it (or, the total asset in the case of an individual businessman) by not less than two times of the latter, and where it is acknowledged that the said amount of the dues cannot be paid even within the deferred period as prescribed in paragraph (2) because such a reason as falls under one of the subparagraphs of paragraph (1) continues, the Minister of Environment may defer the collection further than the period as provided in paragraph (2) or may have the payer of the dues pay the dues in installments for a period extended further than the one as provided in paragraph (2). (4) The period for the deferment of collection as prescribed in paragraph (3) shall be within three years from the day right after the date on which the deferment is decided upon; the number into which the installment payment is divided within the said period shall be not more than twelve. (5) Having decided upon the deferment of collection in accordance with the provisions of paragraph (1) or (3), the Minister of Environment may ask for an offer of a collateral whose worth corresponds to the amount subject to the deferment of collection. (6) In a case where the person who is responsible to pay the dues falls under one of the following specifications, the Minister of Environment may cancel the deferment of collection and collect the delinquent dues: 1. In a case where the person concerned did not pay the delinquent amount until the last day of the designated period; 2. In a case where the person concerned did not comply with the order of the Minister of Environment necessary for an alteration concerning the relevant collateral or preservation of the relevant collateral; and 3. In a case where the deferment of collection is regarded to be unnecessary on account of a change or changes in the property situation concerned or other relevant situations. (7) The person who desires to receive the deferment of collection or the installment payment of the dues or delinquent dues in accordance with the provisions of paragraph (1) or (3) shall submit to the Minister of Environment the application form for the deferment of collection or the installment payment of the discharge dues. (8) Necessary matters concerning the period, amount, imposition and collection of the installment payment shall be determined by the Minister of Environment. 법령보기 화면  Article 28 (Grant of Collection Expenses) (1) In a case where the Minister of Environment entrusted collection of the dues and late penalties to a Special Metropolitan City Mayor, a Metropolitan City Mayor or a Do governor (hereinafter referred to as the “City/ Do governor”) in accordance with the provisions of Article 19 (7) of the Act , the former shall grant to the Mayor City/ Do governor the amount corresponding to 10/100 of the dues and late penalties or the adjusted dues or late penalties as provided in Article 25 collected by the/ Do governor as the collection expenses. (2) The Minister of Environment shall calculate, every month, the collection expenses as provided in paragraph (1) out of the dues and late penalties paid into the special account for environmental improvement as prescribed by the Special Account for Environmental Improvement Act, and then, pay the said collection expenses to the relevant Mayor/ Do governor by the end of each upcoming month. 법령보기 화면  Article 29 (Report on Execution of an Order and Examination Thereof) (1) The enterpriser, who received the improvement order, the order for temporary suspension of the operation, the movement order, the order for suspension of the use or the order for permanent closure as prescribed in the provisions of Articles 16 through 18, 20 or 21 of the Act , in a case where he has completely executed one of the said orders, shall report, without any delay, on the execution of the order concerned. (2) Having received the report as prescribed in paragraph (1), the Minister of Environment shall have a relevant public official examine, without any delay, the executed state of the relevant order or the completed state of the relevant improvement; In a case where the inspection on the degree of pollution of wastewater is deemed to be necessary as a result of the said examination, the Minister of Environment shall collect relevant test materials and instruct an Inspection Agency as designated by the Ministerial Decree of Environment to carry out the inspection on the degree of pollution of wastewater or entrust the said Inspection Agency with the said inspection on the degree of pollution of wastewater. 법령보기 화면  Article 30 (Discharge Facilities Subject to Disposition of Imposing Penalty) The phrase, “other discharge facilities as determined by the Presidential Decree,” as it appears in Article 20-2 (1) 42 of the Act , refers to one of the following cases: 1. The discharge facilities of a company of the defense industry as prescribed in Article 4 of the Act on Special Measures on the Defense Industry; and 2. The discharge facilities acknowledged by the Minister of Environment to be susceptible to such accidents as an explosion or a fire on account of the fact that the raw materials, the subsidiary raw materials, industrial water, products (including semi-products), etc. inserted into the said discharge facilities manifest chemical responses, etc., in a case where the said discharge facilities stop to operate. 