ENFORCEMENT DECREE OF THE SOIL ENVIRONMENT CONSERVATION ACT
28399 · 2013-06-02
ENFORCEMENT DECREE OF THE SOIL ENVIRONMENT CONSERVATION ACT
Presidential Decree No. 24566, May 31, 2013
Presidential Decree No. 14848, Dec. 29, 1995
Amended by Presidential Decree No. 16058, Dec. 31, 1998
Presidential Decree No. 17432, Dec. 19, 2001
Presidential Decree No. 17698, Aug. 8, 2002
Presidential Decree No. 17816, Dec. 26, 2002
Presidential Decree No. 18213, Jan. 9, 2004
Presidential Decree No. 18312, Mar. 17, 2004
Presidential Decree No. 18910, Jun. 30, 2005
Presidential Decree No. 18953, Jul. 22, 2005
Presidential Decree No. 20297, Sep. 28, 2007
Presidential Decree No. 21078, Oct. 8, 2008
Presidential Decree No. 21542, Jun. 16, 2009
Presidential Decree No. 21626, Jul. 7, 2009
Presidential Decree No. 23196, Sep. 30, 2011
Presidential Decree No. 23529, Jan. 25, 2012
Presidential Decree No. 24566, May 31, 2013
법령보기 화면
Article 1 (Purpose)
The purpose of this Decree is to provide the matters delegated by the
Soil Environment Conservation Act
and the necessary matters for the enforcement thereof.
<Amended by Presidential Decree No. 18910, Jun. 30, 2005>
법령보기 화면
Articles 2 and 3 Deleted. <by Presidential Decree No. 17432, Dec. 19, 2001>
법령보기 화면
Article 4 (Methods, etc. of Formulating Basic Plans and Regional Plans)
(1)
When the Minister of Environment deems it necessary to formulate the basic plan for soil conservation (hereinafter referred to as "basic plan") under
Article 4 (1) of the Soil Environment Conservation Act
(hereinafter referred to as the "Act"), he/she may request the heads of relevant central administrative agencies, the Special Metropolitan City Mayor, a Metropolitan City Mayor, a
Do
Governor or the Governor of a Special Self-Governing Province (hereinafter referred to as the "Mayor/
Do
Governor") and the heads of the relevant agencies or organizations to submit data necessary for formulating the basic plan.
<Amended by Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 23196, Sep. 30, 2011>
(2)
When a basic plan has been formulated, or the Minister of Environment has approved a regional soil conservation plan (hereinafter referred to as "regional plan") under
Article 4 (4) of the Act
, he/she shall, without delay, notify the heads of the relevant administrative agencies thereof. The heads of the relevant administrative agencies who have been thus notified shall take measures necessary for enforcing the basic plan or regional plan, unless special circumstances exist.
법령보기 화면
Article 5 (Compensation for Loss)
(1)
The amount of compensation for loss as provided in the provisions of
Article 9 (1) of the Act
, shall be determined in consideration of the transaction price, rent, profitability of the land, buildings, standing timber, earth and rocks, and other constructions concerned.
(2)
Any person who intends to claim for the compensation for a loss in accordance with the provisions of
Article 9 (2) of the Act
, shall submit to the Minister of Environment, the Mayor/
Do
Governor, the head of a
Si
/
Gun
/
Gu
(referring to an autonomous
Gu
; hereinafter the same shall apply) or the head of any soil-related specialized agency (hereinafter referred to as "soil-related specialized agency") provided for in
Article 23-2 of the Act
a written claim stating the following particulars accompanied by documents evidencing the loss to it:
<Amended by Presidential Decree No. 17432, Dec. 19, 2001; Presidential Decree No. 18910, Jun. 30, 2005>
1.
The name, resident registration number and address of the claimant;
2.
The date and place where the loss occurred;
3.
The contents of the loss;
4.
The amount of the loss and the method of assessing it.
(3)
Upon receiving the written claim for the compensation for loss as provided in paragraph (2), the Minister of Environment, the Mayor/
Do
Governor, the head of a
Si
/
Gun
/
Gu
or the head of any soil-related specialized agency shall, without any delay, notify the claimant of the following matters:
<Amended by Presidential Decree No. 17432, Dec. 19, 2001; Presidential Decree No. 18910, Jun. 30, 2005>
1.
The period and method of consultation;
2.
The time, method and procedures of compensation.
(4)
Any person who intends to file a motion for adjudication with the Land Expropriation Committee in accordance with the provisions of
Article 9 (4) of the Act
, shall submit the written motion for adjudication stating the following matters to the relevant Land Expropriation Committee:
1.
The name and address of the person who has filed a motion for adjudication and of the adverse party;
2.
Kinds of the business involved;
3.
The fact that the loss has been incurred;
4.
The particulars with respect to the amount of the compensation for the loss as determined by the disposition bureau and the amount as claimed by the person who has filed a motion;
5.
Details of the consultation.
(5)
Deleted.
<by Presidential Decree No. 17432, Dec. 19, 2001>
법령보기 화면
Article 5-2 (Assessment of Soil Environment)
(1)
The assessment of soil environment under
Article 10-2 of the Act
shall be conducted in the order of a basic survey, an overall survey, and a detailed survey as classified in the following; but when only the basic survey or overall survey is enough to confirm that the soil subject to the assessment has not been contaminated, the next survey may be omitted to close the assessment of soil environment:
<Amended by Presidential Decree No. 24566, May 31, 2013>
1.
Basic survey: A survey on the probability of soil contamination by means of data research, field research, etc.;
2.
Overall survey: A survey on whether the soil is contaminated by means of collecting and analyzing soil samples;
3.
Detailed survey: A survey on the severity and scope of soil contamination by means of collecting and analyzing soil samples.
(2)
Details of procedures and methods for the assessment of soil environment shall be determined and announced by the Minister of Environment.
[This Article Added by Presidential Decree No. 23196, Sep. 30, 2011]
법령보기 화면
Article 5-3 (Orders to Undergo Detailed Surveys, etc.)
