ACT ON SPECIAL CASES CONCERNING ELECTRIC SOURCE DEVELOPMENT
6042 · 2003-11-30
ACT ON SPECIAL CASES CONCERNING ELECTRIC SOURCE DEVELOPMENT
Act No. 6916, May 29, 2003
Act No. 3131, Dec. 5, 1978
Amended by Act No. 3243, Jan. 4, 1980
Act No. 3304, Dec. 31, 1980
Act No. 3642, Dec. 31, 1982
Act No. 4214, Jan. 13, 1990
Act No. 4206, Jan. 13, 1990
Act No. 4429, Dec. 14, 1991
Act No. 4541, Mar. 6, 1993
Act No. 5215, Dec. 30, 1996
Act No. 5914, Feb. 8, 1999
Act No. 5911, Feb. 8, 1999
Act No. 5893, Feb. 8, 1999
Act No. 6283, Dec. 23, 2000
Act No. 6656, Feb. 4, 2002
Act No. 6841, Dec. 30, 2002
Act No. 6916, May 29, 2003
법령보기 화면
Article 1 (Purpose)
The purpose of this Act is to secure the stability of electricity supply and to contribute to the development of the national economy by effectively propelling the electric source development program.
법령보기 화면
Article 2 (Definitions)
For the purpose of this Act, the definitions of terms shall be as follows:
<Amended by Act No. 4214, Jan. 13, 1990; Act No. 6283, Dec. 23, 2000>
1.
The term “electric source facilities” means electric facilities for electricity generation, transformation and transmission of electricity and accessory facilities thereto;
2.
The term “electric source development business” means the business of installing or improving electric source facilities; and
3.
The term an “execution plan for electric source development business” means the detailed plan for the execution of electric source development business in accordance with the basic plan on supply and demand of electricity of the Government.
법령보기 화면
Article 3 (Electric Source Developer)
The electric source development business shall be conducted by the operator of the electric generation business and the operator of the electric transmission business (hereinafter referred to as “electric source developer”) licensed under the provisions of
Article 7 of the Electric Utility Act
.
<Amended by Act No. 6283, Dec. 23, 2000>
[This Article Wholly Amended by Act No. 5215, Dec. 30, 1996]
법령보기 화면
Article 4 (Propelling Committee for Electric Source Development Business)
(1)
The Propelling Committee for Electric Source Development Business (hereinafter referred to as the “Committee”) shall be established in the Ministry of Trade, Industry and Energy in order to deliberate important matters concerning electric source development business.
<Amended by Act No. 4541, Mar. 6, 1993; Act No. 5215, Dec. 30, 1996>
(2)
Matters necessary for the organization, functioning and management of the Committee shall be determined by the Presidential Decree.
법령보기 화면
Article 5 (Authorization of Execution Plan for Electric Source Development Business)
(1)
The electric source developer shall prepare an execution plan for electric source development business, and shall obtain authorization from the Minister of Trade, Industry and Energy; provided, this shall not apply in case of electric source development business determined by the Presidential Decree.
<Amended by Act No. 4541, Mar. 6, 1993: Act No. 5215, Dec. 30, 1996>
(2)
In case where the electric source developer desires to change the matters authorized under the provisions of paragraph (1), it shall obtain authorization from the Minister of Trade, Industry and Energy; provided, it shall report in case of changing minor matters defined by the Presidential Decree.
<Amended by Act No. 4541, Mar. 6, 1993: Act No. 5215, Dec. 30, 1996>
(3)
The execution plan under the provisions of paragraph (1) shall include matters in the following subparagraphs:
1.
Summary of the electric source facilities;
2.
Location and square measure of electric source development business area;
3.
Execution period of the electric source development business;
4.
Matters concerning the cost amount needed and funding;
5.
Matters concerning installation of public facilities pursuant to the provisions in
Article 13
and sharing the costs thereof;
6.
Matters concerning national natural environmental preservation; and
7.
Other matters defined by the Presidential Decree concerning electric resource development business.
(4)
In case where the Minister of Trade, Industry and Energy is to authorize the execution plan or the change thereof under the provisions of paragraph (1) or (2), it shall hear in advance the opinion of the Special Metropolitan City Mayor, Metropolitan City Mayor, or Do governor having jurisdiction over the electric source development business area concerned, and shall have the matter deliberated in the Committee after consultation with the head of the central administrative organs concerned; provided, authorization or authorization of the change of the trifling matters defined by the Presidential Decree may not be deliberated in the Committee.
