ENFORCEMENT DECREE OF THE GROUNDWATER ACT
13602 · 2005-12-01
ENFORCEMENT DECREE OF THE GROUNDWATER ACT
Presidential Decree No. 19158, Nov. 30, 2005
Wholly Amended by Presidential Decree No. 15451, Aug. 8, 1997
Amended by Presidential Decree No. 15598, Dec. 31, 1997
Presidential Decree No. 16093, Jan. 29, 1999
Presidential Decree No. 16297, May 10, 1999
Presidential Decree No. 16512, Aug. 6, 1999
Presidential Decree No. 17175, Mar. 27, 2001
Presidential Decree No. 17433, Dec. 19, 2001
Presidential Decree No. 18594, Dec. 3, 2004
Presidential Decree No. 19158, Nov. 30, 2005
법령보기 화면
Article 1 (Purpose)
The purpose of this Decree is to provide for the matters delegated by the
Groundwater Act
and those necessary for the enforcement thereof.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
법령보기 화면
Article 2 (Survey of Groundwater)
(1)
The Minister of Construction and Transportation shall carry out a basic survey on the characteristics in reserve and the amount of exploitable groundwater across the nation through the geological survey, physical exploration, drilling survey and the survey of the water level and quality of groundwater pursuant to
Article 5 (1) of the Groundwater Act
(hereinafter referred to as the "Act").
<Amended by Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
(2)
In carrying out the basic survey under paragraph (1), the Minister of Construction and Transportation shall make a hydrogeological map drawn on a scale of 1 to 50,000 which includes the following matters:
Provided
, That he may make a hydrogeological map drawn otherwise on a scale of 1 to 50,000 in case he deems it unavoidable, taking into account the contents of the survey:
1.
Distribution of topographies and the nature of the underground;
2.
Distribution of level of groundwater;
3.
Structure and quantitative characteristics of aquifer which contain groundwater;
4.
Characteristics of groundwater quality;
5.
Amount of exploitable groundwater; and
6.
Other matters necessary for the basic survey on the characteristics of groundwater in reserve.
(3)
The Minister of Construction and Transportation shall establish a survey plan on groundwater across the nation by regional group every year and shall carry out a basic survey on the characteristics in reserve and the amount of exploitable groundwater pursuant to the plan:
Provided
, That he may carry out a survey for any area which is urgently needed to develop groundwater as the source of water, and for which a request is made by the head of a relevant central administrative agency, the Special Metropolitan City Mayor, Metropolitan City Mayor or
Do
governor (hereinafter referred to as the "Mayor/
Do
governor") in preference to other areas.
법령보기 화면
Article 3 (Consultation, etc. on Survey of Groundwater)
(1)
Where the head of a relevant central administrative agency, the Mayor/
Do
governor, or the head of
Si
/
Gun
/autonomous
Gu
(hereinafter referred to as the "head of
Si
/
Gun
") intends to carry out a survey for the execution of his duties related to groundwater pursuant to the provisions of main sentence of
Article 5 (3) of the Act
, he shall, in advance, consult with or notify the Minister of Construction and Transportation according to the classifications listed in the following subparagraphs:
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
1.
Where he is required to consult with the Minister of Construction and Transportation: the surveys regarding
Article 2
(2) 2, 3 and 5; and
2.
Where he is required to notify the Minister of Construction and Transportation: the surveys that do not fall under subparagraph 1.
(2)
Where the head of a relevant central administrative agency, the Mayor/
Do
governor, or head of
Si
/
Gun
completes the survey under paragraph (1), he shall notify the Minister of Construction and Transportation of the results within one month from the date of completion of the survey as determined by the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 16297, May 10, 1999>
(3)
The term "urgent reasons as prescribed by the Presidential Decree" in the proviso of
Article 5 (3) of the Act
means cases where it is urgently necessary to develop and use groundwater due to war, natural disaster or other calamity.
법령보기 화면
Article 4 (Vicarious Execution of Survey Work)
(1)
The Minister of Construction and Transportation, the head of the relevant central administrative agency, the Mayor/
Do
governor, or the head of
Si
/
Gun
may have any specialized groundwater-related survey agency (hereinafter referred to as the "specialized groundwater survey agency") falling under any of the following subparagraphs execute as proxy any survey work on groundwater pursuant to
Article 5 (4) of the Act
:
<Amended by Presidential Decree No. 16093, Jan. 29, 1999; Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 17175, Mar. 27, 2001; Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 18594, Dec. 3, 2004; Presidential Decree No. 19158, Nov. 30, 2005>
1.
The Korea Institute of Geoscience and Mineral Resources established under
Article 8 of the Act on the Establishment, Operation and Fosterage of Government-Invested Research Institutions
of Science and Technology;
2.
The Korea Resources Corporation under the Korea Resources Corporation Act;
3.
The Korea Water Resources Corporation under the Korea Water Resources Corporation Act;
4.
The Korea Agricultural and Rural Infrastructure Corporation established pursuant to the Korea Agricultural and Rural Infrastructure Corporation and Farmland Management Fund Act;
5.
The Korea Institute of Construction Technology established under
Article 8 of the Act on the Establishment, Operation and Fosterage of Government-Invested Research Institutions
of Science and Technology; and
6.
The Environmental Management Corporation under the Environmental Management Corporation Act.
(2)
The specialized groundwater survey agency which executes as proxy the survey work regarding groundwater pursuant to the provisions of
Article 5 (4) of the Act
shall notify the Minister of Construction and Transportation, the head of the relevant central administrative agency, the Mayor/
Do
governor, or the head of
Si
/
Gun
of the survey plan within fifteen days from the date on which the survey begins.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
법령보기 화면
Article 5 (Request, etc. for Survey Materials)
(1)
Where the Minister of Construction and Transportation, the head of the relevant central administrative agency, the Mayor/
Do
governor, or the head of
Si
/
Gun
requests any relevant agency to submit survey materials from any relevant agency for the survey of groundwater or asks for cooperation pursuant to
Article 5 (5) of the Act
, he shall specify the contents of necessary survey materials, matters for cooperation and the time limit for submission of materials.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
(2)
Any relevant agency which has been requested to provide survey materials or asked for cooperation pursuant to paragraph (1) shall comply with the request or cooperation unless there exist special causes.
법령보기 화면
Article 6 (Comprehensive Management of Survey Materials)
(1)
The Minister of Construction and Transportation shall put together the survey materials on groundwater across the nation on the bases of the survey on groundwater under
Article 5 (1), (2) and (4) of the Act
and the survey on actual conditions of utilization of groundwater under
Article 28
(1) based on the end of every year and shall publish an annual report of survey on groundwater pursuant to
Article 5 (6) of the Act
.
(2)
Where the Minister of Construction and Transportation publishes an annual report of survey on groundwater pursuant to paragraph (1), he shall send it to the relevant agency and make it available for the general public.
법령보기 화면
Article 6-2 (Creation and Operation of Groundwater Information System, etc.)
(1)
The groundwater information system provided for in
Article 5-2 (1) of the Act
(hereinafter referred to as "groundwater information system") shall contain contents falling under each of the following subparagraphs:
1.
The groundwater data obtained as a result of the survey conducted under
Article 5 of the Act
;
2.
The groundwater data obtained as a result of the observation and survey conducted under
Article 17 of the Act
; and
3.
Other data pertaining to the utilization and management of groundwater.
(2)
The Minister of Construction and Transportation may, when it is deemed necessary to create and operate the groundwater information system, set standards for producing, administering and distributing the data specified in each subparagraph of paragraph (1) after consulting with administrative agencies and organizations concerned thereabout.
(3)
The Minister of Construction and Transportation shall make matters concerning the survey and the current utilization of groundwater, from among the contents of the groundwater information system, accessible to administrative agencies and organizations concerned as well as the general public.
[This Article Added by Presidential Decree No. 17433, Dec. 19, 2001]
법령보기 화면
Article 7 (Basic Plan for Groundwater Management)
(1)
The term "other matters concerning management of groundwater" in
Article 6 (1) 5 of the Act
shall mean the matters listed in the following subparagraphs:
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
1.
The survey plan of groundwater;
2.
The management plan of groundwater;
3.
The investment plan on the management of groundwater; and
4.
The plan of construction and operation of groundwater information system.
(2)
The Minister of Environment shall include matters falling under each of the following subparagraphs in the plan for the quality control and purification of groundwater, which he is required to draw up under
Article 6 (3) of the Act
:
<Added by Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
1.
Basic direction by which a schedule is developed for the quality control and purification of groundwater;
2.
The current groundwater pollution and the forecast thereof;
3.
Schedule for protecting the quality of groundwater;
4.
Schedule for operating the quality measuring networks of groundwater;
5.
Schedule for informatization with regard to the quality of groundwater; and
6.
Other necessary matters concerning the quality control and purification of groundwater.
(3)
The Minister of Environment may, when it is deemed necessary to develop a plan for the quality control and purification of groundwater under paragraph (2), ask the heads of central administrative agencies concerned, the Mayor/
Do
governor or the head of
Si
/
Gun
to submit necessary materials.
<Added by Presidential Decree No. 17433, Dec. 19, 2001>
(4)
The modification of insignificant matters under the proviso of
Article 6 (5) of the Act
means the cases falling under any of the following subparagraphs:
<Amended by Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
1.
Where he alters the actual conditions of utilization of groundwater under
Article 6 (1) 2 of the Act
pursuant to the results of the survey on actual conditions of utilization of groundwater under
Article 17 (6) of the Act
; and
2.
Where he alters an investment plan under paragraph (1) 3.
(5)
Where the Minister of Construction and Transportation establishes or alters a basic plan for groundwater management (hereinafter referred to as the "basic plan") under
Article 6 (1) of the Act
, he shall publicly announce the following matters in the Official Gazette:
<Amended by Presidential Decree No. 17433, Dec. 19, 2001>
1.
Objectives of the basic plan;
2.
Target period of the basic plan;
3.
Characteristics in reserve and the amount of exploitable groundwater;
4.
Survey and utilization plan for groundwater;
5.
Conservation and management plan for groundwater;
6.
Schedule for the quality control and purification of groundwater; and
7.
Other matters as determined by the Ministerial Decree of Construction and Transportation.
(6)
Where the Minister of Construction and Transportation publicly announces the basic plan pursuant to paragraph (5), he shall notify without delay the head of a relevant administrative agency and the Mayor/
Do
governor of the contents thereof.
<Amended by Presidential Decree No. 17433, Dec. 19, 2001>
(7)
The Mayor/
Do
governor who has been notified of the contents of the basic plan pursuant to paragraph (6) shall send related documents to the head of
Si
/
Gun
, and the head of
Si
/
Gun
who has received the related documents shall offer them for public perusal for not less than 20 days.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 17433, Dec. 19, 2001>
법령보기 화면
Article 7-2 (Regional Groundwater Management Plan)
(1)
The change of minor matters provided for in the proviso of
Article 6-2 (1) of the Act
shall be the case falling under each subparagraph of
Article 7
(4).
(2)
Where the Mayor/
Do
governor or the head of
Si
/
Gun
draws up a regional groundwater management plan prescribed in
Article 6-2 (1) or (2) of the Act
(hereinafter referred to as the "regional management plan") and obtains approval therefor from the Minister of Construction and Transportation, he shall announce the matters listed in the following subparagraphs in the official report. The same shall apply to a case where he alters the regional management plan:
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
1.
The objectives of the regional management plan;
2.