(1)
When the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
orders any person causing the contamination to undergo a detailed soil survey under
Article 11 (3) of the Act
, he/she shall set the performance period within up to six months, taking account of the scope of the contaminated soil area, etc.:
Provided
, That with respect to any person who has failed to undergo a detailed soil survey within the performance period due to unavoidable circumstances, such as the size of the area to be surveyed, the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
may extend such performance period only once by a further period up to six months.
<Amended by Presidential Decree No. 23196, Sep. 30, 2011>
(2)
When the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
orders any person causing the contamination to take measures to purify the contaminated soil (referring to the soil whose level of contamination exceeds the worrisome level of soil contamination under
Article 4-2 of the Act
; hereinafter the same shall apply) under
Article 11 (3) of the Act
, he/she shall set the performance period within up to two years, taking account of the scale, etc. of the contaminated soil:
Provided
, That with regard to any person who has failed to carry out the order within the performance period due to unavoidable circumstances, such as the scale of the purification works, methods of the purification, etc., the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
may extend such performance period up to two times by a further period of not exceeding one year for each time.
<Amended by Presidential Decree No. 23196, Sep. 30, 2011>
[This Article Added by Presidential Decree No. 18910, Jun. 30, 2005]
법령보기 화면
Article 6 (Reporting, etc. on Specific Facilities Subject to Control of Soil Contamination)
(1)
Any person who intends to file a report on the installation of the specific facilities subject to the control of soil contamination under
Article 12 (1) of the Act
shall file such report with the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
, accompanied by the following documents:
Provided
, That in cases of oil storage facilities installed for military use under subparagraph 1 (c) of
Article 2 of the Act on National Defense and Military Installations Projects
, some documents to be accompanied may be exempted or some matters to be entered in such documents may be omitted, as prescribed by Ministerial Decree of Environment:
<Amended by Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 21542, Jun. 16, 2009; Presidential Decree No. 23196, Sep. 30, 2011; Presidential Decree 23529, Jan. 25, 2012>
1.
Drawings showing the locations, structures and installations of the specific facilities subject to the control of soil contamination;
2.
Permits to establish a factory, storage and office of dangerous substances under
Article 6 of the Safety Control of Dangerous Substances Act
and detailed statements of structures and installations by storage facilities;
3.
Other matters deemed necessary by the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
for the prevention of soil contamination.
(2)
Any person who intends to alter the specific facilities subject to the control of soil contamination (including the closure of such facilities) under the latter part of
Article 12 (1) of the Act
shall file a report on the alteration to the installation (or closure) of such specific facilities subject to the control of soil contamination with the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
, accompanied by a statement detailing the alteration (or closure) of such facilities.
<Amended by Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 23196, Sep. 30, 2011>
[This Article Wholly Amended by Presidential Decree No. 17432, Dec. 19, 2001]
법령보기 화면
Article 7 (Installation, etc. of Facilities for Preventing Soil Contamination in Specific Facilities Subject to Control of Soil Contamination)
(1)
Any installer of the specific facilities subject to the control of soil contamination (including any operator of such facilities; hereinafter the same shall apply) shall install the following facilities for preventing soil contamination by each specific facility subject to the control of soil contamination, and maintain and manage them appropriately, as prescribed in
Article 12 (3) of the Act
:
<Amended by Presidential Decree No. 17432, Dec. 19, 2001; Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 23196, Sep. 30, 2011>
1.
To use anti-corrosive and anti-oxidizing coatings for the specific facilities subject to the control of soil contamination, utilize materials that have leakage-prevention performance, or install the facilities for preventing soil contaminants from leaking, such as dual wall tanks, and maintain and manage those facilities appropriately;
2.
To install the facilities that can detect the leakage of soil contaminants or can confirm whether soil contaminants are leaking, such as measuring instruments, and maintain and manage those facilities appropriately where, among the specific facilities subject to the control of soil contamination, storage facilities are laid underground;
3.
To install the facilities necessary for the measures to prevent diffusion of contamination or to reduce the degree of toxicity, and maintain and manage those facilities appropriately, in preparation for possible leakage of soil contaminants from the specific facilities subject to the control of soil contamination.
(2)
Standards for installation, maintenance and management of the facilities for preventing soil contamination under paragraph (1) and other necessary matters shall be publicly announced by the Minister of Environment after consultation with the head of a relevant central administrative agency.
<Amended by Presidential Decree No. 17432, Dec. 19, 2001; Presidential Decree No. 24566, May 31, 2013>
법령보기 화면
Article 7-2 (Recommendation and Support for Installation of Facilities for Prevention of Soil Contamination)
(1)
With regard to installing, maintaining and managing the facilities for preventing soil contamination under each subparagraph of
Article 7
(1), the Minister of Environment may recommend any person who intends to install the specific facilities subject to the control of soil contamination that he/she should install, maintain and manage facilities in compliance with the standards for installation, maintenance and management set by Ministerial Decree of Environment, which are more effective standards in prevention and diffusion of soil contamination than the standards publicly announced under paragraph (2) of the same Article.
(2)
Where the facilities for preventing soil contamination is installed, maintained and managed in compliance with the standards for installation, maintenance and management recommended under paragraph (1) (hereinafter referred to as “recommended standards for installation, maintenance and management”), it shall be deemed to comply with the standards for installation, maintenance and management publicly announced under
Article 7
(2).
(3)
The Minister of Environment may provide administrative and financial support to installers of the specific facilities subject to the control of soil contamination, who install, maintain and manage facilities in compliance with the recommended standards for installation, maintenance and management under paragraph (1).
[This Article Added by Presidential Decree No. 24566, May 31, 2013]
법령보기 화면
Article 8 (Soil Contamination Inspection on Specific Facilities Subject to Control of Soil Contamination)
(1)
Any installer of the specific facilities subject to the control of soil contamination shall undergo the soil contamination inspection on a regular basis under
Article 13 (1) of the Act
according to the following classifications:
Provided
, That if an inspection of soil contamination levels under subparagraph 1 and a leakage inspection under subparagraph 2 shall be conducted in the same year, he/she may undergo an inspection of soil contamination levels in the following year:
<Amended by Presidential Decree No. 23196, Sep. 30, 2011>
1.
