ACT ON ACQUISITION OF AND COMPENSATION FOR LAND FOR PUBLIC WORKS PROJECTS
21970 · 2010-11-18
ACT ON ACQUISITION OF AND COMPENSATION FOR LAND FOR PUBLIC WORKS PROJECTS
Act No. 10303, May 17, 2010
Act No. 6656, Feb. 4, 2002
Amended by Act No. 6916, May 29, 2003
Act No. 7304, Dec. 31, 2004
Act No. 7335, Jan. 14, 2005
Act No. 7475, Mar. 31, 2005
Act No. 7758, Dec. 23, 2005
Act No. 7796, Dec. 29, 2005
Act No. 7773, Dec. 29, 2005
Act No. 7835, Dec. 30, 2005
Act No. 8665, Oct. 17, 2007
Act No. 8852, Feb. 29, 2008
Act No. 9053, Mar. 28, 2008
Act No. 9595, Apr. 1, 2009
Act No. 10239, Apr. 5, 2010
Act No. 10303, May 17, 2010
CHAPTER I GENERAL PROVISIONS
법령보기 화면
Article 1 (Purpose)
The purpose of this Act is to ensure the promotion of public welfare and the pertinent protection of property rights through an efficient implementation of public works, by prescribing matters for indemnity of any loss incurred by the acquisition or use of the land, etc. required for the public works through consultations or expropriation.
법령보기 화면
Article 2 (Definitions)
The definitions of the terms used in this Act shall be as follows:
1.
The term "land, etc." means land, goods and rights falling under any subparagraph of
Article 3
;
2.
The term "public works" means projects falling under any subparagraph of
Article 4
;
3.
The term "project operator" means any person who implements the public works;
4.
The term "landowner" means any owner of land required for the public works;
5.
The term "person concerned" means any person holding superficies, servitude, lease hold rights on a deposit basis, mortgages, rights by a loan for use or lease, and any person holding other rights than the ownership for a land, or any person holding the ownership and other rights to goods located on the said land, with respect to the land to be acquired or used by a project operator:
Provided
, That no person who has acquired the rights after the project approval is published under
Article 22
shall be included in the person concerned, except for any person who has succeeded to the existing rights;
6.
The term "point of time for price" means the point of time to become the standard for computing the indemnity amount under
Article 67
(1);
7.
The term "project approval" means a determination of any publicworks as the project to expropriate or use the land, etc.
법령보기 화면
Article 3 (Those Subject to Application)
This Act shall apply to the cases where any project operator acquires or uses land, goods and rights falling under each of the following subparagraphs:
1.
Lands and rights other than the ownership thereof;
2.
Standing trees, buildings and other goods fixed on the land, andother rights than the ownership thereof, which are all required forthe public works, together with the land;
3.
Mining rights, fishing rights, or the rights to use water;
4.
Rights over the soil, stones, sand, or gravel belonging to the land.
법령보기 화면
Article 4 (Public Works)
Any project capable of acquiring or using the land, etc. under this Act shall be those falling under any of the following subparagraphs:
<Amended by Act No. 7475, Mar. 31, 2005; Act No. 8665, Oct. 17, 2007>
1.
Projects for the national defense and military affairs;
2.
Projects to be implemented for public interest by obtaining permission, authorization, approval, designation, etc. under the related Acts, with respect to the railroads, roads, airports, harbors, parking lots, public garages, cargo terminals, cable ways, rail tracks, rivers, dikes, dams, canals, tap-water system, sewerage system, terminal treatment of sewage, treatment of wastewater, erosion control, windbreak, fire prevention, tide embankment, water embankment, reservoirs, irrigation and drainage canals, petroleum reservation and oil supply, treatment of wastes, electricity, telecommunications, broadcasting, gas and meteorologic observations;
3.
Projects with respect to the office buildings, plants, research institutes, test institutes, health or cultural facilities, parks, arboretums, squares, athletic fields, markets, graveyards, crematories, slaughterhouses, and other public facilities to be installed by the State or local governments;
4.
Projects with respect to the schools, libraries, museums and art galleries to be implemented for public interest, by obtaining permission, authorization, approval and designation, etc. under the related Acts;
5.
Projects with respect to the construction of houses, or creation of housing lots for the purpose of lease rent or transfer, which are to be implemented by the State, local governments, government-invested institutions, local public corporations, or any person designated by the State or local governments;
6.
Projects with respect to the pathways, bridges, electric lines, material storages and other accessory facilities required for implementing the projects under subparagraphs 1 through 5;
7.
Projects concerning development of migration complexes, such as houses, and factories, necessary for implementation of the projects under subparagraphs 1 through 5;
8.
Other projects capable of expropriating or using the land, etc. underother Acts.
법령보기 화면
Article 5 (Succession to Rights and Duties, etc.)
(1)
Rights and duties of a project operator under this Act shall be transferred to any person who has succeeded to the former's project.
(2)
Any procedures taken and other acts performed under this Act shall take effect on any successor to a project operator, landowner and person concerned.
법령보기 화면
Article 6 (Method, etc. of Calculating Term)
Method of calculating any term under this Act shall be governed by the
Civil Act
, and matters necessary for a notice and a delivery of documents shall be prescribed by Presidential Decree.
<Amended by Act No. 8665, Oct. 17, 2007>
법령보기 화면
Article 7 (Agent)
Any project operator, landowner or person concerned may designate a lawyer or any other person as his/her agent in performing such acts as an application for project approval, application for adjudication, submission of written opinions, etc.
법령보기 화면
Article 8 (Application for Issuance of Documents)
(1)
Any project operator may, as prescribed by Presidential Decree, request the State or a local government to issue the documents necessary for an implementation of relevant public works, and the State or a local government shall comply with such request.
(2)
The State or a local government shall not impose any service fees on the documents issued under paragraph (1).
CHAPTER II PREPARATION OF PUBLIC WORKS
법령보기 화면
Article 9 (Permission, etc. for Access to Prepare Public Works)
(1)
A project operator may make a survey or an investigation for making preparations for public works by having access to the land occupied by others.
<Amended by Act No. 8665, Oct. 17, 2007>
(2)
When a project operator (excluding cases where a Special Self-Governing Province or
Si
/
Gun
/
Gu
is a project operator) intends to make a survey or an investigation pursuant to paragraph (1), he/she shall obtain permission of the Governor of a Self-Governing Province, the head of a
Si
/
Gun
/
Gu
(referring to the head of autonomous
Gu
; hereinafter the same shall apply) after determining the type of project, the area of land to which he/she intends to have access, and the period thereof; provided,when the project operator is the State, the head of a related central administrative agency which is to implement such project shall notify the Governor of a Self-Governing Province and the head of a
Si
/
Gun
/
Gu
thereof, and when the project operator is the Special Metropolitan City, a Metropolitan City or
Do
, the relevant Special Metropolitan City Mayor, Metropolitan City Mayor or
Do
governor shall notify the head of a
Si
/
Gun
/
Gu
thereof respectively.
<Added by Act No. 8665, Oct. 17, 2007>
(3)
When the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
falls under any of the following subparagraphs, he/she shall publicly notify the project operator, the type of project, the area of land for which he/she grants access, and the period thereof, and notify the land occupant thereof:
<Amended by Act No. 8665, Oct. 17, 2007>
1.
When he/she has granted permission pursuant to the main sentence of paragraph (2);
2.
When he/she has been notified pursuant to the proviso to paragraph (2);
3.
As a case where a Special Self-Governing Province or a
Si
/
Gun
/
Gu
(referring to autonomous
Gu
; hereinafter the same shall apply) is the project operator, when it intends to make a survey or an investigation by having access to the land occupied by others pursuant to paragraph (1).
(4)
A project operator shall make compensation for any loss caused by his/her survey and investigation under paragraph (1) by having access to the land occupied by others.
(5)
No claim shall be made for losses under paragraph (4) after the lapse of one year from the day of becoming aware of such losses, or after the lapse of three years from the day of incurring such losses.
<Amended by Act No. 8665, Oct. 17, 2007>
(6)
A compensation for losses under paragraph (4) shall be determined through the consultation between a project operator and a person who has suffered such losses.
<Amended by Act No. 8665, Oct. 17, 2007>
(7)
When consultation under paragraph (6) is not effected, a project operator or a person who has suffered losses may apply for adjudication to the competent land expropriation committee as prescribed by Presidential Decree.
<Added by Act No. 8665, Oct. 17, 2007>
법령보기 화면
Article 10 (Notice of Access to Land)
(1)
Any person intending to have access pursuant to
Article 9
(2) to the land occupied by others shall notify the Special Self-Governing Province Governor or the head of a
Si
/
Gun
/
Gu
of such date and place not later than five days prior to the date intended for such access.
<Amended by Act No. 8665, Oct. 17, 2007>
(2)
When the Special Self-Governing Province Governor or the head of a
Si
/
Gun
/
Gu
has received a notice under paragraph (1) or when the Special Self-Governing Province Governor or the head of a
Si
/
Gun
/
Gu
intends to have access to the land occupied by others in cases where the Special Self-Governing Province or
Si
/
Gun
/
Gu
is the project operator, it shall promptly make a public announcement thereof, and notify the occupant of such land thereof.
<Amended by Act No. 8665, Oct. 17, 2007>
(3)
No one shall gain access to the residence or the land surrounded by boundary marks and fences, etc. of the land occupant before sunrise or after sunset, without the consent of such land occupant.
법령보기 화면
Article 11 (Obligation for Acknowledgment by Land Occupant)
No land occupant shall hamper, without any justifiable reason, project operator's acts of having access and making a survey or an investigation after it has notified pursuant to
Article 10
.
<Amended by Act No. 8665, Oct. 17, 2007>
법령보기 화면
Article 12 (Removal, etc. of Obstacles)
(1)
When a project operator has access to the land occupied by others and makes a survey or an investigation pursuant to
Article 9
, in cases where there are unavoidable reasons that require him/her to remove obstacles or perform a trial digging (hereinafter referred to as "removal, etc. of obstacles"), he/she shall obtain consent of the owners or occupants of the land:
Provided
, That when he/she has failed to obtain consent of such owners or occupants, he/she may remove obstacles with permission of the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
(excluding the cases where the project operator is the Special Self-Governing Province or the
Si
/
Gun
/
Gu
) and the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
may remove obstacleswithout permission in cases where the Special Self-Governing Province or the
Si
/
Gun
/
Gu
is the project operator.
<Amended by Act No. 8665, Oct. 17, 2007>
(2)
When the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
intends to grant permission pursuant to the proviso to paragraph (1) or when the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
intends to remove obstacles, he/she shall hear in advance the opinions of the relevant owners and occupants.
<Amended by Act No. 8665, Oct. 17, 2007>
(3)
Any person intending to perform a removal, etc. of obstacles under paragraph (1) shall serve such notice to its owner and occupant not later than three days prior to the day intended for performing a removal, etc. of obstacles.
(4)
Any project operator shall make indemnity for any loss incurred by the removal, etc. of obstacles under paragraph (1).
(5)
The provisions of
Articles 9
(5) through (7) shall apply
mutatis mutandis
to a compensation for losses under paragraph (4).
<Amended by Act No. 8665, Oct. 17, 2007>
법령보기 화면
Article 13 (Carrying Identification Card, etc.)
(1)
Any person intending to have access to the land occupied by others with permission of the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
pursuant to the main sentence of
Article 9
(2) and a person intending to remove obstacles pursuant to
Article 12
(excluding cases where the Special Self-Governing Province or
Si
/
Gun
/
Gu
is the project operator) shall carry an identification card and a permit issued by the Governor of a Special Self-Governing Province or the head of the
Si
/
Gun
/
Gu
.
<Amended by Act No. 8665, Oct. 17, 2007>
(2)
Any person intending to have access to the land occupied by others with notification to the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
pursuant to the proviso to
Article 9
(2) and a person intending to have access to the land occupied by others pursuant to
Article 9
(3) 3 and to remove obstacles pursuant to the proviso to
Article 12
(1) in cases where a project operator is the Special Self-Governing Province or
Si
/
Gun
/
Gu
, shall carry his/her identification card.
