ELECTRIC POWER SOURCE DEVELOPMENT PROMOTION ACT
25505 · 2011-10-26
ELECTRIC POWER SOURCE DEVELOPMENT PROMOTION ACT
Act No. 10911, Jul. 25, 2011
Act No. 7016, Dec. 30, 2003
Amended by Act No. 7678, Aug. 4, 2005
Act No. 7677, Aug. 4, 2005
Act No. 8338, Apr. 6, 2007
Act No. 8370, Apr. 11, 2007
Act No. 8355, Apr. 11, 2007
Act No. 8352, Apr. 11, 2007
Act No. 8733, Dec. 21, 2007
Act No. 8819, Dec. 27, 2007
Act No. 8820, Dec. 27, 2007
Act No. 8852, Feb. 29, 2008
Act No. 8974, Mar. 21, 2008
Act No. 8976, Mar. 21, 2008
Act No. 9016, Mar. 28, 2008
Act No. 9313, Dec. 31, 2008
Act No. 9376, Jan. 30, 2009
Act No. 10272, Apr. 15, 2010
Act No. 10331, May 31, 2010
Act No. 10599, Apr. 14, 2011
Act No. 10911, Jul. 25, 2011
법령보기 화면
Article 1 (Purpose)
The purpose of this Act is to secure the stability of electricity supply and demand and to contribute to the development of the national economy by effectively propelling the electric power resource development business.
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 2 (Definitions)
The terms used in this Act shall be defined as follows:
1.
The term "electric power resource facilities" means electric facilities for electricity generation, electricity transmission and electricity transformation and accessory facilities thereto;
2.
The term "electric power resource development business" means the business falling under any of the following:
(a)
Installing or improving the electric power resource facilities;
(b)
Acquiring the land, etc. for the electric power resource facilities that are being installed or have been installed, or securing the title for use;
3.
The term "execution plan for electric power resource development business" means the detailed plan for the execution of electric power resource development business in accordance with the basic plan on supply and demand of electricity of the Government;
4.
The term "land, etc." means the lands, buildings, or the goods fixed on the lands, and the rights other than ownerships therefor, mining rights, fishery rights, and the rights for use of water.
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 3 (Electric Power Resource Developer)
The electric power resource development business shall be conducted by the operator of electric generation business and the operator of electric transmission business licensed under
Article 7 of the Electric Utility Act
and the radioactive waste management agency under
Article 10 of the Radioactive Waste Management Act
(hereinafter referred to as "electric power resource developer").
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 4 (Propelling Committee for Electric Power Resource Development Business)
(1)
The Propelling Committee for Electric Power Resource Development Business (hereinafter referred to as the "Committee") shall be established in the Ministry of Knowledge Economy in order to deliberate upon important matters concerning electric power resource development business.
(2)
Matters necessary for the composition, functioning and management of the Committee shall be determined by Presidential Decree.
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 5 (Authorization of Execution Plan for Electric Power Resource Development Business)
(1)
The electric power resource developer shall establish an execution plan for electric power resource development business (hereinafter referred to as "execution plan"), and shall obtain approval from the Minister of Knowledge Economy therefor:
Provided
, That this shall not apply to electric power resource development business determined by Presidential Decree.
(2)
Where the electric power resource developer intends to alter the matters approved under paragraph (1), he/she shall obtain approval from the Minister of Knowledge Economy therefor:
Provided
, That he/she shall file a report where he/she intends to alter any insignificant matters defined by Presidential Decree.
(3)
The execution plan shall include the following:
1.
Summary of the electric power resource facilities;
2.
Location and area of electric power resource development business area;
3.
Execution period of the electric power resource development business;
4.
Matters concerning the funds needed for electric power resource development business and financing;
5.
Matters concerning installation of public facilities pursuant to
Article 13
and sharing the costs thereof;
6.
Matters concerning national natural environmental preservation;
7.
Other matters defined by Presidential Decree concerning electric power resource development business.
