ENFORCEMENT DECREE OF THE ACT ON ASSISTANCE TO ELECTRIC POWER PLANTS-NEIGHBORING AREAS
281193 · 2026-01-02
ENFORCEMENT DECREE OF THE ACT ON ASSISTANCE TO ELECTRIC POWER PLANTS-NEIGHBORING AREAS
CHAPTER I GENERAL PROVISIONS
Article 1 (Purpose) The purpose of this Decree is to prescribe matters mandated by the Act on Assistance to Electric Power Plants-Neighboring Areas and those necessary for enforcing that Act.
[This Article Wholly Amended on Dec. 28, 2011]
Article 2 (Areas surrounding hydroelectric power plants, tidal power plants or offshore wind power plants, etc.) (1) Areas surrounding a hydroelectric power plant, tidal power plant or offshore wind power plant under the proviso to Article 2 of the Act on Assistance to Electric Power Plants-Neighboring Areas (hereinafter referred to as the “Act”) shall be the areas of Eup/Myeon/Dong to which the areas classified below (hereinafter referred to as “standard areas”) belong, determined with reference to the generator, dam or seawall of the relevant power plant, as areas adjacent to a hydroelectric, tidal or offshore wind power plant with a facility capacity exceeding 10,000 kilowatts that is operated, under construction or scheduled to be built by an operator of electric power generation business under Article 2, subparagraph 4, of the Electric Utility Act (hereinafter referred to as an “operator of electric power generation business”). <Amended on Aug. 5, 2020; Feb. 9, 2021>
1. For a pumped-storage hydroelectric power plant: The land and island areas within a radius of 5 kilometers from the generator;
2. For a hydroelectric power plant other than pumped-storage plants: The following areas:
(a) In the upstream area of the dam, the land and island areas within 2 kilometers from the full water level line;
(b) In areas other than the upstream area of the dam, the land and island areas within 2 kilometers from the river zone under the River Act, and within a radius of 5 kilometers from the electric generator and the dam.
3. For a tidal power plant: The following areas:
(a) In the area inside the seawall, the land and island areas within 2 kilometers from the full water level line;
(b) In areas other than the area inside the seawall, the land and island areas within a radius of 5 kilometers from the generator and the seawall;
4. For an offshore wind power plant: The following areas:
(a) The land areas within 2 kilometers perpendicularly inland from the coastline within a radius of 5 kilometers from the point on the land's coastline (referring to the coastline under Article 8 (1) 3 of the Act on Marine Research and the Use of Marine Information) that is the closest to the generator (hereinafter referred to as the "closest coastal point");
(b) The island areas within the sea area with a radius equal to the distance from the generator to the closest coastal point, centered on the electric generator.
(2) "Electric power plants with a facility capacity equal to or less than that prescribed by Presidential Decree for each type of power generation source" in the main clause of Article 2 of the Act means the following electric power plants; provided, notwithstanding each of the following subparagraphs, an electric power plant of an entity that conducts the district electric business defined in subparagraph 11 of Article 2 of the Electric Utility Act, electric installations for private use under subparagraph 19 of Article 2 of that Act, and an electric power plant of an integrated energy supply business entity that is deemed a district electric business entity under Article 92-2 of that Act means an electric power plant with a facility capacity of 10 million kilowatts or less: <Amended on Jun. 15, 2015; Apr. 20, 2021>
1. For an electric power plant that generates electricity using new energy and renewable energy defined in subparagraphs 1 and 2 of Article 2 of the Act on the Promotion of the Development, Use and Diffusion of New and Renewable Energy (hereafter referred to as a "new and renewable energy power plant" in this paragraph): Electric power plant with a facility capacity of 2,000 kilowatts or less;
2. For an electric power plant other than new and renewable energy power plants: Electric power plant with a facility capacity of 10,000 kilowatts or less.
[This Article Wholly Amended on Dec. 28, 2011]
[Title Amended on Aug. 5, 2020]
CHAPTER II DELIBERATIVE COMMITTEE ON SUPPORT PROGRAMS FOR SURROUNDING AREAS, ETC. <Amended on Jun. 11, 1997>
SECTION 1 Deliberative Committee on Support Programs for Surrounding Areas <Amended on Jun. 11, 1997>
Article 3 (Composition of deliberative committee on support programs for surrounding areas) (1) The chairperson of the deliberative committee on support programs for surrounding areas under Article 3 (1) of the Act (hereinafter referred to as the "committee") shall be a member in general service of the Senior Executive Service of the Ministry of Climate, Energy and Environment who oversees the support programs for the surrounding areas (hereinafter referred to as the "support programs"), and the members shall be the following persons: <Amended on Mar. 23, 2013; Dec. 3, 2024; Oct. 1, 2025>
1. Up to 5 persons designated by the Minister of Climate, Energy and Environment from among public officials in director-general-level positions in central administrative agencies related to support programs;
2. Up to 4 persons commissioned by the Minister of Climate, Energy and Environment from among executive officers of electric power generation business operators, electric transmission business operators under Article 2, subparagraph 6, of the Electric Utility Act, or organizations representing those operators;
3. Up to 4 persons commissioned by the Minister of Climate, Energy and Environment from among persons with extensive knowledge of and experience in local development or persons recommended by civic groups (referring to civil organizations defined in Article 2 of the Assistance for Non-Profit, Non-Governmental Organizations Act).
(2) The term of office of the members under paragraph (1) 2 and 3 shall be 2 years, and they may be reappointed for only one consecutive term. <Amended on Jul. 9, 2019>
[This Article Wholly Amended on Dec. 28, 2011]
Article 4 (Functions of the committee) The Committee shall deliberate on the following matters: <Amended on Jul. 9, 2019>
1. Plans for support programs under Article 9 (1) of the Act;
2. Determination of subsidies under Article 13 (2) of the Act;
3. Allocation of subsidies for each Special Self-Governing Province, Si, Gun, and autonomous Gu (hereinafter referred to as "local government") under Article 14 (2) of the Act;
4. Recovery, etc. of subsidies under Article 16-4 of the Act;
5. Evaluation of support programs under Article 16-5 of the Act;
6. Settlement of accounts of support programs under Article 18 of the Act;
7. Guidelines for formulating support program plans under Article 17 (2);
8. Discontinuation of support programs under Article 32;
9. Other matters submitted to a meeting by the chairperson as deemed necessary for support programs for surrounding areas.
[This Article Wholly Amended on Dec. 28, 2011]
Article 4-2 (Decommission of committee members) If any of the following subparagraphs applies to a member of the Committee under subparagraph 2 or 3 of Article 3, the Minister of Climate, Energy and Environment may decommission the relevant member from office: <Amended on Oct. 1, 2025>
1. If a member becomes unable to perform his or her duties due to mental or physical disability;
2. If a member commits any misconduct in connection with his or her duties;
3. If a member is deemed unsuitable as a member due to neglect of duty, injury to dignity, or any other reason;
4. If a member voluntarily declares that he or she finds it difficult to perform duties.
[This Article Added on Dec. 10, 2015]
Article 5 (Duties of chairperson) (1) The chairperson shall represent the Committee and exercise overall control over the work of the committee.
(2) Where the chairperson is unable to perform his or her duties due to an unavoidable cause, a member of the committee designated by the chairperson in advance shall perform the duties of the chairperson on his or her behalf.
[This Article Wholly Amended on Dec. 28, 2011]
Article 6 (Meetings) (1) The chairperson shall convene and preside over meetings of the Committee.
(2) A meeting of the Committee shall pass resolutions with the attendance of a majority of the incumbent members (including the chairperson; hereafter the same shall apply in this paragraph) and the affirmative vote of a majority of those present.
[This Article Wholly Amended on Dec. 28, 2011]
Article 7 (Executive secretary) The committee shall have 2 executive secretaries to handle the general affairs of the Committee, and the executive secretaries shall be appointed by the chairperson from among public officials of the Ministry of Climate, Energy and Environment. <Amended on Mar. 23, 2013; Dec. 3, 2024; Oct. 1, 2025>
[This Article Wholly Amended on Dec. 28, 2011]
Article 7-2 (Allowances) Allowances may be paid to members of the committee who attend a meeting thereof within the budget; provided, this shall not apply where a member who is a public official attends a meeting in direct connection with his or her duties.
[This Article Wholly Amended on Dec. 28, 2011]
Article 8 (Detailed operational rules) Except as provided in this Decree, matters necessary for the operation of the committee shall be determined by the chairperson after resolution by the Committee.
[This Article Wholly Amended on Dec. 28, 2011]
SECTION 2 Regional Deliberative Committees on Support Programs for Surrounding Areas <Amended on Jun. 11, 1997>
Article 9 (Establishment of regional deliberative committees on support programs for surrounding areas)
(1) The head of the local government having jurisdiction over the area where a power plant is located may establish a regional deliberative committee on support programs for surrounding areas under Article 3 (2) of the Act (hereinafter referred to as a “regional committee”) for each power plant. Where two or more power plants are located within the jurisdiction of the same local government, the regional committees may be integrated.
(2) “Power plants of a size equal to or greater than that prescribed by Presidential Decree” in the proviso to Article 3 (2) of the Act means any of the following power plants. <Amended on Mar. 23, 2013; Oct. 1, 2025>
1. A nuclear power plant in operation or under construction;
2. A power plant in operation or under construction with a facility capacity of at least 100,000 kilowatts and total annual subsidies of at least 500 million won for basic support programs under Article 10 (1) 1 of the Act;
3. Any other power plant that the Minister of Climate, Energy and Environment considers necessary for implementation of support programs.
[This Article Wholly Amended on Dec. 28, 2011]
Article 10 (Composition of regional committees)
(1) The chairperson of a regional committee (hereinafter referred to as the “regional chairperson”) shall be the deputy head of the Si, Gun or Gu of the local government having jurisdiction over the area where the power plant is located, and the members shall be the following persons. <Amended on May 1, 2015>
1. Up to four members of the council of an autonomous Gu, Si or Gun elected from local constituencies under Article 20 (3) of the Public Official Election Act in constituencies to which the surrounding area belongs. If there are more than four such constituency council members, four persons shall be commissioned by the regional chairperson upon the recommendation of the chairperson of the local council. A regional committee for an area surrounding a nuclear power plant may additionally include one proportional-representation member of the council of an autonomous Gu, Si or Gun under Article 20 (2) of the Public Official Election Act;
2. One person each designated by the head of the relevant power plant from among its staff;
3. One person each designated by the head of the relevant local government from among its public officials;
4. Up to four persons, including two commissioned upon the recommendation of the head of the power plant, commissioned by the regional chairperson with consideration given to gender from among persons with extensive knowledge of and experience in regional development;
5. Up to four persons, including two commissioned upon the recommendation of the head of the power plant, commissioned by the head of the local government from among persons who reside in the area surrounding the power plant and are knowledgeable and respected.
