ENFORCEMENT DECREE OF THE ACT ON WATER MANAGEMENT AND RESIDENT SUPPORT, ETC. IN THE YEONGSAN AND SEOMJIN RIVER BASINS

288345 · 2026-07-28

ENFORCEMENT DECREE OF THE ACT ON WATER MANAGEMENT AND RESIDENT SUPPORT, ETC. IN THE YEONGSAN AND SEOMJIN RIVER BASINS Article 1 (Purpose) The purpose of this Decree is to prescribe matters delegated by the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins and matters necessary for its enforcement. Article 2 (Types of Basic Environmental Facilities) “Facilities prescribed by Presidential Decree” in Article 2, subparagraph 4 (f) of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins (hereinafter referred to as the “Act”) means the following facilities installed and operated by the State or local governments: <Amended on January 28, 2014; July 12, 2016; January 16, 2018> 1. Non-point pollution reduction facilities under subparagraph 13 of Article 2 of the Water Environment Conservation Act; 1-2. Buffer storage facilities under Article 21-4 (1) of the Water Environment Conservation Act; 2. Artificial islands for growing aquatic plants, underwater air supply devices, algae removal equipment, algae reduction devices, and other facilities for preventing water pollution in rivers, lakes, and marshes. Article 3 (Scope of Natural Villages) “Areas meeting the criteria prescribed by Presidential Decree” in the proviso to the part, other than the subparagraphs, of Article 4 (1) of the Act means areas in which a natural village comprising at least 10 households has formed. Article 4 (Residents' Consent to Designation of Riparian Zones, etc.) (1) Where the Minister of Climate, Energy and Environment intends to designate a tributary area under the proviso to the part, other than the subparagraphs, of Article 4 (1) of the Act or an area in which a natural village under Article 3 has formed as a riparian zone under Article 4 (1) of the Act (hereinafter referred to as a “riparian zone”), the Minister shall have the head of the Si/Gun having jurisdiction over the relevant area obtain residents' consent in compliance with all of the following requirements: <Amended on October 1, 2025> 1. Consent shall be obtained from at least two thirds of the total number of owners of land and buildings in the relevant area; 2. Consent shall be obtained from the owners of land comprising at least two thirds of the land area in the relevant area. (2) The boundaries of rivers and tributaries under Article 4 (1) of the Act shall be the boundaries of river areas under subparagraph 2 of Article 2 of the River Act, as determined through on-site surveys and other investigations of the relevant boundaries according to the following classifications: 1. Rivers and tributaries for which management registers of river facilities under Article 15 of the River Act (hereinafter referred to as “management registers”) are prepared and maintained: The boundaries of river areas recorded in the management registers; 2. Rivers and tributaries for which management registers are not prepared or maintained: (a) Rivers and tributaries with embankments: The boundaries of those embankments; (b) Rivers and tributaries without embankments: The boundaries of river areas on topographic maps produced by the National Geographic Information Institute. Article 5 (Areas Excluded from Riparian Zones) “Areas prescribed by Presidential Decree” in Article 4 (2) 6 of the Act means natural settlement districts under Article 31 (2) 7 (a) of the Enforcement Decree of the National Land Planning and Utilization Act. <Amended on July 28, 2026> Article 5-2 (Revocation of Designation of Riparian Zones) (1) Where the Minister of Climate, Energy and Environment intends to revoke the designation of a riparian zone pursuant to the main clause of the part, other than the subparagraphs, of Article 4 (3) of the Act, the Minister shall hear the opinion of the Yeongsan and Seomjin River Basin Management Committee under Article 35 of the Act (hereinafter referred to as the “Committee”). <Amended on October 1, 2025> (2) Before hearing the Committee's opinion pursuant to paragraph (1), the Minister of Climate, Energy and Environment shall form an investigation team comprising public officials of relevant central administrative agencies and the relevant local government, experts, representatives of residents, and other relevant persons, and conduct an on-site survey. <Amended on October 1, 2025> (3) Where necessary when revoking the designation of a riparian zone, the Minister of Climate, Energy and Environment may request the following materials from the head of the competent local government: <Amended on October 1, 2025> 1. The location and area of the area whose designation is to be revoked; 2. Topographic drawings showing the riparian zone before and after revocation; 3. Other materials deemed necessary by the Minister of Climate, Energy and Environment. Article 5-3 (Procedures and Timing for Formulation of Master Plans for Management of Riparian Zones) (1) When formulating a master plan for management of riparian zones pursuant to Article 4-2 (1) of the Act (hereinafter referred to as a “management master plan”), the Minister of Climate, Energy and Environment shall hear the opinions of the relevant local governments and request deliberation by the Committee by August 31 of the year preceding the year in which the management master plan is required to be formulated. <Amended on July 28, 2014; October 1, 2025> (2) Where the Minister of Climate, Energy and Environment intends to amend a management master plan formulated pursuant to paragraph (1), the Minister shall hear the opinions of the relevant local governments and request deliberation by the Committee: Provided, That this shall not apply to amendments of minor matters prescribed by Ordinance of the Ministry of Climate, Energy and Environment. <Amended on October 1, 2025> (3) When the Minister of Climate, Energy and Environment formulates or amends a management master plan pursuant to paragraphs (1) and (2), the Minister shall notify the relevant local governments thereof. <Amended on October 1, 2025> Article 5-4 (Formulation and Implementation of Riparian Ecological Belt Implementation Plans) (1) “Matters prescribed by Presidential Decree” in Article 4-3 (1) 4 of the Act means the following matters: 1. The current use of the target area; 2. Methods for purchasing the target area; 3. Management measures after creation and analysis of project effects; 4. Required financial resources and investment plans. (2) “Cases involving changes to minor matters prescribed by Presidential Decree” in the proviso to Article 4-3 (3) of the Act means any of the following cases: 1. Where the original target area is changed by no more than 30 percent; 2. Where the creation period is changed by no more than six months; 3. Where the original required financial resources are changed by no more than 30 percent. (3) Pursuant to Article 4-3 (4) of the Act, the Minister of Climate, Energy and Environment shall formulate a riparian ecological belt implementation plan under the part, other than the subparagraphs, of paragraph (1) of that Article (hereinafter referred to as a “riparian ecological belt implementation plan”) and request deliberation by the Committee by August 31 of the year preceding the year in which the riparian ecological belt creation project is required to be implemented. <Amended on October 1, 2025> (4) Where the Minister of Climate, Energy and Environment formulates a riparian ecological belt implementation plan pursuant to paragraph (3), the Minister shall notify the relevant local governments thereof. The same shall apply to an amendment to a formulated riparian ecological belt implementation plan. <Amended on October 1, 2025> Article 5-5 (Scope of Manufacturing Businesses Excluded from Facilities Subject to Restrictions on Activities) “Manufacturing businesses prescribed by Presidential Decree, such as agricultural product processing businesses” in Article 5 (1) 8 of the Act means the manufacturing businesses specified in attached Table 1. Article 6 (Procedures for Permission for Activities in Riparian Zones) A person who intends to obtain permission to install a facility pursuant to Article 5 (2) of the Act shall submit an application for permission to the Minister of Climate, Energy and Environment, accompanied by the following documents: <Amended on October 1, 2025> 1. Installation specifications, including the area and structure of the facility to be installed; 2. Specifications stating the types and number of livestock and the method of treating livestock excreta (to be attached only where a facility under Article 5 (2) 2 of the Act is to be installed); 3. Installation specifications and drawings of sewage treatment facilities under Article 24 (2) 1 (a) of the Enforcement Decree of the Sewerage Act (to be attached only where a facility under Article 5 (2) 3 of the Act is to be installed). Article 6-2 (Changes to Specific-Use Areas and Districts) “Special grounds prescribed by Presidential Decree” in the proviso to Article 5 (3) of the Act means cases where expansion of any of the following facilities is necessary (limited to expansions not exceeding 30 percent of the original area of the facility): 1. Human excreta treatment facilities under subparagraph 11 of Article 2 of the Sewerage Act; 2. Public treatment facilities under subparagraph 9 of Article 2 of the Act on the Management and Use of Livestock Excreta. Article 7 (Water Quality Standards) “Standards prescribed by Presidential Decree” in the main clause of Article 7 (1) of the Act means the standards according to the following classifications: <Amended on July 12, 2016> 1. Rivers: Biochemical oxygen demand of no more than one milligram per liter; 2. Lakes and marshes: Total organic carbon of no more than two milligrams per liter. Article 8 (Procedures for Public Announcement of Water Source Protection Areas) Article 11 (2) through (4) of the Enforcement Decree of the Water Supply and Waterworks Installation Act shall apply mutatis mutandis to public announcements of water source protection areas under Article 7 (3) of the Act. In such cases, “Minister of Climate, Energy and Environment” shall be construed as “Integrated Special City Mayor or Do Governor.” <Amended on October 1, 2025; July 28, 2026> Article 9 (Procedures for Purchase of Land, etc.) (1) A person who intends to