법령보기 화면  Article 31 (Qualification Standards and Appointment Period of Environmental Manager) (1) In a case where the enterpriser concerned makes a report on appointment of an environmental manager in accordance with the provisions of Article 23 (1) of the Act , the former shall make the said report within the relevant period that falls under one of the following specifications: 1. In a case where the enterpriser concerned has installed the discharge facilities for the first time, at the same time as the report on starting to operate the said discharge facilities is made; 2. In a case where a new environmental manager is appointed replacing the old one, within five days from the date on which the reason for the replacement occurred: Provided , That in a case where there is an unavoidable reason for a workplace which is required to appoint an environmental manager of not less than the first-or second-degree qualification not to be able to employ an environmental manager of such qualification within the designated period, the enterpriser concerned may appoint, within the period of thirty days, an environmental manager of a qualification appropriate to the fourth or fifth type of workplace as shown on Table 1 attached at the end of this Decree. (2) The qualification standards of the environmental managers who shall be employed by different types of workplaces in accordance with the provisions of Article 23 (5) of the Act are as shown on Table 9 attached at the end of this Decree. 법령보기 화면  Article 32 (Types, etc. of Wastewater Terminal Treatment Facilities) (1) Types of the wastewater terminal treatment facilities as prescribed by the provisions of Article 25 (2) of the Act are as follows: 1. The wastewater terminal treatment facilities in an Industrial Complex: referring to the wastewater terminal treatment facilities installed in an industrial complex designated according to the provisions of Articles 6 and 7 of the Industrial Sites and Development Act , or in an industrial area designated according to the provisions of Article 17 (1) 3 of the Urban Planning Act ; 2. The wastewater terminal treatment facilities in an Agro-Industrial Complex: referring to the wastewater terminal treatment facilities installed in an agro-industrial complex designated according to the provisions of Article 8 of the Industrial Site and Development Act; and 3. Other wastewater terminal treatment facilities: referring to the wastewater terminal treatment facilities installed in an area where the Minister of Environment acknowledges the wastewater terminal treatment facilities need be installed for preservation of the water quality of rivers, lakes and marshes, etc., and which is, therefore, designated and publicly announced as such by the Minister of Environment. 법령보기 화면  Article 33 (The Basic Plan for Wastewater Terminal Treatment Facilities) (1) The basic plan for the wastewater terminal treatment facilities as prescribed in Article 26 of the Act shall include the following subject matters: 1. Matters concerning the areas which are supposed to be covered by the wastewater terminal treatment facilities under consideration; 2. Matters concerning the distribution of pollution-sources, the quantity of wastewater discharged and predictions thereon; 3. Matters concerning the wastewater treatment processes diagram, treatment capacity and treatment methods of the wastewater terminal treatment facilities under consideration; 4. An evaluation of the effects of the wastewater to be treated at the wastewater terminal treatment facilities under consideration on the water quality of the public waterways into which the treated wastewater is to be let out; 5. Matters concerning the person who is going to install and operate the wastewater terminal treatment facilities under consideration; 6. Matters concerning the distribution of the burden of the dues; and 7. Other matters necessary for installation of the wastewater terminal treatment facilities under consideration. 법령보기 화면  Article 34 (Maintenance and Management of Wastewater Terminal Treatment facilities) For an appropriate maintenance and management of the wastewater terminal treatment facilities, the person who is in charge of the wastewater terminal treatment facilities as prescribed in Article 25 of the Act shall establish a booklet of guidelines for maintenance and management of the wastewater terminal treatment facilities under the conditions as prescribed by the Ministerial Decree of Environment, and then, shall maintain and manage the wastewater terminal treatment facilities concerned according to the booklet of guidelines. 법령보기 화면  Article 35 (Having Wastewater Flow into Wastewater Terminal Treatment Facilities) (1) The phrase, “the person as determined by the Presidential Decree,” as referred to in Article 27 (1) of the Act , refers to the person who wants to discharge the pollutants which are treated at the wastewater terminal treatment facilities concerned and who wants, at the same time, to discharge wastewater which exceeds the quality of the water to be let out into public waterways. (2) The person who discharges wastewater which does not exceed the quality of the water to be let out into public waterways as provided in paragraph (1) shall submit to the Minister of Environment the application form for an exemption concerning the responsibility of having wastewater flow into the wastewater terminal treatment facilities under the conditions as prescribed by the Ministerial Decree of Environment. 