(4)
Where the Minister of Knowledge Economy is to grant approval tothe execution plan or the change thereof under paragraph (1) or (2), he/she shall listen to in advance the opinion of the Special Metropolitan City Mayor, a Metropolitan City Mayor, a
Do
Governor or the Governor of a Self-Governing Province having jurisdiction over the electric power resource development business area concerned, and shall have the matter deliberated in the Committee after consultation with the head of the relevant central administrative agencies:
Provided
, That approval or approval for change of the insignificant matters defined by Presidential Decree may not be deliberated in the Committee.
(5)
Where the Minister of Knowledge Economy has granted approval to the execution plan or the change of the execution plan under paragraph (1) or (2), he/she shall announce it publicly on the Official Gazette, as prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 5-2 (Listening to Opinions from Residents, etc.)
(1)
When the electric power resource developer intends to obtain the approval of the execution plan or approval for change as referred to in
Article 5
, he/she shall listen to, prior to filing an application for the approval or approval for change, the opinions from the residents who are affected by the execution of the business concerned and related specialists, etc. (hereinafter referred to as "residents, etc.") through perusal of the implementation plan and the presentation meeting:
Provided
, That the same shall not apply to the following cases where:
1.
The opinions of the residents, etc. have been already converged under other Acts and subordinate statutes;
2.
Confidentiality concerning national defense information shall be maintained;
3.
The project size of execution plan or the length of lines is altered within the extent of 30/100;
4.
Cases of businesses to acquire the land, etc. of the installed electric power resource facilities, or to secure the title of use.
(2)
When the electric power resource developer admits that the opinions of the residents, etc. that have been listened to under paragraph (1) are pertinent, the execution planshall reflect such opinions.
(3)
Matters necessary for the methods and procedures for listening to opinions from the residents, etc. as referred to in paragraph (1) shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 6 (Relationship with other Acts)
(1)
Where an electric power resource developer has obtained approval of the execution plan or approval for change pursuant to
Article 5
, he/she shall be regarded as having obtained the permit, authorization, license, decision, designation, approval, discharge, consultation, or disposition,etc. (hereinafter referred to as "authorization and permit, etc.") in subparagraphs below and, if the public notice is made under paragraph (5) of the same Article, authorization and permit, etc. in subparagraphs below shall be regarded as being publicly noticed:
<Amended by Act No. 10272, Apr. 15, 2010; Act No. 10331, May 31, 2010; Act No. 10911, Jul. 25, 2011>
1.
Determination of the urban management planning under
Article 30 of the National Land Planning and Utilization Act
, permit for the development activities under
Article 56 of the same Act
, designation of the executor of the urban planning facilities projects under
Article 86 of the same Act
, authorization of the execution plan under
Article 88 of the same Act
, and permit for the activities in the urban development zone under
Article 9 (5) of the Urban Development Act
;
2.
Permit for the execution of road construction work under
Article 34 of the Road Act
, and permit for the occupation and use of roads under
Article 38 of the same Act
;
3.
Permit for the establishment of private roads under
Article 4 of the Private Road Act
;
4.
Permit for the initiation of the rivers construction work under
Article 30 of the River Act
, permit for occupation and use of rivers under
Article 33 of the same Act
, and permit for use of river water under
Article 50 of the same Act
;
5.
Permit for occupancy and use of public waters under
Article 8 of the Public Waters Management and Reclamation Act
, approval for or report on an implementation plan for occupancy and use under
Article 17 of the same Act
, reclamation license of public waters under
Article 28 of the same Act
, consultation on or approval for reclamation executed by the State, etc. under
Article 35 of the same Act
, and approval for an implementation plan for reclamation of public waters under
Article 38 of the same Act
;
6.
Deleted;
<by Act No. 10272, Apr. 15, 2010>
7.
Authorization for the installation of exclusive waterworks and exclusive waterworks for industrial use under
Articles 52 and 54 of the Water Supply and Waterworks Installation Act
;
8.
Permit for activities in the park zone under
Article 23 of the Natural Parks Act
;
9.
Permit for diversion of the use of farmland under
Article 34 of the Farmland Act
;
10.
