ENFORCEMENT DECREE OF THE PUBLIC WATERS MANAGEMENT AND RECLAMATION ACT
278003 · 2025-10-01
CHAPTER I GENERAL PROVISIONS
Article 1 (Purpose) The purpose of this Decree is to prescribe matters mandated by the Public Waters Management and Reclamation Act and matters necessary for the enforcement thereof.
CHAPTER II MANAGEMENT OF PUBLIC WATERS
SECTION 1 Management of Public Waters
Article 2 (Management of public waters) (1) Public waters, other than public waters managed by the Minister of Oceans and Fisheries in accordance with Article 4 (2), with the exception of its subparagraphs, of the Public Waters Management and Reclamation Act (hereinafter referred to as the "Act"), shall be managed as follows:
1. Public waters in the harbor zones of regional trade ports under Article 3 (2) 2 of the Harbor Act and regional coastal ports under paragraph (3) 2 of that Article: The competent Special Metropolitan City Mayor, Metropolitan City Mayor, Special Self-Governing Province Governor, or Do Governor;
2. Public waters other than public waters under subparagraph 1: The competent Special Self-Governing City Mayor, Special Self-Governing Province Governor, or the head of the competent Si/Gun/Gu (the head of a Gu means the head of an autonomous Gu; hereinafter the same shall apply).
(2) "Public waters prescribed by Presidential Decree" in Article 4 (2) 2 of the Act means any of the following public waters:
1. Public waters in the harbor zones of the national trade ports under Article 3 (2) 1 of the Harbor Act;
2. Public waters in the harbor zones of the national coastal ports under Article 3 (3) 1 of the Harbor Act.
[This Article Wholly Amended on Sep. 8, 2020]
Article 3 (Removal of derelict ships) (1) Where the Minister of Oceans and Fisheries, the Special Metropolitan City Mayor, a Metropolitan City Mayor, a Special Self-Governing City Mayor, a Do Governor, a Special Self-Governing Province Governor, or the head of a Si/Gun/Gu (hereinafter referred to as "management agency of public waters") intends to remove a capsized, sunken, derelict, or moored ship, derelict waste material, or other things (hereinafter referred to as "derelict ship, etc.") pursuant to Article 6 (3) of the Act, the following matters shall be applicable only to the owners, occupants, and interested persons of derelict ships, etc. (referring to persons entered in the ship register pursuant to the Ship Registry Act, and persons entered in the ship register, etc. pursuant to the Act on Mortgage on Motor Motor Vehicles and Specific Movables): The same shall apply in this Article. In such cases, where the owner, occupant, or interested person of the relevant derelict ship, etc. is unknown or it is impossible to notify such fact due to other unavoidable reasons, the matters to be notified shall be publicly announced on the site where the relevant derelict ship, etc. has been derelict and on the bulletin board or website of the management agency of public waters for at least 14 days. <Amended on Mar. 23, 2013; Aug. 9, 2017; Sep. 8, 2020>
1. Name and details of the derelict ship, etc.;
2. Location of the derelict ship, etc.;
3. Scheduled removal date;
4. Removal method.
5. Methods of submission of opinions of interested parties under Article 6 (4) of the Act.
(2) Where the management agency of public waters intends to have the relevant interested parties submit their opinions in accordance with Article 6 (4) of the Act, it shall notify the relevant interested parties of a notice of removal of derelict ships, etc., stating the name of the derelict ships, etc., the place of discovery, the date of investigation, the details of investigation, the investigator, the matters of opinion, etc.
(3) Where any interested party in receipt of the notification under paragraph (2) has an opinion on the removal of a derelict ship, etc., he or she shall submit a written opinion to the management agency of public waters within 20 days from the date of receipt of such notification, as prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013>
(4) Where the management agency of public waters intends to conduct a reinvestigation under Article 6 (5) of the Act, it shall notify interested parties who have submitted their opinions of the subject matter, date and purpose of the investigation, etc. in writing by not later than 7 days before the reinvestigation. In such cases, the interested parties who have submitted their opinions may be allowed to participate in the reinvestigation.
(5) Detailed methods for reinvestigation under paragraph (4) shall be determined by the Minister of Oceans and Fisheries. In such cases, the Minister of Oceans and Fisheries shall publicly notify the detailed methods in the Official Gazette. <Amended on Mar. 23, 2013>
(6) Where the management agency of public waters intends to remove a derelict ship in accordance with Article 6 (6) of the Act, it shall notify the owner, occupant, and interested persons of the following matters in writing by no later than 14 days before the scheduled removal date:
1. Name and details of the derelict ship;
2. Location of the derelict ship;
3. Scheduled removal date;
4. Removal method.
(7) Where the management agency of public waters intends to dispose of derelict ships, etc. in accordance with Article 6 (7) of the Act, it shall sell them by public auction; provided, this shall not apply if the value of the derelict ship, etc. is expected to be lower than the cost of the public auction.
(8) Where the management agency of public waters conducts a public auction in accordance with the main clause of paragraph (7), it shall publicly announce the following matters on the bulletin board or the website of the management agency of public waters for at least 14 days:
1. Name and details of the derelict ship, etc. to be offered for the public auction;
2. Place and date of the public auction;
3. The amount of a tender bond, if any.
(9) Where any amount remains after deducting the expenses incurred in the removal of the relevant derelict ship, etc. and the public auction from the amount obtained through the public auction under the main clause of paragraph (7), the management agency of public waters shall deposit it in accordance with the Deposit Act.
SECTION 2 Permission for Occupancy or Use of Public Waters
Article 4 (Application for permission for occupancy or use of public waters) A person who intends to obtain permission for occupancy or use of public waters under the main clause, with the exception of its subparagraphs, of Article 8 (1) of the Act (hereinafter referred to as "permission for occupancy or use") shall submit an application for permission and related documents to the management agency of public waters according to the management jurisdiction of public waters under Article 4 (2) of the Act, as prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013>
Article 5 (Scope of submerged land) "Submerged land prescribed by Presidential Decree" in Article 8 (1) 4 of the Act means places meeting all of the following requirements:
1. A place where the owner registered on the public cadastral register and the owner on the register are the same;
2. A place where land creation is physically possible;
3. A place which has economic value in consideration of costs incurred in land creation, or is deemed necessary to create land, in consideration of the utilization of adjacent land, etc.
Article 6 (Scope of buildings) (1) "Buildings prescribed by Presidential Decree" in Article 8 (2) of the Act means any of the following buildings, among buildings installed on or below public waters or floating on public waters: <Amended on Jun. 15, 2015; Jun 18, 2019>
1. Buildings necessary for operating harbors and fishery harbors;
2. Buildings necessary for tourist accommodation business under Article 3 (1) 2 of the Tourism Promotion Act;
3. Buildings that conforms to the marine spatial data under subparagraph 2 of Article 2 of the Act on Marine Spatial Planning and Management or master plans for coastal maintenance under Article 21 of the Coast Management Act and are recognized by the management agency of public waters as having no impediment to management of public waters;
4. Deleted; <Jun. 18, 2019>
5. Electric power transmission lines and those auxiliary thereto among electric equipment under subparagraph 16 of Article 2 of the Electric Utility Act.
(2) Deleted. <Jun. 13, 2023>
Article 7 (Prior consultation on permission for occupancy or use) (1) Where the management agency of public waters intends to consult with the head of the relevant administrative agency on permission for occupancy or use in accordance with Article 8 (3) of the Act, it shall send a document stating the following matters to the head of the relevant administrative agency:
1. An applicant for permission for occupancy or use;
2. Area, scale, and details of an application for permission for occupancy or use;
3. Purpose and period of occupancy or use;
4. Matters necessary to understand the current status of an area for which permission for occupancy or use is applied, such as location maps and design drawings;
5. A written opinion on prior review by the relevant management agency of public waters.
(2) Where fishery resources and fisheries are likely to be damaged due to permission for occupancy or use, the management agency of public waters shall include the Minister of Oceans and Fisheries in the agency subject to consultation when it consults with the relevant administrative agency under paragraph (1). <Amended on Mar. 23, 2013>
(3) Upon receipt of a request for consultation on permission for occupancy or use from the management agency of public waters in accordance with paragraphs (1) and (2), the head of the relevant administrative agency shall submit his or her opinion to the management agency of public waters within 20 days from the date of receipt of such request.
Article 8 (Permission for modification of matters of permission for occupancy or use) "Matters prescribed by Presidential Decree, such as period and purpose of occupancy or use" in Article 8 (4) of the Act means any of the following matters:
1. Extension of the period for permission for occupancy or use;
2. Modification of the purpose or area of occupancy or use;
3. Modification of the use or scale of establishments installed with permission for occupancy or use.
Article 9 (Public notice) The public notice on permission for occupancy or use or permission for modification under Article 8 (6) of the Act shall include the following matters:
1. Permission number and date of permission;
2. Purpose of occupancy or use;
3. Place of occupancy or use;
4. Area and period of occupancy or use;
5. Name and address of a person who has obtained permission for occupancy or use (in the case of a corporation, referring to the name and address of the corporation and the name and address of its representative).
Article 9-2 (Collection of opinions from interested parties) (1) Where the management agency of public waters intends to grant permission for occupancy or use of public waters, it shall hear opinions of interested parties, such as fishers, by the following methods in accordance with Article 8 (7) of the Act:
1. Public announcement and perusal;
2. Opinion surveys on fishers, etc. whose fishery activities are affected by the permission for occupancy or use of public waters.
(2) Where the management agency of public waters hears opinions by the method referred to in paragraph (1) 1, it shall publicly announce the following matters in the Official Gazette or public gazette and on the website, etc. of the management agency of public waters, and make them available for perusal by interested parties for at least 14 days from the date of public announcement:
1. Matters referred to in Article 7 (1) 1 through 3;
2. Period and method for submitting opinions;
3. Other matters that the management agency of public waters deems necessary to make public announcement, which are to be known to interested parties, such as fishers.
(3) A person who has an opinion on matters publicly announced in accordance with paragraph (2) may submit his or her opinion to the management agency of public waters in accordance with the period and method for submitting opinions under paragraph (2) 2.
(4) The management agency of public waters shall review the opinions submitted in accordance with paragraph (3) and notify the result thereof to the person who submitted the opinions within 30 days from the date of receipt of the opinions.
(5) In order to efficiently conduct an opinion survey referred to in paragraph (1) 2, the management agency of public waters may request necessary cooperation, such as selecting persons subject to the opinion survey, from a cooperative or the National Federation of Fisheries Cooperatives under the Fisheries Cooperatives Act.
(6) Except as provided in paragraphs (1) through (5), matters necessary for collecting opinions from interested parties regarding permission for occupancy or use of public waters shall be determined and publicly notified by the Minister of Oceans and Fisheries.
[This Article Added on Jul. 4, 2022]
Article 10 (Consultations on or approval for occupancy or use of public waters) (1) Where the State or a local government intends to consult with, or obtain approval from the management agency of public waters on occupancy or use of public waters in accordance with Article 10 of the Act, it shall submit an application for consultation or approval and related documents to the management agency of public waters, as prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013>
(2) Where the management agency of public waters intends to consult on, or approve for, occupancy or use of public waters in accordance with Article 10 of the Act, it shall consult in advance with the heads of relevant administrative agencies.
(3) Where the management agency of public waters intends to consult with or grant approval to the State or a local government for new construction, reconstruction, or extension of a building under Article 8 (1) 1 of the Act in accordance with Article 10 of the Act, it shall consult on, or grant approval to, only a building falling under any subparagraph of Article 6 (1). <Amended on Jun. 13, 2023>
(4) "Matters prescribed by Presidential Decree, such as period and purpose of occupancy or use" in Article 10 (2) of the Act means any of the matters falling under the subparagraphs of Article 8.