He/she shall undergo an inspection of soil contamination levels by a soil-related specialized agency once a year at the time prescribed by Ministerial Decree of Environment:
Provided
, That where he/she has installed the facilities for preventing soil contamination under
Article 7
and is appropriately maintaining and managing them, an inspection cycle may be adjusted within five years according to the standards prescribed by Ministerial Decree of Environment;
2.
Where ten years have passed after the installation of the specific facilities subject to the control of soil contamination falling under the proviso to
Article 13 (3) of the Act
(excluding facilities subject to regular inspections under
Article 17 of the Enforcement Decree of the Safety Control of Dangerous Substances Act
; hereinafter referred to as "facilities subject to a leakage inspection"), he/she shall undergo a leakage inspection conducted by a soil-related specialized agency within six months, and undergo a leakage inspection as prescribed by Ministerial Decree of Environment thereafter.
(2)
Any installer of the specific facilities subject to the control of soil contamination shall undergo any of the following inspections conducted by a soil-related specialized agency in addition to the soil contamination inspection under paragraph (1):
Provided
, That this shall not apply where a reason falling under any of subparagraphs 1 through 3 arises within three months after he/she has undergone an inspection of soil contamination levels under paragraph (1) 1:
1.
Where any installer of the specific facilities subject to the control of soil contamination terminates the use of such facilities or closes such facilities, he/she shall undergo an inspection of soil contamination levels during the period from three months prior to the termination date or closing date to the preceding date of the termination date or closing date;
2.
Where any operator of the specific facilities subject to the control of soil contamination is changed due to transfer, lease, etc. of the specific facilities, he/she shall undergo an inspection of soil contamination levels during the period from three months prior to the date of such change to the preceding date of the date of such change;
3.
Where any installer of the specific facilities subject to the control of soil contamination replaces the facilities or changes the types of soil contaminants stored in the facilities, he/she shall undergo an inspection of soil contamination levels during the period from three months prior to the date of replacement or change to the preceding date of the date of replacement or change;
4.
In cases of facilities subject to a leakage inspection, where it has been confirmed that the soil is contaminated beyond the standards prescribed by Ministerial Decree of Environment as a result of the inspection of soil contamination levels under paragraph (1) 1 and subparagraphs 1 through 3 of this paragraph, he/she shall undergo a leakage inspection without delay;
5.
When he/she has become aware of the fact that soil contaminants have been leaked from the specific facilities subject to the control of soil contamination, he/she shall undergo an inspection of soil contamination levels and a leakage inspection (limited to facilities subject to a leakage inspection) without delay.
(3)
Where he/she has undergone an inspection of soil contamination levels under paragraph (2) 1 through 3 or 5, he/she shall be deemed to have undergone the next inspection of soil contamination levels under paragraph (1) 1, and where he/she has undergone a leakage inspection under paragraph (2) 4 or 5, he/she shall undergo a leakage inspection under paragraph (1) 2 on the basis of the date he/she has undergone such inspection.
(4)
Even in cases falling under any of paragraph (2) 1 through 3, if he/she has undergone an inspection under subparagraph 5 of the same paragraph within the relevant inspection period, he/she need not undergo any separate soil contamination inspection.
(5)
Matters necessary for items of the soil contamination inspection shall be prescribed by Ministerial Decree of Environment.
[This Article Wholly Amended by Presidential Decree No. 21542, Jun. 16, 2009]
법령보기 화면
Article 8-2 (Exemption, etc. from Soil Contamination Inspection)
(1)
Cases where the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
may grant approval for exemption from the soil contamination inspection of the specific facilities subject to the control of soil contamination under the proviso to
Article 13 (1) of the Act
shall be as follows:
<Amended by Presidential Decree No. 23196, Sep. 30, 2011; Presidential Decree No. 24566, May 31, 2013>
1.
Where oil pipeline facilities under the
Oil Pipeline Safety Control Act
among the specific facilities subject to the control of soil contamination are fitted with any device with which the leakage of oil can be checked (limited to an inspection of soil contamination levels) or the safety check-up is undergone under
Article 8 of the said Act
(limited to a leakage inspection);
2.
Where a soil contamination survey agency deems it impossible to take a soil sample due to the relevant facilities installed on the ground or in the basement of a building, etc. where soil boring cannot be conducted;
3.
Where a soil-related specialized agency deems it unnecessary to conduct the soil contamination inspection because soil contaminants have not been stored in storage facilities for at least one year or on other grounds;
4.
Where, among multiple facilities storing the same type of soil contaminants, the use of some facilities is terminated or closed (limited to an inspection of soil contamination levels under
Article 8
(2) 1);
4-2.
Where not more than 15 years have passed from the date when the facilities for preventing soil contamination were installed in compliance with the recommended standards for installation, maintenance and management (limited to the regular inspections of soil contamination under
Article 8
(1));
5.
Where it is intended to change the stored soil contaminants to other types of soil contaminants on which the items of the inspection under
Article 8
(5) are the same (limited to the inspection of soil contamination levels under
Article 8
(2) 3);
6.
Where, otherwise, the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
deems it unnecessary to conduct the soil contamination inspection because purification works are being conducted in compliance with soil purification orders.
(2)
In cases falling under paragraph (1) 1, 4, 5 and 6, the opinions of soil-related specialized agencies need not be presented at the time of applying for approval for exemption from the soil contamination inspection under the proviso to
Article 13 (2) of the Act
.
(3)
Where the specific facilities subject to the control of soil contamination referred to in paragraph (1) 1 extend over at least two jurisdictions of the Governor of a Special Self-Governing Province and the head of a
Si
/
Gun
/
Gu
, the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
who has jurisdiction over the main office of the specific facilities subject to the control of soil contamination shall grant approval for exemption from the soil contamination inspection of the said facilities.
<Amended by Presidential Decree No. 23196, Sep. 30, 2011>
(4)
Where the specific facilities subject to the control of soil contamination exempted from the soil contamination inspection no more have any grounds for such exemption, the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
shall, without delay, withdraw approval for such exemption.
<Amended by Presidential Decree No. 23196, Sep. 30, 2011>
[This Article Added by Presidential Decree No. 18910, Jun. 30, 2005]
법령보기 화면
Article 8-3 (Corrective Orders, etc.)