<Amended by Act No. 8665, Oct. 17, 2007>
(3)
The identification card and permit under paragraphs (1) and (2) shall be produced to the owners and occupants of the land or obstacles and other interested parties.
(4)
Matters concerning for the forms of a voucher and a written permission under paragraphs (1) and (2) shall be prescribed by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
CHAPTER III ACQUISITION OR USE UNDER CONSULTATIONS
법령보기 화면
Article 14 (Preparation of Protocols of Land and of Goods)
(1)
When any project operator needs an acquisition or use of the land, etc. under consultations prior to a project approval under
Article 20
for the implementation of public works, he/she shall prepare a protocol of land and goods and affix his/her signature or seal thereon, and make the landowner and person concerned to affix their signatures or seals thereon:
Provided
, That the same shall not apply to the cases where it is impossible to make the landowner and person concerned to affix their signatures or seals due to the refusal of the landowner and person concerned without any justifiable reason, or the impossibility to know of the landowner and person concerned, or the impossibility to know of their addresses or whereabouts, etc., but the said project operator shall enter such reasons in the relevant protocols of land and goods.
(2)
Matters concerning the entry items in the protocols of land and goods and the preparation thereof, such as the location of land and goods, the landowner and person concerned, etc., shall be prescribed by Presidential Decree.
법령보기 화면
Article 15 (Perusal, etc. of Indemnity Plans)
(1)
When the project operator has prepared the protocols of land and goods pursuant to
Article 14
, he/she shall publicly notify an indemnity plan stating the outline of his/her public works, details of protocols of land and goods, the time, method and procedures for indemnity, etc. in the nationally circulated dailies, and notify the landowner and person concerned thereof respectively and also notify the Governor of a Special Self-Governing Province and the head of a
Si
/
Gun
/
Gu
, except for a project operator requesting perusal pursuant to the proviso to paragraph (2):
Provided
, That in cases where there exist 20 or less landowners and persons concerned, such publication may be omitted.
<Amended by Act No. 8665, Oct. 17, 2007>
(2)
When the project operator has made a public notice or a notification under paragraph (1), he/she shall make the details thereof available for the public perusal for not less than 14 days:
Provided
, That in cases where the project area extends over two or more Sis/Guns/Gus or the project operator is not an administrative agency, he/she shall also forward their copies to the relevant Special Self-Governing Province governor and the heads of relevant Sis/Guns/Gus and request them to offer such copies for the public perusal.
<Amended by Act No. 8665, Oct. 17, 2007>
(3)
Any landowner or person concerned who is dissatisfied with any of the details of the protocols of land and goods which have been published or notified under paragraph (1), may raise an objection in writing tothe project operator within a perusal period under paragraph (2).
(4)
The project operator shall make an additional note of an objection raised under paragraph (3) in the relevant protocols of land and goods, and take appropriate steps when he/she deems that such objection is well-grounded.
법령보기 화면
Article 16 (Consultations)
Any project operator shall hold a faithful consultation with the land-owners and persons concerned on the indemnity for the land, etc., andmatters necessary for the consultations, such as their procedures and methods, etc., shall be prescribed by Presidential Decree.
법령보기 화면
Article 17 (Conclusion of Contracts)
Any project operator shall enter into contracts with the landowners and persons concerned, when the consultations under
Article 16
have yielded any agreement.
법령보기 화면
Article 18 Deleted.<by Act No. 8665, Oct. 17, 2007>
CHAPTER IV ACQUISITION OR USE BY EXPROPRIATION
Section 1 Procedures for Expropriation or Use
법령보기 화면
Article 19 (Expropriation or Use of Land, etc.)
(1)
Any project operator may expropriate or use the land, etc. as prescribed by this Act, when it is necessary for implementing the public works.
(2)
The land, etc. which is being expropriated or used for the public works shall not be expropriated or used for other public works, unless it is specially required.
법령보기 화면
Article 20 (Project Approval)
(1)
When any project operator intends to expropriate or use the land, etc. pursuant to
Article 19
, he/she shall obtain a project approval from the Minister of Land, Transport and Maritime Affairs as prescribed by Presidential Decree.
<Amended by Act No. 8852, Feb. 29, 2008>
(2)
Any person intending to file an application for the project approval under paragraph (1) shall pay the service fees prescribed by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 21 (Hearing of Opinions, etc.)
When the Minister of Land, Transport and Maritime Affairs intends to grant a project approval, he/she shall hold a consultation with the heads of related central administrative agencies and the Special Metropolitan City Mayor, Metropolitan City Mayor,
Do
Governor and the Governor of a Special Self-Governing Province (hereinafter referred to as the "Mayor/
Do
Governor"), and hear in advance the opinions of the Central Land Expropriation Committee and persons interested in the project approval as prescribed by Presidential Decree.
<Amended by Act No. 8665, Oct. 17, 2007; Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 22 (Public Announcement of Project Approval)
(1)
When the Minister of Land, Transport and Maritime Affairs has granted a project approval under
Article 20
, he/she shall promptly notify its purports to the project operator, landowners, persons concerned and the related Mayor/
Do
Governor, and publicly announce in the Official Gazette thename or title of the project operator, types of the project, project areas,and the particulars of the land to be expropriated or used.
<Amended by Act No. 8852, Feb. 29, 2008>
(2)
The Mayor/
Do
Governor (excluding the Governor of a Special Self-Governing Province) in receipt of a notification of the project approval pursuant to paragraph (1) shall serve notice to the head of a related
Si
/
Gun
/
Gu
.
<Amended by Act No. 8665. Oct. 17, 2007>
(3)
A project approval shall take effect from the day of public announcement under paragraph (1).
법령보기 화면
Article 23 (Invalidation of Project Approval)
(1)
When any project operator fails to file an application for adjudication under
Article 28
(1) within one year from the day when a public announcement of the project approval under
Article 22
(1) is made (hereinafter referred to as "public announcement of project approval"), such project approval shall lose its validity on the day next to a day on which one year lapses from the day when the project approval is publicly announced.
(2)
A project operator shall indemnify the landowners or persons concerned for any losses incurred by the invalidation of his/her project approval under paragraph (1).
(3)
The provisions of
Article 9
(5) through (7) shall apply
mutatis mutandis
to a compensation for losses under paragraph (2).
<Amended by Act No. 8665, Oct. 17, 2007>
법령보기 화면
Article 24 (Discontinuation and Alteration of Project)
(1)
When the whole or part of the land. etc. becomes unnecessary to be expropriated or used, since the whole or part of the project has been discontinued or altered after the project approval was publicly announced, the relevant project operator shall promptly file a report thereon with the Mayor/
Do
Governor having jurisdiction over the project area, andserve notice thereof to the landowners and persons concerned.
(2)
When there exists any report filed under paragraph (1), the Mayor/
Do
Governor shall publicly announce in the Official Gazette that there exists a discontinuation or alteration of the whole or part of the project.
(3)
Even in cases where no report is made under paragraph (1), when the Mayor/
Do
Governor becomes aware that it has no longer been necessary to expropriate or use the land since the project operator discontinued or altered the whole or part of the project, he shall hear in advance the opinions of the project operator, and make a public announcement under paragraph (2).
(4)
When the Mayor/
Do
Governor has made a public announcement under paragraphs (2) and (3), he/she shall promptly file a report thereon with the Minister of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29., 2008>
(5)
From the day when a public announcement is made under paragraphs (2) and (3), the whole or part of a project approval shall loseits validity pursuant to the details of such public announcement.
(6)
A project operator shall indemnify the land owners or persons concerned for any losses incurred by the discontinuation or alteration of the whole or part of the project under paragraph (1).
(7)
The provisions of
Article 9
(5) through (7) shall apply
mutatis mutandis
to a compensation for losses under paragraph (6).
<Amended by Act No. 8665, Oct. 17, 2007>
법령보기 화면
Article 25 (Preservation of Land, etc.)
(1)
Subsequent to a public announcement of project approval, no oneshall make an alteration of form and quality in the land for which public announcement has been made, which is likely to hamper the project, or make any damage, destruction or removal of goods provided for in subparagraph 2 or 4 of
Article 3
.
(2)
Subsequent to a public announcement of project approval, any person intending to construct buildings, make large repairs, install structures, or add or increase goods on the land for which public announcement has been made, shall obtain approval of the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
. In such cases, the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
shall hear in advance the opinions of the project operator.
<Amended by Act No. 8665, Oct. 17, 2007>
(3)
Any landowner or person concerned, who has constructed buildings,made large repairs, installed structures, added or increased goods in contravention of paragraph (2), shall restore the relevant buildings, structures, or goods to the original state, and shall not file a claim for the indemnity of any loss incurred thereby.
법령보기 화면
Article 26 (Mutatis Mutandis Application of Procedures such as Consultations, etc.)
(1)
Any project operator who has been granted the project approval under
Article 20
shall go through such procedures as the preparation of protocols of land and goods, the public announcement, notification and perusal ofan indemnity plan, the computation of indemnity amount, and the consultations with the landowners and persons concerned. In such cases, the provisions of
Articles 14 through 16
and
68
shall be applied
mutatis mutandis
.
(2)
When the protocols of land and goods remain unchanged for theproject to which a project approval has been granted under
Article 20
, since no agreement has been yielded even though it had gone through the procedures under
Articles 14 through 16
and
68
prior to the project approval, it may not go through the procedures under
Articles 14 through 16
, notwithstanding the provisions of paragraph (1):
Provided
, That when the project operator, landowner or person concerned reques
Article 16
consultations under
Article 16
, such consultations shall be held.
법령보기 화면
Article 27 (Investigation Right, etc. on Land and Object)
(1)
Subsequent to a public announcement of approval for a project, the project operator or an appraisal business operator who has been entrusted with the appraisal pursuant to
Article 68
(referring to an appraisal business operator under the Public Notice of Values and Appraisal of Real estate Act; hereinafter referred to as "appraisal business operator") may have access to the relevant land or goods and survey or investigate it, notwithstanding
Article 9
, in cases where he/she falls under any of the following subparagraphs. In such cases,
Articles 10
,
11
and
13
shall be applied mutatis mutandis:
<Amended by Act No. 8665, Oct. 17, 2007>
1.
In cases where it is required for a project operator to prepare a project or to draw up a protocol of land and goods;
2.
In cases where it is required for the appraisal business operator to appraise the land, etc. for which he/she has been entrusted with the appraisal.
(2)
Subsequent to a public announcement of project approval, except for the cases where any landowner or person concerned raises an objection against the details of protocols of land and goods within the perusal period pursuant to
Article 15
(3) to be applied
mutatis mutandis
under
Article 26
(1), no objection shall be raised against the details of protocols of land and goods which have been prepared pursuant to
Article 14
to be applied
mutatis mutandis
under
Article 26
(1):
Provided
, That the same shall not apply to the cases where it is attested that any of the details of protocols of land and goods is not true.
(3)
A project operator shall compensate losses (including losses caused by a survey or an investigation made by an appraisal business operator for appraisal under paragraph (1) 2) caused by having access to the land occupied by others and measuring or investigating pursuant to paragraph (1).
<Amended by Act No. 8665, Oct. 17, 2007>
(4)
The provisions of
Article 9
(5) through (7) shall apply
mutatis mutandis
to a compensation for losses under paragraph (3).
<Amended by Act No. 8665, Oct. 17, 2007>
법령보기 화면
Article 28 (Application for Adjudication)
(1)
When the consultation under
Article 26
fails to yield any agreement, or is impossible to be held (including the cases where no request is made for consultations under the proviso to
Article 26
(2)), a project operator may, as prescribed by Presidential Decree, file an application for adjudication with the competent land expropriation committee within one year from the day when the project approval is publicly announced.
