ENFORCEMENT DECREE OF THE SCHOOL FACILITIES PROJECTS PROMOTION ACT
10815 · 1998-01-01
ENFORCEMENT DECREE OF THE SCHOOL FACILITIES PROJECTS PROMOTION ACT
Presidential Decree No. 15598, Dec. 31, 1997
Wholly Amended by Presidential Decree No. 14713, Jul. 6, 1995
Amended by Presidential Decree No. 14920, Feb. 22, 1996
Presidential Decree No. 15598, Dec. 31, 1997
법령보기 화면
Article 1 (Purpose)
The purpose of this Decree is to regulate matters delegated by the
School Facilities Projects Promotion Act
(hereinafter referred to as the “Act”) and those necessary for the enforcement of the Act.
법령보기 화면
Article 2 (Application for Approval of Execution Plan)
(1)
Those who intend to obtain approval on the execution plan for the school facilities projects (hereinafter referred to as the “execution plan”) under the provisions of
Article 4
(1) of the Act shall submit the execution plan accompanied by the following documents to a supervisory organ (hereinafter referred to as the “supervisory authority”) as referred to in the provisions of
Article 84 of the Education Act
:
1.
The investigation record of the lands to be expropriated or to be used (the location, the lot number, the land category, area, the details of rights other than ownership, and the names and addresses of the owner and those who have the surface right, servitude, the right to the lease on a deposit basis, the mortgage, the right to the loan for use or the right to lease, and other rights concerning lands shall be recorded);
2.
The investigation record of the building to be expropriated or to be used (the location, the lot number, the structure of the building, the floor area, the total floor area, the details of rights other than ownership, and the names and the addresses of the owner and those who have the right to lease on a deposit basis, the right to mortgage, the right to loan for use, or the right to lease, and other rights concerning the structure shall be recorded);
3.
The investigation record of the fixture (except a building; hereinafter the same shall apply) of the lands to be expropriated or to be used (the location, the lot number, the land category, the area, the details of rights other than ownership, and the names and addresses of the owners and those who have the right to other fixtures shall be recorded);
4.
The statement of confirmation of the plan for land-expropriation (accompanied by a land register map or a certified copy of forest land, and which is confirmed by a head of Shi/Kun/Ku);
5.
A certified copy of the register;
6.
A copy of cadaster or the certified copy of the forest land;
7.
The map of the location of the place where the school facilities projects are executed;
8.
The plane figure of the execution plan;
9.
A brief plan; and
10.
A reorganization plan for graves, etc. (limited only to the case where graves, etc. are reorganized under the provisions of
Article 14
of the Act).
(2)
Those who intend to obtain approval on the change of the execution plan under the provisions of
Article 4
(2) of the Act shall attach the documents related to the changed plan among the documents indicated in each subparagraph of paragraph (1) to the changed plan prepared by comparing the execution plan for the part to be changed and the original execution plan, and shall submit them to the supervisory authority.
법령보기 화면
Article 3 (Trivial Change in Execution Plan)
(1)
“The trivial changes determined by the Presidential Decree” in the proviso of
Article 4
(2) of the Act refers to one of the following subparagraphs:
1.
The change of area by the division, merger, change of registration, new registration or cadastral survey such as the final survey of lands;
2.
The change of location of the site for a school construction, the site for physical exercise, and the site for practice;
3.
The change of the area which is less than one thousand and two hundred square meters for each construction;
4.
The adjustment of the placement plan for the school facilities or the change of the construction plan similar to this; and
5.
The extension of the period of the project execution which is not more than six months.
(2)
Where those who have obtained approval on the execution plan or the changed plan under the provisions of
Article 4
(1) and (2) of the Act (hereinafter referred to as the “project executor”)make a slight change in the execution plan as referred to in the provisions of paragraph (1), they shall notify the supervisory authority without delay of the outline of the changes.