(2) If two or more local governments have jurisdiction over the area surrounding the power plant, the regional chairperson shall first commission one member under each of paragraph (1) 1 and 5 for each autonomous Gu, Si and Gun, and then commission the remaining members. If five or more local governments have jurisdiction over the area surrounding the power plant, the regional chairperson shall determine the composition taking into consideration the proportions of subsidies under Article 13 (2) of the Act and other relevant matters.
(3) The term of office of members under paragraph (1) 4 and 5 shall be two years, and they may be reappointed for only one consecutive term. <Amended on May 1, 2015>
[This Article Wholly Amended on Dec. 28, 2011]
Article 11 (Functions of regional committees) A regional committee shall deliberate on the following matters concerning support programs under Article 10 (1) 1 and 4 of the Act:
1. Matters concerning reports on the settlement of accounts under Article 18 of the Act;
2. Matters concerning implementer-specific plans under Article 17 (3);
3. Matters concerning long-term plans under Article 18;
4. Other matters concerning support programs for the relevant surrounding area that the regional chairperson considers necessary and submits to a meeting.
[This Article Wholly Amended on Dec. 28, 2011]
Article 12 (Executive secretaries of regional committees, etc.)
(1) A regional committee shall have one executive secretary to handle its general affairs. The executive secretary shall be recommended by the head of the power plant from among staff working at the relevant plant and appointed by the regional chairperson. For a regional committee for an area surrounding a nuclear power plant, the regional chairperson may appoint one public official of the local government having jurisdiction over the area where the nuclear power plant is located as a joint executive secretary.
(2) Articles 5, 6, 7-2 and 8 shall apply mutatis mutandis to the operation of regional committees.
[This Article Wholly Amended on Dec. 28, 2011]
CHAPTER III DELETED. <Feb. 24, 2001>
Article 13 Deleted. <Feb. 24, 2001>
Article 14 Deleted. <Feb. 24, 2001>
Article 15 Deleted. <Feb. 24, 2001>
Article 16 Deleted. <Feb. 24, 2001>
CHAPTER IV FORMULATION OF SUPPORT PROGRAM PLANS
Article 17 (Formulation of support program plans) (1) The plan for support programs under Article 9 (1) of the Act shall include the following matters:
1. Program purpose;
2. Program overview;
3. Program-specific investment plan;
4. Implementation period;
5. Quarterly fund use plan;
6. Other important matters regarding support programs.
(2) The Minister of Climate, Energy and Environment shall prepare guidelines for formulating support program plans each year and notify the implementers of support programs no later than 4 months before the next fiscal year begins. In such cases, where a long-term plan under Article 18 is formulated, the details of the long-term plan shall be reflected. <Amended on Mar. 23, 2013; Oct. 1, 2025>
(3) The implementers of support programs shall submit implementer-specific plans prepared in accordance with the support guidelines for formulating support program plans under paragraph (2) to the Minister of Climate, Energy and Environment by no later than 2 months before the next fiscal year begins. <Amended on Mar. 23, 2013; Oct. 1, 2025>
(4) The Minister of Climate, Energy and Environment shall prepare a support program plan by integrating the implementer-specific plans submitted under paragraph (3) in accordance with the guidelines for formulating support program plans under paragraph (2), and finalize the plan after deliberation by the committee. In such cases, if it is deemed that an implementer-specific plan deviates from the scope of the guidelines for formulating support program plans under paragraph (2) and makes it difficult to achieve the purpose of the support, they may adjust the implementer-specific plan after hearing the opinion of the implementer. <Amended on Mar. 23, 2013; Oct. 1, 2025>
(5) The Minister of Climate, Energy and Environment shall notify the implementer of each support program of the support program plan finalized under paragraph (4) before the next fiscal year begins. <Amended on Mar. 23, 2013; Oct. 1, 2025>
(6) Where any change occurs to the support program plan, paragraphs (1) through (4) shall apply mutatis mutandis to the procedures for changing the plan; provided, this shall not apply to any change to program scale, program location, program implementation period, etc. within the scope of the program purpose.
[This Article Wholly Amended on Dec. 28, 2011]
Article 18 (Long-term plans) (1) An area for which a long-term plan under Article 9 (2) of the Act is required to be formulated shall be any of the following areas:
1. Any of the following areas where an electric power plant is in operation or under construction or is scheduled to be constructed;
(a) An area under the jurisdiction of a local government in which the total annual amount of subsidies for basic support programs under Article 10 (1) 1 of the Act is at least 1 billion won;
(b) An area under the jurisdiction of a local government in which the total amount of subsidies for special support programs under Article 10 (1) 2 of the Act is at least 10 billion won;
2. An area, other than areas under subparagraph 1, for which the head of the competent local government deems necessary to effectively promote regional development or support programs.
(2) A long-term plan shall include the following matters:
1. Regional status and development prospects;
2. Purpose and outline of the long-term plan;
3. Planning period;
4. Major business plans;
5. Impacts of support programs on regional development;
6. Other important matters regarding support programs.
(3) A long-term plan may be revised or changed every 3 years; provided, where a long-term plan for regional development, etc. of the competent local government exists or where it is unavoidable to amend the long-term plan due to changes in circumstances, the long-term plan may be revised or changed in conjunction with such plan and other relevant plans, in consultation with the Minister of Climate, Energy and Environment. <Amended on Mar. 23, 2013; Oct. 1, 2025>
[This Article Wholly Amended on Dec. 28, 2011]
CHAPTER V IMPLEMENTATION OF SUPPORT PROGRAMS
Article 19 (Basic support programs) (1) The types and details of basic support programs under Article 10 (1) 1 of the Act (hereinafter referred to as "basic support programs") shall be as specified in Appendix 1.
(2) The areas eligible for the basic support programs shall be the surrounding areas; provided, basic support programs (excluding electricity rate subsidy programs) implemented for the areas surrounding a nuclear power plant may be implemented within the scope of 30/100 of the subsidies for the basic support programs allocated per each implementer to areas other than the relevant surrounding areas (hereinafter referred to as "areas other than surrounding areas") of the local government to which the surrounding areas belong in accordance with the proviso of Article 14 (1) of the Act. <Amended on Jul. 9, 2019>
(3) The period of implementation of the basic support programs shall be the construction period and operation period of an electric power plant; provided, if the Minister of Climate, Energy and Environment deems it necessary for the facilitation of an electric power source development project, the support programs may be implemented even during the construction preparation period. <Amended on Mar. 23, 2013; Oct. 1, 2025>
(4) Among the basic support programs, the head of a local government shall implement income increase programs, public and social welfare programs, resident welfare support programs, and business attraction support programs. In such cases, the following matters shall be prescribed by ordinance of the local government: <Amended on Dec. 26, 2017>
1. Criteria for resident welfare support program eligibility, support process, and support conditions, including loan ceilings, loan interest rates, and repayment periods;
2. Criteria for business attraction support program eligibility, support process, and support conditions, including support ceilings, and support periods.
(5) Among the basic support programs, the electricity bill subsidy project shall be implemented by the operator of electric power generation business.
(6) Among the basic support programs, educational support programs shall be implemented by an operator of electric power generation business; provided, educational support programs implemented in areas surrounding a nuclear power plant shall be implemented by the head of a local government.
(7) Notwithstanding paragraph (4) and the proviso of paragraph (6), an operator of electric power generation business may implement programs determined by consultation between the head of a local government and the operator of electric power generation business.
(8) In cases of paragraph (5) and the main clause of paragraph (6), if there are 2 or more operators of electric generation business in the same area, the representative business operator may implement the programs through consultation among the operators of electric generation business.
(9) The Minister of Climate, Energy and Environment shall determine and publicly notify the following matters: <Amended on Mar. 23, 2013; May 1, 2015; Oct. 1, 2025>
1. Specific implementation requirements for each detailed program of basic support programs;
2. Details of eligibility for the electricity rate subsidy program and the resident welfare support program and standards for providing those programs;
3. Other matters necessary for the efficient implementation of support programs.
[This Article Wholly Amended on Dec. 28, 2011]
Article 20 Deleted. <Dec. 30, 2005>
Article 21 Deleted. <Dec. 30, 2005>
Article 22 (Special support programs) (1) The details of special support programs under Article 10 (1) 2 of the Act shall be determined by the heads of relevant local governments, taking into consideration the kinds and details of the basic support programs specified in Appendix 1.
(2) Special support programs shall be implemented in the area under the jurisdiction of the local government to which the surrounding area belongs; provided, in any of the following areas, additional funds may be provided in addition to the subsidies for special support programs: <Amended on Mar. 23, 2013; Oct. 1, 2025>
1. An area where the head of a local government requests the Minister of Climate, Energy and Environment to build a nuclear power plant with the consent of the local council by the day immediately before the date specified in any of the following items in accordance with Article 15 (2) 2 of the Act:
(a) The date on which approval of the implementation plan for the electric power source development project under the main clause of Article 5 (1) of the Electric Power Source Development Promotion Act (hereinafter referred to as "implementation plan for the electric power source development project") is publicly notified; provided, where approval of an implementation plan for an electric power source development project has not been obtained, it shall be the date on which authorization is obtained for a plan for works for establishing electric installations under Article 61 (1) of the Electric Utility Act (hereinafter referred to as "work plan for establishment of electric installations");
(b) The date on which reporting of a plan of works to install electrical installations is made under Article 61 (3) of the Electric Utility Act (hereinafter referred to as "reporting of electrical installation plan");
2. An area in which electric generators equal to or greater in number than that determined by Decree of the Ministry of Climate, Energy and Environment are in operation, under construction, or are scheduled to be built under Article 15 (2) 3 of the Act;
3. An area for which the head of the local government requests the construction of a bituminous coal-fired power plant with a facility capacity of 1 million kilowatts or more (including cases where the expansion of the power generation facilities results in a total installed capacity of 1 million kilowatts or more) with the consent of the local council by the day immediately preceding the date under any item of subparagraph 1.
(3) The period of implementation of a special support program shall be as follows: provided, where the Minister of Climate, Energy and Environment deems it necessary, the special support program may be implemented even after the date of commencement of operation in consultation with the head of the relevant local government: <Amended on Mar. 23, 2013; Oct. 1, 2025>
1. Where an implementation plan for an electric power source development project is approved: From the date of public notice of approval to the date preceding the date of commencement of operation;
2. Where authorization of a plan for the construction of electric installations (limited to where he or she has not obtained approval of an implementation plan for an electric power source development project) is obtained: From the date of authorization to the date immediately before the commencement date of operation;
3. Where a report on a plan for installation of electric installations has been filed: From the date of reporting to the date preceding the date of commencement of operation.