<Added by Act No. 5215, Dec. 30, 1996>
(5)
In case where the Minister of Trade, Industry and Energy has authorized the execution plan or has authorized the change of the execution plan under the provisions of paragraph (1) or (2), he shall announce it publicly as prescribed by the Presidential Decree.
<Amended by Act No. 4541, Mar. 6, 1993: Act No. 5215, Dec. 30, 1996>
법령보기 화면
Article 6 (Relations with Other Acts)
(1)
In case where electric resource developer has obtained authorization of the execution plan or authorization for change pursuant to
Article 5
, it shall be regarded as having obtained the permission, authorization, license, decision, designation, approval, discharge, consultation, or disposition, etc. (hereinafter referred to as “authorization and permission, etc.”) in subparagraphs below and, therefore, if the public notice is being made under the provisions of paragraph (5) of the same Article, authorization and permission in subparagraphs below shall be regarded as being publicly noticed:
<Amended by Act Nos. 5893, 5911 & 5914, Feb. 8, 1999; Act No. 6841, Dec. 30, 2002>
1.
Permission for the change of land form and quality, etc. under the provisions of
Article 4 of the Urban Planning Act
, determination of urban planning under the provisions of
Article 12 of the same Act
, the designation of the executor of the urban planning program under the provisions of
Article 23 of the same Act
, and authorization of the execution plan under the provisions of
Article 25 of the same Act
;
2.
Permission for the initiation of the road construction work under the provisions of
Article 34 of the Road Act
, permission of occupation and use of road under the provisions of
Article 40 of the same Act
, and permission of activities under the provisions of
Articles 50 (5) and 51 (3) of the same Act
;
3.
Permission for the establishment of private roads under the provisions of
Article 4 of the Private Road Act
;
4.
Permission for the initiation of the rivers construction work under the provisions of
Article 30 of the River Act
, and permission of occupation and use of rivers under the provisions of
Article 33 of the same Act
;
5.
Permission for occupation and use of the public waters under the provisions of
Article 5 of the Public Waters Management Act
and authorization or report of execution plan under the provisions of
Article 8 of the same Act
;
6.
Licensing the reclamation of public waters under the provisions of
Article 9 of the Public Waters Reclamation Act
, authorization of execution plan under the provisions of
Article 15 of the same Act
, and consultation or approval under the provisions of
Article 38 of the same Act
;
7.
Authorization for the installation of exclusive waterworks and exclusive waterworks for manufacturing use under the provisions of
Articles 36 and 38 of the Water Supply and Waterworks Installation Act
;
8.
Permission for occupation and use of parks and park protection area under the provisions of
Articles 23 and 25 of the Natural Parks Act
;
9.
Approval or consultation of establishment of public facilities under the provisions of
Article 20 of the Act on the Utilization and Management of the National Territory
;
10.
Permission for diversion of the use of farmland under the provisions of
Article 36 of the Farmland Act
;
11.
Permission for and report on the diversion of the use of mountainous districts under the provisions of Articles 14 and 15 of the Management of Mountainous Districts Act, permission for the cutting of standing timber, etc. under the provisions of
Articles 62 (1) and 90 (1) of the Forestry Act
, and permission for the rent or use of national forests under the provisions of
Article 75 of the same Act
;
12.
Permission for deforestation, etc. under the provisions of Article 14 of the Work against Land Erosion or Collapse Act, and discharge of designation of erosion control area under the provisions of Article 20 of the same Act;
13.
Deleted;
<by Act No. 6283, Dec. 23, 2000>
14.
Consultations, etc. on approval matters of government office under the provisions of
Article 10 of the Protection of Military Installations Act
,
Article 6 of the Naval Bases Act
, and Article 16 of the
Military Air Bases Act
;
15.
Permission for land classifications change, etc. under provisions of Article 8 of the Grassland Act, and permission of diversion of grassland under provisions of Article 23 of the same Act;
16.
Permission for a plan for ports construction work under provisions of
Article 9 (2) of the Harbor Act
, and approval of execution plan for ports construction work under provisions of
Article 10 (2) of the same Act
;
17.
Permission for burial under provisions of
Article 16 (2) of the Burial and Graveyard, etc. Act
;
18.
Non-permission measures under provisions of
Article 29 of the Mining Industry Act
and the measures of revocation of mining rights or measures for reduction of mining areas under provisions of
Article 39 of the same Act
; and
19.