법령보기 화면  Article 36 (Designation and Management, etc. of Environmental Management Areas by River-System Influence Areas) (1) In a case where it is deemed to be necessary for management of the water quality by the river-system influence areas, the Minister of Environment may designate, in accordance with the provisions of Article 28 (1) of the Act , environmental management areas by the river-system influence areas (hereinafter referred to as the “management area”). The management areas, in this case, may be designated, divided into a medium influence area and a large influence area. (2) In a case where it is deemed to be necessary for efficient management of the management area as provided in paragraph (1), the Minister of Environment may divide the river systems into several units and decide upon the target water quality for each of the several units, and then, give a public notice of it. (3) Under the conditions as prescribed by the Ministerial Decree of Environment, the Minister of Environment may periodically examine the pollution-sources, etc., situated within the management area. 법령보기 화면  Article 37 (Establishment of Environmental Management Plans and Measures by River-System Influence Areas) (1) As for the establishment of environmental management plans and measures by the river-system influence areas, it shall be established by the Minister of Environment if the case concerned is a large influence area as prescribed in the provisions of Article 36 (1), or, by the head of the Environmental Management Office or the head of a Local Environmental Management Office if the case concerned is a medium influence area. (2) When the management area of a medium influence area has been designated in accordance with Article 36 , the head of the Environmental Management Office or the head of a Local Environmental Management Office shall establish environmental management plans and measures appropriate to the characteristics of the relevant medium influence area which falls under the jurisdiction of the head of the Environmental Management Office or the head of a Local Environmental Management Office concerned (hereinafter referred to as the “medium influence area management plan”), and then, shall have the medium influence area management plan go through the deliberation-and-adjustment processes by the Environmental Management Committee for medium influence areas as prescribed in the provisions of Article 6-4 (1) of the Enforcement Decree of the Framework Act Environmental Policy (hereinafter referred to as the “Medium Influence Area Committee”), and then, shall obtain authorization of the Minister of Environment of the medium influence area management plan, and then, finally, decide upon it. (3) When the management area of a large influence area has been designated in accordance with Article 36 , the Minister of Environment shall establish environmental management plans and measures for the large influence area under consideration (hereinafter referred to as the “large influence area management plan”) based on the medium influence area management plan for which an application for the authorization of the Minister of Environment himself is made in accordance with the provisions of paragraph (1), and then, shall have the large influence area management plan go through the deliberation-and-adjustment processes by the Environmental Management Committee for large influence areas as prescribed in the provisions of Article 6-4 (1) of the Enforcement Decree of the Framework Act on Environmental Policy (hereinafter referred to as the “Large Influence Area Committee”) before the Minister of Environment finally decide upon it. (4) Having established the large influence area management plan or the medium influence area management plan, the Minister of Environment, the head of the Environmental Management Office, the head of a Local Environmental Management Office shall consult, respectively, with the head of the relevant agency and the head of the relevant association before the plan is submitted to deliberations and adjustments by the large influence area committee or the medium influence area committee. (5) When the large influence area management plan or the medium influence area management plan is finally decided upon, the Minister of Environment, the head of the Environmental Management Office or the head of a Local Environmental Management Office shall notify the fact to the head of the relevant agency and the head of the relevant association who shall, in their turn, take necessary measures or do necessary cooperations. 법령보기 화면  Article 38 (Establishment, etc. of Adjusted Plan concerning Medium Influence Area Management Plan, etc.) (1) In a case where there have been major economic or social changes affecting the execution of the large influence area management plan or the medium influence area management plan decided upon in accordance with the provisions of Article 37 (2) and (3), the Minister of Environment, the head of the Environmental Management Office or the head of a Local Environmental Management Office shall establish an adjusted plan, having taken the said changes into consideration. (2) The provisions of Article 37 shall apply mutatis mutandis to the establishment, final decision and notification, etc. of the adjusted plan as prescribed in paragraph (1). 법령보기 화면  Article 39 (Contents of Conditions for Preventing Pollution of Water of Public Waterways) In the conditions necessary for preventing pollution of the water of public waterways as provided in Article 30 (1) of the Act shall be included the following stipulations: 1. The specified wastes shall be treated in accordance with the provisions of Article 25 (4) of the Wastes Control Act ; 2. The wastes from everyday living shall be treated in such a way as is consistent with the standards and methods of the collection, transportation and treatment of the wastes from everyday living as provided in Article 13 (3) of the Wastes Control Act ; and 3. When an area of public waterways is intended to be reclaimed by means of the specified wastes or the wastes from everyday living, the reclamation shall be carried out only after the said specified wastes or the wastes from everyday living are properly treated in accordance with the standards and methods of wastes treatment as prescribed in Article 13 (3) or 25 (4) of the Wastes Control Act . 