FRAMEWORK ACT ON THE CONSTRUCTION INDUSTRY
6963 · 1998-01-01
FRAMEWORK ACT ON THE CONSTRUCTION INDUSTRY
Act No. 5453, Dec. 13, 1997
Wholly Amended by Act No. 5230, Dec. 30, 1996
Amended by Act No. 5386, Aug. 28, 1997
Act No. 5453, Dec. 13, 1997
CHAPTER Ⅰ GENERAL PROVISIONS
법령보기 화면
Article 1 (Purpose)
The purpose of this Act is to ensure the proper execution of construction works and the sound development of the construction industry by providing for fundamental matters on the survey, design, execution, supervision, maintenance and management, technological management, etc. of construction works and for other matters necessary for the license and registration of construction businesses and contracts for construction works, etc.
법령보기 화면
Article 2 (Definitions)
The definitions of terms as used in this Act shall be as follows:
<Amended by Act No. 5386, Aug. 28, 1997>
1.
The term “construction industry” means construction businesses and construction service businesses;
2.
The term “construction business” means a business involved in conducting construction works;
3.
The term “construction service business” means a business involved in rendering services relating to construction works (hereinafter referred to as “construction services”), such as survey, design, supervision, business management, and maintenance and management in respect of construction works;
4.
The term “construction works” means works (including sites preparation work for installing facilities) which install, maintain and repair facilities, such as engineering work, construction work, industrial equipment work, landscape gardening work, and environmental installation work as well as installation and disassembly work etc. of machinery and equipments and other structures:
Provided
, That works falling under any of the following subparagraphs shall not be included:
(a)
Electric works under the Electrical Construction Business Act;
(b)
Information and communication works under the Information and Communication Work Business Act;
(c)
Fire-fighting equipment works under the Fire Services Act; and
(d)
Repair and restoration of cultural properties under the Protection of Cultural Properties Act.
5.
The term “constructor” means a person who conducts a construction business with a license or registration under this Act or other Acts :
6.
The term “construction business management” means any act of conducting all or part of a managerial business on planning, feasibility test, analysis, design, procurement, contracts, execution management, supervision, assessment, follow-up management, etc. in respect of construction works;
7.
The term “ordering person” means a person who contracts construction works to constructors, except for a persons who subcontracts his contracted construction work as contractor to others;
8.
The term “contract” means a contract under which, regardless of titles such as prime contract, subcontract, consignment and others, either of the parties promises to complete a construction work and the other party commits himself to pay a consideration for the results of the work;
9.
The term “subcontract” means a contract which a contractor concludes with a third party to contract all or part of his contracted construction work;
10.
The term “contractor” means a person who is contracted for construction works by any ordering person, including constructors who subcontract in contract relations;
11.
The term “subcontractor” means a person who is subcontracted for construction works by a contractor; and
12.
The term “construction engineer” means a person who has expertise or skills in respect of construction works and is so recognized under related Acts and subordinate statutes.
법령보기 화면
Article 3 (Basic Ideas)
The basic ideas of this Act are to contribute to the national economy and safety of citizens’ living by pushing ahead with the balanced development of the construction industry to attain international competitiveness in respective fields of designs, supervision, execution, business management, maintenance and management, etc..
법령보기 화면
Article 4 (Relations with Other Acts)
Except as provided for in other Acts with respect to the construction industry, this Act shall apply: with respect to construction service business, the provisions of
Articles 6
and
26
and Chapter 8 (
Articles 69
through 80) shall apply.
법령보기 화면
Article 5 (Measures with Respect to Foreign Constructors)
The Minister of Construction and Transportation may, if necessary for licensing or registration of a construction business for foreigners or foreign corporations, establish standards so as to recognize requirements, academic background, career, etc. obtained in a foreign country with respect to construction business.
법령보기 화면
Article 6 (Establishment of Basic Plan for Construction Industry Promotion)
(1)
The Minister of Construction and Transportation shall establish and execute a basic plan for the construction industry promotion every 5 years for the fostering of the said industry, the development of construction technology, the security of the safety and quality of construction works, etc..
(2)
The basic plan for the construction industry promotion referred to in paragraph (1) shall include the following matters:
1.
Basic policies of measures for promoting the construction industry;
2.
Measures for the development of construction expertise and cultivation of construction technical manpower;
3.
Internationalization and assistance to overseas expansion of the construction industry;
4.
Measures for securing the safety, environment and quality of construction works;
5.
Measures for encouraging small and medium construction businesses and small and medium construction services businesses; and
6.
Other matters as determined by the Presidential Decree.
(3)
The Minister of Construction and Transportation may establish and execute annual plans to the limits of the basic plan for the promotion of the construction industry referred to in paragraph (1) in consideration of trends in construction markets and development, etc. of construction expertise.
법령보기 화면
Article 7 (Responsibilities of Construction-related Persons)
(1)
The Government shall determine and spread the standards on the design, execution supervision and maintenance and management of construction works, the quality and standards of construction materials, and matters regarding contracts for works to secure the quality and safety of construction works.
(2)
Any ordering person of construction work shall designate a competent constructor according to fair standards and procedures to ensure that the installations shall be constructed suitable for the public safety and welfare, and shall endeavor that the construction works shall be appropriately executed.
(3)
A constructor shall observe the Acts and subordinate statutes on construction works to ensure the quality and safety of installations and construction services, and shall perform his business faithfully in conformity with a design drawing, specifications and the relevant contract for work, etc..
CHAPTER Ⅱ LICENSE AND REGISTRATION OF CONSTRUCTION BUSINESS
법령보기 화면
Article 8 (Kinds of Construction Business)
(1)
Construction businesses shall be classified into general construction business and specialized construction business and construction business requiring license or registration under the provisions of other Acts shall, except as otherwise provided in the relevant Act, be classified into neither general construction business nor specialized construction business.
(2)
General construction business is the construction business which executes installations under a comprehensive planning, management and coordination, and the category of business shall be determined by the Presidential Decree.
(3)
Specialized construction business is a business which constructs any specific part of installations or executes any work in specialized fields, and the category of business shall be determined by the Presidential Decree.
법령보기 화면
Article 9 (License of Construction Business)
(1)
Any person who desires to carry on general construction business or specialized construction business shall obtain license form the Minister of Construction and Transportation by category of business under the conditions as determined by the Presidential Decree:
Provided
, That this shall not apply in case where he carries on any minor construction work as determined by the Presidential Decree as business.
(2)
Any person who desires to obtain license of general construction business or specialized construction business shall make an application for license to the Minister of Construction and Transportation under the conditions as determined by the Ministerial Decree of Construction and Transportation.
(3)
Where the Minister of Construction and Transportation grants a license of general construction business or specialized construction business pursuant to paragraph (1), he shall deliver a certificate of construction business license and a construction business license booklet under the conditions as determined by the Ministerial Decree of Construction and Transportation.
(4)
License of general construction business or specialized construction business referred to in paragraph (1) shall be renewed every 5 years, and unless renewed, the license shall cease to be effective.
(5)
Except as otherwise provided for in any other Act, any legal person in which the State or any local government has invested a majority of its capital or whose principal object is not-profit one, shall not make an application for license of general construction business or specialized construction business referred to in paragraph (1).
법령보기 화면
Article 10 (Standards for License of Construction Business)
Technical capacity, capital (referred to as appraised value of assets in case of individuals; hereinafter the same shall apply), facilities and equipments which are to be the standards for license of general construction business or specialized construction business referred to in
Article 9
(1) and other necessary matters shall be determined by the Presidential Decree.
법령보기 화면
Article 11 (Registration of Specialized Construction Business)
(1)
Any person who desires to carry on construction business of the category of business as determined by the Presidential Decree from among specialized construction business may, notwithstanding the provisions of
Article 9
(1), register with the Minister of Construction and Transportation and carry on construction business under the conditions as determined by the Presidential Decree.
(2)
Any person who desires to make a registration of specialized construction business pursuant to paragraph (1) shall make an application for registration to the Minister of Construction and Transportation under the conditions as determined by the Ministerial Decree of Construction and Transportation.
(3)
Where a registration of specialized construction business referred to in paragraph (1) is made, the Minister of Construction and Transportation shall deliver a registration certificate of construction business and a booklet of construction business registration under the conditions as determined by the Ministerial Decree of Construction and Transportation.
(4)
Technical capacity, capital, facilities and equipment which are to be the standards for registration referred to in paragraph (1), and other necessary matters shall be determined by the Presidential Decree.
(5)
The provisions of
Article 9
(5) shall apply
mutatis mutandis
to the registration of specialized construction business.
법령보기 화면
Article 12 (Restriction on Concurrent Operation by Constructors)
(1)
Any person who has obtained a license of general construction business (hereinafter referred to as a “general constructor”) pursuant to
Article 9
(1) shall not obtain a license of specialized construction business doubly except as determined by the Presidential Decree.
(2)
Any person who has obtained a license of specialized construction business or made a registration thereof (hereinafter referred to as a “specialized construction constructor”) pursuant to
Article 9
(1) or 11 (1) may obtain a license of another category of specialized construction business or make a registration thereof doubly within the scope as determined by the Presidential Decree.
(3)
In applying the provisions of paragraphs (1) and (2), no individual who is a constructor shall be a representative of a legal person who is a constructor, and no representative of a legal person who is a constructor shall obtain a license of construction business or make a registration thereof in his own name.
법령보기 화면
Article 13 (Disqualifications for License or Registration of Construction Business)
(1)
No person who falls under any of the following subparagraphs shall obtain a license of construction business or make a registration thereof referred to in
Article 9
(1) or 11 (1). In case of a legal person the same shall also apply in case where it has any of its executive officers falling under any of the following subparagraphs:
1.