(2)
Any person who files an application for adjudication pursuant to paragraph (1) shall pay the service fees prescribed by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 29 (Confirmation of Yielding Agreement)
(1)
When an agreement is yielded by going through the procedures under
Article 26
among the project operator, landowners and persons concerned, the project operator may, as prescribed by Presidential Decree, file an application for the confirmation of yielding an agreement with the competent land expropriation committee within the period of application for adjudication under
Article 28
(1), by obtaining consent of relevant landowner and persons concerned.
(2)
The provisions of
Articles 28
(2),
31
,
32
,
34
,
35
,
52
(7),
53
(4),
57
and
58
shall apply
mutatis mutandis
to the confirmation of yielding an agreement under paragraph (1).
(3)
When any project operator has filed an application for the confirmation of yielding an agreement under paragraph (1) by obtaining an authentication under the
Notary Public Act
with respect to matters prescribed by Presidential Decree, such as the location, parcel number, category and area of the land on which an agreement has been yielded, such agreementshall be deemed to be confirmed by the competent land expropriation committee's accepting such agreement.
<Amended by Act No. 8665, Oct. 17, 2007>
(4)
The confirmation under paragraphs (1) and (3) shall be deemed an adjudication under this Act and any project operator, landowner and person concerned shall not contest the yielding and details of the agreement confirmed.
법령보기 화면
Article 30 (Request for Filing Application for Adjudication)
(1)
When the consultation has failed to yield any agreement subsequent to a public announcement of project approval, any landowner and persons concerned may request in writing any project operator to file an application for adjudication, as precribed by Presidential Decree.
(2)
Any project operator in receipt of the request under paragraph (1) shall, as prescribed by Presidential Decree, file an application for adjudication with the competent land expropriation committee within 60 days from the day when such request has been made. In such cases, the provisions of
Article 28
(2) shall apply
mutatis mutandis
to the service fees.
(3)
When any project operator has filed an application for adjudication after the expiration of the period under paragraph (2), the amount computed by applying the legal rate of interest under
Article 3 of the Act on Special Cases Concerning Expedition, etc. of Legal Proceedings
to such lapsed period shall be paid in addition to the indemnity adjudicated by the competent land expropriation committee.
<Amended by Act No. 8665, Oct. 17, 2007>
법령보기 화면
Article 31 (Perusal)
(1)
The land expropriation committee in receipt of a written application for adjudication under
Article 28
(1) shall, as prescribed by Presidential Decree, promptly make a public announcement thereof, and make the copies of related documents available for the public perusal for not less than 14 days from the day of such public announcement.
(2)
When the land expropriation committee has made a public announcement under paragraph (1), any landowner or person concerned may present his/her opinions during the perusal period of the relevant documents.
법령보기 화면
Article 32 (Examination)
(1)
When the perusal period under
Article 31
(1) has expired, the land expropriation committee shall promptly investigate and examine the relevant application.
(2)
The land expropriation committee may, when deemed necessary toconduct an examination, have the project operator, landowners and persons concerned appear before it, and let them state their opinions.
(3)
In cases where the land expropriation committee has the project operator, landowners and persons concerned appear before it under the provisions of paragraph (2), it shall notify in advance the project operator, landowners and persons concerned of the date and place of such examination.
법령보기 화면
Article 33 (Advice on Conciliation)
(1)
The land expropriation committee may let its subcommittee com-posed of three members advise the project operator, landowners and persons concerned to seek a conciliation, prior to making any adjudication. In such cases, the subcommittee shall be comprised of such members as may be designated by the chairman or selected from among its members, but other matters necessary for the composition of the subcommittee shall be prescribed by Presidential Decree.
(2)
When the conciliation under paragraph (1) has been achieved, the relevant land expropriation committee shall prepare a protocol of conciliation, and let the members, project operator, landowners and persons concerned taking part in such conciliation to affix their signatures orseals thereon.
(3)
In case where the signatures or seals have been affixed on the protocol of conciliation under paragraph (2), it shall be deemed that an agreement the details of which are identical with the protocol of conciliation has been reached by and among the parties concerned.
법령보기 화면
Article 34 (Adjudication)
(1)
Any adjudication of the land expropriation committee shall be made in writing.
(2)
Any written adjudication under paragraph (1) shall contain the text of a judicial decision and the reasons and the date of adjudication, and the chairman and members present at the meeting shall affix their names and seals thereon, after which its authentic copy shall be served on the project operator, landowners and persons concerned.
법령보기 화면
Article 35 (Adjudication Period)
The land expropriation committee shall render its adjudication within14 days from the day when the examination under
Article 32
has been commenced:
Provided
, That when there exist any special grounds, such period may be extended only once within the limit of 14 days.
법령보기 화면
Article 36 (Rectification of Adjudication)
(1)
When it is evident that there exists any error in calculations or entries, or other error similar thereto in the adjudication, the land expropriation committee may, either
ex officio
or upon request from theparties, render an adjudication of its rectification.
(2)
Any adjudication of rectification shall be added to the original copy and authentic copy of the principal adjudication:
Provided
, That when it is impossible to add it to the authentic copy, the said committee shall prepare the authentic copy of the adjudication of rectification, and serveit on the parties concerned.
법령보기 화면
Article 37 (Omission of Adjudication)
When the land expropriation committee has omitted its adjudication on a part of the applications, the application for such omitted portion shall continuously remain pending in the relevant land expropriation committee.
법령보기 화면
Article 38 (Use of Land at Time of Natural Disaster)
(1)
When it becomes in urgent need of the public works to maintain the public safety due to natural disasters or other exigencies, any project operator may immediately use, as prescribed by Presidential Decree, the land of others with permission of the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
:
Provided
, That when the project operator is the State, the head of the relevant central administrative agency may use it with notification to the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
, and when a project operator is the Special Metropolitan City, or a Metropolitan City or
Do
, the Special Metropolitan City Mayor, Metropolitan City Mayor or
Do
Governor may use it with notification to the head of the relevant
Si
/
Gun
/
Gu
respectively, and when a project operator is the Special Self-Governing Province or
Si
/
Gun
/
Gu
, the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
may use it without permission or notification.
<Amended by Act No. 8665, Oct. 17, 2007>
(2)
When the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
has granted permission or has received a notice pursuant to paragraph (1) or when the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
intends to use the land of others pursuant to the proviso to paragraph (1), he/she shall promptly notify the owner and occupant of such land of the matters prescribed by Presidential Decree.
<Amended by Act No. 8665, Oct. 17, 2007>
(3)
The period of using the land under paragraph (1) shall not exceed six months.
(4)
Any project operator shall compensate any losses incurred by his/her use of other persons' land under paragraph (1).
(5)
The provisions of
Article 9
(5) through (7) shall apply
mutatis mutandis
to a compensation for losses under paragraph (4).
<Amended by Act No. 8665, Oct. 17, 2007>
법령보기 화면
Article 39 (Land Use in Need of Urgency)
(1)
When the land expropriation committee in receipt of an application for adjudication under
Article 28
deems that, if such adjudication were to be waited, there could exist a concern over causing a difficulty in preventing disasters or significantly hampering other public interests, it may at once grant permission for using the relevant land, upon request from the project operator and under conditions prescribed by Presidential Decree, after letting him/her to provide collaterals:
Provided
, That in cases where the State or a local government is the project operator, such collaterals may not be provided.
(2)
The period of using the land under paragraph (1) shall not exceed six months.
(3)
The provisions of
Article 38
(2) shall apply
mutatis mutandis
when the land expropriation committee grants a permission under paragraph (1).
Section 2 Effect of Expropriation or Use
법령보기 화면
Article 40 (Payment or Deposit of Indemnity)
(1)
Except for the cases of using the land under
Article 38
or
39
, a project operator shall pay the indemnity adjudicated by the competent land expropriation committee not later than the day of commencing the expropriation or use (referring to the day of commencing the expropriation or use decided by the land expropriation committee by its adjudication; hereinafter the same shall apply).
(2)
When it falls under any of the following subparagraphs, a project operator may deposit the indemnity at the deposit office in the locationof the land, etc. intended for the expropriation or use, not later than the day of commencing the expropriation or use:
1.
When a person entitled to the indemnity refuses to receive it or is unable to receive it;
2.
When a person entitled to the indemnity is unable to be known without any negligence by the project operator;
3.
When a project operator objects to the indemnity adjudicated by the competent land expropriation committee;
4.
When the payment of indemnity is banned by any seizure or provisional seizure.
(3)
When there exists any change in the right subsequent to the public announcement of a project approval, any person who succeeds to such right shall receive the indemnity under paragraph (1) or the deposit under paragraph (2).
(4)
Any project operator shall, in the case of paragraph (2) 3, pay the indemnity computed by himself/herself to the person entitled to the indemnity, and deposit the difference between the amount paid by him/her and the indemnity adjudicated by the land expropriation committee. In such cases, any person entitled to the indemnity shall not receive the deposited indemnity until the procedures for such objection are to be completed.
법령보기 화면
Article 41 (Indemnity for Land Use in Need of Urgency)
(1)
In cases where the land is used pursuant to
Article 39
, if there exists any demand from the landowner or a person concerned before the land expropriation committee adjudicates thereon, the project operator shall pay the indemnity computed by himself/herself to the landowner or the person concerned.
(2)
When any project operator fails to pay the indemnity by the payment period of indemnity under adjudication by the land expropriation committee, the landowner or person concerned shall acquire the whole or part of the collateral provided under
Article 39
.
법령보기 화면
Article 42 (Invalidation of Adjudication)
(1)
When any project operator has failed to pay or deposit the indemnity adjudicated by the competent land expropriation committee by the day of commencing the expropriation or use, the adjudication by the relevant land expropriation committee shall lose its validity.
(2)
Any project operator shall indemnify the landowner or a person concerned for any losses incurred by the invalidation of an adjudicationunder paragraph (1).
(3)
The provisions of
Article 9
(5) through (7) shall apply
mutatis mutandis
to a compensation for losses under paragraph (2).
<Amended by Act No. 8665, Oct. 17, 2007>
법령보기 화면
Article 43 (Transfer, etc. of Land or Goods)
Any person holding the right over the land to be expropriated or used or the goods fixed thereon, who is the landowner, person concerned or any other person not included in a landowner or person concerned, shall transfer or relocate the relevant land or goods to the project operatorby the day of commencing the expropriation or use.
법령보기 화면
Article 44 (Vicarious Transfer or Relocation)
(1)
The Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
shall vicariously transfer or relocate the land or goods upon request from the project operator, when it falls under any of the following subparagraphs:
<Amended by Act No. 8665, Oct. 17, 2007>
1.
When any person liable to transfer or relocate the land or goods is unable to perform such liability without any intention or negligence;
2.
When any project operator is unable to identify the person liable to transfer or relocate the land or goods without any negligence.
(2)
In cases where the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
vicariously transfers or relocates the land or goods pursuant to paragraph (1), any expenses incurred thereby shall be borne by the person liable to do so.
<Amended by Act No. 8665, Oct. 17, 2007>
법령보기 화면
Article 45 (Acquisition, Termination and Limit of Rights)
(1)
Any project operator shall acquire the ownership of the land or goods on the day of commencing the expropriation, and other rights over such land or goods shall be terminated simultaneously therewith.
(2)
Any project operator shall acquire the right of using the land or goods on the day of commencing the use, and other rights over the land or goods shall not be exercised during the period of such use.
(3)
Any right admitted by the land expropriation committee by adjudication shall not be terminated or suspended from its exercise, notwithstanding the provisions of paragraphs (1) and (2).
법령보기 화면
Article 46 (Risk Bearing)
In cases where the land or goods to be expropriated or used are demolished or damaged without any intention or negligence by the landowner or persons concerned after the land expropriation committee adjudicates thereon, any losses incurred thereby shall be borne by the project operator.
법령보기 화면
Article 47 (Real Rights Granted by Way of Security and Indemnity)
In cases where the objects of the real rights granted by way of security have been expropriated or used, the relevant real rights granted by way of security may be exercised on the indemnity to be received by the debtor as a result of the expropriation or use of the objects:
Provided
, That such indemnity shall be seized before its payment.