Prior approval of lands under provisions of
Article 11 (3) of the Atomic Energy Act
.
(2)
In case where electric resource developer intends to conduct activities under provisions of subparagraphs of paragraph (1) in order to execute the electric resource development business of which the execution plan or change permission has been authorized under provisions of
Article 5
, it shall report such to the head of administrative agencies concerned in advance.
(3)
In case where electric resource developer desires to construct a building under provisions of subparagraph 2 of
Article 2 of the Building Act
in order to execute electric resource development business of which the authorization for the execution plan or authorization for change has been obtained under provisions of
Article 5
, it shall submit basic design drawing papers under provisions of
Article 8 (2) of the same Act
to the head of the administration agencies concerned, and this shall be regarded as having obtained an authorization for building or having been reported under provisions of
Article 8
or
9
of the same Act.
[This Article Wholly Amended by Act No. 5215, Dec. 30, 1996]
법령보기 화면
Article 6-2 (Expropriation of Land)
(1)
Electric resource developer can expropriate or use the land, building, or fixtures of the land and rights other than the ownership thereof, mining right, fishery right and the right of using the water (hereinafter referred to as “land, etc.”) necessary for the execution of electric resource development business.
(2)
The land purchased by an electric resource developer through consultation in the electric development business area after the authorization of execution plan, authorization of change or report under provisions of
Article 5
shall be regarded as being taken by expropriation under the Act on the Acquisition of Land, etc. for Public Works and the Compensation Therefor in the application of the
Income Tax Act
or the
Corporate Tax Act
.
<Amended by Act No. 6656, Feb. 4, 2002>
(3)
In case where public notice is made for the authorization of execution plan or authorization of change under provisions of
Article 5
in the application of paragraph (1), it shall be regarded as public notice being made for a project approval under provisions of
Article 20
(1) of the
Act on the Acquisition of Land, etc. for Public Works and the Compensation Therefor
and for a project approval under provisions of
Article 22
of the same Act.
<Amended by Act No. 6656, Feb. 4, 2002>
(4)
The land tribunal in charge of the approval of adjudication and use of land, etc. in an electric resource development business area appropriate for the standards defined by the Presidential Decree shall be the Central Land Tribunal, and the application for adjudication may be made only in the period of executing electric resource development business notwithstanding the provisions of
Article 23
(1) of the
Act on the Acquisition of Land, etc. for Public Works and the Compensation Therefor
and
Article 28
(1) of the same Act.
<Amended by Act No. 6656, Feb. 4, 2002>
(5)
Except as otherwise provided for in this Act, the
Act on the Acquisition of Land, etc. for Public Works and the Compensation Therefor
shall apply mutatis mutandis to the expropriation or use of land, etc. under provisions of paragraph (1).
<Amended by Act No. 6656, Feb. 4, 2002>
[This Article Added by Act No. 5215, Dec. 30, 1996]
법령보기 화면
Article 6-3 (Entrance to and Exit from Land, etc.)
(1)
Where deemed necessary for the execution of electric resource development business, an electric resource developer may enter other person’s land, use it temporarily, or change or remove such obstacles as bamboos, trees, soil, earths and stones.
(2)
The provisions of
Articles 5
and
6
of the Urban Planning Act shall apply mutatis mutandis to the cases in paragraph (1). In this case, “executioner of urban planning business” shall be regarded as an “electric resource developer.”
[This Article Added by Act No. 5215, Dec. 30, 1996]
법령보기 화면
Article 7 (Consultation concerning Authorization Matters of Administrative Agencies Concerned)
In case where the heads of the administrative agencies concerned intend to authorize matters falling under the following subparagraphs that happen in the electric resource development area after authorization for execution plan being made under the provisions of
Article 5
or to take other measures, it shall consult with the Minister of Trade, Industry and Energy. The same shall apply to the cases that business is run directly by the State or local governments:
<Amended by Act No. 4541, Mar. 6, 1993; Act No. 5215, Dec. 30, 1996>
1.
Establishment of roads, railroads, bridge, waterway, waterworks, and channels, etc. and their attached facilities;
2.
Change in water flow of rivers, filling-up and dredging-up of rivers or sea surface, construction of ports or reconstruction, and establishment of fishery rights;
3.
Construction or remodelling of building, or reconstruction of building; and
4.
Land reclamation, excavation of the ground and filling-up, and other changes in land qualification.