Permit for and report on the diversion of the use of mountainous districts and report on the temporary use of mountainous districts under
Articles 14, 15 and 15-2 of the Management of Mountainous Districts Act
, permit for soil gathering under
Article 25 of the same Act
, permit for and report on the cutting of standing timber, etc. under
Articles 36 (1) and (4) and 45 (1) and (2) of the Creation and Management of Forest Resources Act
, and permit for the rent or use of national forests under
Article 21 of the Management and Administration of State Forests Act
;
11.
Permit for deforestation, etc. under
Article 14 of the Work against Land Erosion or Collapse Act
, and cancellation of designation of erosion control area under
Article 20 of the same Act
;
12.
Consultations on permit, etc. of administrative agencies under
Article 13 of the Protection of Military Bases and Installations Act
;
13.
Permit for the form and quality alteration of the land, etc. under
Article 21-2 of the Grassland Act
, and permit of the diversion of grassland under
Article 23 of the same Act
;
14.
Permit for a plan for harbor construction works under
Article 9 (2) of the Harbor Act
, and approval of execution plan for harbor construction works under
Article 10 (2) of the same Act
;
15.
Permit for the reburial under
Article 27 (1) of the Funeral Services, etc. Act
;
16.
Non-permission measures pursuant to
Article 24 of the MiningIndustry Act
, and the measures of revocation of mining rights or measures for reduction of mining areas pursuant to
Article 34 of the same Act
;
17.
Early Site Permit under
Article 10 (3) of the Nuclear Safety Act
.
(2)
When an electric power resource developer intends to conduct activities under the subparagraphs of paragraph (1) in order to execute the electric power resource development business for which the execution plan or the change thereof has been approved under
Article 5
, he/she shall report such fact to the heads of relevant administrative agencies in advance.
(3)
When an electric power resource developer intends to construct a building under
Article 2 (1) 2 of the Building Act
in order to execute electric power resource development business for which the approval for the execution plan or approval for change has been obtained under
Article 5
, he/she shall submit basic design drawingpapers under
Article 11 (2) of the same Act
to the heads of the relevant administrative agencies , and, by doing so, shall be regarded as having obtained permist for building or having reported under
Article 11 or 14 of the same Act
.
(4)
When an electric power resource developer intends to construct a house under
Article 16 (1) of the Housing Act
in order to execute electric power resource development business for which the approval for the execution plan or approval for change has been obtained under
Article 5
, he/she shall submit the relevant documents under the same paragraph to the heads of the relevant administrative agencies, and, by doing so, shall be regarded as having obtained approval for housing construction business plan under the same paragraph.
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 6-2 (Expropriation of Land)
(1)
An electric power resource developer may expropriate or use the land, etc. necessary for the electric power resource development business.
(2)
The land purchased by an electric power resource developer through consultation in the electric development business area after the approval of execution plan, approval for change or report under
Article 5 shall be regarded as being taken by expropriation under the Acton the Acquisition of Land, etc. for Public Works and the Compensation Therefor in the application of the Income Tax Act
or the
Corporate Tax Act
.
(3)
Where public notice is made for the approval of execution plan or approval for change under
Article 5
in the application of paragraph (1), it shall be regarded as public notice being made for a project approval under
Article 20 (1) of the Act on Acquisition of and Compensation for Land, etc. for Public Works Projects
and for a project approval under
Article 22 of the same Act
.
(4)
The land tribunal in charge of the approval of adjudication and use of land, etc. in an electric power resource development business area appropriate for the standards defined by Presidential Decree shall be the Central Land Tribunal, and the application for adjudication may be made only in the period of executing electric power resource development business, notwithstanding the provisions of
Article 23 (1) of the Act on Acquisition of and Compensation for Land, etc. for Public Works Projects
and
Article 28 (1) of the same Act
.
(5)
Except as otherwise provided in this Act, the
Act on Acquisition of and Compensation for Land, etc. for Public Works Projects
shall apply
mutatis mutandis
to the expropriation or use of land, etc. under paragraph (1).