The target period of the regional management plan;
3.
The characteristics in reserve and the amount of exploitable groundwater;
4.
The plan for the management of water volume and for the utilization of groundwater;
5.
The conservation and management plan for groundwater;
6.
The plan for quality control of groundwater;
7.
Matters concerning the period and place during and in which relevant documents are offered for public perusal; and
8.
The grounds for changing the regional management plan and contents of such change (limited to a case where the regional management plan is altered).
(3)
The term "where there occur groundwater problems prescribed by Presidential Decree" in
Article 6-2 (2) of the Act
means the case that falls under any of the following subparagraphs:
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
1.
Where drying up of water source or ground subsidence happens due to the substantially lowered level of groundwater arising from the excessive development and use of groundwater;
2.
Where the improvement or purification of water quality is required as the water quality of groundwater has deteriorated;
3.
Where seawater has intruded into aquifer due to the excessive development and use of groundwater in the seaside area or island; or
4.
Where the use of groundwater becomes difficult unless the measures necessary for conservation and management are taken.
(4)
The head of
Si
/
Gun
who has received the approval for regional management plan pursuant to the provisions of
Article 6-2 (2) of the Act
and the head of
Si
/
Gun
who has been notified of the contents of the regional management plan by the Mayor/
Do
governor pursuant to the provisions of latter part of paragraph (4) of the same Article shall make the contents thereof available to the public for twenty days or more.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
[This Article Added by Presidential Decree No. 17433, Dec. 19, 2001]
법령보기 화면
Article 8 (Application, etc. for Permission to Develop and Utilize Groundwater)
(1)
Any person who intends to obtain permission on the development and utilization of groundwater under
Article 7 (1) or 8 (2) (proviso) of the Act
shall submit a written application for permission to the head of
Si
/
Gun
accompanied with the following documents:
Provided
, That where an application for the permission of development and use of groundwater is made pursuant to the provisions of proviso of
Article 8 (2) of the Act
, the submission of documents listed in subparagraph 1 may be dispensed with:
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
1.
Cadastral map or forest map which indicates the locations of facilities for developing and using groundwater;
2.
Layout plan of facilities for developing and using groundwater;
3.
Groundwater impact statement; and
4.
Other documents as determined by the Ministerial Decree of Construction and Transportation.
(2)
Any installation diagram of facilities for developing and using groundwater under paragraph (1) 2 shall be drawn by any of the following:
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
1.
A specialized groundwater survey agency;
2.
An entity engaged in engineering in the field of geological features, foundation, development of underground resources, development of water sources, water supply and drainage, or agricultural or fishery civil engineering which has made a report under the
Engineering Technology Promotion Act
;
3.
A professional engineer in the field of geological features, foundation, development of underground resources, development of water sources, water supply and drainage, or agricultural or fishery civil engineering who has registered the opening of an professional engineers' office under the
Professional Engineers Act
;
4.
A groundwater impact investigation agency under
Article 27 (1) of the Act
(hereinafter referred to as the "groundwater impact investigation agency");
5.
An operator of groundwater purification business (hereinafter referred to as the "groundwater purification business operator") who has registered under
Article 29-2 (1) of the Act
; and
6.
Any agent for investigating environmental impact, who has registered under
Article 12 of the Management of Drinking Water Act
.
(3)
The layout plan of the facilities for developing and using groundwater in paragraph (1) 2 shall meet the requirements listed in the following subparagraphs:
<Added by Presidential Decree No. 19158, Nov. 30, 2005>
1.
To have the upper part of the protection wall under the ground surface installed above the ground surface:
Provided
, That this shall not apply where the Mayor/
Do
governor deems that the installation under the ground surface is necessary in view of the topographic conditions;
2.
To install the upper protection facility firmly so as not to be damaged, broken or polluted, and to have a drain installed in the upper protection facility; and
3.
To have an information board prescribed by Ministerial Decree of Construction and Transportation affixed to the upper protection facility.
(4)
The detailed standards for installation of the facilities for development and use of groundwater besides those prescribed in paragraph (3) shall be prescribed by Ministerial Decree of Construction and Transportation.
<Added by Presidential Decree No. 19158, Nov. 30, 2005>
법령보기 화면
Article 8-2 (Purposes of Development and Utilization of Groundwater)
(1)
Any person who intends to develop and utilize groundwater shall indicate the purposes of development and utilization of groundwater that fall under any of the following subparagraphs when he makes an application or report pursuant to the provisions of
Articles 7 (1)
and
8 (1) of the Act
, and also indicate whether it is utilized as drinking water when classifying the purposes:
1.
Household water: groundwater used for daily life, such as household use:
Provided
, That groundwater falling under subparagraph 2 or 3 is excluded;
2.
Industrial water: groundwater used for the manufacture of goods and operation of equipment in the factories or other manufacturing industries; or
3.
Agricultural and fishery water: the groundwater used for the agriculture, forestry, livestock and fishery business.
[Added by Presidential Decree No. 19158, Nov. 30, 2005]
법령보기 화면
Article 9 (Review of Groundwater Impact Investigation)
(1)
Where the head of
Si
/
Gun
receives a written investigation of groundwater impact from any person who has applied for permission on groundwater development and utilization pursuant to
Article 7 (2) of the Act
, he shall review whether it conforms to the items, method for investigation and assessment standards of groundwater impact investigation under
Article 12
(1).
<Amended by Presidential Decree No. 16297, May 10, 1999>
(2)
In reviewing a groundwater impact investigation pursuant to paragraph (1), the head of
Si
/
Gun
may, where he deems it necessary to adjust or supplement it, ask any person who has applied for permission on groundwater development and utilization to adjust or supplement the groundwater impact investigation.
<Amended by Presidential Decree No. 16297, May 10, 1999>
(3)
The head of
Si
/
Gun
may seek the opinions from the related experts where deemed it necessary to review the groundwater impact investigation pursuant to paragraph (1).
<Amended by Presidential Decree No. 16297, May 10, 1999>
법령보기 화면
Article 9-2 (Restriction on Permission for Development and Utilization of Groundwater or on Volume of Groundwater to be Collected)
The term "cases which are prescribed by the Presidential Decree" in
Article 7 (3) 4 of the Act
means where a request is made by the relevant administrative agency for restriction on such development and utilization of groundwater as may impact on the water volume of the rivers under the
River Act
.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
[This Article Added by Presidential Decree No. 16297, May 10, 1999]
법령보기 화면
Article 10 Deleted.<by Presidential Decree No. 17433, Dec. 19, 2001>
법령보기 화면
Article 11 (Alteration of Permitted Matters)
(1)
The term "case where he intends to alter matters as prescribed by the Presidential Decree" in the main sentence of
Article 7 (6) of the Act
means:
<Amended by Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
1.
Deleted;
<by Presidential Decree No. 17433, Dec. 19, 2001>
2.
Where he alters (including the alteration of whether to utilize for drinking water or not) the purposes of development and utilization of groundwater; and
3.
A case where he alters facilities installed for developing and utilizing groundwater [limited to a case where the pumping capacity of groundwater is increased (referring to the maximum water-intake quantity that is made possible by making use of the relevant facilities in light of the power unit of groundwater development and utilization facilities as well as the diameter and depth, etc. of earthen pipes: hereinafter the same shall apply)].
(2)
Where any person who has obtained permission on groundwater development and utilization pursuant to
Article 7 (1) of the Act
intends to alter the permitted matters, he shall make an application for the permission of alteration under the conditions as determined by Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
(3)
Deleted.
<by Presidential Decree No. 17433, Dec. 19, 2001>
(4)
Where any matter other than those of any subparagraphs of paragraph (1) from among permitted matters is altered, any person who has obtained permission on groundwater development and utilization pursuant to
Article 7 (1) of the Act
shall notify the head of
Si
/
Gun
within fifteen days from the date on which such cause occurs.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
법령보기 화면
Article 12 (Items and Method, etc. of Groundwater Impact Investigation)
(1)
The items, method of investigation and assessment standards of the groundwater impact investigation under
Article 7 (7) of the Act
shall be listed in the annexed Table 1:
Provided
, That where deemed it particularly necessary to conserve groundwater, the Mayor/
Do
governor may add other items and method of investigation thereto under the conditions as determined by the Municipal Ordinances of the relevant Special Metropolitan City, Metropolitan City or
Do
(hereinafter referred to as the "City/
Do
") or the items and method of investigation and assessment standards of the environmental impact investigation may be based on those of
Article 10 of the Management of Drinking Water Act
.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
(2)
The guidelines and contents of making a groundwater impact investigation under
Article 7 (7) of the Act
shall be listed in the annexed Table 2.
법령보기 화면
Article 12-2 (Permission for Groundwater Development and Utilization in Vicinity of River)
The term "the scope prescribed by the Presidential Decree" in
Article 72 (1) of the Act
means any area within 300 meters from the river area.
[This Article Added by Presidential Decree No. 17433, Dec. 19, 2001]
법령보기 화면
Article 12-3 (Extension of Valid Term for Groundwater Development and Utilization)
Any person, who intends to get the valid term of the permission for his groundwater development and utilization extended in accordance with
Article 7-3 (3) of the Act
, shall file an application for extending such term, accompanied by a survey report on groundwater impact that is compiled based on the survey conducted within the last six months, with the head of
Si
/
Gun
30 days prior to the expiration of valid term under the conditions as prescribed by the Ministerial Decree of Construction and Transportation.
[This Article Added by Presidential Decree No. 17433, Dec. 19, 2001]
법령보기 화면
Article 13 (Report on Groundwater Development and Utilization)
(1)
Any person who intends to make a report on groundwater development and utilization pursuant to the provisions of
Article 7 (6) (proviso) or 8 (1) of the Act
shall submit the following documents to the head of
Si
/
Gun
:
Provided
, That in cases falling under
Article 7 (6) (proviso) or 8 (1) 1 of the Act
, submission of documents may be in part dispensed with as determined by the Ministerial Decree of Construction and Transportation:
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
1.
Cadastral map or forest map which indicates the locations of facilities for developing and using groundwater;
2.
Layout plan of facilities for developing and using groundwater; and
3.
Other documents as determined by the Ministerial Decree of Construction and Transportation.
(2)
Any person who intends to make a report on groundwater development and utilization pursuant to
Article 8 (1) of the Act
may follow the standard diagram of facilities for developing and using groundwater under the conditions as determined by the Ministerial Decree of Construction and Transportation in drawing an installation diagram of facilities for developing and using groundwater under paragraph (1) 2.
(3)
The term "under the scale as prescribed by the Presidential Decree" in
Article 8 (1) 2 of the Act
means cases where pumping capacity per day is not more than 150 tons of water (limited to cases where earthen pipes whose inner diameter is not more than 50 millimeters are used):
Provided
, That where deemed it particularly necessary for the conservation of groundwater or depending on regional conditions, the Mayor/
Do
governor may regulate pumping capacity within a half limit under the conditions as determined by the Municipal Ordinances of the City/
Do
concerned.
(4)
The term "under the scale as prescribed by the Presidential Decree" in
Article 8 (1) 5 of the Act
means cases where pumping capacity per day is not more than 100 tons of water (limited to cases where earthen pipes whose inner diameter is not more than 40 millimeters are used):
Provided
, That where deemed it particularly necessary for the conservation of groundwater or depending on regional conditions, the Mayor/
Do
governor may regulate pumping capacity within a half limit under the conditions as determined by the Municipal Ordinances of the City/
Do
concerned.