(5) Where the management agency of public waters intends to modify the matters consulted on, or approved for, occupancy or use of public waters in accordance with Article 10 (2) of the Act, it shall consult with the heads of relevant administrative agencies in advance.
(6) Article 7 shall apply mutatis mutandis to consultation with the heads of relevant administrative agencies following consultation with, or approval by, the management agency of public waters under paragraphs (2) and (5). In such cases, "permission for occupancy or use" shall be construed as "consultation on, or approval for, occupancy or use".
Article 11 (Priority order of permission for occupancy or use) (1) Where applications for permission for occupancy or use under Article 4 or applications for consultation on, or approval for, occupancy or use or under Article 10 (1) concurrently exist (referring to where another application is received during the processing period [excluding the extended processing period) of the relevant application while the first application is pending] in public waters of the same zone, the management agency of public waters shall grant permission, consultation, or approval in the following order:
1. Applications filed by the State or a local government;
2. Applications necessary for marine and fisheries-related projects;
3. Applications with less impact on the marine environment;
4. Applications filed by an end user as an owner of adjacent land.
(2) The area of permission for occupancy or use under Article 8 (1) of the Act or the area consulted on or approved for occupancy or use under Article 10 (1) of the Act shall be the area calculated by aggregating the area directly occupied or used and the area indirectly occupied or used, and the detailed standards for calculation shall be determined by the Minister of Oceans and Fisheries. <Amended on Mar. 23, 2013>
(3) Where the management agency of public waters intends to grant permission for occupancy or use under Article 8 of the Act or consult on, or approve for, occupancy or use under Article 10 of the Act, if the application period is within the period under the items of subparagraphs 1, 2, and 3 of Article 11 of the Act, it shall grant permission for, consult on, or approve for occupancy or use by recognizing the period corresponding to at least 1/2 of the period requested by the applicant; provided, this shall not apply if the State or a local government deems it is necessary for official or public use, or it is particularly necessary in consideration of conditions, etc. <Amended on Sep. 19, 2017>
Article 11-2 (Considerations for permission for occupancy or use) "Matters prescribed by Presidential Decree" in Article 12 (1) 6 of the Act means as follows:
1. Possibility of occurrence of a disaster due to the installation of artificial structures, change in the form and quality of land, etc.;
2. Other matters necessary for the preservation and management of public waters and the protection of the public interest, as determined and publicly notified by the Minister of Oceans and Fisheries.
[This Article Added on Jun. 13, 2023]
Article 12 (Entitled person) (1) "Person with rights prescribed by Presidential Decree" in the main clause, with the exception of its subparagraphs, of Article 12 (2) of the Act means any of the following persons: <Amended on Jun. 21, 2016; Aug. 26, 2020; Jan. 5, 2021; Jan. 10, 2023; Jun. 13, 2023>
1. A person who has obtained permission for occupancy or use under Article 8 of the Act;
2. A person who has obtained a reclamation license under Article 28 of the Act;
3. A piscary holder under subparagraph 9 of Article 2 of the Fisheries Act;
4. A person who holds a license for fishery business under Article 7 of the Fisheries Act or a license for aquaculture business under Article 10 of the Aquaculture Industry Development Act (excluding inland aquaculture business under paragraph (1) 7 of that Article);
5. A person who has obtained permission for the fishery business within a demarcated zone under Article 40 (3) of the Fisheries Act or permission for the inland saline aquaculture business under Article 43 (1) 1 of the Aquaculture Industry Development Act;
5-2. A person who has obtained permission for the business of producing seeds for fisheries under Article 21 of the Fisheries Seed Industry Promotion Act;
6. The owner or occupant of adjacent land or artificial structures;
7. The owner or occupant of a shipyard [only applicable to permission for, consultation on, or approval for public waters not exceeding 3 times the length of the maximum vessel that can be boarded from the tip of an underwater slipway (referring to structures and equipment that can lift a vessel onto the ground), which are public waters necessary for boarding a vessel at a shipyard].
(2) "Public works projects prescribed by Presidential Decree, such as national defense or prevention of natural disaster" in Article 12 (2) 2 of the Act means the following projects: <Amended on Jun. 13, 2023>
1. Projects for providing necessary facilities for national defense;
2. Projects to install establishments, such as breakwaters and banks, to prevent natural disasters, such as tidal waves.
(3) Where the management agency of public waters grants permission for, consultation on, or approval for occupancy or use, and a dispute arises between a person who intends to occupy and use public waters and a person who falls under any of the subparagraphs of paragraph (1) over a right likely to be compromised under the main clause, with the exception of its subparagraphs, of Article 12 (2) of the Act, it may refer to the opinion of the relevant agency according to the following classification: <Amended on Jul. 20, 2012; Mar. 23, 2013; Jan. 10, 2023; Jun. 13, 2023; Dec. 31, 2024>
1. Disputes in areas falling under subparagraph 1 a and b of Article 2 of the Act: Any of the following agencies:
(a) A fishery-related specialized investigation or research institute or education institution designated by the Minister of Oceans and Fisheries in accordance with subparagraph 4 b 1) of Appendix 10 of the Enforcement Decree of the Fisheries Act;
(b) An assessment agency registered in accordance with Article 33 of the Marine Use Impact Assessment Act;
2. Disputes in zones falling under subparagraph 1 (c) of Article 2 of the Act: Environmental impact assessment agents registered in accordance with Article 53 of the Environmental Impact Assessment Act.
(4) Where the management agency of public waters determines whether a right is likely to be compromised in accordance with Article 12 (2) of the Act, it shall examine the following criteria: <Amended on Jun. 13, 2023>
1. Whether the entitled person under each subparagraph of paragraph (1) becomes unable to use public waters or adjacent land according to the purpose of the relevant right by the relevant permission for, consultation on, or approval for, occupancy or use;
2. Whether the relevant public waters or adjacent land cannot be properly used without taking measures, such as installation of facilities to prevent damage.
Article 13 (Calculation of occupancy or use fees of pubic waters) (1) Where the Minister of Oceans and Fisheries intends to collect occupancy or use fees (hereinafter referred to as "occupancy or use fees") under the former part, with the exception of its subparagraphs, of Article 13 (1) of the Act for public waters managed by him or her in accordance with Article 4 (2) of the Act, he or she shall collect an amount calculated by the calculation method prescribed by Decree of the Ministry of Oceans and Fisheries according to the standards classified as follows; in such cases, where an act under any item of subparagraph 3 is accompanied by an act subject to permission for occupancy or use under Article 8 (1) 1 of the Act, the standards for calculation under subparagraph 1 and the standards for calculation under any item of subparagraph 3 shall apply together: <Amended on Mar. 23, 2013; Feb. 28, 2022>
1. An act under Article 8 (1) 1, 2, 4, 7 through 9, and 11 of the Act: The price of land adjacent to the relevant public waters;
2. An act under Article 8 (1) 3 of the Act:
(a) Dredging for reclaiming, filling, or using dredged soil for aggregate: The market price of dredged soil surveyed by the method prescribed by Decree of the Ministry of Oceans and Fisheries;
(b) Dredging or excavating for any purpose other than that referred to in item a: The price of land adjacent to the relevant public waters;
3. An act under Article 8 (1) 5 of the Act:
(a) Drawing in or discharging water for use in the electric business: The capacity of an inflow pump or drainage pump;
(b) Drawing in or discharging water for purposes other than that referred to in item (a): The diameter of an inflow pipe or drainage pipe;
4. An act under Article 8 (1) 6 of the Act: The market price of earth, stones, and sand surveyed by the method prescribed by Decree of the Ministry of Oceans and Fisheries;
5. An act under Article 8 (1) 10 of the Act: The price of land adjacent to the relevant public water and the market price of earth, stones, and sand surveyed by the method prescribed by Decree of the Ministry of Oceans and Fisheries.
(2) "Price of land adjacent to the relevant public waters" in paragraph (1) means the price of land if there is any land adjacent to the relevant public waters, or the price of land nearest to the relevant public waters if there is no land adjoining the relevant public waters; provided, if the land adjacent to or nearest to the relevant public water surface is public land, such as roads, rivers, and banks, it shall mean the price of the land adjacent to the public land.
(3) Occupancy and use fees of public waters, other than public waters managed by the Minister of Oceans and Fisheries in accordance with the latter part, with the exception of its subparagraphs, of Article 13 (1) of the Act, shall be prescribed by ordinance of the relevant local government within the scope prescribed by the standards and methods for calculation under paragraph (1). <Added on Feb. 28, 2022>
(4) A person who has obtained permission for occupancy or use for at least 1 year in accordance with Article 11 (3) shall submit an annual occupancy or use plan and a written request for imposition of occupancy or use fees to the management agency of public waters 1 month before the period of imposition of the relevant occupancy or use fees expires. <Amended on Feb. 28, 2022>
(5) The deadline for payment of occupancy and use fees and other matters necessary for the collection thereof shall be prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013; Feb. 28, 2022>
(6) Except as provided in paragraphs (1) through (5), matters necessary for the collection and calculation of occupancy or use fees shall be prescribed by Decree of the Ministry of Oceans and Fisheries or by ordinance of a local government. <Amended on Feb. 28, 2022>
Article 14 (Reduction of, or exemption from, occupancy or use fees of pubic waters) (1) The management agency of public waters may reduce or exempt occupancy or use fees in accordance with the proviso, with the exception of its subparagraphs, of Article 13 (1) of the Act in accordance with the following standards: <Amended on Mar. 3, 2015; Aug. 9, 2017; Jun. 18, 2019; Feb. 28, 2022>
1. In cases falling under Article 13 (1) 1 through 10 and 13 of the Act: Full exemption (in cases of persons falling under paragraph (2) 7, 50/100 reduction);
2. In cases falling under Article 13 (1) 11 of the Act: 50/100 reduction; provided, the full amount will be exempted until December 31, 2020;
3. In cases falling under Article 13 (1) 12 or 14 of the Act: 50/100 reduction;
4. In cases falling under Article 13 (1) 15 of the Act: Reduction or exemption according to the rate determined and publicly notified by the management agency of public waters in consideration of the period during which public waters have not been occupied or used for their original purpose, the extent of damage, etc.
(2) "Person prescribed by Presidential Decree" in Article 13 (1) 1 of the Act means a person falling under any of the following: <Amended on Sep. 19, 2017>
1. A corporation that conducts projects entrusted by the State or a local government;
2. A person who installs official or public establishments which revert to the State or a local government;
3. Cooperatives, cooperatives' federation, fishing village fraternities under subparagraphs 4 and 5 of Article 2 and Article 15 of the Fisheries Cooperatives Act;
4. Sea Explorers of Korea under the Act on the Support for Sea Explorers of Korea;
5. A person who installs Expo facilities under subparagraph 1 of Article 2 of the Special Act on the Commemoration of and Follow-Up on the Expo 2012 Yeosu Korea;
6. School foundations under the Private School Act (limited to cases of establishment and operation of private schools);
7. A public organization other than those referred to in subparagraphs 1 through 6 (limited to cases for non-profit projects for the purpose of public interest).