A person who has been declared bankrupt, but not yet reinstated;
2.
A person who has been adjudged incompetent or quasi-incompetent;
3.
A person whose license of construction business is cancelled or whose registration thereof is erased for a reason falling under any of
Article 83
(1) 1, 3, 5, 7 and 9 and for whom 5 years have not passed since. In this case, the reference to a person whose license of construction is cancelled or whose registration thereof is erased is a legal person shall include other person who has performed acts which caused it at the time of its cancellation or erasion and its representative; and
4.
A person who has been sentenced to imprisonment without prison labor or heavier for any crime referred to in the National Security Act, Chapters 1 and 2 of Part Ⅱ of the Criminal Act, the Punishment of Violence, etc. Act or the Illegal Check Control Act or in violation of this Act, and for whom 5 years have not passed from the date on which the execution of the relevant punishment is completed or exempted or a person who has been punished to suspension of sentence, but is under a grace period.
(2)
Where any general constructor or specialized constructor falls under any subparagraphs of paragraph (1), his license or registration of the relevant construction business shall lose its validity:
Provided
, That this shall not apply in case where a legal person has any of its executive officers falling under the cause, he has been discharged and another executive officer has been appointed within 3 months from the date when said cause comes to its knowledge.
(3)
The Minister of Construction and Transportation shall notify the cause to the person who is unable to obtain a license of construction or make a registration thereof pursuant to paragraph (1).
법령보기 화면
Article 14 (Continued Work after Disposition, etc. of Suspension of Business)
(1)
Any general constructor or specialized constructor who has been subject to a disposition of suspension of business, cancellation of license or erasion of registration referred to in
Article 82
or
83
and his general successor may continue to execute construction works for which he has made a contract or he has started with permission or authorization, etc. under related Acts and subordinate statutes before the disposition is made. The same shall also apply in case where a license or registration of general construction business or specialized construction business lose its validity pursuant to
Article 9
(4) and 13 (2).
(2)
Any general constructor or specialized constructor who has been subject to a disposition of suspension of business, cancellation of license or erasion of registration referred to in
Article 82
or
83
and his general successor shall notify contents of the disposition without delay to the ordering person of the relevant construction work.
(3)
Where any general constructor or specialized constructor continues construction works pursuant to paragraph (1) after his license or registration of construction business is terminated, cancelled or erased, he shall be deemed a constructor until he completes the works.
(4)
Any ordering person of construction work may, if not any particular circumstances, rescind a contract agreement only within 30 days from the date on which he receives the notification referred to in paragraph (2) from the constructor or he knows the fact.
법령보기 화면
Article 15 (Duty of Report by Constructor, etc.)
(1)
Where there occurred any change in a trade name, seat of business office and other matters as determined by the Presidential Decree, the general constructor or specialized constructor shall report it under the conditions as determined by the Ministerial Decree of Construction and Transportation.
(2)
Where the general constructor or specialized constructor carries on not less than two categories of construction business and the administrative agencies to which he must make a report according to his respective categories of business, are different from each other, he may make a report on all categories of business en bloc to one administrative agency. In this case, the administrative agency which has received the report shall notify contents thereof to the heads of related administrative agencies.
(3)
Where the head of
Si
/
Gun
/
Gu
(referred to as the head of autonomous Ku) has received a report on starting construction works referred to in Article 16 (1) of the Building Act and contents of the report includes matters on contract works, he shall notify it to the Administrator of National Tax Administration.
법령보기 화면
Article 16 (Scope of Operation by Constructors)
(1)
A general constructor or specialized constructor shall not receive a contract for construction works other than those falling under the category of business which he has obtained a license or made a registration pursuant to
Article 9
(1) or 11 (1) :
Provided
, That he may receive a contract for construction work and its appurtenant work en bloc.
(2)
No general constructor shall, by contract, execute only construction work which the specialized constructor may execute (hereinafter referred to as a “specialized work”):
Provided
, That this shall not apply in case where the general constructor receives a contract for any work which belongs to an appurtenant work of the construction work being executed by him by contract, and which corresponds by nature to a specialized work.
(3)
No specialized constructor shall receive a contract for construction works compound with works corresponding to not less than 2 specialized works:
Provided
, That this shall not apply in case where he falls under any of the following subparagraphs:
1.
Where he receives a contract jointly with a general constructor on condition that he shall execute sections corresponding to specialized works as determined by the Presidential Decree;
2.
Where he receives a contract for a special work and its appurtenant work en bloc; and
3.
Where a specialized constructor who has obtained licenses or made registrations of not less than 2 categories of specialized construction business receives a subcontract for compound works composed of specialized works corresponding to the category of business.
(4)
The scope of appurtenant works referred to in the provisos of paragraphs (1) and (2), and the provisions of paragraph (3) 2 shall be determined by the Presidential Decree.
법령보기 화면
Article 17 (Transfer, etc. of Construction Business)
(1)
Where any general constructor or specialized constructor falls under any of the following subparagraphs, he shall obtain authorization from the Minister of Construction and Transportation:
1.
Where any general constructor or specialized constructor desires to transfer his construction business; and
2.
Where a legal person who is a general constructor or specialized constructor and a legal person who is neither a general constructor nor specialized constructor desires to merge (excluding the case where a legal person who is a general constructor or specialized constructor merges with a legal person who is not a general constructor or specialized constructor).
(2)
Where the transfer of construction business referred to in paragraph (1) is authorized, any person who takes over any construction business shall succeed to the status as constructor who transfers construction business, and where the corporate merger is authorized, the legal person who is newly established or survives after merger shall succeed to the status as constructor of the legal person who ceases to exist by merger.
(3)
The provisions of paragraphs (1) and (2) shall apply
mutatis mutandis
in case where he succeeds to construction of the general constructor or specialized constructor. In this case, where the successor falls under any of the following disqualifications of
Article 12
(1), he shall transfer the construction business to another person within 3 months.
법령보기 화면
Article 18 (Procedures of Authorization on Transfer, etc. of Construction Business)
(1)
Any person who desires to obtain authorization on transfer corporate merger or succession of construction business referred to in
Article 17
(1) or (3) shall make an application for authorization to the Minister of Construction and Transportation.
(2)
Where the Minister of Construction and Transportation receives an application for authorization on transfer of construction pursuant to paragraph (1), he shall notify it publicly. In this case, expenses of the public notice shall be borne by the person who desires to transfer it.
(3)
Any person who has interests in the transfer of construction business may present his opinion to the Minister of Construction and Transportation 30 days from the date of public notice referred to in paragraph (2).
법령보기 화면
Article 19 (Contents, etc. of Transfer of Construction Business)
(1)
Any person who desires to obtain authorization on transfer of construction business pursuant to
Article 17
(1) 1 shall transfer the following rights and duties in all on the category of business desired to be transferred:
1.
Rights and duties on a contract agreement of construction work under execution; and
2.
Rights and duties on repairs of defects of the work which it is completed and where it is during the period of defect security liability thereto.
(2)
In case of paragraph (1), where a construction work is under execution, a construction business shall not be transferred if the ordering person of said construction work agrees, or if the contract therefor is rescinded.
법령보기 화면
Article 20 (Restriction on Transfer of Construction Business)
Where any general constructor or specialized constructor falls under any of the following subparagraphs, he shall not make an application for authorization on transfer of construction business referred to in
Article 18
(1):
Provided
, That this shall not apply in case where he is under obligation to transfer construction business due to his falling under the latter part of
Article 17
(3):
1.
Where he has carried on construction business for a period of less than 1 year after he obtained a license or made a registration pursuant to
Article 9
(1) or 11 (1);
2.
Where he has carried on construction bushiness for a period of less than 1 year after he took over referred to in
Article 17
(1) 1;
3.
Where he is under a period of disposition of suspension of business;
4.
Where he has been subject to the disposition of restriction on disqualifications to participate in a tender as an illegal operator under the provisions of the Act on Contracts to which the State is a Party or the Local Finance Act, and is under a period of the disposition; and
5.
Where he has been to the disposition of cancellation of license of, or erasion of registration of construction business pursuant to
Article 83
, and is under a period of suspension of execution of the disposition under the provisions of the Administrative Appeals Act or the Administrative Litigation Act.
법령보기 화면
Article 21 (Prohibition of Lending of Construction Business License, etc.)
No constructor shall have another person receive a contract for or execute construction works by using his name or trade name, or shall lend his construction business license or construction business license pocketbook.
CHAPTER Ⅲ CONTRACT AND SUBCONTRACT AGREEMENTS
법령보기 화면
Article 22 (Principles of Contract Agreement on Construction Works)
(1)
Parties to a contract for construction works (including subcontracts; hereinafter the same shall apply) shall conclude a contract by agreement and fairly on equal footing, and shall perform the contract in good faith.
(2)
In concluding a contract for construction works, the parties to the contract shall, in writing, specify the amount of the contract, period of work and other matters as determined by the Presidential Decree, and shall deliver the singed and sealed a duplicate of contracts to the other party for preservation.
(3)
A constructor shall keep a construction work book in which matters regarding construction works are entered at his principal office under the conditions as determined by the Ministerial Decree of Construction and Transportation.
법령보기 화면
Article 23 (Appraisal and Public Notice of Announcement of Execution Capacity)
(1)
The Minister of Construction and Transportation shall appraise and announce publicly the execution capacity of construction works for general constructors and specialized constructors as determined by the Presidential Decree to secure that the ordering person may select an appropriate constructor.