법령보기 화면
Article 4 (Consultation with Head of Competent Administrative Agency)
(1)
When the supervisory authority which has received the application for the approval of the execution plan or the approval on the change of a plan under the provisions of
Article 2
deems that conditions and matters necessary for the approval are met and provided, it shall submit the copies of the documents (in case where the execution plan is changed, it refers to the documents concerning the matters to be changed; hereinafter the same shall apply in this Article) indicated in each subparagraph of
Article 2
(1) and the copies of an execution plan to the head of the competent administrative agency having jurisdiction over the matters indicated in each subparagraph of
Article 5
of the Act for the deliberation as referred to in Article 4 (3) of the Act without delay.
(2)
When the State or a local government prepares an execution plan under the provisions of
Article 4
(4) of the Act or when it changes the execution plan and intends to consult with the head of the competent administrative agency in jurisdiction of the matters indicated in each subparagraph of
Article 5
of the Act, it shall send the copies of the documents indicated in each subparagraph of
Article 2
(1) and the execution plan to the head of the competent administrative agency; provided, in case of the slight changes falling under one of the subparagraphs of
Article 3
(1), it shall not apply.
(3)
The head of the competent administrative agency who has received the request for consultation under the provisions of paragraph (2) and (1) shall send the statement of his opinion within twenty days after he has received the request, unless there is an inevitable circumstance.
법령보기 화면
Article 5 (Execution Plan)
The matters which shall be included in the execution plan under the provisions of
Article 4
(5) of the Act shall be as follows:
1.
Name and address of the person who undertakes the project (in case
of a corporation, the name, and location of a corporation and the name and address of its representative);
2.
Kind and name of a school;
3.
Location where the school facilities projects are executed;
4.
The outline of the project such as the area, size, financial resources, and execution period, etc. of school facilities projects; and
5.
The purpose of the school facilities projects and their installation and relocation or expansion.
법령보기 화면
Article 6 (Presentation of Statement of Opinion)
(1)
In case where the supervisory authority, the State or a local government intends to hear the opinion of the party concerned under the provisions of
Article 4
(6) of the Act, it shall notify the matters indicated in
Article 2
(1) 1 through 3 and subparagraphs 1 and 2 of Article 5 concerning the land, construction, and fixture of the land necessary for its expropriation or use, and shall allow the public to inspect the documents for fourteen days after its notification.
(2)
When the supervisory authority or the State or a local government makes a notification as referred to in the provisions of paragraph (1), it shall notify the parties concerned such as land-owners without delay of its contents and the fact that a statement of opinion may be submitted under the provisions of paragraph (3); provided, where it is impossible to know the person subject to notification or the address, the dwelling place of the person to be notified or to know the place where the notification is to be sent, it shall not apply.
(3)
The land owners and other parties concerned may send the statement of opinion to the supervisory authority, the State, or local government within the period during which the document or the statement is open to the public under the provisions of paragraph (1).
법령보기 화면
Article 7 (Notification and Notice)
Where the supervisory authority has approved the execution plan or the change of the plan under
Article 4
(7) of the Act or where the State or a local government has finished the consultation on the execution plan, it shall notify the head of the competent administrative agency in jurisdiction of the related matters among each subparagraph of
Article 5
of the Act and the party concerned such as the land-owner, of the matters indicated in the provisions of
Article 2
(1) 1 through 3, and subparagraphs 1 through 4 of Article 5 and make public notification
in a Gazette; provided, where it is impossible to know the person subject to notification or it is impossible to know the address and the dwelling place of the person to be notified, and the place where the notification is to be sent, no notification may be made.
법령보기 화면
Article 8 (Approval of Construction)
(1)
Those who intend to construct, build, repair in large scale or change the purpose of the school facilities (hereinafter referred to as the “construction, etc.) whose total ground area is more than two hundred square meters or which is a three-storied building or higher, shall submit the application for approval along with its relevant documents to the supervisory authority. Where the ground area of the school facilities becomes not less than two hundred square meters or a three-storied building or higher by expansion, the same shall apply.
(2)
When the supervisory authority gives approval for the construction, under the provisions of
Article 5-2
(1) of the Act, if the school facilities to be approved are subject to permission under the provisions of
Article 8
(2) of the Fire Services Act, it shall obtain an agreement in advance from the head of the competent fire headquarters or from the head of the competent fire station.
