FAIR TRANSACTIONS IN SUBCONTRACTING ACT

16047 · 2009-04-01

FAIR TRANSACTIONS IN SUBCONTRACTING ACT  Act No. 9616, Apr. 1, 2009   Act No. 3779, Dec. 31, 1984 Amended by Act No. 4198, Jan. 13, 1990 Act No. 4419, Dec. 14, 1991 Act No. 4514, Dec. 8, 1992 Act No. 4898, Jan. 5, 1995 Act No. 4860, Jan. 5, 1995 Act No. 5234, Dec. 30, 1996 Act No. 5386, Aug. 28, 1997 Act No. 5454, Dec. 13, 1997 Act No. 5507, Jan. 13, 1998 Act No. 5816, Feb. 5, 1999 Act No. 5756, Feb. 5, 1999 Act No. 6198, Jan. 21, 2000 Act No. 6893, May 29, 2003 Act No. 7107, Jan. 20, 2004 Act No. 7315, Dec. 31, 2004 Act No. 7488, Mar. 31, 2005 Act No. 7864, Mar. 3, 2006 Act No. 8539, Jul. 19, 2007 Act No. 9085, Mar. 28, 2008 Act No. 9616, Apr. 1, 2009 법령보기 화면  Article 1 (Purpose) The purpose of this Act is to contribute to the sound development of the national economy by establishing fair order in subcontract transactions so that the principal contractor and subcontractor may complement each other and develop balance on equal terms. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 2 (Definitions) (1) The term "subcontract transaction" in this Act means that a principal contractor entrusts a subcontractor with manufacturing (including entrustment with processing; hereinafter the same shall apply), repair, construction or services, or a principal contractor re-entrusts a subcontractor with manufacturing, repair, construction, or services that have been entrusted to the principal contractor by another contractor, and the entrusted subcontractor (hereinafter referred to as "entrustment with manufacturing, etc.") conducts manufacturing, repair, construction, or services of what the subcontractor has been entrusted (hereinafter referred to as "objects, etc."), and delivers, turns over or provides the principal contractor (hereinafter referred to as "delivery, etc.") and receives the price thereof (hereinafter referred to as "subcontract consideration"). (2) The term "principal contractor" in this Act means a person falling under any of the following subparagraphs: 1. Business person, other than a small or medium business person (referring to the person under Article 2 (1) of the Framework Act on Small and Medium Enterprises , including small and medium enterprise cooperatives under the Small and Medium Enterprise Cooperatives Act ; hereinafter the same shall apply), who entrusts a small or medium business person with manufacturing, etc.; 2. Small or medium business person whose annual sales in the immediately preceding business year (referring to the sum total of the assessed amount of construction capability for the year concerned in cases of a transaction to which the assessed amount of construction capability applies as prescribed in the related Acts, and referring to the total amount of assets in the absence of annual sales or assessed amount of construction capability; hereafter the same shall apply in this subparagraph), or whose number of regular employees is more than twice that of other small or medium business persons who are entrusted with manufacturing, etc., and who entrusts other small or medium business persons with manufacturing, etc.: Provided , That when small or medium business persons whose annual sales are equal to the amount prescribed by Presidential Decree, they shall be excluded. (3) The term "subcontractor" in this Act means a small or medium business person who is entrusted with manufacturing, etc. by a principal contractor under the subparagraphs of paragraph (2). (4) Where a business person entrusts an affiliate company prescribed in subparagraph 3 of Article 2 of the Monopoly Regulation and Fair Trade Act with manufacturing, etc., and the affiliate company re-entrusts a third person with whole or considerable part of manufacturing, repair, construction, or services that have been entrusted, and where the third party falls under paragraph (3) if he/she is deemed to have been entrusted with manufacturing, etc. directly from the business person who has entrusted an affiliate company even though the affiliate company does not fall under any of the subparagraphs of paragraph (2), the affiliate company and the third person shall be deemed a principal contractor and a subcontractor under this Act, respectively. (5) Where a company belonging to an enterprise group subject to the limitations on mutual investment under Article 9 (1) of the Monopoly Regulation and Fair Trade Act entrusts or is entrusted with manufacturing, etc., it shall be governed by the following subparagraphs: 1. Even though the company which entrusts manufacturing, etc. does not fall under any of the subparagraphs of paragraph (2), it shall be deemed a principal contractor under this Act; 2. Even though the company entrusted with manufacturing, etc., falls under paragraph (3), it shall not be deemed a subcontractor under this Act. (6) The term "entrustment with manufacturing" in this Act means that a business person who engages in a business of the act falling under any of the following subparagraphs entrusts another business person with the manufacturing of goods from such business. In such cases, the scope of goods resulting from such business shall be determined and announced by the Fair Trade Commission: 1. Manufacturing of goods; 2. Sale of goods; 3. Repair of goods; 4. Construction. (7) Paragraph (6) shall apply to the goods prescribed by Presidential Decree, limited to areas, such as the Special Metropolitan City, Metropolitan Cities, etc. prescribed by Presidential Decree, notwithstanding paragraph (6). (8) The term "entrustment with repair" in this Act means that a business person entrusts another enterprise with all or part of repair where the business person engages in a business of repairing goods in compliance with an order or of repairing goods that he/she is using. (9) The term "entrustment with construction" in this Act means that a business person falling under any of the following subparagraphs (hereinafter referred to as "constructor") entrusts another constructor with all or part of the construction work from his/her business, or a constructor entrusts another business person with construction work prescribed by Presidential Decree: 1. Constructors under subparagraph 5 of Article 2 of the Framework Act on the Construction Industry ; 2. Constructors under subparagraph 3 of Article 2 of the Electrical Construction Business Act ; 3. Information and communications construction business operators under subparagraph 4 of Article 2 of the Information and Communication Works Business Act; 4. Persons who have had the fire-fighting system installation business registered as prescribed in Article 4 (1) of the Fire-Fighting System Installation Business Act; 5. Other business persons prescribed by Presidential Decree. (10) The term "person ordering" in this Act means a person who gives a contract for manufacturing, repair, construction or services to a principal contractor: Provided , That for re-subcontracting, it means a principal contractor. (11) The term "service entrustment" in this Act means that a business person (hereinafter referred to as "service provider") who engages in a business of preparing knowledge and information-related products or of supplying services (hereinafter referred to as "services") entrusts all or part of performance of the services to another service provider. (12) The term "knowledge and information-related products" in this Act means those falling under any of the following subparagraphs: 1. Information programs (referring to software under subparagraph 