(5)
In calculating the pumping capacity under paragraphs (3) and (4), the entire pumping capacity shall be summed up in the case falling under any of the following subparagraphs:
<Amended by Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
1.
Where any person who has already developed and utilized groundwater increases the original pumping capacity of the relevant facilities;
2.
Where any person installs not less than two groundwater development and utilization facilities in the same place of business; or
3.
Where the same person installs not less than two groundwater development and utilization facilities in an area whose distance between such groundwater development and utilization facilities is not more than 50 meters.
(6)
The alteration of important matters under the main sentence of
Article 8 (2) of the Act
means cases falling under any of the following subparagraphs:
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
1.
Where the reporter's title is altered;
2.
Where the purposes of groundwater development and utilization are altered (including the alteration of whether to utilize for drinking water or not);
3.
Where the facilities for developing and using groundwater are altered; or
4.
Where the development and utilization of groundwater are suspended for three months or more:
Provided
, That this shall not apply where it is deemed inevitable to suspend the use of groundwater for purposes of agricultural use or fishery use.
(7)
Any person who intends to make a report of alteration pursuant to the main sentence of
Article 8 (2) of the Act
shall make a report to the head of
Si
/
Gun
within one month from the date on which any cause for alteration occurs.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
(8)
The provisions of
Article 8
(3) and (4) shall apply
mutatis mutandis
to the installation of groundwater development and utilization facility which is subject to report.
<Added by Presidential Decree No. 19158, Nov. 30, 2005>
법령보기 화면
Article 13-2 (Orders Issued to Make Corrections, etc.)
(1)
The head of
Si
/
Gun
shall, when he intends to take necessary measures, such as a corrective order, the order to suspend the use or the order for joint utilization, against any person who has filed a report on the groundwater development and utilization under
Article 8 (3) of the Act
, serve notice thereof on him in the form of a document specifying the grounds for issuing each of such orders, how to execute each of such orders and a fixed period during which each of such orders is executed, etc.
(2)
With respect to any person who has failed to execute any of the orders given under paragraph (1) within the fixed period due to inevitable cause such as natural disaster, the head of
Si
/
Gun
may extend such fixed period within the limit of the original period only once. In this case, any person who intends to get the fixed period extended shall file an application for extending such fixed period with the head of
Si
/
Gun
3 days prior to the expiration of the fixed period.
(3)
Any person who has been notified of any of the orders given under paragraph (1) shall, when he carries out any of such orders, make a report thereon to the head of
Si
/
Gun
within fifteen days from the date on which he carries out any of such orders under the conditions as prescribed by the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
[This Article Added by Presidential Decree No. 17433, Dec. 19, 2001]
법령보기 화면
Article 14 (Report on Completing Construction Work)
(1)
Deleted.
<by Presidential Decree No. 16297, May 10, 1999>
(2)
Where any person who has obtained permission pursuant to
Article 7 of the Act
or has made a report pursuant to
Article 8 of the Act
completes construction work for the installation of facilities for developing and using groundwater, he shall make a report to the head of
Si
/
Gun
within 1 month from the date on which he completes construction work under the conditions as determined by the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
(3)
Where the head of
Si
/
Gun
receives a report on completion of construction work under paragraph (2), he shall deliver a certificate of completion after confirming whether the facilities for developing and using groundwater are installed in conformity with the permitted or reported contents within 15 days from the date on which he receives the report under the conditions as determined by the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
(4)
The term "matters prescribed by Presidential Decree, such as the location, etc. of groundwater development and utilization facilities" in
Article 9 (2) of the Act
means the matters of the following subparagraphs:
<Added by Presidential Decree No. 19158, Nov. 30, 2005>
1.
The location of groundwater development and utilization facilities; and
2.
Matters falling under any of the following items:
(a)
The depth and diameter of excavation and planned volume of water intake among the contents of installation of failities; or
(b)
The power equipment, inner diameter of blowoff pipe, depth of installation, capacity of pumping.
(5)
Where the Mayor/
Do
governor intends to order correction or to take necessary measures to the person who has reported the completion of construction pursuant to the provisions of
Article 9 (2) of the Act
, he shall notify the contents affixing a specified period of performance within the extent of three months.
<Added by Presidential Decree No. 19158, Nov. 30, 2005>
(6)
The Mayor/
Do
governor may extend once more the period of performance within the extent of the original period of performance to the person who has failed to perform the ordered measures within the period referred to in paragraph (5) due to natural disaster or other unavoidable causes. In this case, the person who intends to have the performance period extended shall apply for the extension of period to the Mayor/
Do
governor by three days before the expiration of the original performance period.
<Added by Presidential Decree No. 19158, Nov. 30, 2005>
(7)
Where the person who was notified of the measures, such as the order of correction, etc. pursuant to the provisions of paragraph (5) has performed the order of performance, etc., he shall notify the Mayor/
Do
governor of the matters of performance within fifteen days from the date of performance as prescribed by Ministerial Decree of Construction and Transportation.
<Added by Presidential Decree No. 19158, Nov. 30, 2005>
법령보기 화면
Article 14-2 (Usage of Flowing-out Groundwater)
The term "the usage as prescribed by Presidential Decree" in
Article 9-2 (2) of the Act
means the usages listed in the following subparagraphs:
1.
Fire-fighting usage, cleaning usage, landscaping usage or construction usage among the household usages; and
2.
Other usages recognized by the Mayor/
Do
governor as necessary.
[This Article Wholly Amended by Presidential Decree No. 19158, Nov. 30, 2005]
법령보기 화면
Article 14-3 (Report, etc. of Act of Excavation Affecting Groundwater)
(1)
The term "important matters prescribed by Presidential Decree" in the latter part of
Article 9-4 (1) of the Act
means the matters falling under any of the following subparagraphs:
<Added by Presidential Decree No. 19158, Nov. 30, 2005>
1.
The depth or diameter of excavation; and
2.
The name of construction company.
(2)
The term "acts as prescribed by the Presidential Decree" in
Article 9-4 (1) 4 of the Act
means the act falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
1.
The prospecting made under
Article 37 (1) of the Enforcement Decree of the Mining Industry Act
;
2.
The geological and groundwater survey whose excavation measures not less than 75 millimeters in diameter (excluding the cases of national defense and military purposes); and
3.
The construction work of geothermal air-conditioning and heating in order to utilize subterranean heat as energy source for air-conditioning and heating (excluding the case of pumping groundwater).
(3)
The term "the extent prescribed by the Presidential Decree" in
Article 9-4 (3) of the Act
means the case where groundwater development and utilization facilities installed in an area located within 50 meters in a radius from the center of a place where excavation takes place fall under each of the following subparagraphs:
1.
Where the maximum intake volume of groundwater per day decreases by not less than 1/5; and
2.
Where the quality of groundwater fails to meet water-quality standards set under
Article 20 (2) of the Act
(hereinafter referred to as "waterquality standards").
[This Article Added by Presidential Decree No. 17433, Dec. 19, 2001]
법령보기 화면
Article 14-4 (Post Management, etc. of Groundwater Development and Utilization Facilities)
(1)
The term "measures necessary for post management" in
Article 95 (1) of the Act
means cleaning, inspection and maintenance of groundwater development and utilization facilities.
(2)
Where the Mayor/
Do
governor intends to take necessary measures, such as an order of correction, suspension of use, etc. pursuant to the provisions of
Article 9-5 (3) of the Act
against the person who has not performed the post management or has reported fraudulently, he shall notify the person who develops and utilizes groundwater of the contents thereof affixing a specific period of time within the extent of three months.
(3)
The provisions of
Article 14
(6) and (7) shall apply
mutatis mutandis
to the extension of performance period of necessary measures, such as order of correction, suspension of utilization, etc. pursuant to the provisions of
Article 9-5 (3) of the Act
and the notification of performance result.
(4)
The scale and usage of the facilities subject to post management pursuant to the provisions of
Article 9-5 (4) of the Act
shall be as listed in the following subparagraphs and the post management shall be performed be every two years:
Provided
, That the post management of the facilities falling under subparagraph 4 shall be performed every five years:
1.
A facility with a pumping capacity exceeding 100 tons a day from among the facilities for groundwater development and utilization by the State or local government for emergency water supply against war or state of emergency;
2.
A facility with a pumping capacity exceeding 100 tons a day from among the groundwater development and utilization facilities for public water supply pursuant to the provisions of
Article 19
(1);
3.
A facility with a pumping capacity exceeding 100 tons a day as prescribed by Ministerial Decree of Construction and Transportation from among the facilities that develop and utilize multitude-use groundwater after receiving permission, approval, etc. or reporting pursuant to the provisions of the Act or other Acts; and
4.
The facility excluding the facility falling under subparagraphs 2 and 3 from among the groundwater development and utilization facilities permitted pursuant to the provisions of
Article 7 (1) of the Act
or the proviso of
Article 8 (2) of the Act
.
(5)
The detailed methods of cleaning, inspection and maintenance of groundwater development and utilization facilities pursuant to the provisions of paragraph (1) shall be prescribed by Ministerial Decree of Construction and Transportation.
[This Article Added by Presidential Decree No. 19158, Nov. 30, 2005]
법령보기 화면
Article 15 (Degree of Inferior Water Quality)
(1)
Deleted.
<by Presidential Decree No. 19158, Nov. 30, 2005>
(2)
The term "inferior water quality" in
Articles 10 (1) 7
and
15 (1) 4 of the Act
means the level at which the quality of groundwater is unfit for development and utilization:
Provided
, That the water quality of the groundwater development and utilization facility recognized by the head of
Si
/
Gun
as in need of purification treatment for the purpose of groundwater development and utilization means the case where the water quality after purification treatment is unfit for development and utilization.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
법령보기 화면
Article 16 (Order, etc. for Correction before Revocation of Permission)
(1)
Where the head of
Si
/
Gun
intends to order any correction or take necessary measures pursuant to
Article 10 (3) of the Act
before revoking permission on groundwater development and utilization, he shall notify the contents thereof to the person who has obtained permission on groundwater development and utilization within a fixed period not exceeding 3 months.
<Amended by Presidential Decree No. 16297, May 10, 1999>
(2)
The head of
Si
/
Gun
may extend the period notified pursuant to paragraph (1) only once within the initially notified period where he deems inevitable cause including natural disasters or other calamities exist. In this case, any person who intends to have the period extended shall make an application for extension of the period to the head of
Si
/
Gun
no later than 3 days before the initially notified period expires.
<Amended by Presidential Decree No. 16297, May 10, 1999>
(3)
Where any person who has received notification pursuant to paragraph (1) carries out an order for correction or measures, he shall notify the head of
Si
/
Gun
within fifteen days from the date on which he does so under the conditions as determined by the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
법령보기 화면
Articles 17 and 18 Deleted.<by Presidential Decree No. 16297, May 10, 1999>
법령보기 화면
Article 19 (Area to be Designated as Groundwater Preservation Area)
(1)
The term "groundwater development and utilization facilities for
public water-supply prescribed by the Presidential Decree" in
Article 12 (1) 3 of the Act
means the groundwater development and utilization facilities installed to supply the wide-area waterworks, local waterworks, small-scale waterworks, exclusive waterworks or small-size water-supply system prescribed in
Article 3 of the Water Supply and Waterworks Installation Act
with groundwater (hereinafter referred to as "public watersupply facilities") and the term "the radius prescribed by the Presidential Decree" means 50 meters.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
(2)
The term "area prescribed by Presidential Decree" in
Article 12 (1) 7 of the Act
means the area falling under any of the following subparagraphs:
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
1.