(3) "Types of business prescribed by Presidential Decree" in Article 13 (1) 14 of the Act means the types of business determined through consultation between the Minister of Oceans and Fisheries and the heads of relevant central administrative agencies, for which reduction of, or exemption from, occupancy or use fees is necessary for support of any of the following areas: <Added on Jun. 18, 2019; Feb. 18, 2022>
1. An area designated as a special area for responding to industrial crisis in accordance with Article 10 (1) of the Special Act on Response to Local Industrial Crisis and Recovery of Local Economy;
2. An area designated and publicly notified in accordance with Article 32 of the Framework Act on Employment Policy and Article 29 of the Enforcement Decree of that Act;
3. An employment disaster area under Article 32-2 of the Framework Act on Employment Policy.
Article 15 (Installment payment) (1) Where an annual occupancy or use fee exceeds 300,000 won, the management agency of public waters may allow payment in installments not exceeding 4 times a year in accordance with the former part of Article 13 (6) of the Act. In such cases, interest under the latter part of Article 30 (5) of the Enforcement Decree of the State Property Act shall be added to the balance of payment. <Amended on Oct. 29, 2012; Sep. 19, 2017; Jul. 31, 2020>
(2) "Where ... equals or exceeds the amount prescribed by Presidential Decree" in the latter part of Article 13 (6) of the Act means annual occupancy or use fees of at least 10 million won, and "extent of the amount prescribed by Presidential Decree" means not more than 10/100 of annual occupancy or use fees.
(3) Except as provided in paragraphs (1) and (2), matters necessary for the installment payments of occupancy and use fees, such as the deadline for installment payments, shall be prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013>
Article 15-2 (Collection of additional charges) (1) Where a person liable to pay occupancy or use fees fails to pay the occupancy or use fees by the payment deadline under Article 13 (5), the management agency of public waters shall collect additional charges equivalent to 3/100 of the occupancy or use fees to be paid in accordance with Article 13 (7) of the Act. <Amended on Feb. 28, 2022>
(2) Where the management agency of public waters intends to collect additional charges under paragraph (1), it shall notify in writing the payment of occupancy or use fees in arrears and additional charges.
(3) The person in receipt of notification under paragraph (2) shall pay occupancy or use fees in arrears and additional charges within 20 days from the date of receipt of the relevant notification; provided, where he or she fails to pay occupancy or use fees in arrears and additional charges within the period due to natural disasters or unavoidable reasons, he or she shall pay such fees and charges within 7 days from the date when such reasons cease to exist.
(4) Article 16 shall apply mutatis mutandis to the settlement of additional charges which have been overpaid or erroneously paid. In such cases, "occupancy or use fees" shall be construed as "additional charges".
[This Article Added on Sep. 19, 2017]
Article 16 (Settlement of occupancy or use fees overpaid or erroneously paid) (1) Where occupancy or use fees are overpaid or erroneously paid, the management agency of public waters shall additionally collect or return the difference. The same shall also apply where the price of land, which serves as the basis for calculating occupancy or use fees under Article 13 (1), is determined again due to an error by an administrative agency.
(2) Where the management agency of public waters additionally collects or returns the difference in accordance with paragraph (1), it shall add interest under Article 73 of the Enforcement Decree of the State Property Act from the date of overpayment or erroneous payment until the date of additional collection or return.
Article 17 (Adjustment formula for occupancy or use fees) The adjustment formula for occupancy or use fees under Article 14 of the Act shall be as specified in Appendix 1.
Article 18 (Collection of indemnities) (1) Where the management agency of public waters intends to collect indemnities in accordance with the former part of Article 15 (1) of the Act, it shall investigate and confirm the relevant violations and then notify in writing that indemnities shall be paid, clearly stating the types of violations, the amount of indemnities, etc.
(2) The person in receipt of notification in accordance with paragraph (1) shall pay indemnities within 20 days from the date of receipt of the relevant notification; provided, where he or she fails to pay indemnities within the period due to natural disasters or unavoidable reasons, he or she shall pay indemnities within 7 days from the date when such reasons cease to exist.
(3) The collection of indemnities under paragraph (1) shall be made for the period of occupancy or use without obtaining permission for occupancy or use. In such cases, where the period during which permission for occupancy or use was not obtained exceeds 1 fiscal year, the amount of indemnities calculated for each fiscal year shall be aggregated and collected.
(4) The management agency of public waters shall collect additional charges equivalent to 3/100 of indemnities from a person who is obliged to pay the indemnities but fails to do so by the deadline under paragraph (2), in accordance with the latter part of Article 15 (1) of the Act. <Amended on Sep. 19, 2017>
(5) Where the management agency of public waters intends to collect additional charges under paragraph (4), it shall give written notice, demanding payment of the delayed indemnities and additional charges.
(6) The person in receipt of notice under paragraph (5) shall pay the delayed indemnities and additional charges within 20 days from the date of receipt of the relevant notice; provided, where he or she fails to pay additional charges within the period due to natural disasters or unavoidable reasons, he or she shall pay such charges within 7 days from the date when such reasons cease to exist.
(7) Article 15 shall apply mutatis mutandis to the installment payments of indemnities and additional charges. In such cases, "annual occupancy or use fees" shall be construed as "indemnities or additional charges by fiscal year".
(8) Article 16 shall apply mutatis mutandis to the settlement of indemnities and additional charges which have been overpaid or erroneously paid. In such cases, "occupancy or use fees" shall be construed as "indemnities or additional charges".
Article 19 (Transfer of rights and obligations) The rights and obligations arising from permission for occupancy or use in accordance with Article 16 (1) of the Act shall be transferred or succeeded to any of the following persons:
1. Where a person who has obtained permission for occupancy or use transfers the rights and obligations arising from permission for occupancy or use, the transferee;
2. Where a person who has obtained permission for occupancy or use dies, the heir;
3. Where persons who have obtained permission for occupancy or use merge together, the corporation which continues to exist after the merger or which is established by the merger;
4. Where a corporation in the process of incorporation is established after its promoters have obtained permission for occupancy or use, such corporation.
[This Article Wholly Amended on Aug. 9, 2017]
SECTION 3 Implementation Plan for Occupancy or Use
Article 20 (Approval of implementation plan for occupancy or use) (1) "Acts that meet the requirements prescribed by Presidential Decree" in the former part of Article 17 (1) of the Act means any of the following acts: <Amended on Jul. 20, 2012>
1. Acts falling under Article 8 (1) 1 of the Act; provided, this shall exclude acts of installing artificial structure with a limited occupancy or use period of 6 months or less, or other similar artificial structure, and acts of installing artificial structure, recognized and publicly notified by the management agency of public waters, for which approval of the implementation plan is not required at the time of granting permission for occupancy or use;
2. Acts falling under Article 8 (1) 2 and 3 of the Act, among which the following acts fall under each item:
(a) Acts subject to environmental impact assessment under Article 22 of the Environmental Impact Assessment Act;
(b) Acts of damaging other land or public waters, recognized and publicly notified by the management authority of public waters as requiring approval of the implementation plan for occupancy or use;
3. Acts falling under Article 8 (1) 4 of the Act.
(2) "Where ... intends to modify matters prescribed by Presidential Decree" in the latter part of Article 17 (1) of the Act means any of the following:
1. Where the scale of artificial structures is to be changed by 10/100 or more;
2. Where the total construction cost is to be changed by 10/100 or more;
3. Where the construction period is to be extended by 6 months or more.
(3) "Where ... intends to modify matters prescribed by Presidential Decree" in the latter part of Article 17 (2) of the Act means cased falling under paragraph (2) 2 or 3.
(4) A person who intends to extend the approval period or reporting period for the implementation plan for occupancy or use in accordance with Article 17 (4) of the Act shall submit a written statement on reasons for the extension to the management agency of public waters at least 20 days before the expiration of the period. <Amended on Jan. 10, 2017>
(5) The public notice on approval or reporting of the implementation plan for occupancy or use under Article 17 (5) of the Act shall include the following matters:
1. Name and address of a person who has obtained permission for occupancy or use (in the case of a corporation, referring to the name and address of the corporation and the name and address of its representative);
2. Details of construction;
3. Scheduled dates of commencement and completion of the project;
4. Date of approval of the implementation plan for occupancy or use or acceptance of a report thereon.
Article 21 (Application for completion inspection) (1) A person who intends to undergo a completion inspection in accordance with Article 18 (1) of the Act shall submit an application for completion inspection and related documents to the management agency of public waters, as prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013>
(2) A person who intends to report the completion of construction in accordance with Article 18 (2) of the Act shall submit a report on completion inspection and related documents to the management agency of public waters, as prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013>
(3) When the management agency of public waters conducts a completion inspection in accordance with Article 18 (3) of the Act, it may request public institutions, research institutes, or other specialized institutions or organizations to conduct the completion inspection, if deemed necessary for an efficient completion inspection.
(4) The public notice regarding the acceptance of the report on construction completion under Article 18 (4) of the Act or the issuance of the certificate of completion inspection shall include the following matters:
1. Name and address of a person who has filed an application for completion inspection (in the case of a corporation, referring to the name and address of the corporation and the name and address of its representative);
2. Details of construction;
3. Date of acceptance of the report on construction completion or date of issuance of a certificate of completion inspection;
4. Matters deemed necessary by the management agency of public waters, other than those prescribed in subparagraphs 1 through 3.
SECTION 4 Disposition Related to Occupancy or Use
Article 22 (Exemption from obligation of restoration) "Reasons prescribed by Presidential Decree" in Article 21 (4) of the Act means any of the following reasons:
1. Where the relevant public waters are used as roads, etc., and restoration is not possible;
2. Where it is impracticable to restore public waters for national defense, prevention of natural disasters, etc.;
3. Where the impact on the marine environment and ecosystem is minimal and there is no hindrance to the management and use of public waters, it is deemed unnecessary to restore public waters.
Article 23 (Reversion of artificial structures) Where the management agency of public waters intends to revert artificial structures, establishments, earth, rocks, or other things to the State or any local government in accordance with Article 21 (6) of the Act, it shall notify the owner and occupant of the location, type, quantity, timing of reversion, and other necessary matters of the relevant artificial structures, etc. In such cases, where the owner or occupant cannot be identified or notification is otherwise impossible due to unavoidable reasons, the management agency of public waters shall publicly announce such fact on its bulletin board or website for at least 14 days.
Article 24 (Deposit of restoration costs) (1) In the case of permission for occupancy or use which the management agency of public waters deems it necessary to require the deposit of an amount equivalent to the costs for restoration (hereafter referred to as the "performance guarantee" in this Article) in accordance with Article 21 (7) of the Act, it shall require the person who has obtained such permission to submit a restoration plan and documents calculating the costs for restoration before applying for approval of the implementation plan for occupancy or use under the main clause of Article 17 (1) of the Act or before reporting the implementation plan for occupancy or use under the main clause of Article 17 (2) of the Act.
(2) The management agency of public waters shall review the restoration plan submitted in accordance with paragraph (1) and the costs required for restoration, and require the person who has obtained permission for occupancy or use to deposit an amount equivalent to the costs for restoration as a performance guarantee by the time of applying for approval of the implementation plan for occupancy or use under the main clause of Article 17 (1) of the Act or the time of reporting under the main clause of Article 17 (2) of that Act.
(3) Where the performance guarantee increases due to any modification in the implementation plan for occupancy or use, the management agency of public waters shall require the person who has deposited a performance guarantee in accordance with paragraph (2) to deposit the increased amount additionally when the person applies for approval for modification in the implementation plan for occupancy or use under the latter part of Article 17 (1) of the Act or reports the modification under the latter part of Article 17 (2) of that Act. In such cases, paragraphs (1) and (2) shall apply mutatis mutandis to the documents to be submitted by the person who deposited the performance guarantee and the calculation of the additional performance guarantee.