1 of Article 2 of the Software Industry Promotion Act , and those which are a combination of a series of instructions and commands embedded in a device having information processing capability, such as a computer and an electronic calculator, in order to obtain specific results); 2. Results comprised of movies, broadcasting programs and other images, voices or sounds; 3. Results comprised of a combination of characters, diagrams and signs or of a combination of the foregoing and colors (including drawings under subparagraph 3 Article 2 of the Certified Architects Act and drawings from among the engineering works under subparagraph 1 of Article 2 of the Engineering Technology Promotion Act ); 4. Others corresponding to subparagraphs 1 through 3, determined and announced by the Fair Trade Commission. (13) The term "service duties" in this Act means an activity corresponding to any of the following subparagraphs: 1. Engineering works (excluding design) under subparagraph 1 of Article 2 of the Engineering Technology Promotion Act ; 2. Transporting cargo by making use of trucks or intermediating cargo as prescribed by the Trucking Transport Business Act ; 3. Maintaining and managing buildings as prescribed by the Building Act ; 4. Preventing danger, etc. to facilities, places, goods, etc. or of preventing harm to the life and body of people and protecting them from danger as prescribed by the Security Services Industry Act; 5. Other activities of providing labor to carry through the business entrusted by a principal contractor, which have been determined and announced by the Fair Trade Commission. (14) The term "means of payment in place of bill" in this Act refers to the means of payment that is used in substitution for a bill when a principal contractor pays subcontract consideration, which falls under any of the following subparagraphs: 1. Exclusive-use card for business purchases: Credit card or debit card that a credit card company under the Specialized Credit Financial Business Act issues to a principal contractor for the payment of subcontract consideration, which is not usable at general credit card merchants, but is issued for the sole purpose of payment of subcontract consideration to the relevant subcontractor according to a contract among the principal contractor, subcontractor and credit card company; 2. Loan against security of credit sales claims: Where the subcontractor lends money from a financial institution by offering the claims on credit sales to the principal contractor as security in order to receive subcontract consideration, and the principal contractor redeems the loan of the subcontractor from the financial institution with the subcontract consideration, in which case money is lent according to the terms and conditions determined by the Governor of the Bank of Korea; 3. Purchase loan: Where a principal contractor makes a contract of credit line with a financial institution and lends money therefrom, pays subcontract consideration to the subcontractor by means of information processing system, and redeems the loan to the financial institution on the due date; 4. Other means of payment used in place of a bill in the payment of subcontract consideration, which are determined and announced by the Fair Trade Commission. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 3 (Issuance and Preservation of Documents) (1) Where a principal contractor entrusts a subcontractor with manufacturing, etc., he/she shall issue a document (including electronic document under subparagraph 1 of Article 2 of the Framework Act on Electronic Commerce ; the same shall apply hereafter in this Article) stating the matters in paragraph (2) to the subcontractor by not later than the deadline according to the classifications in the following subparagraphs unless a justifiable reason exists to the contrary: 1. Where manufacturing is entrusted: Before a subcontractor commences any work for the supply of goods; 2. Where repair is entrusted: Before a subcontractor commences repair for which a contract has been concluded; 3. Where construction is entrusted: Before a subcontractor commences any contracted construction works; 4. Where services are entrusted: Before a subcontractor performs services for which a contract has been concluded. (2) The document in paragraph (1) shall include the details of subcontract, such as subcontract consideration and method of payment thereof, and the matters prescribed by Presidential Decree, such as the conditions, method, procedures, etc. of adjusting the subcontract consideration following price fluctuations in raw materials according to Article 16-2 (1), and the principal contractor and subcontractor shall affix signature (including certified digital signature under subparagraph 3 of Article 2 of the Digital Signature Act ) or put name and seal thereon. (3) The principal contractor and the subcontractor shall preserve documents concerning subcontract transactions, as prescribed by Presidential Decree. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 3-2 (Preparation and Use of Standard Form Subcontract) The Fair Trade Commission may recommend the preparation and use of standard form subcontract to the business persons or business organizations to which this Act applies. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 4 (Prohibition of Fixing Unreasonable Subcontract Consideration) (1) Where a principal contractor entrusts a subcontractor with manufacturing, etc., he/she shall not compel the subcontractor to fix the subcontract consideration at a substantially lower level than the consideration paid ordinarily for the same or similar manufacturing, etc. of the objects, etc. by using unlawful methods (hereinafter referred to as "fixing unreasonable subcontract consideration"), or to accept such subcontract. (2) Any act by the principal contractor falling under any of the following subparagraphs shall be deemed fixing unreasonable subcontract consideration: 1. Fixing a subcontract consideration by indiscriminately reducing the unit price without any justifiable reasons; 2. Fixing a subcontract consideration by deducting an amount after allotting unilaterally such amount under some pretext, such as a request for cooperation, etc.; 3. Fixing a subcontract consideration by discriminating against a specific subcontractor without any justifiable reasons; 4. Fixing a subcontract consideration by causing the subcontractor to make an error regarding the terms and conditions of transaction, such as order quantity, etc., or by deceiving the subcontractor in such a way as to show him/her the quotations of another business person or false quotations to take advantage of it; 5. Fixing a subcontract consideration unilaterally at a low price by a principal contractor without the consent of the subcontractor; 6. Fixing a subcontract consideration at a price lower than the total amount under the heading direct construction expenses prescribed by Presidential Decree without any justifiable reasons when a private subcontract is concluded; 7. Fixing a subcontract consideration at a price lower than the lowest tender price without any justifiable reasons in concluding the subcontract by competitive bidding. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 5 (Prohibition of Compelling Purchase of Goods, etc.) In entrusting a subcontractor with manufacturing, etc, the principal contractor shall not compel the subcontractor, except with justifiable reasons, such as the maintenance, improvement, etc. of the quality of the objects, etc., to purchase or use (including utilization; hereinafter the same shall apply) any goods, equipment, supply of service duties, etc. designated by him/her. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 6 (Payment in Advance) (1) Where a principal contractor who has entrusted a subcontractor with manufacturing, etc., receives advance payment from the person ordering, he/she shall pay an advance to the subcontractor within fifteen days after he/she received it (the day on which the principal contractor entrusted manufacturing, etc., if he/she had received it before he/she entrusted manufacturing, etc.) so that he/she may undertake manufacturing, repair or construction or service performance in accordance with the contents and ratio of the advance. (2) Where a principal contractor pays an advance received from the person ordering after the deadline under paragraph (1), he/she shall pay interest calculated by the interest rate determined and notified by the Fair Trade Commission in consideration of economic circumstances, such as late-payment interest rates, etc. applied by financial institutions under the Banking Act , which is within 40/100 per annum for the period that has passed. (3) Article 13 (6), (7), (9) and (10) shall apply mutatis mutandis to bill discount charge, payment of fees, bill discount rate and rate of fees where advance payment is made by bill or means of payment in place of bill. In such cases, "sixty days from the date when such objects, etc. have been received" shall be deemed "fifteen days from the date when the principal contractor received advance payment from the person ordering". [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 7 (Opening Local Letters of Credit) Where a principal contractor entrusts a subcontractor with manufacturing or services of the goods for export, he/she shall open a local letter of credit in favor of the subcontractor, within fifteen days from the date of the entrustment, unless any justifiable reason exists to the contrary: Provided , That where the principal contractor entrusts manufacturing or services before he/she receives an original letter of credit in cases of export by letter of credit, he/she shall open a local letter of credit within fifteen days after he/she received an original letter of credit. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 8 (Prohibition of Unreasonable Cancelation of Entrustment) (1) No principal contractor shall perform an act falling under any of the following subparagraphs unless any reason attributable to the subcontractor exists after entrusting the subcontractor with manufacturing, etc.: Provided , That where the supply of service duties from among the entrustment with services is entrusted, subparagraph 2 shall not apply: 1. Arbitrarily cancelling or altering the entrustment with manufacturing, etc.; 2. Refusing or delaying the receipt or takeover of the delivery, etc. of objects, etc. (2) Where the objects, etc. are delivered, etc., the principal contractor shall immediately issue a certificate of receipt to the subcontractor (immediately after the completion of inspection in cases of opening a local letter of credit pursuant to Article 7) even before an inspection except for cases of entrustment of supply of service duties: Provided , That for entrustment with construction, he/she shall take over the object immediately after the inspection is completed. (3) "Receipt" in paragraph (1) 2 means that the principal contractor places the objects, etc. under actual control, which have been delivered by the subcontractor: Provided , That where it is difficult to move the objects, etc., the time when the inspection commences shall be deemed the time of receipt. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 9 (Criteria, Method and Time of Inspection) (1) The criteria and method of inspection of the objects, etc. delivered by the subcontractor shall be determined objectively, impartially and reasonably by mutual agreement between the principal contractor and the subcontractor. (2) Unless any justifiable reason exists to the contrary, the principal contractor shall notify the subcontractor of the result of inspection into the objects, etc. in writing within ten days from the date when he/she received such objects, etc. (in cases of entrustment with manufacturing, it includes the date when the portion of manufacturing works performed was notified, and in cases of entrustment with construction, it refers to the date when the subcontractor notified the completion of construction works, or the portion of construction works completed). In the absence of such notification within the prescribed period, the objects, etc. shall be deemed to have passed the inspection: Provided , That where the supply of service duties from among entrustment of services is entrusted, the same shall not apply. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 10 (Prohibition of Unreasonable Return of Goods) (1) When a principal contractor has taken delivery, etc. of the objects, etc. from a subcontractor, he/she shall not return them to the subcontractor, unless any reason attributable to the subcontractor exists (hereinafter referred to as "unreasonable return"): Provided , That where the supply of service duties from among entrustment of services is entrusted, the same shall not apply. (2) The acts of the principal contractor which fall under any of the following subparagraphs shall be deemed unreasonable return: 1. Returning the objects, etc. by reason of cancellation of order from the other party to the transaction, or any change in economic circumstances, etc.; 2. Returning the objects, etc. by vaguely determining the criteria and method of inspection, and thereby judging unjustly that the objects, etc. failed to pass inspection; 3. Returning the objects, etc. although they have been judged to have failed to pass inspection due to the inferior quality of the raw materials supplied by the principal contractor; 4. Returning the objects, etc. by reason of delay in the supply, although it is caused by delay in the supply of raw materials by the principal contractor. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 11 (Prohibition of Unreasonable Reduction in Price) (1) A principal contractor shall not unreasonably reduce the subcontract consideration fixed at the time of the entrustment of manufacturing, etc. (hereinafter referred to as "unreasonable reduction in price"), unless any reason attributable to the subcontractor exists. (2) The acts of the principal contractor which fall under any of the following subparagraphs shall be deemed an unreasonable reduction in price: 1. Reducing subcontract consideration by citing unreasonable grounds, such as request for cooperation, cancellation of order by the other party to the transaction, change in economic circumstances, etc., after giving entrustment, in which the conditions, etc. for reduction in the subcontract consideration have not been specified at the time of giving entrustment; 2. Reducing subcontract consideration by applying the terms of agreement unilaterally and retroactively to the portion that was entrusted before agreement, where agreement has been concluded with the subcontractor with regard to reduction of unit cost; 3. Reducing subcontract consideration excessively on the grounds that the subcontract consideration is paid in cash or prior to the due date for payment; 4. Reducing subcontract consideration unilaterally by reason of insignificant fault by the subcontractor, which