법령보기 화면
Article 8 (Restriction on Disposal of State and Publicly Owned Land)
(1)
Land possessed by the State or local governments in the electric resource development business area shall not be sold or disposed of for other purpose except for electric resource development business.
(2)
Land under the provisions of paragraph (1) can be sold to the electric resource developer by a free contract, notwithstanding the provisions of the
State Properties Act
and the
Local Finance Act
.
법령보기 화면
Article 9 (Entrust of Purchasing Land, etc.)
Electric resource developer may entrust the purchasing business and compensation business for loss for land, etc. to be used for electric resource development business to the head of the local government concerned as prescribed by the Presidential Decree.
법령보기 화면
Article 10 (Migration Measures)
(1)
The electric resource developer shall establish migration measures and carry out them for those who are losing their basis of life (hereinafter referred to as “migrants”) as providing land, etc. necessary for the execution of electric resource development business as prescribed by the Presidential Decree.
(2)
In case where electric resource developer desires to establish migration measures under the provisions of paragraph (1), it shall consult with the head of local government concerned in advance.
(3)
The state and local governments shall give top priority in supporting the National Housing Fund under the
Housing Act
to the construction of housing area and building houses in accordance with the execution of migration measures.
<Amended by Act No. 6916, May 29, 2003>
(4)
Electric resource developer can entrust the purchasing business for land, etc. for the migrants and establishment of migration measures to the head of local government concerned as prescribed by the Presidential Decree.
(5)
Electric resource developer may provide support necessary for migration and settlement or life stability as prescribed by the Ministerial Decree of Trade, Industry and Energy for those who do not wish to move to the migrant settlement area (including migrants in case of not establishing settlement area) out of the migrants considering their loss of hometown and life basis caused by the electric resource development business.
<Added by Act No. 5215. Dec. 30, 1996>
법령보기 화면
Article 11 (Public Announcement of Designation of Prearranged Area for Electric Resource Development Business)
(1)
The Minister of Trade, Industry and Energy may designate the prearranged area for electric resource development business on receipt of the application from the electric resource development businessman in case where it is deemed necessary for the execution of electric resource development business.
<Amended by Act No. 4541, Mar. 6, 1993; Act No. 5215, Dec. 30, 1996>
(2)
In case where the Minister of Trade, Industry and Energy designates the prearranged area for electric resource development business under the provisions of paragraph (1), it shall announce it publicly as prescribed by the Presidential Decree.
<Amended by Act No. 4541, Mar. 6, 1993; Act No. 5215, Dec. 30, 1996>
(3)
In case where Minister of Trade, Industry and Energy intends to designate the prearranged area for electric resource development business under the provisions of paragraph (1), it shall consult with the head of the central administrative agencies concerned in advance, and shall take the process of deliberation by the Committee under the provisions of
Article 4
.
<Amended by Act No. 4541, Mar. 6, 1993; Act No. 5215, Dec. 30, 1996>
(4)
The provisions of
Article 7
shall be applied mutatis mutandis to the prearranged area for electric resource development business under the provisions of paragraph (1).
법령보기 화면
Article 12 (Purchase Request for Land, etc.)
(1)
In case where public announcement for designation of prearranged area for electric resource development business is made under provisions of
Article 11
, the land owners in the same area can request the purchase of land, etc. to the electric resource developer, even before the authorization of the execution plan under provisions of
Article 5
.
(2)
In case where electric resource developer is requested for the purchase of land, etc. under provisions of paragraph (1), it shall purchase them without delay.
(3)
The provisions of
Article 6-2
(2) shall be applied mutatis mutandis to the land being transferred to the electric resource developer from the land owner in the prearranged area for electric resource development business under provisions of paragraph (1).
<Amended by Act No. 5215, Dec. 30, 1996>
(4)
Those who are obliged to move out owing to hand-over of land, etc. to electric resource developer under provisions of paragraph (1) shall be regarded as migrants under provisions of
Article 10
.
법령보기 화면
Article 13 (Prior Construction in Public Facilities)
In case where the execution plan is authorized under provisions of
Article 5
, the head of the administrative agency concerned in charge of roads, bridges, ports, waterworks and other facilities defined by the Presidential Decree (hereinafter referred to as “public facilities”) shall give preference to the construction of the public facilities concerned so as the electric resource development business to be carried out smoothly; provided, the head of the administrative agencies concerned can entrust the construction work of the public facilities to the electric resource developer in case it is deemed necessary after receiving the application from the electric resource developer.