sell land and facilities attached to that land (hereinafter referred to as “land, etc.”) to the State pursuant to Article 8 (1) of the Act shall submit the following documents (including electronic documents) to the head of a river basin environmental office or the head of a regional environmental office: <Amended on May 4, 2010; November 2, 2010; July 28, 2014> 1. Deleted. <November 2, 2010> 2. Documents concerning the current use of the land; 3. Documents describing structures located on the land to be sold. (2) Upon receiving an application for purchase of land, etc. under paragraph (1), the head of a river basin environmental office or the head of a regional environmental office shall verify the following documents through the joint use of administrative information under Article 36 (1) of the Electronic Government Act: Provided, That where the applicant does not consent to verification of the document under subparagraph 1, the applicant shall be required to submit it. <Added on November 2, 2010; Amended on January 8, 2019> 1. In the case of an individual, an extract of the resident registration record containing the resident registration number; 2. In the case of a corporation, a certificate of registered corporate matters; 3. A certified copy of the register of the land, etc. that the applicant intends to sell. (3) Upon receiving an application for purchase of land, etc. under paragraph (1), the head of a river basin environmental office or the head of a regional environmental office shall determine the purchase priority according to the criteria for purchase priorities established by the Committee, taking into account characteristics of the Yeongsan and Seomjin River basins, such as distance from river boundaries and the level of pollution loads, and shall notify the owner of the land, etc. of the purchase priority of the relevant land, etc. <Amended on November 2, 2010> (4) Deleted. <July 28, 2014> (5) When purchasing land, etc. in an area falling under any of the subparagraphs of Article 8 (2) of the Act, the head of a river basin environmental office or the head of a regional environmental office may give priority to its purchase following deliberation by the Committee. <Amended on July 28, 2014> Article 9-2 (Calculation of Purchase Prices of Land, etc.) (1) The purchase price of land, etc. under the main clause of the part, other than the subparagraphs, of Article 8 (2) of the Act shall be calculated as the arithmetic mean of the amounts appraised by at least two appraisal corporations, etc. under subparagraph 4 of Article 2 of the Act on Appraisal and Certified Appraisers pursuant to the main clause of the part, other than the subparagraphs, of Article 8 (2) of the Act. <Amended on August 31, 2016; March 9, 2021> (2) Notwithstanding paragraph (1), in any of the following cases, the purchase price may be determined on the basis of compensation for land, business losses, and other losses under the Act on Acquisition of and Compensation for Land, etc. for Public Works Projects: 1. A case falling under Article 8 (2) 1 of the Act; 2. A case in which all the land, etc. jointly offered for sale by multiple persons is purchased and that land, etc. meets all of the following requirements: (a) It consists of at least two adjoining parcels of land, etc. with different owners; (b) At least 50 percent of each adjoining parcel of land, etc. lies within 200 meters of the boundary of a river, lake, or marsh. Article 10 (Water Quality Targets by River System Section) (1) Where the Minister of Climate, Energy and Environment intends to set water quality targets by river system section under the main clause of Article 9 (1) of the Act, the Minister shall set those targets so that the water quality of major water sources can achieve and maintain the "Slightly Good" grade or higher under subparagraph 3 (a) 2) and (b) 2) of Attached Table 1 to the Enforcement Decree of the Framework Act on Environmental Policy. <Amended 2012.7.20, 2025.10.1, 2026.7.28> (2) Public notice under the main clause of Article 9 (1) of the Act shall include the following matters: <Amended 2026.7.28> 1. The river system sections for which water quality targets are to be set and the basins that affect them (hereinafter referred to as "basins"); 2. Water quality targets at boundary points between Integrated Special Cities and Dos; 3. Water quality targets by river system section. (3) The Minister of Climate, Energy and Environment shall designate the downstream end of a basin as the point for the water quality target and measure and verify changes in the water quality of the relevant basin as prescribed by Ordinance of the Ministry of Climate, Energy and Environment. <Amended 2025.10.1> Article 10-2 (Setting of Jurisdictional Water Quality Targets) (1) Before issuing public notice under the main clause of Article 9 (1) of the Act, the Minister of Climate, Energy and Environment shall notify Integrated Special City Mayors and Do Governors (hereinafter referred to as "Mayors/Do Governors") of the deadline by which they may notify the Minister of Climate, Energy and Environment of their intention to set water quality targets for river system sections within their jurisdiction (hereinafter referred to as "jurisdictional water quality targets") pursuant to the proviso of Article 9 (1) of the Act and the deadline by which they may apply to the Minister of Climate, Energy and Environment for approval. <Amended 2025.10.1, 2026.7.28> (2) Where a Mayor/Do Governor intends to publicly announce jurisdictional water quality targets pursuant to the proviso of Article 9 (1) of the Act, the Mayor/Do Governor shall notify the Minister of Climate, Energy and Environment of the intention to set jurisdictional water quality targets within the notification deadline under paragraph (1), and then apply to the Minister of Climate, Energy and Environment for approval of the jurisdictional water quality targets within the application deadline under paragraph (1). <Amended 2025.10.1> (3) The criteria for approval under the proviso of Article 9 (1) of the Act shall be as follows: <Amended 2025.10.1, 2026.7.28> 1. Jurisdictional water quality targets shall be appropriately set so that the water quality targets at boundary points between Integrated Special Cities and Dos publicly notified by the Minister of Climate, Energy and Environment pursuant to the proviso of Article 9 (1) of the Act can be achieved and maintained; 2. Jurisdictional water quality targets shall be set on the basis of an appropriate analysis of any of the following matters: (a) Matters concerning the current status of water use and flow rates by basin; (b) Matters concerning the current status, etc. of natural and geographical pollution sources within the basin and projections of pollution sources; (c) Matters concerning the quantities of pollutants generated and discharged, etc. by pollution source within the basin; (d) Matters concerning the relationship between water quality and pollution sources. (4) Upon obtaining approval under the proviso of Article 9 (1) of the Act, a Mayor/Do Governor shall publicly announce the approved jurisdictional water quality targets without delay. (5) Where a Mayor/Do Governor who has notified the Minister of Climate, Energy and Environment of the intention to set jurisdictional water quality targets under paragraph (1) falls under any of the following subparagraphs, the Minister of Climate, Energy and Environment shall set and publicly notify water quality targets by river system section for the relevant area without delay: <Amended 2025.10.1> 1. Where the Mayor/Do Governor fails to apply for approval within the application deadline under paragraph (1), or applies for approval but fails to obtain it; 2. Where the Mayor/Do Governor fails to make the public announcement under paragraph (4). Article 11 (Jurisdiction over Places of Business) "Places of business prescribed by Presidential Decree" in the former part of the portion of Article 12 (1) of the Act other than its subparagraphs means the places of business specified in Attached Table 1-2. <Amended 2014.7.28> Article 12 (Methods and Criteria for Calculating Penalty Surcharges for Exceeding Total Pollution Loads) (1) The method of calculating benefits from excess discharges, imposition coefficients by excess rate, imposition coefficients by region, and imposition coefficients by number of violations under Article 13 (3) of the Act, and the method of calculating penalty surcharges for exceeding total pollution loads under Article 13 (1) of the Act (hereinafter referred to as "penalty surcharges for exceeding total pollution loads"), shall be as specified in Attached Table 2. <Amended 2016.7.12> (2) The number of violations under paragraph (1) shall be the number of occasions on which orders to take measures, orders to suspend operations, or closure orders under Article 12 (6) and (8) of the Act have been received. In such cases, the number of violations shall be calculated for each place of business over the most recent 2-year period as of the date of the violation. <Amended 2014.7.28> Article 13 (Notices of Payment of Penalty Surcharges for Exceeding Total Pollution Loads) (1) Notice of payment of a penalty surcharge for exceeding total pollution loads shall be given within 60 days from the date on which the grounds for imposition arise. <Amended 2016.7.12> (2) Notice of payment of a penalty surcharge for exceeding total pollution loads shall be given in writing, stating the quantity of pollutants subject to imposition, the amount imposed, the payment period and place of payment, and other necessary matters. In such cases, the payment period for the penalty surcharge for exceeding total pollution loads shall be 30 days from the date on which the payment notice is issued. <Amended 2016.7.12> Article 14 (Adjustment of Penalty Surcharges for Exceeding Total Pollution Loads) (1) Where any of the following cases applies, the Minister of Climate, Energy and Environment, an Integrated Special City Mayor, or the head of a Si/Gun (hereinafter referred to as an "imposing authority") shall recalculate and adjust the penalty surcharge for exceeding total pollution loads; where there is a difference between the amount already paid and the adjusted amount, the imposing authority shall impose the difference additionally or refund it. <Amended 2014.7.28, 2016.7.12, 