(4) The deposit of the performance guarantee shall, in principle, be made in cash, but may be substituted by the submission of a letter of guarantee, securities, etc. falling under any of the following subparagraphs:
1. A letter of guarantee, securities, etc. falling under each subparagraph of Article 37 (2) of the Enforcement Decree of the Act on Contracts to which the State Is a Party;
2. A letter of guarantee, securities, etc. falling under each subparagraph of Article 37 (2) of the Enforcement Decree of the Act on Contracts to Which a Local Government Is a Party.
(5) Where a person who has deposited a performance guarantee fails to fulfill the obligation of restoration under Article 21 (1) of the Act, the management agency of public waters may restore public waters on behalf of the person who deposited the performance guarantee.
(6) Where the management agency of public waters restores public waters in accordance with paragraph (5), it shall apply the performance guarantee to the costs for such restoration and return any remaining amount to the person who deposited the performance guarantee. In such cases, Article 63 (1) of the Enforcement Decree of the Act on Contracts to Which the State is a Party shall apply mutatis mutandis to the direct use of the performance guarantee.
(7) Where a person who has deposited a performance guarantee fulfills the obligation of restoration under Article 21 (1) of the Act or is exempted from the obligation of restoration in accordance with paragraph (4) of that Article, the performance guarantee (including interest accrued if paid in cash) shall be returned without delay. <Amended on Jan. 10, 2017>
(8) Deleted. <Jan. 10, 2017>
(9) Deleted. <Jan. 10, 2017>
CHAPTER III RECLAMATION OF PUBLIC WATERS
SECTION 1 Master Plans for Reclamation of Public Waters
Article 25 (Formulation of master plans for reclamation of public waters) The Minister of Oceans and Fisheries shall review the following matters when formulating a master plan for reclamation of public waters (hereinafter referred to as the "master plan for reclamation") in accordance with Article 22 of the Act, or when intending to modify or cancel the master plan for reclamation in accordance with Article 27 of the Act: <Amended on Apr. 10, 2012; Mar. 23, 2013; Jun. 18, 2019>
1. Feasibility of reclamation related to reclamation purpose and land use plan;
2. Land use plan for public waters to be reclaimed (hereinafter referred to as "predetermined land to be reclaimed") and the correlation with adjacent public waters or land use;
3. Impact of reclamation on the marine environment and ecosystem;
4. Extent to which public use and access to adjacent public waters or land are restricted due to reclamation;
5. Safety of predetermined land to be reclaimed in relation to natural disasters, such as waves and tidal waves;
6. Correlation with national plans such as urban and Gun plans under the National Land Planning and Utilization Act and marine spatial plans under the Act on Marine Spatial Planning and Management.
Article 26 (Request for reflection in master plan for reclamation) A person who intends to request the reflection of public waters requiring reclamation in the master plan for reclamation in accordance with Article 23 (1) of the Act shall submit a written request and related documents to the Minister of Oceans and Fisheries, as prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013>
Article 27 (Investigation of request for reflection in master plan for reclamation) "Matters prescribed by Presidential Decree" in Article 23 (2) of the Act means the following matters: <Amended on May 7, 2024>
1. Relevancy to zones under other statutes or regulations, such as protection zones under the Act on the Conservation and Utilization of Modern and Contemporary Cultural Heritage or protection zones under the Act on Conservation and Utilization of Natural Heritage, or plans under other statutes or regulations;
2. Whether the person who requested the reflection in the master plan for reclamation in accordance with Article 23 (1) of the Act is an end user.
Article 28 (Request for data) When the Minister of Oceans and Fisheries requests the heads of relevant administrative agencies to provide data necessary for investigation or survey under Article 23 (2) of the Act in accordance with paragraph (3) of that Article, he or she shall make a request in writing, specifying the content of the data and the submission deadline, etc. <Amended on March 23, 2013>
Article 29 (Cost bearing for investigation or survey) Where the Minister of Oceans and Fisheries intends to impose the costs of investigation or survey on the person requesting the reflection in the master plan for reclamation in accordance with Article 23 (4) of the Act, he or she shall consult in advance with the relevant person requesting the reflection in the master plan for reclamation regarding the designation of a specialized institution to be commissioned for the investigation or survey and cost bearing, and shall conduct the investigation or survey in accordance with the content of an agreement. <Amended on Mar. 23, 2013>
Article 30 (Priority order of master plan for reclamation) "Priority order prescribed by Presidential Decree" in Article 23 (6) of the Act means as follows:
1. Requests filed by a central administrative agency or a local government;
2. Requests filed by an end user as an owner of adjacent land;
3. Requests filed by an end user other than those under subparagraphs 1 and 2.
Article 31 (Changes in marine environment and ecosystem due to reclamation) "Matters prescribed by Presidential Decree" in Article 24 (1) 5 of the Act means the following:
1. Damage to and changes in tideland or inland wetlands;
2. Changes in ocean currents and tidal currents and the movement of soil or stones;
3. Changes in the habitat environment of aquatic animals or plants;
4. Soil contamination caused by soil, stones, etc. introduced during reclamation.
Article 32 (Public notice of master plan for reclamation) The public notice regarding the formulation of a master plan for reclamation under Article 26 (1) of the Act shall include the following matters:
1. Purpose of reclamation;
2. Scale of reclamation;
3. Location of predetermined land to be reclaimed.
Article 33 (Establishment of rights within predetermined land to be reclaimed) "Cases prescribed by Presidential Decree" in Article 26 (4) of the Act means the following cases: <Amended on Mar. 23, 2013; Jun. 21, 2016; Aug. 26, 2020; Jan. 10, 2023>
1. Where extension of the period of permission for occupancy or use of public waters is permitted, or consultation on or approval for extension of the consultation or approval period is agreed upon or granted to any person falling under any of the following subparagraphs at the time of formulating the master plan for reclamation:
(a) A person who has obtained permission for occupancy or use of public waters in accordance with Article 8 (1) of the Act;
(b) A person who has consulted on or obtained approval for occupancy or use of public waters in accordance with Article 10 (1) of the Act;
2. Where the Minister of Oceans and Fisheries deems it necessary for the efficient use and management of public waters, and temporarily grants any of the following permission, consultation, or approval before granting a reclamation license under Article 28 of the Act, on the condition of excluding the installation of facilities for compensation for losses or prevention of losses under Article 32 of the Act:
(a) Permission for occupancy or use of public waters under Article 8 (1) of the Act or permission for extension of the period for permission;
(b) Consultation on or approval for the occupancy or use of public waters under Article 10 (1) of the Act, or consultation for extension of the consultation or approval period, or approval for extension;
3. Where a report under Article 47 of the Fisheries Act is accepted within the validity period of the communal fishery right for a piscary holder under subparagraph 9 of Article 2 of that Act;
4. Where permission for extension of the validity period of a license for fishery business or a license for aquaculture business is granted or a license for fishery business or a license for aquaculture business is newly granted in the relevant public waters to a person who holds a license for fishery business under Article 7 of the Fisheries Act or a license for aquaculture business under Article 10 of the Aquaculture Industry Development Act (excluding inland aquaculture business under paragraph (1) 7 of that Article);
5. Where a license for fishery business or a license for aquaculture business is newly granted in the relevant public waters to a person who has obtained permission for the fishery business within a demarcated zone under Article 40 (3) of the Fisheries Act or permission the inland saline aquaculture business under Article 43 (1) 1 of the Aquaculture Industry Development Act;
6. Where permission for business of producing seeds for fisheries is newly granted in the relevant public waters to a person who has obtained permission for business of producing seeds for fisheries under Article 21 of the Fisheries Seed Industry Promotion Act.
SECTION 2 Reclamation License of Public Waters
Article 34 (Application for reclamation license) (1) A person who intends to obtain a reclamation license (hereinafter referred to as "reclamation license") under Article 28 (1) through (3) of the Act shall submit a written application and related documents to the reclamation license agency under Article 28 (1) of the Act (hereinafter referred to as "reclamation license agency"), as prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013>
(2) The application for a license under paragraph (1) shall specify the relevant reclamation purpose falling under the reclamation purposes specified in Appendix 2. In such cases, where 2 or more reclamation purposes are determined, the area for each reclamation purpose shall be separately determined and specified.
(3) The head of the relevant central administrative agency and the relevant Special Metropolitan City Mayor, Metropolitan City Mayor, Do Governor (hereinafter referred to as "Mayor/Do Governor"), Special Self-Governing City Mayor, or Special Self-Governing Province Governor, who have been requested to consult in accordance with Article 28 (4) of the Act, shall submit their written opinions to the reclamation license agency within 20 days from the date of receipt of the consultation request. <Amended on Aug. 9, 2017>
Article 35 (Exceptions to restrictions on reclamation of public waters) "Where... as prescribed by Presidential Decree" in the proviso of Article 28 (7) of the Act means any of the following cases:
1. Where the reclamation purpose and the area by reclamation purpose fall under any of the following:
(a) Sites for factories processing intermediate goods and sites for factories processing raw materials: 230,000 square meters or less;
(b) Sites for logistics complexes and processing facilities: 165,000 square meters or less;
(c) Sites for housing facilities and other facility sites (referring to other facility sites under subparagraph 17 of Appendix 2): 100,000 square meters or less;
2. Where the coastline is maintained to improve the coastal landscape or to enhance its use;
3. Where it is necessary for a project directly related to a plan (hereinafter referred to as "national plan") formulated by the head of a relevant agency in accordance with statutes and regulations for public waters that the State or local government does not plan to reclaim:
(a) Designation of free economic zones under the Special Act on Designation and Management of Free Economic Zones;
(b) Designation of industrial complexes under the Industrial Sites and Development Act;
(c) Other plans formulated by the heads of central administrative agencies.
Article 36 (Priority order of reclamation license) (1) "Priority order prescribed by Presidential Decree" in Article 28 (8) of the Act means as follows:
1. Applications filed by the State or a local government;
2. Applications filed by an end user as an owner of adjacent land;
3. Applications filed by an end user other than those under subparagraphs 1 and 2.
(2) Where applications for a reclamation license compete, the reclamation license agency shall grant the license in the priority order under paragraph (1); provided, when deemed necessary in consideration of the economic feasibility and appropriateness of the reclamation, the reclamation license agency may adjust the reclamation area applied for and grant reclamation licenses to 2 or more applicants.
Article 37 (Additional clauses to reclamation licenses) "Matters prescribed by Presidential Decree" in Article 29 of the Act means as follows:
1. Matters regarding the sale of disused state-owned or public land under Article 42 of the Act;
2. Matters regarding the reversion to the State or local governments of reclaimed land necessary for official or public use under Article 46 (1) 1 and 2 of the Act, and the reversion to the State of an area equivalent to the reclaimed seashore.
Article 38 (Standards for reclamation license) "Where ... as prescribed by Presidential Decree" in Article 30 (1) 4 of the Act means any of the following:
1. Where necessary for national defense;
2. Where necessary for disaster prevention;
3. Where reclamation is necessary due to a natural disaster or other similar change in the status of public waters.
Article 39 (Scope of areas expected to be damaged by reclamation) "Areas adjacent to the predetermined land to be reclaimed which is expected to be damaged by reclamation" under Article 30 (2) of the Act means areas among public waters or land (including establishments; hereinafter the same shall apply) adjacent to the predetermined land to be reclaimed, where a person entitled to reclamation of public waters under Article 31 of the Act (hereinafter referred to as "person entitled to reclamation of public waters") is unable to use the public waters or land according to the purpose of the relevant right due to reclamation, or is unable to use the public waters or land without taking measures such as installing establishments to prevent damage.