(3)
Where the supervisory authority has approved the construction under the provisions of
Article 5-2
(1) of the Act, it shall issue to the applicant the statement of the approval of the construction prescribed by the Ministerial Decree of Education.
법령보기 화면
Article 9 (Report on Construction, etc.)
(1)
Those who intend to construct the school facilities other than those which have to be approved by the supervisory authority under the provisions of
Article 8
(1) and the school facilities applicable mutatis mutandis with respect to its construction under the
Building Act
pursuant to the provisions of
Article 72 of the Building Act
shall notify it to the supervisory office, submitting the report determined by the Ministerial Decree of Education accompanied by the relevant documents under the provisions of
Article 5-2
(1) of the Act.
(2)
When the supervisory authority receives the report on the construction, etc. under the provisions of paragraph (1), it shall confirm
its content and issue the certificate of complete report on the construction, to the person who has made report.
법령보기 화면
Article 10 (Approval of Construction, etc. and Change of Reported Matters)
(1)
Where one intends to change the construction of the school facilities on which he has obtained approval or made report under
Article 5-2
(1) of the Act, he shall submit a report on the change or the application for the approval on change determined by the Ministerial Decree of Education accompanied by the relevant documents to the supervisory authority.
(2)
The provisions of
Article 8
shall apply mutatis mutandis to an application for approval on change of construction, and the provisions of
Article 9
to the report on change of the construction, respectively.
법령보기 화면
Article 11 (Notification of Approved and Reported Matters of Construction, etc.)
Where the supervisory authority gives approval for construction, etc. or the approval of change under the provisions of
Article 5-2
(2) of the Act, or where it receives the report or the report on change, it shall send the copies of the approval on the construction, the approval on change, or the report, and the report on change to the head of the competent Shi/ Kun/Ku (limited to the head of autonomous Ku; hereinafter the same shall apply).
법령보기 화면
Article 12 (Construction, etc. of School Facilities by State or Local Government)
When the State or local government intends to construct the school facilities under the provisions of
Article 5-2
(3) of the Act, if the school facilities to be approved are subject to permission under the provisions of
Article 8
(2) of the Fire Services Act, it shall notify the head of the competent Shi/Kun/Ku of its plan for construction, set by the Ministerial Decree of Education, after obtaining the consent in advance from the head of the competent fire headquarters or the head of the fire station.
법령보기 화면
Article 13 (Notification of Corrective Measures)
Where the supervisory authority gave an order necessary for the correction concerning the construction of school facilities under the provisions of
Article 5-2
(5) of the Act, it shall notify the head of the competent Shi/ Kun/Ku of the result of corrective measures taken, including the following matters:
1.
Location where construction, etc. is done;
2.
Name and address of a person who undertakes construction, etc. (in case of a juristic person, its title and location of the corporation and the name and address of its representative);
3.
Contents of the violation of Acts; and
4.
Copy of the order for the corrective measures.
법령보기 화면
Article 14 (Consultation about Activities within School Facilities)
After the approval of or the consultation about the execution plan under the provisions of
Article 4
of the Act, if the head of each administrative agency intends to consult with the supervisory authority of the school for the execution of the businesses indicated in each subparagraph of
Article 6
of the Act or for the approval and other dispositions, he shall send the supervisory authority the documents which covered the matters indicated in the following subparagraphs:
1.
Kind of project or facilities;
2.
Agency concerned with the approval, etc. of project;
3.
Name and address of a person who executes project;
4.
Area or size of the project or facilities;
5.
Period and purpose of project or occupancy;
6.
Measures for restoration of facilities;
7.
Map of location and a ground plan (including a main sectional plan); and
8.
Land register map (where the projected line of facilities shall be specified).
법령보기 화면
Article 15 (Public Facilities Which Shall be Installed in Advance)
The term “public facilities determined by the Presidential Decree” in
Article 7
of the Act means electricity, telecommunication, gas, and district heating facilities.