The area which is recognized as in need of conservation or restriction of development of groundwater pursuant to the basic plan or regional management plan;
2.
The area which is apprehended to have been invaded or to be invaded by seawater into the geological stratum endowed with groundwater due to excessive development and utilization of groundwater in the seaside area and island; or
3.
The area which is apprehended to suffer a fall in the volume of groundwater used by public water-supply facilities due to the installation of groundwater development and utilization facilities and located within a 100-meter radius from the center of such public water-supply facilities.
(3)
Deleted.
<by Presidential Decree No. 19158, Nov. 30, 2005>
(4)
The term "area prescribed by the Presidential Decree" in
Article 12 (6) 3 of the Act
means the area that is deemed necessary to be designated as a groundwater preservation area under the basic plan.
(5)
The scope of designating any groundwater preservation area provided for in
Article 12 (1) of the Act
is as shown in the Appendix 3.
[This Article Wholly Amended by Presidential Decree No. 17433, Dec. 19, 2001]
법령보기 화면
Article 20 (Designation Procedures, etc. of Groundwater Preservation Area)
(1)
Where it is deemed necessary to designate a groundwater preservation area or alter the designation (including removal of designation; hereinafter the same shall apply) under
Article 12 (1) of the Act
, the head of a relevant central administrative agency or the head of
Si
/
Gun
may ask the Mayor/
Do
governor to designate a groundwater preservation area or alter the designation under the conditions as determined by the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 16297, May 10, 1999>
(2)
Where the head of a relevant central administrative agency or the head of
Si
/
Gun
asks for the designation or alteration of designation of a groundwater preservation area pursuant to paragraph (1), he shall submit a written request, accompanied by the following documents:
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
1.
Documents which contain the purpose of or cause for designation or alteration of designation;
2.
Documents which contain the contents of designation or alteration of designation;
3.
Topography drawn on a scale of 1 to 5,000 or greater which indicates the range and size of an area which he intends to designate or alter the designation;
4.
Land protocol with the lot number, land category and size of the area; and
5.
Other documents as determined by the Ministerial Decree of Construction and Transportation.
(3)
Where deemed that the request for designation or alteration of designation of a groundwater preservation area under paragraph (1) is reasonable, the Mayor/
Do
governor shall designate a groundwater preservation area or alter the designation.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
(4)
Where the Mayor/
Do
governor intends to designate a groundwater preservation area or alter the designation pursuant to
Article 12 (1) of the Act
, he shall take the following matters into consideration:
<Amended by Presidential Decree No. 17433, Dec. 19, 2001>
1.
Characteristics in reserve and actual conditions on utilization of groundwater;
2.
Water-quality characteristics and polluted condition of groundwater;
3.
Effects on natural ecosystem due to groundwater development;
4.
The current utilization of land in the relevant area;
5.
The installation of current facilities that cause the pollution of groundwater in the relevant area under
Article 26-2
(1); and
6.
Relevance to any development plan under other Acts and subordinate statutes.
(5)
Any alteration of minor matters under the proviso of
Article 12 (2) of the Act
shall mean:
1.
Where the name of a groundwater preservation area is altered; and
2.
Where the size of a groundwater preservation area is increased or decreased within 10% of the designated area.
(6)
Where the Mayor/
Do
governor designates a groundwater preservation area or alters the designation, he shall make public notice of the following matters in the official report, etc. pursuant to
Article 12 (5) of the Act
, and the head of
Si
/
Gun
who has received the notification of designation or alteration of designation of a groundwater preservation area from the Mayor/
Do
governor shall make the publicly notified contents available to the public for not less than 20 days pursuant to
Article 12 (5) of the Act
:
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
1.
Date on which a groundwater preservation area has been designated or altered;
2.
Name of a groundwater preservation area;
3.
Location and size of a groundwater preservation area;
4.
Cause for designation or alteration of designation of a groundwater preservation area;
5.
Drawing that is prepared based on the topographical drawing made on a scale of 1 to 5,000 or greater; and
6.
Other matters as determined by the Ministerial Decree of Construction and Transportation.
(7)
Where the Mayor/
Do
governor designates a groundwater preservation area or alters the designation, he shall make public notice of the groundwater preservation area concerned:
Provided
, That this shall not apply in case where he removes the designation of a groundwater preservation area.
(8)
Where deemed that any cause falling under any subparagraphs of
Article 12 (1) of the Act
has disappeared, the Mayor/
Do
governor shall remove the designation of a groundwater preservation area.
(9)
Necessary matters on public notification under paragraph (7) shall be determined by the Ministerial Decree of Construction and Transportation.
법령보기 화면
Article 20-2 (Hearing Opinion of Residents)
(1)
When the Mayor/
Do
governor intends to hear the opinion of residents regarding the designation or alteration of designation of a groundwater preservation area pursuant to the provisions of the main sentence of
Article 12-2 (1) of the Act
, he shall notify the relevant head of
Si
/
Gun
of the announcement plan containing the essential contents of the designation plan or alteration plan of designation.
(2)
The head of
Si
/
Gun
who has been notified pursuant to the provisions of paragraph (1) shall announce it for at least fourteen days so that the residents may read it.
(3)
Those who have any opinion on the designation or alteration of designation of a groundwater preservation area announced and perused pursuant to paragraph (2) may submit their opinions in writing to the Mayor/
Do
governor within the period of public perusal.
(4)
The Mayor/
Do
governor shall consider whether to reflect the opinions submitted pursuant to the provisions of paragraph (3) in the designation or alteration of designation of a groundwater preservation area, and notify the result to the person who submitted the opinion concerned within thirty days from the date of completion of perusal.
(5)
The term "minor matters as prescribed by Presidential Decree" in the proviso of
Article 12-2 (1) of the Act
means the case for the correction of errors in the calculation of area among the contents of a designation or alteration of designation of a groundwater preservation area.
[This Article Added by Presidential Decree No. 19158, Nov. 30, 2005]
법령보기 화면
Article 21 (Prohibition of Acts within Groundwater Preservation Areas)
(1)
The term "extent beyond those as prescribed by the Presidential Decree" in
Article 13 (1) 1 of the Act
means cases where pumping capacity per day is not less than 30 tons of water. In this case where earthen pipes whose inner diameter is not less than 32 millimeters are used, pumping capacity per day shall be deemed not less than 30 tons of water.
(2)
The provisions of
Article 13
(5) shall apply
mutatis mutandis
to the measurement of pumping capacity under paragraph (1).
<Amended by Presidential Decree No. 17433, Dec. 19, 2001>
(3)
The term "facilities as prescribed by Presidential Decree" in the part other than the items of
Article 13 (1) 2 of the Act
means facilities subject to permission, approval, report, etc. under the
Water Quality Conservation Act
, the
Wastes Control Act
, the
Toxic Chemicals Control Act
, the
Soil Environment Conservation Act
or the
Act on the Disposal of Sewage, Excreta and Livestock Wastewater
.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
(4)
The term "acts as prescribed by the Presidential Decree" in
Article 13 (1) 3 of the Act
means:
1.
The act of conducting underground excavation work such as tunneling work which threatens to alter flowing route or flowing velocity of groundwater;
2.
The act of installing structures such as underground oil storages which threaten to pollute groundwater;
3.
The act of installing wastes reclamation land, specific waste storage facilities and cemeteries;
4.
The acts of digging for minerals, picking earth and stones and raising stocks, etc. beyond the extent as determined by the Ministerial Decree of Construction and Transportation, which can have serious effect on the volume and quality of groundwater; and
5.
Deleted.
<by Presidential Decree No. 16297, May 10, 1999>
(5)
The head of
Si
/
Gun
shall, when he intends to ban any act of newly developing and utilizing groundwater in the groundwater preservation area in accordance with
Article 13 (2) of the Act
, publish matters falling under each of the following subparagraphs in the public report, etc. and make the contents of such publication available to the public for a period of not less than twenty days:
<Amended by Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
1.
The date on which the groundwater preservation area has been designated or the date on which such designation has been altered;
2.
The name of the groundwater preservation area;
3.
The location and size of the groundwater preservation area;
4.
The drawing that is prepared based on the topographical drawing made on a scale of 1 to 5,000 or greater; and
5.
The substance of the banned act of developing and utilizing groundwater and the period during which such banned act is imposed.
법령보기 화면
Article 22 (Amount and Deposit Time, etc. of Guaranty Money)
(1)
Any person who has obtained permission or authorization, etc. for or made a report on the development and utilization of groundwater under
Article 7 (1)
,
8 (1)
,
9-4 (1)
or
13 (1) 1 of the Act
or under other Acts shall deposit the guaranty money under
Article 14 of the Act
in cash or by a written guarantee or securities, etc. as determined by the Ministerial Decree of Construction and Transportation before the date of the start of the construction work concerned.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
(2)
The amount of guaranty money under paragraph (1) shall be the expenses required for the restoration to the original state, and the detailed standards for calculation of the amount shall be determined by the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 16297, May 10, 1999>
(3)
The deposit period of guaranty money under
Article 14 (1) of the Act
shall be 5 years from the date on which the works commence:
Provided
, That where deemed it particularly necessary, taking into account the regional conditions or the situation of the facilities for developing and using groundwater, the head of
Si
/
Gun
may have guaranty money deposited continuously after reviewing whether it is necessary to do so every 5 years.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 17433, Dec. 19, 2001>
(4)
Where the period of groundwater development and utilization is determined under
Articles 7
and
7-3 of the Act
or other Acts, the deposit period of guarantee money shall, notwithstanding the provisions of paragraph (3), expire on the date on which one year lapses after the expiration of the period of development and utilization. Where the period of groundwater development and utilization is extended, the deposit period of guarantee money shall expire on the date on which one year lapses after the expiration of the period of groundwater development and utilization from the day on which permission is granted for such extension.
<Amended by Presidential Decree No. 17433, Dec. 19, 2001>
(5)
Where any person who is obligated to restore an area to the original state (hereinafter referred to as "person obligated to restore to the original state") pursuant to
Article 15 (1) of the Act
does so, the deposit period of guaranty money elapses or the relevant area falls under
Article 23
(1) 3, the head of
Si
/
Gun
shall return the guaranty money under the conditions as determined by the Ministry of Construction and Transportation.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
(6)
Deleted.
<by Presidential Decree No. 17433, Dec. 19, 2001>
(7)
The head of
Si
/
Gun
may, if the guaranty money falls short of the cost required to restore the original state when he restores the original state on behalf of the person obliged to restore the original state in accordance with
Article 15 (4) of the Act
, demand additional funds from the person obligated to restore the original state, and shall return the balance of guaranty money without delay to the latter where there is any balance after the guaranty money is spent.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 17433, Dec. 19, 2001>
법령보기 화면
Article 22-2 (Exemption from Liability of Depositing Guaranty Money)
The term "cases prescribed by Presidential Decree as deemed surely to be restored to the original state" in
Article 14 (1) 2 of the Act
means the cases falling under
Article 14-3
(2) 3.
[This Article Added by Presidential Decree No. 19158, Nov. 30, 2005]
법령보기 화면
Article 23 (Exception, etc. to Restoration to Original State)
(1)
The term "cases as determined by the Presidential Decree" in the proviso of the part other than subparagraphs in
Article 15 (1) of the Act
means the case falling under any of the following subparagraphs:
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
1.