법령보기 화면  Article 40 (Specified Facilities) The phrase, “the facilities as designated by the Presidential Decree,” referred to in the provisions of Article 30-2 (1) of the Act , means the facilities as shown on Table 10 attached at the end of this Decree. 법령보기 화면  Article 41 (Matters to Be Reflected in Comprehensive Plans for Construction Undertakings on National Territory) In the comprehensive plans for construction undertakings, which a Do governor or the head of Gun establishes for his Do or Gun in accordance with the provisions of Article 32-2 of the Act , shall be reflected the installation plans of the facilities of the following specifications: 1. The sewage terminal treatment facilities as prescribed in Article 5-2 of the Sewerage Act ; 2. The excreta treatment facilities as prescribed in Article 21 of the Act on the Disposal of Sewage, Excreta and Livestock-Wastewater 3. The livestock-wastewater treatment facilities as prescribed in Article 30 of the Act on the Disposal of Sewage, Excreta and Livestock Wastewater ; and 4. The wastewater terminal treatment facilities as prescribed in Article 25 of the Act . 법령보기 화면  Article 42 (Lakes and Marshes Water Quality Preservation Committee) (1) The Lakes and Marshes Water Quality Preservation Committee as provided in Article 38 of the Act (hereinafter referred to as the “Committee”) shall be composed of not more than 25 members including the chairman of the Committee. (2) The Vice-Minister of Environment shall become the chairman of the Committee. And the people of the following specifications shall become the members of the Committee when appointed or requested as such by the Minister of Environment: 1. Not more than four persons of the secondto the fourth-degree of public officials in general government services or public officials in research services; 2. Vice-Mayor or Vice-Governor of a Metropolitan City or a Do with a specified lakes and marshes water quality management area under its jurisdiction; and 3. Eight experts in the environment of lakes and marshes. (3) The term of office for the members requested under paragraph (2) 3 shall be two years. (4) The chairman of the Committee shall convene a meeting of the Committee and become the chairman of the meeting. (5) A certain amount of compensation which can be spared within the limit of the relevant budget may be given to the members, other than those who are public officials, of the Committee. 법령보기 화면  Article 43 (Functions, etc. of Committee) (1) The Committee shall deliberate on the matters of the following specifications: 1. Matters concerning establishment of the basic measures for preservation of the water quality of lakes and marshes; 2. Matters concerning establishment of the comprehensive measures for preservation of the water quality of the specified lakes and marshes; 3. Matters concerning the environmental standards for lakes and marshes; and 4. Other important matters concerning preservation and improvement of the water quality of lakes and marshes. (2) Necessary matters for operating the Committee shall be determined by the chairman of the Committee through the resolution of the Committee. 법령보기 화면  Article 44 (Types of Wastewater Treatment Businesses) The types of the wastewater treatment businesses, as prescribed in Article 43 (1) of the Act , and what each of the types does are as follows: 1. Entrusted wastewater treatment businesses: referring to the enterprises which equip themselves with wastewater treatment facilities and treat the entrusted wastewater in ways other than restoring and recycling; and 2. wastewater recycling businesses: referring to the enterprises which restore the entrusted wastewater and then recycle it as the raw materials and resources for goods. 법령보기 화면  Article 45 (Standards for quality of Service Water) (1) The standards for the quality of the service water as prescribed in Article 45 of the Act shall be determined with the following pollutants as their main categories of judgement: 1. Cadmium and its compound; 2. Copper and its compound; 3. Arsenic and its compound; and 4. Other specified substances hazardous to the water quality determined by the Minister of Environment in consultation with the Minister of Agriculture, Forestry and Fisheries. (2) Intending to determine the standards for the quality of the service water in terms of the pollutants as provided in the subparagraphs of paragraph (1), the Mayor/ Do governor shall, in advance, obtain the Minister of Environment’s approval for doing so. (3) Having decided upon the standards for the quality of the service water, the Mayor/ Do governor shall take necessary measures for the standards to be maintained. 법령보기 화면  Article 46 (Taking Such Measures As Banking with Soil, Cutting Soil, etc.) (1) Intending to take such measures as banking with the soil or cutting the soil, etc. as provided in Article 45 of the Act , the Mayor/ Do governor shall notify, in advance, the owner or cultivator of the relevant agricultural land or forest, etc., of his intention. (2) When taking such measures as banking with the soil or cutting the soil, etc., in accordance with the provision of paragraph (1), the Mayor/ Do governor shall follow the standards and methods, etc., determined by the Minister of Environment, for the prevention of pollution of the agricultural land. 