(4) The special support programs shall be implemented by the head of the local government; provided, a program agreed upon through consultation between the head of the local government and an operator of electric power generation business may be implemented by the relevant business operator for the efficient implementation of the program.
[This Article Wholly Amended on Dec. 28, 2011]
Article 23 Deleted. <Dec. 30, 2005>
Article 24 (Public relations program) The public relations programs under Article 10 (1) 3 of the Act shall be conducted by a person under each subparagraph of Article 11 of the Act in connection with the electric power business for the general public. <Amended on Jul. 9, 2019>
[This Article Wholly Amended on Dec. 28, 2011]
Article 25 (Other support programs) (1) Programs falling under Article 10 (1) 4 of the Act shall be as follows: <Amended on Mar. 23, 2013; Oct. 1, 2025>
1. Programs for management, research, evaluation, and public relations of support programs;
2. Support programs for the establishment and operation of organizations for monitoring environmental and radiation safety in areas surrounding nuclear power plants;
3. Support programs for environmental conservation and monitoring in areas surrounding thermal power plants;
4. Other programs prescribed by the Minister of Climate, Energy and Environment after deliberation by the Committee, which are necessary to facilitate the construction and operation of electric power plants.
(2) Programs under paragraph (1) 1 through 3 shall be implemented by the head of a local government having jurisdiction over an area where an electric power plant is located, and programs under paragraph (1) 4 shall be implemented by an operator of electric power generation business.
(3) Matters necessary for programs under paragraph (1) 2 and 3 shall be determined and publicly notified by the Minister of Climate, Energy and Environment. <Amended on Jul. 9, 2019; Oct. 1, 2025>
[This Article Wholly Amended on Dec. 28, 2011]
Article 25-2 (Application for support programs) (1) Where the implementer of a support program under Article 11 of the Act intends to implement a basic support program or a special support program under Article 10 (1) 2 of the Act, they shall apply to the Minister of Climate, Energy and Environment under Article 10-2 of the Act within the following period: <Amended on Oct. 1, 2025>
1. Basic support programs: The implementation period under Article 19 (3);
2. Special support programs under Article 10 (1) 2 of the Act: The implementation period under the main clause, with the exception of the subparagraphs, of Article 22 (3).
(2) Except as provided in paragraph (1), detailed matters necessary for applying for support programs shall be determined and publicly notified by the Minister of Climate, Energy and Environment. <Amended on Oct. 1, 2025>
[This Article Added on Apr. 20, 2021]
Article 26 (Application for subsidies) (1) Where the implementer of a support program under Article 11 of the Act seeks to receive a subsidy under Article 13 (2) of the Act, they shall apply to the Minister of Climate, Energy and Environment for the required funds for each quarter before the beginning of the quarter. <Amended on Mar. 23, 2013; Oct. 1, 2025>
(2) Upon receipt of an application under paragraph (1), the Minister of Climate, Energy and Environment shall pay subsidies necessary for the implementation of the relevant support program to the implementer of the relevant support program once a quarter; provided, the Minister of Climate, Energy and Environment may adjust the timing of the payment of the subsidy in consideration of the status of securing the subsidy and the status of expenditure. <Amended on Mar. 23, 2013; Oct. 1, 2025>
[This Article Wholly Amended on Dec. 28, 2011]
Article 27 (Determination of subsidies) (1) Subsidies for basic support programs under Article 19 shall be the amount calculated under Appendix 2.
(2) Subsidies and additional funds for special support programs under Article 22 shall be as follows: <Amended on Mar. 23, 2013; Oct. 1, 2025>
1. Subsidies: An amount determined by the Minister of Climate, Energy and Environment after deliberation by the Committee, within 15/1000 of the construction cost of the power plant [meaning the amount calculated as of the date of public notice of approval of the implementation plan for the electric power source development project (or authorization of the electric installation work plan if such approval is not obtained), or the date of reporting of the electric installation work plan, excluding site purchase costs];
2. Additional funds: An amount equivalent to 5/1000 of the construction cost under subparagraph 1; in such cases, the amount of the additional funds provided to the same local government shall not exceed 5/1000 of the construction cost.
(3) Notwithstanding paragraphs (1) and (2), the subsidy for offshore wind power plants shall be the amount calculated in accordance with Appendix 2-2. <Added on Aug. 5, 2020>
(4) The subsidy for public relations programs under Article 24 shall be determined by the Minister of Climate, Energy and Environment after deliberation by the Committee. <Amended on Mar. 23, 2013; Aug. 5, 2020; Oct. 1, 2025>
(5) Subsidies for other support programs under Article 25 shall be determined by the Minister of Climate, Energy and Environment after deliberation by the Committee within the range of 10/100 of the annual subsidies for basic support programs. <Amended on Mar. 23, 2013; Aug. 5, 2020; Oct. 1, 2025>
(6) The Minister of Climate, Energy and Environment shall re-examine the appropriateness of the standards for determining subsidies prescribed in paragraphs (1) through (5) in accordance with Article 13 (2) of the Act, every 5 years (referring to the period that ends on the day before the base date of every fifth year) counting from April 21, 2021, and any changes to the standards for determining subsidies shall be subject to deliberation by the Committee. <Added on Apr. 20, 2021; Oct. 1, 2025>
[This Article Wholly Amended on Dec. 28, 2011]
Article 27-2 (Support programs implemented by operator of nuclear or hydroelectric power generation business) (1) Where an operator of nuclear or hydroelectric power generation business implements support programs under Article 13-2 (1) of the Act (hereinafter referred to as "operator's support programs"), the operator shall disclose a plan, etc. of the operator's support programs in accordance with paragraph (2) of that Article through its website, etc. within the period specified in each of the following: <Added on May 1, 2015>
1. For the operator's support program plan, selection criteria and selection results: Within 10 days after finalizing the plan, selection criteria, or selection results;
2. For the post-settlement results of the operator's support programs: By April 30th of the year following the year in which the operator's support programs are implemented.
(2) The types of the operator's support programs under Article 13-2 (3) of the Act shall include education and scholarship support programs, local economic cooperation programs, surrounding environment improvement programs, local welfare programs, local culture promotion programs, and other support programs, and their specific details are as shown in Appendix 3. <Amended on May 1, 2015>
(3) The scale of the operator's support programs under Article 13-2 (3) of the Act shall not exceed the amount calculated under Appendix 4. However, additional funds may be provided for a nuclear power plant that, after the design lifespan of a power-generating reactor and its related facilities has expired under Article 21 (3) of the Nuclear Safety Act, obtains permission for modification under Article 20 (1) of that Act and continues to operate those facilities, as determined and publicly notified by the Minister of Climate, Energy and Environment. <Amended on Mar. 23, 2013; May 1, 2015; Oct. 1, 2025; Dec. 23, 2025>
(4) Areas eligible for the operator's support programs under Article 13-2 (3) of the Act shall be as follows: <Amended on May 1, 2015; Jun. 15, 2015>
1. Areas surrounding a nuclear power plant;
2. Areas surrounding a hydroelectric power plant with a facility capacity exceeding 10,000 kilowatts under the main clause of Article 2 (1);
3. Any of the following areas of an electric power plant that produces hydroelectric power under subparagraph 2 (c) of Article 2 of the Act on Promotion of Development, Use and Diffusion of New and Renewable Energy and has a facility capacity of more than 2,000 kilowatts but not more than 10,000 kilowatts:
(a) In the upstream area of the dam: Land and island areas within 2 kilometers from the full water level line;
(b) In areas other than the upstream area of the dam, the land and island areas within 2 kilometers from the river zone under the River Act, and within a radius of 5 kilometers from the electric generator and the dam.
(5) For areas other than the surrounding area under paragraph (4) 1, the operator of the nuclear power plant may implement the operator's support programs within the range of 30/100 of the operator's support funds if necessary for enhancing the efficiency of the operator's support programs and for balanced regional development. <Amended on May 1, 2015>
(6) The operator's support programs shall be implemented by an operator of nuclear power generation business or hydroelectric power generation business, but prior to deciding on the operator's support programs, consultation shall be conducted with the regional committee; provided, in the case of paragraph 5, the programs determined through consultation between the operator of nuclear power generation business and the head of the relevant local government may be implemented by the head of the local government. <Amended on May 1, 2015>
(7) The implementation period of the operator's support programs shall be the construction period and operation period of the electric power plant. <Amended on May 1, 2015>
[This Article Wholly Amended on Dec. 28, 2011]
Article 28 (Use of subsidies for areas other than surrounding area) The areas other than the surrounding areas for which subsidies can be used under the proviso of Article 14 (1) of the Act shall be as follows: <Amended on Mar. 23, 2013; Oct. 1, 2025>
1. Areas where basic support programs are implemented under the proviso of Article 19 (2);
2. Areas other than surrounding areas where special support programs are implemented under Article 22 (including areas for collective relocation of migrants who have relocated their residences due to the construction of the electric power plant);
3. Areas where the Minister of Climate, Energy and Environment deems it particularly necessary to implement support programs as the areas are directly related to the support programs or the construction and operation of the electric power plant.
[This Article Wholly Amended on Dec. 28, 2011]
Article 29 (Methods of allocation of subsidies) (1) If there are two or more local governments having jurisdiction over areas surrounding an electric power plant, subsidies shall be allocated to each local government in accordance with the following classifications; provided, in the case of offshore wind power plants, subsidies shall be allocated in accordance with Appendix 4-2: <Amended on Mar. 23, 2013; Aug. 5, 2020; Oct. 1, 2025>
1. 40/100 of the subsidies shall be allocated according to the jurisdictional ratio of each local government to the land and island areas within a radius of 5 kilometers from the electric generator (in the case of hydroelectric power plants and tidal power plants, the areas under Article 2 (1) 2 and 3);
2. 30/100 of the subsidies shall be allocated according to the population ratio of each local government to the land and island areas within a radius of 5 kilometers from the generator (in the case of hydroelectric power plants and tidal power plants, the areas under Article 2 (1) 2 and 3);
3. 20/100 of the subsidies shall be allocated to the local government that has jurisdiction over the location of the electric power plant; provided, if there exist two or more local governments with jurisdiction over the location, the subsidies shall be distributed according to the number of generators;
4. 10/100 of the subsidies shall be allocated by the Minister of Climate, Energy and Environment after deliberation by the regional committee, taking into account local conditions such as the level of local development and the fairness in subsidy allocation among areas;
5. The additional funds under Article 22 (2) 1 and 3 shall be allocated to the local government that has requested the construction of the relevant facilities;
6. The additional funds under Article 22 (2) 2 shall be allocated in accordance with the ratio calculated under subparagraphs 1 through 4 based on all generators in the relevant areas.