법령보기 화면
Article 48 (Obligation for Return and Restoration to Original State)
(1)
When the period for using the land or goods has expired, or they have become unnecessary to be used due to the discontinuation or change of the project or other causes, the project operator shall promptly return the relevant land or goods to the owner of the land or goods, or any successor thereto.
(2)
In the case of paragraph (1), when there exists any request from the landowner for the restoration to the original state, the project operator shall return the relevant land by restoring it to its original state, except for the cases where such losses have been indemnified in advance.
CHAPTER V LANDEXPROPRIATION COMMITTEE
법령보기 화면
Article 49 (Establishment)
In order to render an adjudication on the expropriation and use of the land, etc., the Central Land Expropriation Committee shall be established under the Ministry of Land, Transport and Maritime Affairs, and the local land expropriation committee under the Special Metropolitan City, a Metropolitan City,
Do
and Special Self-Governing Province (hereinafter referred to as "City/
Do
"), respectively.
<Amended by Act No. 8665, Oct. 17, 2007; Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 50 (Matters to Be Adjudicated)
(1)
Matters to be adjudicated by the land expropriation committee shallbe as follows:
1.
Zone of the land to be expropriated or used, and methods of its use;
2.
Indemnity for losses;
3.
Commencing date of the expropriation or use, and its period;
4.
Other matters prescribed by this Act and other Acts.
(2)
The land expropriation committee shall render an adjudicationwithin the scope requested by the project operator, landowner, or persons concerned:
Provided
, That in the indemnity for the losses under paragraph (1) 2, the said committee may render an adjudication on increase of indemnity.
법령보기 화면
Article 51 (Jurisdiction)
(1)
The Central Land Expropriation Committee shall take charge of the matters concerning the adjudication of projects falling under each of the following subparagraphs:
1.
Projects the project operator of which is the State or a City/
Do
;
2.
Projects whose land to be expropriated or used extends over two or more Cities/
Dos
.
(2)
The local land expropriation committee shall take charge of the matters concerning the adjudication of projects other than each subpara-graph of paragraph (1).
법령보기 화면
Article 52 (Central Land Expropriation Committee)
(1)
The Central Land Expropriation Committee shall consist of not more than 20 members including one chairman, but the members in the number prescribed by Presidential Decree from among its members shall be permanent.
(2)
The Minister of Land, Transport and Maritime Affairs shall be the chairman of the Central Land Expropriation Committee, and if the chairman is unable to perform his/her duties due to unavoidable reasons, a member designated by the chairman shall act on behalf of the chairman.
<Amended by Act No. 8852, Feb. 29, 2008>
(3)
The chairman of the Central Land Expropriation Committee shall represent the Committee and exercise the overall control of its affairs.
(4)
Permanent members of the Central Land Expropriation Committee shall be appointed by the President on the recommendation of the Minister of Land, Transport and Maritime Affairs from among persons falling under any of the following subparagraphs:
<Amended by Act No. 7796, Dec. 29, 2005; Act No. 8852, Feb. 29, 2008>
1.
Persons who have served not less than 15 years as judges, prosecutors or lawyers;
2.
Persons who have taught the jurisprudence or public administration science as associate professors or higher in universities or collegesnot less than five years;
3.
Persons who have served not less than two years as the public officials of Grade III in their ranks or the public officials in general service who belong to the Senior Civil Service of the administrative agencies.
(5)
Nonpermanent members of the Central Land Expropriation Committee shall be commissioned by the Minister of Land, Transport and Maritime Affairs from among the persons of profound learning and experience in land expropriation.
<Amended by Act No. 8852, Feb. 29, 2008>
(6)
Meetings of the Central Land Expropriation Committee shall beconvoked by the chairman, and shall consist of the chairman, one permanent member and seven members designated by the chairman for each meeting.
(7)
Meetings of the Central Land Expropriation Committee shall resolve with the attendance of a majority of its consisting members under paragraph (6) and concurrent votes of a majority of those present.
(8)
The Central Land Expropriation Committee shall have the secretariat to deal with its affairs.
(9)
Matters concerning the position ranks, etc. of permanent members and the organization of the secretariat of the Central Land Expropriation Committee shall be prescribed by Presidential Decree.
<Amended by Act No. 7773, Dec. 29, 2006>
법령보기 화면
Article 53 (Local Land Expropriation Committee)
(1)
A local land expropriation committee shall consist of nine members, including one chairman.
(2)
The Mayor/
Do
Governor shall be the chairman of a local land expropriation committee, and if the chairman is unable to perform his/her duties due to unavoidable reasons, a member designated by the chairman shall act on behalf of the chairman.
(3)
A local land expropriation committee shall consist of one member appointed by the Mayor/
Do
governor from among his/her public officials and seven members commissioned by him/her from among persons of profound learning and experience in land expropriation.
(4)
Meetings of a local land expropriation committee shall be convoked by the chairman, and resolve with the attendance of not less than five members including the chairman, and concurrent votes of a majority of thosepresent.
(5)
The provisions of
Article 52
(3) shall apply
mutatis mutandis
to a local land expropriation committee.
법령보기 화면
Article 54 (Disqualifications for Members)
(1)
Persons falling under any of the following subparagraphs shall not become a member of the land expropriation committee:
1.
Incompetents, quasi-incompetents or persons declared bankrupt and not reinstated as yet;
2.
A person for whom two years have not elapsed since the day when his/her imprisonment without labor or heavier punishment sentenced by a court was completely executed (including cases where its execution is deemed terminated) or exempted;
3.
A person who is under the suspension of the execution of imprisonment without labor or a heavier punishment as declared by a court;
4.
A person for whom two years have not elapsed since the day he/she has been sentenced to a fine.
(2)
When a member falls under any subparagraph of paragraph (1), he/ she shall deservedly resign from his/her office.
법령보기 화면
Article 55 (Terms of Office)
Terms of office for the permanent members and commissioned members ofthe land expropriation committee shall be three years respectively, and the consecutive reappointment or recommissioning may be permitted.
법령보기 화면
Article 56 (Guarantee of Status)
Except for the cases where the relevant land expropriation committeedeems by its resolution that there exists a ground falling under any of the following subparagraphs, no commissioned member shall be dismissed against his/her will during his/her service:
1.
When he/she is unable to perform his/her duties due to his/her physical or mental impediments;
2.
When he/she has violated his duties.
법령보기 화면
Article 57 (Exclusion, Challenge and Avoidance of Members)
(1)
Any member of the land expropriation committee who falls underany of the following subparagraphs shall be prohibited from attendingany relevant meeting of the land expropriation committee:
1.
Project operator, landowner or person concerned;
2.
Spouse, relative or agent of the project operator, landowner or person concerned;
3.
In cases where the project operator, landowner or person concernedis a corporation, any officer of the relevant corporation or any person who performs the corporation's duties.
(2)
In cases where there exists any situation whereunder it is difficult for the project operator, landowner and person concerned to expect that any member makes a fair deliberation and resolution, they may file an application for challenge, by stating such reasons. In such cases, thechairman of the land expropriation committee shall decide on whether to accept the social application, without going through a resolution by the committee.
(3)
When any member falls under any ground of paragraph (1) or (2), he/she may voluntarily avoid participating in the deliberation and resolution of the relevant case.
(4)
The provisions of paragraphs (1) through (3) shall apply
mutatis mutandis
to the staff-members who are not the members involved in the affairs of deliberation and resolution on the case.
법령보기 화면
Article 58 (Authorities Regarding Deliberation or Investigation)
(1)
When deemed necessary for the deliberation, the land expropriation committee may perform an act falling under each of the following subparagraphs:
1.
Requiring any project operator, landowner, person concerned or witness to attend the committee and make a statement, or to request them to provide written opinions or data;
2.
Requiring any appraisal business operator and other appraiser to perform the appraisal and assessment, or to attend the committeeand make a statement;
3.
Requiring any member of the land expropriation committee, any staffmembers of the secretariat under
Article 52
(8), or any staff-members in charge of the affairs of a local land expropriation committee, to conduct on-site investigations.
(2)
The provisions of
Article 13
shall apply
mutatis mutandis
to the cases where any member or staff-member conducts on-site investigations under paragraph (1) 3.
(3)
The land expropriation committee may pay to the witness, appraisal business operator or other appraiser under paragraph (1), daily allowances, travel expenses and appraisal fees at a charge of the project operator, as prescribed by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 59 (Allowances and Travel Expenses for Members)
The land expropriation committee may pay to its members allowances and travel expenses as prescribed by Ministerial Decree of Land, Transport and Maritime Affairs:
Provided
, That the same shall not apply to members who are public officials and attend in direct connection with their duties.
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 60 (Detailed Rules for Operation)
Matters necessary for the operation, etc. of the land expropriation committee shall be prescribed by Presidential Decree.
CHAPTER VI INDEMNITY FOR LOSSES, ETC.
Section 1 Principle of Indemnification for Losses
법령보기 화면
Article 61 (Indemnity by Project Operators)
The project operator shall indemnify the landowner or person concerned for any losses incurred by the acquisition or use of the land, etc. required for the public works.
법령보기 화면
Article 62 (Prior Indemnity)
Any project operator shall pay the full amount of indemnity to the land-owner and person concerned before undertaking his/her works for therelevant public works:
Provided
, That the same shall not apply to the cases where the land is used at the time of natural disasters under
Article 38
, where it is used for any of urgency under
Article 39
, or where there exist consents of the landowner and persons concerned.
법령보기 화면
Article 63 (Indemnity in Cash, etc.)
(1)
Other than those as provided for in other Acts, the indemnity forlosses shall be paid in cash:
Provided
, That if it is deemed that a project operator can make compensation with land, after taking a reasonable plan for use of land and project plan of the relevant public works into account, andif the landowner wants such compensation with land, he/she may compensate with the land developed by implementing such public works pursuant to the standards and procedures prescribed by the following subparagraphs for the part, other than the amount which is compensated in cash under the main sentence or in bonds under paragraphs (7) and (8) from among the compensation to be paid to the landowner:
<Amended by Act No. 8665, Oct. 17, 2007; Act No. 10239, Apr. 5, 2010>
1.
A person who may receive the indemnity with land: A person who has transferred land whose size exceeds the area of partition limit of a site under
Article 49 (1) of the Building Act
to a project operator. In such cases, when persons subject to compensation with land compete with each other, a person who is not an absentee real estate owner under paragraph (7) 2 and is compensated with bonds pursuant to paragraph (7) shall be compensated with land before others, and a project operator shall determine and publicly announce the priority and method of deciding persons subject to compensation with land;
<Amended by Act No. 10239, Apr. 5, 2010>
2.
Basis amount of calculation of the land price to be compensated: General price of sale in lots, except cases where there are special provisions in other Acts;
3.
Public announcement of criteria for compensation: When a plan of compensation is publicly announced pursuant to
Article 15
, it shall be publicly announced including the basis of compensation with land or shall be publicly announced including such content that the basis of compensation with land will be publicly announced on daily newspapers separately.
(2)
The area of land to be compensated to landowners pursuant to the proviso to paragraph (1) shall be determined by a project operator, taking the plan for use of land and project plan of such public works into consideration. In such cases, such area of compensation shall not exceed 990 square meters for a house lot and 1,100 square meters for a commercial lot.
<Added by Act No. 8665, Oct. 17, 2007; Act No. 10239, Apr. 5, 2010>
(3)
The right decided to receive a compensation with land pursuant to the proviso to paragraph (1) shall not be resold (including sale, donation, other acts accompanying change of the right, but excluding a case of inheritance and investment in kind to a real estate investment company specialized in development pursuant to
Real Estate Investment Company Act
) from the date of concluding such compensation contract until the registration for transfer of ownership is completed, and when it is violated, a project operator may pay compensations which are supposed to be paid with land in cash. In such cases, the interest rate for an amount of compensation in cash shall be a half of the interest rate under paragraph (9) 2 (a).