Where he continues to develop and use groundwater by obtaining permission or authorization, etc. or making a report pursuant to the provisions of the Act or other Acts;
2.
Where the head of
Si
/
Gun
deems that it is necessary to use as water level observatory or water quality observatory of groundwater; and
3.
Where the head of
Si
/
Gun
deems that it is unnecessary to restore the original state under topographical conditions.
(2)
The term "other cases which require the restoration of the original state and which are, at the same time, determined by the Presidential Decree" in
Article 15 (1) 6 of the Act
means the following cases:
<Added by Presidential Decree No. 16297, May 10, 1999>
1.
Where the concerned ground or structures subside or are likely to subside because groundwater level is lowered; and
2.
Where groundwater is dried up or is likely to be dried up because groundwater level is lowered.
법령보기 화면
Article 24 (Standards, Method and Period, etc. of Restoration to Original State)
(1)
Where the head of
Si
/
Gun
intends to order the restoration to the
original state pursuant to
Article 15 (2) or (3) of the Act
, he shall notify the contents thereof in writing to the person obligated to restore to the original state within a fixed period of not more than one month. In this case, the person obligated to restore to the original state shall execute the restoration to the original state after notifying the head of
Si
/
Gun
of the date when the restoration to the original state is executed.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
(2)
The provisions of
Article 16
(2) shall apply
mutatis mutandis
to an extension of the period of restoration to the original state pursuant to paragraph (1).
<Amended by Presidential Decree No. 16297, May 10, 1999>
(3)
The head of
Si
/
Gun
shall, in the event that he has to restore the original state on behalf of the person obliged to restore the original state in accordance with
Article 15 (4) of the Act
, serve a written notice thereof on the person obliged to restore the original state 7 days prior to the date on which he commences the works of restoring the original state.
<Added by Presidential Decree No. 17433, Dec. 19, 2001>
(4)
The restoration to the original state under
Article 15 of the Act
shall be made according to the following methods:
Provided
, That where the head of
Si
/
Gun
deems that the restoration to the original state is insufficient by the following methods, it shall be made by another method as determined by the head of
Si
/
Gun
:
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
1.
To check the inner side of the excavated hole and eliminate the installation material and polluted material and fill up from the bottom of original excavation to the ground surface with a material through which water is hard to permeate, such as cement slurry, clay, etc.:
Provided
, That filling up at the lower part of the protection wall beneath the ground surface (hereafter in this paragraph referred to as the "protection wall") may be filled up with a material through which water is easy to permeate, such as sand, etc.; and
2.
To eliminate the protection wall installed beneath the ground surface:
Provided
, That where it is hard to eliminate the protection wall, to cut off the protection wall more than one meter from the ground surface after digging out earth from the around area.
(5)
The head of
Si
/
Gun
shall confirm whether or not the person obligated to restore the original state, who has received the order therefor, restores the original state in conformity with paragraph (4) within a fixed period of restoration.
<Added by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 17433, Dec. 19, 2001>
법령보기 화면
Article 25 (Measures, etc. against Pollution of Groundwater)
(1)
Any person who is obligated to take necessary measures such as installing facilities for preventing groundwater pollution (hereinafter referred to as "person obligated to prevent groundwater pollution") pursuant to
Article 16 (1) of the Act
shall take measures against groundwater pollution according to the standards in the following subparagraphs:
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
1.
He shall install the upper protective pores of the groundwater development and utilization facilities and protective walls beneath the surface of the earth, and maintain a certain degree of slope in the vicinity of the groundwater development and utilization facilities in order to keep pollutants from flowing into from the surface of the earth or other groundwater development and utilization facilities:
Provided
, That in the case falling under any of the following items, the upper protective pores may not be installed:
(a)
Where groundwater is developed and utilized in any building which is not feared to face an inflow of pollutants; or
(b)
Where antipollution measures are taken under subparagraph 4 when agricultural water or fishery water is developed and utilized without using any fixed power unit;
2.
He shall measure the volume and quality of groundwater that is developed and utilized by installing an integrating flowmeter (including a system which enables the measurement of flow, such as time clock; hereinafter the same shall apply) and the excurrent system in the upper protective pores of the groundwater development and utilization facilities (in a proper place inside a building in case that the upper protective pores are not installed under subparagraph 1 (a)):
Provided
, That the same shall not apply to a case where the groundwater development and utilization facilities fall under any of the following items:
(a)
The groundwater development and utilization facilities whose daily pumping capacity is not more than 30 tons (limited to a case where the earthen pipes whose inner diameter measures not more than 32 millimeters are used) which are used for household or national defense and military; or
(b)
The groundwater development and utilization facilities installed for agricultural use or fishery use, which do not use any fixed power unit;
3.
He shall install the groundwater gauge in the groundwater development and utilization facilities to make it possible to measure the water level of groundwater:
Provided
, That the same shall not apply to the groundwater development and utilization facilities that fall under any of the following items:
(a)
The groundwater development and utilization facilities whose excavation measures less than 100 millimeters in a diameter or the groundwater development and utilization facilities whose daily pumping capacity is not more than 30 tons (limited to a case where the earthen pipes whose inner diameter measures not more than 32 millimeters are used), which are used for household or national defense and military; or
(b)
The groundwater development and utilization facilities installed for agricultural use or fishery use, which do not use any fixed power unit;
4.
He shall install the earthen pipes in the groundwater development and utilization facilities for agricultural use or fishery use, which does not use any fixed power unit, not less than 30 centimeters high above the surface of the earth, and make the end portion of each of the earthen pipes the form of "ㄱ" and keep it covered in order to prevent any inflow of pollutants; and
5.
He shall fulfill other measures for preventing groundwater pollution as determined by the Minister of Environment.
(2)
The head of
Si
/
Gun
shall seal the integrate rain gauge installed under paragraph (1) 2 when he confirms a report on the completion of installation works in accordance with
Article 14
(3).
<Added by Presidential Decree No. 17433, Dec. 19, 2001>
(3)
In the event that the sealed integrate rain gauge under paragraph (2) needs to be replaced or repaired on the grounds that it is damaged or breaks down, any person obliged to prevent groundwater pollution shall make a report thereof to the head of
Si
/
Gun
under the conditions as prescribed by the Ministerial Decree of Construction and Transportation.
<Added by Presidential Decree No. 17433, Dec. 19, 2001>
(4)
Any person obligated to prevent groundwater pollution shall measure the volume of groundwater to be developed and used and its level every month by the facilities against groundwater pollution installed pursuant to paragraph (1):
Provided
, That this shall not apply to any facilities referred to in the proviso of paragraph (1) 3 or any facilities which are installed after a report on groundwater development and utilization under
Article 8 of the Act
is made and which the head of
Si
/
Gun
deems that it is not necessary to measure such volume and level.
<Amended by Presidential Decree No. 16297, May 10, 1999>
(5)
The matters necessary for the detailed installation standards for facilities against groundwater pollution under paragraph (1) shall be determined by the Ministerial Decree of Environment.
법령보기 화면
Article 26 (Order Given to Prevent Groundwater from Being Polluted, etc.)
(1)
The Minister of Environment or the head of
Si
/
Gun
may, under
Article 16 (2) of the Act
, order any installer or manager of facilities that pollute groundwater or are feared to considerably pollute groundwater to take steps falling under each of the following subparagraphs to keep groundwater from being polluted:
1.
Installation of groundwater pollution measuring gauges and the measurement of groundwater quality;
2.
Assessment of the progress of pollution in groundwater;
3.
Installation of facilities used to prevent pollutants from leaking into groundwater;
4.
Purification of polluted groundwater;
5.
Improvements in the operation of the relevant facilities and equipment; and
6.
Shutdown, transfer or removal of the relevant facilities.
(2)
Necessary matters concerning the order issued to prevent groundwater from being polluted under paragraph (1) shall be prescribed by the Ministerial Decree of Environment.
[This Article Wholly Amended by Presidential Decree No. 17433, Dec. 19, 2001]
법령보기 화면
Article 26-2 (Prevention of Facilities Inducing Groundwater Pollution from Polluting Groundwater, etc.)
(1)
Any installer or manager (hereinafter referred to as the "manager of facilities inducing groundwater pollution") of facilities inducing groundwater pollution under
Article 16-2 (1) of the Act
(hereinafter referred to as the "facilities inducing groundwater pollution") shall take steps falling under each of the following subparagraphs to prevent groundwater from being polluted:
1.
Installation of facilities used to prevent pollutants from leaking into groundwater;
2.
Installation of facilities used to confirm whether pollutants leak into groundwater;
3.
Installation of groundwater pollution measuring gauges between the upstream and the downstream of the facilities inducing groundwater pollution; and
4.
Periodic measurement of groundwater quality and filing of a report on the outcome of such periodic measurement of groundwater quality with the head of
Si
/
Gun
.
(2)
The term "the groundwater pollution prescribed by the Presidential Decree is feared to occur or the time that the groundwater pollution occurs" in
Article 16-2 (2) of the Act
means the time that pollutants leak into nearby groundwater in the course of operating the facilities inducing groundwater pollution.
(3)
The manager of facilities inducing groundwater pollution shall, when the relevant facilities fall under paragraph (2), take without any delay steps falling under each of the following subparagraphs:
1.
The measurement of quality of groundwater that is required under
Article 16-2 (1) of the Act
;
2.
The removal of pollutants; and
3.
The installation of facilities used to deter the proliferation of pollutants.
(4)
The manager of facilities inducing groundwater pollution shall, when he takes the steps required by paragraph (3), report without any delay matters falling under each of the following subparagraphs to the head of
Si
/
Gun
:
1.
Date and place on and in which a groundwater pollution incident occurs, and the cause and substance of such incident;
2.
Kind, density and quantity of pollutants leaking into groundwater;
3.
Area that is feared to suffer damage caused by groundwater pollution incident and a place where the measurement of water quality is taken;
4.
Details of various steps taken to control such groundwater pollution incident; and
5.
A topographical map, a land registration map or a forest land map, each drawn on a scale of not less than 1 to 5,000 or greater.
(5)
Necessary matters concerning the method of installing groundwater pollution measuring gauges, the period and method during and by which water quality is measured and how to make a report on the outcome of the measurement of water quality, etc. provided for in paragraph (1) shall be prescribed by the Ministerial Decree of Environment.
[This Article Added by Presidential Decree No. 17433, Dec. 19, 2001]
법령보기 화면
Article 26-3 (Measures Taken against Manager of Facilities Inducing Groundwater Pollution)
(1)
In the event that any groundwater is found to fail to meet waterquality standards set by the Ministerial Decree of Environment in accordance with
Article 16-3 (1) of the Act
as a result of the measurement of water quality of such groundwater that is taken in accordance with
Article 16-2 (1) of the Act
, the Minister of Environment or the head of
Si
/
Gun
shall order the manager of facilities inducing groundwater pollution that provides a cause of pollution to make a report on dangers posed by groundwater pollution, the scope of such pollution, the assessment of the cause of such pollution and steps planned to be taken to prevent a recurrence of such pollution, etc. (hereinafter referred to as the "report on the assessment of groundwater pollution") under the conditions as prescribed by the Ministerial Decree of Environment.
(2)
The Minister of Environment or the head of
Si
/
Gun
shall order the manager of facilities inducing groundwater pollution to take necessary steps from among the steps falling under each of the following subparagraphs:
1.