(2) "Where any unavoidable cause exists as prescribed by Presidential Decree" in the proviso of Article 14 (2) of the Act means where the electric power plant falls under any of the following subparagraphs and it is highly unreasonable to allocate the subsidies in accordance with paragraph (1), which may hinder the smooth construction and operation of the electric power plant:
1. Where an electric power plant is located in a densely populated area, such as a Dong area of the Special Metropolitan City, a Metropolitan City, or a City;
2. Where there are serious conflicts over the allocation of subsidies between local governments due to large surrounding areas, such as areas surrounding a hydroelectric power plant or a tidal power plant;
3. Where an electric power plant is in operation and its facility capacity is less than 1 hundred thousand kilowatts, resulting in a small amount of subsidies.
[This Article Wholly Amended on Dec. 28, 2011]
Article 30 (Acquisition and management of facilities in implementing support programs) (1) The acquisition and management of facilities following the implementation of basic support programs and special support programs under Articles 19 and 22 shall be governed by the ordinance of the local government with jurisdiction over the relevant area.
(2) When a local government grants permission for use or profit-making of facilities acquired by the local government, among facilities under paragraph (1) to residents in the surrounding area and those in an area other than the surrounding area under Article 28, the local government may exempt such residents from the usage fee or rental fee notwithstanding Article 29 (3) of the Enforcement Decree of the Public Property and Commodity Management Act.
[This Article Wholly Amended on Dec. 28, 2011]
Article 31 (Submission of results of program implementation) The implementer of support programs under Article 11 of the Act shall submit the results of implementing the programs to the Minister of Climate, Energy and Environment within 20 days after the end of each quarter. <Amended on Mar. 23, 2013; Oct. 1, 2025>
[This Article Wholly Amended on Dec. 28, 2011]
Article 32 (Suspension of support programs) (1) "Period prescribed by Presidential Decree" in subparagraph 1 of Article 16-3 of the Act means 2 years or more.
(2) "Where it becomes impractical to achieve the purposes" in subparagraph 2 of Article 16-3 of the Act means any of the following cases:
1. If the recipient of a subsidy uses the subsidy for any purpose other than those specified in the support program plan;
2. If the recipient of a subsidy fails to use the subsidy for at least 1 year after the date when the time scheduled for its use under the support program plan has elapsed.
[This Article Wholly Amended on Dec. 28, 2011]
Article 32-2 (Procedures for recovery of subsidies) (1) Where the Minister of Climate, Energy and Environment intends to recover subsidies under Article 16-4 (1) of the Act, he or she shall undergo deliberation by the Committee. <Amended on Oct. 1, 2025>
(2) Where the Minister of Climate, Energy and Environment intends to hold a meeting of the Committee under paragraph (1), he or she shall notify the implementer of the relevant support programs in writing of the subsidies to be recovered, etc. by no later than 20 days prior to holding the committee meeting. <Amended on Oct. 1, 2025>
(3) A person in receipt of notification under paragraph (2) may submit necessary opinions in writing to the Minister of Climate, Energy and Environment within 10 days from the date of receipt of the notification. <Amended on Oct. 1, 2025>
(4) The Minister of Climate, Energy and Environment shall notify the implementer of the relevant support programs in writing of the amount of the subsidies to be recovered, which is finalized after deliberation by the Committee. <Amended on Oct. 1, 2025>
[This Article Added on Jul. 9, 2019]
[Previous Article 32-2 moved to Article 32-3 <Jul. 9, 2019>]
Article 32-3 (Repayment of recovered subsidies) Where the Minister of Climate, Energy and Environment pays a subsidy recovered, or an amount determined not to be subsidized in the following year, in accordance with Article 16-4 (2) of the Act, Articles 17 and 26 shall apply mutatis mutandis to the formulation of a support program plan, the application for such subsidy, and such other matters. <Amended on Mar. 23, 2013; Oct. 1, 2025>
[This Article Wholly Amended on Dec. 28, 2011]
[Moved from Article 32-2; previous Article 32-3 moved to Article 32-4 <Jul. 9, 2019>]
Article 32-4 (Evaluation of support programs) (1) The implementer of a support program for any of the following electric power plants shall be subject to evaluation under Article 16-5 (1) of the Act; provided, the Minister of Climate, Energy and Environment may exclude the implementer of a support program from the evaluation if the total annual amount of subsidies for the basic support program allocated to the implementer is less than 300 million won: <Amended on Mar. 23, 2013; May 1, 2015; Oct. 1, 2025>
1. An electric power plant with a facility capacity of 500,000 kilowatts or more;
2. An electric power plant with a total annual subsidy of 500 million won or more for basic support programs;
3. Any other electric power plant recognized by the Minister of Climate, Energy and Environment as requiring evaluation.
(2) The content of the evaluation of support programs under Article 16-5 (1) of the Act shall be as follows: <Amended on Mar. 23, 2013; Oct. 1, 2025>
1. Results of execution of support program expenses;
2. Results of utilization of facilities installed through support programs and results of welfare support;
3. Other matters deemed necessary by the Minister of Climate, Energy and Environment, such as residents' satisfaction level.
(3) "Corporation or organization prescribed by Presidential Decree" in Article 16-5 (2) of the Act means an organization dedicated to planning, management, and evaluation under Article 38 (1) 1 of the Enforcement Decree of the Electric Utility Act.
(4) The Minister of Climate, Energy and Environment shall classify the results of the evaluation conducted under paragraph (1) into excellent, ordinary, and inadequate, and reduce the amount of subsidies for the implementer of the support program evaluated as inadequate by an amount within the range of 5 percent to 10 percent of the subsidies for the following year, as determined and publicly notified by the Minister of Climate, Energy and Environment, and the amount of that reduction shall be used to provide increased subsidies to implementers of support programs evaluated as excellent. <Amended on Mar. 23, 2013; Jul. 9, 2019; Oct. 1, 2025>
(5) Except as provided in paragraphs (1) through (4), detailed matters necessary for evaluating support programs, such as an increase in subsidies, shall be separately determined by the Minister of Climate, Energy and Environment. <Amended on Mar. 23, 2013; Oct. 1, 2025>
[This Article Added on Dec. 28, 2011]
[Moved from Article 32-3 <Jul. 9, 2019>]
Article 33 (Early use of subsidies) (1) Where a long-term plan is formulated and implemented in accordance with subparagraph 1 of Article 16 of the Act, subsidies for basic and special support programs during the construction period of the relevant electric power plant may respectively be used in advance in accordance with the relevant long-term plan, notwithstanding Articles 19 and 22.
(2) Notwithstanding Article 22 (3), additional funds under the proviso of Article 22 (2) may be used during the construction preparation period of the relevant electric power plant.
(3) Early use of subsidies under subparagraph 2 of Article 16 of the Act shall be within each of the following ranges:
1. In the case of areas surrounding an electric power plant that is constructing an additional generator on its existing site and an electric plant that is in operation: Range of the estimated subsidy for the following year;
2. In all cases other than those specified in subparagraph 1: Range of the estimated subsidies during the construction period within 3 years including the year in question.
(4) If a subsidy is used in advance in accordance with paragraph (3), the estimated subsidy for the following year cannot be used in advance in the year in which the subsidy was originally scheduled to be provided.
(5) Where the implementer of a support program intends to use a subsidy in advance in accordance with Article 16 of the Act, they shall consult with the Minister of Climate, Energy and Environment in advance. <Amended on Mar. 23, 2013; Oct. 1, 2025>
[This Article Wholly Amended on Dec. 28, 2011]
Article 33-2 (Re-carrying and use of subsidies) The implementer of support programs may carry over and use the subsidies for basic and special support programs carried over in accordance with Article 16 of the Act only if the implementer formulates and implements a long-term plan covering 3 years or longer for the support programs under Article 9 (2) of the Act.
[This Article Added on Jul. 9, 2019]
Article 34 (Preferential treatment of local enterprises) (1) "Contract for construction works, commodities, services, etc. prescribed by Presidential Decree" in Article 17-2 of the Act means any of the following contracts:
1. Contract for construction works: Less than 3 billion won (less than 300 million won for specialized construction under the Framework Act on the Construction Industry, electrical construction works under the Electrical Construction Business Act, information and communications construction works under the Information and Communications Construction Business Act, and firefighting system installation works under the Firefighting System Installation Business Act);
2. Contract for manufacturing and purchasing commodities: Less than 100 million won;
3. Contract for services: Less than 200 million won (less than 2 billion won in cases of contracts for simple labor services, such as cleaning service).
(2) Operators of electric power generation business subject to Article 39 of the Act on the Management of Public Institutions shall establish preferential treatment standards for local enterprises after consultation with the Minister of Finance and Economy, taking into account the nature of contracts and other relevant matters, and post them on their websites. <Amended on Dec. 30, 2025>
[This Article Added on Dec. 28, 2011]
Article 35 (Definition of construction period) (1) "Construction period", "construction preparation period", and "operation period" in Articles 19 (3), 27-2 (7), 33 (1), and 33 (2) shall be as follows: <Amended on May 1, 2015>
1. Construction period: The period from the commencement date of construction works of an electric plant to the day immediately before the commencement date of operation of the electric power plant;
2. Construction preparation period: The period from the date on which the approval of an execution plan for an electric power source development project is publicly notified under Article 5 of the Electric Power Source Development Promotion Act or on which the designation of a prearranged area for an electric power source development project is publicly notified under Article 11 of that Act to the day immediately before the commencement date of construction works of an electric plant;
3. Operation period: The period from the commencement date of operation of the electric power plant to the end date of the operation.
(2) The commencement date of construction works, commencement date of operation, and end date of operation referred to in each subparagraph of paragraph (1) and in Article 22 (3) shall be prescribed by Decree of the Ministry of Climate, Energy and Environment. <Amended on Mar. 23, 2013; Oct. 1, 2025>
[This Article Wholly Amended on Dec. 28, 2011]
Article 36 (Detailed matters regarding support programs) Except as provided in this Decree, necessary matters, such as budgetary support, regarding support programs implemented by the head of a local government in accordance with Articles 19, 22, and 25 may be prescribed by ordinance of the relevant local government. <Amended on Jul. 9, 2019>
[This Article Wholly Amended on Dec. 28, 2011]
CHAPTER VI SUPPLEMENTARY PROVISIONS
Article 37 (Criteria for imposing administrative fines) Criteria for imposing administrative fines under Article 20 (1) of the Act shall be as specified in attached Appendix 5.
[This Article Wholly Amended on Dec. 28, 2011]
ADDENDA <Presidential Decree No. 14715, Jul. 6, 1995>
(1) (Enforcement date) This Decree shall enter into force on the date of its promulgation.
(2) (Transitional measures concerning allocation of subsidies in cases of 2 or more local governments having jurisdiction over areas surrounding electric power plant) Where there are 2 or more local governments having jurisdiction over areas surrounding an electric power plant, the previous provisions shall apply to subsidies to be paid in 1995, notwithstanding the amended provisions of Article 29.