<Added by Act No. 8665, Oct. 17, 2007; Act No. 10239, Apr. 5, 2010>
(4)
In cases where a landowner wants to be compensated with land according to the provision of paragraph 1, he/she may request a compensation in cash instead of land from the date on which a year lapses after its conclusion of compensation contract. In this case, the interest rate for cash compensation shall be the same as the one pursuant to paragraph (9) 2 (a).
<Newly inserted by Act No. 10239, Apr. 5, 2010>
(5)
In cases where a project operator is unable to compensate the whole or a part of land to be compensated with land due to the reasons prescribed by Ministerial Decree of Land, Transport and Maritime Affairs, such as change of the relevant project plan, etc., he/she may compensate it in cash in lieu of land. In such cases, the interest rate for an amount of compensation in cash shall be the interest rate under paragraph (9) 2 (a).
<Added by Act No. 8665, Oct. 17, 2007; Act No. 8852, Feb. 29, 2008; Act No. 10239, Apr. 5, 2010>
(6)
In cases where a landowner requests a compensation in cash for any compensation supposed to be paid with land because he/she falls under any of the following subparagraphs, a project operator shall pay such compensation in cash. In such cases, the interest rate for an amount of compensation in cash shall be the interest rate under paragraph (9) 2 (a):
<Added by Act No. 8665, Oct. 17, 2007; Act No. 8852, Feb. 29, 2008; Act No. 10239, Apr. 5, 2010>
1.
In cases where a landowner receives the disposition on default of national taxes and local taxes, or compulsory execution thereof;
2.
In cases where the whole members of a household intend to emigrate abroad or to stay abroad for two years or longer;
3.
Other cases prescribed by Ministerial Decree of Land, Transport and Maritime Affairs, similar to subparagraphs 1 and 2.
(7)
In cases where the project operator is the State, a local government or a public agency and a public organization designated and announced pursuant to the
Act on the Management of Public Institutions
prescribed by Presidential Decree, which falls under any of the following subparagraphs, the indemnity may be paid with the bonds issued by the relevant project operator, notwithstanding the main sentence of paragraph (1):
<Amended by Act No. 8665, Oct. 17, 2007; Act No. 9053, Mar. 28, 2008; Act No. 10239, Apr. 5, 2010>
1.
Where the landowner or person concerned so desires;
2.
Where for the public works the project approval of which has been granted, the indemnity for the land of the absentee real estate owner as prescribed by Presidential Decree exceeds the specific amount set by Presidential Decree, and where the indemnity is paid for such amount in excess.
(8)
A public agency and a public organization designated and announced pursuant to the
Act on the Management of Public Institutions
prescribed by Presidential Decree from among the persons implementing the public works falling under any of the following subparagraphs within the area where the speculation in land is feared to be prevalent, shall pay the indemnity with the bonds issued by the relevant project operator for the portion exceeding the fixed amount of 100 million won or more as prescribed by Presidential Decree, from among the indemnities for the absentee real estate owners under the provisions of paragraph (7) 2, notwithstanding the provisions of paragraph (7):
<Added by Act No. 7758, Dec. 23, 2005; Act No. 8665, Oct. 17, 2007; Act No. 9053, Mar. 28, 2008; Act No. 10239, Apr. 5, 2010>
1.
Housing site development business under the
Housing Site Development Promotion Act
;
2.
Industrial complex development business under the
Industrial Sites and Development Act
;
3.
Other large-scale development business which is prescribed by Presidential Decree.
(9)
In cases where the indemnity is paid with bonds pursuant to paragraphs (7) and (8), the time limit for redemption of such bonds shall be fixed within the limit not exceeding five years, and the interest rate thereof shall be as the following subparagraphs:
<Amended by Act No. 7758, Dec. 23, 2005; Act No. 8665, Oct. 17, 2007; Act No. 9053, Mar. 28, 2008; Act No. 10239, Apr. 5, 2010>
1.
In cases where an absentee real estate owner is paid with bonds pursuant to paragraphs (7) 2 and (8):
(a)
Bonds with the time limit of redemption of three years or less : Interest rate of time deposit with three-year maturity (which is obtained by averaging the interest rates being adopted by the banks covering the whole country as their business areas, from among the banks established pursuant to the
Banking Act
, in the preceding month of the date of issuance of the bond);
<Newly inserted by Act No.10239, Apr. 5, 2010; Act No. 10303, May 17, 2010>
(b)
Bonds with the time limit of redemption of more than three years and five years or less: Interest rate shall be that of National Treasury bond with five-year maturity. (which is obtained by averaging the distribution rates of National Treasury bond in the preceding month of the date of issuance of the bonds)
<Newly inserted by Act No.10239, Apr. 5, 2010>
2.
In cases where a person who is not an absentee real estate owner is paid with bonds because he/she wants so:
(a)
Bonds with the time limit of redemption of three years or less : Interest rate of time deposit with three year maturity (which is obtained by averaging the distribution rates of National Treasury bond in the preceding month of the date of issuance of the bonds) shall apply, but in cases where interest rate of time deposit with three-year maturity is higher than that of National Treasury bond with three-year maturity, the former shall apply;
<Newly inserted by Act No.10239, Apr. 5, 2010>
(b)
Bonds with the time limit of redemption of more than three years and five years or less : Interest rate shall be that of National Treasury bond with five-year maturity (which is obtained by averaging the distribution rates of National Treasury bond in the preceding month of the date of issuance of the bonds).
<Newly inserted by Act No.10239, Apr. 5, 2010>
법령보기 화면
Article 64 (Indemnity by Individual)
The indemnity for losses shall be paid individually to the land owner or persons concerned:
Provided
, That the same shall not apply to the cases where it is impossible to compute the indemnity amount by individual.
법령보기 화면
Article 65 (Lump Sum Indemnity)
In cases where there exist, within the same project area, several pieces of land, etc. under the same ownership but with the different indemnity periods, the project operator shall ensure to make a lump sum payment of indemnity, when the landowner or persons concerned requests so.
법령보기 화면
Article 66 (Prohibition on Offsetting Losses by Gains Accruing from Project Implementation)
In cases where any project operator acquires or uses part of a group of lands that belong to the same landowner, even when the price of remaining land is raised, or when any gains have accrued due to the implementation of relevant public works, he/she shall be prohibited from offsetting any losses incurred by such acquisition or use by the said gains.
법령보기 화면
Article 67 (Point of Time, etc. for Indemnity Amount)
(1)
Computation of an indemnity amount shall be based on the price at the time of yielding an agreement where the agreement is reached, and the price at the time of adjudicating on the expropriation or use where the adjudication is rendered.
(2)
When there exist any fluctuations in the price of lands, etc. due to the relevant public works, they shall not be taken into account for the computation of an indemnity amount.
법령보기 화면
Article 68 (Computation of Indemnity Amount)
(1)
In cases where any project operator intends to compute the indemnity amount for the land, etc., he/she shall entrust the appraisal of the lands, etc. to not less than two appraisal business operators:
Provided
, That the same shall not apply to the cases where the project operator is able to compute the indemnity amount on his/her own according to the standards prescribed by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 7335, Jan. 14, 2005; Act No. 8665, Oct. 17, 2007; Act No. 8852, Feb. 29, 2008>
(2)
In selecting appraisal business operators under paragraph (1), where any landowner makes a request under conditions prescribed by Presidential Decree, one appraisal business operator recommended by such landowner may be selected in addition to the appraisal business operators referred to in paragraph (1).
(3)
Matters concerning the procedures for and method of entrusting the appraisal and the standards for computing the indemnity amount, etc. under paragraphs (1) and (2), shall be prescribed by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 69 (Issuance of Indemnity Bonds)
(1)
In cases where the State pays indemnities with bonds pursuant to
Article 63
(7) in order to indemnify landowners and related persons for any losses incurred by the acquisition or use of lands, etc. for road constructions under the
Road Act
, industrial complex development projects under the
Industrial Sites and Development Act
, construction works for railroads under the
Railroad Construction Act
, harbor works under the Harbor Act,and other public works prescribed by Presidential Decree, the State may issue the indemnity bonds with the charge of the accounts falling under any of the following subparagraphs:
<Amended by Act No. 7304, Dec. 31, 2004; Act No. 8665, Oct. 17, 2007; Act No. 10239, Apr. 5, 2010>
1.
General accounts;
2.
Special accounts for traffic facilities;
3.
Deleted.
<by Act No. 8665, Oct. 17, 2007>
(2)
Indemnity bonds shall be issued by the Minister of Strategy and Finance at the request of the head of a related central administrative agency in charge of the management of the accounts under each subparagraph of paragraph (1).
<Amended by Act No. 8852, Feb. 29, 2008>
(3)
In cases where the Minister of Strategy and Finance intends to issue the indemnity bonds, he/she shall obtain a resolution from the National Assembly by account.
<Amended by Act No. 8852, Feb. 29, 2008>
(4)
Indemnity bonds shall be issued by making delivery to landowners and persons concerned.
(5)
Indemnity bonds may be transferred or provided as a collateral.
(6)
Methods of issuing indemnity bonds, methods of determining interest rates, methods of making redemption, and other matters necessary forthe issuance of indemnity bonds shall be prescribed by Presidential Decree.
(7)
Issuance of indemnity bonds shall be governed by the
State Bond Act
, except for the cases as otherwise provided for in this Act.
<Amended by Act No. 8665, Oct. 17, 2007>
Section 2 Types and Standards, etc. of Indemnification for Losses
법령보기 화면
Article 70 (Indemnity for Land Acquired)
(1)
With respect to the lands acquired under any consultation or adjudication, the indemnity shall be made based upon the officially assessed land prices under the
Public Notice of Values and Appraisal of Real Estate Act
, but such indemnity shall be made at a reasonable price as assessed by taking account of the plan for utilizing relevant lands under the related Acts and subordinate statutes from the standard date of such official assessment to the point of time for price, the fluctuation rate of land price prescribed by Presidential Decree for the area the price of which is not affected by the relevant public works, the producer price inflation (referring to the rate computed based on the producer price index surveyed and published by the Bank of Korea under
Article 86 of the Bank of Korea Act
), and also the location, shape, environment, utilization status, etc. of the relevant land.
<Amended by Act No. 7335, Jan. 14, 2005; Act No. 8665, Oct. 17, 2007>
(2)
Indemnity amount for the land shall be computed by taking account of the actual utilization status at the point of time for price and theobjective situation judged by the general utilization methods, but the situations of temporary land utilization, the subjective value conceived by the landowner or persons concerned, and the case of premising that the land would be used for special purposes, etc., shall not be takeninto account.
(3)
In the acquisition by consultations prior to the project approval, the officially assessed land price referred to in paragraph (1) shall be such price as announced publicly at the point of time nearest to the point of time for price, from among those assessed officially at the point of time for price of the relevant land.
<Added by Act No. 8665, Oct. 17, 2007>
(4)
In the acquisition subsequent to the project approval, the officially assessed land price referred to in paragraph (1) shall be such price as announced publicly at the point of time nearest to the date of public announcement of the relevant project approval, from among the officially assessed land prices published at the time of yielding an agreement or adjudication on the relevant land, which are such officially assessed land prices making the point of time prior to the date of public announcement of the project approval as their standard date of public announcement.
(5)
Notwithstanding paragraphs (3) and (4), in cases where it is recognized that the price of land to be acquired has been changed because the plan or implementation of the public works has been publicly notified or announced, the officially assessed land price under paragraph (1) shall be such price as publicly announced at the nearest time of the date of public notification or the date of announcement of the relevant public works, from among the officially assessed land prices at the time of the price of the relevant land as the officially assessed land price the date of basis of the public notification or announcement of which is the time before the relevant date of public notification or the relevant date of announcement.
<Added by Act No. 8665, Oct. 17, 2007>
(6)
Definite methods for computing or assessing the indemnity amount for the land to be acquired and for other rights than its ownership shall be prescribed by Ministerial Decree of Land, Transport and Maritime Affairs by taking account of the investment costs, expected gains, transaction prices, etc.