법령보기 화면
Article 16 (Cancellation, etc. of Approval of Execution Plan)
When the supervisory office cancels the approval on an execution plan or gives an order for other necessary measures such as the change of the execution plan under the provisions of
Article 11
(1) of the Act, it shall notify the matters indicated in the following subparagraphs to the head of the competent administrative agency and the party concerned such as a land owner after consultation, and shall put a notice of it on the Gazette ; provided, in case where it is impossible to know the person to be notified or it is impossible to know the address and the dwelling place of the person to be notified, and it is impossible to know the place to which the notification shall be sent, the notification may not be made:
1.
Kind and title of the school;
2.
Name and address of the project undertaker (in case of a corporation, the title and the location of the corporation, and the name and address of its representative);
3.
Location, area and size of school facilities; and
4.
Reasons for taking measures.
법령보기 화면
Article 17 Deleted.<by Presidential Decree No. 15598, Dec. 31, 1997>
법령보기 화면
Article 18 (Inspection on Completion)
(1)
When the project-executor or the person who constructs school facilities (if the project-executor or the person who constructs facilities is the State or local government, it shall be excluded; hereinafter the same shall apply) completes the school facilities project (including the construction of school facilities; hereinafter, the same shall apply in this Article), he shall make a report on the completion of the school facilities project to the supervisory authority within seven days after the completion of the project.
(2)
When the supervisory authority receives the report on the completion of school facilities projects under the provisions of paragraph (1), it shall conduct an inspection on completion within fourteen days after it receives the report, and when the school facilities pass the inspection on completion, it shall issue the certificate of the inspection on completion determined by the Ministerial Decree of Education to the projectexecutor and those who construct the facilities. In this case, the supervisory office shall confirm the delivery of the certificate of inspection on completion of the construction of fire facilities as referred to in
Article 8
(4) of the Fire Services Act and
Article 62
(3) of the same Act in advance.
(3)
When the supervisory office delivers the certificate of the inspection of completion under the provisions of paragraph (2), it shall notify the head of the competent administrative agency having jurisdiction over the matters indicated in each subparagraph of
Article 5
of the Act that the applicant has passed the inspection, and notify the head of the related Shi/Kun/Ku, accompanied by the following documents:
1.
Copy of the certificate of inspection on completion;
2.
Application form for record of the construction register; and
3.
Drawing of the present building.
(4)
When the State or local government completes the school facilities project, it shall notify the head of the competent administrative agency of the matters indicated in each subparagraph of
Article 5
of the Act, and it shall notify the head of the competent Shi/ Kun/Ku, accompanied by the following documents:
1.
Application form for the record of the building register; and
2.
Drawing of the present building.
법령보기 화면
Article 19 (Notice of Removal of Grave to Another Place)
(1)
The notice as referred to in
Article 14
(3) of the Act shall be made on the daily newspaper. In this case, the period of notice shall be not less than one month.
(2)
The notice as referred to in paragraph (1) shall include the location of the grave, etc., the lot number, the reasons for the removal of a grave to another place, and other matters necessary for the removal.
법령보기 화면
Article 20 (Payment of Expenses Necessary for Removal of Grave to Another Place)
(1)
If necessary for the payment of expenses required for the removal or transfer of a grave within the place of the school facilities project which the project-executors except the State or local government executed, the supervisory office may roughly estimate the amount of expenses which shall be borne by the project-executor under the provisions of
Article 14
(5) of the Act, and may have him pay the expense in advance.
(2)
Where the amount paid in advance under the provisions of paragraph (1) is less than the amount of expenses which the project-executor should bear, the supervisory authority shall collect the amount of deficiency without delay, and where there remains any surplus, the supervisory authority shall return it without delay.
법령보기 화면
Article 21 (Delegation of Authority)
(1)
The Minister of Education shall delegate the following authority concerning the national elementary schools, middle schools, and high schools (except the technical high schools) under the
Article 15
(1) of the Act to the superintendent of the board of education:
<Amended by Presidential Decree No. 14920, Feb. 22, 1996>
1.
Preparation of, and consultation about, the execution plan under the provisions of
Article 4
(4) of the Act;
2.