2025.10.1, 2026.7.28> 1. Where the implementation of measures or orders has not been completed by the scheduled date for completion of compliance with an order to take measures, an order to suspend operations, or a closure order under Article 12 (6) or (8) of the Act, or has been completed within that period, resulting in a change in the discharge period of pollutants or discharged substances that forms the basis for calculating the penalty surcharge for exceeding total pollution loads; 2. Where, after a penalty surcharge for exceeding total pollution loads has been imposed, it is recognized that the discharge conditions of pollutants, etc. have changed from those at the time of the original measurement due to improvements to facilities, etc., and a reinspection shows that the quantity of pollutants or discharged substances differs from the quantity originally measured. (2) Where a penalty surcharge for exceeding total pollution loads is adjusted on the grounds specified in paragraph (1) 1, the discharge period of pollutants or discharged substances for calculating the penalty surcharge for exceeding total pollution loads shall be calculated by reflecting the difference between the scheduled date and actual date of completion of compliance. <Amended 2016.7.12> (3) Where a penalty surcharge for exceeding total pollution loads is adjusted on the grounds specified in paragraph (1) 2, it shall be calculated on the basis of the newly measured quantity of pollutants or discharged substances, limited to the period from the date of reinspection onward. <Amended 2016.7.12> (4) An adjusted imposition or refund of a penalty surcharge for exceeding total pollution loads under paragraph (1) 1 shall be made within 30 days from the date on which compliance with the completion of improvements, suspension of operations, or completion of closure of the relevant discharge facilities or pollution prevention facilities is verified. <Amended 2016.7.12> (5) Where an imposing authority adjusts a penalty surcharge for exceeding total pollution loads and imposes the difference additionally or refunds it, the authority shall give written notice of the amount, grounds, place of payment or refund, and other necessary matters. <Amended 2016.7.12> Article 15 (Applications for Adjustment of Penalty Surcharges for Exceeding Total Pollution Loads) (1) A business operator who has received notice of payment of a penalty surcharge for exceeding total pollution loads (hereinafter referred to as a "person liable for payment") may apply for adjustment of the relevant penalty surcharge for exceeding total pollution loads where grounds falling under any of the subparagraphs of Article 14 (1) exist. <Amended 2016.7.12> (2) An application for adjustment under paragraph (1) shall be made within 30 days from the date of receipt of the notice of payment of the penalty surcharge for exceeding total pollution loads. <Amended 2016.7.12> (3) Where an application for adjustment is made, the imposing authority shall notify the applicant of the result of its handling within 30 days. Article 16 (Extension of Payment Deadlines and Payment in Installments of Penalty Surcharges for Exceeding Total Pollution Loads) (1) An imposing authority may extend the payment deadline for a penalty surcharge for exceeding total pollution loads or permit payment in installments pursuant to the proviso of Article 29 of the General Act on Public Administration, and the same shall apply to amounts in arrears. In such cases, the extension of the payment deadline shall not exceed 1 year from the day following the payment deadline, and payment in installments shall be made in not more than 6 installments over a period not exceeding 12 months. (2) Where the penalty surcharge for exceeding total pollution loads payable by a person whose payment deadline has been extended or who makes payment in installments pursuant to paragraph (1) exceeds twice that person's capital or total amount of investment (total assets in the case of an individual business operator), and grounds falling under any of the subparagraphs of Article 29 of the General Act on Public Administration continue to exist so that the imposing authority recognizes that payment cannot be made even within the period under paragraph (1), the authority may further extend the payment deadline or permit payment in installments. (3) An extension of the payment deadline under paragraph (2) shall not exceed 3 years from the day following the payment deadline extended pursuant to paragraph (1), and payment in installments shall be made in not more than 12 installments over a period not exceeding 36 months. Article 17 (Disbursement of Collection Expenses) (1) Pursuant to Article 13 (7) of the Act, the Minister of Climate, Energy and Environment shall disburse to Integrated Special City Mayors and heads of Sis/Guns, as collection expenses, an amount equivalent to 10 percent of the penalty surcharges for exceeding total pollution loads and additional charges collected by them (the adjusted penalty surcharges for exceeding total pollution loads and additional charges where adjusted pursuant to Article 14). <Amended 2016.7.12, 2025.10.1, 2026.7.28> (2) The Minister of Climate, Energy and Environment shall settle each month the collection expenses under paragraph (1) from among the penalty surcharges for exceeding total pollution loads and additional charges paid into the Environmental Improvement Special Account under Article 45 of the Framework Act on Environmental Policy, and shall pay them to the relevant Integrated Special City Mayors and heads of Sis/Guns by the following month. <Amended 2016.7.12, 2021.3.9, 2025.10.1, 2026.7.28> Article 18 (Scope of Facilities, Including Buildings, for Which Permission, etc. Must Not Be Granted in the Event of Noncompliance with Total Pollution Load Management) "Facilities, including buildings, of at least the scale prescribed by Presidential Decree" in Article 16 (1) 4 of the Act means facilities, including buildings, falling under any of the following subparagraphs whose project plan area falls within Attached Table 4 to the Enforcement Decree of the Environmental Impact Assessment Act: <Amended 2014.5.9, 2018.1.16> 1. Type 1 through Type 3 places of business under Attached Table 13 to the Enforcement Decree of the Water Environment Conservation Act; 2. Facilities falling under any of the subparagraphs of Article 3 of the Enforcement Decree of the Seoul Metropolitan Area Readjustment Planning Act. Article 18-2 (Expenses Necessary for Total Pollution Load Management) "Expenses necessary for total pollution load management prescribed by Presidential Decree" in Article 17 of the Act means the following expenses: <Amended 2014.5.9, 2014.7.28, 2016.7.12> 1. Expenses necessary to formulate total pollution load management master plans and total pollution load management implementation plans under Articles 10 and 11 of the Act; 2. Expenses necessary for evaluations under Article 11 (4) of the Act. Article 19 (Restrictions on Installation of Waste Landfill Facilities) (1) "Distances prescribed by Presidential Decree" in Article 20 of the Act means the distances according to the following categories: 1. The main streams of the Yeongsan, Seomjin, and Tamjin Rivers: 1 kilometer from the boundaries of the main streams of the Yeongsan, Seomjin, and Tamjin Rivers; 2. Tributaries flowing directly into the main streams of the Yeongsan, Seomjin, and Tamjin Rivers: 500 meters from the boundaries of tributaries flowing directly into the main streams of the Yeongsan, Seomjin, and Tamjin Rivers. (2) Article 4 (2) shall apply mutatis mutandis to the boundaries of the main streams of the Yeongsan, Seomjin, and Tamjin Rivers and tributaries flowing directly into them under paragraph (1). Article 20 (Criteria for Areas Eligible for Resident Support Projects, etc.) (1) "Criteria prescribed by Presidential Decree" in Article 21 (1) 2 of the Act means the criteria according to the following categories: 1. In the case of an area where the annual average biochemical oxygen demand previously exceeded 10 milligrams per liter: The annual average biochemical oxygen demand shall be no more than one-fifth of that before the residents' voluntary efforts or no more than 3.3 milligrams per liter; 2. In the case of an area where the annual average biochemical oxygen demand had remained at or below 10 milligrams per liter: The annual average biochemical oxygen demand shall be no more than one-third of that before the residents' voluntary efforts or no more than 1 milligram per liter. (2) Where the head of a Si/Gun recognizes that an area under Article 21 (1) 2 of the Act exists within his or her jurisdiction, the head shall submit the following materials concerning that area to the Minister of Climate, Energy and Environment by March 31 each year: <Amended 2009.12.24, 2025.10.1, 2026.7.28> 1. Water quality data measured by a testing institution falling under any of the following items: (a) The National Institute of Environmental Research and its subordinate institutions; (b) Institutes of Health and Environment of Integrated Special Cities and Dos; (c) River basin environmental offices and regional environmental offices; (d) Offices of the Korea Environment Corporation under the Korea Environment Corporation Act; (e) Other water quality testing institutions recognized by the Minister of Climate, Energy and Environment; 2. The area of the relevant region and the current status of its residents; 3. Methods of water quality improvement and details of the improvements; 4. Details of local residents' activities to improve water quality. Article 21 (Scope of Persons and Areas Eligible for Resident Support Projects) (1) The scope of residents or areas eligible for support through resident support projects under Article 21 (1) of the Act shall be as follows: <Amended 2014.5.9, 2014.7.28> 1. Residents of water source management areas who have met all of the following requirements since before designation of the water source management area, and the villages in which those residents reside: (a) They shall have continuously maintained resident registration and actually resided in the Si/Gun having jurisdiction over the riparian zone or a water source protection area under Article 7 (1) of the Water Supply and Waterworks Installation Act and Article 7 (1) of this Act (hereinafter referred to