(3) (Special cases concerning support programs in 1995) In implementing support programs in 1995, where it is unavoidable to modify or otherwise change the annual plan due to the amendments to the Act and this Decree, the subsidies may be carried over to 1996 and executed in that year.
ADDENDA <Presidential Decree No. 15390, Jun. 11, 1997>
(1) (Enforcement date) This Decree shall enter into force on the date of its promulgation.
(2) (Repeal of another statute or regulation) The Enforcement Decree of the Act on the Promotion of Radioactive Wastes Control Projects and Assistance to the Adjoining Areas is hereby repealed.
(3) (Special cases concerning support programs in 1997) In implementing support programs in 1997, if it is unavoidable to modify or otherwise change the annual plan due to the amendments to the Act and this Decree, the subsidies may be carried over to 1998 and executed in that year.
ADDENDA <Presidential Decree No. 17136, Feb. 24, 2001>
(1) (Enforcement date) This Decree shall enter into force on the date of its promulgation; provided, the amended provisions of Articles 3, 4, 7, 7-2, 9 through 18, Article 24 (3), Article 25 (1) 3, Article 26, Article 27 (1) 2, paragraph (4) 1 (limited to changing "Corporation" to "Minister of Commerce, Industry and Energy"), paragraphs (5) through (7), subparagraph 3 of Article 28, Article 29 (1) 4, Article 31, Article 32, Article 34 (2), Article 37 (3), and Appendix 3 shall enter into force on January 1, 2002.
(2) (Applicability to payment of additional funds) The amended provisions of the proviso of Article 22 (2) shall begin to apply to an electric power plant or radioactive wastes control facilities, the construction of which commences after this Decree enters into force.
(3) (Transitional measures concerning support program eligibility) Notwithstanding the amended provisions of Article 2 (1), the previous provisions shall apply to the electric power plants that are implementing basic support programs in accordance with the previous provisions as at the time this Decree enters into force.
(4) (Transitional measures concerning implementation of programs in 2001) Notwithstanding the amended provisions of Article 2, the previous provisions shall apply to the subsidies to be paid in accordance with the 2001 support program plan formulated under the previous provisions as at the time this Decree enters into force.
ADDENDUM (Decree Amending the Regulations on Management of Parolees and Other Regulations for Electronic Processing of Civil Petitions) <Presidential Decree No. 18312, Mar. 17, 2004>
This Decree shall enter into force on the date of its promulgation.
ADDENDA (Enforcement Decree of the Electric Power Source Development Promotion Act) <Presidential Decree No. 18457, Jun. 29, 2004>
Article 1 (Enforcement date) This Decree shall enter into force on July 1, 2004. <Proviso omitted in the source>
Article 2 Omitted in the source.
Article 3 (Amendment of other statutes and regulations) Paragraphs (1) through (3) Omitted in the source.
(4) The Enforcement Decree of the Act on Assistance to Electric Power Plants-Neighboring Areas is amended as follows:
In Article 35 (1) 2, “Act on Special Cases Concerning Electric Power Source Development” is replaced by “Electric Power Source Development Promotion Act”.
Paragraphs (5) through (15) Omitted in the source.
Article 4 Omitted in the source.
ADDENDA (Enforcement Decree of the Special Act on Assistance to the Locations of Facilities for Disposal of Low- and Intermediate-Level Radioactive Waste) <Presidential Decree No. 19047, Sep. 14, 2005>
(1) (Enforcement date) This Decree shall enter into force on the date when the area in which the first disposal facilities are to be installed is designated and publicly notified as a planned area for an electric power source development project under Article 11 of the Electric Power Source Development Promotion Act. <Proviso omitted in the source>
(2) (Amendment of other statutes and regulations) The Enforcement Decree of the Act on Assistance to Electric Power Plants-Neighboring Areas is partially amended as follows:
In Article 3 (1) 2, “operators of electric power generation business and operators of radioactive waste management business under Article 83 of the Electric Utility Act (hereinafter referred to as ‘operators of radioactive waste management business’)” is replaced by “operators of electric power generation business”.
In the main clause of the portion of Article 9 preceding its subparagraphs, “for each power plant or radioactive waste management facility” is replaced by “for each power plant”; in the proviso to the portion of the same Article preceding its subparagraphs, “power plants or radioactive waste management facilities” is replaced by “power plants”; in subparagraph 1 of the same Article, “nuclear power plants or radioactive waste management facilities” is replaced by “nuclear power plants”; and in subparagraph 3 of the same Article, “power plants or radioactive waste management facilities” is replaced by “power plants”.
In the portion of Article 10 (1) preceding its subparagraphs, “power plants or radioactive waste management facilities” is replaced by “power plants”; in subparagraph 2 of the same paragraph, “power plants or radioactive waste management facilities” is replaced by “power plants”; and in subparagraph 4 of the same paragraph, “the head of the power plant or radioactive waste management facility” is replaced by “the head of the power plant”.
In Article 12 (1), “the head of the power plant or radioactive waste management facility” is replaced by “the head of the power plant”, and “power plants or radioactive waste management facilities” is replaced by “power plants”.
In Article 18 (1) 1, “power plants or radioactive waste management facilities” is replaced by “power plants”.
In the main clause of Article 19 (3), “power plants or radioactive waste management facilities” is replaced by “power plants”; and in the main clause and proviso of paragraph (4) of the same Article, “operators of electric power generation business or operators of radioactive waste management business” is replaced in each instance by “operators of electric power generation business”.
In Article 20 (1) through (3), “nuclear power plants or radioactive waste management facilities” is replaced in each instance by “nuclear power plants”; and in paragraph (4) of the same Article, “operators of electric power generation business or operators of radioactive waste management business” is replaced by “operators of electric power generation business”.
In Article 21 (1) through (3), “power plants or radioactive waste management facilities” is replaced in each instance by “power plants”.
In Article 22 (2) 1, “nuclear power plants or radioactive waste management facilities” is replaced by “nuclear power plants”; in paragraph (3) of the same Article, “power plants or radioactive waste management facilities” is replaced by “power plants”; and in the proviso to paragraph (4) of the same Article, “operators of electric power generation business or operators of radioactive waste management business” is replaced by “operators of electric power generation business”.
In Article 23 (1), “power plants (limited to power plants with a facility capacity of at least 1 million kilowatts) or radioactive waste management facilities” is replaced by “power plants (limited to power plants with a facility capacity of at least 1 million kilowatts)”; and in paragraph (3) of the same Article, “power plants or radioactive waste management facilities” is replaced by “power plants”.
In the portion of Article 24 (2) preceding its subparagraphs, “operators of electric power generation business or operators of radioactive waste management business” is replaced by “operators of electric power generation business”; and in subparagraph 1 of the same paragraph, “power plants or radioactive waste management facilities” is replaced by “power plants”.
In Article 25 (1), subparagraph 2-2, “nuclear power plants and radioactive waste management facilities” is replaced by “nuclear power plants”; in subparagraph 3 of the same paragraph, “power plants or radioactive waste management facilities” is replaced by “power plants”; and in paragraph (2) of the same Article, “operators of electric power generation business or operators of radioactive waste management business” is replaced by “operators of electric power generation business”, and “nuclear power plants or radioactive waste management facilities” is replaced by “nuclear power plants”.
In Article 27 (1) 1, “nuclear power plants and radioactive waste management facilities” is replaced by “nuclear power plants”; in paragraph (4) 1 of the same Article, “the construction cost of a power plant (meaning the construction cost in the master plan for construction, excluding site purchase costs) or the construction cost of radioactive waste management facilities prescribed by Decree of the Ministry of Commerce, Industry and Energy” is replaced by “the construction cost of a power plant (meaning the construction cost in the master plan for construction, excluding site purchase costs)”; and paragraph (8) of the same Article is deleted.
In Article 28, subparagraphs 2 and 3, “power plants or radioactive waste management facilities” is replaced in each instance by “power plants”.
In Article 29 (1) 1 and 2, “generators or permanent radioactive waste disposal facilities” is replaced in each instance by “generators”; in the main clause of subparagraph 3 of the same paragraph, “power plants or radioactive waste management facilities” is replaced by “power plants”; in the proviso to that subparagraph, “according to the number of generators or the proportions of the areas of radioactive waste management facilities” is replaced by “according to the number of generators”; and in the portion of paragraph (2) of the same Article preceding its subparagraphs and in subparagraph 1 of that paragraph, “power plants or radioactive waste management facilities” is replaced in each instance by “power plants”.
In Article 32, “operators of electric power generation business or operators of radioactive waste management business” is replaced by “operators of electric power generation business”, and “power plants or radioactive waste management facilities” is replaced by “power plants”.
In Article 33 (1) and (2), and Article 35 (1) 1 through 3, “power plants or radioactive waste management facilities” is replaced in each instance by “power plants”.
In the title of Appendix 2, “nuclear power plants and radioactive waste management facilities” is replaced by “nuclear power plants”; in the generation-source column of item 2 of that Appendix, “nuclear power (radioactive waste management facilities)” is replaced by “nuclear power”; in item 3 (a) (1) of that Appendix, “power plants or radioactive waste management facilities” is replaced by “power plants”; in the former part of item (a) (2), “power plants or radioactive waste management facilities” is replaced by “power plants”; and in item 3 (b) (1) and (c) (1), “power plants or radioactive waste management facilities” is replaced in each instance by “power plants”.
(3) Omitted in the source.
ADDENDA <Presidential Decree No. 19242, Dec. 30, 2005>
Article 1 (Enforcement date)
This Decree shall enter into force on January 1, 2006.
Article 2 (Applicability to criteria for determining subsidies)
The criteria for determining the subsidy under the amended provisions of Article 27 shall begin to apply to the 2006 subsidy determination.
Article 3 (Applicability to local support programs by operators of hydroelectric power generation business)
The provisions of Article 27-2 (3) 3 shall apply only if basic support programs for the relevant area were implemented in 2005.
Article 4 (Transitional measures regarding period for implementation of special support programs)
Notwithstanding the amended provisions of Article 22 (3), the previous provisions shall apply where subsidies for special support programs are determined after the master plan for construction has been finalized as at the time this Decree enters into force.
Article 5 (Transitional measures concerning construction period of electric power plant)
Notwithstanding the amended provisions of Article 27, with regard to the surrounding areas for which the subsidies for basic support programs calculated as at the time this Decree enters into force are reduced to 50/100 or less of the subsidies calculated under previous provisions, the previous provisions shall apply during the construction period of the electric power plant.