(2)
The execution capacity referred to in paragraph (1) shall be appraised according to the results of construction works, capital, standards etc. for safety, environment and quality control of construction works of a constructor under the conditions as determined by the Presidential Decree.
(3)
A constructor shall report the results of construction works of the previous year, capital and other matters as determined by the Ministerial Decree of Construction and Transportation every year under the conditions as determined by the Ministerial Decree of Construction and Transportation.
(4)
The time, method, and procedures of public announcement of execution capacity referred to in paragraph (1) and other necessary matters shall be determined by the Ministerial Decree of Construction and Transportation.
법령보기 화면
Article 24 (Comprehensive Management of Construction Industrial Information)
(1)
The Minister of Construction and Transportation may manage comprehensively information on constructors such as capital, actual conditions of management and situations of construction progress of constructors, and construction-related information such as the actual demand and supply of materials and manpower necessary for construction works and provide them for the ordering person of construction work and related industries requiring them.
(2)
The Minister of Construction and Transportation may ask constructors, producers and suppliers of construction materials, related administrative agencies, associations of construction-related business owners, mutual-aid associations and research institutions to present the materials on situations of construction progress, situations of production and sale of construction materials, etc. for the comprehensive management of information referred to in paragraph (1). In this case, the requested person shall comply with it unless there exist particular causes.
법령보기 화면
Article 25 (Restriction on Qualification of Contractors)
(1)
An ordering person shall give a contract to the constructor who has obtained a license of business corresponding to contents of the relevant work, or made a registration of the category thereof.
(2)
An ordering person or contractor may restrict qualifications of constructors or subcontractors of construction works on the basis of the execution capacity announced publicly pursuant to
Article 23
(1). In this case, the standards for appraisal of execution capacity shall, if necessary, separately determined in consideration of the characteristics etc. of the work and publicly announced execution capacity, etc..
법령보기 화면
Article 26 (Entrustment of Functions of Construction Project Management)
(1)
An ordering person may, if necessary, entrust all or part of the functions of construction project management to a person who is equipped with an expert knowledge and technical capacity on construction project management.
(2)
Where the contents of the functions of construction project management are the functions to be made a report or a registration etc. under related Acts and subordinate statutes, no person who has failed to make a report or registration, etc. under the relevant Acts and subordinate statutes shall be entrusted with the relevant functions of construction project management:
Provided
, That where any person, who has entrusted with the functions of construction project management for the construction of airports, expressways, power plants, dams or plants which are large scale compound construction works, is equipped with technical manpower such as architects or technical engineers capable of carrying out the design or management control under related Acts and subordinate statutes, he may, notwithstanding the provisions of Article 23 (1) of the Certified Architects Act or Article 28 (1) of the Construction Technology Management Act, carry out them entrusted with the design or management control together.
(3)
Any person who is entrusted with the functions of construction project management shall carry out the entrusted functions with due care imposed on a good administrator.
(4)
No person who is entrusted with the functions of construction project management shall advise for himself or his affiliated company (meaning affiliated companies referred to in subparagraph 3 of Article 2 of the Monopoly Regulation and Fair Trade Act) to receive a contract for the relevant construction works.
법령보기 화면
Article 27 (Period for Estimate)
An ordering person shall grant a certain period as determined by the Presidential Decree for the constructor to make an estimate of the relevant construction work, before a contract for said work is entered, if it is a free contract, and before inviting a tender, if said contract is concluded by public tender.
법령보기 화면
Article 28 (Warranty against Defects of Construction Contractor)
(1)
The contractor shall be responsible to the ordering person for warranting any defects arising within the period as determined by the Presidential Decree by kind of work, within the limit of 10 years from the date of completion of the construction work where the object of the construction work is built of brick masonry-type structure, reinforced concrete structure, steel structure, steel reinforced concrete structure or other similar structure and within the limit of 5 years from the date of completion of the construction work where it is built of other structure.
(2)
Notwithstanding the provisions of paragraph (1), the contractor shall not be responsible for warranting any defects arising from any of the following causes:
1.
Where they arise as the quality or standard, etc. of the materials supplied by the ordering person is below the standards;
2.
Where they are executed by the instruction of the ordering person; and
3.
Where the ordering person uses the object of the construction work in excess of the life of durability or structural durability in the design under related Acts and subordinate statutes.
(3)
Where the period of liability for warranty against defects on construction work is provided for in any other Act or subordinate statute (excluding
Articles 670
and 671 of the Civil Act), or in contract agreements, it shall be governed by the conditions as determined by said Act or subordinate statute, or said contract.
법령보기 화면
Article 29 (Restriction on Subcontracts of Construction Works)
(1)
A constructor shall not give any other constructor a subcontract for all or most of the important parts as determined by the Presidential Decree of the construction work for which he has received a contract:
Provided
, That this shall not apply if the ordering person agrees so and said work is divided into parts which are subcontracted to not less than 2 persons, respectively, under the conditions as determined by the Presidential Decree.
(2)
Where any contractor desires to subcontract any work corresponding to a specialized work from among construction works for which he has received contracts, he shall subcontract it to a specialized constructor of the corresponding category of business, and notify it to the ordering person under the conditions as determined by the Presidential Decree:
Provided
, That it shall be subject thereto where the part desired to be subcontracted corresponds to the important proportion and it requires the ordering person to obtain a prior approval on condition of a contract agreement out of necessity for the sake of quality control.
(3)
No contractor shall subcontract part of his contracted construction work to a general constructor:
Provided
, That this shall not apply in case where the ordering person gives his consent to it in writing by deeming that it is necessary to enhance the quality of the work or the execution efficiency for its execution.
(4)
No subcontractor shall subcontract his contracted construction work again to other persons:
Provided
, That this shall not apply in case where a general constructor who has received a subcontract pursuant to the proviso of paragraph (3) notifies the construction work corresponding to a specialized work from his contracted construction works to the ordering person and subcontracts it again to a specialized constructor of the relevant category of business, and where a subcontractor makes an agreement with participators in the execution pursuant to
Article 39
(3).
법령보기 화면
Article 30 (Subcontract, etc. of Part of Construction Work)
(1)
Where a general constructor receives a contract for a construction work whose construction amount for a case of work exceeds the amount as determined by the Presidential Decree, he shall subcontract the work equivalent to the amount according to the ratio as determined by the Ministerial Decree of Construction and Transportation from among the total construction amount to a specialized constructor of the relevant category of business:
Provided
, That this shall not apply in case where it is difficult to subcontract by dividing the relevant construction work and is determined as by the Ministerial Decree of Construction and Transportation.
(2)
Where a constructor desires to receive a contract for construction works ordered by the State, the local government or government-invested institutions and as determined by the Presidential Decree, he may calculate an estimated contract amount by estimate in advance from the specialized constructor to receive a subcontract for it. In this case, where the relevant construction work is contracted, the contractor and the specialized constructor shall conclude a subcontract according to the contents of the estimate.
법령보기 화면
Article 31 (Request, etc. for Replacement of Subcontractor)
(1)
Where there is a subcontractor who is deemed significantly unsuitable in executing a construction work, the ordering person may request the contractor for the replacement of the subcontractor by specifying the causes as determined by the Presidential Decree.
(2)
Where it is deemed to cause a serious effect on the result of the work by not complying with the request referred to in paragraph (1) without any justifiable reason, the ordering person may rescind the contract agreement on the construction work.
법령보기 화면
Article 32 (Status of Subcontractors)
(1)
In executing his subcontracted construction work, any subcontractor shall have the same obligation to the ordering person as the contractor does.
(2)
The provisions of paragraph (1) shall not prejudice the legal relations between the contractor and the subcontractor.
법령보기 화면
Article 33 (Hearing of Subcontractors’ Opinion)
Where a contractor has subcontractors in executing a contracted construction work, he shall consult their opinions in advance about the method and process of construction on the execution of the construction work and other matters which are deemed necessary.
법령보기 화면
Article 34 (Payment of Prices for Subcontract, etc.)
(1)
The contractor shall pay the subcontractor the price for subcontract where he receives the completion money for a contracted construction work and the amount equivalent to the portion executed by the subcontractor where the contractor receives the accomplished money within 15 days from the date of the receipt (meaning the due date of draft where the contractor receives the work price by draft from the ordering person), respectively.
(2)
In concluding a contract agreement, the contractor shall deliver a written guarantee which certifies the payment of the price for subcontract to the subcontractor:
Provided
, That this shall not apply in cases as determined by the Ministerial Decree of Construction and Transportation.
(3)
Where the contractor receives an advance payment from the ordering person, he shall pay an advance payment to his subcontractors according to the contents and proportion of the advance payment he receives to ensure that they may purchase materials, employ field workers and start the subcontracted work. In this case, the contractor may request the subcontractor for a guarantee in preparation for a case that the subcontractor may return the advance payment.
법령보기 화면
Article 35 (Direct Payment of Price for Subcontract)
(1)
In cases falling under any of the following subparagraphs, the ordering person may grant direct payment to the subcontractor for the price for subcontract corresponding to the portion of work executed by the subcontractor. In this case, the obligation of the ordering person to pay the price to the contractor shall be deemed to have been extinguished within the limit of his payment to the subcontractor:
1.
Where the ordering person and the contractor have reached an agreement by specifying their intentions that the price for subcontract may be directly paid to the subcontractor and the method and procedures of its payment;
2.
Where the subcontractor has won a final judgement ordering the payment of the price for subcontract for the portion of work executed by the subcontractor in a lawsuit against the contractor;
3.
