ACT ON CARBON DIOXIDE CAPTURE, TRANSPORT, STORAGE, AND UTILIZATION
280027 · 2025-12-02
CHAPTER I GENERAL PROVISIONS
Article 1 (Purpose) The purpose of this Act is to prevent the serious impacts of the climate crisis and to contribute to the sustainable development of the national economy by prescribing matters necessary for technology development and industrialization required for efficiently capturing carbon dioxide emitted from industrial activities and other sources and either storing it underground or utilizing it for industrial and daily life purposes.
Article 2 (Definitions) The terms used in this Act are defined as follows:
1. The term "capture" means the collection of carbon dioxide emitted from sources of greenhouse gas emissions, such as industrial activities, or present in the atmosphere, into containers or facilities for domestic or international storage or utilization;
2. The term "transport" means the act of delivering captured carbon dioxide (referring to carbon dioxide streams under Article 10(1) of the Management of Marine Debris and Contaminated Marine Sediment Act and carbon dioxide prescribed by Presidential Decree; hereinafter the same shall apply) to storage sites or utilization business facilities, for domestic or foreign storage or utilization, by means prescribed by Presidential Decree;
3. The term "storage" means the permanent isolation of captured carbon dioxide from the atmosphere, to prevent its leakage into the atmosphere, by injecting it into domestic or foreign onshore or offshore geological formations;
4. The term "utilization" means converting captured carbon dioxide into substances useful for human life or economic activities and using them as industrial resources, or directly using exhaust gases containing carbon dioxide;
5. The term "carbon dioxide transport pipeline" means a pipeline and related facilities for transporting captured carbon dioxide, as prescribed by Presidential Decree;
6. The term "storage site" means a place that meets the standards prescribed by Presidential Decree, for storing captured carbon dioxide in onshore or offshore geological formations, to prevent its leakage into the atmosphere or ocean.
Article 3 (Responsibilities of the State) (1) The State and local governments shall formulate and implement policy measures to establish methods for calculating carbon dioxide reductions and statistical foundations necessary for the effective management and improvement of carbon dioxide capture, transport, storage, and utilization (hereinafter referred to as "CCUS"), and to promote the development of related industries.
(2) The State and local governments shall endeavor to promote necessary education and publicity campaigns in order to enhance public awareness of CCUS.
(3) Business entities engaged in CCUS shall develop and commercialize related technologies and shall actively cooperate with government policies on CCUS.
Article 4 (Relationship to other statutes) (1) Captured carbon dioxide and substances or objects produced through its utilization (excluding by-products generated during the utilization process that are no longer necessary for the relevant business activities) shall not constitute wastes defined in subparagraph 1 of Article 2 of the Wastes Control Act (hereinafter referred to as "wastes").
(2) If captured carbon dioxide is mixed with wastes, this Act shall not apply, and the corresponding provisions of the Wastes Control Act shall apply.
CHAPTER II FORMULATION OF MASTER PLANS FOR CCUS
Article 5 (Master plans for CCUS) (1) The Government shall formulate and implement a master plan for CCUS (hereinafter referred to as "master plan") every 5 years to efficiently promote CCUS.
(2) A master plan shall include the following:
1. Matters regarding the basic direction and objectives of CCUS;
2. Matters regarding domestic and international trends and prospects for technological and industrial development related to CCUS;
3. Matters regarding the research, development, and commercialization of CCUS technologies;
4. Matters regarding the selection, management, and other related aspects of candidate sites for carbon dioxide storage under Article 14;
5. Matters regarding investment or support for CCUS facilities;
6. Matters regarding the enhancement of international competitiveness of CCUS-related technologies and industries;
7. Matters regarding the safety management and monitoring of storage sites;
8. Matters regarding the promotion of CCUS and the enhancement of public acceptance thereof;
9. Matters regarding the procurement and operation of necessary financial resources;
10. Other matters necessary for CCUS as prescribed by Presidential Decree.
(3) When formulating a master plan, the Government shall refer the plan to the National Climate Crisis Response Commission (hereinafter referred to as the "National Climate Crisis Response Commission") under Article 15 of the Framework Act on Carbon Neutrality and Green Growth for Coping with Climate Crisis for deliberation. The same shall also apply to any modification of important matters prescribed by Presidential Decree in the master plan. <Amended on Nov. 11, 2025>
(4) The Minister of Climate, Energy and Environment shall assist with business affairs related to the formulation, implementation, and other related aspects of a master plan, and the heads of relevant central administrative agencies, heads of local governments, and heads of public institutions (referring to public institutions defined in Article 4 of the Act on the Management of Public Institutions; the same shall apply hereinafter) shall provide full cooperation, including furnishing materials requested by the Minister. <Amended on Oct. 1, 2025>
(5) Other matters necessary for the methods, procedures, and related aspects of formulating and modifying master plans shall be prescribed by Presidential Decree.