법령보기 화면  Article 47 (Putting Restrictions on Cultivation, etc., of Agricultural and Marine Products) (1) Putting restrictions on cultivation, etc., of agricultural and marine products or collecting and destroying already produced agricultural and marine products in accordance with the provisions of Article 46 (1) of the Act shall be done only when the pollution standards as shown on Table 1 attached at the end of this Decree are applicable to the case under consideration. (2) Intending to put restrictions on cultivation, etc. of the agricultural and marine products or to collect and destroy already produced agricultural and marine products under the provisions of Article 46 (1) of the Act , the Mayor/ Do governor shall first obtain an authorization, for doing so, from the Minister of Environment, and then, shall determine and give a public notice of the object, method, period and area of the impending action. (3) Intending to give the authorization as provided in paragraph (2), the Minister of Environment shall consult, in advance, with the Minister of Agriculture, Forestry and Fisheries. 법령보기 화면  Article 48 (Compensation for Dischargers of Specified Substances Hazardous to Water quality) (1) The amount of the compensation as prescribed in Article 46 (2) of the Act shall be determined by the agreement reached between the owner or cultivator of the land under consideration and the discharger of the specified substances hazardous to the water quality. When no such agreement can be reached, the parties concerned may apply for an intercession by the Mayor/ Do governor. (2) Having received the application for the intercession as provided in paragraph (1), the Mayor/ Do governor shall take into consideration the official price of the land concerned, determined according to the Public Notice of Values and Appraisal of Lands, etc. Act , the average quantity of yearly agricultural or marine products concerned or other relevant realities of the area under consideration when he adjusts and determines the amount of the compensation. (3) When the amount of the compensation has been adjusted and determined in accordance with the provisions of paragraph (2), the person who discharged the specified substances hazardous to the water quality shall pay, without any delay, the determined amount of the compensation to the owner or cultivator, etc., of the land concerned. 법령보기 화면  Article 49 (Cooperation by Relevant Agencies) The phrase, “other matters as determined by the Presidential Decree,” as referred to in subparagraph 11 of Article 51 of the Act , means the matters of the following specifications: 1. Designation of the limited urban development Area; 2. Restoration, into its original state, of the land damaged by installation of tourism facilities or industrial facilities, etc.; and 3. Control of the quantity of the water to be let out, in a case where the water stored in a dam need be let out because an accident of polluting the water occurred or the quality of the water deteriorated and, consequently, the water to be turned into the tap water is impossible to be collected. 법령보기 화면  Article 50 (Delegation of Rights) (1) The Minister of Environment shall delegate the rights of the following specifications to the Mayor/ Do governor in accordance with the provisions of Article 55 (1) of the Act : Provided , That this provision shall not apply to the rights as provided in subparagraphs 1 through 19 and 22 through 37 with regard to the workplaces as designated on Table 12 attached at the end of this Decree: 1. Reception of the application for the permit on or the report on installation of the discharge facilities as prescribed in Article 10 (1) of the Act and reception of the application for the permit on or the report on an alteration of installation of the self-same discharge facilities as prescribed in Article 10 (2) and (3) of the Act ; 2. The exemption authorization with respect to the duty of installing the preventive facilities as provided in Article 11 (1) of the Act or the revocation of the authorization as provided in Article 11 (3) of the Act ; 3. Reception of the report on succession to the rights and responsibilities as prescribed in Article 11-2 (2) of the Act ; 4. Authorization of the design and construction of the preventive facilities as prescribed in the proviso of Article 12 (1) of the Act ; 5. Reception of the applications for the authorization on installation of the joint preventive facilities or the applications for the authorization on an alteration of installation thereof and reception of the reports on an alteration of installation of the joint preventive facilities as provided in Article 13 of the Act ; 6. Reception of the reports on starting to operate the discharge facilities and the preventive facilities as prescribed in Article 14 (1) of the Act ; 7. Issuance of the orders to take the measures as prescribed in Article 14 (4) of the Act ; 8. The acknowledgement with regard to the dilution treatment of pollutants as prescribed in the proviso of Article 15 (1) 3 of the Act ; 9. Issuance of the order to take necessary measures concerning the operation of the discharge facilities or the preventive facilities as provided in the provisions of Article 15 (3) of the Act ; 10. Reception of the reports on improper operations as prescribed in Article 15 (5) of the Act ; 11. Issuance of the improvement order as prescribed in Article 16 of the Act ; 12. Issuance of the order for temporary suspension of operation, etc. with regard to the discharge facilities as prescribed in Article 17 of the Act ; 13. Issuance of