Where the construction work ordered by the State, the local government or government-invested institutions falls under any of the following items and the ordering person deems necessary for the protection of the subcontractor:
(a)
Where the contractor delays the payment of the price for subcontract referred to in
Article 34
(1) once or more times; and
(b)
Where a contract agreement is concluded at the amount which falls short of the ratio as determined by the Ministerial Decree of Construction and Transportation in comparison with the estimated construction work cost;
4.
Where the ordering person deems that there exists an obvious cause for which the contractor is unable to pay the price for subcontract due to the contractor’s bankruptcy, etc.; and
5.
Where the contractor fails to deliver a written guarantee to pay the price for subcontract referred to in
Article 34
(2) to the subcontractor without justifiable causes.
(2)
Where the case falls under any of the following items of paragraph (1) 3 and it is likely deemed to sustain losses due to causes attributable to the subcontractor, the contractor may ask the ordering person to suspend the direct payment of the price for subcontract by specifying the causes.
(3)
The method and procedures where the price for subcontract is directly paid pursuant to paragraph (1) 3 through 5 shall be determined by the Ministerial Decree of Construction and Transportation.
법령보기 화면
Article 36 (Adjustment of Price for Subcontract Pursuant to Modification of Designs)
Where the contractor receives an increase in the construction amount from the ordering person due to a modification of designs or fluctuations in economic situations after the subcontract, he shall pay the subcontractor the increased expenses according to the contents and proportion of the increases in construction amount he receives if the additional expenses are required for the completion of an object for the same causes. In this case, if the construction amount decreases, the decreased one shall be paid in proportion thereto.
법령보기 화면
Article 37 (Inspection and Delivery)
(1)
Where the contractor is notified of a completed or accomplished portion of a subcontracted work by the subcontractor, he shall conduct an inspection to confirm it within 10 days.
(2)
Where the subcontracted work is completed according to the contents of design as a result of the inspection referred to in paragraph (1), the contractor shall take delivery of it without delay.
법령보기 화면
Article 38 (Prohibition of Unfair Acts)
No contractor shall force a subcontractor into acts which are deemed unfavorable to the subcontractor due to designation etc. of purchasing places of materials in connection with the execution of subcontracted works.
CHAPTER Ⅳ EXECUTION AND TECHNICAL MANAGEMENT
법령보기 화면
Article 39 (Drawing Up, etc. of Execution Management Book)
(1)
The constructor shall draw up an execution management book and notify it to the ordering person under the conditions as determined by the Ministerial Decree of Construction and Transportation.
(2)
The names (meaning trade name and name of the representative in case of a legal person) of any of the following subparagraphs and kinds of works to be executed by them and period, etc. of works shall be entered in the execution management book referred to in paragraph (1):
1.
Contractor;
2.
Subcontractors; and
3.
Person who participates in the execution of work (hereinafter referred to as the “execution participant”) regardless of the titles such as piece rate, contract, entrustment or others under the managerial responsibility of a specialized constructor.
(3)
Where the subcontractor make an agreement with the participant in execution about the kinds of works to be executed and period etc. of works, he shall notify the contents of the agreement without delay to the constructor and the constructor shall make a notification referred to in paragraph (1) within 15 days from the date of receipt of the notification. The same shall also apply in case where any changes are made in the notified contents.
(4)
Where the constructor neglects the notification or makes a notification by omitting any part of it referred to in paragraph (1), the subcontractor or execution participant may notify the kinds of works executed by himself and period, etc. of works directly to the ordering person.
(5)
The provisions of
Article 34
(1) and
Article 35
(excluding paragraph (1) 5 of the same Act) shall apply
mutatis mutandis
to the payment of the price to the execution participant entered in the execution management book pursuant to paragraph (2). In this case, the references to “ordering person” shall be deemed to read “contractor” and the references to “subcontractor” shall be deemed to read “execution participant”.
(6)
Where a notification referred to in paragraph (1) is made, the subcontract which is included in the relevant execution management book shall be deemed to have been made a notification referred to in main sentence of
Article 29
(2).
(7)
The constructor shall draw up an execution scheme and put up it on a construction field under the conditions as determined by the Ministerial Decree of Construction and Transportation.
법령보기 화면
Article 40 (Assignment of Construction Engineers)
(1)
The constructor shall assign at least a construction engineer to a construction field for the execution management of a construction work and other technical management under the conditions as determined by the Presidential Decree.
(2)
The construction engineer who has been assigned to a construction field pursuant to paragraph (1) shall not desert the construction field without justifiable causes, unless he obtains consent of the ordering person.
(3)
Where it is deemed that the construction engineer who has been assigned to a construction field pursuant to paragraph (1) has no capacity to carry out his duties due to physical infirmity, etc., the ordering person may request the contractor to replace the construction engineer. In this case, the contractor shall comply with it without justifiable causes.
법령보기 화면
Article 41 (Restriction on Execution of Special Structures, etc.)
(1)
The construction works falling under any of the following subparagraphs shall, even though not executed by contract, be executed by the constructor:
1.
Works on manufacture and erection of cableways;
2.
Works on construction or major repairs of a building for residential purpose whose total space exceeds 661m2 or other buildings whose total space exceeds 495m2:
Provided
, That this shall not apply to the works as determined by the Presidential Decree; and
3.
Construction works which are closely related to the use by the public at large and which is as determined by the Presidential Decree.
(2)
The head of the State agency or local government who makes a disposition of authorization, permission, approval, etc. on Class A installations and Class B installations under the Special Act on the Safety Control of Installations may recommend the ordering person to replace a builder in consideration of the size of the relevant construction work, and the necessity etc. of structural safety where he deemed that the builder is significantly unsuitable for the execution capacity. In this case, the ordering person shall comply with it without justifiable causes.
법령보기 화면
Article 42 (Prohibition of Concurrent Occupations of Construction Engineers)
No construction engineers who are employed by the constructor shall be engaged in other enterprises (including a construction enterprise of his own operating).
법령보기 화면
Article 43 (Posting of Construction Work Sign)
(1)
The constructor shall hang out a sign specifying the contents of a construction work at a construction field under the conditions as determined by the Ministerial Decree of Construction and Transportation.
(2)
Where the constructor completes a construction work as determined by the Ministerial Decree of Construction and Transportation, he shall install signboards specifying the trade names and names etc. of representatives of the ordering person, designer, supervisor and constructor of the construction work at places within easy sight of the general public.
(3)
The ordering person shall appropriate the expenses for installing the signboards referred to in paragraphs (1) and (2) in the expenses of the relevant construction work.
법령보기 화면
Article 44 (Liability for Damages by Constructor)
(1)
Where the constructor inflict losses on others by executing roughly a construction work on purpose or by negligence, he shall be under obligation to compensate for the losses.
(2)
Where the losses referred to in paragraph (1) arise from a grave negligence of the ordering person, the constructor may exercise a right to indemnity against the ordering person.
(3)
Where the subcontractor inflict losses on others by executing roughly a subcontracted construction work on purpose or by negligence, the contractor shall be under obligation to compensate for the losses jointly and severally with the subcontractor.
(4)
Where the contractor compensate for the losses pursuant to paragraph (3), he may exercise a right to indemnity against the subcontractor.
CHAPTER Ⅴ RATIONALIZATION OF MANAGEMENT AND ASSISTANCE TO SMALL AND MEDIUM CONSTRUCTORS
법령보기 화면
Article 45 (Efforts for Rationalization, etc. of Management)
The constructor shall make efforts to rationalize the management such as the establishment of contract order, proper execution of construction works, sound financial management, and to develop the construction expertise.
법령보기 화면
Article 46 (Assistance to Small and Medium Constructors)
(1)
The Minister of Construction and Transportation may establish and execute assistance policies to small and medium constructors in consultations with the head of related central administrative agency.
(2)
The heads of related administrative agency and government-invested institutions shall cooperate positively in the execution of assistance policies to small and medium constructors referred to in paragraph (1).
법령보기 화면
Article 47 (Measures for Assistance to Small and Medium Constructors)
(1)
Where it is necessary to assist small and medium constructors, the Minister of Construction and Transportation may ask any state agency, local government or government-invested institution ordering a construction work for the expansion of the opportunity to participate therein by small and medium constructors and for taking necessary measures.
(2)
Where it is deemed necessary to assist small and medium constructors, the Minister of Construction and Transportation set the lower limit of the construction amount of the construction work for which a constructor, a large enterprise, may receive a contract under the conditions as determined by the Presidential Decree.
법령보기 화면
Article 48 (Cooperation between Constructors)
(1)
The Minister of Construction and Transportation may prove guidance on the subcontract and joint contract, etc. to maintain mutual cooperative relations between general constructors and specialized constructors, and mutual cooperative relations between constructors which are large enterprises and constructors which are small and medium enterprise constructors, for the balanced development of construction business and the efficient execution of construction works.
(2)
The Minister of Construction and Transportation may guide any general constructor to register a constructor of the category of business related to the work to be executed as cooperator to maintain mutual cooperative relations between constructors.
(3)
The constructor who has obtained a registration and the cooperator who has make a registration pursuant to paragraph (2) shall cooperate in the following matters:
1.
Preferential selection of cooperators as joint contractor or subcontractor where they receive a contract for or subcontract a construction work;
2.
Exchange of technology and information on construction works; and
3.
Assistance to manpower, funds or technical development necessary for the execution of construction works.
(4)
The Minister of Construction and Transportation may ask any related agency for cooperation in giving preferential treatment to a general constructor whose results are excellent by appraising the results of the performance according to the cooperative relations with cooperators referred to in paragraphs (1) and (2) at the time of appraising the execution capacity or ordering works.