Article 40 (Loss prevention facilities and compensation for loss) (1) A person who has obtained a reclamation license under Article 32 of the Act (hereinafter referred to as "reclamation licensee") shall, where it is possible to install facilities to prevent losses that the person entitled to reclamation of public waters may suffer, give priority to installing such facilities in accordance with Article 32 (1) of the Act; provided, if consultation is reached between the parties or if the cost of installing the relevant facilities significantly exceeds the loss, compensation for the loss may be made in lieu of installing the loss prevention facilities.
(2) Where a reclamation licensee is unable to install facilities to prevent losses that may be incurred by the person entitled to reclamation of public waters, he or she shall compensate for any loss. The same shall apply where losses remain despite the installation of facilities to prevent losses under the main clause of paragraph (1).
(3) The installation of facilities to prevent loss or compensation for loss under paragraphs (1) and (2) shall apply only to losses arising from reclamation.
Article 41 (Application for adjudication) A person who intends to file an application for adjudication on compensation in accordance with Article 32 (3) of the Act shall submit a written application for adjudication with the competent Land Tribunal, stating each matter falling under the following:
1. Name and address of the applicant for adjudication (in the case of a corporation, referring to the name and address of the corporation and the name and address of its representative);
2. Details of losses incurred;
3. Details on the amount of compensation for losses presented or demanded by the applicant for adjudication and the amount of compensation for losses presented or demanded by the other party in the course of negotiations;
4. Background of the consultation.
Article 42 (Public notice of reclamation licenses) The public notice regarding reclamation licenses under Article 33 of the Act shall include the following matters:
1. License number and date of license issuance;
2. Name and address of the reclamation licensee (in the case of a corporation, referring to the name and address of the corporation and the name and address of its representative);
3. Reclamation purpose;
4. Location and area of reclamation;
5. Period for reclamation works.
Article 43 (Collection of reclamation license fees) (1) Where the reclamation license agency intends to collect reclamation license fees in accordance with Article 34 of the Act, it shall collect the amount calculated according to the criteria for calculating reclamation license fees prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013>
(2) Where a reclamation license is revoked or its effect is lost, the reclamation license fee already paid shall not be refunded.
(3) The reclamation license fees under Article 34 of the Act collected by the Mayor/Do Governor, a Special Self-Governing City Mayor, or a Special Self-Governing Province Governor shall be vested in the treasury of the relevant Special City, Metropolitan City, Special Self-Governing City, Do, or Special Self-Governing Province; if re-delegated to the head of a Si/Gun/Gu in accordance with the latter part of Article 60 (2) of the Act and collected by the head of a Si/Gun/Gu, such fees shall be vested in the treasury of the relevant Si/Gun/autonomous Gu; and fees collected by others shall be vested in the National Treasury. <Amended on Aug. 9, 2017>
(4) The deadline for payment of reclamation license fees and other matters necessary for the collection thereof shall be prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013>
Article 44 (Exemption from reclamation license fees) "Corporations for public interest or public organizations prescribed by Presidential Decree" in subparagraph 1 of Article 34 of the Act means the following corporations or public organizations:
1. Cooperatives, cooperatives' federation, and fishing village fraternities under subparagraphs 4 and 5 of Article 2 and Article 15 of the Fisheries Cooperatives Act;
2. Sea Explorers of Korea under the Act on the Support for Sea Explorers of Korea.
Article 45 (Reclamation executed by the State) Where the State, a local government, or the Korea Land and Housing Corporation under the Korea Land and Housing Corporation Act intends to consult with, or obtain approval from the reclamation license agency on reclamation licenses in accordance with Article 35 of the Act, it shall submit a written application for consultation or approval and related documents to the reclamation license agency, as prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013>
Article 46 (Small-scale reclamation executed by the State) (1) "Official or public use prescribed by Presidential Decree" in Article 36 (1) of the Act means the following:
1. Coastal road construction projects (including access roads to aqua farms);
2. Construction projects of joint workplaces for processing fishery products, etc.;
3. Construction projects of wastewater pumping stations;
4. Projects for disaster recovery and prevention;
5. Coastal maintenance projects under the Coast Management Act.
(2) Where the State or a local government intends to consult on or obtain approval for small-scale reclamation in accordance with Article 36 (2) of the Act, it shall submit an application for approval of small-scale reclamation and related documents to the reclamation license agency, as prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013>
(3) The heads of relevant administrative agencies subject to consultation under Article 36 (2) of the Act shall include the Administrators of Regional Offices of Oceans and Fisheries and the head of each Basin Environmental Office or the head of each Regional Environmental Office. <Amended on Aug. 9, 2017>
(4) The head of the relevant administrative agency who has received a request for consultation in accordance with Article 36 (2) of the Act shall submit his or her written opinion within 20 days from the date of receipt of the request for consultation.
(5) The reclamation license agency that has received an application for approval of small-scale reclamation in accordance with paragraph (2) shall, after consulting with the heads of relevant administrative agencies in accordance with Article 36 (2) of the Act, undergo deliberation by the local committee for deliberation on coastal management under Article 31 of the Coast Management Act.
Article 47 (Transfer of created reclaimed land) When the reclamation license agency intends to transfer the reclaimed land in accordance with Article 37 of the Act to the head of the relevant central administrative agency, it shall transfer the reclaimed land together with a transfer document stating the following matters, accompanied by the business plan, drawings and specifications, certified copies of cadastral records for the reclaimed land, land use plan, cadastral survey map, and as-built drawings and documents:
1. Location of the reclaimed land;
2. Reclamation purpose;
3. Date of commencement and completion of construction works;
4. Area for reclamation;
5. Total construction cost;
6. Opinions on the allocation or sale of reclaimed land.
SECTION 3 Reclamation Works
Article 48 (Application for approval of implementation plan for reclamation of public waters) (1) A person who intends to obtain approval of the implementation plan for reclamation of public waters (hereinafter referred to as "implementation plan for reclamation") in accordance with the former part of Article 38 (1) of the Act shall submit a written application for approval and related documents to the reclamation license agency, as prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013>
(2) The reclamation license agency shall review whether the implementation plan for reclamation under paragraph (1) are appropriate. In such cases, if the total project cost exceeds 3 billion won, the review shall be requested to a specialized agency such as the Public Procurement Service.
(3) When approving the implementation plan for reclamation, the reclamation license agency shall reflect the results of the review under paragraph (2).
(4) A person who intends to obtain approval for modification of the implementation plan for reclamation in accordance with the latter part of Article 38 (1) of the Act shall submit a written application for approval for modification thereof and related documents to the reclamation license agency, as prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013>
(5) "Unavoidable reasons prescribed by Presidential Decree, such as natural disasters" in the proviso of Article 38 (3) of the Act means any of the following: <Amended on Sep. 19, 2017>
1. Where the period is delayed due to the implementation of additional clauses imposed in accordance with Article 29 of the Act;
2. Where proceedings related to the relevant license are in progress;
3. Where a natural disaster or any other cause not attributable to the reclamation licensee occurs.
(6) The public notice on approval or approval for modification of the implementation plan for reclamation under Article 38 (5) of the Act shall include the following matters: <Amended on Sep. 19, 2017>
1. Date of approval of the implementation plan for reclamation (including the date of approval of modification thereof in the case of approval of modification);
2. Name and address of the reclamation licensee (in the case of a corporation, referring to the name and address of the corporation and the name and address of its representative);
3. Reclamation purpose;
4. Location and areas for reclamation works;
5. Project period (including the commencement date and the scheduled completion date) of reclamation works;
6. Reasons for modification of the implementation plan for reclamation and the details of modification (limited to cases of approval for modification);
7. Land use plan for predetermined land to be reclaimed.
(7) When approving or granting approval for modification of the implementation plan for reclamation received in accordance with paragraphs (1) and (4), the reclamation license agency shall consult with the head of the relevant administrative agency regarding the vesting of the ownership under Article 46 (1) 1 and 2 of the Act.
Article 48-2 (Joint council for authorization or permission deemed granted) (1) Where the reclamation license agency intends to hold a joint council for authorization or permission deemed granted (hereinafter referred to as the "joint council") under Article 39-2 (1) of the Act, it shall notify the heads of the relevant administrative agencies of the fact of holding a meeting of the joint council no later than 7 days before the meeting is held.
(2) The heads of relevant administrative agencies in receipt of the notification in accordance with paragraph (1) shall submit their opinions on authorization, permission, etc. deemed granted under the subparagraphs of Article 39 (1) of the Act at a meeting of the joint council; provided, the heads of the relevant administrative agencies may submit their opinions thereon within the period under the former part of Article 24 (4) of the Framework Act on Administration, where it is impracticable for them to submit such opinions at the meeting of the joint council because they need to conduct an additional review of statutes or regulations, verification of facts, etc. <Amended on Dec. 12, 2023>
(3) Except as provided in paragraphs (1) and (2), matters necessary for the operation, etc. of the joint council shall be determined by the reclamation license agency.
[This Article Added on Sep. 19, 2017]
Article 49 (Conveyance of disused state-owned or public land) "Public facilities prescribed by Presidential Decree, such as roads and banks" in Article 42 (1), with the exception of its subparagraphs, of the Act means any of the following facilities:
1. Roads;
2. Banks;
3. Ditches;
4. Reservoirs;
5. Official or public facilities other than the facilities prescribed in subparagraphs 1 through 4.
Article 49-2 (Transfer of rights and obligations of reclamation of public waters) The rights and obligations arising from a reclamation license in accordance with Article 43 (1) of the Act shall be transferred or succeeded to any of the following persons:
1. Where a reclamation licensee transfers the rights and duties arising from the reclamation license, the transferee;
2. Where a reclamation licensee dies, the heir;
3. Where reclamation licensees merge together, the corporation which continues to exist after the merger or which is established by the merger;
4. Where a corporation in the process of incorporation is established after its promoters have obtained a reclamation license, such corporation.
[This Article Added on Aug. 9, 2017]
Article 50 (Application for completion inspection) (1) A person who intends to undergo a completion inspection in accordance with Article 45 of the Act shall submit a written application for completion inspection and related documents to the reclamation license agency, as prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013; Sep. 19, 2017>
(2) The reclamation license agency in receipt of the application for completion inspection in accordance with paragraph (1) shall, when conducting the completion inspection, consult in advance with the relevant administrative agencies as to whether the opinions of relevant agencies obtained during the approval of the reclamation license under Article 28 of the Act and the approval of the implementation plan for reclamation under Article 38 of the Act have been properly reflected.