A close survey conducted to find the scope of groundwater pollution;
2.
Installation of additional facilities used to prevent pollutants from leaking into groundwater;
3.
A change in the traditional methods of transporting, storing and treating pollutants that can leak into groundwater;
4.
A project undertaken to purify polluted groundwater;
5.
Improvements in the equipment and operation of the relevant facilities; and
6.
A survey conducted to determine whether groundwater polluted by natural attenuation is naturally purified or can be naturally purified.
(3)
Contents to be contained in the report on the assessment of groundwater pollution and a guideline by which such report is compiled and other necessary matters shall be prescribed and published by the Minister of Environment.
[This Article Added by Presidential Decree No. 17433, Dec. 19, 2001]
법령보기 화면
Article 26-4 (Approval of Plans for Purifying Polluted Groundwater,etc.)
(1)
The manager of facilities inducing groundwater pollution shall, after developing a plan for purifying polluted groundwater in accordance with
Article 16-4 (1) of the Act
, obtain approval therefor from the head of
Si
/
Gun
30 days before he commences the works of purifying polluted groundwater in accordance with
Article 16-2 (2) of the Act
or within 6 months from the date on which he is ordered to purify polluted groundwater in accordance with
Article 16-3 (1) of the Act
.
(2)
Any plan for purifying polluted groundwater shall contain matters falling under each of the following subparagraphs:
1.
Method and kind of purification project;
2.
Purification project period and place (including the location and area of the facilities inducing groundwater pollution and the area subject to the project cost);
3.
The scale of the purification project, including the facility capacity and installation area, etc.;
4.
Aggregate project cost and the cost required by works;
5.
How to finance the project cost; and
6.
Countermeasures in case that the purification project fails to go as planned.
(3)
Detailed matters necessary for developing any plan for purifying polluted groundwater shall be prescribed and published by the Minister of Environment.
[This Article Added by Presidential Decree No. 17433, Dec. 19, 2001]
법령보기 화면
Article 27 (Survey of Actual Changes in Water Level of Groundwater)
(1)
The Minister of Construction and Transportation shall set up 300 or more national observation networks referred to in
Article 17 (1) of the Act
taking into account the characteristics in reserve of groundwater and the actual conditions on utilization of groundwater, etc. across the nation and every national observation network shall measure the water level of groundwater not less than once a day:
Provided
, That in case that the Minister of Agriculture and Forestry sets up and operates groundwater-level observation networks in areas where groundwater is used for agricultural and fishery purposes in accordance with Article 18-2 of the Rearrangement of Agricultural and Fishing Villages Act, such groundwater-level observation networks may be used instead of setting up national observation networks there.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
(2)
The head of
Si
/
Gun
shall set up auxiliary observation networks in his jurisdictional areas taking into account the actual conditions on utilization of groundwater and the current state of groundwater quality, etc. in accordance with
Article 17 (2) of the Act
and every auxiliary observation network shall measure the water level of groundwater not less than once a month.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
(3)
The Minister of Construction and Transportation shall analyze changes in the water level of groundwater based on the results of the water-level measurement of groundwater that is taken in accordance with paragraph (1).
(4)
Detailed matters concerning standards for setting up observation networks under paragraphs (1) and (2), and measuring methods, etc. shall be prescribed and published by the Minister of Construction and Transportation.
[This Article Wholly Amended by Presidential Decree No. 17433, Dec. 19, 2001]
법령보기 화면
Article 28 (Survey, etc. on Actual Conditions of Groundwater Utilization)
(1)
The head of
Si
/
Gun
shall carry out the survey on the actual conditions of utilization of groundwater in the following matters by
Ri
/
Dong
and by use within his jurisdiction every year pursuant to
Article 17 (6) of the Act
:
<Amended by Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
1.
Matters on general conditions such as locations, users and quantity of use;
2.
Matters on various factors such as depths and diameters of facilities of groundwater development and utilization;
3.
Matters on groundwater quality including the data on water quality inspection of
Article 30
(5);
4.
Matters regarding the cost of utilizing groundwater; and
5.
Other matters regarding pumping equipment, etc.
(2)
The head of
Si
/
Gun
shall make a report on the results of survey on actual conditions of utilization of groundwater under paragraph (1) to the Minister of Construction and Transportation and the relevant Mayor/
Do
governor by the end of March of the following year under the conditions as determined by the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
(3)
The term "measures necessary as prescribed by Presidential Decree" in
Article 17 (8) of the Act
means the measures in the following subparagraphs:
<Added by Presidential Decree No. 19158, Nov. 30, 2005>
1.
The execution of investigation and analysis of cause regarding the characteristics of endowment, the volume that can be exploited, the present situation of development and utilization of groundwater in the area concerned; and
2.
The request for designation as groundwater preservation area to the relevant Mayor/
Do
governor where it is deemed necessary in accordance with the result of investigation and analysis under subparagraph 1.
법령보기 화면
Article 29 (Inspection of Water Quality, etc.)
(1)
The term "person prescribed by the Presidential Decree" in
Article 20 (1) of the Act
means the person who develops and utilizes groundwater falling under any of the following subparagraphs:
Provided
, That any person who develops and utilizes groundwater for public supply and undergoes the inspection of water quality of such groundwater in accordance with
Article 19 of the Water Supply and Waterworks Installation Act
shall be excluded:
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
1.
Drinking water; or
2.
Household water, industrial water, agricultural water and fishery water, each of which is in conformity with scale and detailed purposes, etc. prescribed by the Ministerial Decree of Environment.
(2)
Any person who falls under paragraph (1) shall undergo the inspection of the quality of groundwater, which is conducted by any specialized water-quality inspection institution (hereinafter referred to as "specialized water-quality inspection institution") during a period set by the Ministerial Decree of Environment. In this case, if groundwater is developed and utilized for drinking water, such groundwater shall undergo the inspection of water quality, which is conducted by any inspection institution provided for in
Article 30
(1) 2.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
[This Article Wholly Amended by Presidential Decree No. 17433, Dec. 19, 2001]
법령보기 화면
Article 30 (Specialized Water-Quality Inspection Institutions, etc.)
(1)
Specialized water-quality inspection institutions provided for in
Article 20 (1) of the Act
shall be those falling under any of the following subparagraphs:
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
1.
Specialized groundwater survey agency;
2.
Inspection institutions provided for in
Article 35 of the Management of Drinking Water Act
;
3.
Operators of general waterwork business provided for in subparagraph 20 of
Article 3 of the Water Supply and Waterworks Installation Act
;
4.
The National Institute of Agricultural Science and Technology under the control of the Rural Development Administration;
5.
The
Do
agricultural technology institutes, each of which is established by each of local governments in accordance with the regulations governing the standards for administrative organs and the fixed number of public officials of local governments; or
6.
Water-quality inspection institutions designated by the Ministerial Decree of Environment if groundwater is developed and utilized for facilities installed under national defense and military installation projects.
(2)
Any specialized water-quality inspection institution shall, if it finds that any groundwater fails to meet the water-quality standards as a result of the inspection of the water quality of such groundwater, which is conducted in accordance with
Article 20 (1) of the Act
, notify without any delay the Minister of Environment or the head of
Si
/
Gun
of the fact.
(3)
The Minister of Environment or the head of
Si
/
Gun
may, upon receiving the notice served under paragraph (2), order any person who uses the relevant groundwater to cease the use of such groundwater or to improve the water quality of such groundwater in a manner falling under any of the following subparagraphs in accordance with
Article 20 (2) of the Act
:
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
1.
The purification treatment of groundwater (limited to the case where the head of
Si
/
Gun
recognized the purification treatment as necessary for the purpose of development and utilization of groundwater);
2.
The supplementation of groundwater development and utilization facilities; and
3.
Deleted.
<by Presidential Decree No. 19158, Nov. 30, 2005>
(4)
The Minister of Environment or the head of
Si
/
Gun
shall, when he intends to order any person who develops and utilizes groundwater to take steps including ceasing the use of such groundwater and improving the water quality of such groundwater under paragraph (3), serve a notice, accompanied by a document specifying details of such steps, on such person.
(5)
Every specialized water-quality inspection institution shall keep the records of water-quality inspection for 2 years and submit the records of water-quality inspection as of the end of every quarter to the Minister of Environment or the head of
Si
/
Gun
by the end of the month following the month in which every quarter ends under the conditions as prescribed by the Ministerial Decree of Environment.
[This Article Wholly Amended by Presidential Decree No. 17433, Dec. 19, 2001]
법령보기 화면
Article 31 (Items, etc. Subject to Water Quality Inspection)
(1)
The items subject to water quality inspection under
Article 20 (3) of the Act
shall be as follows:
<Amended by Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
1.
In case of drinking water, items setting up water quality standards of drinking water under
Article 5 of the Management of Drinking Water Act
; and
2.
In the case of household water, industrial water, agricultural water and fishery water, items setting up groundwater quality standards prescribed by the Ministerial Decree of Environment.
(2)
The method of water quality inspection under
Article 20 (3) of the Act
shall be as follows:
<Amended by Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
1.
In case of drinking water, it shall be carried out by a method of drinking water quality inspection under
Article 5 of the Management of Drinking Water Act
; and
2.
In case of household water, agricultural water, fishery water and industrial water, it shall be carried out by the inspection method of water pollution progress pursuant to the provisions of
Article 8 of the Water Quality Conservation Act
.
법령보기 화면
Article 32 (Registration, etc. of Construction Business for Groundwater Development and Utilization)
(1)
Any person who intends to make a registration of construction business for groundwater development and utilization pursuant to
Article 22 (1) of the Act
shall submit a written application for registration to the head of
Si
/
Gun
under the conditions as determined by the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
(2)
The head of
Si
/
Gun
shall, upon receiving a written application for registration under paragraph (1), confirm whether such application is in conformity with the standards for registration under paragraph (3) and falls under any of the subparagraphs of
Article 23 of the Act
, and shall, if the applicant is deemed to meet the registration standards as a result of the confirmation, enter his application in the register of construction business for groundwater development and utilization and deliver a certificate of registration on him under the conditions as determined by the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
(3)
The standards for registration of construction business for groundwater development and utilization under
Article 22 (1) of the Act
shall be listed in the annexed Table 4.
(4)
The term "matters prescribed by Presidential Decree, such as trade name, title, etc. from among the registered matters" in the latter part of
Article 22 (1) of the Act
means the matters of the following subparagraphs:
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
1.
Trade name or title;
2.
Representative or officer (excluding the representative or officer from the specialized groundwater survey agency that has registered the construction business of groundwater development and utilization);
3.
Technical capability, facility and equipment pursuant to the provisions of annexed Table 4; and
4.
The relocation of main office.
(5)
An application for alteration in the contents of registration under the latter part of
Article 22 (1) of the Act
shall be made within one month after the cause thereof occurred.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
법령보기 화면
Article 33 Deleted.<by Presidential Decree No. 16297, May 10, 1999>
법령보기 화면
Article 34 (Exceptions to Construction Work for Groundwater Development and Utilization)
(1)
Deleted.
<by Presidential Decree No. 19158, Nov. 30, 2005>
(2)
The term "other insignificant construction works as prescribed by the Presidential Decree" in
Article 22 (3) 4 of the Act
means the construction work falling under any of the following subparagraphs:
<Added by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
1.