as a "water source protection area") [including cases where they moved out of the relevant area due to unavoidable grounds, such as education, medical treatment, or public duties, and moved back within 6 months (limited to 1 occasion)]; (b) They shall have continuously owned land, etc. in the riparian zone or water source protection area; 2. Residents who are spouses or lineal ascendants or descendants and have inherited, or received in its entirety as a gift, land, etc. that a resident falling under subparagraph 1 has continuously owned in the relevant area since before designation of the riparian zone or water source protection area, and who have continuously maintained resident registration and actually resided in the Si/Gun having jurisdiction over the relevant riparian zone or water source protection area since before receiving the inheritance or gift [including cases where, after receiving the inheritance or gift, they moved out of the relevant area due to unavoidable grounds, such as education, medical treatment, or public duties, and moved back within 6 months (limited to 1 occasion)], and the villages in which those residents reside; 3. Residents of water source management areas who do not fall under subparagraph 1 or 2 and have continuously resided in the relevant water source protection area since before its designation; 4. Residents of water source management areas who do not fall under subparagraphs 1 through 3 and have continuously engaged in a livelihood determined by the Committee, such as agriculture, forestry, or fisheries, in the relevant water source protection area since before its designation; 5. Water source management areas and areas under Article 21 (1) 2 of the Act; 6. The areas of Sis/Guns/Gus having jurisdiction over areas under Article 21 (1) 3 of the Act. (2) In applying paragraph (1) 1 or 2, where land, etc. is jointly owned, only 1 of the joint owners shall be deemed the owner (meaning a person selected by agreement among the parties; where no agreement is reached, the owner with the largest share; and where there are multiple owners with the largest share, 1 person selected according to the criteria prescribed by Ordinance of the Ministry of Climate, Energy and Environment). <Amended 2014.5.9, 2025.10.1> Article 22 (Criteria for Allocation of Support Funds, etc.) (1) Resident support projects under Article 21 (1) of the Act shall be classified into indirect support projects, direct support projects, and special support projects, the details of which shall be as specified in Attached Table 3. <Amended 2014.7.28> (2) The criteria applicable by person eligible for support under a resident support project under paragraph (1) (hereinafter referred to as a "resident support project beneficiary") and by eligible area shall be as specified in Attached Table 4. <Amended 2014.7.28> (3) Financial resources provided for resident support projects (hereinafter referred to as "resident support project funds") shall be classified into funds used for indirect support projects and direct support projects (hereinafter referred to as "general support project funds") and funds used for special support projects (hereinafter referred to as "special support project funds"). <Amended 2014.7.28> (4) The Committee shall determine and allocate the areas eligible for special support project funds and the amounts of support, taking into consideration the extent to which resident convenience facilities and pollutant purification facilities have been installed, the current status of deployment of renewable energy, etc.; among special support project funds, the funds used for water quality improvement and regional development projects under subparagraph 3 (b) of Attached Table 3 shall not exceed the amount calculated according to the following formula: <Amended 2026.7.28> (Annual resident support project funds - Funds used for projects to install and operate renewable energy facilities under subparagraph 3 (a) of Attached Table 3) × 30% (5) General support project funds shall be resident support project funds excluding special support project funds. In such cases, an amount equivalent to 50 percent of general support project funds shall be allocated taking into consideration the weights prescribed by Ordinance of the Ministry of Climate, Energy and Environment according to land area and restrictions on activities for each water source management area of the Sis/Guns/Gus having jurisdiction over the residences of resident support project beneficiaries, and the remainder shall be allocated taking into consideration the level of support per resident support project beneficiary; detailed methods of allocation shall be prescribed by Ordinance of the Ministry of Climate, Energy and Environment. <Amended 2014.7.28, 2025.10.1> Article 23 (Procedures for Implementation of Resident Support Projects, etc.) (1) To ensure the smooth implementation of resident support projects under Article 21 of the Act, the Committee shall notify heads of Sis/Guns having jurisdiction over areas eligible for resident support projects of the following matters by March 31 each year: <Amended 2021.3.9> 1. The amount of resident support project funds for the following year within the Yeongsan and Seomjin River Basin Management Fund under Article 31 of the Act (hereinafter referred to as the "Fund"); 2. Guidelines for formulating the resident support project plan for the following year (hereinafter referred to as the "project plan"). (2) The head of a Si/Gun shall formulate a project plan that includes the following matters in accordance with the guidelines for formulating project plans under paragraph (1), obtain approval from the competent Mayor/Do Governor, and submit it to the Committee by April 30: 1. An implementation plan for the details of resident support projects specified in Attached Table 3; 2. Other matters specified in the guidelines for formulating project plans. (3) When formulating a project plan under paragraph (2), the head of a Si/Gun shall gather residents' opinions in accordance with the procedures, methods, etc. prescribed by ordinance of the relevant Si/Gun: Provided, That this shall not apply to a project that has obtained the consent of the Si/Gun council as prescribed by ordinance of the relevant Si/Gun. (4) The Committee shall deliberate on project plans in consideration of the proposed fund operation plan under Article 66 (5) of the National Finance Act and notify heads of Sis/Guns of the results without delay. (5) Where the head of a Si/Gun intends to change important matters, such as the project scale or resident support project funds, in a project plan that has undergone deliberation by the Committee, the head shall obtain approval from the competent Mayor/Do Governor and submit the plan for redeliberation by the Committee. In such cases, important changes requiring redeliberation by the Committee shall be specified in the guidelines for formulating project plans under paragraph (1). (6) The head of a Si/Gun shall submit the results of implementation of resident support projects for each year to the Committee by March 31 of the following year. (7) Deleted <2021.3.9> (8) Deleted <2021.3.9> Article 23-2 (Management of Real Estate Acquired through Resident Support Projects) (1) "Resident communities, such as village associations, prescribed by Presidential Decree" in Article 21-2 (1) of the Act means resident communities, such as village associations, that are unincorporated associations whose members comprise all or some of the residents of administrative districts, such as Dongs and Ris (hereinafter referred to as "resident communities"). (2) Pursuant to Article 21-2 (2) of the Act, a resident community shall make a supplementary registration to the ownership registration stating: "This land or building is real estate acquired pursuant to the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins, and, without the consent of the competent head of a Si/Gun/Gu, no act may be undertaken to transfer the relevant land or building, establish limited real rights over it, or impose any restriction on ownership, including attachment, provisional attachment, or provisional disposition." Article 24 (Criteria for Support for Business Establishments, etc.) The Minister of Climate, Energy and Environment and the heads of relevant central administrative agencies may give priority in providing technical and financial support under Article 22 of the Act to small and medium enterprise operators (meaning small and medium enterprise operators under Article 2, subparagraph 1 of the Small and Medium Enterprises Promotion Act) intending to improve facilities falling under any of the following subparagraphs: <Amended on November 20, 2009; January 16, 2018; October 1, 2025> 1. Water pollution prevention facilities under Article 2, subparagraph 12 of the Water Environment Conservation Act; 2. Treatment facilities under Article 2, subparagraph 8 of the Act on the Management and Use of Livestock Excreta. Article 25 (Support for Operation of Water Pollution Prevention Facilities) (1) The Committee may provide support of up to 30 percent of the operating costs of water pollution prevention facilities under Article 23 of the Act. (2) A person seeking support under Article 23 of the Act shall apply to the Committee by March 31 each year, as prescribed by Ordinance of the Ministry of Climate, Energy and Environment. <Amended on October 1, 2025> Article 26 (Notification, etc.) Where the Minister of Climate, Energy and Environment, the Mayor of an Integrated Special City, or the head of a Si/Gun intends to give notification under Article 25 (2) of the Act, the notification shall be in writing and include the main details of the project plan and a list of the land, etc. subject to use or expropriation. <Amended on July 28, 2014; October 1, 2025; July 28, 2026> Article 27 (Scope of Public Waters Subject to Water Use Charges) "Public waters prescribed by Presidential Decree" in Article 30 (1) of the Act and the introductory portion of paragraph (2) of that Article means the waters of Juam Lake, Dongbok Lake, Sangsa Lake, the re-regulating reservoir dam on the Isacheon Stream, Sueo Lake, and Tamjin Lake (based on the planned flood level line). Article 28 (Submission of Materials) (1) A waterworks business operator shall, under Article 30 (4) of the Act, submit to the Committee materials