<Amended by Act No. 5215, Dec. 30, 1996>
법령보기 화면
Article 14 (Belongingness of Public Facilities, etc.)
(1)
The public facilities newly constructed in the process of carrying out the electric resource development business by the electric resource developer shall belong to the State or local government concerned that will manage the facilities free of charge, and the properties of the State or local government concerned of which the use of the public facilities is out owing to the replacement of the existing public facilities by the new public facilities shall belong to the electric resource developer free of charge; provided, in case the estimated amount of the properties that shall belong to the electric resource developer exceeds over the construction cost of the public facilities that the electric resource developer concerned shall newly install, the State or local government concerned shall hand over the excessive portion to the electric resource developer for counter value.
(2)
The electric resource development businessman shall notify the kinds and a detailed list of the properties that shall belong to the electric resource developer and the list of the public facilities that shall belong to the State or local government under provisions of paragraph (1) to the administrative agency on completion of the construction work.
(3)
In case where the electric resource developer notifies the kinds and a detailed list for public facilities and properties to the administrative agency under provisions of paragraph (2), the public facilities concerned shall belong to the State or local government, while the properties concerned shall belong to the electric resource developer.
(4)
In case of registration of properties and public facilities under provisions of paragraph (1), document certifying the source of registration under the
Registration of Real Estate Act
can be substituted by the authorization letter for execution plan, authorization letter for change and notification letter under provisions of paragraph (2).
[This Article Added by Act No. 5215, Dec. 30, 1996]
법령보기 화면
Article 15 (Fund Support)
Government may support part of the needed fund to the electric resource developer, if necessary for the smooth execution of the electric resource development business.
법령보기 화면
Article 16 (Service by Publication of Documents)
In case the electric resource development business is unable to send documents to the persons interested in the execution of the electric resource development business due to the unidentification of address or location of the interested persons, or other reasons, the procedure can be substituted by the service by publication of documents as prescribed by the Presidential Decree.
법령보기 화면
Article 17 (Enforcement Decree)
Matters necessary for the enforcement of this Act shall be determined by the Presidential Decree.
ADDENDUM
This Act shall enter into force on January 1, 1979.
ADDENDA<Act No. 3243, Jan. 4, 1980>
(1)
(Enforcement Date) This Act shall enter into force on June 1, 1980.
(2)
through (6) Omitted.
ADDENDA<Act No. 3304, Dec. 31, 1980>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation; provided, the provisions of
Article 3
of the Addenda shall enter into force on the date the establishment registration of the Corporation is completed.
Articles 2 through 11 Omitted.
ADDENDA<Act No. 3642, Dec. 31, 1982>
Article 1 (Enforcement Date)
This Act shall enter into force on February 1, 1983.
Articles 2 through 7 Omitted.
ADDENDA<Act No. 4206, Jan. 13, 1990>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA<Act No. 4214, Jan. 13, 1990>
Article 1 (Enforcement Date)
This Act shall enter into force three months after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA<Act No. 4429, Dec. 14, 1991>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA<Act No. 4541, Mar. 6, 1993>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 5 Omitted.
ADDENDA<Act No. 5215, Dec. 30, 1996>
(1)
(Enforcement Date) This act shall enter into force three months after the date of its promulgation.
(2)
(Transitional Measures concerning Authorization of Execution Plan, etc.) The previous provisions shall be applied to the execution plans submitted for application for authorization or authorization for change under the previous provisions before the enforcement of this Act.
(3)
(Applications on Migration Measures, etc.) The amended provisions of
Article 10
(5) shall be applied to the electric resource development business being carried out after obtaining authorization thereof under the previous provisions at the time when this Act enters into force.
ADDENDA<Act No. 5893, Feb. 8, 1999>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA<Act No. 5911, Feb. 8, 1999>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 8 Omitted.
ADDENDA<Act No. 5914, Feb. 8, 1999>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 5 Omitted.
ADDENDA<Act No. 6283, Dec. 23, 2000>
Article 1 (Enforcement Date)
This Act shall enter into force two months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 14 Omitted.
ADDENDA<Act No. 6656, Feb. 4, 2002>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 2003.
Articles 2 through 12 Omitted.
ADDENDA<Act No. 6841, Dec. 30, 2002>
Article 1 (Enforcement Date)
This Act shall enter into force nine months after the date of its promulgation.
Articles 2 through 12 Omitted.
ADDENDA<Act No. 6916, May 29, 2003>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 13 Omitted.
Last updated : 2009-07-26