The works of restoring the groundwater development and utilization facilities whose daily pumping capacity is less than 30 tons and excavation measures not more than 75 millimeters in a diameter to the original state; or
2.
The maintenance work (including the replacement and repair of integrating flowmeter and excurrent system) of upper protective pores in facilities for developing and using groundwater.
법령보기 화면
Article 35 (Report on Transfer and Takeover of Construction Business for Groundwater Development and Utilization)
(1)
Any person who intends to make a report on the transfer, takeover or merger pursuant to
Article 24 (1) of the Act
shall submit a written report to the head of
Si
/
Gun
within one month from the date of transfer, takeover or merger.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
(2)
Where the head of
Si
/
Gun
receives a report under paragraph (1), he shall review whether it meets the standards for registration under the annexed Table 4 and whether it falls under any of the subparagraphs of
Article 23 of the Act
.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
(3)
Any person who has succeeded to the construction business for groundwater development and utilization pursuant to
Article 24 (3) of the Act
shall make a report to the head of
Si
/
Gun
within three months from the date of succession under the conditions as determined by the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
법령보기 화면
Article 36 (Continued Construction after having been Subject to Disposition of Cancellation of Registration)
Where any construction businessman for groundwater development and utilization, who has been subject to disposition of cancellation of registration pursuant to
Article 25 (2) of the Act
, intends to continue the construction work which started before such disposition is taken, he shall, without delay, notify the orderer of the construction work and the head of
Si
/
Gun
who has jurisdiction over the construction area of the fact that his registration has been cancelled.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
법령보기 화면
Article 37 (Procedures, etc. for Cancellation of Registration of Construction Business for Groundwater Development and Utilization)
(1)
Deleted.
<by Presidential Decree No. 16297, May 10, 1999>
(2)
Where the head of
Si
/
Gun
takes a disposition of cancellation of registration pursuant to
Article 25 (1) of the Act
, he shall make public notification without delay in the official report, etc. and notify the person in question.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
(3)
Other matters necessary for the procedures, etc. of cancellation of registration of a construction business for groundwater development and utilization shall be determined by the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 16297, May 10, 1999>
법령보기 화면
Article 38 (Standards for Registration of Groundwater Impact Investigation Agencies)
(1)
A person who is eligible to register as a groundwater impact investigation agency under
Article 27 (1) of the Act
shall be the one who falls under any of the following subparagraphs and who shall be equipped with the technical capability, facility and equipment under the annexed Table 6:
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
1.
A specialized groundwater survey agency;
2.
An entity engaged in engineering in the field of geological features, foundation, development of water resources, water supply and drainage, civil engineering for agriculture or fishery, which has reported pursuant to the
Engineering Technology Promotion Act
;
3.
An engineering firm in which a certified engineer in the field of geological features, foundation, development of water resources, water supply and drainage, civil engineering in agriculture or fishery has been established and registered under the
Professional Engineers Act
;
4.
A natural (physical) science or engineering-related university institute under the
Higher Education Act
;
5.
An agent for environmental impact investigation designated under the
Management of Drinking Water Act
; and
6.
Other corporations which carry out groundwater-related business.
(2)
Any person who intends to be registered as a groundwater impact investigation agency pursuant to
Article 27 (1) of the Act
shall submit a written application for registration to the head of
Si
/
Gun
under the conditions as determined by the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
(3)
Where the head of
Si
/
Gun
receives a written application for registration under paragraph (2), he shall confirm whether it meets the standards for registration under paragraph (1) and whether it falls under any of the subparagraphs of
Article 28 of the Act
.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
(4)
Where the head of
Si
/
Gun
permits a registration of a groundwater impact investigation agency pursuant to
Article 27 (1) of the Act
, he shall enter it in a register of groundwater impact investigation agency and deliver the certificate of registration to the applicant under the conditions as determined by the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
(5)
An application for the alteration of registration pursuant to the
latter part of
Article 27 (1) of the Act
shall be filed within one month from the date on which the cause occurred.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
(6)
The term "matters prescribed by the Presidential Decree, such as trade name, title, etc. from among the registered matters" in the latter part of
Article 27 (1) of the Act
shall be as listed in the following subparagraphs:
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
1.
Trade name or title;
2.
Representative or officer (excluding the representative or officer of a specialized groundwater survey agency registered as a groundwater impact investigation institution);
3.
Technical capability, facility and equipment pursuant to the provisions of the Appendix 6; and
4.
The relocation of principal office.
법령보기 화면
Article 39 (Cancellation, etc. of Registration of Groundwater Impact Investigation Agencies)
(1)
Deleted.
<by Presidential Decree No. 16297, May 10, 1999>
(2)
Where the head of
Si
/
Gun
takes a disposition of cancellation of registration pursuant to
Article 29 (1) of the Act
, he shall make public notification without delay in an official report, etc. and notify the person in question.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
법령보기 화면
Article 39-2 (Registration of Groundwater Purification Business)
(1)
Any person who intends to get his groundwater purification business registered in accordance with
Article 29-2 (1) of the Act
shall fall under any of the subparagraphs of
Article 38
(1), and have the technical capability, capital, facility and equipment as listed in the Appendix 7 and file an application for the registration of his business with the head of
Si
/
Gun
under the conditions as prescribed by the Ministerial Decree of Environment.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
(2)
The head of
Si
/
Gun
shall, upon receiving the application filed in accordance with paragraph (1), confirm whether such application is in conformity with the registration standards provided for in the Appendix 7 and falls under any of the subparagraphs of
Article 23 of the Act
, and if the application is deemed to conform to the registration standards as a result of the confirmation, he shall enter his application in the groundwater purification business register and deliver a registration certificate to the applicant under the conditions as prescribed by the Ministerial Decree of Environment.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
(3)
The term "matters prescribed by the Presidential Decree, such as trade name, title, etc. from among the registered matters" in the latter part of
Article 29-2 (1) of the Act
shall be as listed in the following subparagraphs:
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
1.
Trade name or title;
2.
Representative or officer (excluding the representative or officer of a specialized groundwater survey agency registered as a groundwater purification business);
3.
Technical capability, facility and equipment pursuant to the provisions of the Appendix 7; and
4.
The relocation of principal office.
(4)
An application for the alteration of registration pursuant to the latter part of
Article 29-2 (1) of the Act
shall be filed within one month from the date on which the cause occurred.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
(5)
Deleted.
<by Presidential Decree No. 19158, Nov. 30, 2005>
(6)
The term "insignificant purification work prescribed by the Presidential Decree" in the proviso of
Article 29-2 (2) of the Act
means the purification work done in case that the water quality of groundwater does not exceed 110/100 of the water-quality standards.
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
(7)
The provisions of
Articles 35
through
37
shall apply
mutatis mutandis
to the purification work. In this case, the "business of the work for developing and utilizing groundwater" and the "operator of the business of the work for developing and utilizing groundwater" shall deemed the "purification business of groundwater" and "the operator of the purification business of groundwater", respectively.
[This Article Added by Presidential Decree No. 17433, Dec. 19, 2001]
법령보기 화면
Article 40 (Groundwater Management Committee)
(1)
The Central Groundwater Management Committee shall be established in the Ministry of Construction and Transportation with the mandate of counseling the Minister of Construction and Transportation about the matters falling under each of the following subparagraphs:
1.
Matters concerning the making or changing of the basic plan;
2.
Matters concerning the designation of any groundwater preservation area under
Article 12 (6) of the Act
; and
3.
Other matters brought up by the Minister of Construction and Transportation for discussion or deliberation in connection with the development, utilization, preservation and management of groundwater.
(2)
The regional groundwater management committee may be established in each City/
Do
with the mandate of counseling each of the Mayor/
Do
governor about the matters falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
1.
Matters concerning the formulation or alteration of the regional management plan pursuant to the provisions of
Article 6-2 (1) and (2) of the Act
or matters concerning the consultation on
Si
/
Gun
regional management plan for each
Si
/
Gun
;
2.
Matters concerning the designation and alteration of any groundwater preservation area under
Article 12 (1) of the Act
; and
3.
Other matters brought up by the Mayor/
Do
governor for discussion or deliberation in connection with the development, utilization, preservation and management of groundwater.
(3)
The regional groundwater management committee may be established in each of
Si
/
Gun
/autonomous
Gu
(hereinafter referred to as the "
Si
/
Gun
") with the mandate of counseling the head of
Si
/
Gun
about the matters falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 19158, Nov. 30, 2005>
1.
Matters concerning the formulation or alteration of the regional management plan pursuant to the provisions of
Article 6-2 (2) of the Act
;
2.
Matters concerning the survey of the impact on groundwater under
Article 7 (2) of the Act
;
3.
Matters on the report on the assessment of groundwater pollution under
Article 26-3
(1);
4.
Matters concerning the plan for purifying polluted groundwater under
Article 26-4
; and
5.
Other matters brought up by the head of
Si
/
Gun
for discussion or deliberation in connection with the development, utilization, preservation and management of groundwater.
(4)
Necessary matters concerning the composition, function and operation, etc. of the Central Groundwater Management Committee established under paragraph (1) shall be prescribed by the Ministerial Decree of Construction and Transportation and necessary matters concerning the composition, function and operation of the regional groundwater management committee established under paragraphs (2) and (3) shall be prescribed by the Municipal Ordinance of the relevant City/
Do
or
Si
/
Gun
.
[This Article Wholly Amended by Presidential Decree No. 17433, Dec. 19, 2001]
법령보기 화면
Article 40-2 (Establishment, etc. of Groundwater Management Special Account)
(1)
The term "purposes prescribed by the Presidential Decree" in
Article 30-2 (4) 9 of the Act
means the purpose falling under any of the following subparagraphs:
1.
The execution of groundwater impact investigation pursuant to the provisions of
Article 8 (3) of the Act
;
2.
The review of groundwater impact investigation pursuant to the provisions of
Article 9
; and
3.
Other purposes prescribed by the Municipal Ordinance of
Si
/
Gun
for the conservation and management of groundwater.
(2)
The head of
Si
/
Gun
shall formulate an operation plan for Special Account by the end of every February pursuant to the provisions of
Article 30-2 (6) of the Act
and report it to the Minister of Construction and Transportation and the Mayor/
Do
governor. In this case the operation plan for Special Account shall contain the matters of the following subparagraphs:
1.
The scale of Special Account;
2.
The revenue and expenditure of the previous year;
3.
The business plan of the year concerned;
4.
The repayment plan of loan; and
5.
Other matters regarding the management of Groundwater Management Special Account.
(3)
The term "alteration of minor matters prescribed by the Presidential Decree" in the latter part of
Article 30-2 (6) of the Act
means the alteration of the matters falling under paragraph (2) 5 among the operation plan of Groundwater Management Special Account that has been formulated.
[This Article Added by Presidential Decree No. 19158, Nov. 30, 2005]
법령보기 화면
Article 40-3 (Imposition and Collection of Groundwater Utilization Charge)
(1)
The term "purpose and scale prescribed by the Presidential Decree" in
Article 30-3 (1) 5 of the Act
means the cases falling under any of the following subparagraphs:
1.
Where schools and affiliated facilities pursuant to the provisions of
Article 2 of the Elementary and Secondary Education Act
and
Article 2 of the Higher Education Act
develop and utilize groundwater;
2.
Where social welfare facilities pursuant to the provisions of
Article 34 of the Social Welfare Services Act
develop and utilize groundwater;
3.