including the following matters by the 15th day of the month following the month in which a payment notice for a water use charge under Article 30 (1) of the Act (hereinafter referred to as a "water use charge") is issued: 1. The volume of raw water abstracted; 2. The volume of tap water supplied and the loss rate; 3. Materials for calculation of water use charges and details of payment; 4. Other materials requested by the chairperson of the Committee as deemed necessary for calculation and forecasting of water use charges. (2) Where the head of a Si/Gun authorizes the installation of a private water supply system or private industrial water supply system under Articles 52 and 54 of the Water Supply and Waterworks Installation Act in the waters under Article 27, the head shall notify the Committee of that fact without delay. (3) Where the head of a flood control office having jurisdiction over the Yeongsan and Seomjin River Basins grants permission to use river water under Article 50 of the River Act, the head shall notify the Committee thereof without delay. (4) Where the Korea Water Resources Corporation under the Korea Water Resources Corporation Act concludes a contract with a local government to supply, directly or after purification, raw water abstracted from public waters subject to water use charges under Article 27, it shall notify the Committee of the details without delay. <Newly Inserted on July 12, 2016> Article 29 (Areas Exempt from Water Use Charges) "Areas prescribed by Presidential Decree" in Article 30 (5) of the Act means the following areas: 1. Water source management areas; 2. Catchment areas of rivers flowing into public waters under Article 27 (meaning areas where rainwater naturally flows into public waters, such as rivers and lakes, and which are bounded by a line connecting the surrounding ridges). Article 30 (Determination and Public Notice of Water Use Charge Rates) (1) The Committee shall deliberate on and adjust the rate of water use charges every two years, taking into account the financial resources required for the uses of the Fund under Article 33 of the Act. (2) The Minister of Climate, Energy and Environment shall publicly notify the rate of water use charges deliberated on and adjusted under paragraph (1) no later than 90 days before the beginning of the fiscal year. <Amended on October 1, 2025> (3) Where no rate is publicly notified under paragraph (2), the rate most recently publicly notified shall apply. Article 31 (Methods for Calculating Water Consumption by End Users) (1) Water consumption by end users under Article 30 (1) of the Act shall be the water consumption used as the basis for imposition and collection of water supply charges. (2) Where a waterworks business operator supplies a mixture of water from public waters subject to water use charges under Article 27 and water from other public waters, notwithstanding paragraph (1), the water consumption calculated by multiplying the water consumption under subparagraph 1 by the ratio under subparagraph 2 shall be the water consumption of end users in the water supply area under the jurisdiction of the relevant waterworks business operator (where the operator is a local government, this means the area under the jurisdiction of that local government): <Amended on July 12, 2016> 1. The water consumption used as the basis for imposition and collection of water supply charges; 2. The ratio of the volume of water from public waters subject to water use charges (where there is no record of supply of water from public waters subject to water use charges in the preceding year, this means the planned volume of water supply for the relevant year) to the total volume of water supplied by the relevant waterworks business operator in the preceding year. Article 32 (Methods for Calculating, Imposing, and Collecting Water Use Charges for End Users, etc.) (1) Water use charges for end users under Article 30 (1) of the Act (hereinafter referred to as "water use charges for end users") shall be calculated by multiplying the rate under Article 30 by the water consumption under Article 31. (2) Water use charges for end users shall be imposed by including them in the payment notice for water supply charges and shall be collected in cash or by credit cards, debit cards, etc. (hereinafter referred to as "credit cards, etc."). <Amended on July 12, 2016> (3) A waterworks business operator shall remit to the Fund, without delay, the water use charges imposed on and collected from end users. (4) Except as otherwise provided for in this Decree, specific methods for imposing and collecting water use charges for end users, collection procedures, etc. shall follow the procedures for collection of water supply charges prescribed by ordinance of the relevant local government: Provided, That where the waterworks business operator is not a local government, they shall follow the procedures for collection of water supply charges prescribed in the supply regulations under Article 38 of the Water Supply and Waterworks Installation Act. Article 33 (Water Use Charges for Installers of Private Water Supply Systems and Users of River Water, etc.) (1) Water use charges for installers of private water supply systems and users of river water under Article 30 (2) of the Act shall be calculated by multiplying the volume of water abstracted by the relevant installer or user by the rate under Article 30; where the volume abstracted by an installer of a private water supply system is unknown, the charges shall be calculated based on the average daily water supply volume under Article 58 (2) 3 of the Enforcement Decree of the Water Supply and Waterworks Installation Act. (2) Installers of private water supply systems and users of river water shall notify the Committee of the volume of water abstracted each month and the amount of water use charges therefor by the 10th day of the following month, and shall pay the charges into the Fund in cash or by credit cards, etc. by the last day of the following month. <Amended on July 12, 2016> (3) The Committee shall enter into agreements with credit card business entities under Article 2, subparagraph 2-2 of the Specialized Credit Finance Business Act (hereinafter referred to in this Article as "payment processing agencies") to enable payment of water use charges by credit cards, etc. <Newly Inserted on July 12, 2016> (4) Where water use charges are paid by credit cards, etc. under paragraph (2), the date of approval by the payment processing agency shall be deemed the date of payment. <Newly Inserted on July 12, 2016> Article 33-2 (Exemption from Water Use Charges for Users of River Water) Where a user of river water under Article 30 (2) 2 of the Act falls under any of the following subparagraphs, the user shall be exempt from water use charges under paragraph (7) of that Article: <Amended on January 16, 2018; March 9, 2021> 1. Where the State or a local government uses river water for the purpose of measuring water pollution; 2. Where river water is used for any of the following purposes, no new water pollutants under Article 2, subparagraph 7 of the Water Environment Conservation Act are present in the water discharged into the river after use, and there is no difference between the volume of river water abstracted and the volume of water discharged: (a) Where a power generation business operator under Article 2, subparagraph 4 of the Electric Utility Act uses river water as cooling water; (b) Where river water is used to produce hydrothermal energy under Article 2 (4) and subparagraph 5 of attached Table 1 of the Enforcement Decree of the Act on the Promotion of the Development, Use and Diffusion of New and Renewable Energy. Article 34 (Entrustment of Compulsory Collection) A waterworks business operator intending to entrust compulsory collection of water use charges under Article 30 (9) of the Act shall send a document stating the following matters to the head of the local government to be entrusted with such collection: 1. The name and address of the person liable for payment; 2. The amount payable and the payment deadline; 3. Whether a demand notice or a payment demand notice has been issued, and the year, month, and day of issuance; 4. Other necessary matters. Article 35 (Uses of the Fund) "Projects or expenses prescribed by Presidential Decree" in Article 33, subparagraph 14 of the Act means the following projects or expenses: <Amended on January 16, 2018; March 9, 2021; February 13, 2024> 1. Projects to create riparian green spaces; 2. Education and publicity for water quality improvement; 3. Sediment dredging projects; 4. Installation and operation of automatic water quality measurement and monitoring devices; 5. Projects to reduce nonpoint source pollution; 6. Management of water source management areas; 7. Ecological river restoration projects for water quality improvement; 8. Water pollution prevention projects for groundwater development and use facilities without an owner or manager; 9. Forestry projects to enhance water recharge functions; 10. Basic environmental survey projects; 11. Management of purchased land, etc.; 12. Costs of transportation and disposal of waste under Article 31 (1) of the Water Environment Conservation Act (limited to those recognized by the Committee among the shares borne by local governments for waste generated at dams determined by the Committee); 13. Projects to maintain water abstraction and purification facilities among waterworks facilities under Article 3, subparagraph 17 of the Water Supply and Waterworks Installation Act; 14. Projects for surveys and research on the use of water resources, such as river water; 15. Projects for surveys and management of leaked or abandoned livestock excreta, compost, and liquid manure; 16. Projects to prevent and reduce algal growth; 17. Other projects or expenses selected by the Committee for water management in the Yeongsan and Seomjin River Basins. Article 36 (Operation and Management of the Fund) (1) Where a Fund operation plan is finalized under Article 66 of the National Finance Act, the Committee shall notify the relevant local governments. (2) The Committee shall review and evaluate the execution and use of funds received by local governments, etc. and reflect the results in the Fund operation plan for the following year. Article 37 (Delegation of Authority) (1) The