SECTION 4 Acquisition of Reclaimed Land's Ownership
Article 51 (Acquisition of ownership of reclaimed land and total project cost) (1) "Reclaimed land necessary to be used for official or public purposes as prescribed by Presidential Decree" in Article 46 (1) 1 of the Act means roads, revetments (shoreline and bank erosion prevention facilities), quay walls (wharf walls), small vessel piers, breakwaters, drainage facilities, parks, or reclaimed land necessary to be used for official or public purposes in accordance with other statutes and regulations. In such cases, reclaimed land necessary for national facilities shall be reverted to the State, and reclaimed land necessary for local government facilities shall be reverted to the local government. <Amended Jan. 5, 2021>
(2) When a reclamation licensee acquires the ownership of reclaimed land equivalent to the total project costs in accordance with Article 46 (1) 3 of the Act, the price of the relevant reclaimed land shall be calculated as a reasonable price considering the transaction prices of nearby similar land, and shall be based on the arithmetic mean of the values appraised by 2 or more appraisal corporations, etc. designated by the reclamation license agency, as prescribed by Decree of the Ministry of Oceans and Fisheries (referring to appraisal corporations, etc. under the Act on Appraisal and Certified Appraisers; hereinafter the same shall apply). <Amended on Mar. 23, 2013; Aug. 31, 2016; Jan. 21, 2022>
(3) Where the reclamation license agency recognizes that the appraisal value by appraisal corporations, etc. under paragraph (2) is not appropriate, or where the highest appraisal value among the appraisal values exceeds 130 percent of the lowest appraisal value, it may have at least 2 other appraisal corporations, etc. conduct a reappraisal. In such cases, the price of the relevant reclaimed land shall be based on the arithmetic mean of the reappraised appraisal values. <Amended on Jan. 21, 2022>
(4) "The aggregate of the amounts prescribed by Presidential Decree, such as investigation costs, design costs, net construction costs, and compensation costs" in Article 46 (1) 3 of the Act means the aggregate of the amounts of the following costs related to the relevant reclamation works based on the date of application for completion inspection of the relevant reclamation works:
1. Investigation costs: The survey costs and other investigation costs for the implementation of reclamation works, which are not included in the net construction costs, calculated based on the standards for determining the price of an engineering project under Article 31 of the Engineering Industry Promotion Act;
2. Design costs: The costs incurred in design necessary for the implementation of reclamation works, calculated based on the standards for determining the price of an engineering project under Article 31 of the Engineering Industry Promotion Act;
3. Net construction costs: The aggregate of material costs, labor costs, expenses, overhead expenses, and profits for the implementation of reclamation works, calculated based on the standards for determining budget prices under Article 9 of the Enforcement Decree of the Act on Contracts to Which the State Is a Party, the Government-standard estimated commodity prices and unit prices (referring to the prices publicly notified by the Government, if any);
4. Compensation costs: The actual compensation costs incurred for the implementation of reclamation works and the installation costs of loss prevention facilities;
5. Incidental costs: The aggregate of the costs referred to in each of the following subparagraphs:
(a) Construction supervision fees based on the standards for prices of engineering projects under Article 31 of the Engineering Industry Promotion Act;
(b) Insurance premiums under Article 4 of the Industrial Accident Compensation Insurance Act;
(c) Amount of damages caused by natural disasters;
(d) The increase in construction costs due to price fluctuations calculated by applying mutatis mutandis Article 64 of the Enforcement Decree of the Act on Contracts to Which the State Is a Party; in such cases, the increase in construction costs shall be based on the implementation period of the relevant reclamation works publicly notified in accordance with Article 48 (6) (referring to the period from the commencement date of the reclamation works to the application date for completion inspection; hereinafter the same shall apply), excluding any period other than the extended completion period recognized by the reclamation license agency as not attributable to the reclamation licensee, such as natural disasters or modifications in national plans;
(e) Taxes, public charges, and charges under statutes and regulations;
(f) Environmental impact assessment expenses, expenses for investigation of damage impact, reclaimed land appraisal fees under paragraphs (2) and (3), and all expenses incurred in the implementation of additional clauses of reclamation licenses;
6. Construction interest by process: Construction interest calculated as determined by the reclamation license agency on the aggregate from subparagraphs 1 through 5 (the interest rate shall be the weighted average deposit interest rate for time deposits of deposit banks announced by the Bank of Korea during the project period); in such cases, the construction interest shall be based on the implementation period of the relevant reclamation works as publicly notified in accordance with Article 48 (6), excluding any period other than the extended completion period recognized by the reclamation license agency as not attributable to the reclamation licensee, such as natural disasters or modifications in national plans.
(5) The expenses referred to in subparagraphs 1 to 5 of paragraph (4) shall be based on evidentiary documents, such as work contracts and tax invoices, and expenses not accompanied by such documents shall not be included in the total project costs.
Article 52 (Additional registration on matters on restrictions on exercise of ownership of reclaimed land) A person who has acquired the ownership of reclaimed land falling under Article 46 (1) 3 and 4 of the Act shall additionally state the following restrictions on the exercise of ownership in accordance with Article 46 (2) of the Act: This reclaimed land shall not be used by changing the reclamation purpose within 10 years from the date of completion inspection (the date of inspection shall be entered), except in cases where the reclamation purpose is modified in accordance with the proviso of Article 48 (1) of the Act or with the approval of the reclamation license agency in accordance with Article 49 of the Act (the reclamation purpose at the time of completion inspection or the modified reclamation purpose at the time of approval for modification shall be entered).
Article 53 (Notification of matters regarding acquisition of ownership of reclaimed land) (1) The reclamation license agency shall notify the competent tax office, registry office, Special Self-Governing City, Special Self-Governing Province, and a Si/Gun/autonomous Gu of matters regarding the acquisition of ownership of reclaimed land, accompanied by data regarding the acquisition value of the completed reclaimed land within 1 month from the date of issuance of the certificate of completion inspection in accordance with Article 46 (4) of the Act and the certificate of completion inspection. <Amended on Aug. 9, 2017>
(2) A Special Self-Governing City, Special Self-Governing Province, and a Si/Gun/autonomous Gu in receipt of the notification in accordance with paragraph (1) shall take necessary measures to ensure that the restrictions on modification of reclamation purpose under Article 48 of the Act are stated in a written confirmation of land use planning under Article 10 of the Framework Act on the Regulation of Land Use. <Amended on Aug. 9, 2017>
Article 54 (Sale price of remaining reclaimed land) (1) The sale price of the remaining reclaimed land under the latter part of Article 47 (1) of the Act shall be an amount equivalent to 75 percent of the estimated price under Article 42 (1) of the Enforcement Decree of the State Property Act for the remaining reclaimed land.
(2) "Facilities prescribed by Presidential Decree" in Article 47 (2) 4 of the Act means agricultural or fishing village facilities for a specialized resort business, folklore villages, museums, and art galleries under Article 2 (1) 3 a of the Enforcement Decree of the Tourism Promotion Act. <Added on Sep. 19, 2017>
(3) The lease method, lease period, and rent of reclaimed land and remaining reclaimed land under Article 47 (3) of the Act are as follows: <Amended on Sep. 19, 2017>
1. Lease method: Selective competitive contract or negotiated contract;
2. Lease period: Project period for a project implemented by leasing sites for facilities falling under any of the subparagraphs of Article 47 (2) of the Act;
3. Rent: Amount equivalent to 50 percent of annual usage fees under Article 29 of the Enforcement Decree of the State Property Act.
Article 55 (Scope of minor modification of reclamation purpose) (1) "Minor modifications of reclamation purpose prescribed by Presidential Decree" in the proviso of Article 48 (1) of the Act means any of the following cases:
1. Where the State or a local government changes all or part of a predetermined land to be reclaimed, reclaimed land, or reclaimed land that has passed the completion inspection to official or public use in accordance with relevant statutes and regulations;
2. Where reclaimed lands for harbor facility sites, shipbuilding facility sites, fishery harbor facility sites, and sites for logistics complexes and processing facilities (only applicable to sites for facilities for processing or handling agricultural, fishery, and livestock products) or reclaimed lands that have received completion inspections are mutually exchanged;
3. Where a reclamation licensee specifies 2 or more reclamation purposes in accordance with the latter part of Article 34 (2) and mutually exchanges the reclamation purposes within the scope of 10 percent of the total licensed reclamation area before the completion inspection of the reclamation works;
4. Where a reclamation licensee intends to continue using the area for which permission for occupancy or use was obtained in accordance with Article 8 of the Act at the time of obtaining the reclamation license for the purpose of such occupancy or use after the date on which the reclamation license was granted.
(2) The public notice regarding the confirmation of modification of reclamation purpose under Article 48 (3) of the Act shall include the following matters:
1. Date of confirmation of modification of reclamation purpose;
2. Name and address of a person who has obtained confirmation of modification of reclamation purpose (in the case of a corporation, referring to the name and address of the corporation and the name and address of its representative);
3. Reclamation purpose and land use plan before and after modification;
4. Location and area of the modified reclaimed land;
5. Reasons for modification of reclamation purpose.
Article 56 (Application for approval for modification of reclamation purpose) (1) A person who intends to obtain confirmation or approval for modification of reclamation purpose in accordance with Articles 48 (2) and 49 (1) of the Act shall submit a written application for confirmation of modification or approval for modification and related documents to the reclamation license agency, as prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013>
(2) The reclamation license agency in receipt of the application for confirmation or approval for modification of reclamation purpose in accordance with paragraph (1) shall consult in advance with the Minister of Oceans and Fisheries as to whether the application conforms to the master plan for reclamation and the marine spatial master plans under Article 5 of the Act on Marine Spatial Planning and Management. <Amended on Mar. 23, 2013; Jun. 18, 2019>
Article 57 (Criteria for calculation of revaluated reclaimed land) "Required expenses ... prescribed by Presidential Decree" in Article 49 (2) of the Act means the aggregate of the following expenses: <Amended on Oct. 1, 2025>
1. Taxes and public charges: Taxes, public charges, or charges imposed in accordance with statutes and regulations in connection with the ownership of the reclaimed land;
2. Appraisal expenses: Appraisal expenses incurred for the revaluation of the reclaimed area;
3. Capital costs: The amount obtained by multiplying the acquisition value of the reclaimed land acquired by the reclamation licensee in accordance with Article 46 (1) 3 of the Act by the annual change rate of the consumer price index compared to the previous year, dividing by 100, and aggregating the amounts for each year; in such cases, the consumer price index shall be the overall consumer price index for all cities (referring to the total index) publicly notified by the Minister of Data and Statistics in accordance with subparagraph 2 of Article 3 of the Statistics Act, and the period for aggregating the annual amounts shall be from the year in which the completion inspection of the reclamation works under Article 45 of the Act falls to the year immediately preceding the year in which the application for modification of reclamation purpose is filed in accordance with Article 49 (1) of the Act;
4. Other expenses: Expenses incurred for the improvement of reclaimed land that has undergone the completion inspection, reflected in the revaluation of the reclaimed land.
Article 58 (Methods of revaluating reclaimed land) Article 51 (2) and (3) shall apply mutatis mutandis to the revaluation methods of reclaimed land under Article 49 (4) of the Act.
Article 59 (Public notice of approval for modification of reclamation purpose) The public notice regarding the approval for modification of reclamation purpose under Article 49 (5) of the Act shall include the following matters:
1. Date of approval for modification of reclamation purpose;
2. Name and address of a person who has obtained approval for modification of reclamation purpose (in the case of a corporation, referring to the name and address of the corporation and the name and address of its representative);
3. Reclamation purpose before modification;
4. Reclamation purpose after modification;
5. Location and area of the modified reclaimed land;
6. Land category, parcel, and area of revalued reclaimed land reverted to the State;
7. Reasons for modification of reclamation purpose.
Article 60 (Confirmation of reclaimed land use) (1) When the reclamation license agency confirms the use of reclaimed land in accordance with Article 51 of the Act, it shall do so in writing or by on-site access.
(2) The reclamation license agency shall confirm the use of the reclaimed land at least once semiannually by the method prescribed in paragraph (1), record the results as prescribed by Decree of the Ministry of Oceans and Fisheries, and maintain such records. <Amended on Mar. 23, 2013>
SECTION 5 Disposition Related to Reclamation of Public Waters
Article 61 (Reasons for revocation of reclamation license) "Where the process of reclamation works fails to meet the standards prescribed by Presidential Decree" in Article 52 (1) 2 of the Act means where the reclamation process is less than 30 percent of the entire work process and less than 30 percent of the expected work process.