Where groundwater is developed and utilized for a pumping capacity of not more than 100 tons a day (limited to the case where a discharge pipe with an inner diameter of forty millimeters or less is used) for housekeeping purpose (limited to the facilities used to lead household management) among household water;
4.
Where groundwater is developed and utilized for a pumping capacity of not more than 150 tons a day (limited to the case where a discharge pipe with an inner diameter of forty millimeters or less is used) for a small-scale water supply system in an area where water service is not yet supplied; and
5.
Where it is prescribed by the Municipal Ordinance of
Si
/
Gun
, other than the cases listed in subparagraphs 1 through 4.
(2)
In setting the calculation standards for charge for groundwater utilization by the Municipal Ordinance of
Si
/
Gun
pursuant to the provisions of
Article 30-3 (2) of the Act
, the pumping volume of groundwater, usage, etc. shall be considered.
[This Article Added by Presidential Decree No. 19158, Nov. 30, 2005]
법령보기 화면
Article 41 (Permission on Entry, etc. to Land)
Anyone who intends to obtain permission to temporarily use the land of a third party or to alter or remove bamboo trees, earth and stocks or other obstacles thereon under
Article 31 (3) of the Act
shall submit to the head of
Si
/
Gun
a written application which includes the seat, lot number, land category, area, present conditions of the land to be entered or used, the name and address of the owner or occupier, and the purpose, time and period of entry and use accompanied by drawings.
법령보기 화면
Article 42 (Education, etc.)
(1)
Anyone who is subject to education and training pursuant to the provisions of
Article 34-2 (2) of the Act
shall be as listed in the following subparagraphs:
1.
The technical personnel of the groundwater development and utilization construction business falling under subparagraph 1 of the Appendix 4;
2.
The technical personnel of the groundwater impact investigation institution falling under subparagraph 1 of the Appendix 6; and
3.
The technical personnel of the groundwater purification business falling under subparagraph 1 of the Appendix 7.
(2)
The contents of education and training pursuant to the provisions of
Article 34-2 (2) of the Act
shall contain the matters of the following subparagraphs:
1.
Laws and policies on groundwater;
2.
Technology on the development, conservation and management of groundwater; and
3.
Other matters necessary for the appropriate development and utilization, and conservation and management of groundwater.
(3)
Anyone who is subject to education and training pursuant to the provisions of paragraph (1) shall have an education and training within one year from the date on which they registered pursuant to the provisions of
Articles 22 (1)
,
27 (1)
and
29-2 (1) of the Act
:
Provided
, That the persons of a specialized groundwater survey agency who are subject to education and training have had an in-house education and training including the contents of paragraph (2), they shall be deemed as having had an education and training pursuant to the provisions of
Article 34-2 (2) of the Act
.
(4)
Pursuant to the provisions of
Article 34-2 (3) of the Act
, the Minister of Construction and Transportation may entrust the agencies and organizations of the following subparagraphs with the duty of education and training pursuant to the provisions of
Article 34-2 (2) of the Act
:
1.
Korea Water Resources Corporation pursuant to the Korea Water Resources Corporation Act;
2.
Korea Agricultural and Rural Infrastructure Corporation pursuant to the Korea Agricultural and Rural Infrastructure Corporation and Farmland Management Fund Act; and
3.
The associations established pursuant to the provisions of
Article 26-2 of the Act
.
(5)
The head of the agency or organization which has been entrusted with the duty of education and training pursuant to the provisions of paragraph (4) shall, each year, present the Minister of Construction and Transportation with a plan of education for the next year containing the matters of the subparagraphs of paragraph (2), and present the Minister of Construction and Transportation with the result of education executed in the year concerned by January 30 of the next year.
(6)
Matters necessary for the period of education, etc. besides the matters prescribed by this Decree shall be prescribed by the Ministerial Decree of Construction and Transportation.
[This Article Added by Presidential Decree No. 19158, Nov. 30, 2005]
법령보기 화면
Article 43 (Delegation of Authority)
The Minister of Environment shall delegate the following authority to the head of a regional environmental management office pursuant to
Article 36 (1) of the Act
:
<Amended by Presidential Decree No. 17433, Dec. 19, 2001>
1.
Order given to take steps for preventing groundwater pollution under
Article 16 (2) of the Act
;
2.
Order issued to take steps under
Article 16-3 (1) and (2) of the Act
;
3.
The measurement of actual pollution of water quality under
Article 18 (1) of the Act
; and
4.
Order given to cease the utilization of groundwater or to take steps for improving water quality under
Article 20 (2) of the Act
.
법령보기 화면
Article 44 (Procedures for Imposition and Collection of Fine for Negligence)
(1)
Where the head of
Si
/
Gun
imposes a fine for negligence pursuant to
Article 41 (1) of the Act
, he shall specify in writing an offense, the amount of the fine for negligence, the method and period, etc. for raising objection and the obligation to pay after investigating and confirming the offense and notify any person subject to the fine for negligence.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
(2)
Where the head of
Si
/
Gun
intends to impose a fine for negligence pursuant to paragraph (1), he shall give the person subject to the fine for negligence an opportunity to state his opinion orally or in writing for a fixed period of not less than ten days. In this case, he shall be deemed to have no opinion where he has no stated his opinion within a fixed period.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
(3)
The standards for imposition of a fine for negligence under
Articles 39
and
40 of the Act
shall be listed in the annexed Table 8.
(4)
The head of
Si
/
Gun
may increase or decrease the amount within a half limit of the amount based on the standards for imposition listed in the annexed Table 8 in consideration of the motives, substance and number of offences. In this case, the total amount of a fine for negligence shall, if increased, not exceed the amount of a fine for negligence under
Articles 39
and
40 of the Act
.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 19158, Nov. 30, 2005>
(5)
Matters necessary for the procedures of imposition of a fine for negligence shall be prescribed by the Municipal Ordinance of the
Si
/
Gun
concerned.
<Amended by Presidential Decree No. 16297, May 10, 1999; Presidential Decree No. 17433, Dec. 19, 2001; Presidential Decree No. 19158, Nov. 30, 2005>
ADDENDA
(1)
(Enforcement Date) This Decree shall enter into force on the date of its promulgation:
Provided
, That the provisions of
Articles 32
through
37
shall enter into force on January 1, 1998.
(2)
(Transitional Measures on Groundwater Use) Any person, who has developed and used groundwater without making a report thereon at the time when this Decree enters into force and who is subject to make a new report pursuant to
Article 13
and
Article 8 (1) of the Act
, shall make a report on groundwater development and utilization to the Mayor/
Do
governor within 3 months from the date of entry into force of this Decree.
(3)
(Transitional Measures on Pollution Preventive Measures) Where any person who has made a report on groundwater development and utilization pursuant to paragraph (2) of the Addenda is deemed to have taken pollution preventive measures under
Article 25
(1) by any specialized water quality investigation agency within 1 year from the date of such report, he shall be deemed to have taken pollution preventive measures under
Article 25
(1).
(4)
(Relation with Other Acts and Subordinate Statutes) Where other Acts and subordinate statutes cite the previous Enforcement Decree of the Groundwater Act or its provisions at the time when this Decree enters into force and where this Decree includes the provisions corresponding to them, the provisions corresponding to this Decree shall be deemed to have been cited in lieu of the previous provisions.
ADDENDUM<Presidential Decree No. 15598, Dec. 31, 1997>
This Decree shall enter into force on January 1, 1998.
ADDENDA<Presidential Decree No. 16093, Jan. 29, 1999>
Article 1 (Enforcement Date)
This Decree shall enter into force on the date of its promulgation.
Articles 2 through 4 Omitted.
ADDENDA<Presidential Decree No. 16297, May 10, 1999>
(1)
(Enforcement Date) This Decree shall enter into force on the date of its promulgation.
(2)
(Applicable Cases for Report on Alteration in Development and Utilization of Groundwater) The amended provisions of
Article 13
(6) 4 shall apply to a case of suspending the development and utilization of groundwater on or after the date this Act takes effect.
(3)
(Transitional Measures concerning Alteration in Technical Capacity for Construction Business for Groundwater Development and Utilization) Where a person who has acquired the technical qualification of Grade II for excavation technician repealed by the amendments to the Enforcement Decree of the National Technical Qualifications Act, Presidential Decree No. 15794, at the time this Decree takes effect is registered as technical personnel for a construction business for groundwater development and utilization, he shall be deemed to hold the technical qualification under the amended provisions of subparagraph 1 (a) of the Appendix 4, notwithstanding the amended provisions of the said Table.
ADDENDA<Presidential Decree No. 16512, Aug. 6, 1999>
Article 1 (Enforcement Date)
This Decree shall enter into force on the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA<Presidential Decree No. 17175, Mar. 27, 2001>
Article 1 (Enforcement Date)
This Decree shall enter into force on the date of its promulgation.
Articles 2 and 3 Omitted.
ADDENDA<Presidential Decree No. 17433, Dec. 19, 2001>
(1)
(Enforcement Date) This Decree shall enter into force on the date of its promulgation:
Provided
, That the amended provisions of
Article 8
(2) 5 and
39-2
shall enter into force on July 1, 2002.
(2)
(Transitional Measures concerning Report on Development and Utilization of Groundwater) Any person who develops and utilizes groundwater without filing a report thereon, but is made entitled to file such report under
Article 8 (1) of the Act
and
Article 13
of this Decree at the time that this Act enters into force shall file a report on his development and utilization of groundwater, accompanied by the documents falling under each of the following subparagraphs, with the head of
Si
/
Gun
by November 17, 2002:
1.
A land registration map or a forest map showing the location of his groundwater development and utilization facilities; and
2.
The plan for restoring the original state.
ADDENDA<Presidential Decree No. 18594, Dec. 3, 2004>
Article 1 (Enforcement Date)
This Decree shall enter into force on the date of its promulgation.
Articles 2 through 5 Omitted.
ADDENDA<Presidential Decree No. 19158, Nov. 30, 2005>
Article 1 (Enforcement Date)
This Decree shall enter into force on December 1, 2005.
Article 2 (Applicable Examples regarding Installation of Groundwater Development and Utilization Facility)
The amended provisions of
Article 8
(3) and (4) shall apply to the application for permission of groundwater development and utilization that is filed on or after the date this Decree enters into force.
Article 3 (Applicable Examples regarding Registration of Groundwater Development and Utilization Construction Business)
The amended provisions of the Appendixs 4, 6 and 7 shall apply to the application for permission of groundwater development and utilization that is filed on or after the date this Decree enters into force.
Article 4 (Transitional Measures regarding Post Management of Groundwater Development and Utilization Facility)
(1)
Where the groundwater development and utilization facility whose completion of construction, etc. has been reported pursuant to the previous provisions at the time of enforcement of this Decree is involved in the facilities subject to post management pursuant to the amended provisions of
Article 14-4
(4), and the period of inspection pursuant to the part besides the subparagraphs of the same paragraph has expired, the post management shall be executed pursuant to the provisions of
Article 9-5 of the Act
within one year after the enforcement of this Decree.
(2)
The starting point of the period pursuant to the provisions of paragraph (1) shall be the date on which the report of completion of construction, etc. has been filed under the previous provisions.
Article 5 (Transitional Measures regarding Education for Technical Personnel)
The technical personnel who fall under any of the subparagraphs of
Article 42
(1) at the time of enforcement of this Decree shall have the education and training pursuant to the amended provisions of paragraphs (2) and (3) of the same Article by December 1, 2008.
Last updated : 2009-07-26