(1)
When the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
orders any installer of the specific facilities subject to the control of soil contamination to install or improve the facilities for preventing soil contamination, or to undergo a detailed soil survey pursuant to
Article 14 (1) of the Act
, he/she shall set the performance period within up to six months in consideration of the result of the soil contamination inspection conducted under
Article 8
and the type, scale, etc. of the specific facilities subject to the control of soil contamination:
Provided
, That the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
may grant an extension of such performance period only once by a further period up to six months to any person who has failed to perform the order within the performance period due to unavoidable circumstances, such as the scale of an area to be surveyed.
<Amended by Presidential Decree No. 23196, Sep. 30, 2011>
(2)
When the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
orders any installer of the specific facilities subject to the control of soil contamination to take measures to purify contaminated soil pursuant to
Article 14 (1) of the Act
, he/she shall determine the performance period within up to two years:
Provided
, That the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
may grant an extension of such performance period up to two times by a further period of not exceeding one year for each time to any person who has failed to perform the order for purification measures due to unavoidable circumstances, such as the scale and method of purification works.
<Amended by Presidential Decree No. 23196, Sep. 30, 2011>
[This Article Wholly Amended by Presidential Decree No. 21542, Jun. 16, 2009]
법령보기 화면
Article 9 (Orders, etc. to Undergo Detailed Soil Surveys)
(1)
When a Mayor/
Do
Governor or the head of a
Si
/
Gun
/
Gu
orders any person causing the contamination to undergo a detailed soil survey under
Article 15 (1) of the Act
, he/she shall set the performance period within up to six months, taking account of the scope of the contaminated soil area, etc.:
Provided
, That with respect to any person who has failed to undergo a detailed soil survey within the performance period due to unavoidable circumstances, such as the size of the area to be surveyed, a Mayor/
Do
Governor or the head of a
Si
/
Gun
/
Gu
may extend such performance period only once by a further period up to six months.
<Amended by Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 23196, Sep. 30, 2011>
(2)
Deleted.
<by Presidential Decree No. 18910, Jun. 30, 2005>
[This Article Wholly Amended by Presidential Decree No. 17432, Dec. 19, 2001]
법령보기 화면
Article 9-2 (Orders Given to Take Measures, etc.)
(1)
A Mayor/
Do
Governor or the head of a
Si
/
Gun
/
Gu
shall, when he/she orders any person causing the contamination to take measures to prevent soil contamination under
Article 15 (3) of the Act
(hereinafter referred to "order given to take measures"), set the performance period within up to two years, taking account of soil contaminants and the type, size, etc. of facilities.
<Amended by Presidential Decree No. 18910, Jun. 30, 2005>
(2)
With respect to any person who inevitably has failed to perform the order given to take measures within the performance period referred to in paragraph (1) due to the scale, construction method, or such, a Mayor/
Do
Governor or the head of a
Si
/
Gun
/
Gu
may extend such performance period up to two times by a further period of not exceeding one year for each time.
<Amended by Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 21542, Jun. 16, 2009>
[This Article Added by Presidential Decree No. 17432, Dec. 19, 2001]
법령보기 화면
Article 10 (Standards for and Methods of Purifying Contaminated Soil)
(1)
Standards for purifying contaminated soil under
Article 15-3 (1) of the Act
shall follow the worrisome levels of soil contamination under
Article 4-2 of the Act
.
<Added by Presidential Decree No. 18910, Jun. 30, 2005>
(2)
The methods of purifying contaminated soil under
Article 15-3 (1) of the Act
shall be as follows:
<Amended by Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 23196, Sep. 30, 2011>
1.
Biological treatment, including decomposition and absorption of contaminants, using microorganisms or plants;
2.
Physical and chemical treatment, including isolation, separation, extraction and cleansing treatment of contaminants;
3.
Heat treatment, including burning and decomposition of contaminants.
(3)
Detailed matters concerning the methods of purification under each subparagraph of paragraph (2) shall be prescribed and announced by the Minister of Environment.
<Amended by Presidential Decree No. 18910, Jun. 30, 2005>
[This Article Wholly Amended by Presidential Decree No. 17432, Dec. 19, 2001]
법령보기 화면
Article 11 (Direct Performance of Purification Works by Persons Causing Contamination)
With respect to contaminated soil falling under any of the following subparagraphs, the person causing the contamination may purify it himself/herself without entrusting the purification work to a person who has made a registration of the soil purification business (hereinafter referred to as "soil purification business operator") under
Article 23-7 (1) of the Act
, pursuant to the proviso to
Article 15-3 (2) of the Act
:
1.
Contaminated soil in the facilities of military units under the
Act on National Defense and Military Installations Projects
or the soil contaminated in the course of military activities, each of which is less than 50 cubic meters in quantity;
2.
Soil contaminated by organic solvents or oil, which is less than 5 cubic meters in quantity.
[This Article Added by Presidential Decree No. 18910, Jun. 30, 2005]
법령보기 화면
Article 11-2 (Methods of Verifying Soil Contamination due to Natural Causes)
(1)
“Methods prescribed by Presidential Decree” provided in
Article 15-5 (2) 4 of the Act
means any of the following methods:
1.
To prove that concentrations of the relevant contaminant in the site concerned is similar to those in the neighboring area measured from the soil analysis;
2.
To prove that the relevant contaminant has come from the bed rock in the site concerned;
3.
To prove otherwise by scientific methods that the relevant contaminant has originated due to natural causes.
(2)
When a Mayor/
Do
Governor, the head of a
Si
/
Gun
/
Gu
, or the person causing the contamination intends to have a hazard assessment conducted pursuant to
Article 15-5 (2) 4 of the Act
, he/she shall submit a report concerning matters under each subparagraph of paragraph (1), which is prepared by a soil-related specialized agency, to the Minister of Environment.
(3)
The Minister of Environment shall confirm the report submitted under paragraph (2) and notify the relevant Mayor/
Do
Governor, the head of the relevant
Si
/
Gun
/
Gu
, or the person causing the contamination of the results thereof, including whether the soil contamination is due to natural causes.