Article 6 (Action plans for CCUS) (1) The heads of the relevant central administrative agencies shall formulate and implement an annual action plan for CCUS (hereinafter referred to as "action plan") in accordance with the master plan.
(2) When formulating an action plan, the heads of relevant central administrative agencies shall submit the plan, along with the implementation results of the previous year's action plan, to the National Climate Crisis Response Commission. <Amended on Nov. 11, 2025>
(3) Other matters necessary for the procedures and related aspects for formulating action plans and submitting implementation results shall be prescribed by Presidential Decree.
CHAPTER III INSTALLATION OF CARBON DIOXIDE CAPTURE AND TRANSPORT FACILITIES
Article 7 (Reporting on plans for installation of carbon dioxide capture facilities) (1) A person who intends to install and operate a carbon dioxide capture facility shall prepare an installation and operation plan for the capture facility (hereinafter referred to as the "installation plan") and report the plan to the Minister of Climate, Energy and Environment. <Amended on Oct. 1, 2025>
(2) An installation plan shall include the following:
1. The name or title of the person who intends to install and operate a carbon dioxide capture facility;
2. Matters concerning the installation site the carbon dioxide capture facility, such as its location and area;
3. Matters regarding the equipment of the carbon dioxide capture facility, such as its capacity and capture method;
4. Other matters necessary for reporting under paragraph (1), as prescribed by Presidential Decree.
(3) If a person who has filed a report under paragraph (1) (hereinafter referred to as "capture business entity") intends to modify any important matters prescribed by Presidential Decree in the installation plan, the person shall file a report on the modification.
(4) When the Minister of Climate, Energy and Environment intends to accept a report under paragraph (1) or a report on modification under paragraph (3), the Minister shall have a prior consultation with the heads of relevant central administrative agencies. <Amended on Oct. 1, 2025>
(5) The Minister of Climate, Energy and Environment may provide a person who has filed a report under paragraph (1) or a report on modification under paragraph (3) with the administrative and financial support necessary for the installation and operation of the relevant capture facility. <Amended on Oct. 1, 2025>
(6) Matters necessary for reports and reports on modification under paragraphs (1) and (3), consultations with the heads of relevant central administrative agencies under paragraph (4), administrative and financial support under paragraph (5), and other relevant details shall be prescribed by Presidential Decree.
Article 8 (Approval for carbon dioxide transport business) (1) A person who intends to conduct business of transporting captured carbon dioxide via transport means referred to in subparagraph 2 of Article 2 (hereinafter referred to as "transport business") shall obtain approval from the Minister of Climate, Energy and Environment after preparing facilities and documents as prescribed by Presidential Decree; provided, a person who intends to conduct transport business that corresponds to marine cargo transportation services defined in subparagraph 3 of Article 2 of the Marine Transportation Act shall file for registration in advance with the Minister of Oceans and Fisheries under Article 24 of that Act. <Amended on Oct. 1, 2025>
(2) Except as provided in this Act, transport business shall be governed by other statutes, including the High-Pressure Gas Safety Control Act, the Ship Safety Act, the Ballast Water Management Act, the Marine Transportation Act, the Motor Vehicle Management Act, the Railroad Service Act, and the Railroad Safety Act.
Article 9 (Safety management regulations) (1) A person who has obtained approval under the main clause of Article 8(1) and intends to install and operate a carbon dioxide transport pipeline shall establish safety management regulations, including the following matters, to ensure the safety of the carbon dioxide transport pipeline and shall obtain approval of the regulations from the Minister of Climate, Energy and Environment before installing and operating the pipeline. The same shall also apply to any modification of the approved safety management regulations: <Amended on Oct. 1, 2025>
1. Emergency response measures in the event of a captured carbon dioxide leakage accident;
2. Safety management system;
3. Matters prescribed by Decree of the Ministry of Climate, Energy, and Environment to ensure the safety of the carbon dioxide transport pipeline.