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 6-3 (Entrance to and Exit from Land, etc.)
(1)
Where deemed necessary for the execution of electric power resource development business, an electric power resource developer may conduct any of the following:
1.
Gaining access to another person's land;
2.
Using temporarily another person's land;
3.
Changing or removing the obstacles including trees, soil, stones, and others.
(2)
Articles 130 and 131 of the National Land Planning and Utilization Act
shall apply
mutatis mutandis
to the cases in paragraph (1). In this case, "executor of urban planning facilities projects" shall be construed as an "electric power resource developer."
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 7 (Consultation concerning Matters Authorized by Administrative Agencies Concerned)
Where the heads of the relevant administrative agencies intend to authorize the following matters in the electric power resource development area after approval for execution plan is obtained or to take other measures, they shall consult with the Minister of Knowledge Economy. The same shall apply where business is run directly by the State or local governments:
1.
Establishment of roads, railroads, bridge, waterway, waterworks, and channels, etc. and their attached facilities;
2.
Change in water flow of rivers, filling-up and dredging-up of rivers or sea surface, construction of ports or reconstruction, and establishment of fishery rights;
3.
Construction or remodelling of building, or reconstruction of building;
4.
Land reclamation, excavation of the ground and filling-up, and other changes in land qualification.
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 8 (Restriction on Disposal of State and Publicly Owned Land, etc.)
(1)
Land possessed by the State or local governments in the electric resource development business area shall not be sold or disposed of for other purpose except for electric power resource development business.
(2)
Land under paragraph (1) may be sold to the electric power resource developer by a free contract, notwithstanding the provisions of the
State Properties Act
and the
Public Property and Commodity Management Act
.
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 9 (Entrustment of Purchasing Land, etc.)
An electric power resource developer may entrust the purchasing of land, etc. to be used for electric power resource development business and loss compensation to the head of the competent local government, as prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 10 (Migration Measures)
(1)
An electric power resource developer shall establish and carry out migration measuresfor those who are losing their basis of life (hereinafter referred to as "migrants") due to provision of land, etc. necessary for the execution of electric power resource development business, as prescribed by Presidential Decree.
(2)
Where an electric power resource developer intends to establish migration measures under paragraph (1), he/she shall consult in advance with the head of the competent local government.
(3)
The State or local governments shall give top priority in supporting the National Housing Fund under the
Housing Act
to the construction of housing area and building houses in accordance with the execution of migration measures.
(4)
An electric power resource developer may entrust the purchasing of land, etc. for the migrants and establishment and execution of migration measures to the head of the competent local government-, as prescribed by Presidential Decree.
(5)
An electric power resource developer may provide support necessary for migration and settlement or life stability as prescribed by Ministerial Decree of Knowledge Economy for those, from among the migrants, who do not wish to move to the migrant settlement area (including the migrants for whom no settlement area is established), considering their loss of hometown and life basis caused by the electric power resource development business.
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 11 (Public Announcement of Designation of Prearranged Area for Electric Power Resource Development Business)
(1)
The Minister of Knowledge Economy may designate the prearranged area for electric power resource development business on receipt of the application from the electric power resource developer where it is deemed necessary for the execution of electric power resource development business.
(2)
Where the Minister of Knowledge Economy designates the prearranged area for electric power resource development business under paragraph (1), he/she shall announce it publicly as prescribed by Presidential Decree.
(3)
Where the Minister of Knowledge Economy intends to designate the prearranged area for electric power resource development business under paragraph (1), he/she shall consult in advance with the head of the relevant central administrative agencies, and shall undergo deliberation by the Committee.
(4)
Article 7
shall apply
mutatis mutandis
to the prearranged area for electric power resource development business under paragraph (1).
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 12 (Purchase Request for Land, etc.)
(1)
Where public announcement for designation of prearranged area for electric power resource development business is made under
Article 11
, the land owners of the same area may request the purchase of land, etc. to the electric power resource developer, even before the approval of the execution plan.