Minister of Climate, Energy and Environment shall delegate the following authority under Article 40 (1) of the Act to the Mayor of an Integrated Special City or the head of a Si/Gun: <Amended on July 12, 2016; October 1, 2025; July 28, 2026> 1. Management of riparian zones under Article 4 (5) of the Act; 2. Permission for installation of facilities under Article 5 (2) of the Act; 3. Deleted. <January 23, 2018> 4. Deleted. <January 23, 2018> (2) The Minister of Climate, Energy and Environment shall delegate the following authority under Article 40 (1) of the Act to the head of a river basin environmental office or the head of a regional environmental office: <Amended on July 28, 2014; July 12, 2016; January 23, 2018; October 1, 2025> 1. On-site surveys of actual conditions and consultations for designation of riparian zones under Article 4 (4) of the Act; 2. Formulation and implementation of management master plans under Article 4-2 (1) of the Act; 2-2. Formulation and implementation of riparian ecological belt implementation plans under Article 4-3 of the Act; 3. Allocation of pollution loads by business establishment, designation of discharge quantities, orders to take measures such as improvement of pollution prevention facilities, and orders to suspend operations or close facilities under Article 12 of the Act; 4. Imposition and collection of penalty surcharges for exceeding total pollution loads under Article 13 of the Act; 5. Imposition and collection of penalty surcharges under Article 14 of the Act; 6. Inspections, requests for submission of the results of measures, and orders to take measures such as improvement under Article 19 of the Act; 7. Approval of water quality improvement project plans under Article 24 (1) of the Act; 8. Consultations with the heads of relevant administrative agencies under Article 26 (2) of the Act; 9. Collection of delinquent water use charges and payment thereof into the Fund under Article 30 (8) and (10) of the Act (limited to arrears of water use charges for installers of private water supply systems and users of river water); 10. Imposition and collection of administrative fines under Article 43 (3) of the Act; 11. Formation of survey teams and on-site surveys of actual conditions under Article 5-2 (2). Article 37-2 (Entrustment of Duties) (1) The Minister of Climate, Energy and Environment may, under Article 40 (2) of the Act, entrust duties concerning the management of land, etc. purchased under Article 8 (1) of the Act and its use for water quality improvement in the Yeongsan and Seomjin River Basins to the following institutions: <Amended on May 23, 2023; October 1, 2025> 1. The Korea Environment Conservation Institute under Article 59 of the Framework Act on Environmental Policy; 2. Other institutions recognized by the Minister of Climate, Energy and Environment as having the human and material resources necessary to perform duties concerning the management of land, etc. purchased under Article 8 (1) of the Act and its use for water quality improvement in the Yeongsan and Seomjin River Basins. (2) Where the Minister of Climate, Energy and Environment entrusts duties under paragraph (1), the Minister shall publicly notify the entrusted person or entity and the details of the entrusted duties. <Amended on October 1, 2025> (3) An institution entrusted with duties under paragraph (1) shall report the results of the entrusted duties to the Minister of Climate, Energy and Environment as prescribed by that Minister. <Amended on October 1, 2025> Article 37-3 (Processing of Unique Identification Information) Where unavoidable for the performance of the following duties, the Minister of Climate, Energy and Environment (including persons to whom the Minister's authority has been delegated under Article 37), the head of a Si/Gun (including persons to whom the relevant authority has been delegated or entrusted), the Committee, or a waterworks business operator may process data containing resident registration numbers under Article 19, subparagraph 1 of the Enforcement Decree of the Personal Information Protection Act: <Amended on March 9, 2021; October 1, 2025> 1. Duties concerning permission for installation of facilities in riparian zones under Article 5 (2) of the Act; 2. Duties concerning purchase of land or facilities affixed to such land under Article 8 (1) of the Act; 3. Duties concerning resident support projects under Article 21 (1) of the Act; 4. Duties concerning imposition and collection of water use charges under Article 30 (1) of the Act. Article 37-4 Deleted. <March 9, 2021> Article 38 (Imposition of Administrative Fines) (1) The criteria for imposition of administrative fines under Article 43 (1) and (2) of the Act shall be as specified in attached Table 5. (2) When determining the amount of an administrative fine, the Minister of Climate, Energy and Environment, the Mayor of an Integrated Special City, or the head of a Si/Gun may reduce the amount under paragraph (1) by up to one-half, taking into account the motives for and consequences of the violation, etc. <Amended on October 1, 2025; July 28, 2026> ADDENDA <Presidential Decree No. 17677, July 13, 2002> (1) (Enforcement Date) This Decree shall enter into force on July 15, 2002: Provided, That Article 23 (3) shall enter into force on January 1, 2003; Articles 7 and 8 shall enter into force on January 15, 2005; and Articles 11 through 18 shall enter into force on the enforcement dates prescribed in the respective subparagraphs of the proviso to Article 1 of the Addenda to the Act. (2) (Special Cases concerning Eligibility for Resident Support Projects) In applying subparagraph 1 of Article 21 to water source protection areas or riparian zones designated before this Decree enters into force, "before the designation of a water source protection area or riparian zone" and "before the designation of a water source protection area" shall each be construed as "before this Decree enters into force." (3) (Special Cases concerning Rates of Water Use Charges) Notwithstanding Article 30 (1), the rate of water use charges first agreed upon and adjusted after this Decree enters into force shall apply for the period from the date on which this Decree enters into force through December 31, 2003. ADDENDA (Organization of the Ministry of Environment and Its Affiliated Agencies) <Presidential Decree No. 17698, August 8, 2002> Article 1 (Enforcement Date) This Decree shall enter into force on the date of its promulgation. <Proviso Omitted.> Articles 2 and 3 Omitted. Article 4 (Amendments to Other Statutes and Regulations) (1) through (16) Omitted. (17) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is amended as follows: In the main clause of Article 9 (1), paragraph (2) of that Article, the former part of paragraph (3) of that Article, and the main clause of Article 37 (2), "head of an environmental management office or head of a regional environmental management office" shall be replaced by "head of a river basin environmental office or head of a regional environmental office." Article 20 (2) 1 (c) shall be amended as follows: (c) River basin environmental offices and regional environmental offices. (18) through (37) Omitted. Article 5 Omitted. ADDENDA (Enforcement Decree of the National Land Planning and Utilization Act) <Presidential Decree No. 17816, December 26, 2002> Article 1 (Enforcement Date) This Decree shall enter into force on January 1, 2003. Articles 2 through 15 Omitted. Article 16 (Amendments to Other Statutes and Regulations) (1) through (38) Omitted. (39) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is amended as follows: Article 5 shall be amended as follows: Article 5 (Areas Excluded from Riparian Zones) "Areas prescribed by Presidential Decree" in Article 4 (2) 7 of the Act means Class II district-unit planning zones under Article 51 (3) of the National Land Planning and Utilization Act (limited to residential types) and natural settlement districts under Article 31 (2) 6 (a) of the Enforcement Decree of that Act. (40) through (73) Omitted. Article 17 Omitted. ADDENDA (Organization of the Ministry of Construction and Transportation and Its Affiliated Agencies) <Presidential Decree No. 18067, July 26, 2003> Article 1 (Enforcement Date) This Decree shall enter into force on the date of its promulgation. Article 2 (Amendments to Other Statutes and Regulations) (1) through (3) Omitted. (4) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is amended as follows: In Article 4 (2) 2 (b), "National Geography Institute" shall be replaced by "National Geographic Information Institute." (5) and (6) Omitted. ADDENDA (Decree Amending the Regulations on Management of Parolees and Other Presidential Decrees for Electronic Processing of Civil Petitions) <Presidential Decree No. 18312, March 17, 2004> This Decree shall enter into force on the date of its promulgation. ADDENDA (Enforcement Decree of the Water Quality Conservation Act) <Presidential Decree No. 18515, August 10, 2004> Article 1 (Enforcement Date) This Decree shall enter into force on August 10, 2004. Article 2 (Amendments to Other Statutes and Regulations) (1) through (4) Omitted. (5) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is amended as follows: In subparagraph 1 of Article 18, "attached Table 1 of the Enforcement Decree of the Water Quality Conservation Act" shall be replaced by "attached Table 6 of the Enforcement Decree of the Water Quality Conservation Act." ADDENDA (Organization of the Ministry of Environment and Its Affiliated Agencies) <Presidential Decree No. 18953, July 22, 2005> Article 1 (Enforcement Date) This Decree shall enter into force on the date of its promulgation. Article 2 (Amendments to Other Statutes and Regulations) (1) through (9) Omitted. (10) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: In Article 20 (2) 1 (a), "National Environmental Research Institute" shall be replaced by "National Institute of Environmental Research." (11) through (17) Omitted. ADDENDA <Presidential Decree No. 19070, September 30, 2005> This Decree shall enter into force on the date of its promulgation: Provided, That the amended provisions of Article 30 (2) shall enter into force on January 1, 2006. ADDENDA (Enforcement Decree of the Framework Act on Environmental Policy) <Presidential Decree No. 19745, December 4, 2006> Article 1 (Enforcement Date) This Decree shall enter into force on January 1, 2007. <Proviso Omitted.