(2) A person who has obtained approval under paragraph (1) (hereinafter referred to as "pipeline operator") and their employees shall comply with the safety management regulations under paragraph (1).
(3) The Minister of Climate, Energy and Environment shall periodically inspect whether a pipeline operator and their employees comply with the safety management regulations under paragraph (1), as prescribed by Presidential Decree. <Amended on Oct. 1, 2025>
Article 10 (Safety managers) (1) A pipeline operator shall appoint a safety manager for the safety management of the relevant carbon dioxide transport pipeline before commencing business or use, as prescribed by Decree of the Ministry of Climate, Energy and Environment, and shall report the appointment to the Minister of Climate, Energy and Environment within the period prescribed by Decree of the Ministry of Climate, Energy and Environment from the date of such appointment. <Amended on Oct. 1, 2025>
(2) When a safety manager is dismissed or retires, the relevant pipeline operator shall appoint another safety manager within the period prescribed by Decree of the Ministry of Climate, Energy and Environment from the date of such dismissal or retirement. <Amended on Oct. 1, 2025>
(3) A pipeline operator shall designate a deputy to temporarily perform the duties of a safety manager in any of the following cases:
1. Where the safety manager is temporarily unable to perform their duties due to travel, disease, or other reasons;
2. Where a successor has not been appointed after the dismissal or retirement of the safety manager.
(4) The qualifications, number, and scope of duties of safety managers under paragraph (1), the period during which deputies may perform the duties of safety managers under paragraph (3), and other necessary matters shall be prescribed by Presidential Decree.
Article 11 (Safety inspections) (1) A pipeline operator shall have the relevant carbon dioxide transport pipeline undergo the following safety inspections, conducted by the Minister of Climate, Energy and Environment: <Amended on Oct. 1, 2025>
1. Periodic inspections: Inspections conducted annually; in such cases, the validity period shall be 1 year from the date of the periodic inspection, and the initial periodic inspection shall be conducted within 1 year from the date of the completion inspection;
2. Occasional inspections: Inspections conducted when a carbon dioxide leakage accident has occurred or is likely to occur during use, which is deemed necessary by the Minister of Climate, Energy, and Environment.
(2) The Minister of Climate, Energy and Environment may determine and publicly notify necessary matters regarding the standards for safety inspections related to the methods and procedures for safety inspections under paragraph (1). <Amended on Oct. 1, 2025>
(3) If the Minister of Climate, Energy and Environment deems that a pipeline operator is unable to receive a safety inspection under paragraph (1) due to a natural disaster or any other unavoidable cause, the Minister may extend the validity period of the safety inspection or postpone such inspection, as prescribed by Presidential Decree. <Amended on Oct. 1, 2025>
(4) Necessary matters for conducting safety inspections under paragraph (1) shall be prescribed by Presidential Decree.
Article 12 (Entry onto another person's land) (1) A pipeline operator may enter or use another person's land, or alter or remove plants or other obstacles on such land, if necessary for field investigation, surveying, construction, and operation related to the installation work of the relevant carbon dioxide pipeline, or for the preservation of such pipeline.
(2) The Act on Acquisition of and Compensation for Land for Public Works Projects shall apply mutatis mutandis to the entry onto and use of land, the alteration and removal of plants and other obstacles, and the compensation therefor under paragraph (1).
CHAPTER IV EXPLORATION, SELECTION, AND CLOSURE OF CANDIDATE SITES FOR CARBON DIOXIDE STORAGE
Article 13 (Approval for exploration of storage sites) (1) A person who intends to conduct exploration for the purpose of identifying a storage site in onshore or offshore geological formations shall obtain approval therefor from the Minister of Climate, Energy and Environment. In such cases, an application for exploration approval may include areas where exploration rights have been established under Article 12 of the Submarine Mineral Resources Development Act. <Amended Oct. 1, 2025>
(2) A person who intends to obtain exploration approval under paragraph (1) shall file an application with the Minister of Climate, Energy and Environment, attaching the following documents: <Amended on Oct. 1, 2025>
1. A map of the onshore or seabed area, specifying the area to be explored;
2. An exploration plan;
3. A specification of major equipment necessary for exploration;
4. A plan for investigating the geological structure, fault distribution, and seismic characteristics of the exploration area;