the movement order with regard to a workplace as prescribed in Article 18 of the Act ; 14. Imposition and collection of the dues (excluding the dues with regard to the wastewater terminal treatment facilities) as prescribed in Article 19 of the Act ; 15. Issuance of the order for temporary suspension of operation, the order for permanent closure or revocation of the permit as prescribed in Article 20 (1) of the Act ; 16. The disposition of imposing and collecting the penalties as prescribed in Article 20-2 of the Act ; 17. Taking the measure of closing, etc. such illegal facilities as prescribed in Article 21 of the Act ; 18. Reception of the reports on an appointment of the environmental manager or on a replacement of the old environmental manager with a new one as prescribed in Article 23 (1) of the Act ; 19. Issuance of the order to replace the existing environmental manager with a new one as prescribed in Article 24 of the Act ; 20. Issuance of the order to execute the removal or prevention measure as prescribed in Article 29 (3) of the Act ; 21. Vicarious execution of the removal or prevention measure as prescribed in Article 29 (4) of the Act ; 22. Reception of the reports on installation of the specified facilities or the reports on an alteration of installation thereof as prescribed in Article 30-2 (1) of the Act ; 23. Issuance of the improvement order as provided in Article 30-2 (3) ofbthe Act ; 24. Issuance of the order for temporary suspension of operation or the order for permanent closure as prescribed in Article 30-2 (4) of the Act ; 25. The rights to be applied mutatis mutandis in accordance with the provisions of Article 30-2 (5) of the Act ; 26. Issuance of the report order, etc. and the inspection with regard to the persons as prescribed in Article 49 (1) 1 and 2 of the Act ; 27. Hearing on the delegated rights among the rights as prescribed in the subparagraphs of Article 53 of the Act ; 28. Imposition and collection of the fine for negligence as prescribed in Article 60 of the Act (The fine for negligence as provided in Article 60 (2) 8 of the Act shall be limited to the cases of persons who did not have their environmental managers go through the relevant education; the fine for negligence as provided in Article 60 (2) 9 of the Act , to the cases of persons as prescribed in Article 49 (1) 1 and 2 of the Act ); 29. Reception of the applications for prolongation of the installation period of the discharge facilities as prescribed in Article 2 (8); 30. Reception of the applications for prolongation of the improvement period as prescribed in Article 10 (2); 31. The consultation as prescribed in Article 12 (2); 32. Reception of the submitted documents relating to the calculation of the discharged quantity of pollutants necessary for computation of the basic dues as prescribed in Article 20 ; 33. The adjustment of the discharged quantity of pollutants as prescribed in Article 21 ; 34. The request for submittance of the documents and the inspection of the degree of pollution as prescribed in Article 22 ; 35. The acknowledgement of such discharge facilities as prescribed in subparagraph 2 of Article 30 ; 36. Reception of the applications for exemption of the duty of having wastewater flow into the wastewater terminal treatment facilities as prescribed in Article 35 (2); and 37. The examination of the pollution-sources, etc. situated within the Management Area as prescribed in Article 36 (3). (2) In accordance with the provisions of Article 55 (1) of the Act , the Minister of Environment shall delegate the rights of the following specifications to the head of the Environmental Management Office or the head of a Local Environmental Management Office: 1. The installation of the measuring networks of the degree of water pollution and the regular measurement thereof as prescribed in Article 3 (1) of the Act ; 2. The expropriation and utilization of the land, etc., as prescribed in Article 5 (1) of the Act ; 3. The authorization of the basic plan for the wastewater terminal treatment facilities and the designation and public announcement of the joint treatment area as prescribed in Article 26 of the Act ; 4. The request for taking measures as prescribed in Article 32 (4) of the Act ; 5. The registration of the preventive facilities businesses, the modification registration thereof, the cancellation of the registration thereof, the temporary suspension of operation thereof and the designation of the construction inspector thereof as prescribed in Articles 39, 41 and 42 of the Act ; 6. The permit on the wastewater treatment businesses, the modification permit thereon, the cancellation of the permit thereon and the temporary suspension of operation thereof as prescribed in Article 43 (1) and (4) of the Act ; 7. The registration of the vicarious measurement businesses, the modification registration thereof, the cancellation of the registration thereof and the temporary suspension of operation thereof as prescribed in Article 44 (1) and (5) of the Act ; 8. The order to make a report, etc. and the inspection as prescribed in Article 49 (1) 4 through 6 of the Act ; 9. The hearing on the delegated rights among the rights as prescribed in subparagraphs of Article 53 of the Act ; 10. The imposition and collection of the fine for negligence as prescribed in Article 60 (2) 8 and 9 of the Act (The fine for negligence as provided in Article 60 (2) 8 of the Act shall be limited to the cases of persons who did not have the technicians engaged in the preventive facilities businesses, the wastewater treatment businesses and the vicarious measurement businesses go through the necessary education; the fine for negligence as provided in Article 60 (2) 9 of the Act , to the cases of persons as prescribed in Article 49 (1) 4 through 6 of the Act ); 11. The rights as prescribed in paragraph (1) 1 through 19 and 22 through 37 with regard to the workplaces as designated on Table 12 attached at the end of this Decree; and 12. The imposition and collection of the dues with regard to the wastewater terminal treatment facilities as prescribed in Article 13 (3). 