does not cause any substantial loss to the principal contractor; 5. Deducting an amount more than the proper purchase price or proper rent from the subcontract consideration, where the principal contractor has had the subcontractor purchase from him/her the goods, etc. necessary for the manufacturing, repair, construction or service performance of the objects, etc. or use his/her equipment, etc.; 6. Reducing subcontract consideration on the grounds that the prices of commodities or the price of materials, etc. at the time of payment of subcontract consideration has fallen compared with the price at the time of delivery, etc.; 7. Reducing subcontract consideration unfairly for unreasonable reasons, such as loss from operations or reduced sale price, etc.; 8. Imposing on the subcontractor employment insurance premium, industrial safety and health management expenses, other expenses, etc., which should be borne by the principal contractor under the Act on the Collection of Insurance Premiums, etc. for Employment Insurance and Industrial Accident Compensation Insurance, the Occupational Safety and Health Act, etc. (3) Where the principal contractor pays an unreasonably reduced price after more than sixty days from the receipt of objects, etc., the principal contractor shall pay interest accrued for the period beyond sixty days in accordance with the interest rate fixed and announced by the Fair Trade Commission by taking into account economic circumstances, such as late-payment interest rates, etc. applied by financial institutions under the Banking Act within the limit of 40/100 per annum. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 12 (Prohibition of Unfair Requests for Settlement of Purchase Price, etc.) Where a principal contractor has had a subcontractor purchase goods, etc. necessary for the manufacturing, repair, construction, or service performance of objects, etc. from himself/herself, or use his/her equipment, etc., he/she shall not conduct an act falling under any of the following subparagraphs without justifiable grounds: 1. Having the subcontractor pay all or part of the purchase price or rent prior to the date of payment of subcontract consideration of the relevant objects, etc.; 2. Having the subcontractor pay the purchase price or rent on condition that is remarkably unfavorable compared with that on which the principal contractor purchases or uses the goods, etc., or supplies the goods, etc. to a third party. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 12-2 (Prohibition of Unfair Requests for Economic Profits) No principal contractor shall compel a subcontractor to provide money, goods, services or other economic profits to himself/herself or third parties without justifiable grounds. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 13 (Payment, etc. of Subcontract Consideration) (1) Where a principal contractor entrusts a subcontractor with manufacturing, etc., he/she shall pay the subcontract consideration by not later than the earliest date for payment fixed within the extent of 60 days from the date of receipt of objects, etc. (in cases of entrustment with construction, it refers to the date of taking over the objects, etc.; in cases of entrustment of services, the date when the subcontractor has completed the performance of the services entrusted; and if the principal contractor and subcontractor agree to issue tax invoices on one or more occasions a month on certain days because of frequent delivery of goods, etc., it refers to such days; hereinafter the same shall apply): Provided , That in cases which fall under any of the following subparagraphs, this shall not apply: 1. Where it is deemed that the principal contractor and subcontractor have fixed the date for payment on equal terms; 2. Where the date for payment is deemed reasonable in light of the characteristics of the business and economic conditions. (2) Where the date for payment of subcontract consideration is not fixed, the date of receipt of objects, etc. shall be deemed the date for payment of the subcontract consideration, and where the date for payment is fixed past sixty days from the date of receipt of the objects, etc. (excluding cases falling under the proviso to paragraph (1)), the sixtieth day from the date of receipt of the objects, etc. shall be deemed the date for payment of the subcontract consideration, respectively. (3) Where a principal contractor has entrusted a subcontractor with manufacturing, etc., he/she shall pay the subcontractor the subcontract consideration within 15 days from the date when the work progress payment or amount completed, etc. was received (the date for payment, where the date for payment of the subcontract consideration arrives before then) when the principal contractor has received work progress payment, etc. following the completion of manufacturing, repair, construction or service performance from the person ordering, and he/she shall pay the subcontractor an amount corresponding to the portion of manufacturing, repair, construction or service performance that has been performed within 15 days from the date when the work progress payment or money corresponding to the completed portion of work, etc. was received (the date for payment, where the date for payment of the subcontract consideration arrives before then) when the principal contractor has received the completed portion, etc. according to the progress of manufacturing, repair, construction or service performance from the person ordering. (4) When a principal contractor pays the subcontract consideration to a subcontractor, he/she shall not pay less than the proportion of cash which he/she received from the person ordering in connection with the entrustment of the manufacturing, etc. concerned. (5) Where a principal contractor pays the subcontract consideration by a bill, he/she shall not draw a bill, the period of payment of which exceeds the period of payment (issuance date to due date) of the bill that the principal contractor has received from the person ordering in connection with the entrustment of the manufacturing, etc. concerned. (6) Where a principal contractor pays the subcontract consideration by a bill, the bill shall be one which can be discounted at any financial institution established by law and the discount commission for the period from the date of delivery and to the due date of the bill shall be paid to the subcontractor on the day on which the bill is delivered: Provided , That where the bill is delivered within sixty days after the objects, etc. are received (referring to the date for payment where the date for payment is fixed under the proviso to paragraph (1), and to the date referred to in paragraph (3) where work progress payment or money corresponding to the completed portion of work, etc. are received from the person ordering; hereafter the same shall apply in this Article), the discount commission for the period from the date on which sixty days pass after the date when the objects, etc. are received to the due date of the bill shall be paid to the subcontractor within sixty days from the date when the objects, etc. are received. (7) Where a principal contractor pays the subcontract consideration by means of payment in place of bill, he/she shall pay commission (including interest for loan; hereinafter the same shall apply) on the date for payment for the period from the date for payment (referring to the date of approval of card settlement in cases of exclusive-use card for business purchases, to the