Article 6 (Amendment of other statutes and regulations) The Enforcement Decree of the Special Act on the Locations of Facilities for Disposal of Low- and Intermediate-Level Radioactive Waste is partially amended as follows:
Paragraph (2) of the Addenda to the Enforcement Decree of the Special Act on the Locations of Facilities for Disposal of Low- and Intermediate-Level Radioactive Waste (Presidential Decree No. 19047) is deleted.
ADDENDA (Regulations on Personnel Management of the Senior Executive Service) <Presidential Decree No. 19513, Jun. 12, 2006>
Article 1 (Enforcement date) This Decree shall enter into force on July 1, 2006.
Articles 2 and 3 Omitted in the source.
Article 4 (Amendment of other statutes and regulations) Paragraphs (1) through (96) Omitted in the source.
(97) The Enforcement Decree of the Act on Assistance to Electric Power Plants-Neighboring Areas is partially amended as follows:
In the portion of Article 3 (1) preceding its subparagraphs, “a Grade I public official of the Ministry of Commerce, Industry and Energy” is replaced by “a general-service public official belonging to the Senior Executive Service of the Ministry of Commerce, Industry and Energy”.
Paragraphs (98) through (241) Omitted in the source.
ADDENDA (Organization of the Ministry of Knowledge Economy and Its Affiliated Agencies) <Presidential Decree No. 20678, Feb. 29, 2008>
Article 1 (Enforcement date) This Decree shall enter into force on the date of its promulgation. <Proviso omitted in the source>
Articles 2 through 6 Omitted in the source.
Article 7 (Amendment of other statutes and regulations) Paragraphs (1) through (21) Omitted in the source.
(22) The Enforcement Decree of the Act on Assistance to Electric Power Plants-Neighboring Areas is partially amended as follows:
In the portion of Article 3 (1) preceding its subparagraphs and in Article 7, “Ministry of Commerce, Industry and Energy” is replaced in each instance by “Ministry of Knowledge Economy”.
In Article 3 (1) 1, 2 and 3; Article 9, subparagraph 3; the former part of Article 17 (2), paragraph (3) of the same Article, the former and latter parts of paragraph (4) of the same Article, and paragraph (5) of the same Article; the proviso to Article 18 (4); the proviso to Article 19 (3) and the portion of paragraph (8) of the same Article preceding its subparagraphs; the proviso to the portion of Article 22 (3) preceding its subparagraphs; Article 25 (1) 3; Article 26 (1) and (2); Article 27 (2) 1, (3) and (4); the proviso to Article 27-2 (2); Article 28, subparagraph 3; Article 29 (1) 4; Article 31; Article 32-2; Article 33 (5); and Article 37 (1), the former part of paragraph (2) of the same Article, and the proviso to paragraph (3) of the same Article, “Minister of Commerce, Industry and Energy” is replaced in each instance by “Minister of Knowledge Economy”.
In Article 22 (2) 2 and Article 35 (2), “Decree of the Ministry of Commerce, Industry and Energy” is replaced in each instance by “Decree of the Ministry of Knowledge Economy”.
Paragraphs (23) through (86) Omitted in the source.
ADDENDA (Enforcement Decree of the Electric Utility Act) <Presidential Decree No. 21833, Nov. 20, 2009>
Article 1 (Enforcement date) This Decree shall enter into force on November 22, 2009.
Article 2 (Amendment of other statutes and regulations) (1) Omitted in the source.
(2) The Enforcement Decree of the Act on Assistance to Electric Power Plants-Neighboring Areas is partially amended as follows:
In the proviso to the portion of Article 2 (2) preceding its subparagraphs, “Article 2, subparagraph 10-2, of the Electric Utility Act” is replaced by “Article 2, subparagraph 11, of the Electric Utility Act”, and “Article 2, subparagraph 17, of that Act” is replaced by “Article 2, subparagraph 19, of the same Act”.
(3) Omitted in the source.
ADDENDUM <Presidential Decree No. 22786, Mar. 30, 2011>
This Decree shall enter into force on the date of its promulgation.
ADDENDA (Enforcement Decree of the Nuclear Safety Act) <Presidential Decree No. 23248, Oct. 25, 2011>
Article 1 (Enforcement date) This Decree shall enter into force on October 26, 2011.
Article 2 Omitted in the source.
Article 3 (Amendment of other statutes and regulations) Paragraphs (1) through (6) Omitted in the source.
(7) The Enforcement Decree of the Act on Assistance to Electric Power Plants-Neighboring Areas is partially amended as follows:
In the proviso to Article 27-2 (2), “pursuant to Article 42-2 (4) of the Enforcement Decree of the Atomic Energy Act” is replaced by “under Article 36 (4) of the Enforcement Decree of the Nuclear Safety Act”.
Paragraphs (8) through (21) Omitted in the source.
Article 4 Omitted in the source.
ADDENDA <Presidential Decree No. 23414, Dec. 28, 2011>
Article 1 (Enforcement date)
This Decree shall enter into force on January 1, 2012.
Article 2 (Applicability to terms of regional committee members)
The amended provisions of Article 10 (1) 4 and 5 shall begin to apply to members commissioned for the first time after this Decree enters into force.
Article 3 (Applicability to unit price of subsidies for tidal power sources)
The amended provisions of Article 27 (1) and Appendix 2 shall begin to apply to the subsidies for the basic support programs to be provided in 2013.
Article 4 (Applicability to increase or decrease of subsidies based on evaluation results of support programs)
The amended provisions of Article 32-3 (4) shall begin to apply to the 2013 subsidies.
Article 5 (Special cases concerning areas surrounding already installed tidal power plant)
Notwithstanding the amended provisions of Article 2 (1) 3, the areas surrounding a tidal power plant already installed as at the time this Decree enters into force shall be the land and island areas within a radius of 5 kilometers from the seawall.
ADDENDA (Organization of the Ministry of Trade, Industry and Energy and Its Affiliated Agencies) <Presidential Decree No. 24442, Mar. 23, 2013>
Article 1 (Enforcement date) This Decree shall enter into force on the date of its promulgation. <Proviso omitted in the source>
Articles 2 through 11 Omitted in the source.
Article 12 (Amendment of other statutes and regulations) Paragraphs (1) through (23) Omitted in the source.
(24) The Enforcement Decree of the Act on Assistance to Electric Power Plants-Neighboring Areas is partially amended as follows:
In the portion of Article 3 (1) preceding its subparagraphs and in Article 7, “Ministry of Knowledge Economy” is replaced in each instance by “Ministry of Trade, Industry and Energy”.
In Article 3 (1) 1 through 3; Article 9 (2) 3; the former part of Article 17 (2), paragraph (3) of the same Article, the former and latter parts of paragraph (4) of the same Article, and paragraph (5) of the same Article; the proviso to Article 18 (3); the proviso to Article 19 (3) and the portion of paragraph (9) of the same Article preceding its subparagraphs; the portion of Article 22 (2) 1 preceding its items and the proviso to the portion of paragraph (3) of the same Article preceding its subparagraphs; Article 25 (1) 4; Article 26 (1) and the main clause and proviso of paragraph (2) of the same Article; Article 27 (2) 1 and paragraphs (3) and (4) of the same Article; the proviso to Article 27-2 (2); Article 28, subparagraph 3; Article 29 (1) 4; Article 31; Article 32-2; Article 32-3 (1) 3, paragraph (2) 3 of the same Article, and paragraphs (4) and (5) of the same Article; and Article 33 (5), “Minister of Knowledge Economy” is replaced in each instance by “Minister of Trade, Industry and Energy”.
In Article 22 (2) 2 and Article 35 (2), “Decree of the Ministry of Knowledge Economy” is replaced in each instance by “Decree of the Ministry of Trade, Industry and Energy”.
Paragraphs (25) through (92) Omitted in the source.
ADDENDA <Presidential Decree No. 26221, May 1, 2015>
Article 1 (Enforcement date) This Decree shall enter into force on the date of its promulgation. However, the amended provisions listed in each of the following subparagraphs shall enter into force on the date specified in that subparagraph:
1. The amended provisions of Article 27-2 (excluding the amended provisions of paragraph (4) 2), Article 35 (1), Appendix 3, and Appendix 4 [excluding the amended provisions of item 1 (a) 3) and item 2 (b)]: May 4, 2015;
2. The amended provisions of Article 27-2 (4) 2, Appendix 1, and Appendix 4, item 1 (a) 3): January 1, 2016.
Article 2 (Applicability to consecutive terms of regional committee members) (1) The amended provisions of Article 10 (3) shall apply beginning with persons commissioned as members of regional committees, including those commissioned for a consecutive term, after this Decree enters into force.
(2) When applying the amended provisions of Article 10 (3) under paragraph (1), a member who was commissioned for the first time before this Decree enters into force and is serving a term may serve one consecutive term after that term expires, while a member who was commissioned for a consecutive term at least once before this Decree enters into force and is serving a term may not serve a further consecutive term after that term expires.
Article 3 (Applicability to calculation of subsidies for basic support programs and operator's support programs) The amended provisions of Appendix 2, item 4 (b), and Appendix 4, item 2 (b), shall apply beginning with the calculation of subsidies for 2016.
ADDENDA (Enforcement Decree of the Act on the Promotion of the Development, Use and Diffusion of New and Renewable Energy) <Presidential Decree No. 26316, Jun. 15, 2015>
Article 1 (Enforcement date) This Decree shall enter into force on July 29, 2015. <Proviso omitted in the source>
Article 2 Omitted in the source.
Article 3 (Amendment of other statutes and regulations) Paragraphs (1) through (3) Omitted in the source.
(4) The Enforcement Decree of the Act on Assistance to Electric Power Plants-Neighboring Areas is partially amended as follows:
In Article 2 (2) 2, “new and renewable energy under the items of Article 2, subparagraph 1, of the Act on the Promotion of the Development, Use and Diffusion of New and Renewable Energy” is replaced by “new energy and renewable energy under Article 2, subparagraphs 1 and 2, of the Act on the Promotion of the Development, Use and Diffusion of New and Renewable Energy”; and in the portion of Article 27-2 (4) 3 preceding its items, “Article 2, subparagraph 1 (d), of the Act on the Promotion of the Development, Use and Diffusion of New and Renewable Energy” is replaced by “Article 2, subparagraph 2 (c), of the Act on the Promotion of the Development, Use and Diffusion of New and Renewable Energy”.
Paragraphs (5) through (13) Omitted in the source.
ADDENDUM (Decree Partially Amending the Enforcement Decree of the Mining Industry Act and Other Decrees to Strengthen Fairness and Accountability in the Operation of Committees Affiliated with Administrative Agencies) <Presidential Decree No. 26703, Dec. 10, 2015>
This Decree shall enter into force on the date of its promulgation.