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 71 (Indemnity, etc. for Land to be Used)
(1)
With respect to the land to be used under any consultation or adjudication, the indemnity shall be made with the proper price assessed by taking account of the land rents, lease rents, methods of use, period of use, and prices, etc. of such land and adjacent ones similar thereto.
(2)
Detailed methods for computing or assessing the indemnity amount for the land to be used and the use of space underground and surface thereof shall be prescribed by Ministerial Decree of Land, Transport and Maritime Affairs by taking account of the investment costs, expected gains, transaction prices, etc.
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 72 (Request for Purchase, etc. of Land to be Used)
When it falls under any of the following subparagraphs subsequent toa public announcement of project approval, the owner of relevant land may either request the project operator to purchase his/her land, or request the competent land expropriation committee to expropriate his/her land. In such cases, a person concerned may request the project operator or the competent land expropriation committee to have his/her right sustained:
1.
When the land use period is 3 years or more;
2.
When the form and quality of the land is changed by its use;
3.
When the landowner's buildings stand on his/her land intended to be used.
법령보기 화면
Article 73 (Indemnity for Loss of Remaining Land and Costs for Work)
(1)
When there is any decrease in the price of remaining land or other losses due to the acquisition or use of a part of a group of lands belonging to the same landowner, or when it is necessary to newly install any passage, ditch, fence, etc. or to implement other works on the remaining land, the project operator shall indemnify for such losses or the costs for such works as prescribed by Ministerial Decree of Land, Transport and Maritime Affairs:
Provided
, That in cases where the total amount of the reduced price of the remaining land and the construction costs for the remaining land is larger than the price of the remaining land, the project operator may purchase such remaining land.
<Amended by Act No. 8665, Oct. 17, 2007; Act No. 8852, Feb. 29, 2008>
(2)
No claim for losses or expenses under the main sentence of para-graph (1) shall be filed after one year has passed from the date of completion of the construction of the relevant project.
<Added by Act No. 8665, Oct. 17, 2007>
(3)
In cases where a project operator purchases remaining land pursuant to the proviso to paragraph (1) after the announcement of approval for the project, it shall be deemed that approval for the project under
Article 20
or the announcement of approval for the project under
Article 22
has been made for such remaining land.
<Added by Act No. 8665, Oct. 17, 2007>
(4)
Article 9
(6) and (7) shall apply
mutatis mutandis
to a compensation for losses or expenses, or the acquisition of land under paragraph (1).
<Added by Act No. 8665, Oct. 17, 2007>
(5)
The provisions of
Articles 70
,
75
,
76
,
77
and
78
(4) through (6) shall apply
mutatis mutandis
to the method of calculation and assessment of the specific amount of compensation for the remaining land and objects in the remaining land to be purchased pursuant to the proviso to paragraph (1).
<Added by Act No. 8665, Oct. 17, 2007>
법령보기 화면
Article 74 (Request for Purchase and Expropriation of Remaining Land)
(1)
When it is remarkably difficult to use the remaining land for itscustomary purposes due to the purchase or expropriation by consultation of part of a group of lands belonging to the same landowner, the relevant landowner may request the project operator to purchase the remaining land, and subsequent to a project approval, he/she may request the competent land expropriation committee to expropriate it. In such cases, the request for expropriation shall be limited to the cases where the consultations on the purchase fail to yield any agreement, and it shall be made by the completion date of construction of such project.
<Amended by Act No. 8665, Oct. 17, 2007>
(2)
Any person who holds the right over the remaining land and anygoods thereon, for which a request has been made for their purchase or expropriation under paragraph (1), may request the project operator or the competent land expropriation committee to have his/her right sustained.
(3)
Article 73
(3) shall apply
mutatis mutandis
to the acquisition of land under paragraph (1).
<Amended by Act No. 8665, Oct. 17, 2007>
(4)
The provisions of
Articles 70
,
75
,
76
,
77
and
78
(4) through (6) shall apply
mutatis mutandis
to the computation of definite indemnity amount for the remaining land and goods thereon and the methods of assessment, etc.
<Amended by Act No. 8665, Oct. 17, 2007>
법령보기 화면
Article 75 (Indemnity for Goods, Such as Buildings, etc.)
(1)
For the buildings, standing trees, structures and other goods fixed to the land (hereinafter referred to as "buildings, etc."), any indemnity shall be made in the amount of costs necessary for their transfer (hereinafter referred to as "transfer costs"):
Provided
, That in cases falling under any of the following subparagraphs, such indemnity shall be made at the price of the relevant goods:
1.
Where it is difficult to transfer the buildings, etc., or where such transfer makes it impossible to use the buildings, etc. in pursuance of its customary purposes;
2.
Where the transfer costs of buildings, etc. are in excess of the priceof such goods;
3.
Where the project operator acquires them for the purpose of a direct use in his/her public works.
(2)
Any losses incurred to farm crops shall be indemnified by taking comprehensive account of their types and the extent of their growth, etc.
(3)
For the soil, stones, sand or gravel belonging to the land (limited to the cases where the soil, stones, sand or gravel become the objectsfor acquisition or separate use from the relevant land), any indemnity shall be made at the proper price assessed by taking account of the transaction prices, etc.
(4)
For the graves, any indemnity shall be made by computing the expenses required for changing their burial sites.
(5)
In cases where buildings, etc. in the planned project area fall under paragraph (1) 1 or 2, a project operator may apply for adjudication of expropriation of such objects to the competent land expropriation committee.
<Added by Act No. 8665, Oct. 17, 2007>
(6)
Definite computation of the indemnity amount for goods prescribed in paragraphs (1) through (4) and for other goods, and the assessment methods and indemnity standards thereof, shall be prescribed by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 8665, Oct. 17, 2007; Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 75-2 (Compensation for Damages, etc. to Remaining Buildings)
(1)
In cases where the prices of remaining buildings are reduced or other damages occur because part of a group of buildings belonging to the same building owner is acquired or used, the project operator shall compensate for such damages under conditions prescribed by Ministerial Decree of Land, Transport and Maritime Affairs:
Provided
, That the total amount of the reduced price of the remaining buildings and the repairing expenses (referring to the expenses used for construction deemed normally necessary for equally maintaining such usefulness for use of the remaining parts of the buildings for their original purpose:
Provided
, That no expenses necessary for improvement of facilities required by the related Acts and subordinate statutes, such as the
Building Act
, etc. shall be included) is larger than the prices of the remaining buildings, a project operator may purchase such remaining buildings.
<Amended by Act No. 8852, Feb. 29, 2008>
(2)
When it is remarkably difficult to use the remaining buildings for their original purposes because part of a group of buildings belonging to the same building owner has been purchased or expropriated by consultation, such building owner may request a project operator to purchase the remaining buildings and may request the competent land expropriation committee to expropriate them after the project has been approved. In such cases, a request for expropriation shall be made only in cases where the consultation on the purchase has not been effected, and it shall be made by the completion date of construction of such project.
(3)
Article 9
(6) and (7) shall apply
mutatis mutandis
to a compensation and the acquisition of the remaining buildings under paragraph (1).
(4)
Article 73
(2) shall apply
mutatis mutandis
to a compensation under the main sentence of paragraph (1), and
Article 73
(3) to the acquisition of the remaining buildings under the proviso to paragraph (1) and paragraph (2).
(5)
Articles 70
,
75
,
76
,
77
and
78
(4) through (6) shall apply
mutatis mutandis
to the method of calculation and assessment of the specific amount of compensation for the remaining buildings to be acquired pursuant to the proviso to paragraph (1) and paragraph (2).
[This Article Added by Act No. 8665, Oct. 17, 2007]
법령보기 화면
Article 76 (Indemnity for Rights)
(1)
For the mining rights, fishing rights and the rights to use water (including water facilities), etc., any indemnity shall be made at the proper price assessed by taking account of the investment costs, expected gains and transaction prices, etc.
(2)
Definite computation of the indemnity amount under paragraph (1) and the assessment methods shall be prescribed by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 77 (Indemnity for Business Losses, etc.)
(1)
For any business losses incurred by the discontinuation or suspension of business, any indemnity shall be made by taking account of the business profits, transfer expenses for facilities, etc.
(2)
For the farm losses, any indemnity shall be made to actual farmers by taking account of the revenues, etc. per unit area of the farmland:
Provided
, That in cases where an owner of farmland is a farmer living in the area concerned, indemnity may be made in accordance with consultation between an owner of farmland and an actual farmer.
<Amended by Act No. 8665, Oct. 17, 2007>
(3)
For the wage losses suffered by the workers temporarily laid off or unemployed, any indemnity shall be made by taking account of the average wage, etc. under the
Labor Standards Act
.
<Amended by Act No. 8665, Oct. 17, 2007>
(4)
Definite computation of the indemnity amount under paragraphs (1) through (3) and the assessment methods, indemnity standards and matters concerning criteria for approval of actual farmers under paragraph (2) shall be prescribed by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 8665, Oct. 17, 2007; Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 78 (Formulation, etc. of Plans for Moving)
(1)
Any project operator shall either formulate and implement a planfor moving or pay the resettlement funds, under conditions prescribed by Presidential Decree, for persons who become to lose their basis for living due to an implementation of public works (hereinafter referred to as "persons subject to a plan for moving") by providing the residential buildings.
(2)
When any project operator intends to formulate a plan for moving under paragraph (1), he/she shall hold in advance a consultation with the head of a competent local government.
(3)
The State or local governments shall primarily grant assistance to the National Housing Fund under the
Housing Act
for the creation of housing lots and the construction of houses in pursuance of the implementation of a plan for moving.
<Amended by Act No. 6916, May 29, 2003; Act No. 8665, Oct. 17, 2007>
(4)
A plan for moving shall contain the basic facilities for living on a normal level, such as roads, water-supply facilities, drainage facilities and other public facilities, etc. with respect to the resettlement land (including a housing complex being constructed according to the execution of a plan for moving); and the costs required therefor shall be borne by the project operator:
Provided
, That in cases where any project operator who is not an administrative agency formulates and implements a plan for moving, the local government may subsidize part of such costs.
<Amended by Act No. 8665, Oct. 17, 2007>
(5)
For the residents of residential buildings, any indemnity shall bemade by computing the expenses required for moving the residence and those required for the transport of movables, such as the household effects, etc.
(6)
In cases where there exists no indemnity amount to be paid to farmers or fishermen who are to move to other areas, since they have become unable to continue carrying on their farming or fishing due to an implementation of public works, or the total amount of such indemnity falls short of an amount prescribed by Ministerial Decree of Land, Transport and Maritime Affairs, such amount or such difference shall be indemnified.
<Amended by Act No. 8852, Feb. 29, 2008>
(7)
In cases where qualified recipients and the second higher bracket under subparagraphs 1 and 11 of
Article 2 of the National Basic Living Security Act
living in an area where the relevant public works are being implemented, desire to be employed, a project operator may employ them preferentially for the affairs related to the relevant public works and shall endeavor to help their employment.
<Added by Act No. 8665, Oct. 17, 2007>
(8)
The standards for expenses necessary for the basic facilities for living under paragraph (4) shall be prescribed by Presidential Decree.
<Added by Act No. 8665, Oct. 17, 2007>
(9)
Indemnities under paragraphs (5) and (6) shall be governed by the standards prescribed by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 78-2 (Formulation, etc. of Relocation Measures for Factories)
In cases where a person who is unable to operate his/her factory (referring to a factory under subparagraph 1 of
Article 2 of the Industrial Cluster Development and Factory Establishment Act
) in the relevant area any more because the factory site is transferred or expropriated by consultation due to the execution of the public works prescribed by Presidential Decree wants, a project operator shall formulate a plan for relocation measures prescribed by Presidential Decree, such as moving into an adjacent industrial complex designated and developed by the
Industrial Sites and Development Act
.