Notice of the investigation record of the lands and buildings to be expropriated under the provisions of
Article 4
(6) of the Act and Article 6 of this Decree for public perusal, the notification of the content of the public notice to the party concerned, and reception of opinion concerning this;
3.
Notification and public notice of the consultation about the execution plan as referred to in
Article 4
(7) of the Act;
4.
Notification of the construction, etc. of the school facilities as referred to in
Article 5-2
(3) of the Act;
5.
Consultation about the activities within the school facilities as referred to in
Article 6
of the Act;
6.
Notification and public notice of the completion of the school facilities project under the provisions of
Article 13
(3) of the Act; and
7.
The matters concerning the rearrangement of a grave, etc. as referred to in
Article 14
(1) through (4) of the Act.
(2)
The superintendent of the board of education shall delegate the authority indicated in subparagraph 1 to the educational superintendent in the matters concerning the school facilities project for the national elementary schools and middle schools and the construction, etc. of school facilities project, and he shall delegate the authority indicated in subparagraphs 2 through 7 to the educational superintendent in the matters concerning the school facilities project for the private elementary schools and the private middle schools and the construction, etc. of the school facilities:
<Amended by Presidential Decree No. 14920, Feb. 22, 1996; Presidential Decree No. 15598, Dec. 31, 1997>
1.
The authority indicated in each subparagraph of paragraph (1);
2.
Authority indicated in paragraph (1) 2 and the notification and public notice of the approval, the approval of the change and, the consultation and approval, etc. of the execution plan under the provisions of
Article 4
(1) through (3), and (7) of the Act to the competent agency, etc.;
3.
Approval of the change and the reception of the report and of the changed report of the construction, etc. of the school facilities, and the notification and notice to the head of Shi, etc. under
Article 5-2
(1) and (2) of the Act;
4.
Investigation concerning the violation of the Act, the order for the corrective measures, and the notification of this matter to a head of Shi, etc. under the provisions of
Article 5-2
(5) of the Act and the Article 13 of this Decree,;
5.
Cancellation and change of the approval of the execution plan and the order for other necessary measures under
Article 11
of the Act, and the hearing under
Article 11-2
of the Act;
6.
Collection of report concerning the projector-executor, etc. and order for the presentation of materials, and inspection under the provisions of
Article 12
of the Act; and
7.
The reception of the report on completion of the school facilities project, etc., the inspection on completion of school facilities, and the notification of it to the head of Shi, etc. under
Article 13
(1) and (2) of the Act.
ADDENDA
(1)
(Enforcement Date) This Decree shall enter into force on July 6, 1995.
(2)
(Special Examples in Application of Urban Planning Act to Existing Schools) “What meets the standards determined by the Presidential Decree” in paragraph (2) of the Addenda of the Act No. 3634 refers to the facilities approved by the supervisory authority, which meet the provisions of
Articles 2
, 3 (1) through (3), (5), and 13 (4) of the Decree of the standard for the school facilities and equipments; provided, in case that the reduction of facilities is approved under the provisions of
Article 11
of the Decree of the standard for the school facilities and equipments, it refers to the facilities approved by the supervisory office.
(3)
(Transitional Measures concerning Disposition, etc.) In case that there is any provision concerning the disposition, order, and measures, etc. which the supervisory authority gave under the previous provisions at the time when this Decree enters into force, or in case that there is any provision concerning the application and report, etc. to the supervisory authority among this Decree, they shall be considered to have been done according to the relevant provisions.
(4)
(Relation with Other Acts and Subordinate Statutes) In case that the other Acts and subordinate statutes quote the previous provisions at the time when this Decree enters into force they shall be considered to have quoted the provisions corresponding to them.
ADDENDA<Presidential Decree No. 14920, Feb. 22, 1996>
Article 1 (Enforcement Date)
This Decree shall enter into force on March 1, 1996.
Article 2 Omitted.
ADDENDUM<Presidential Decree No. 15598, Dec. 31, 1997>
This Decree shall enter into force on January 1, 1998.
Last updated : 2009-07-26