Article 62 (Public notice of revocation of reclamation license) Where the reclamation license agency revokes a reclamation license, it shall publicly notify the following matters in accordance with Article 52 (2) of the Act:
1. Date of revocation of the reclamation license;
2. Name and address of a person whose reclamation license is revoked (in the case of a corporation, referring to the name and address of the corporation and the name and address of its representative);
3. Location and area of the region where the reclamation license has been revoked;
4. Reason for revocation of the reclamation license;
5. Reclamation purpose and land use plan of the region where the reclamation license has been revoked.
Article 63 (Requirements for restoration of effect of reclamation license) "More than the work process prescribed by Presidential Decree" in Article 53 (4) of the Act means 30/100 or more of the entire work process. <Amended on Sep. 19, 2017>
Article 64 (Requirements for exemption from obligation of restoration) "Reasons prescribed by Presidential Decree" in Article 54 (4) of the Act mean where the impact on the environment and ecosystem is minimal, and the conservation, use, and management of public waters are not hindered, so that restoration is deemed unnecessary.
Article 65 (Procedures for reversion to the State of facilities exempt from obligation of restoration) (1) Where the reclamation license agency intends to revert reclaimed land, buildings, establishments, or other artificial structures installed within the zone of reclamation works to the State in accordance with Article 54 (6) of the Act (including cases applied mutatis mutandis in accordance with paragraph (8) of that Article), it shall notify the owner of the relevant facilities or other objects of the location, quantity, timing of reversion, and other necessary matters. In such cases, where the owner is unknown or notification is otherwise impossible due to unavoidable reasons, it shall make a public announcement for at least 14 days.
(2) When the reclamation license agency intends to revert to the State any reclaimed land, buildings, establishments, or other artificial structures installed within the zone of reclamation works in accordance with Article 54 (6) of the Act (including cases applied mutatis mutandis in accordance with paragraph (8) of that Article), it shall consult in advance with relevant administrative agencies.
Article 66 (Criteria and timing for deposit of performance guarantee) (1) Where the reclamation license agency requires the deposit of an amount equivalent to the cost of restoration in accordance with the main clause of Article 54 (9) of the Act (hereinafter referred to as the "performance guarantee"), it shall require the deposit of an amount corresponding to 20 percent of the net construction cost under Article 51 (4) 3 before the commencement of the relevant reclamation works. In such cases, where the net construction cost increases due to modification of the implementation plan for reclamation under the latter part of Article 38 (1) of the Act, the reclamation license agency shall require an additional deposit corresponding to the increased amount.
(2) The deposit of the performance guarantee shall, in principle, be made in cash, but may be substituted by the submission of a letter of guarantee, securities, etc. falling under any of the following subparagraphs:
1. A letter of guarantee, securities, etc. falling under each subparagraph of Article 37 (2) of the Enforcement Decree of the Act on Contracts to which the State Is a Party;
2. A letter of guarantee, securities, etc. falling under each subparagraph of Article 37 (2) of the Enforcement Decree of the Act on Contracts to Which a Local Government Is a Party.
(3) "Persons prescribed by Presidential Decree" in the proviso of Article 54 (9) of the Act means corporations directly established in accordance with statutes.
Article 67 (Use of performance guarantee) (1) Where a reclamation licensee fails to fulfill the obligation of restoration under the main clause of Article 54 (1) of the Act, the reclamation license agency may restore public waters on behalf of the reclamation licensee.
(2) Where the reclamation license agency restores public waters in accordance with paragraph (1), it shall apply the performance guarantee to the costs for such restoration and return any remaining amount to the reclamation licensee. In such cases, Article 63 (1) of the Enforcement Decree of the Act on Contracts to Which the State is a Party shall apply mutatis mutandis to the direct use of the performance guarantee.
Article 68 (Return of performance guarantee) (1) The reclamation license agency shall return performance guarantee (including interest accrued if paid in cash; hereafter in this Article the same shall apply) when the person who has deposited the performance guarantee has undergone the completion inspection under Article 45 of the Act or has fulfilled the obligation of restoration of public waters under Article 54 (1) of the Act.
(2) A person who intends to receive the return of the performance guarantee shall submit a claim for return and related documents to the reclamation license agency, as prescribed by Decree of the Ministry of Oceans and Fisheries. <Amended on Mar. 23, 2013>
(3) Where there is a claim for refund under paragraph (2), the reclamation license agency shall, without delay, verify the fact of restoration of public waters and other facts, and refund the performance guarantee.
CHAPTER IV SUPPLEMENTARY PROVISIONS
Article 69 (Notification of investigation results) The notification by the management agency of public waters under Article 55 (6) of the Act shall include the results of the investigation, etc. under paragraphs (1) and (2) of that Article, as well as the matters to be addressed by the relevant persons.
Article 70 (Submission of data) When the reclamation license agency requires a reclamation licensee to submit data or report in accordance with Article 56 (1) of the Act, it shall be in writing clearly stating the content of the data, the deadline for submission, etc.
Article 71 (Application for adjudication) A person who intends to apply for adjudication on compensation for losses under Article 57 (3) of the Act shall file an application for adjudication with the competent Land Tribunal, stating each matter falling under the following:
1. Names and addresses of both the applicant seeking adjudication and the other party;
2. Details of losses incurred;
3. Details on the amount of indemnification presented or demanded by the applicant for the adjudication and the amount of indemnification presented or demanded by the other party in the course of negotiations;
4. Background of the consultation.
Article 72 (Operation of information system for management and reclamation of public waters) (1) Where civil petitions such as reporting, approval, permission, inspection, issuance, and notification under the Act are handled using the forms or electronic documents prescribed by the information system for management and reclamation of public waters in accordance with Article 59 (2) of the Act, such civil petitions shall be deemed to have been handled in accordance with the relevant provisions of the Act.
(2) The management agency of public waters shall report to the Minister of Oceans and Fisheries on the status of management of public waters under its jurisdiction, as prescribed by Decree of the Ministry of Oceans and Fisheries, to establish and operate the information system for management and reclamation of public waters under Article 59 (1) of the Act. <Amended on Mar. 23, 2013>
Article 73 (Delegation of authority regarding management of public waters) The Minister of Oceans and Fisheries shall delegate the following authority over public waters within the harbor zones of exclusive economic zones under Article 2 of the Act on the Exclusive Economic Zone and Continental Shelf, national trade ports under Article 3 (2) 1 of the Harbor Act, and national coastal ports under Article 3 (3) 1 of that Act, in accordance with the former part of Article 60 (1) of the Act, to the Director General of a Regional Office of Oceans and Fisheries: <Amended on Jul. 4, 2022>
1. Order for removal of derelict ships, etc. under Article 6 of the Act and measures for removal and disposal of derelict ships, etc.;
2. Permission for occupancy or use and permission for modification under Article 8 of the Act, prior consultation and public notice thereof, and collection of opinions from interested parties regarding permission for occupancy or use;
3. Acceptance of reports on modification of matters of permission for occupancy or use under Article 9 of the Act;
4. Consultation on, or approval for, occupancy and use and consultation on, or approval for, modification thereof under Article 10 of the Act and Article 10 (2) and (5) of this Decree, prior consultation and public notice thereof, and collection of opinions from interested parties regarding consultation on, or approval for, occupancy and use;
5. Collection, reduction or exemption, and installment payment of occupancy or use fees and additional charges under Article 13 of the Act;
6. Adjustment of occupancy or use fees under Article 14 of the Act;
7. Collection and installment payment of indemnities and additional charges under Article 15 of the Act;
8. Acceptance of reports on transfer, etc. of rights and obligations under Article 16 of the Act;
9. Approval of implementation plans, approval for modification thereof, and acceptance of reports and reports on modification under Article 17 of the Act;
10. Completion inspection, confirmation of completion inspection, acceptance and public notice of construction completion under Article 18 of the Act;
11. Order for measures such as cancellation of permission, consultation, or approval, suspension of occupancy or use, and reconstruction or relocation of artificial structures, establishments, soil, stones, or other objects on public waters, and installation of signs under Article 19 of the Act;
12. Cancellation of permission for occupancy or use, suspension of occupancy or use, or order for renovation or relocation of artificial structures, establishments, and other objects under Article 20 of the Act;
13. Approval and notification of exemption from the obligation of restoration, order for restoration, necessary measures for restoration, measures for reversion to the State of artificial structures, etc., and measures for deposit and return of restoration costs under Article 21 of the Act;
14. Measures for deposit of performance guarantee under Article 21 (7) of the Act (including restoration of public waters under Article 24 (6) and appropriation and return of performance guarantee corresponding thereto);
15. Access to and investigation of business places or other necessary locations under Article 55 of the Act;
16. Compensation for losses and consultation on compensation for losses under Article 57 of the Act;
17. Hearing under Article 58 of the Act;
18. Imposition and collection of administrative fines under Article 66 of the Act.
[This Article Wholly Amended on Sep. 8, 2020]
Article 74 (Delegation of authority regarding reclamation of public waters) (1) The Minister of Oceans and Fisheries shall delegate the following authority to the Director General of a Regional Office of Oceans and Fisheries within the harbor zone of national trade ports under Article 3 (2) 1 of the Harbor Act, reclaimed districts of public waters of 100,000 square meters or more under Article 28 (1) 2 of the Act, and reclaimed districts under Article 28 (2) of the Act, in accordance with the former part of Article 60 (2) of the Act: <Amended on Mar. 23, 2013; Aug. 9, 2017; Jul. 14, 2020>
1. Reclamation license, and consultation with the heads of relevant central administrative agencies, the Mayor/Do Governor, a Special Self-Governing City Mayor, or a Special Self-Governing Province Governor under Article 28 of the Act;
2. Public notice regarding reclamation license under Article 33 of the Act;
3. Collection of and exemption from reclamation license fees under Article 34 of the Act;
4. Consultation and approval regarding reclamation of public waters implemented by the State or local governments under Article 35 (1) of the Act, and completion inspection under paragraph (4) of that Article;
5. Matters falling under subparagraphs 1, 2, 8 through 12, 14, and 16 through 20 among the matters applied mutatis mutandis in accordance with Article 35 (6) of the Act;
6. Consultation and approval regarding small-scale reclamation of public waters implemented by the State, etc. under Article 36 (1) of the Act, and consultation with relevant administrative agencies under paragraph (2) of that Article;
7. Transfer of control over reclaimed land resulting from government projects under Article 37 of the Act;
8. Approval, approval for modification, and public notice of implementation plan for reclamation under Article 38 of the Act;
9. Consultations with the heads of relevant administrative agencies under Article 39 (3) of the Act;
10. Permission for use before the completion inspection on reclaimed land under Article 44 of the Act;
11. Completion inspection on reclamation works under Article 45 of the Act;
12. Notification of matters regarding the acquisition of ownership of reclaimed land under Article 46 (4) of the Act;
13. Confirmation and public notice under Article 48 of the Act;
14. Approval for modification of reclamation purpose and consultation with the heads of relevant central administrative agencies and Mayors/Do Governors, and public notice thereon following the relevant approval for modification under Article 49 of the Act;
15. Registration and record regarding the ownership of revaluated reclaimed land, and other necessary measures for the preservation of rights under Article 50 (2) of the Act;
16. Confirmation of use of reclaimed land under Article 51 of the Act;
17. Cancellation of approval for reclamation licenses or implementation plans for reclamation, construction suspension order, reconstruction, removal, repair, prohibition or restriction of use, or restoration of buildings, establishments, etc., or other necessary measures, and installation of signs under Article 52 of the Act;
18. Reinstatement of the effects of reclamation license under Article 53 (3) and (4) of the Act;
19. Restoration order, measures necessary for restoration, exemption from the obligation of restoration and notification of exemption status, measures for reversion of reclaimed land, buildings, establishments, or other artificial structures to the State, and measures for deposit and return of performance guarantee under Article 54 of the Act;
20. Orders for submission of data or reporting, entry inspections and inquiries of books, documents, or other objects under Article 56 of the Act;