[This Article Added by Act No. 8665, Oct. 17, 2007]
법령보기 화면
Article 79 (Indemnity for Costs, etc. for Other Lands)
(1)
When any project operator requires a new installation of the passages, ditches, fences, etc. and other works on the land other than those acquired and used due to an implementation of public works (including the remaining land), he/she shall indemnify the whole or a part of such expenses:
Provided
, That in cases where the construction costs for the relevant land are larger than the price of such land, the project operator may purchase such land.
<Amended by Act No. 8665, Oct. 17, 2007>
(2)
In cases where land, etc. outside of the area where public works are implemented is unable to fulfill their original functions due to implementation of public works, such losses shall be compensated under conditions prescribed by Ministerial Decree of Land, Transport and Maritime Affairs.
<Added by Act No. 8665, Oct. 17, 2007; Act No. 8852, Feb. 29, 2008>
(3)
In cases where a project operator recognizes a compensation under paragraph (2) necessary, he/she shall publicly announce that a compensation may be filed when he/she publicly announces a plan for compensation pursuant to
Article 15
, or he/she shall publicly announce a plan for compensation under paragraph (2) as prescribed by Presidential Decree.
<Added by Act No. 8665, Oct. 17, 2007>
(4)
Other indemnities for the losses incurred by an implementation of public works shall be governed by the standards prescribed by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 8665, Oct. 17, 2007; Act No. 8852, Feb. 29, 2008>
(5)
Article 73
(2) shall apply
mutatis mutandis
to a compensation for expenses or losses under the main sentence of paragraph (1) and paragraph (2).
<Amended by Act No. 8665, Oct. 17, 2007>
(6)
Article 73
(3) shall apply
mutatis mutandis
to the acquisition of land under the proviso to paragraph (1).
<Added by Act No. 8665, Oct. 17, 2007>
(7)
Articles 70
,
75
,
76
,
77
and
78
(4) through (6) shall apply
mutatis mutandis
to the method of calculation and assessment of the specific amount of compensation for the land to be acquired pursuant to the proviso to paragraph (1).
<Added by Act No. 8665, Oct. 17, 2007>
법령보기 화면
Article 80 (Consultations and Adjudication on Indemnity for Losses)
(1)
Indemnities for losses or expenses, or acquisition of land under
Article 79
(1) and (2) shall be determined by consultations between the project operator and persons who have suffered such losses.
<Amended by Act No. 8665, Oct. 17, 2007>
(2)
When the consultations under paragraph (1) fail to yield any agreement, the project operator or persons who have suffered the losses may, under conditions prescribed by Presidential Decree, request the competent land expropriation committee to render an adjudication thereon.
법령보기 화면
Article 81 (Entrustment of Indemnity Affairs, etc.)
(1)
Any project operator may entrust the institutions falling under any of the following subparagraphs with the affairs concerning the indemnity or a plan for moving:
<Amended by Act No. 7835, Dec. 30, 2005; Act No. 8665, Oct. 17, 2007>
1.
Local governments;
2.
Any institutions as prescribed by Presidential Decree, public agencies designated and announced pursuant to the provisions of
Articles 4 through 6 of the Act on the Management of Public Institutions
or local public corporations under the
Local Public Enterprises Act
having the actual record of indemnities or the expertise in the indemnity affairs.
(2)
Matters necessary for the scope of affairs, service fees, etc. at the time of entrustment under paragraph (1) shall be prescribed by Presidential Decree.
법령보기 화면
Article 82 (Indemnity Council)
(1)
The head of a competent local government wherein the public works are implemented may, if deemed necessary, set up the indemnity council in order to make a consultation on the matters falling under any of the following subparagraphs:
Provided
, That in cases where public works exceeding the scale prescribed by Presidential Decree are implemented, the indemnity council shall be established under conditions prescribed by Presidential Decree:
<Amended by Act No. 8665, Oct. 17, 2007>
1.
Matters concerning the prior convergence of opinions for the assessment of indemnity amount;
2.
Matters concerning the scope of remaining land and the formulation of plan for moving;
3.
Matters concerning the relocation of public facilities within the relevant project area;
4.
Matters deemed to be necessary by the head of a local government from among such matters requested by the landowner or person concerned, etc.;
5.
Other matters referred by the head of a local government.
(2)
Members of the indemnity council shall be appointed or commissioned by the head of a relevant local government from among persons falling under any of the following subparagraphs:
Provided
, That the indemnity council is established pursuant to the proviso to the part other than the subparagraphs of paragraph (1), a person prescribed by Presidential Decree shall appoint or commission its members:
<Amended by Act No. 8665, Oct. 17, 2007>
1.
Landowners and persons concerned;
2.
Judges, lawyers, notary publics or persons having experience in the business of appraisal and assessment or of indemnities for not less than five years;
3.
Public officials of the relevant local government;
4.
Project operators.
(3)
Matters necessary for the establishment, composition and operation, etc. of the indemnity council shall be prescribed by Presidential Decree.
CHAPTER VII RAISING OBJECTIONS, ETC.
법령보기 화면
Article 83 (Raising Objections)
(1)
Any person who is dissatisfied with an adjudication rendered by the Central Land Expropriation Committee under
Article 34
may raise an objection to the said Committee.
(2)
Any person who is dissatisfied with an adjudication rendered by the local land expropriation committee under
Article 34
may raise an objection to the Central Land Expropriation Committee by going through the relevant local land expropriation committee.
(3)
Raising objections under paragraphs (1) and (2) shall be made within 30 days from the day of receiving the authentic copy of a written adjudication.
법령보기 화면
Article 84 (Adjudication on Raising Objections)
(1)
In cases where there exists an objection raised under
Article 83
, the Central Land Expropriation Committee, when it is deemed that an adjudication under
Article 34
is illegal or unjustifiable may either revoke the whole or part of such adjudication, or alter the indemnity amount.
(2)
In cases where the indemnity amount has been increased under paragraph (1), any project operator shall pay such increased indemnity to the person entitled to the indemnity within 30 days from the day of receiving the authentic copy of a written adjudication revoking or altering the original adjudication:
Provided
, That when it falls under Article40 (2) 1, 2 or 4, such indemnity may be deposited.
법령보기 화면
Article 85 (Institution of Administrative Litigation)
(1)
Any project operator, landowner or person concerned, when he/she is dissatisfied with an adjudication under
Article 34
, may institute an administrative litigation within 60 days from the day when he/she receives a written adjudication and within 30 days from the day when he/she receives a written adjudication on his/her objection in cases where he has raised an objection, respectively. In such cases, the project operator shall depositthe increased indemnity pursuant to
Article 84
before he/she institutes an administrative litigation, and the person entitled to the indemnity shallbe prohibited from receiving the deposited indemnity until the litigation is closed.
(2)
In cases where an administrative litigation intended to be institutedunder paragraph (1) is concerning the increase or decrease in the indemnity, its defendant shall be the project operator when the litigant instituting such litigation is a landowner or a person concerned, and it shall be either the landowner or person concerned when the said litigant is the project operator, respectively.
법령보기 화면
Article 86 (Effect of Adjudication on Objection)
(1)
When the adjudication on any objection has been determined due to an absence of institution of any litigation within the period fixed under
Article 85
(1) or any other causes, it shall be deemed that a final and conclusive judgement under the
Civil Procedure Act
has been rendered, and the authentic copy of a written adjudication shall have the sameeffect as that of a written judgement with executive force.
<Amended by Act No. 8665, Oct. 17, 2007>
(2)
When the adjudication on any objection has been determined, any project operator, landowner or person concerned may, under the conditions prescribed by Presidential Decree, request the competent land expropriation committee to issue a certificate of determination of adjudication.
법령보기 화면
Article 87 (Payment Including Legal Rate of Interest)
In cases where an administrative litigation instituted under
Article 85
(1) by any project operator has been rejected, dismissed, or withdrawn, such project operator shall pay, in addition to the indemnity, the amount computed by applying the legal rate of interest under
Article 3 of the Act on Special Cases Concerning Expedition, etc. of Legal Proceedings
to the period from the day falling under any of the following subparagraphs to the date of adjudication or that of withdrawal:
<Amended by Act No. 8665, Oct. 17, 2007>
1.
Date of receiving the authentic copy of adjudication, when an administrative litigation has been instituted after such adjudicationwas rendered;
2.
Date of receiving the authentic copy of adjudication, when an administrative litigation has been instituted after such adjudication was rendered on the objection.
법령보기 화면
Article 88 (Non-Suspension of Disposition Effect)
No raising of objection under
Article 83
or institution of administrative litigation under
Article 85
shall suspend the progress of project or the expropriation or use of land.
법령보기 화면
Article 89 (Vicarious Execution)
(1)
In cases where any person liable to perform an obligation under this Act or any disposition taken thereunder fails to perform the obligation, or faces any difficulty in completing such obligation within the fixed period, or where there exist any grounds for deeming that it is remarkably detrimental to the public interest to let him/her perform such obligation, the project operator may request the Mayor/
Do
governor or the head of a
Si
/
Gun
/
Gu
to make a vicarious execution under conditions prescribed by the
Administrative Vicarious Execution Act
. In such cases, the Mayor/
Do
governor or the head of a
Si
/
Gun
/
Gu
in a receipt of such request shall comply with it unless there exist any justifiable grounds.
<Amended by Act No. 8665, Oct. 17, 2007>
(2)
In cases where the project operator is the State or a local government, it may make the vicarious execution on its own as prescribed by the
Administrative Vicarious Execution Act
, notwithstanding the provisions of paragraph (1).
<Amended by Act No. 8665, Oct. 17, 2007>
(3)
In cases where the project operator makes such a request to do a vicarious execution pursuant to paragraph (1) or makes the vicarious execution by him/herself pursuant to paragraph (2), the State or a local government shall make an effort to protect any person responsible for performing the obligation.
<Amended by Act No. 10239, Apr. 5, 2010>
법령보기 화면
Article 90 (Compulsory Collection)
When any obligator under
Article 44
(2) fails to pay such costs, the Governor of a Special Self-Governing Province and the head of a
Si
/
Gun
/
Gu
may collect such costs by referring to the practices of dispositions on default of local taxes.
<Amended by Act No. 8665, Oct. 17, 2007>
CHAPTER VIII RIGHT OF REPURCHASE
법령보기 화면
Article 91 (Right of Repurchase)
(1)
In cases where the whole or part of acquired lands becomes unnecessary due to a discontinuation or alteration of the relevant project or any other causes within 10 years from the day when the land has been acquired under consultations or the day commencing the expropriation of land (hereinafter in this Article referred to as "acquisition date"), the landowner at the time of the acquisition date or his/her general successor (hereinafter referred to as "repurchase right holder") may repurchase such land by paying to the project operator the amount equivalent to the indemnity paid for such land, within one year from the day when the whole or part of the relevant land has become unnecessary, or within 10 years from the acquisition date.
(2)
The provisions of paragraph (1) shall apply
mutatis mutandis
to the cases where the whole of the acquired land has not been used for the relevant project within five years from the acquisition date, but in such cases, the repurchase right shall be exercised within six years from the acquisition date.
(3)
No remaining land purchased or expropriated under
Article 74
(1) shallbe repurchased unless it is the case where a group of lands adjacent to the remaining land has become unnecessary.
(4)
In cases where the land price has remarkably fluctuated as comparedto the land price as of the acquisition date, the project operator and the repurchase right holder shall hold a mutual consultation on the repurchase amount, but when such consultation fails to yield any agreement, they may request the court to render a decision on the increase or decrease in the said amount.
(5)
Repurchase rights under paragraphs (1) through (3) may be contested against any third party when the registration of an acquisition under consultations or expropriation of the land required for the pubic works has been made under conditions prescribed by the
Registration of Real Estate Act
.