법령보기 화면  Article 51 (Supervision, etc. Following Delegation of Rights) (1) In a case where it is deemed to be particularly necessary for proper management of the water pollution affecting a wide area, the Minister of Environment may check upon or confirm, or may have the head of the Environmental Management Office or the head of a Local Environmental Management Office check upon or confirm, whether there are any such violations of Acts as not observing the permissible discharge standards, etc., with regard to workplaces other than those as shown on Table 12 attached at the end of this Decree. (2) In a case where the Minister of Environment, the head of the Environmental Management Office or the head of a Local Environmental Management Office has found out a case of violation of Acts and subordinate statutes with regard to a workplace as a result of the checking-upon or confirming as provided in paragraph (1), he shall notify to the relevant Mayor/ Do governor what he has found out and what he thinks must be done under the circumstances. (3) The Mayor/ Do governor who has been notified in accordance with the provisions of paragraph (2) shall take necessary measures, and then, report or notify the result of the measures taken to the Minister of Environment, the head of the Environmental Management Office or the head of a Local Environmental Management Office. 법령보기 화면  Article 52 (Report) (1) Having dealt with the tasks delegated in accordance with the provisions of Article 55 (1) of the Act , the Mayor/ Do governor, the head of the Environmental Management Office or the head of a Local Environmental Management Office shall report what he has done to the Minister of Environment under the conditions as prescribed by the Ministerial Decree of Environment. (2) Having issued the order for temporary suspension of operation, the movement order or the permit revocation in accordance with the provisions of Articles 17, 18 and 20 of the Act , the Mayor/ Do governor shall, without any delay, report what he has done to the Minister of Environment and the head of the relevant central administrative agency. 법령보기 화면  Article 53 (Delegation of Tasks) Under the provisions of Article 55 (2) of the Act , the Minister of Environment shall delegate the task of educating Environmental Managers as prescribed in Article 48 of the Act to the head of the Environmental Preservation Association as prescribed in Article 38 of the Framework Act on Environmental Policy 법령보기 화면  Article 54 (Imposition of Fine for Negligence) (1) When imposing the fine for negligence under the provisions of Article 60 (3) of the Act , the Minister of Environment shall, first, examine and confirm the case of violation under consideration, and then, notify in writing the fact of violation, the amount of the fine for negligence imposed, the method and period of an appeal to the person on whom the said fine for negligence is imposed. (2) Having decided to impose the fine for negligence as provided in paragraph (1), the Minister of Environment shall designate a period of not less than ten days during which the person on whom the said fine for negligence is imposed can take an opportunity to state his opinion either orally or in writing. If there is no statement of opinion, in this case, until the designated period is over, the person on whom the said fine for negligence is imposed shall be regarded as having no intention to make an appeal. (3) In determining the amount of the fine for negligence, the Minister of Environment shall take into consideration the motivation and results, etc. of the violation under consideration. (4) The procedures for collecting the fine for negligence shall be determined by the Ministerial Decree of Environment. ADDENDA Article 1 (Enforcement Date) This Decree shall enter into force on the date of its promulgation. But the matters concerning the imposition of the basic dues, among the amended provisions of Articles 13 (2) 14 , 15 through 28 , shall enter into force on January 1, 1997 with regard to the discharge facilities (including the Joint preventive facilities and the wastewater terminal treatment facilities) whose scales fall under one of the following specifications, and, on January 1, 2000 with regard to the discharge facilities other than those whose scales fall under one of the following specifications, in accordance with the proviso of paragraph (1) of the Addenda for the amended Act No. 5095 among the water Quality Conservation Act. And the amended provisions of Article 14 (1) 16 and 17 shall enter into force on January 1, 1998: 1. The first and second type of workplaces as shown on Table 1 attached at the end of this Decree excluding, however, the workplaces which have their wastewater flow into the wastewater terminal treatment facilities as prescribed in subparagraph 5 of Article 2 of the Sewerage Act (hereinafter referred to as the “wastewater terminal treatment facilities”). As for the joint preventive facilities, if there is a workplace of the not more than third type among the workplaces which have their wastewater flow into the said facilities, the basic dues