[This Article Added by Presidential Decree No. 23196, Sep. 30, 2011]
법령보기 화면
Article 11-3 (Omission of Verification of Purification Process)
Where the area of contaminated soil is less than 1,000 cubic meters [excluding the soil which has been contaminated by heavy metals, the contamination level of which exceeds the countermeasure standards against soil contamination (hereinafter referred to as the "countermeasure standards") under
Article 16 of the Act
, and which is 500 cubic meters or more in quantity] under the proviso to
Article 15-6 (1) of the Act
, the verification of the purification process may be omitted.
[This Article Added by Presidential Decree No. 18910, Jun. 30, 2005]
법령보기 화면
Article 11-4 (Formulation of Plans to Create Soil Control Complexes)
The Minister of Environment shall include the following matters when formulating a plan to create a soil control complex under
Article 15-7 (2) of the Act
:
1.
Purpose of creation, necessity, and period of creation and operation;
2.
Current situation of the site subject to creation of the complex, including its location and size;
3.
Measures to secure the site subject to creation of the complex;
4.
Methods of securing funds and financing for creation of the complex;
5.
Plans to establish and operate major infrastructure, including transportation facilities;
6.
Plans for environment conservation;
7.
Contaminated soil purification capacity;
8.
Matters concerning the recycling and distribution of purified soil.
[This Article Added by Presidential Decree No. 23196, Sep. 30, 2011]
법령보기 화면
Article 11-5 (Changes in Plans to Create Soil Control Complexes)
“Where he/she intends to change the important matters of plan for creation of a soil control complex which are prescribed by Presidential Decree” in the latter part of
Article 15-7 (2) of the Act
means any of the following cases:
1.
Where more than 20 percent of the area of the site subject to creation of the complex is to be changed;
2.
Where more than 20 percent of the contaminated soil purification capacity is to be changed.
[This Article Added by Presidential Decree No. 23196, Sep. 30, 2011]
법령보기 화면
Article 12 (Designation of Area Requiring Measures for Soil Conservation)
(1)
"Any region that falls under the cases that is prescribed by Presidential Decree" in the proviso to
Article 17 (1) of the Act
means any of the following:
<Added by Presidential Decree No. 18910, Jun. 30, 2005>
1.
Farmland where the size of land in which the contaminant content of crops cultivated therein is in excess of the maximum residue limit of heavy metal (hereinafter referred to as "maximum residue limit of heavy metal") under
Article 7 of the Food Sanitation Act
is at least 10,000 square meters;
2.
An area requiring special measures to prevent any damage to people's health or the environment because the soil, underground water, etc. is simultaneously contaminated with soil contaminants, such as heavy metals and oil.
(2)
When the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
requests the Minister of Environment to designate any area as an area requiring countermeasures pursuant to
Article 17 (2) of the Act
, he/she shall file a written application for designation of an area requiring countermeasures with the Minister of Environment.
<Amended by Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 21542, Jun. 16, 2009; Presidential Decree No. 23196, Sep. 30, 2011>
(3)
Standards for designating an area requiring countermeasures under
Article 17 (3) of the Act
shall be as follows:
<Amended by Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 23196, Sep. 30, 2011>
1.
In cases of farmland, areas where the soil contamination level 30 centimeters deep from the ground surface is in excess of the countermeasure standards and other areas which are requested by the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
to be designated as an area requiring countermeasures as the contaminant content of crops cultivated in such areas is found to be in excess of the maximum residue limit of heavy metal;
2.
In cases of areas other than farmland, areas where the soil contamination level between the ground surface and the upper soil of ground water (aquifer) is in excess of the countermeasure standards and other areas which are requested by the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
to be designated as an area requiring countermeasures as such areas are feared to inflict a physical injury upon persons and the surface area of such areas is at least 10,000 square meters.
(4)
When the Minister of Environment designates any area as an area requiring countermeasures and announces such designation under
Article 17 (4) of the Act
, he/she shall send the details of such publication and the relevant documents to the Governor of the relevant Special Self-Governing Province or the head of the relevant
Si
/
Gun
/
Gu
for public perusal and have signs publishing details of such designation installed in places that are frequented by the public within the area requiring countermeasures.
<Amended by Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 23196, Sep. 30, 2011>
[This Article Wholly Amended by Presidential Decree No. 17432, Dec. 19, 2001]
법령보기 화면
Article 12-2 (Formulation of Countermeasure Plans)
Where an area requiring countermeasures under
Article 18 (1) of the Act
extends over at least two
Sis/Guns/Gus
, the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
who has jurisdiction over a wider area of the area requiring countermeasures shall formulate a countermeasure plan. In such cases, the Governor of the Special Self-Governing Province or the head of the
Si
/
Gun
/
Gu
who formulates the countermeasure plan shall consult thereabout the Governor of a Special Self-Governing Province or the heads of other relevant
Sis/Guns/Gus
who are not main agents of the formulation of such plan.
<Amended by Presidential Decree No. 23196, Sep. 30, 2011>
[This Article Added by Presidential Decree No. 18910, Jun. 30, 2005]
법령보기 화면
Article 13 (Types of Projects to Improve Contaminated Soil)
The types of the projects to improve contaminated soil under
Article 18 (4) of the Act
shall be as follows:
<Amended by Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 21542, Jun. 16, 2009; Presidential Decree No. 23196, Sep. 30, 2011; Presidential Decree No. 24566, May 31, 2013>
1.
Farmland improvement project, such as the use of a soil controller or bringing soil from another land and mixing it with the soil in question;
2.
Dredging projects of contaminated waterways;
3.
Hygienic reclamation and purification projects of contaminated soil;
4.
Cultivation projects of such plants as are strong absorbents of soil contaminants;
5.
Other projects deemed necessary by the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
.
법령보기 화면
Article 13-2 (Surveys, etc. of Damage to Health of Residents)
The details of the survey of damage to the health of residents and the countermeasures therefor as provided for in
Article 18 (5) of the Act
shall be as follows:
<Amended by Presidential Decree No. 24566, May 31, 2013>
1.
Scope of residents subject to the survey of damage to health and the methods of such survey;
2.
Agencies in charge of the survey of damage to health;
3.
Decision on damage to health and the countermeasures therefor;
4.
Other necessary matters relating to the survey of damage to health and the countermeasures therefor.