<Amended by Act No. 8665, Oct. 17, 2007>
(6)
Subsequent to an acquisition under consultations or expropriationof the land by the State, local governments or public agencies prescribed by Presidential Decree from among the public agencies designated and announced pursuant to the provisions of
Articles 4 through 6 of the Act on the Act on the Management of Public Institutions
, which are required for the public works, after obtaining the project approval, in cases where the relevant public works have been altered into other public works stipulated in subparagraphs 1 through 5 of
Article 4
, the period of exercising the repurchase right under paragraphs (1) and (2) shall be reckoned from the day when the alteration of the relevant public works has been publicly announced in the Official Gazette. In such cases, the State, local governments or public agencies prescribed by Presidential Decree from among the public agencies designated and announced pursuant to the provisions of
Articles 4 through 6 of the Act on the Management of Public Institutions
shall, as prescribed by Presidential Decree, notify the repurchase right holder of the fact of an alteration of public works.
<Amended by Act No. 8665, Oct. 17, 2007; Act No. 10239, Apr. 5, 2010>
법령보기 화면
Article 92 (Notice, etc. of Repurchase Right)
(1)
When any land to be repurchased under
Article 91
(1) and (2) happened to come by, the project operator shall promptly notify the repurchase right holder thereof:
Provided
, That when the project operator is unable to learn, without any negligence, the whereabouts of such a right holder, he/she shall make a public notice as prescribed by Presidential Decree.
(2)
Subsequent to an elapse of six months from the day of receiving the notice under paragraph (1) or the public notice has been made, no repurchase right holder shall exercise a repurchase right, notwithstanding the provisions of
Article 91
(1) and (2).
CHAPTER IX PENAL PROVISIONS
법령보기 화면
Article 93 (Penal Provisions)
(1)
Any person who has received the indemnity by falsity and other illegal means, or anyone who has delivered such indemnity while he/sheknows of such fact, shall be punished by imprisonment with prison labor for not more than five years or by a fine not exceeding 30 million won.
(2)
An attempt to commit a crime provided in paragraph (1) shall be punished.
법령보기 화면
Article 94 Deleted.<by Act No. 8665, Oct. 17, 2007>
법령보기 화면
Article 95 (Penal Provisions)
Any appraisal business operator or any other appraisers entrusted withthe appraisal and assessment under
Article 58
(1) 2, who have performed the appraisal and assessment by falsity and other illegal means shallbe punished by imprisonment with prison labor for not more than two years or by a fine not exceeding ten million won.
법령보기 화면
Article 96 (Penal Provisions)
Any person who has violated the provisions of
Article 25
(1) or the former part of paragraph (2) shall be punished by imprisonment withprison labor for not more than one year or by a fine not exceeding five million won.
법령보기 화면
Article 97 (Penal Provisions)
A person falling under any of the following subparagraphs shall be punished by a fine not exceeding two million won:
<Amended by Act No. 8665, Oct. 17, 2007>
1.
A project operator who has had access to the land occupied by others or let others do likewise without permission of the Governor of a Special Self-Governing Province and the head of a
Si
/
Gun
/
Gu
in violation of the main sentence of
Article 9
(2);
2.
A land occupant who has obstructed the activities of a project operator or an appraisal business operator in violation of
Article 11
(including the case of
mutatis mutandis
application under
Article 27
(1));
3.
A person who has removed the obstacles in violation of
Article 12
(1);
4.
A person who has failed to deliver or transfer the land or objects in violation of
Article 43
.
법령보기 화면
Article 98 (Joint Penal Provisions)
If the representative of a juristic person, or an agent, an employee or any other employed person of a juristic person or an individual has committed an act falling under any of the provisions of
Article 93
or
Articles 95 through 97
in connection with the affairs of such juristic person or individual, not only shall the person in violation be punished accordingly, but such juristic person or individual shall be punished by a fine under the corresponding Article:
Provided
, That the same shall not apply where a juristic person or an individual has exercised due diligence and supervision for the related affairs in order to prevent such violation.
[This Article Wholly Amended by Act No. 9595, Apr. 1, 2009]
법령보기 화면
Article 99 (Fines for Negligence)
(1)
Any person falling under any of the following subparagraphs shall be punished by a fine for negligence not exceeding 2 million won:
1.
Person prescribed in
Article 58
(1) 1, who has failed to appear ormake statement without any justifiable grounds, or who has madethe false statement;
2.
Person, who has been requested for a submission of a written opinion or the data under
Article 58
(1) 1, and has failed to submit them without any justifiable grounds, or submitted the false written opinion or data;
3.
Appraisal business operator or any other appraiser, who has been entrusted with the appraisal and assessment or requested for attendance and statement under
Article 58
(1) 2, and has failed to comply with it without any justifiable grounds;
4.
Person who has rejected, obstructed or avoided the on-site investigations provided for in
Article 58
(1) 3.
(2)
The fine for negligence referred to in paragraph (1) shall be imposed and collected by the Minister of Land, Transport and Maritime Affairs or the Mayor/
Do
governor under the conditions as prescribed by Presidential Decree.
<Amended by Act No. 9595, Apr. 1, 2009>
(3)
through (5) Deleted.
<by Act No. 9595, Apr. 1, 2009>
ADDENDA
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 2003.
Article 2 (Abrogation of Other Acts)
The
Land Expropriation Act and the Act on Special Cases concerningthe Acquisition of Lands for Public Use and the Compensation for Their Loss shall be hereby abrogated.
Article 3 (General Transitional Measures)
Any disposition, procedures and other acts that are each taken, followed and performed under the previous
Land Expropriation Act and the Act on Special Cases concerning the Acquisition of Lands for Public Use and the Compensation for Their Loss at the time of enforcement of this Act shall be deemed to be taken, followed and performed under this Act.
Article 4 (Transitional Measures concerning Public Works)
Any projects to be publicly notified, announced or executed as they correspond to the public works pursuant to the previous provisions before the enforcement of this Act, shall be deemed the public works under the provisions of
Article 4
.
Article 5 (Application Examples and Transitional Measures concerning Indemnity Procedures Prior to Project Approval)
The provisions of
Articles 14 through 16
shall apply, starting with any public works to be publicly notified or announced or executed after the enforcement of this Act, and any public works having already been publicly notified or announced or executed at the time of enforcement of this Act shall be governed by the previous Act on Special Cases concerningthe Acquisition of Lands for Public Use and the Compensation for Their Loss and the enforcement decree thereof.
Article 6 (Application Examples and Transitional Measures concerning Indemnity Procedures Subsequent to Project Approval)
The provisions of
Articles 26 through 29
shall apply, starting with any project subjected to a project approval after the enforcement of this Act, but any projects already subjected to a project approval at the time of enforcement of this Act, shall be governed by the previous
Land Expropriation Act and the enforcement decree thereof.
Article 7 (Transitional Measures concerning Previous Adjudication)
With respect to any adjudication against which no litigation has been instituted at the time of enforcement of this Act, for which the period for raising an objection under the previous provisions has alreadyelapsed, the litigation under
Article 85
shall not be instituted.
Article 8 (Transitional Measures concerning Standing to Be Sued in Pending Litigation)
The previous
Land Expropriation Act shall, notwithstanding the provisions of
Article 85
(2), govern the standing to be sued in the litigation case for the increase or decrease in an indemnity, which is pending before the court at the time of enforcement of this Act.
Article 9 (Transitional Measures concerning Repurchase)
The previous Act on Special Cases concerning the Acquisition of Lands for Public Use and the Compensation for Their Loss shall govern thecase where an application for adjudication has been filed with the competent land expropriation committee, since the consultations on the repurchase amount have failed to yield any agreement at the time of enforcement of this Act.
Article 10 (Transitional Measures concerning Penal Provisions)
The previous
Land Expropriation Act shall govern any application of the penal provisions and the fine for negligence to the acts committed prior to the enforcement of this Act.
Article 11 Omitted.
Article 12 (Relations with Other Acts)
Where the Act on Special Cases concerning the Acquisition of Lands for Public Use and the Compensation for Their Loss, the Land Expropriation Act, or their provisions are cited in other Acts at the time of the enforcement of this Act, and if there exist any corresponding provisions in this Act, this Act or the corresponding provisions in this Act shall be deemed to have been cited.
ADDENDA<Act No. 6916, May 29, 2003>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 13 Omitted.
ADDENDA<Act No. 7304, Dec. 31, 2004>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 10 Omitted.
ADDENDA<Act No. 7335, Jan. 14, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation.
Articles 2 through 12 Omitted.
ADDENDUM<Act No. 7475, Mar. 31, 2005>
This Act shall enter into force three months after the date of its promulgation.
ADDENDA<Act No. 7758, Dec. 23, 2005>
(1)
(Enforcement Date) This Act shall enter into force three months after the date of its promulgation.
(2)
(Applicability to Indemnity with Bonds for Owners of Absentee Real Estates) The amended provisions of
Article 63
(3) shall apply starting from the project for which the indemnity plan is noticed publicly, or notified to the landowners and the persons concerned under the provisions of
Article 15
after the enforcement of this Act.
ADDENDA<Act No. 7773, Dec. 29, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force on July 1, 2006.
Article 2 Omitted.
ADDENDA<Act No. 7796, Dec. 29, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force on July 1, 2006.
Articles 2 through 6 Omitted.
ADDENDUM<Act No. 7835, Dec. 30, 2005>
This Act shall enter into force on the date of its promulgation.
ADDENDA<Act No. 8665, Oct. 17, 2007>
(1)
(Enforcement Date) This Act shall enter into force six months after the date of its promulgation:
Provided
, That the amended provisions of the proviso to
Articles 63
(1), (2) through (5),
70
(5) and
78
(7) shall enter into force on the date of its promulgation.
(2)
(Applicability to Request for Purchase and Expropriation of Remaining Land) The amended provisions of
Article 70
(5), the proviso to
Article 73
(1), (2), (3) and (5),
Articles 74
(1),
75-2
,
78
(4) and (8),
78-2
, the proviso to
Article 79
(1), (3), (5) through (7), the provisos to paragraphs (1) and (2) of
Article 82
shall apply starting from the project for which the plan for compensation is publicly announced and the plan for compensation is notified to the landowners and the interested persons pursuant to
Article 15
(including a case where applied mutatis mutandis pursuant to
Article 26
(1)) after this Act enters into force:
Provided
, That the land acquired after approval for the project pursuant to
Article 70
(4) from among the amended provisions of
Article 70
(5) shall apply starting from the project for which the plan or execution of public works is publicly announced or notified after this Act enters into force.
(3)
(Transitional Measures concerning Special Cases of Compensation for Land Registration for Preservation of Which Has Not Been Made) In cases where a written confirmation has been obtained or an application for issuance of a written confirmation has been made pursuant to the former Article 18 before this Act enters into force, the previous provisions shall apply notwithstanding the amended provisions of
Article 18
.
(4)
(Transitional Measures concerning Penalty Provisions) The former provisons shall apply to the penalty provisons for the acts (including a case where a written confirmation has been obtained pursuant to paragraph (3) of the Addenda or it has been used) performed before this Act enters into force.
ADDENDA<Act No. 8852, Feb. 29, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 7 Omitted.
ADDENDA<Act No. 9053. Mar. 28, 2008>
(1)
(Enforcement Date) This Act shall enter into force on April 18, 2008.
(2)
(Applicability) The amended provisions of
Article 63 (8) 2 shall apply starting from a compensation made with bond after this Act enters into force.
ADDENDUM<Act No. 9595, Apr. 1, 2009>
This Act shall enter into force on the date of its promulgation.
ADDENDA<Act No. 10239, Apr. 5, 2010>
(1)
(Enforcement Date) This Act shall enter into force on the date of its promulgation.
(2)
(Applicability concerning the Area of Land to be Compensated) The amended provision of
Article 63
(2) shall apply starting from the first indemnity plan that is publicly notified after this Act enters into force.
(3)
(Applicability for Exceptions for Limitation on Resale of the Right to Receive an Indemnity with Land) In cases where the right decided to receive an indemnity with land is invested in kind to real estate investment company specialized in investment, the amended provision of
Article 63
(3) that excludes limitation on resale shall apply starting from a case where a land is not determined for receiving the indemnity even though its indemnity contract is concluded when this Act enters into force.
ADDENDA<Act No. 10303, Apr. 5, 2010>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 10 Omitted.