(5)
The matters necessary for the guidance referred to in paragraph (1) and registration as cooperators, and cooperation between constructors referred to in paragraph (2) shall be determined by the Presidential Decree.
법령보기 화면
Article 49 (Investigation, etc. into Actual Conditions of Constructors)
(1)
Where it is deemed necessary to determine whether it conforms to the standards for license or registration, the subcontract is proper and it is executed in good faith, he may receive a report on the functions, situations of financial management and situations, etc., of execution from the constructor for a specified period, have public officials under his jurisdiction investigate the actual conditions of management by constructors or inspect materials or facilities necessary for the execution of works.
(2)
Where it is necessary to investigate the actual conditions of management relating to constructors referred to in paragraph (1), he may have a certified public accountant or specialized management diagnosing institution equipped with the requirements as determined by the Ministerial Decree of Construction and Transportation diagnose the financial management conditions of the constructors.
(3)
Where it is deemed necessary to investigate the actual conditions of management by constructors referred to in paragraph (1), he may demand the ordering person or supervisor of a construction work and other construction work-related institutions to present materials on the situations of execution of the construction work.
(4)
Any public official who conducts the investigation or inspection pursuant to paragraph (1) shall produce a certificate indicating his powers to the person concerned.
CHAPTER Ⅵ ORGANIZATION OF CONSTRUCTORS
법령보기 화면
Article 50 (Establishment of Associations)
(1)
General constructors may establish a construction association and specialized constructors, a specialized construction association, for the maintenance of the dignity of constructors, development of construction expertise and sound development of construction business:
Provided
, That where determined by the Presidential Decree, associations other than the construction association or specialized construction association may be established independently.
(2)
The construction association and specialized construction association referred to in the main sentence of paragraph (1) and associations referred to in the proviso of the same paragraph (hereinafter referred to as “each association”) shall be legal persons.
(3)
The association shall come into existence by registration of incorporation at the site of its principal office.
(4)
Matters etc. on the qualifications of members and officers of each association shall be determined by the articles of association.
(5)
The matters to be entered in the articles of association of each association and matters necessary for the supervision of each association shall be determined by the Presidential Decree.
법령보기 화면
Article 51 (Procedures of Authorization on Establishment of Association)
(1)
In desiring to establish each association, it shall be promoted by more than 5 constructors who have membership, obtain the consent of more than the number of constructors as determined by the Presidential Decree from among those who have membership, draw up the articles of association at a inaugural general meeting, and then it shall make an application for authorization to the Minister of Construction and Transportation.
(2)
The Minister of Construction and Transportation shall, in granting authorization according to the application referred to in paragraph (1), announce it publicly.
(3)
Necessary affairs until each association comes into existence and officers are appointed shall be carried out by promoters.
법령보기 화면
Article 52 (Recommendation and Consultation, etc.)
(1)
Each association may recommend matters on construction business to the Government, and shall reply to the request for consultations on construction business by the Government.
(2)
Where each association finds the fact that any member or constructor who has membership violates this Act, it may confirm it and report it to the Minister of Construction and Transportation.
법령보기 화면
Article 53 (Application Mutatis Mutandis of Provisions of Civil Act)
Except as provided for in this Act, the provisions on the juristic persons of the Civil Act shall apply
mutatis mutandis
with respect to each association.
CHAPTER Ⅶ CONSTRUCTION-RELATED MUTUAL-AID ASSOCIATION
법령보기 화면
Article 54 (Establishment of Mutual-Aid Association)
(1)
General constructors may establish a construction mutual-aid association, and specialized constructors, a specialized construction mutual-aid association or mutual-aid association by category of business to secure an autonomous economic activities, and provide various guarantees and funds loans, etc. necessary to carry on construction business through mutual cooperative organizations between constructors.
(2)
The construction mutual-aid association, specialized construction mutualaid association or mutual-aid association by category of business referred to in paragraph (1) (hereinafter referred to as “each mutual-aid association”) shall be juristic persons.
(3)
Each mutual-aid association shall come into existence by registration of incorporation at the site of its principal office.
(4)
The qualification of partners, matters on officers, matters on contribution and loans and matters on the operation of each mutual-aid association shall be determined by the articles of association.
(5)
The matters to be entered in the articles of association, object of guarantee, guarantee limit and matters necessary for the supervision of each mutual-aid association shall be determined by the Presidential Decree.
법령보기 화면
Article 55 (Procedures of Authorization, etc. on Establishment of Mutual Aid Association)
(1)
In desiring to establish each mutual-aid association, it shall be promoted by not less than 200 constructors who are qualified as partners, obtain the consent of more than the number of constructors as determined by the Presidential Decree from among those who are qualified as partners, draw up the articles of association and then it shall make an application for authorization to the Minister of Construction and Transportation.
(2)
The Minister of Construction and Transportation shall, in granting authorization referred to in paragraph (1), announce it publicly.
(3)
Necessary affairs until each mutual-aid association comes into existence and officers are appointed shall carried out by promoters.
법령보기 화면
Article 56 (Projects of Mutual-Aid Association)
(1)
Each mutual-aid association shall carry out the following projects:
1.
Tender guarantee, contract guarantee (including work performance guarantee), damage guarantee, guarantee for repair of defects, advance guarantee, subcontract guarantee necessary for partners to carry on construction business and other guarantees as determined by the Presidential Decree;
2.
Loans of funds necessary for partners to carry on construction business;
3.
Discount of bill which partners receive as construction work money;
4.
Good offices for purchase of machinery and materials for construction works by partners;
5.
Welfare promotion and benevolent projects compensating for losses due to accidents on duty of those who are employed as partners;
6.
Projects on research and education relating to the improvement and enhancement of the management of construction business and construction expertise;
7.
Contributions to construction-related juristic persons;
8.
Establishment and operation of common user facilities by partners and other projects for the promotion of partners’ benefits;
9.
Supply of data processing and computer operation-related services for partners;
10.
Investment in related projects necessary for the attainment of the association’s purposes;
11.
Projects entrusted by the State, local government or public organizations as determined by the articles of association; and
12.
Projects incidental to projects referred to in subparagraphs 1 through 11 and which are determined by the articles of association.
(2)
Each mutual-aid association may execute joint projects such as exchange of information for mutual cooperation and promotion of understanding between respective mutual-aid associations or with mutual-aid associations under other Acts.
법령보기 화면
Article 57 (Benevolent Provisions)
(1)
Where each mutual-aid association desires to conduct the benevolent projects referred to in
Article 56
(1) 5, it shall specify the benevolent provisions and obtain authorization on them from the Minister of Construction and Transportation. The same shall also apply in case where it desires to modify the benevolent provisions.
(2)
The benevolent provision shall specify the matters necessary for the operation of benevolent projects such as the scope of benevolent projects, contents of benevolent contracts, benevolent fees, benevolent money and legal liability reserve for appropriating benevolent money.
법령보기 화면
Article 58 (Exclusion of Application from Insurance Business Act)
The provisions of the Insurance Business Act shall not apply to benevolent projects referred to in
Article 56
(1) 5 from among projects of each mutualaid association.
법령보기 화면
Article 59 (Transfer, etc. of Quotas)
(1)
Any partner or a person who was a partner may transfer his quotas to other partners or those who desire to be partners under the conditions as determined by the Presidential Decree.
(2)
Any person who takes over the quotas pursuant to paragraph (1) shall succeed to the rights and duties of the transferor on the quotas.
(3)
The transfer and pledge of quotas shall be effected by method of transfer and pledge of inscribed shares under the Commercial Act.
(4)
The provisional attachment or attachment of quotas made under the civil procedure or disposition on default of national taxes etc. shall be effected by method of attachment or provisional attachment of debts payable to order referred to in Article 566 of the Civil Procedure Act .
법령보기 화면
Article 60 (Acquisition etc. of Quotas by Mutual-Aid Association)
(1)
Where there exists a cause falling under any of the following subparagraphs, each mutual-aid association may acquire the quotas of partners or those who were partners:
Provided
, That where it falls under subparagraphs 1 and 3, it shall acquire the quotas:
1.
Where it desires to decrease contributions;
2.
Where it is necessary to realize security interest with which it has partners;
3.
Where any withdrawing partner request each association for the take over of quotas to recover his contributions;
4.
Where 2 years have elapsed since any partner withdrew; and
5.
Where any fractional account occurs at the time of transferring contributions in the reserve funds.
(2)
Where each mutual-aid association acquires the quotas pursuant to paragraph (1) 1, it shall without delay proceed with the reduction procedures of contributions and where it falls under subparagraphs 2 through 5 of the same paragraph, it shall dispose of them without delay.
(3)
No quotas of partners shall be the object of pledge unless they are furnished as security for the obligation of each mutual-aid association.
(4)
Where each mutual-aid association acquires the quotas pursuant to paragraph (1), it shall without delay pay the money paid to partners or those who were partners.
(5)
The claim for liquidation money which partners or those who were partners have according to the acquisition of quotas by each mutual-aid association pursuant to paragraph (1) shall be extinguished by prescription unless it is exercised for 5 years from the date of acquisition of the quotas.
법령보기 화면
Article 61 (Guarantee etc. by Credit)
Each mutual-aid association may appraise the situations of property and investigate actually the capacity to carry out the relevant work for partners, under the conditions as determined by Presidential Decree and then enforce guarantee or loans to him.
법령보기 화면
Article 62 (Appointment of Agent)
Each mutual-aid may appoint an agent who is authorized to perform all judicial or extra-judicial acts on the functions of the relevant mutual-aid association from among its officers or staff.