5. Other documents prescribed by Presidential Decree.
(3) If the documents submitted under paragraph (2) conform to the exploration approval standards prescribed by Presidential Decree, the Minister of Climate, Energy and Environment may grant approval for such exploration. In such cases, the Minister shall seek the opinions of the Minister of Trade, Industry and Energy and the Minister of Oceans and Fisheries with respect to the exploration approval of offshore geological storage sites and may seek the opinion of the Administrator of the Korea Meteorological Administration with respect to paragraph (2)4. <Amended on Oct. 1, 2025>
(4) The Minister of Climate, Energy and Environment may attach conditions or impose obligations necessary for the implementation of exploration, when granting exploration approval under paragraph (3). <Amended on Oct. 1, 2025>
(5) If a person who has been granted exploration approval under paragraph (1) (hereinafter referred to as "exploration right holder") falls under any of the following cases, the Minister of Climate, Energy and Environment may revoke such approval: <Amended on Oct. 1, 2025>
1. Where the person fails to fulfill the conditions attached or obligations imposed at the time of approval for exploration;
2. Where the person violates the exploration approval standards under paragraph (3).
(6) An exploration right holder shall submit exploration results to the Minister of Climate, Energy and Environment as prescribed by Presidential Decree within 3 years from the date the exploration approval is granted. <Amended on Oct. 1, 2025>
(7) The Minister of Climate, Energy and Environment may extend the period for the submission of exploration results once by up to 3 years, if an exploration right holder is unable to submit the exploration results within the period under paragraph (6) due to force majeure or falls under any reason prescribed by Presidential Decree. <Amended on Oct. 1, 2025>
(8) The procedures for exploration approval under paragraph (1), the procedures for revocation of exploration approval under paragraph (5), and other necessary matters shall be prescribed by Presidential Decree.
Article 14 (Selection of candidate storage sites) (1) The Minister of Climate, Energy and Environment and the Minister of Oceans and Fisheries may select the following sites as candidate sites for carbon dioxide storage (hereinafter referred to as "candidate storage sites"); in such cases, the Ministers may seek the opinions of the heads of relevant central administrative agencies in advance: <Amended on Oct. 1, 2025>
1. A site applied for as a candidate storage site by an exploration right holder who has submitted exploration results;
2. A mining area where the term of the mining right under Article 12 of the Mining Industry Act has expired or such right has otherwise been terminated;
3. A submarine mining concession area where the natural gas submarine mining concession right has been extinguished under Article 19(2) of the Submarine Mineral Resources Development Act;
4. A site recognized as suitable as a candidate storage site based on the results of a research project on storage site identification.
(2) A person who intends to file an application for the selection of a site specified in the subparagraphs of paragraph (1) as a candidate storage site shall submit the following documents to the Minister of Climate, Energy and Environment and the Minister of Oceans and Fisheries: <Amended on Oct. 1, 2025>
1. A map of the onshore or seabed area, specifying the area of the candidate storage site;
2. An exploration report and an evaluation report for the candidate storage site;
3. A safety and environmental assessment report for the candidate storage site;
4. A site suitability assessment report for the candidate storage site;
4. An assessment report on the crustal structure, fault distribution, and seismic characteristics of the exploration area;
6. Other documents prescribed by Presidential Decree.
(3) If a site is selected as a candidate storage site upon application by the relevant exploration right holder, the exploration right of such holder shall expire notwithstanding the continuation of the exploration period.
(4) Matters necessary for the standards, procedures, and other details for selecting candidate storage sites shall be prescribed by Presidential Decree.
Article 15 (Publication of candidate storage sites) (1) When the Minister of Climate, Energy and Environment and the Minister of Oceans and Fisheries select a candidate storage site under Article 14(1), they shall publicize the location of such selected site and other relevant details prescribed by Presidential Decree. <Amended on Oct. 1, 2025>
(2) Matters necessary for the methods, procedures, and other details for publication of candidate storage sites under paragraph (1) shall be prescribed by Presidential Decree.
Article 16 (Revocation of selection of candidate storage sites) (1) The Minister of Climate, Energy and Environment and the Minister of Oceans and Fisheries may revoke the selection of a candidate storage site designated under Article 14(1), in any of the following cases: <Amended on Oct. 1, 2025>
1. Where major unexpected geological or safety issues arise during construction related to the storage site;
2. Where significant defects in the storage project approval process under the main clause of Article 18(1) could cause substantial harm to the ecosystem;
3. Where permitting storage business under the main clause of Article 18(1) becomes impracticable due to a disaster or calamity.