shall be imposed, with the quantity of pollutants discharged from the said workplace being excluded; 2. The workplaces, installed within the countermeasure area and within the area where installation of the discharge facilities is limited as provided in Article 10 (4) of the Act , among the third type of workplaces as shown on Table 1 attached at the end of this Decree, excluding, however, the workplaces which have their wastewater flow into the wastewater terminal treatment facilities. As for the joint preventive facilities, if there is a workplace of the not more than fourth type among the workplaces which have their wastewater flow into the said facilities, the basic dues shall be imposed, with the quantity of pollutants discharged from the said workplace being excluded; and 3. Among the wastewater terminal treatment facilities, those whose daily treatment capacities are not less than 700 ㎥ (or, 200 ㎥ in the cases of the special countermeasure areas and the areas where installation of the discharge facilities is limited). Article 2 (Transitional Measures concerning Decrease or Exemption of Basic Dues) In imposing, from 1997 through 1999, the basic dues on the persons who run the workplaces as provided in subparagraph 1 of Article 1 of the Addenda and the persons who run the third type of workplaces as provided in subparagraph 2 of Article 1 of the Addenda, in accordance with the provision of Article 19 (3) of the Act , 50 percentage of the basic dues, 30 percentage of the basic dues and 10 percentage of the basic dues shall be decreased in 1997, 1998 and 1999, respectively, with regard to the person who runs the first type of workplace among the workplaces as provided in subparagraph 1 of Article 1 of the Addenda; 70 percentage of the basic dues, 50 percentage of the basic dues and 30 percentage of the basic dues shall be decreased in 1997, 1998 and 1999, respectively, with regard to the person who runs the second type of workplace among the workplaces as provided in subparagraph 1 of Article 1 of the Addenda and the person who runs the third type of workplace as provided in subparagraph 2 of Article 1 of the Addenda. Article 3 (Transitional Measures concerning Discharge Facilities on Which Permit Was Obtained Before) Among the discharge facilities which were installed and are now being operated or are now being installed with the necessary permit obtained before the time this Decree enters into force, the discharge facilities which are required to be reported by the amended provisions of Article 2 (2) shall be regarded as having been reported under this Decree. Article 4 (Transitional Measures concerning Areas Where Permit on Installation of Discharge Facilities Is Limited and concerning Discharge Facilities Themselves) The areas where the permit on installation of the discharge facilities is limited and the discharge facilities subject to the permit limitation, having been already given a public notice in accordance with the former provisions at the time this Decree enters into force, shall be regarded as having been given a public notice in accordance with this Decree. Article 5 (Transitional Measures concerning Designation, etc. of Environmental Management Area by River-System Influence Areas) The environmental management areas by the influence areas or the environmental management plans and measures by the influence areas having been already designated or established in accordance with the provisions of Article 6-5 of the Enforcement Decree of the Framework Act on Environmental Policy at the time this Decree enters into force, shall be regarded as having been designated or established under this Decree. Article 6 (Transitional Measures concerning Specified Facilities) (1) Among the discharge facilities installed before the time this Decree enters into force, those which are to be modified into the Specified facilities in accordance with the amended provisions as shown on Table 10 attached at the end of this Decree shall be regarded as the Specified facilities under this Decree: Provided , That the person who installed and has been operating the Specified facilities, shall have the report certificate on the specified facilities issued to himself within six months from the date on which this Decree enters into force. (2) The person, who installed and has been operating the facilities which are newly to become the specified facilities in accordance with the amended provisions as shown on Table 10 attached at the end of this Decree at the time this Decree enters into force, shall report thereon within one year from the date on which this Decree enters into force. Article 7 (Transitional Measures concerning Establishment of Plan for Meeting with Burden of Discharge Dues of Wastewater Terminal Treatment Facilities) The person who installed and has been operating a wastewater terminal treatment facilities at the time this Decree enters into force shall establish the plan for meeting with the burden of discharge dues, and then, obtain the authorization as prescribed in Article 16 of the Environment Improvement Expenses Liability Act , within six months from the date on which this Decree enters into force. Article 8 (Transitional Measures concerning Establishment of Guidelines for Maintenance and Management of Wastewater Terminal Treatment Facilities) The person who installed and has been operating a wastewater terminal treatment facilities at the time this Decree enters into force shall establish the guidelines for maintenance and management thereof within six months from the date on which this Decree enters into force. Last updated : 2009-07-26