(2)
Where electric power resource developer is requested for the purchase of land, etc. under paragraph (1), he/she shall purchase them without delay.
(3)
Article 6-2
(2) shall apply
mutatis mutandis
to the land being transferred to the electric power resource developer from the land owner of the prearranged area for electric power resource development business under paragraph (1).
(4)
Those who are obliged to move out owing to hand-over of land, etc. to electric power resource developer under paragraph (1) shall be construed as migrants under
Article 10
.
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 13 (Preferential Construction of Public Facilities)
Where the execution plan is approved, the head of the relevant administrative agency in charge of roads, bridges, ports, waterworks and other facilities prescribed by Presidential Decree (hereinafter referred to as "public facilities") shall give preference to the construction of the public facilities concerned so that the electric power resource development business may be carried out smoothly:
Provided
, That the head of the relevant administrative agency may entrust the construction work of the public facilities to the electric power resource developer where deemed necessary upon receipt of the application from the electric power resource developer.
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 14 (Vesting of Public Facilities, etc.)
(1)
The public facilities newly constructed in the process of carrying out the electric power resource development business by the electric power resource developer shall be vested in the State or local government, which will manage the facilities, at no cost, and, in cases where the use of public facilities discontinues due to the replacement of existing public facilities by new public facilities, the properties of the State or local government shall be vested in the electric power resource developer at no cost:
Provided
, That in cases where the value of the properties that shall be vested in the electric power resource developer exceeds the construction cost of the public facilities that the electric power resource developer newly installs, the State or local government shall transfer the excessive portion to the electric power resource developer for value.
(2)
The electric power resource developer shall notify the kinds and a detailed list of the properties that shall be vested in the electric power resource developer and the public facilities that shall be vested in the State or local government under paragraph (1) to the office of administration on completion of the construction work.
(3)
When the electric power resource developer notifies the kinds and a detailed list for public facilities and properties to the office of administration under paragraph (2), the public facilities concerned shall be vested in the State or local government, while the properties concerned shall be vested in the electric power resource developer.
(4)
In cases of registration of properties and public facilities under paragraph (1), document certifying the grounds for registration under the
Registration of Real Estate Act
may be substituted by the authorization letter for execution plan, authorization letter for change and notification letter under paragraph (2).
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 15 (Subsidization of Funds)
Government may partially subsidize the expenses incurred by the electric power resource developer, if necessary for the smooth execution of the electric power resource development business.
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 16 (Service by Publication of Documents)
In cases the electric power resource development business is unable to send documents to the persons interested in the execution of the electric power resource development business due to the unknown address or location of the interested persons, or other reasons, the procedure may be substituted by the service by publication of documents as prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9376, Jan. 30, 2009]
법령보기 화면
Article 17 Deleted. <by Act No. 9376, Jan. 30, 2009>
ADDENDUM
This Act shall enter into force on January 1, 1979.
ADDENDA <Act No. 3243, Jan. 4, 1980>
(1)
(Enforcement Date) This Act shall enter into force on June 1, 1980.
(2)
through (6) Omitted.
ADDENDA <Act No. 3304, Dec. 31, 1980>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 11 Omitted.
ADDENDA <Act No. 3642, Dec. 31, 1982>
Article 1 (Enforcement Date)
This Act shall enter into force on February 1, 1983.
Articles 2 through 7 Omitted.
ADDENDA <Act No. 4206, Jan. 13, 1990>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA <Act No. 4214, Jan. 13, 1990>
Article 1 (Enforcement Date)
This Act shall enter into force three months after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA <Act No. 4429, Dec. 14, 1991>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA <Act No. 4541, Mar. 6, 1993>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 5 Omitted.
ADDENDA <Act No. 5215, Dec. 30, 1996>
(1)
(Enforcement Date) This Act shall enter into force three months after the date of its promulgation.
(2)
(Transitional Measures concerning Authorization of Execution Plan, etc.) The previous provisions shall be applied to the execution plans submitted for application for authorization or authorization for change under the previous provisions at the time this Act enters into force.