[This Article Added by Presidential Decree No. 18910, Jun. 30, 2005]
법령보기 화면
Article 14 (Accommodating Jurisdiction over Areas Requiring Countermeasures)
(1)
The projects to improve contaminated soil of any area requiring countermeasures under
Article 19 (4) of the Act
shall be implemented in each jurisdiction. If it is impractical to implement such projects individually in each jurisdiction, the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
who has jurisdiction over the area with a wider contaminated area shall implement the projects to improve contaminated soil.
<Amended by Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 23196, Sep. 30, 2011>
(2)
The Governor of a Special Self-Governing Province or the heads of relevant
Sis/Guns/Gus
, other than the project-implementing entity under paragraph (1), shall actively cooperate in the implementation of the pertinent projects to improve contaminated soil.
<Amended by Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 23196, Sep. 30, 2011>
법령보기 화면
Article 15 (Limitations on Use of Land, etc.)
When the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
intends to impose a limitation on the use of land or the installation of facilities in any area requiring countermeasures under
Article 20 of the Act
, he/she shall determine and announce the object, method, period, area, etc. of the limitation. In such cases, he/she shall take into consideration the balance between the purpose of designating specific-use areas under the
National Land Planning and Utilization Act
and the limitations on activities.
<Amended by Presidential Decree No. 17816, Dec. 26, 2002; Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 23196, Sep. 30, 2011>
법령보기 화면
Article 16 (Limitations on Installation of Facilities in Area Requiring Countermeasures)
“Facilities prescribed by Presidential Decree and deemed to have the probability to harm the purpose of the designation of the area requiring countermeasures in such area" in
Article 21 (2) of the Act
means facilities which produce contaminants mainly causing the designation of the area requiring countermeasures, facilities which use raw materials containing contaminants, or facilities which produce goods containing contaminants.
법령보기 화면
Article 17 (Special Cases concerning Abandoned Metal Mining Areas)
The Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
shall investigate the present condition of the metal mining areas under his/her jurisdiction, for which the responsibility of the former mining concession holder or mining leaseholder under
Article 18 of the Mining Safety Act
is extinguished and shall report the results of the investigation to the relevant Mayor/
Do
Governor and the Minister of Environment.
<Amended by Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 23196, Sep. 30, 2011>
법령보기 화면
Article 17-2 (Standards, etc. for Designation of Soil-Related Specialized Agency)
(1)
Any person who intends to be designated as a soil-related specialized agency pursuant to the former part other than each subparagraph of
Article 23-2 (2) of the Act
shall secure the inspection facilities, equipment and the technical manpower as shown in Appendix 1.
<Amended by Presidential Decree No. 24566, May 31, 2013>
(2)
The matters which need to be designated for change pursuant to the latter part other than each subparagraph of
Article 23-2 (2) of the Act
shall be as follows:
<Amended by Presidential Decree No. 24566, May 31, 2013>
1.
Any change in the trade name or the location of business place;
2.
Replacement of the representative;
3.
Replacement of the technical manpower.
(3)
In changing the matters provided for in each subparagraph of paragraph (2), the designation of the changed matters shall be made within 60 days from the date when the cause of such change arises.
<Amended by Presidential Decree No. 21542, Jun. 16, 2009>
[This Article Added by Presidential Decree No. 18910, Jun. 30, 2005]
법령보기 화면
Article 17-3 (Soil Contamination Survey Agencies)
“Agencies prescribed by Presidential Decree" in the proviso to parts other than each subparagraph of
Article 23-2 (3) of the Act
shall be as follows:
<Amended by Presidential Decree No. 18213, Jan. 9, 2004; Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 18953, Jul. 22, 2005; Presidential Decree No. 21078, Oct. 8, 2008; Presidential Decree No. 21542, Jun. 16, 2009; Presidential Decree No. 24566, May 31, 2013>
1.
National Institute of Environmental Research;
2.
City/
Do
health and environmental research institutes;
3.
Basin environment offices or regional environment offices;
4.
and 5. Deleted.
<by Presidential Decree No. 21542, Jun. 16, 2009>
[This Article Added by Presidential Decree No. 17432, Dec. 19, 2001]
법령보기 화면
Article 17-4 (Requirements, etc. for Registration of Soil Purification Business)
(1)
Any person who intends to file for registration to run soil purification business under the former part of
Article 23-7 (1) of the Act
shall secure facilities, equipment and technical manpower as stipulated in Appendix 2.
(2)
Any changes to be registered under the latter part of
Article 23-7 (1) of the Act
are as follows:
1.
Any change in the trade name or the location of business place;
2.
Replacement of the representative;
3.
Replacement of the technical manpower;
4.
Any change in off-site soil treatment facilities provided in subparagraph 1 (b) of Appendix 2.
(3)
In changing the matters provided in paragraph (2) 1 through 3, the registration of the changed matters shall be filed within 30 days from the date the grounds for such change arises, and in changing the matters provided in paragraph (2) 4, the registration of such change shall be filed in advance.
(4)
When an application for registration is filed pursuant to
Article 23-7 (1) of the Act
, the Minister of Environment shall permit registration unless the relevant applicant falls under any of the following cases:
<Added by Presidential Decree No. 23196, Sep. 30, 2011>
1.
Where he/she is subject to the prohibition on concurrently running other businesses under
Article 23-5 of the Act
;
2.
Where he/she falls under grounds for disqualification under
Article 23-8 of the Act
;
3.
Where he/she intends to install facilities in an area where installation and operation of such facilities is prohibited or restricted under other Acts and subordinate statutes (only applicable to installation of off-site soil treatment facilities);
4.
Where he/she fails to secure facilities, equipment and technical manpower provided in paragraph (1);
5.
Where he/she violates any restrictions imposed under this Decree, or other Acts and subordinate statutes.
[This Article Added by Presidential Decree No. 18910, Jun. 30, 2005]
법령보기 화면
Article 17-5 (Prohibition of Subcontract)
(1)
“Works prescribed by Presidential Decree” in the main sentence of
Article 23-9 (2) of the Act
means the operation and construction works of soil purification facilities.
(2)
“Unavoidable reasons prescribed by Presidential Decree” in the proviso to
Article 23-9 (2) of the Act
means reasons falling under any of the following subparagraphs:
<Added by Presidential Decree No. 24566, May 31, 2013>
1.