법령보기 화면
Article 63 (Accumulation of Legal Liability Reserve)
(1)
Each mutual-aid association may appropriate a legal liability reserve and a contingency reserve in accordance with the kinds of its guarantees at the closing of each period for the settlement of accounts.
(2)
Matters necessary for appropriation of legal liability reserve and contingency reserve referred to in paragraph (1) shall be determined by the Presidential Decree.
법령보기 화면
Article 64 (Investigation, etc. of Situations of Execution)
(1)
Each mutual-aid association may enter a construction field which it certifies and investigate the situations of execution and may state its opinion to a partners who executes the work, under the conditions as determined by the Presidential Decree.
(2)
Each mutual-aid association may have each association or constructionrelated specialized institutions execute vicariously the functions on the investigation of the situations of execution referred to in paragraph (1).
법령보기 화면
Article 65 (Submission of Report, etc.)
(1)
Where it is deemed necessary, the Minister of Construction and Transportation may have each mutual-aid association present a report on functions or order necessary measures or public official under his jurisdiction investigate the situations of functions or accounting situations of each mutual-aid association or inspect its books or other documents.
(2)
Any public official who conducts the investigation or inspection pursuant to paragraph (1) shall produce a certificate indicating his powers to the persons concerned.
법령보기 화면
Article 66 (Restriction on Collection of Security Deposit)
Where each mutual-aid association certifies the performance of duties of a partner, a guarantee creditor shall, notwithstanding the agreements under related Acts and subordinate statutes and written contracts, etc., substitute a written guarantee for security deposit or a written guarantee of work performance, and shall not collect security deposit or any other nominal amount otherwise from the partner.
법령보기 화면
Article 67 (Responsibilities of Mutual-Aid Association)
(1)
Each mutual-aid association shall pay the guarantee creditor guarantee deposit where any cause which it shall pay security deposit, under the conditions as determined by Acts and subordinate statutes or written contracts, in relating to the matters it certifies.
(2)
The right to security deposit with which the guarantee creditor has each mutual-aid association shall be extinguished by prescription unless it is exercised for 5 years from the date of termination of guarantee period.
법령보기 화면
Article 68 (Application Mutatis Mutandis of Other Acts)
Except as provided for in this Act, the provisions on the juristic persons of the Civil Act and provisions on the account of the joint stock company of the Commercial Act shall apply
mutatis mutandis
with respect to each mutual-aid association, respectively.
CHAPTER Ⅷ CONSTRUCTION DISPUTE CONCILIATION COMMITTEE
법령보기 화면
Article 69 (Establishment of Construction Dispute Conciliation Committee)
(1)
A Central Construction Dispute Conciliation Committee (hereinafter referred to as the “Central Committee”) shall be established under the jurisdiction of the Minister of Construction and Transportation and local construction disputes conciliation committees (hereinafter referred to as the “local committee”) shall each be established under the jurisdiction of the Seoul Special Metropolitan City Mayor or other Metropolitan City Mayor or
Do
governor (hereinafter referred to as the “Mayor/
Do
governor”) to conciliate the disputes on construction business and construction service industry.
(2)
The Central Committee and the local committee (hereinafter referred to as the “Committee”) shall, on the request of one or both of the parties, examine and conciliate the following disputes:
1.
Disputes on the responsibility between parties concerned with a construction work such as design, execution and supervision;
2.
Disputes on construction works between ordering persons and contractors, except the disputes relating to the interpretation of the Acts and subordinate statutes on the contracts to which the State is a party;
3.
Disputes on subcontracts of construction works between contractors and subcontractors, except the matters applied by the Fair Transactions in Subcontracting Act;
4.
Disputes on the responsibility for execution between contractors and third parties;
5.
Disputes on the guarantee responsibility between parties to a contract agreement of a construction work and guarantors; and
6.
Other disputes on matters as determined by the Presidential Decree.
법령보기 화면
Article 70 (Composition of Committee)
(1)
The Committee shall be composed of not more than 15 members, including a chairman and a vice-chairman, respectively.
(2)
Public officials who belong to any central administrative agency, local government or local administrative agency and are nominated by the head of the relevant agency, and those as commissioned by the Minister of Construction and Transportation or the Mayor/
Do
governor, form among those fall under any of the following subparagraphs shall be members of the Committee:
1.
A person who is or was in office as assistant professor or higher lecturing on engineering or jurisprudence at a university or college under the Education Act;
2.
A person who is qualified as judge, public prosecutor or lawyer; and
3.
A person who has much learning and experience on construction works, construction business or construction service industry.
(3)
The Vice-Minister of Construction and Transportation shall be installed as chairman of the Central Committee, the vice-mayor or vice-governor of Seoul Special Metropolitan City or other Metropolitan City or
Do
(hereinafter referred to as the “City/
Do
”) shall be installed as chairman of the local committee, and the vice-chairman shall be elected by the Committee from among members.
(4)
The term of members who are not public officials shall be 3 years, and they may be reelected.
(5)
The members appointed to fill vacancies shall hold office for the remainder of the predecessor’s term.
법령보기 화면
Article 71 (Meetings of Committee)
(1)
A meeting of the Committee shall be convened by the chairman.
(2)
Decisions of meetings of the Committee shall be taken by a majority of all members attending and by affirmative vote of a majority of members present.
법령보기 화면
Article 72 (Notification of Application for Conciliation)
(1)
Where the Committee receives an application for dispute conciliation from one of the parties, it shall notify the contents of the application to the other party.
(2)
The other party who receives the notification pursuant to paragraph (1) shall notify his intention about whether he will reply to a conciliation to the Committee.
법령보기 화면
Article 73 (Denial and Suspension of Conciliation)
(1)
Where it is deemed to inappropriate to conciliate by the Committee by nature of disputes or it is deemed that an application for conciliation is made for illegal purposes, the Committee may deny the conciliation. In this case, it shall notify the cause, etc. for denial of conciliation to the party who is the applicant.
(2)
Where one of the parties to a dispute denies a conciliation, the Committee shall notify in writing the merits of conciliation and causes, etc. for denial of conciliation to the parties.
(3)
Where one of the parties to a dispute files an action, the Committee shall suspend the conciliation procedures and notify it to the parties.
법령보기 화면
Article 74 (Processing Period)
(1)
The Committee shall examine an application for dispute conciliation and draw up a draft conciliation within 60 days from the date of receipt of the application:
Provided
, That it may extend the period by a resolution of the Committee where there exist compelling causes.
(2)
Where the Committee extends the period pursuant to the proviso of paragraph (1), it shall notify the cause for extension of the period or other matters on the extension of the period to the parties.
법령보기 화면
Article 75 (Investigation and Hearing of Opinion)
(1)
Where it is deemed necessary, the Committee may haves member of the Committee, a public official belonging to the Ministry of Construction and Transportation or public official belonging to the City/
Do
inspect related documents or enter a related workplace and investigate them.
(2)
Where it is deemed necessary, the Committee may have parties or experts concerned attend a meeting of the Committee and state their opinions to be heard by it.
법령보기 화면
Article 76 (Conciliation Division)
(1)
Where it is deemed necessary to deal efficiently with the conciliation affairs, the Committee may establish a conciliation division composed of not more than 5 members by each field of conciliation cases.
(2)
The members of the conciliation division referred to in paragraph (1) shall be designated by the chairman.
(3)
The conciliation division shall examine in advance a conciliation case, draw up a draft conciliation and present it to a meeting of the Committee.
법령보기 화면
Article 77 (Agreement before Conciliation)
Where both parties to the dispute reach an agreement on the dispute settlement, the Committee shall suspend the conciliation procedures and draw up an written agreement without delay pursuant to the contents of the agreement, and the chairman and each party shall sign and seal it.
법령보기 화면
Article 78 (Effect of Conciliation)
(1)
Where the Committee draws up a draft conciliation, it shall present it without delay to each party.
(2)
The party to whom a draft conciliation is presented pursuant to paragraph (1) shall notify whether he will accept it to the committee within 15 days from the date of receipt of the presentation.
(3)
Where the parties accept the draft conciliation, the Committee shall draw up a written conciliation, and the chairman and each party shall sign and seal it.
(4)
A written conciliation referred to in paragraph (3) shall have the same effect as a judicial protocol of settlement.
법령보기 화면
Article 79 (Sharing of Expenses)
(1)
The expenses which cost for appraisal, diagnosis, test, etc. for dispute conciliation shall be borne by the applicant:
Provided
, That where an agreement thereon is made between the parties, they shall be governed by the agreement.
(2)
Where it is deemed necessary, the Committee may have parties pay the expenses referred to in paragraph (1) in advance under the conditions as determined by the Presidential Decree.
(3)
Scope of expenses referred to in paragraph (1) shall be determined by the Presidential Decree.
법령보기 화면
Article 80 (Operation, etc. of Committee)
Except as provided for in
Articles 69
through
79
, matters necessary for the composition, jurisdiction, organization and operation of the Committee and the conciliation procedures, etc. shall be determined by the Presidential Decree.
CHAPTER Ⅸ ORDINANCE, ETC. OF CORRECTION
법령보기 화면
Article 81 (Ordinance, etc. of Correction)
Where any constructor falls under any of the following subparagraphs, the Minister of Construction and Transportation may order him to correct it for a specified period, or make other necessary direction:
1.
Where he fails to make a report on the results of construction works referred to in
Article 23
(3);
2.
Where he fails to execute a contracted construction work without justifiable causes;
3.
Where he fails to perform warranty against defects referred to in
Article 28
;
4.
Where he receives a contract for a construction work pursuant to the latter part of
Article 30
(2) and one of the parties to a subcontract refuses to conclude the subcontract according to the contents of the intial estimate;
5.