(3)
(Applicability to Migration Measures, etc.) The amended provisions of
Article 10
(5) shall be applied to the electric power resource development busi-
ness being carried out after obtaining authorization thereof under the pre- vious provisions at the time when this Act enters into force.
ADDENDA <Act No. 5893, Feb. 8, 1999>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA <Act No. 5911, Feb. 8, 1999>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 8 Omitted.
ADDENDA <Act No. 5914, Feb. 8, 1999>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promul- gation.
Articles 2 through 5 Omitted.
ADDENDA <Act No. 6283, Dec. 23, 2000>
Article 1 (Enforcement Date)
This Act shall enter into force two months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 14 Omitted.
ADDENDA <Act No. 6656, Feb. 4, 2002>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 2003.
Articles 2 through 12 Omitted.
ADDENDA<Act No. 6841, Dec. 30, 2002>
Article 1 (Enforcement Date)
This Act shall enter into force nine months after the date of its promulgation.
Articles 2 through 12 Omitted.
ADDENDA<Act No. 6916, May 29, 2003>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 13 Omitted.
ADDENDA <Act No. 7016, Dec. 30, 2003>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation:
Provided
, That the amended provisions of
Article 5-2
shall enter into force one year after the date of its promulgation, and the amended provisions of
Article 6
(1) shall enter into force on the date of its promulgation.
Article 2 (Transitional Measures concerning Approval, etc. of Execution Plans)
(1)
The previous provisions shall govern the execution plans for which an application for approval or modified approval has been filed as referred to in the previous provisions at the time of the enforcement of this Act, but the amended provisions of
Article 6
shall be applicable thereto.
(2)
The execution plans subjected to an approval or modified approval as referred to in the previous provisions at the time of the enforcement of this Act shall be deemed to have been subjected to an approval or modified approval as referred to in this Act.
Article 3 Omitted.
Article 4 (Relation with Other Acts)
Where other Acts and subordinate statutes cite the Act on Special Cases concerning Electric Power Resource Development and provisions thereof at the time of enforcement of this Act, the said Acts and subordinate statutes shall be construed to have cited this Act and corresponding provisions thereof.
ADDENDA<Act No. 7677, Aug. 4, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 8 Omitted.
ADDENDA<Act No. 7678, Aug. 4, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 12 Omitted.
ADDENDA<Act No. 8338, Apr. 6, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 17 Omitted.
ADDENDA<Act No. 8352, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 16 Omitted.
ADDENDA<Act No. 8355, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA<Act No. 8370, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 20 Omitted.
ADDENDA<Act No. 8733, Dec. 21, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force nine months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 11 Omitted.
ADDENDA<Act No. 8819, Dec. 27, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 9 Omitted.
ADDENDA<Act No. 8820, Dec. 27, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 9 Omitted.
ADDENDA<Act No. 8852, Feb. 29, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 7 Omitted.
ADDENDA<Act No. 8974, Mar. 21, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 14 Omitted.
ADDENDA<Act No. 8976, Mar. 21, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 10 Omitted.
ADDENDA<Act No. 9016, Mar. 28, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 2009. (Proviso Omitted.)
Articles 2 through 8 Omitted.
ADDENDA<Act No. 9313, Dec. 31, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation.
Articles 2 and 3 Omitted.
ADDENDA<Act No. 9376, Jan. 30, 2009>
(1)
(Enforcement Date) This Act shall enter into force six months after the date of its promulgation.
(2)
(Applicability concerning Listening to Opinions of Residents, etc.) The amended provisions of
Article 5-2
(1) shall apply beginning with the first electric power resource developer who files an application for the execution plan for electric power resource development business after this Act enters into force.
ADDENDA<Act No. 10272, Apr. 15, 2010>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 14 Omitted.
ADDENDA<Act No. 10331, May 31, 2010>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 13 Omitted.
ADDENDA<Act No. 10911, Jul. 25, 2011>
Article 1 (Enforcement Date)
This Act shall enter into force three months after the date of its promulgation.
Articles 2 through 5 Omitted.