Where urgent soil purification is needed due to a natural disaster;
2.
Where urgent soil purification is needed since an area is declared as a special disaster area under
Article 60 of the Framework Act on the Management of Disasters and Safety
.
[This Article Added by Presidential Decree No. 23196, Sep. 30, 2011]
법령보기 화면
Article 18 (Delegation and Entrustment of Authority)
(1)
The Minister of Environment shall delegate the following authority to the head of a basin environment office or the head of a regional environment office under
Article 27 (1) of the Act
:
<Amended by Presidential Decree No. 17432, Dec. 19, 2001; Presidential Decree No. 17698, Aug. 8, 2002; Presidential Decree No. 18910, Jun. 30, 2005; Presidential Decree No. 23196, Sep. 30, 2011; Presidential Decree No. 24566, May 31, 2013>
1.
Establishment of measuring networks and regular measurements under
Article 5 (1) of the Act
;
2.
Detailed soil surveys conducted under
Article 5 (4) of the Act
;
3.
Expropriation or use of land, etc. under
Article 7 (1) of the Act
;
4.
Designation of a soil environment assessment agency and announcement of such designation under
Article 23-2 (2) 1 and (4) of the Act
;
5.
Administrative dispositions taken against a soil environment assessment agency under
Article 23-6 of the Act
;
5-2.
Receipt and processing of reports concerning succession of the status of soil environment assessment agencies under
Article 23-12 (3) of the Act
;
5-3.
Deleted; <by Presidential Decree No. 24566, May 31, 2013>
6.
Requests for the report and submission of data concerning soil environment assessment agencies and the inspection thereof under
Article 26-2 (2) of the Act
;
7.
Hearings held on the revocation of designation of a soil environment assessment agency under subparagraph 2 of
Article 26-5 of the Act
;
8.
Imposition and collection of fines for negligence under
Article 32 of the Act
.
(2)
The Minister of Environment shall delegate the following authority to the president of the National Institute of Environmental Research under
Article 27 (1) of the Act
:
<Added by Presidential Decree No. 23196, Sep. 30, 2011; Presidential Decree No. 24566, May 31, 2013>
1.
Designation of a hazard assessment agency and announcement of such designation under
Article 23-2
(2) 1 and (4);
2.
Administrative dispositions taken against a hazard assessment agency under
Article 23-6 of the Act
;
3.
Receipt and processing of reports concerning succession of the status of hazard assessment agencies under
Article 23-12 (3) of the Act
;
4.
Requests for the report and submission of data concerning hazard assessment agencies and the inspection thereof under
Article 26-2 (2) of the Act
;
5.
Hearings held on the revocation of designation of a hazard assessment agency under subparagraph 2 of
Article 26-5 of the Act
.
(3)
The Minister of Environment may, under
Article 27 (2) of the Act
, entrust the following works to the Korea Environment Corporation pursuant to the Korea Environment Corporation Act. In this case, the Minister of Environment shall publicly announce the date of entrustment and the entrusted works:
<Added by Presidential Decree No. 24566, May 31, 2013>
1.
Surveys necessary for establishment of the basic plan for soil conservation under
Article 4 (1) of the Act
;
2.
Detailed soil surveys under
Article 5 (4) of the Act
;
3.
Surveys on the actual state and level of topsoil erosion under
Article 6-2 (1) of the Act
;
4.
Detailed soil surveys and soil purification works under
Article 6-3 (1) of the Act
;
5.
Works related to the expropriation and the use of land, etc. under
Article 7
(1):
Provided
, That the scope thereof is limited to those necessary for the works entrusted by the Minister of Environment;
6.
Formulation and change of a plan for creation of a soil control complex, and hearings and consultations thereon under
Article 15-7
(2);
7.
Works related to using or earning profit from part of the land of a soil control complex, or lending or selling it under
Article 15-7
(3).
법령보기 화면
Article 18-2 (Reexamination of Regulations)
The Minister of Environment shall take measures, such as repeal, deregulation, or maintenance upon examining by December 31, 2014 whether the performance period of measures to purify contaminated soil and the extension thereof and the number of extensions under
Article 8-3
(2) are appropriate.
<Amended by Presidential Decree No. 23196, Sep. 30, 2011>
[This Article Added by Presidential Decree No. 21626, Jul. 7, 2009]
법령보기 화면
Article 19 (Standards for Imposition of Fines for Negligence)
Standards for imposition of fines for negligence under
Article 32 (1) and (2) of the Act
shall be as stipulated in Appendix 3.
<Amended by Presidential Decree No. 23196, Sep. 30, 2011>
[This Article Wholly Amended by Presidential Decree No. 21542, Jun. 16, 2009]
ADDENDUM
This Decree shall enter into force on January 6, 1996.
ADDENDA <Presidential Decree No. 16058, Dec. 31, 1998>
(1)
(Enforcement Date) This Decree shall enter into force on January 1, 1999:
Provided
, That the amended provisions of
Article 8
(3) 3 shall enter into force on April 1, 1999.
(2)
(Transitional Measures concerning Inspection of Soil Contamination Levels) With respect to facilities which fall under the amended provisions of
Article 8
(2) 1 (a) or (b) at the time this Decree enters into force under the main sentence of paragraph (1) and for which six months have not passed since the inspection of soil contamination levels was made under the previous provisions, the inspection of the soil contamination levels which is to be conducted first after this Decree enters into force shall be exempted, notwithstanding the amended provisions of
Article 8
(2) 1:
Provided
, That this shall not apply to the facilities which fall under the proviso to the same subparagraph.
(3)
Omitted.
ADDENDUM <Presidential Decree No. 17432, Dec. 19, 2001>
This Decree shall enter into force on January 1, 2002.
ADDENDA <Presidential Decree No. 17698, Aug. 8, 2002>
Article 1 (Enforcement Date)
This Decree shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 5 Omitted.
ADDENDA <Presidential Decree No. 17816, Dec. 26, 2002>
Article 1 (Enforcement Date)
This Decree shall enter into force on January 1, 2003.
Articles 2 through 17 Omitted.