21. Compensation for losses and consultation on compensation for losses under Article 57 of the Act;
22. Hearing under Article 58 of the Act;
23. Imposition and collection of administrative fines under Article 66 of the Act.
(2) The Minister of Oceans and Fisheries shall delegate the authority regarding each subparagraph of paragraph (1) within the coastal ports under Article 3 (1) 2 of the Harbor Act and regional trade ports under Article 3 (2) 2 of that Act to the Mayor/Do Governor, a Special Self-Governing City Mayor, or a Special Self-Governing Province Governor in accordance with the former part of Article 60 (2) of the Act. <Amended on Mar. 23, 2013; Aug. 9, 2017>
(3) The case where a Mayor/Do Governor may re-delegate part of the authority delegated in accordance with paragraph (2) to the head of a Si/Gun/Gu after obtaining approval from the Minister of Oceans and Fisheries in accordance with the latter part of Article 60 (2) of this Act shall only apply when the reclamation license area does not span 2 or more Si/Gun/autonomous districts. <Amended on Mar. 23, 2013>
Article 74-2 Deleted. <Mar. 7, 2023>
CHAPTER V PENALTY PROVISIONS
Article 75 (Criteria for imposing administrative fines) The criteria for imposing administrative fines under Article 66 of the Act shall be as specified in Appendix 3.
[This Article Wholly Amended on Aug. 9, 2017]
20101014
22449
ADDENDA <Presidential Decree No. 22449, Oct. 14, 2010>
Article 1 (Enforcement date)
This Decree shall enter into force on October 16, 2010.
Article 2 (Repeal of other statute or regulation)
The following statutes and regulations are hereby repealed:
1. Enforcement Decree of the Public Waters Management Act;
2. Enforcement Decree of the Public Waters Reclamation Act.
Article 3 (Applicability to calculation of total project costs)
Article 51 (4) and (5) shall apply from the first implementation plan for reclamation for which an application for approval is filed after this Decree enters into force.
Article 4 Omitted.
Article 5 (Relationship to other statutes or regulations)
A citation of the previous Enforcement Decree of the Public Waters Management Act, the previous Enforcement Decree of the Public Waters Reclamation Act, or the provisions thereof by other statutes or regulations as at the time this Decree enters into force shall be a citation of this Decree or corresponding provisions thereof in lieu of the previous Enforcement Decree of the Public Waters Management Act, the previous Enforcement Decree of the Public Waters Reclamation Act, or the provisions thereof, if such corresponding provisions exist herein.
20120410
23718
ADDENDA <Presidential Decree No. 23718, Apr. 10, 2012>
Article 1 (Enforcement date)
This Decree shall enter into force on April 15, 2012. (Proviso Omitted.)
Articles 2 through 13 Omitted.
Article 14 Omitted.
Article 15 Omitted.
20120720
23966
ADDENDUM <Presidential Decree No. 23966, Jul. 20, 2012>
Article 1 (Enforcement date)
This Decree shall enter into force on July 22, 2012. (Proviso Omitted.)
Articles 2 through 4 Omitted.
Article 5 Omitted.
Article 6 Omitted.
20121029
24155
ADDENDA <Presidential Decree No. 24155, Oct. 29, 2012>
Article 1 (Enforcement date)
This Decree shall enter into force on November 1, 2012. (Proviso Omitted.)
Article 2 Omitted.
Article 3 (Applicability to amendments to the Public Waters Management and Reclamation Act)
The amended provisions of the former part of Article 15 (1) of the Enforcement Decree of the Public Waters Management and Reclamation Act shall begin to apply to annual fees for occupancy or use collected after this Decree enters into force.
Articles 4 through 11 Omitted.
20130323
24443
ADDENDA <Presidential Decree No. 24443, Mar. 23, 2013>
Article 1 (Enforcement date)
This Decree shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 5 Omitted.
Article 6 Omitted.
20131230
25050
ADDENDUM <Presidential Decree No. 25050, Dec. 30, 2013>
This Decree shall enter into force on February 14, 2014. (Proviso Omitted.)
20150303
26132
ADDENDA <Presidential Decree No. 26132, Mar. 3, 2015>
Article 1 (Enforcement date)
This Decree shall enter into force on the date of its promulgation.
Article 2 (Applicability to reduction of, or exemption from, occupancy or use fees of pubic waters)
The amended provisions of the proviso of Article 14 (1) 2 shall apply to the reduction of, or exemption from, occupancy or use fees for the occupancy or use of public waters falling under Article 13 (1) 11 of the Act after this Decree enters into force.
20150615
26316
ADDENDA <Presidential Decree No. 26316, Jun. 15, 2015>
Article 1 (Enforcement date)
This Decree shall enter into force on July 29, 2015. (Proviso Omitted.)
Article 2 Omitted.
Article 3 Omitted.
20160621
27245
ADDENDA <Presidential Decree No. 27245, Jun. 21, 2016>
Article 1 (Enforcement date)
This Decree shall enter into force on June 23, 2016.
Article 2 Omitted.
Article 3 Omitted.
Article 4 Omitted.
20160630
27299
ADDENDA <Presidential Decree No. 27299, Jun. 30, 2016>
Article 1 (Enforcement date)
This Decree shall enter into force on July 1, 2016. (Proviso Omitted)
Articles 2 through 15 Omitted.
20160831
27472
ADDENDA <Presidential Decree No. 27472, Aug. 31, 2016>
Article 1 (Enforcement date)
This Decree shall enter into force on September 1, 2016.
Articles 2 through 5 Omitted.
Article 6 Omitted.
Article 7 Omitted.
20170110
27784
ADDENDUM <Presidential Decree No. 27784, Jan. 10, 2017>
This Decree shall enter into force on the date of its promulgation.
20170809
28241
ADDENDA <Presidential Decree No. 28241, Aug. 9, 2017>
Article 1 (Enforcement date)
This Decree shall enter into force on the date of its promulgation.
Article 2 (Applicability to reduction of, or exemption from, occupancy or use fees of pubic waters)
The amended provisions of Article 14 (1) 1 shall also apply where a person has obtained the permission for occupancy or use for business for the purpose of producing seeds for fisheries under the Fisheries Seed Industry Promotion Act before this Decree enters into force.
20170919
28333
ADDENDUM <Presidential Decree No. 28333, Sep. 19, 2017>
This Decree shall enter into force on September 22, 2017; provided, the amended provisions of Articles 11, 14, and 15 shall enter into force on the date of its promulgation.
20190618
29879
ADDENDUM <Presidential Decree No. 29879, Jun. 18, 2019>
This Decree shall enter into force on July 1, 2019.
20200303
30509
ADDENDUM <Presidential Decree No. 30509, Mar. 3, 2020>
This Decree shall enter into force on the date of its promulgation.
20200714
30852
ADDENDUM <Presidential Decree No. 30852, Jul. 14, 2020>
This Decree shall enter into force on July 30, 2020.
20200731
30886
ADDENDA <Presidential Decree No. 30886, Jul. 31, 2020>
Article 1 (Enforcement date)
This Decree shall enter into force on the date of its promulgation.
Article 2 Omitted.
Article 3 Omitted.
20200826
30977
ADDENDA <Presidential Decree No. 30977, Aug. 26, 2020>
Article 1 (Enforcement date)
This Decree shall enter into force on August 28, 2020.
Articles 2 through 5 Omitted.
20200908
30993
ADDENDUM <Presidential Decree No. 30993, Sep. 8, 2020>
This Decree shall enter into force on January 1, 2021.
20210105
31380
ADDENDUM <Presidential Decree No. 31380, Jan. 5, 2021>
This Decree shall enter into force on the date of its promulgation. (Proviso Omitted.)
20220121
32352
ADDENDA <Presidential Decree No. 32352, Jan. 21, 2022>
Article 1 (Enforcement date)
This Decree shall enter into force on January 21, 2022. (Proviso Omitted.)
Articles 2 through 4 Omitted.
Article 5 Omitted.
20220218
32455
ADDENDA <Presidential Decree No. 32455, Feb. 18, 2022>
Article 1 (Enforcement date)
This Decree shall enter into force on February 18, 2022.
Article 2 Omitted.
20220228
32514
ADDENDUM <Presidential Decree No. 32514, Feb. 28, 2022>
This Decree shall enter into force on March 1, 2022.
20220704
32761
ADDENDUM <Presidential Decree No. 32761, Jul. 4, 2022>
This Decree shall enter into force on July 5, 2022.
20230110
33225
ADDENDA <Presidential Decree No. 33225, Jan. 10, 2023>
Article 1 (Enforcement date)
This Decree shall enter into force on January 12, 2023.
Articles 2 through 9 Omitted.
Article 10 Omitted.
Article 11 Omitted.
20230307
33321
ADDENDUM <Presidential Decree No. 33321, Mar. 7, 2023>
This Decree shall enter into force on the date of its promulgation.
20230425
33434
ADDENDA <Presidential Decree No. 33434, Apr. 25, 2023>
Article 1 (Enforcement date)
This Decree shall enter into force on the date of its promulgation.
Article 2 (Applicability to administrative dispositions, penalty surcharges, or administrative fines)
The amended provisions of Articles 1 through 61 shall also apply where an administrative disposition is made or a penalty surcharge or an administrative fine is imposed for a violation committed before this Decree enters into force after this Decree enters into force.
20230613
33540
ADDENDUM <Presidential Decree No. 33540, Jun. 13, 2023>
This Decree shall enter into force on June 28, 2023.
20231212
33913
ADDENDUM <Presidential Decree No. 33913, Dec. 12, 2023>
This Decree shall enter into force on the date of its promulgation.
20240507
34488
ADDENDA <Presidential Decree No. 34488, May 7, 2024>
Article 1 (Enforcement date)
This Decree shall enter into force on May 17, 2024.
Articles 2 through 5 Omitted.
20240528
34533
ADDENDA <Presidential Decree No. 34533, May 28, 2024>
Article 1 (Enforcement date)
This Decree shall enter into force on the date of its promulgation. (Proviso Omitted.)
Article 2 Omitted.
Article 3 (Applicability to amendments to the Public Waters Management and Reclamation Act)
The amended provisions of Appendix 1 of the Enforcement Decree of the Public Waters Management and Reclamation Act shall begin to apply to occupancy or use fees that are adjusted and collected in accordance with Article 14 of the Public Waters Management and Reclamation Act after this Decree enters into force.
Articles 4 through 6 Omitted.
20241231
35167
ADDENDA <Presidential Decree No. 35167, Dec. 31, 2024>
Article 1 (Enforcement date)
This Decree shall enter into force on January 3, 2025.
Article 2 Omitted.
Article 3 Omitted.
Article 4 Omitted.
20251001
35811
ADDENDUM <Presidential Decree No. 35811, Oct. 1, 2025>
This Decree shall enter into force on the date of its promulgation; provided, where any Presidential Decree amended in accordance with this Decree was promulgated before this Act enters into force but its enforcement date has yet to arrive, the amended parts of such Presidential Decree shall enter into force on the date such relevant Presidential Decree enters into force.