ADDENDUM <Presidential Decree No. 28494, Dec. 26, 2017>
This Decree shall enter into force on the date of its promulgation; provided, the amended provisions of Appendix 2 shall enter into force on January 1, 2018.
ADDENDUM <Presidential Decree No. 29959, Jul. 9, 2019>
Article 1 (Enforcement date)
This Decree shall enter into force on the date of its promulgation.
Article 2 (Applicability to reappointment of committee members)
The amended provisions of Article 3 (2) shall also apply to members in office as at the time this Decree enters into force; provided, a member who has been reappointed at least once shall remain in office until the expiration of that term, notwithstanding the amended provisions of Article 3 (2).
Article 3 (Applicability to subsidies for basic support programs for areas surrounding nuclear power plant)
The amended provisions of the proviso of Article 19 (2) shall begin to apply to the 2020 basic support program subsidies allocated to each implementer of the support programs.
Article 4 (Applicability to re-carryover of subsidies)
The amended provisions of Article 33-2 shall begin to apply where subsidies that were previously carried over are carried over again after this Decree enters into force.
ADDENDUM <Presidential Decree No. 30917, Aug. 5, 2020>
This Decree shall enter into force on August 5, 2020.
ADDENDUM (Presidential Decree Partially Amending 473 Statutes and Regulations to Clarify Difficult Statutory Terminology) <Presidential Decree No. 31380, Jan. 5, 2021>
This Decree shall enter into force on the date of its promulgation. <Proviso omitted in the source>
ADDENDA (Enforcement Decree of the Act on Marine Research and the Use of Marine Information) <Presidential Decree No. 31438, Feb. 9, 2021>
Article 1 (Enforcement date) This Decree shall enter into force on February 19, 2021.
Articles 2 and 3 Omitted in the source.
Article 4 (Amendment of other statutes and regulations) Paragraphs (1) through (6) Omitted in the source.
(7) The Enforcement Decree of the Act on Assistance to Electric Power Plants-Neighboring Areas is partially amended as follows:
In Article 2 (1) 4 (a), “Article 6 (1) 4 of the Act on the Establishment and Management of Spatial Data” is replaced by “Article 8 (1) 3 of the Act on Marine Research and the Use of Marine Information”.
Paragraphs (8) through (17) Omitted in the source.
Article 5 Omitted in the source.
ADDENDA <Presidential Decree No. 31631, Apr. 20, 2021>
Article 1 (Enforcement date)
This Decree shall enter into force on April 21, 2021.
Article 2 (Transitional measures concerning electric power plants that generate electricity using renewable energy)
Notwithstanding the amended provisions of Article 2 (2), the previous provisions of Article 2 (2) shall apply to electric power plants subject to Article 2 of the Addenda to the Act Partially Amending the Act on the Promotion of the Development, Use and Diffusion of New and Renewable Energy (Act No. 16236) (hereafter referred to as the "New and Renewable Energy Act" in this Article) for the period during which subparagraph 2 (g) of Article 2 of the New and Renewable Energy Act is not applicable in accordance with Article 2 of the Addenda to that Act.
ADDENDA (Enforcement Decree of the Fisheries Act) <Presidential Decree No. 33225, Jan. 10, 2023>
Article 1 (Enforcement date) This Decree shall enter into force on January 12, 2023.
Articles 2 through 9 Omitted in the source.
Article 10 (Amendment of other statutes and regulations) Paragraphs (1) through (14) Omitted in the source.
(15) The Enforcement Decree of the Act on Assistance to Electric Power Plants-Neighboring Areas is partially amended as follows:
In Note 1 (a) to Appendix 4-2, “Article 41 (1) of the Fisheries Act” is replaced by “Article 40 (1) of the Fisheries Act”; and in Note 1 (b) of the same Notes, “Article 41 (2) of the Fisheries Act” is replaced by “Article 40 (2) of the Fisheries Act”.
Paragraphs (16) through (48) Omitted in the source.
Article 11 Omitted in the source.
ADDENDUM <Presidential Decree No. 35042, Dec. 3, 2024>
This Decree shall enter into force on the date of its promulgation.
ADDENDA (Organization of the Ministry of Trade and Industry and Its Affiliated Agencies) <Presidential Decree No. 35803, Oct. 1, 2025>
Article 1 (Enforcement date) This Decree shall enter into force on the date of its promulgation. However, amendments to Presidential Decrees under Article 6 of these Addenda that were promulgated before this Decree enters into force but whose enforcement dates have not yet arrived shall enter into force on the respective enforcement dates of those Presidential Decrees.
Articles 2 through 5 Omitted in the source.
Article 6 (Amendment of other statutes and regulations) Paragraphs (1) through (29) Omitted in the source.
(30) The Enforcement Decree of the Act on Assistance to Electric Power Plants-Neighboring Areas is partially amended as follows:
In the portion of Article 3 (1) preceding its subparagraphs and in Article 7, “Ministry of Trade, Industry and Energy” is replaced in each instance by “Ministry of Climate, Energy and Environment”.
In Article 3 (1) 1 through 3; the portion of Article 4-2 preceding its subparagraphs; Article 9 (2) 3; the former part of Article 17 (2), paragraph (3) of the same Article, the former and latter parts of paragraph (4) of the same Article, and paragraph (5) of the same Article; the proviso to Article 18 (3); the proviso to Article 19 (3) and the portion of paragraph (9) of the same Article preceding its subparagraphs; the portion of Article 22 (2) 1 preceding its items and the proviso to the portion of paragraph (3) of the same Article preceding its subparagraphs; Article 25 (1) 4 and paragraph (3) of the same Article; the portion of Article 25-2 (1) preceding its subparagraphs and paragraph (2) of the same Article; Article 26 (1) and the main clause and proviso of paragraph (2) of the same Article; Article 27 (2) 1 and paragraphs (4) through (6) of the same Article; the proviso to Article 27-2 (3); Article 28, subparagraph 3; Article 29 (1) 4; Article 31; Article 32-2 (1) through (4); Article 32-3; the proviso to the portion of Article 32-4 (1) preceding its subparagraphs, subparagraph 3 of the same paragraph, paragraph (2) 3 of the same Article, and paragraphs (4) and (5) of the same Article; and Article 33 (5), “Minister of Trade, Industry and Energy” is replaced in each instance by “Minister of Climate, Energy and Environment”.
In Article 22 (2) 2 and Article 35 (2), “Decree of the Ministry of Trade, Industry and Energy” is replaced in each instance by “Decree of the Ministry of Climate, Energy and Environment”.
Paragraphs (31) through (101) Omitted in the source.
ADDENDA (Enforcement Decree of the Nuclear Safety Act) <Presidential Decree No. 35942, Dec. 23, 2025>
Article 1 (Enforcement date) This Decree shall enter into force on January 1, 2026.
Article 2 Omitted in the source.
Article 3 (Amendment of other statutes and regulations) (1) The Enforcement Decree of the Act on Assistance to Electric Power Plants-Neighboring Areas is partially amended as follows:
In the proviso to Article 27-2 (3), “after the design lifespan of reactor facilities has expired under Article 36 (4) of the Enforcement Decree of the Nuclear Safety Act” is replaced by “after the design lifespan of a power-generating reactor and its related facilities has expired under Article 21 (3) of the Nuclear Safety Act, obtains permission for modification under Article 20 (1) of the same Act and”.
(2) Omitted in the source.
ADDENDA (Organization of the Ministry of Finance and Economy) <Presidential Decree No. 35947, Dec. 30, 2025>
Article 1 (Enforcement date) This Decree shall enter into force on January 2, 2026. However, amendments to Presidential Decrees under Article 6 of these Addenda that were promulgated before this Decree enters into force but whose enforcement dates have not yet arrived shall enter into force on the respective enforcement dates of those Presidential Decrees.
Articles 2 through 5 Omitted in the source.
Article 6 (Amendment of other statutes and regulations) Paragraphs (1) through (207) Omitted in the source.
(208) The Enforcement Decree of the Act on Assistance to Electric Power Plants-Neighboring Areas is partially amended as follows:
In Article 34 (2), “Minister of Economy and Finance” is replaced by “Minister of Finance and Economy”.
Paragraphs (209) through (313) Omitted in the source.
APPENDIX 1 [000100E] <Amended on May 1, 2015>
Types and details of basic support programs (Related to Article 19 (1))
| Type of program | Details |
| --- | --- |
| Income-increase programs | Programs implemented for regional development and to increase residents' income, including the installation and operation of agricultural, forestry and fisheries facilities, commercial and industrial facilities, and tourism facilities. |
| Public and social welfare programs | Programs to construct and operate medical facilities, roads, port facilities, water supply and sewerage facilities, environmental and sanitation facilities, radiological disaster prevention facilities, sports and recreation facilities, and electricity and telecommunications facilities; and programs to expand facilities related to social welfare for local residents, such as the construction of welfare centers, and to operate support programs. |
| Educational support programs | Programs supporting the education of local residents, including assistance with educational equipment, commuting to school, accommodation and meals, payment of tuition assistance and scholarships, and construction of facilities related to education and culture. |
| Resident welfare support programs | Programs providing funds and other assistance required for programs necessary for the safety of local residents' daily lives and improvement of their residential environment, etc.; and programs subsidizing a specified amount of residents' health examination expenses and information and telecommunications expenses, etc., to promote residents' welfare. |
| Business-attraction support programs | Programs implemented to promote local revenue and job creation, including support for funds necessary to attract, establish and operate enterprises. |
| Electricity-rate subsidy programs | Programs subsidizing a specified amount of the electricity charges for residential and industrial power prescribed in the terms and conditions of supply under Article 16 of the Electric Utility Act. |
| Other support programs | Programs necessary to enhance residents' cooperation in conformity with the purposes of support programs for areas surrounding power plants. |
Note: The details of basic support programs include planning, surveys, research and expense support necessary to implement each program.
APPENDIX 2 [000200E] <Amended on Apr. 20, 2021>
Method of calculating subsidies for basic support programs (Related to Article 27 (1))
1. Annual subsidies for basic support programs
(a) Formula
Electricity generated in the year before the preceding year (kWh) × subsidy unit rate by generation source (won/kWh)
+ installed capacity (MW) × installed-capacity unit rate by generation source (10,000 won/MW)
(b) The quantity of electricity generated under item (a) means the quantity sold to the Korea Power Exchange under Article 35 of the Electric Utility Act. For a power plant of a person supplying electricity to an electricity sales business operator under Articles 8 and 9 of the Addenda to the Act Wholly Amending the Electric Utility Act (Act No. 6283), it means the quantity of electricity so supplied.