Where he violates the duties as constructor referred to in
Article 34
and
Articles 36
through 38;
6.
Where he fails to assign a construction engineer to a construction field in violation of
Article 40
or it is deemed that an assigned construction engineer is unsuitable for management of work execution;
7.
Where he fails to hang out a sing specifying the contents of a construction work or to install a signboard after he completes the construction work; and
8.
Where he is likely to cause any danger and injury to the public by his roughly executing a construction work.
법령보기 화면
Article 82 (Suspension, etc. of Business)
(1)
Where any constructor falls under any of the following subparagraphs, the Minister of Construction and Transportation may order him to suspend his business for a specified period not exceeding 6 months or impose a penalty not exceeding 50 million won on him:
1.
Where defects exceeding the scale as determined by the Ministerial Decree of Construction and Transportation occur more than 3 times due to causes attributable to a contractor or subcontractor during the defect security liability period referred to in
Article 28
. In this case, for a cause attributable to the subcontractor, the contractor shall be deemed to have the same responsibility;
2.
Where the annual average amount of the results of construction works in the recent 2 years after he has obtained a license of constructor or made a registration thereof falls short of the amount as determined by the Presidential Decree:
Provided
, That this shall not apply in case where there exist justifiable causes as determined by the Presidential Decree;
3.
Where he makes a notification referred to in
Article 29
(2) falsely;
4.
Where he fails to reply to the order or directions of correction referred to in
Article 81
without justifiable causes;
5.
Where he falls under any of the following items; and
(a)
Where he fails to perform the order of correction referred to in Article 21-5 (1) of the Construction Technology Management Act;
(b)
Where he violates the duty to draw up a detailed draw up a detailed drawing of execution referred to in Article 23-2 (3) of the Construction Technology Management Act or executes the work without examination and confirmation by the supervisor or construction supervisor;
(c)
Where he fails to carry out in good faith the quality test or inspection referred to in Article 24 of the Construction Technology Management Act;
(d)
Where he fails to carry out in good faith the safety check up referred to in Article 26-2 (2) of the Construction Technology Management Act; and
(e)
Where he fails to perform the order of correction referred to in Article 36-17 of the Construction Technology Management Act.
6.
Where a constructor who causes a serious accident referred to in the Industrial Safety and Health Act is asked for a suspension of business by the Minister of Labor and he is asked for a suspension of business by a State or local government agency pursuant to the provisions of other Acts and subordinate statutes.
(2)
Where any constructor falls under any of the following subparagraphs, the Minister of Construction and Transportation may order him to suspend his business for a specified period not exceeding one year or impose a penalty not exceeding the amount equivalent to 50/100 of the contract amount (meaning the subcontract amount in case of subparagraph 2 and the amount of specialized work to be subcontracted in case of subparagraph 3 of the violated work:
1.
Where he receives a contract for construction works in violation of
Article 16
;
2.
Where he violates the restriction on a subcontract referred to in
Article 29
(2) through (4), except in case where he fails to make a notification or neglect it referred to in paragraph (2) of the same Article ;
3.
Where he violates the provisions of
Article 30
(1); and
4.
Where he receives a contract for a construction work which falls short of the lower limit of the construction amount referred to in
Article 47
(2).
(3)
Where any person who has been subject to the disposition of the penalty pursuant to paragraph (1) or (2) fails to pay the penalty within the time limit, it shall be collected following the example of dispositions on default of national taxes.
법령보기 화면
Article 83 (Cancellation, etc. of License of Construction Business)
Where any constructor falls under any of the following subparagraphs, the Minister of Construction and Transportation may cancel his license of construction business, erase his registration thereof or order him to suspend his business for a specified period not exceeding a year:
Provided
, That where he falls under subparagraphs 1, 3, 5 and 7, the Minister of Construction and Transportation shall cancel his license of construction or erase his registration thereof:
1.
Where he obtains his license of construction business or has it renewed by illegal means;
2.
Where he falls short of the standards for license of construction business referred to in
Article 10
;
3.
Where he makes a registration of construction business referred to in
Article 11
(1) by illegal means;
4.
Where he falls short of the standards for registration referred to in
Article 11
(4);
5.
Where he violates the provisions of
Article 21
;
6.
Where he subcontracts in violation of
Article 29
(1);
7.
Where he violates the disposition of suspension of business referred to in
Article 82
or this Article ;
8.
Where he fails to commence the business until a year elapse after he obtains a license of construction business or makes a registration thereof or he suspends the business for more than 1 year successively;
9.
Where he executes roughly construction works on purpose or by negligence; and
10.
Where a request for cancellation of license or erasion of registration is made by a state or local government agency under other Acts and subordinate statutes.
법령보기 화면
Article 84 (Detailed Standards for Disposition of Suspension, etc. of Business)
The period of suspension of business and the amount of penalty depending on the category and degree of offenses where a disposition of suspension of business or a disposition of imposition of penalty is made pursuant to
Article 82
or a disposition of suspension of business is made pursuant to
Article 83
, and other necessary matters shall be determined by the Presidential Decree.
법령보기 화면
Article 85 (Request for Sanctions by Interested Persons)
Where a constructor has a cause falling under any of subparagraphs of
Article 81
, any interested person may request the Minister of Construction and Transportation to make appropriate measures against the constructor by specifying the causes.
법령보기 화면
Article 86 (Hearing)
Where the Minister of Construction and Transportation desires to cancel the license of construction business or erase the registration thereof pursuant to
Article 83
, he shall hold a hearing.
[This Article Wholly Amended by Act No. 5453, Dec. 13, 1997]
CHAPTER Ⅹ SUPPLEMENTARY PROVISIONS
법령보기 화면
Article 87 (Implementation of Retirement Benevolent System for Construction Workers)
(1)
Any constructor who executes construction works as determined by the Presidential Decree shall subscribe to the retirement benevolent system for construction workers under the Act on the Employment Improvement, etc. of Construction Workers.
(2)
Parties to a contract agreement of construction works who are obliged to subscribe to the retirement benevolent system for construction workers pursuant to paragraph(1) shall specify the amount required for the subscription to the retirement benevolent system for construction workers in the calculated specifications of contract amount of the relevant construction work.
(3)
The Minister of Construction and Transportation may provide preferential treatment to constructors who have subscribed to the retirement benevolent system for construction workers pursuant to paragraph (2) in the appraisal of their execution capacity referred to in
Article 23
and implementation of other construction measures.
법령보기 화면
Article 88 (Prohibition of Seizure on Wages)
(1)
The amount equivalent to wages to be paid to workers of the relevant work from among contract amount of a construction work for which a constructor receives a contract shall not be seized.
(2)
The scope and method for calculation of the amount equivalent to wages referred to in paragraph (1) shall be determined by the Presidential Decree.
법령보기 화면
Article 89 (Prohibition of Disclosure of Facts Learned in Execution of Duties)
Any person falling under any of the following subparagraphs shall not disclose the situations of property and duties of a constructor which he has learned in the execution of his duties without particular causes:
1.
A person who is or was a public official engaged in the affairs of license, registration, authorization or supervision under this Act;
2.
A person who is or was a member of the Construction Dispute Conciliation Committee ; and
3.
A person who is or was engaged in the entrusted affairs referred to in
Article 91
(3).
법령보기 화면
Article 90 (Fiction of Public Officials in Application of Penal Provisions)
The members of the Construction Dispute Conciliation Committee and those who are engaged in the entrusted affairs referred to in
Article 91
(3) shall be deemed to be public officials in the application of
Articles 127
and
129
through 132.
법령보기 화면
Article 91 (Delegation and Entrustment of Powers)
(1)
Part of the powers of the Minister of Construction and Transportation provided under this Act may be delegated to the head of the agency under his jurisdiction or the Mayor/
Do
governor under the conditions as determined by the Presidential Decree.
(2)
The powers of the Minister of Construction and Transportation on the category of business as determined by the Presidential Decree from among specialized construction business may be entrusted to the head of the central administrative agency or head of the agency under his jurisdiction related to a specialized work executed by the relevant specialized constructor.
(3)
The following powers from among those of the Minister of Construction and Transportation provided under this act may be entrusted to each association (including associations established whose membership is specialized constructors under construction-related Acts such as the Energy Use Rationalization Act), each mutual-aid association and other constructionrelated specialized institutions under the conditions as determined by the Presidential Decree:
1.
Disposal of a report by a constructor referred to in
Article 15
(1);
2.
Public notice of application for authorization on transfer of construction business and reception of opinions by interested persons referred to in
Article 18
;
3.
Appraisal of execution capacity and disposal of a report on the results, etc. of construction works of a construction referred to in
Article 23
;
4.
Comprehensive management of construction industrial information referred to in
Article 24
;
5.
Guidance for cooperation between constructors referred to in
Article 48
; and
6.
Investigation into the actual conditions of constructors (excluding the diagnosis of financial management conditions referred to in paragraph (2) and demand for presentation of materials on the situations of execution of construction works necessary for its execution referred to in
Article 49
.
법령보기 화면
Article 92 (Fees)
Any person who falls under any of the following subparagraphs shall pay fees under the conditions as determined by the Ministerial Decree of Construction and Transportation:
1.
A person who makes an application for license of construction business pursuant to
Article 9
(1);
2.
A person who makes an application for redelivery of a construction business license or construction business license pocketbook referred to in
Article 9
(3);
3.
A person who makes an application for renewal of construction business license pursuant to
Article 9
(4);
4.
A person who makes an application for registration of construction business pursuant to
Article 11
(1);
5.
A person who makes an application for redelivery of a construction business registration pocketbook referred to in
Article 11
(3);
6.