> Article 2 (Amendments to Other Statutes and Regulations) (1) Omitted. (2) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: In the latter part of the text of Article 10 (1) preceding its subparagraphs, "Grade II of the environmental standards for water quality" shall be replaced by "Slightly Good grade of the environmental standards for water quality and aquatic ecosystems." (3) through (5) Omitted. ADDENDA (Enforcement Decree of the Sewerage Act) <Presidential Decree No. 20289, September 27, 2007> Article 1 (Enforcement Date) This Decree shall enter into force on September 28, 2007. Articles 2 through 4 Omitted. Article 5 (Amendments to Other Statutes and Regulations) (1) through (8) Omitted. (9) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: In subparagraph 3 of Article 6, "under subparagraph 5 of Article 2 of the Act on Treatment of Sewage, Excreta and Livestock Wastewater" shall be replaced by "under Article 24 (2) 1 (a) of the Enforcement Decree of the Sewerage Act." Subparagraph 2 of attached Table 1 shall be amended as follows, and in subparagraph 3 of that Table, "under Article 21 of the Act on Treatment of Sewage, Excreta and Livestock Wastewater" shall be replaced by "under subparagraph 10 of Article 2 of the Sewerage Act." 2. Public sewage treatment facilities under subparagraph 9 of Article 2 of the Sewerage Act. (10) through (19) Omitted. Article 6 Omitted. ADDENDA (Enforcement Decree of the Act on the Management and Use of Livestock Excreta) <Presidential Decree No. 20290, September 27, 2007> Article 1 (Enforcement Date) This Decree shall enter into force on September 28, 2007. Articles 2 and 3 Omitted. Article 4 (Amendments to Other Statutes and Regulations) (1) through (8) Omitted. (9) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: In subparagraph 2 of Article 6, "livestock wastewater" shall be replaced by "livestock excreta." Subparagraph 2 of Article 24 shall be amended as follows: 2. Treatment facilities under subparagraph 8 of Article 2 of the Act on the Management and Use of Livestock Excreta. Subparagraph 4 of attached Table 1 shall be amended as follows: 4. Public treatment facilities under Article 24 of the Act on the Management and Use of Livestock Excreta. (10) through (23) Omitted. Article 5 Omitted. ADDENDA (Enforcement Decree of the Act on Testing, Inspection, etc. in the Environmental Field) <Presidential Decree No. 20297, September 28, 2007> Article 1 (Enforcement Date) This Decree shall enter into force on October 5, 2007. <Proviso Omitted.> Article 2 (Amendments to Other Statutes and Regulations) (1) through (5) Omitted. (6) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: In item (c) of subitem (3) of item (b) of subparagraph 1 of attached Table 2, "in accordance with the official testing methods for water pollution under Article 7 of the Water Quality Conservation Act" shall be replaced by "in accordance with the official testing standards for environmental pollution under Article 6 (1) 5 of the Act on Testing, Inspection, etc. in the Environmental Field." (7) through (11) Omitted. Article 3 Omitted. ADDENDA (Enforcement Decree of the Water Quality and Aquatic Ecosystem Conservation Act) <Presidential Decree No. 20428, November 30, 2007> Article 1 (Enforcement Date) This Decree shall enter into force on the date of its promulgation. Articles 2 through 5 Omitted. Article 6 (Amendments to Other Statutes and Regulations) (1) through (8) Omitted. (9) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: In subparagraph 1 of Article 18, "under attached Table 6 of the Enforcement Decree of the Water Quality Conservation Act" shall be replaced by "under attached Table 13 of the Enforcement Decree of the Water Quality and Aquatic Ecosystem Conservation Act"; and in subparagraph 1 of Article 24, "under subparagraph 6 of Article 2 of the Water Quality Conservation Act" shall be replaced by "under subparagraph 12 of Article 2 of the Water Quality and Aquatic Ecosystem Conservation Act." (10) through (22) Omitted. Article 7 Omitted. ADDENDA (Enforcement Decree of the River Act) <Presidential Decree No. 20763, April 3, 2008> Article 1 (Enforcement Date) This Decree shall enter into force on April 7, 2008. Article 2 Omitted. Article 3 (Amendments to Other Statutes and Regulations) (1) through (11) Omitted. (12) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: In the part of Article 4 (2) preceding its subparagraphs, "river areas under Article 2 (1) 2 of the River Act" shall be replaced by "river areas under subparagraph 2 of Article 2 of the River Act"; and in subparagraph 1 of that paragraph, "river registers under Article 14 of the River Act" shall be replaced by "management registers for river facilities under Article 15 (1) of the River Act." (13) through (20) Omitted. Article 4 Omitted. ADDENDA <Presidential Decree No. 21188, December 24, 2008> Article 1 (Enforcement Date) This Decree shall enter into force on December 28, 2008. Article 2 (Applicability concerning Resident Support Projects) (1) The amended provisions of Article 21 (1) 1 and 2 shall apply beginning with resident support projects for 2010. (2) The amended provisions of Article 21 (2) shall apply beginning with persons who own land, etc. in riparian zones or water source protection areas newly designated after this Decree enters into force. Article 3 (Applicability concerning Water Use Charges for River Water Users) The amended provisions of Article 33 (limited to those concerning river water users) shall apply beginning with charges for January 2009. Article 4 (Special Cases concerning Formulation of Management Master Plans) Notwithstanding the amended provisions of Article 5-2, deliberation by the Committee on the management master plan first formulated after this Decree enters into force shall be requested by January 31 of the year in which the management master plan must be formulated. ADDENDA (Enforcement Decree of the Small and Medium Enterprises Promotion Act) <Presidential Decree No. 21835, November 20, 2009> Article 1 (Enforcement Date) This Decree shall enter into force on November 22, 2009. Article 2 (Amendments to Other Statutes and Regulations) (1) through (35) Omitted. (36) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: In the part of Article 24 preceding its subparagraphs, "Act on the Promotion of Small and Medium Enterprises and Encouragement of Purchase of Their Products" shall be replaced by "Small and Medium Enterprises Promotion Act." (37) through (64) Omitted. Article 3 Omitted. ADDENDA (Enforcement Decree of the Korea Environment Corporation Act) <Presidential Decree No. 21904, December 24, 2009> Article 1 (Enforcement Date) This Decree shall enter into force on January 1, 2010. Articles 2 through 4 Omitted. Article 5 (Amendments to Other Statutes and Regulations) (1) through (12) Omitted. (13) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: In Article 20 (2) 1 (d), "Environmental Management Corporation under the Environmental Management Corporation Act" shall be replaced by "Korea Environment Corporation under the Korea Environment Corporation Act." (14) through (30) Omitted. Article 6 Omitted. ADDENDA (Enforcement Decree of the Electronic Government Act) <Presidential Decree No. 22151, May 4, 2010> Article 1 (Enforcement Date) This Decree shall enter into force on May 5, 2010. Articles 2 and 3 Omitted. Article 4 (Amendments to Other Statutes and Regulations) (1) through (116) Omitted. (117) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: In the proviso to the part of Article 9 (1) preceding its subparagraphs, "Article 21 (1) of the Electronic Government Act" shall be replaced by "Article 36 (1) of the Electronic Government Act." (118) through (192) Omitted. ADDENDA (Decree Partially Amending the Enforcement Decree of the Economic Education Support Act and Other Presidential Decrees for Sharing Administrative Information and Reducing Paperwork) <Presidential Decree No. 22467, November 2, 2010> This Decree shall enter into force on the date of its promulgation. ADDENDA <Presidential Decree No. 22602, December 31, 2010> Article 1 (Enforcement Date) This Decree shall enter into force on January 1, 2011. Article 2 (Applicability concerning Methods and Criteria for Calculating Total Pollution Load Excess Charges) The amended provisions of attached Table 2 shall apply beginning with the first total pollution load excess charge imposed after this Decree enters into force. ADDENDA (Decree Partially Amending the Enforcement Decree of the Act on the Submission and Management of Taxation Data and Other Presidential Decrees to Establish Legal Bases for Processing Sensitive Information and Unique Identifying Information) <Presidential Decree No. 23488, January 6, 2012> Article 1 (Enforcement Date) This Decree shall enter into force on the date of its promulgation. <Proviso Omitted.> Article 2 Omitted. ADDENDA (Enforcement Decree of the Framework Act on Environmental Policy) <Presidential Decree No. 23967, July 20, 2012> Article 1 (Enforcement Date) This Decree shall enter into force on July 22, 2012. <Proviso Omitted.> Article 2 (Amendments to Other Statutes and Regulations) (1) through (10) Omitted. (11) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: In Article 10 (1), "attached Table 1 of the Enforcement Decree of the Framework Act on Environmental Policy" shall be replaced by "the attached Table of the Enforcement Decree of the Framework Act on Environmental Policy." (12) through (19) Omitted. Article 3 Omitted. ADDENDA (Decree Partially Amending the Enforcement Decree of the Housing Act and Other Presidential Decrees to Establish Regulatory Review Deadlines Following the Amendment of the Framework Act on Administrative Regulations) <Presidential Decree No. 25050, December 30, 2013> This Decree shall enter into force on January 1, 2014. <Proviso Omitted.> ADDENDA (Enforcement Decree of the Water Quality and Aquatic Ecosystem Conservation Act) <Presidential Decree No. 25127, January 28, 2014> Article 1 (Enforcement Date) This Decree shall enter into force on January 31, 2014. <Proviso Omitted.