2. Subsidy unit rates and installed-capacity unit rates by generation source
| Generation source | Nuclear | Bituminous coal thermal | Anthracite coal thermal | Oil thermal | Gas thermal | Pumped storage | Hydroelectric | Tidal | New and renewable energy |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
| Subsidy unit rate (won/kWh) | 0.25 | 0.18 | 0.3 | 0.15 | 0.1 | 0.2 | 0.2 | 0.2 | 0.1 |
| Installed-capacity unit rate (10,000 won/MW) | - | - | - | - | - | 50 | 500 | - | - |
Note: Among hydroelectric power plants, excluding pumped-storage power plants, the subsidy unit rate for new and renewable energy applies to power plants with a facility capacity exceeding 2,000 kilowatts but not exceeding 10,000 kilowatts, and the hydroelectric subsidy unit rate applies to power plants exceeding 10,000 kilowatts.
3. Minimum annual subsidy for basic support programs by generation source
(a) Nuclear power plants, thermal power plants, hydroelectric power plants, tidal power plants, and new and renewable energy installations with a facility capacity exceeding 10,000 kilowatts, excluding hydroelectric installations: 30 million won.
(b) New and renewable energy installations with a facility capacity of 10,000 kilowatts or less: 20 million won.
4. Other matters
(a) Subsidies for a power plant at which a generator is newly constructed or decommissioned in the year covered by the support program plan shall be calculated by the number of months in the construction and operation periods. The month in which construction commences and the month in which operation commences shall be treated as part of the construction period, and the month in which operation ceases shall be treated as part of the operation period.
(b) A month for which there is no electricity-generation record for the year before the preceding year because of generator construction shall be treated as part of the construction period. Electricity generation during the construction period shall be calculated by applying the average utilization rate of the same generation source in the year before the preceding year [the quantity of electricity under item 1 (b) ÷ {installed capacity (kW) × 24 hours × 365 days}].
(c) If there are two or more generators using different generation sources within a power plant's premises, the subsidy shall be calculated by applying the higher subsidy unit rate.
(d) For an area where two or more surrounding areas overlap, the subsidy shall be the sum of the subsidies calculated separately.
(e) When calculating subsidies each year, fractions of less than 1 million won shall be discarded.
(f) For a power plant generating electricity from a generation source not specified in item 2, annual subsidies for basic support programs shall be calculated by applying the lowest of the subsidy unit rates by generation source under item 2, and the installed-capacity unit rates under that item shall not apply.
APPENDIX 2-2 [000202E] <Added on Aug. 5, 2020>
Method of calculating subsidies for offshore wind power plants (Related to Article 27 (3))
1. Method of calculating subsidies for offshore wind power plants
The subsidy for an offshore wind power plant shall be the amount obtained by multiplying the amount calculated under Article 27 (1) and (2) by the payment rate in the following table corresponding to the area-weighted average distance from the generator to the standard areas.
| Area-weighted average distance | 0 km to 16 km | Over 16 km to 20 km | Over 20 km to 25 km | Over 25 km to 30 km | Over 30 km to 35 km | Over 35 km to 40 km | Over 40 km |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Payment rate | 100% | 84% | 64% | 44% | 24% | 4% | 0% |
2. Formula for the area-weighted average distance
The formula for the area-weighted average distance under item 1 is as follows:
Sum of [area of each standard area (km²) × distance from the generator to that standard area (km)]
divided by
Sum of the areas of all standard areas
Notes
1. Each standard area in the formula above includes all land and island areas belonging to the standard areas under Article 2 (1) 4 for one offshore wind power plant.
2. The distance from the generator to a standard area in the formula above means the distance classified below:
(a) If the standard area is a land area, the distance from the generator to the closest coastal point.
(b) If the standard area is an island area, the distance from the generator to the point closest to it on the island's coastline, meaning the coastline under Article 6 (1) 4 of the Act on the Establishment and Management of Spatial Data.
APPENDIX 3 [000300E] <Amended on Apr. 20, 2021>
Details of operator's support programs, etc. (Related to Article 27-2 (2))
| Type of program | Details |
| --- | --- |
| 1. Education and scholarship support programs | Education-related support programs, including the development of outstanding local talent, provision of dormitories, training at English-language villages, attraction of outstanding teachers, and scholarship programs. |
| 2. Local economic cooperation programs | Programs supporting the revitalization of the local economy, including assistance with sales channels for local specialty products and assistance to strengthen the competitiveness of local industries. |
| 3. Surrounding-environment improvement programs | Programs creating a pleasant local living environment, including marine cleanups, road improvements and improvements to the residential environment. |
| 4. Local welfare programs | Programs improving living conditions for local residents, including support for welfare facilities, construction and operation of childcare facilities, provision of sports facilities, and support for the operation of village bus services. |
| 5. Local cultural promotion programs | Programs creating an environment in which local residents can enjoy cultural life, including support for cultural events and for the construction of cultural facilities. |
| 6. Other operator's support programs | Programs making use of local characteristics, including local publicity, and promoting residents' welfare, resolving current local issues and improving the area's image; ancillary programs related to the planning and operation of operator's support programs; and programs supporting organizations established to monitor the environment and radiation safety, etc., in areas surrounding nuclear power plants. |
APPENDIX 4 [000400E] <Amended on May 1, 2015>
Method of calculating subsidies for operator's support programs (Related to Article 27-2 (3))
1. Annual subsidies for operator's support programs
(a) Formulas
1) Nuclear: Electricity generated in the year before the preceding year (kWh) × 0.25 (won/kWh).
2) Hydroelectric: 5 million won per 1,000 kilowatts of installed capacity.
3) Pumped storage: 500,000 won per 1,000 kilowatts of installed capacity.
(b) The quantity of electricity generated under item (a) 1) means the quantity sold to the Korea Power Exchange under Article 35 of the Electric Utility Act. For a power plant of a person supplying electricity to an electricity sales business operator under Articles 8 and 9 of the Addenda to the Act Wholly Amending the Electric Utility Act (Act No. 6283), it means the quantity of electricity so supplied.
2. Other matters
(a) Subsidies for a power plant at which a generator is newly constructed or decommissioned in the year covered by the support program plan shall be calculated by the number of months in the construction and operation periods. The month in which construction commences and the month in which operation commences shall be treated as part of the construction period, and the month in which operation ceases shall be treated as part of the operation period.
(b) A month for which there is no electricity-generation record for the year before the preceding year because of generator construction shall be treated as part of the construction period. Electricity generation during the construction period shall be calculated by applying the average utilization rate of the same generation source in the year before the preceding year [the quantity of electricity under item 1 (b) ÷ {installed capacity (kW) × 24 hours × 365 days}].
(c) For an area where two or more surrounding areas overlap, the subsidy shall be the sum of the subsidies calculated separately.
(d) In a case falling under Article 27-2 (4) 3, support of up to 200 million won may be provided notwithstanding item 1.
(e) When calculating subsidies each year, fractions of less than 1 million won shall be discarded.
APPENDIX 4-2 [000402E] <Amended on Jan. 10, 2023>
Method of allocating subsidies to areas surrounding offshore wind power plants (Related to the proviso to Article 29 (1))
| Proportion of subsidy | Allocation method |
| --- | --- |
| 1. 40/100 of the subsidy | Allocate according to each local government's share of the number of fishing vessels capable of fishing in the sea area where the offshore wind power plant is installed. |
| 2. 20/100 of the subsidy | Allocate to the local government managing the public waters under the Public Waters Management and Reclamation Act in which the power plant is installed. If two or more local governments manage those public waters, allocate according to the ratio of the number of generators. |
| 3. 15/100 of the subsidy | Allocate according to each local government's jurisdictional share of the area of the land and island areas belonging to the standard areas, meaning the area multiplied by the distance weight. |
| 4. 15/100 of the subsidy | Allocate according to each local government's share of the population of the land and island areas belonging to the standard areas, meaning the population multiplied by the distance weight. |
| 5. 10/100 of the subsidy | Allocate by the Minister of Trade, Industry and Energy after deliberation by the regional committee, taking into consideration local conditions, including the degree of regional development and fairness in the allocation of subsidies among areas. |
Notes
1. “Fishing vessels capable of fishing in the sea area where the offshore wind power plant is installed” in item 1 of the table above means fishing vessels registered under Article 13 (1) of the Fishing Vessels Act with a local government having jurisdiction over the land and island areas belonging to the area surrounding the offshore wind power plant, and falling under either of the following:
(a) Fishing vessels licensed for offshore fisheries under Article 40 (1) of the Fisheries Act;
(b) Fishing vessels licensed for coastal fisheries under Article 40 (2) of the Fisheries Act.
2. The distance weight in items 3 and 4 of the table above shall be the square of the value obtained by subtracting the distance from the generator to the closest coastal point from 40 kilometers. If the value obtained by subtracting that distance from 40 kilometers is less than zero, the distance weight shall be zero.
APPENDIX 5 [000500E] <Amended on Dec. 28, 2011>
Criteria for imposing administrative fines (Related to Article 37)
1. General criteria
(a) Criteria for imposing administrative fines according to the number of violations apply where an administrative fine has been imposed for the same violation within the most recent three years. The dates used to apply the criteria according to the number of violations shall be the date on which an administrative fine was imposed for a violation and the date on which a violation was detected again after that disposition.
(b) The authority imposing the fine may reduce the amount by up to one-half of the administrative fine under item 2 in any of the following cases. This shall not apply to a violator who is in arrears on an administrative fine:
1) The violator falls under any of the subparagraphs of Article 2-2 (1) of the Enforcement Decree of the Act on the Regulation of Violations of Public Order;
2) The violation is recognized as having resulted from minor negligence or error;
3) It is recognized that the violator has made efforts to correct or resolve the state of noncompliance with the Act;
4) It is otherwise considered necessary to reduce the administrative fine, taking into consideration the degree of the violation, its motives, its consequences and other relevant circumstances.
(c) The authority imposing the fine may increase the amount by up to one-half of the administrative fine under item 2 in any of the following cases. The maximum administrative fine under Article 20 (1) of the Act shall not be exceeded:
1) The nature and degree of the violation are serious and the harm to consumers and others is recognized as substantial;
2) The state of noncompliance with the Act has continued for at least six months;
3) It is otherwise considered necessary to increase the administrative fine, taking into consideration the degree of the violation, its motives, its consequences and other relevant circumstances.
2. Individual criteria
(Unit: 10,000 won)
| Violation | Statutory basis | First violation | Second violation | Third or subsequent violation |
| --- | --- | --- | --- | --- |
| (a) Failure to make a report or making a false report under Article 19 (1) of the Act | Article 20 (1) 1 of the Act | 150 | 200 | 250 |
| (b) Failure to submit materials or submission of false materials under Article 19 (1) of the Act | Article 20 (1) 2 of the Act | 150 | 200 | 250 |
| (c) Refusing, obstructing or evading an inspection under Article 19 (1) of the Act | Article 20 (1) 3 of the Act | 500 | 500 | 500 |