ADDENDA <Presidential Decree No. 18213, Jan. 9, 2004>
Article 1 (Enforcement Date)
This Decree shall enter into force on the date of its promulgation.
Articles 2 and 3 Omitted.
ADDENDUM <Presidential Decree No. 18312, Mar. 17, 2004>
This Decree shall enter into force on the date of its promulgation.
ADDENDA <Presidential Decree No. 18910, Jun. 30, 2005>
Article 1 (Enforcement Date)
This Decree shall enter into force on July 1, 2005:
Provided
, That the amended provisions of
Articles 8-2
(1) 1,
11
, and
11-2
shall take effect on January 1, 2006, and the amended provisions of
Article 8
(1) 2 and (3) (limited to the matters relating to the leakage inspection) on July 1, 2006.
Article 2 (Applicability to Corrective Order)
The amended provisions of
Article 8-3
concerning the period of implementing a corrective order and the extension of such a period shall apply to any person to whom such corrective order is given on or after the date this Decree enter into force.
Article 3 (Transitional Measures concerning Leakage Inspection)
(1)
Notwithstanding the amended provisions of
Article 8
(1) 2 concerning the leakage inspection, the facilities subject to a leakage inspection for which not less than fifteen years have passed at the time the said provisions enter into force since they were installed shall undergo a leakage inspection not later than June 30, 2007, and the facilities subject to a leakage inspection for which not less than ten years but less than fifteen years have passed at the time of the said provisions enter into force since their installation, not later than June 30, 2008, respectively.
(2)
Notwithstanding the provisions of paragraph (1), if the leakage inspection as referred to in
Article 8
(1) 2 (a) is undergone after July 1, 2001 (referring to July 1, 2002 in case of the facilities for which not less than ten years but less than fifteen years have passed since their installation) or the leakage inspection as referred to in
Article 8
(1) 2 (b) is undergone after July 1, 2003 (referring to July 1, 2004 in case of the facilities for which not less than ten years but less than fifteen years have passed since their installation), the next leakage inspection shall be undergone according to the classification of items of
Article 8
(1) 2 on the basis of the date when such inspection is conducted.
Article 4 (Transitional Measures concerning Standards for Designation of Soil-Related Specialized Agency)
Any person who is designated as a soil contamination survey agency at the time of the entry into force of this Decree shall receive the designation of its change after securing the inspection facilities, equipment and the technical manpower as described in the amended provisions of subparagraph 1 of Appendix 1 within six months from the date this Decree takes effect, and any person who is designated as a leakage inspection agency at the time this Decree enters into force shall receive the designation of its change after securing the inspection facilities, equipment and the technical manpower as described in the amended provisions of subparagraph 2 of Appendix 1 within one year from the date when this Decree takes effect.
ADDENDA <Presidential Decree No. 18953, Jul. 22, 2005>
Article 1 (Enforcement Date)
This Decree shall enter into force on the date of its promulgation.
Article 2 Omitted.
ADDENDA <Presidential Decree No. 20297, Aug. 28, 2007>
Article 1 (Enforcement Date)
This Decree shall enter into force on October 5, 2008. (Proviso Omitted.)
Articles 2 and 3 Omitted.
ADDENDA <Presidential Decree No. 21078, Oct. 8, 2008>
Article 1 (Enforcement Date)
This Decree shall enter into force on the date of its promulgation.
Articles 2 through 4 Omitted.
ADDENDA <Presidential Decree No. 21542, Jun. 16, 2009>
Article 1 (Enforcement Date)
This Decree shall enter into force on the date of its promulgation.
Article 2 (Transitional Measures concerning Soil Contamination Inspection)
The previous provisions shall apply to an inspection of soil contamination levels for any installer of the specific facilities subject to the control of soil contamination who should undergo an inspection of soil contamination levels under
Article 8
(1) 1 and a leakage inspection under subparagraph 2 of the same paragraph not later than December 31, 2008.
Article 3 (Transitional Measures concerning Corrective Orders)
The previous provisions shall apply to the extension of the performance period to any installer of the specific facilities subject to the control of soil contamination who has received a corrective order pursuant to
Article 8-3
(1) at the time this Decree enters into force.
Article 4 (Transitional Measures concerning Orders Given to Take Measures)
The amended provisions of
Article 9-2
(2) shall apply to the extension of the performance period to any person causing the contamination who has been ordered to take measures pursuant to
Article 9-2
(1) at the time this Decree enters into force.
Article 5 (Transitional Measures concerning Standards for Designation of Soil-Related Specialized Agency)
Any person who has been designated as a soil-related specialized agency at the time when this Decree enters into force shall be designated for modification with required technical human resources under the amended provisions of Appendix 1 within one year from the date this Decree enters into force.
Article 6 (Transitional Measures concerning Standards for Registration of Soil Purification Business)
Any person who has registered a soil purification business at the time this Decree enters into force shall register for modification with required technical human resources under the amended provisions of Appendix 2 within one year from the date this Decree enters into force.
ADDENDUM <Presidential Decree No. 21626, Jul. 7, 2009>
This Decree shall enter into force on the date of its promulgation.
ADDENDA <Presidential Decree No. 23196, Sep. 30, 2011>
Article 1 (Enforcement Date)
This Decree shall enter into force on October 6, 2011.
Articles 2 (Applicability to Extension of Performance Period)
(1)
The amended provisions of
Article 5-3
(1) shall begin to apply from the first detailed survey of soil, the performance period of which is extended after this Decree enters into force.
(2)
The amended provisions of
Article 9
(1) shall begin to apply from the first detailed survey of soil, the performance period of which is extended after this Decree enters into force.
Articles 3 (Applicability to Soil Contamination Survey of Specific Facilities subject to Control of Soil Contamination)
The amended provisions of
Article 8
(1) 1 shall also apply to soil contamination surveys which are being conducted at the time this Decree enters into force.
ADDENDA <Presidential Decree No. 23529, Jan. 25, 2012>
Article 1 (Enforcement Date)
This Decree shall enter into force on January 26, 2012.
Articles 2 and 3 Omitted.
ADDENDUM <Presidential Decree No. 24566, May 31, 2013>
This Decree shall enter into force on June 2, 2013.
Last updated : 2015-10-27