> Article 2 Omitted. Article 3 (Amendments to Other Statutes and Regulations) (1) through (3) Omitted. (4) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: In subparagraph 1 of Article 2, "subparagraph 12-2 of Article 2 of the Water Quality and Aquatic Ecosystem Conservation Act" shall be replaced by "subparagraph 13 of Article 2 of the Water Quality and Aquatic Ecosystem Conservation Act." (5) Omitted. ADDENDA <Presidential Decree No. 25345, May 9, 2014> Article 1 (Enforcement Date) This Decree shall enter into force on the date of its promulgation. Article 2 (Transitional Measures concerning Criteria for Selecting Persons Eligible for Resident Support Projects in Cases of Joint Ownership of Land, etc.) Notwithstanding the amended provisions of Article 21 (2), the previous provisions shall apply to persons who jointly own land, etc. in water source management areas designated before this Decree enters into force. ADDENDA <Presidential Decree No. 25519, July 28, 2014> Article 1 (Enforcement Date) This Decree shall enter into force on July 29, 2014: Provided, That the amended provisions of Article 5-5 and attached Table 1 shall enter into force on January 1, 2016. Article 2 (Special Cases concerning Requests for Deliberation on Implementation Plans for Riparian Ecological Belts) Notwithstanding the amended provisions of Article 5-4 (3), deliberation by the Committee on an implementation plan for a riparian ecological belt for a project to create a riparian ecological belt to be implemented in 2015 may be requested by December 31, 2014. ADDENDA (Decree Partially Amending the Enforcement Decree of the Building Act and Other Presidential Decrees to Improve Regulations, Including Establishment of Regulatory Review Deadlines) <Presidential Decree No. 25840, December 9, 2014> Article 1 (Enforcement Date) This Decree shall enter into force on January 1, 2015. Articles 2 through 16 Omitted. ADDENDA <Presidential Decree No. 27340, July 12, 2016> This Decree shall enter into force on July 28, 2016: Provided, That the amended provisions of subparagraph 1-2 of Article 2, subparagraph 2 of Article 7, Article 28 (4), Article 31 (2), and Article 33-2 shall enter into force on the date of its promulgation, and the amended provisions of Articles 32 and 33 shall enter into force on December 30, 2016. ADDENDA (Enforcement Decree of the Act on Appraisal and Certified Appraisers) <Presidential Decree No. 27472, August 31, 2016> Article 1 (Enforcement Date) This Decree shall enter into force on September 1, 2016. Articles 2 through 5 Omitted. Article 6 (Amendments to Other Statutes and Regulations) (1) through (67) Omitted. (68) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: In Article 9-2 (1), "Act on Public Announcement of Real Estate Values and Appraisal" shall be replaced by "Act on Appraisal and Certified Appraisers." (69) through (92) Omitted. Article 7 Omitted. ADDENDA (Enforcement Decree of the Water Quality and Aquatic Ecosystem Conservation Act) <Presidential Decree No. 27792, January 17, 2017> Article 1 (Enforcement Date) This Decree shall enter into force on January 28, 2017. Articles 2 through 6 Omitted. Article 7 (Amendments to Other Statutes and Regulations) (1) through (16) Omitted. (17) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: Subparagraph 1 of attached Table 1-2 shall be amended as follows: 1. Public wastewater treatment facilities under subparagraph 17 of Article 2 of the Water Quality and Aquatic Ecosystem Conservation Act. (18) through (29) Omitted. ADDENDA (Decree Partially Amending 33 Presidential Decrees, Including the Enforcement Decree of the Fair Transactions in Franchise Business Act, to Establish Regulatory Review Deadlines, etc.) <Presidential Decree No. 28471, December 12, 2017> Article 1 (Enforcement Date) This Decree shall enter into force on January 1, 2018. Article 2 Omitted. ADDENDA (Enforcement Decree of the Water Environment Conservation Act) <Presidential Decree No. 28583, January 16, 2018> Article 1 (Enforcement Date) This Decree shall enter into force on January 18, 2018. Article 2 (Amendments to Other Statutes and Regulations) (1) through (22) Omitted. (23) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: In subparagraphs 1 and 1-2 of Article 2, "Water Quality and Aquatic Ecosystem Conservation Act" shall each be replaced by "Water Environment Conservation Act." In subparagraph 1 of Article 18, "Enforcement Decree of the Water Quality and Aquatic Ecosystem Conservation Act" shall be replaced by "Enforcement Decree of the Water Environment Conservation Act." In subparagraph 1 of Article 24, "Water Quality and Aquatic Ecosystem Conservation Act" shall be replaced by "Water Environment Conservation Act." In subparagraph 2 (b) of Article 33-2, "Water Quality and Aquatic Ecosystem Conservation Act" shall be replaced by "Water Environment Conservation Act." In subparagraph 12 of Article 35, "Water Quality and Aquatic Ecosystem Conservation Act" shall be replaced by "Water Environment Conservation Act." In subparagraph 1 of attached Table 1-2, "Water Quality and Aquatic Ecosystem Conservation Act" shall be replaced by "Water Environment Conservation Act." (24) through (46) Omitted. ADDENDA <Presidential Decree No. 28607, January 23, 2018> This Decree shall enter into force on the date of its promulgation. ADDENDA (Presidential Decree Partially Amending 2 Statutes and Regulations to Reduce Requirements for Submission of Certified Copies of Resident Registration Records) <Presidential Decree No. 29471, January 8, 2019> This Decree shall enter into force on the date of its promulgation. ADDENDA (Presidential Decree Partially Amending 210 Statutes and Regulations to Improve Difficult Legal Terminology) <Presidential Decree No. 29950, July 2, 2019> This Decree shall enter into force on the date of its promulgation. <Proviso Omitted.> ADDENDA <Presidential Decree No. 31525, March 9, 2021> Article 1 (Enforcement Date) This Decree shall enter into force on the date of its promulgation. Article 2 (Applicability concerning Criteria for Allocation of Support Funds) The amended provisions of Article 22 (4) shall apply beginning with cases in which the Committee determines expenses for special support projects after this Decree enters into force. Article 3 (Transitional Measures concerning Methods and Criteria for Calculating Penalty Surcharges for Exceeding Total Pollution Loads) In applying the methods and criteria for calculating penalty surcharges for exceeding total pollution loads to violations committed before this Decree enters into force, the previous provisions shall apply notwithstanding the amended provisions of subparagraph 1 of the Notes in item (a) of subitem 3) of item (b) of subparagraph 1 of attached Table 2. ADDENDA (Enforcement Decree of the Framework Act on Environmental Policy) <Presidential Decree No. 33479, May 23, 2023> Article 1 (Enforcement Date) This Decree shall enter into force on June 11, 2023. Article 2 (Amendments to Other Statutes and Regulations) (1) through (9) Omitted. (10) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: In Article 37-2 (1) 1, “Environmental Preservation Association” shall be replaced by “Korea Environment Conservation Institute.” (11) through (16) Omitted. ADDENDA (Presidential Decree Partially Amending 123 Statutes and Regulations, Including the Enforcement Decree of the Special Act on Construction of Gadeokdo New Airport, for Innovation in Administrative Legislation) <Presidential Decree No. 33913, December 12, 2023> This Decree shall enter into force on the date of its promulgation. ADDENDA <Presidential Decree No. 34221, February 13, 2024> This Decree shall enter into force on February 17, 2024. ADDENDA (Organization of the Ministry of Climate, Energy and Environment and Its Affiliated Agencies) <Presidential Decree No. 35804, October 1, 2025> Article 1 (Enforcement Date) This Decree shall enter into force on the date of its promulgation: Provided, That, among the Presidential Decrees amended pursuant to Article 6 of these Addenda, the provisions amending Presidential Decrees promulgated before this Decree enters into force whose enforcement dates have not yet arrived shall enter into force on the respective enforcement dates of those Presidential Decrees. Articles 2 through 4 Omitted. Article 5 (Amendments to Other Statutes and Regulations) (1) through (42) Omitted. (43) The Enforcement Decree of the Act on Water Management and Resident Support, etc. in the Yeongsan and Seomjin River Basins is partially amended as follows: In the part of Article 4 (1) preceding its subparagraphs, Article 5-2 (1) and (2), the part of paragraph (3) of that Article preceding its subparagraphs, subparagraph 3 of that paragraph, Article 5-3 (1), the main clause of paragraph (2) of that Article, paragraph (3) of that Article, Article 5-4 (3), the former part of paragraph (4) of that Article, the part of Article 6 preceding its subparagraphs, the latter part of Article 8, Article 10 (1) and (3), Article 10-2 (1) and (2), paragraph (3) 1 of that Article, the part of paragraph (5) of that Article preceding its subparagraphs, the part of Article 14 (1) preceding its subparagraphs, Article 17 (1) and (2), the part of Article 20 (2) preceding its subparagraphs, subparagraph 1 (e) of that paragraph, the part of Article 24 preceding its subparagraphs, Article 26, Article 30 (2), the part of Article 37 (1) preceding its subparagraphs, the part of paragraph (2) of that Article preceding its subparagraphs, the part of Article 37-2 (1) preceding its subparagraphs, subparagraph 2 of that paragraph, paragraphs (2) and (3) of that Article, the part of Article 37-3 preceding its subparagraphs, and Article 38 (2), “Minister of Environment” shall each be replaced by “Minister of Climate, Energy and Environment.” In the proviso to Article 5-3 (2), Article 10 (3), Article 21 (2), the latter part of Article 22 (5), and Article 25 (2), “Ordinance of the Ministry of Environment” shall each be replaced by “Ordinance of the Ministry of Climate, Energy and Environment.” In the title of attached Table 1-2 and the Notes to subparagraph 1 (c) of attached Table 2, “Minister of Environment” shall each be replaced by “Minister of Climate, Energy and Environment.” (44) through (80) Omitted. ADDENDA <Presidential Decree No. 36539, July 28, 2026> Article 1 (Enforcement Date) This Decree shall enter into force on the date of its promulgation. Article 2 (Applicability concerning Changes to the Limit on Special Support Project Funds) The amended provisions of Article 22 (4) shall apply beginning with resident support project funds for 2027.