date of transmission of details of delivery, etc. of goods in cases of loan against of security of credit card sales claims, and to the date of settlement of purchase funds in cases of purchase loans; hereinafter the same shall apply) to the date of repayment of the subcontract consideration to the subcontractor: Provided , That where it is paid by means of payment in place of bill within sixty days from the date of receipt of objects, etc., commission for the period from the day on which sixty days pass from the date of receipt of objects, etc. to the due date of the bill shall be paid to the subcontractor within sixty days from the date of receipt of objects, etc. (8) Where a principal contractor pays the subcontract consideration after sixty days pass from the date of receipt of objects, etc., he/she shall pay interest calculated by the interest rate fixed within the limit of 40/100 per annum and announced by the Fair Trade Commission for the days elapsed in consideration of economic circumstances, such as late-payment interest rates, etc. applied by financial institutions under the Banking Act . (9) The discount rate applied in paragraph (6) shall be fixed within the limit of 40/100 per annum and announced by the Fair Trade Commission in consideration of the discount rate for commercial bills applied by financial institutions established by law. (10) The commission rate applied in paragraph (6) shall be fixed within the limit of 40/100 per annum and announced by the Fair Trade Commission in consideration of the commission rate for the means of payment in place of bill or interest rate for loan, etc. applied by financial institutions established by law. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 13-2 (Performance of Construction Subcontracts and Guarantees for Payment of Consideration) (1) In cases of entrustment with construction, the principal contractor shall provide a guarantee for payment of the consideration of construction in accordance with the classifications in the following subparagraphs, while the subcontractor shall provide a performance bond equivalent to 10/100 of the contract value: Provided , That where it is deemed that no guarantee is necessary or is inappropriate in consideration of the financial status of the principal contractor or the scale, etc. of construction, which is prescribed by Presidential Decree, this shall not apply: 1. Where the period of construction is four months or less: Amount calculated by subtracting advance payments from the contract price; 2. Where the period of construction exceeds four months, and the interval of payments for the completed portion of work does not exceed two months: Amount calculated according to the following formula: Amount of Guarantee = Subcontract Price - Agreed Advance Payments × 4 Period of Construction (Months) 3. Where the period of construction exceeds four months, and the interval of payments for the completed portion of work exceeds two months: Amount calculated according to the following formula: Amount of Guarantee = Subcontract Price - Agreed Advance Payments × Interval of Payments for the Completed Portion of Work (Months) × 2 Period of Construction (Months) (2) The guarantee between principal contractor and subcontractor under paragraph (1) shall be paid in cash (including by bank check issued by offices of postal services or financial institutions under the Banking Act ) or by the delivery of a guarantee certificate issued by an institution falling under any of the following subparagraphs: 1. Every mutual-aid association under the Framework Act on the Construction Industry ; 2. Insurance companies under the Insurance Business Act ; 3. The Kora Credit Guarantee Fund under the Credit Guarantee Fund Act ; 4. Financial institutions under the Banking Act ; 5. Other guarantee institutions prescribed by Presidential Decree. (3) Where a principal contractor delivers guarantee certificates in accordance with paragraph (2), the principal contractor may combine the guarantees for payment of all the construction works entrusted during the period of construction or the guarantees for payment of all the construction works entrusted in one fiscal year into one guarantee certificate for delivery. (4) In addition to the matters prescribed in paragraphs (1) through (3), matters necessary for performance bonds for subcontracting and payment guarantees for subcontract consideration shall be prescribed by Presidential Decree. (5) Where a principal contractor fails to guarantee the payment of construction price under the main sentence of paragraph (1), the subcontractor need not guarantee the performance of contract. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 14 (Direct Payment of Subcontract Consideration) (1) Where a ground falling under any of the following subparagraphs occurs, the person ordering shall pay the subcontract consideration corresponding to the completed portion of manufacturing, repair, construction, or service performance directly to the subcontractor: 1. When the subcontractor has requested direct payment of the subcontract consideration where payment has been suspended, the principal contractor is bankrupt, or other similar reasons exist, or where the principal contractor has become unable to pay the subcontract consideration as permission, authorization, license, registration, etc. relating to the business have been revoked; 2. When agreement has been made among the person ordering, principal contractor and subcontractor that the person ordering shall pay the subcontract consideration directly to the subcontractor; 3. When the subcontractor has requested direct payment of the subcontract consideration where the principal contractor has failed to pay to the relevant subcontractor two or more installments of the subcontract consideration to be paid by the principal contractor as prescribed in Article 13 (1) or (3); 4. When the subcontractor has requested direct payment of the subcontract consideration where the principal contractor has failed to perform his/her obligation to guarantee the payment of subcontract consideration as prescribed in Article 13-2 (1). (2) Where a ground prescribed in paragraph (1) occurs, the obligation of the person ordering to pay consideration to the principal contractor and the obligation of the principal contractor to pay the subcontract consideration to the subcontract shall be deemed to have extinguished within such limit. (3) Where a principal contractor requires suspension of direct payment of the relevant subcontract consideration with documents evidencing the fact that the subcontractor delays paying wages, price of materials, etc. in connection with the relevant subcontract, the person ordering need not pay the subcontract consideration directly notwithstanding paragraph (1). (4) When the person ordering pays the subcontract consideration directly to the relevant subcontractor as prescribed in paragraph (1), he/she shall pay it minus the subcontract consideration that has already been paid by the person ordering to the principal contractor. (5) Where confirmation, etc. of a completed portion are necessary for the subcontractor to receive the subcontract consideration directly from the person ordering as prescribed in paragraph (1), the principal contractor shall take necessary measures without delay. (6) Matters necessary for the methods, procedures, etc. for payment where the subcontract consideration is paid directly as prescribed in paragraph (1) shall be prescribed by Presidential Decree. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 15 (Payment of Refund of Customs Duties) (1) Where a principal contractor entrusts a subcontractor with manufacturing or services for goods to be exported and where he/she has customs duties, etc. refunded under the Act on Special Cases concerning the Refundment of Customs Duties, etc. Levied on Raw Materials for Export , he/she shall pay the refund to the subcontractor in accordance with terms of the refund received within fifteen days after he/she received it. (2) Notwithstanding paragraph (1), the refundable amount of customs duties, etc. shall be paid to the subcontractor within sixty days from the date of receipt of objects, etc., unless any fault attributable to the subcontractor exists. (3) Where a principal contractor pays the refundable amount of customs duties, etc. after the due date prescribed in paragraphs (1) and (2), he/she shall pay interest for such days overdue, calculated according to the interest rate fixed within the limit of 40/100 per annum in consideration of economic circumstances, such as late-payment interest rates, etc. applied by financial institutions under the Banking Act and announced by the Fair Trade Commission. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 16 (Adjustment of Subcontract Consideration due to Change in Design, etc.) (1) Where a principal contractor receives any additional money from the person ordering due to any change in design or economic situation, etc., after entrusting manufacturing, etc., and when any additional expenses are required to complete or finish objects, etc. due to the same reason, he/she shall increase the subcontract consideration in proportion to the contents and rate of the additional money he/she has received, and where the person ordering has reduced the money, he/she may reduce the subcontract consideration in proportion to the contents and rate thereof. (2) The increase or decrease in the subcontract consideration under paragraph (1) shall be made within thirty days after the person ordering has increased or decreased such consideration. (3) Article 13 (8) shall apply mutatis mutandis to the interest where additional subcontract consideration is paid after 15 days from the date when additional money under paragraph (1) was received, and Article 13 (6), (7), (9) and (10) shall apply mutatis mutandis to the bill discount commission, payment of commission, discount rate for bill and commission rate where additional subcontract consideration is paid by bill or means of payment in place of bill. In such cases, "sixty days from the date when such objects, etc. have been received" shall be deemed "fifteen days from the date when the additional money has been received". [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 16-2 (Adjustment of Subcontract Consideration due to Fluctuations in Price of Raw Materials) (1) Where adjustment of subcontract consideration is inevitable because the price of raw material necessary for the manufacturing, etc. of objects, etc. has fluctuated after a subcontractor has been entrusted with manufacturing, etc., the subcontractor may request the principal contractor to adjust subcontract consideration. (2) A principal contractor shall start consultation on the adjustment of subcontract consideration within 10 days from a request under paragraph (1), and shall not refuse or neglect consultation without justifiable grounds. (3) Where a principal contractor has not started consultation on the adjustment of subcontract consideration within 10 days from a request under paragraph (1) or has not reached agreement on the adjustment of subcontract consideration within 30 days from a request under paragraph (1), the principal contractor or subcontractor may apply for mediation of the Subcontract Dispute Mediation Council established under Article 24. [This Article Newly Inserted by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 17 (Prohibition of Unreasonable Payment in Kind) No principal contractor shall pay the subcontract consideration with goods contrary to the intention of the subcontractor. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 18 (Prohibition of Unreasonable Intervention in Management) No principal contractor shall intervene in the management of the subcontractor by means of regulating the volume of subcontract transactions. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 19 (Prohibition of Retaliatory Measures) No principal contractor shall perform any act limiting the opportunity of a subcontractor to receive an order, suspending transactions, or giving any disadvantages because the subcontractor has performed an act falling under any of the following subparagraphs: 1. Reporting to the authority concerned, etc. that the principal contractor has violated this Act; 2. Requesting the principal contractor under Article 16-2 (1) for mediation of subcontract consideration or applying for mediation to the Subcontract Dispute Mediation Council under paragraph (3) of the same Article. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 20 (Prohibition of Evasion of this Act) No principal contractor shall perform any act to evade the actual application of this Act relating to a subcontract transaction. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 21 (Matters to be Observed by Subcontractors) (1) Where a subcontractor has been entrusted with manufacturing, etc. by a principal contractor, the subcontractor shall fulfill the details of the entrustment in good faith. (2) No subcontractor shall cooperate with the principal contractor in any offense against this Act. (3) A subcontractor shall, upon making a report as prescribed by this Act, present documentary evidence, etc. to the Fair Trade Commission without delay. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 22 (Reporting, etc. on Offenses) (1) When a violation of this Act is deemed to have occurred, anyone may report it to the Fair Trade Commission. (2) When a report has been made under paragraph (1), or a violation of this Act is deemed to have occurred, the Fair Trade Commission may make a necessary investigation. (3) When the Fair Trade Commission has notified a principal contractor of a violation reported by a subcontractor, peremptory notice under Article 174 of the Civil Act shall be deemed to have been given: Provided , That where the reported case is rejected, dismissed or withdrawn, this shall not apply. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 23 (Limitation on Transactions subject to Investigation) Subcontract transactions subject to the investigation by the Fair Trade Commission as prescribed in Article 22 (2) shall be limited to those for which three years have not passed from the date on which the transaction was concluded: Provided , That where a subcontract transaction is reported within three years from the date on which the transaction was concluded, investigation may be made even after three years have passed from the date on which the transaction was concluded. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 24 (Subcontract Dispute Mediation Council) (1) Every business organization prescribed by Presidential Decree shall establish a Subcontract Dispute Mediation Council (hereinafter referred to as the "Council"). (2) The Council shall verify the dispute on the subcontract transaction between a principal contractor and a subcontractor at the request of the Fair Trade Commission or both parties, or shall mediate the dispute. (3) Where a dispute is mediated, the Council shall report the result to the Fair Trade Commission without delay, and where it is not mediated, the Council shall report the reason for the failure of mediation. (4) Matters necessary for the composition, operation, etc. of the Council, shall be prescribed by Presidential Decree. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 24-2 Deleted.<by Act No. 9616, Apr. 1, 2009> 법령보기 화면  Article 25 (Corrective Measures) (1) The Fair Trade Commission may recommend or order the persons ordering and principal contractors who have violated Articles 3, 4 through 12, 12-2, 13, 13-2, 14 through 16, 16-2 (2), and 17 through 20 to pay subcontract consideration, to stop violations, and to take other measures necessary for the correction of the relevant violations. (2) Where the Council mediates a dispute as prescribed in Article 24 (2), it shall be deemed that the Fair Trade Commission has taken measures necessary for the correction under paragraph (1) as the Council has mediated the dispute unless any special ground exists to the contrary. (3) Where the Fair Trade Commission has ordered corrective measures (excluding cases in which it is deemed to have ordered as prescribed in paragraph (2); hereafter the same shall apply in this paragraph) as prescribed in paragraph (1), it may order the principal contractor who has been ordered to announce the fact that he/she has been so ordered. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 25-2 (Deposit) Where a subcontractor does not receive repayment or is unable to receive repayment, a principal contractor against whom corrective measures have rendered prescribed in Article 25 (1) or (2) may be relieved of the obligation to perform the corrective measures by depositing the object of repayment in favor of the subcontractor. This shall also apply where it is impossible for the principal contractor to identify the subcontractor without fault on his/her part. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 25-3 (Penalty Surcharges) (1) The Fair Trade Commission may impose upon the person ordering, principal contractor or subcontractor falling under any of the following subparagraphs a penalty surcharge within the extent not exceeding double the subcontract consideration for the manufacturing, etc. entrusted to the subcontractor, or double the subcontract consideration for the manufacturing, etc. entrusted by the person ordering or principal contractor: 1. Principal contractor who has not issued a document or has issued a false document in violation of Article 3 (1) and (2); 2. Person who has not preserved documents in violation of Article 3 (3), or principal contractor or subcontractor who has fraudulently prepared and issued documents concerning subcontract transactions; 3. Principal contractor who has violated Articles 4 through 12, 12-2, 13 and 13-2; 4. Person ordering who has violated Article 14 (1); 5. Principal contractor who has violated Article 14 (5); 6. Principal contractor who has violated Articles 15, 16, 16-2 (2), and 17 through 20. (2) The provisions of Articles 55-3 through 55-7 under the Monopoly Regulation and Fair Trade Act shall apply mutatis mutandis to penalty surcharges under paragraph (1). [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 26 (Cooperation by Heads of Relevant Administrative Agencies) (1) Where it is deemed necessary for implementing this Act, the Fair Trade Commission may hear the opinion of the heads of the relevant administrative agencies or request the heads of the relevant administrative agencies to provide human resources support for investigation or other necessary cooperation. (2) The Fair Trade Commission shall give demerits to the principal contractor or subcontractor who has violated the provisions of Articles 3, 4 through 12, 12-2, 13, 13-2, 14 through 16, 16-2 (2), and 17 through 20, which are prescribed by Presidential Decree, in consideration of the degree of violation and damage, and shall request the heads of the relevant administrative agencies to restrict him/her from participating in bidding, to suspend business as prescribed in Article 82 (1) 6 of the Framework Act on the Construction Industry and to take other measures necessary for the fairness of subcontract transactions where the demerits exceed the standard prescribed by Presidential Decree. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 27 (Monopoly Regulation and Fair Trade Act to be Applied Mutatis Mutandis) (1) Articles 42, 43, 43-2, 44, 45 and 52 of the Monopoly Regulation and Fair Trade Act shall apply mutatis mutandis to the deliberation and decision of the Fair Trade Commission under this Act while Articles 53, 53-2, 53-3, 54, 55 and 55-2 of the same Act shall apply mutatis mutandis to the exclusive jurisdiction over raising an objection, filing a lawsuit, or filing an objection to any disposition of the Fair Trade Commission. (2) Articles 50, 50-2, 50-3 and 51 of the Monopoly Regulation and Fair Trade Act shall apply mutatis mutandis to the investigation, hearing of opinion, recommendation for correction, etc. of the Fair Trade Commission necessary to implement this Act. (3) Article 62 of the Monopoly Regulation and Fair Trade Act shall apply mutatis mutandis to persons falling under the following subparagraphs: 1. Members or public officials of the Fair Trade Commission who perform or have performed the duties prescribed by this Act; 2. Persons who are or have been in charge of dispute mediation of subcontract transactions at the Council. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 28 (Relation to Monopoly Regulation and Fair Trade Act) Article 23 (1) 4 of the Monopoly Regulation and Fair Trade Act shall not apply to matters concerning subcontract transactions to which this Act applies. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 29 (Penal Provisions) A person who has violated Article 62 of the Monopoly Regulation and Fair Trade Act applied mutatis mutandis pursuant to Article 27 (3) shall be punished by imprisonment for not more than two years, or a fine not exceeding two million won. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 30 (Penal Provisions) (1) A principal contractor falling under any of the following subparagraphs shall be punished by a fine not exceeding the amount equivalent to double the subcontract consideration for the manufacturing, etc. entrusted to the subcontractor by the principal contractor: 1. Person who has violated Articles 4 through 12, 12-2 and 13; 2. Person who has not guaranteed the payment of construction price in violation of Article 13-2 (1); 3. Person who has violated Articles 15, 16 and 17; 4. Person who has refused consultation without justifiable grounds, in violation of Article 16-2 (2). (2) A person who falls under any of the following subparagraphs shall be punished by a fine not exceeding one hundred and fifty million won: 1. Person who has violated Articles 18 through 20; 2. Person who has not complied with an order issued under Article 25. (3) A person who has made a false appraisal under Article 50 (1) 2 of the Monopoly Regulation and Fair Trade Act applied mutatis mutandis pursuant to Article 27 (2) shall be punished by a fine not exceeding thirty million won. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 30-2 (Fines for Negligence) (1) A person who falls under any of the following subparagraphs shall be punished by a fine for negligence not exceeding thirty million won: 1. Person who has failed to appear without justifiable grounds, in violation of Article 50 (1) 1 of the Monopoly Regulation and Fair Trade Act applied mutatis mutandis pursuant to Article 27 (2); 2. Person who has failed to report or submit necessary materials or things, or who has reported fraudulently or submitted false materials or things prescribed in Article 50 (1) 3 or (3) of the Monopoly Regulation and Fair Trade Act applied mutatis mutandis pursuant to Article 27 (2); 3. Person who has refused, obstructed, or evaded inspection prescribed in Article 50 (2) of the Monopoly Regulation and Fair Trade Act applied mutatis mutandis pursuant to Article 27 (2). (2) Any person who has not complied with an instruction to maintain order prescribed in Article 43-2 of the Monopoly Regulation and Fair Trade Act applied mutatis mutandis pursuant to Article 27 (1) shall be punished by a fine for negligence not exceeding one million won. (3) Fines for negligence under paragraphs (1) and (2) shall be imposed and collected by the Fair Trade Commission. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 31 (Joint Penal Provisions) Where the representative of a juristic person, or the agent, worker or employee of a juristic person or individual commits an offense in Article 30 relating to the affairs of the juristic person or individual, not only shall the offender be punished but the juristic person or individual also shall be punished by a fine under the applicable provision: Provided , That where the juristic person or individual has not neglected to give considerable attention to or supervise the relevant affairs so as to prevent such offense, the same shall not apply. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 32 (Complaints) Public prosecution against a crime prescribed in Article 30 may be initiated only when there is a charge by the Fair Trade Commission. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 33 (Contributory Negligence) Where a subcontractor is responsible for any offense against this Act committed by a principal contractor, it may be taken into consideration when taking corrective measures, filing a complaint, or applying penal provisions under this Act. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 34 (Relationship to other Acts) Where any provision of the Act on the Promotion of Collaborative Cooperation between Large Enterprises and Small-Medium Enterprises, the Electrical Construction Business Act , the Framework Act on the Construction Industry , and the Information and Communication Works Business Act is contrary to this Act, such provision shall be governed by this Act. [This Article Wholly Amended by Act No. 9616, Apr. 1, 2009] 법령보기 화면  Article 35 Deleted.<by Act No. 9616, Apr. 1, 2009> ADDENDUM This Act shall enter into force three months after the date of its promulgation. ADDENDA<Act No. 4198, Jan. 13, 1990> Article 1 (Enforcement Date) This Act shall enter into force on April 1, 1990. Articles 2 through 5 Omitted. ADDENDA<Act No. 4419, Dec. 14, 1991> Article 1 (Enforcement Date) This Act shall enter into force on July 1, 1992. (Proviso Omitted.) Articles 2 through 8 Omitted. ADDENDA<Act No. 4514, Dec. 8, 1992> (1) (Enforcement Date) This Act shall enter into force on April 1, 1993. (2) (Transitional Measures) The amended provisions of Articles 6, 7, 13 and 15 shall not apply to any subcontract already concluded at the time this Act enters into force. (3) Omitted. ADDENDA<Act No. 4860, Jan. 5, 1995> (1) (Enforcement Date) This Act shall enter into force on April 1, 1995. (2) (Transitional Measures) Notwithstanding the revised provisions of Articles 2, 13 (4) and 16 (2), any subcontract already concluded at the time this Act enters into force shall be governed by the previous provisions. ADDENDA<Act No. 4898, Jan. 5, 1995> Article 1 (Enforcement Date) This Act shall enter into force on July 1, 1995. Articles 2 through 11 Omitted. ADDENDA<Act No. 5234, Dec. 30, 1996> (1) (Enforcement Date) This Act shall enter into force on April 1, 1997. (2) (Transitional Measures concerning Subcontract Transactions under Conclusion of Subcontracts) If a subcontract was already concluded at the time this Act entered into force, the former provisions of this Act shall apply notwithstanding the amended provisions of Articles 13-2 and 25-3. ADDENDA<Act No. 5386, Aug. 28, 1997> Article 1 (Enforcement Date) This Act shall enter into force on January 1, 1998. (Proviso Omitted.) Articles 2 through 8 Omitted. ADDENDUM<Act No. 5454, Dec. 13, 1997> This Act shall enter into force on January 1, 1998. (Proviso Omitted.) ADDENDA<Act No. 5507, Jan. 13, 1998> Article 1 (Enforcement Date) This Act shall enter into force on the date of its promulgation. Article 2 Omitted. ADDENDA<Act No. 5756, Feb. 5, 1999> Article 1 (Enforcement Date) This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.) Articles 2 through 7 Omitted. ADDENDA<Act No. 5816, Feb. 5, 1999> (1) (Enforcement Date) This Act shall enter into force on April 1, 1999. (2) (Transitional Measures concerning Subcontract Transaction under Conclusion of Subcontract) Notwithstanding the amended provisions of Article 13, the previous provisions shall apply to a subcontract transaction for which a subcontract has already been concluded at the time when this Act enters into force. ADDENDA<Act No. 6198, Jan. 21, 2000> Article 1 (Enforcement Date) This Act shall enter into force six months after the date of its promulgation. Articles 2 through 7 Omitted. ADDENDA<Act No. 6893, May 29, 2003> Article 1 (Enforcement Date) This Act shall enter into force one year after the date of its promulgation. Articles 2 through 6 Omitted. ADDENDA<Act No. 7107, Jan. 20, 2004> (1) (Enforcement Date) This Act shall enter into force three months after the date of its promulgation. (2) (Applicability to Penal Provisions) The amended provisions of Article 30 (1) 3-2 shall apply to the first subcontract concluded after this Act enters into force. ADDENDA<Act No. 7315, Dec. 31, 2004> Article 1 (Enforcement Date) This Act shall enter into force on April 1, 2005. (Proviso Omitted.) Articles 2 through 10 Omitted. ADDENDA<Act No. 7488, Mar. 31, 2005> (1) (Enforcement Date) This Act shall enter into force three months after the date of its promulgation. (2) (Applicability to Subcontract Transactions of Service Entrustment) The amended provisions of Article 2 (1) and (11) shall apply starting from the first subcontract transaction for which the contract for subcontract of service entrustment is concluded after this Act enters into force. (3) (Applicability to Additional Payment for Refund of Penalty Surcharges) The amended provisions of Article 25-3 (2) shall apply starting from the first penalty surcharges refunded after this Act enters into force. (4) (Transitional Measures concerning Subcontract Transaction for which Subcontract has been Concluded) The previous provisions shall govern the subcontract transaction for which a subcontract has already been concluded at the time when this Act enters into force, notwithstanding the amended provisions of Articles 2 (1) and (11), 12-2 and 13-2 (5). ADDENDA<Act No. 7864, Mar. 3, 2006> Article 1 (Enforcement Date) This Act shall enter into force three months after the date of its promulgation. Articles 2 through 11 Omitted. ADDENDUM<Act No. 8539, Jul. 19, 2007> This Act shall enter into force three months after the date of its promulgation. ADDENDUM<Act No. 9085, Mar. 28, 2008> This Act shall enter into force six months after the date of its promulgation. ADDENDUM<Act No. 9616, Apr. 1, 2009> This Act shall enter into force on the date of its promulgation. Last updated : 2010-03-22