A person who makes an application for authorization on transfer of construction business, corporate merger or succession of construction business pursuant to
Article 17
(1) or (3); and
7.
A person who makes an application for dispute conciliation pursuant to
Article 69
(2).
CHAPTER XI PENAL PROVISIONS
법령보기 화면
Article 93 (Penal Provisions)
(1)
Any constructor, execution participant specified in the execution management book pursuant to
Article 39
(2) or construction engineer assigned to a construction field pursuant to
Article 40
(1), who causes serious damage and destruction to the structurally major sections of bridges, tunnels, railroads or other installations as determined by the Presidential Decree in the defect security liability period referred to in
Article 28
after starting the construction work and poses danger to the public, by executing the construction work in violation of the Acts and subordinate statutes on the safety of construction works, shall be punished by imprisonment for not more than 10 years.
(2)
Any person who results in the death or injury of other people by committing the crimes listed in paragraph (1) shall be punished by life imprisonment or imprisonment for not more than 3 years.
법령보기 화면
Article 94 (Penal Provisions)
(1)
Any person who commits the crimes listed in
Article 93
(1) by functional negligency shall be punished by imprisonment or imprisonment without prison labor for not more than 5 years or a fine not exceeding fifty million won.
(2)
Any person who results in the death or injury of other people by committing the crimes listed in
Article 93
(1) by functional negligency shall be punished by imprisonment or imprisonment without prison labor or a fine not exceeding one hundred million won.
법령보기 화면
Article 95 (Penal Provisions)
Any person who commits an act falling under any of the following subparagraphs in a tender for construction works shall be punished by imprisonment for not more than 5 years or a fine not exceeding 50 million won:
1.
A person who tenders at a manipulated price in advance in collusion with other bidders for the purpose of making undue profit or impairing fair price-fixing;
2.
A person who presents an estimated tender of another constructor; and
3.
A person who interferes with tenders of other constructors by trick, threat of force or other means.
법령보기 화면
Article 96 (Penal Provisions)
Any person who falls under any of the following subparagraph shall be punished by imprisonment for not more than 1 year or a fine not exceeding ten million won:
1.
A person who carries on construction business without obtaining a license referred to in
Article 9
(1) or by obtaining a license by illegal means;
2.
A person who carries on construction business without making a registration referred to in
Article 11
(1) or by making a registration by illegal means;
3.
A person who carries on construction business without obtaining authorization referred to in
Article 17
or by obtaining authorization by illegal means;
4.
A Constructor and his other party who violate the provisions of
Article 21
;
5.
A person who subcontracts in violation of
Article 29
(1) and (4);
6.
A person who executes construction works in violation of
Article 41
(1); and
7.
A person who violates the disposition of suspension of business referred to in
Article 82
or
83
without justifiable causes.
법령보기 화면
Article 97 (Penal Provisions)
Any person who falls under any of the following subparagraphs shall be punished by a fine not exceeding five million won:
1.
A person who fails to report or reports falsely the results of construction works referred to in
Article 23
(3); and
2.
A person who fails to assign a construction engineer to a construction field referred to in
Article 40
(1).
법령보기 화면
Article 98 (Joint Penal Provision)
(1)
Where a representative of a juristic person, or an agent, servant or employee of a juristic person or individual commits the offenses listed in
Article 93
in respect of the functions of the juristic person or individual, the relevant juristic person or individual shall be punished by a fine not exceeding 1,000 million, in addition to the punishment of the offender.
(2)
Where a representative of a juristic person, or an agent, servant or employee of a juristic person or individual commits the offenses listed in
Articles 94
through
97
in respect of the functions of the juristic person or individual, the relevant juristic person or individual shall be punished by a fine provided under respective Articles.
법령보기 화면
Article 99 (Fine for Negligence)
Any person who falls under any of the following subparagraphs shall be punished by a fine for negligence not exceeding 2 million and 500 thousand won:
1.
A person who fails to make a notification referred in
Article 14
(2);
2.
A constructor who fails to conclude a contract agreement in writing in violation of
Article 22
(2);
3.
A person who fails to keep a construction work book referred to in
Article 22
(3);
4.
A person who fails to make a notification or neglect it referred to in
Article 29
(2);
5.
A person who fails to draw up a execution management book or to notify it referred to in
Article 39
(1);
6.
A person who interferes with the notification referred to in
Article 39
(4);
7.
A person who violates the prohibition of concurrent occupations referred to in
Article 42
and a constructor who have an construction engineer violate the same Article by employing construction engineer employed by other construction enterprises; and
8.
A person who refuses, evades or interferes with the investigation or inspection or makes a false report referred to in
Article 49
(1) or 91 (3) 6.
법령보기 화면
Article 100 (Fine for Negligence)
Any person who falls under any of the following subparagraphs shall be punished by a fine for negligence not exceeding five hundred thousand:
1.
A person who neglects to make a report referred to in
Article 15
(1);
2.
A person who deserts a construction field in violation of
Article 40
(2); and
3.
A person who neglects to make a report referred to in
Article 49
(1).
법령보기 화면
Article 101 (Imposition and Collection Procedures of Fine for Negligence)
(1)
The fine for negligence referred to in
Articles 99
and
100
shall be imposed and collected by the Minister of Construction and Transportation under the conditions as determined by the Presidential Decree.
(2)
Any person who is dissatisfied with the disposition of a fine for negligence may make objections with the Minister of Construction and Transportation within 30 days from the date on which he is informed of the disposition.
(3)
Where any person who has been subject to the disposition of a fine for negligence made by the Minister of Construction and Transportation pursuant to paragraph (1) makes objections pursuant to paragraph (2), the Minister of Construction and Transportation shall notify the fact without delay to the competent court and the competent court which receives the notification shall bring the case of a fine for negligence to a trial under the Non-Contentious Case Litigation Procedure Act.
(4)
Where no objection is made and no fine for negligence is paid within the period referred to in paragraph (2), it shall be collected following the example of dispositions on default of national taxes.
ADDENDA
Article 1 (Enforcement Date)
This Act shall enter into force on July 1, 1997:
Provided
, That the provisions of
Article 9
shall enter into force on July 1, 1997 and the provisions of
Article 87
shall enter into force on January 1, 1998.
Article 2 (Repeal of Other Acts)
Acts falling under any of the following subparagraphs shall be repealed respectively:
1.
The Construction Mutual Aid Association Act.; and
2.
The Specialized Construction Mutual Aid Association Act.
Article 3 (General Transitional Measures)
Any disposition which has been made under the provisions of the previous Construction Business Act, the Construction Mutual Aid Association Act or the Specialized Construction Mutual Aid Association Act at the time when this Act enters into force shall be deemed to have been made under the provisions of this Act.
Article 4 (Transitional Measures on Existing Builders, etc. of Gas Facilities)
Any person who has made a registration falling under any of the following subparagraphs at the time of entry into force of this Act shall be deemed to made a registration of the relevant category of business pursuant to
Article 11
(1):
1.
Registration of a builder referred to in Article 12-2 (1) of the Urban Gas Business Act;
2.
Registration of a builder referred to in Article 15-2 of the Safety Control and Business Regulation of Liquefied Petroleum Gas Act;
3.
Registration of execution business of specific heat-using machinery and materials referred to in Article 51 of the Energy Use Rationalization Act;
4.
Registration of maintenance and management business of installations referred to in
Article 19
(1) of the Special Act on the Safety Control of Installations; and
5.
Registration of ondol(hypocaust) execution business referred to in Article 56 (2) of the Building Act.
Article 5 (Transitional Measures on Existing Associations)
The construction associations, specialized construction associations and construction work business associations by category of business established pursuant to the previous provisions at the time this Act enters into force shall be deemed to have been established pursuant to
Article 50
(1), respectively.
Article 6 (Transitional Measures on Existing Mutual Aid Association)
The construction mutual aid association established pursuant to previous the Construction Mutual Aid Association Act, and the specialized construction mutual aid association and mutual aid association by category of business established pursuant to the Specialized Construction Mutual Aid Association Act at the time when this Act enters into force shall be deemed to have been established respectively pursuant to
Article 54
(1).
Article 7 (Transitional Measures on Construction Business Dispute Conciliation Committee)
The Construction Business Dispute Conciliation Committee already established prior to entry into force of this Act shall be deemed the Central Construction Dispute Conciliation Committee pursuant to
Article 69
(1), and the disputes pending under the Construction Business Dispute Conciliation Committee at the time this Act enters into force shall be examined and conciliated by the Central Construction Dispute Conciliation Committee.
Article 8 (Transitional Measures on Penal Provisions)
In applying the penal provisions to acts committed prior to entry into force of this Act, the previous provision shall apply.
Article 9 (Transitional Measures on Fine for Negligence)
In applying the provisions of a fine for negligence to any act committed prior to entry into force of this Act, the previous provisions shall apply.
Article 10 Omitted.
Article 11 (Relation with Other Acts and Subordinate Statutes)
In case where other Acts and subordinate statutes refer to the previous Construction Business Act, the Construction Mutual Aid Association Act and the Specialized Construction Mutual Aid Association Act or any provision thereof at the time this Act enters into force, any of the above stated three Acts or any provision thereof may, if any corresponding provision in this Act, be construed to refer to this Act or the corresponding provisions thereof.
ADDENDA<Act No. 5386, Aug. 28, 1997>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 1998. (Proviso is Omitted.)
Articles 2 through 8 Omitted.
ADDENDA<Act No. 5453, Dec. 13, 1997>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 1998. (Proviso is Omitted.)
Article 2 Omitted.
Last updated : 2009-07-26