(2) When the Minister of Climate, Energy and Environment and the Minister of Oceans and Fisheries revoke the selection of a candidate storage site under paragraph (1), they shall publicize such fact. <Amended on Oct. 1, 2025>
(3) Matters necessary for the revocation of the selection of candidate storage sites under paragraph (1) and the details, methods, and other relevant aspects of publication under paragraph (2) shall be prescribed by Presidential Decree.
Article 17 (Closure of storage sites) (1) The Minister of Climate, Energy and Environment may order the closure of a storage site in any of the following cases: <Amended on Oct. 1, 2025>
1. Where the storage capacity is saturated, making additional storage impracticable or ineffective;
2. Where the Minister of Climate, Energy and Environment decides to close a storage site, as prescribed by Presidential Decree, following a request for closure of such site by a person granted permission for storage business under the main clause of Article 18(1) (hereinafter referred to as "storage business entity");
3. Where the Minister of Climate, Energy and Environment deems it appropriate to close the storage site due to a natural disaster, leakage of stored carbon dioxide, or any other relevant reason;
4. Other cases where the closure of the storage facilities is necessary, as prescribed by Presidential Decree.
(2) The costs of closing a storage site under paragraph (1) shall be borne by the relevant storage business entity.
(3) Matters necessary for the issuance of an order to close storage sites under paragraph (1) and the procedures, methods, and other relevant measures for the closure of storage sites shall be prescribed by Presidential Decree.
(4) Upon completion of the closure of a storage site under paragraph (1), the relevant storage business entity shall immediately restore the site to its original state, including dismantling facilities installed for the storage business, in accordance with the standards and procedures prescribed by Presidential Decree.
(5) A storage business entity that has completed restoration under paragraph (4) shall obtain approval from the Minister of Climate, Energy and Environment, as prescribed by Presidential Decree. <Amended on Oct. 1, 2025>
CHAPTER V PERMISSION FOR STORAGE BUSINESS
Article 18 (Permission for storage business) (1) A person who intends to conduct storage business shall obtain permission from the Minister of Climate, Energy and Environment, as prescribed by Presidential Decree, and the same shall also apply to any modification of the permitted matters; provided, a person who intends to conduct storage business involving the storage of carbon dioxide streams in an offshore geological storage site shall obtain prior permission from the Minister of Oceans and Fisheries under Article 10(1) and (2) of the Management of Marine Debris and Contaminated Marine Sediment Act. <Amended on Oct. 1, 2025>
(2) An exploration right holder who files an application for storage business permission under the main clause of paragraph (1) for a storage site that the holder has explored shall be given priority.
(3) When filing an application for storage business under paragraph (1), the following documents shall be attached:
1. Matters regarding the procedures and methods for managing captured carbon dioxide at storage sites and related facilities;
2. Matters regarding the inspection, maintenance, and repair of storage sites and related facilities;
3. Matters regarding the management of the purity and compression state of the stored carbon dioxide;
4. Matters regarding the leakage and migration of stored carbon dioxide;
5. Matters regarding the disclosure of information related to the operation of storage sites and related facilities;
6. Other matters deemed necessary for the operation of storage sites and related facilities.
(4) The standards for granting permission for storage business under the main clause of paragraph (1) shall be as follows; in such cases, the details of the permission standards shall be prescribed by Presidential Decree:
1. The commencement or modification of storage business shall not hinder the prevention of disasters;
2. The applicant shall secure the financial resources and technical capabilities necessary to properly carry out the storage business;
3. The applicant shall have the capability to possess and maintain a storage site equipped with facilities suitable for stable storage and post-management of captured carbon dioxide.
(5) A storage business entity shall file a report on the use of the selected candidate storage site under Article 14(1) as a storage site with the Minister of Climate, Energy and Environment. <Amended on Oct. 1, 2025>
(6) Matters necessary for the procedures, methods, and other details for reporting under paragraph (5) shall be prescribed by Presidential Decree.
Article 19 (Grounds for disqualification for storage business entities) (5) None of the following persons shall be eligible to obtain permission for storage business:
1. A person under adult guardianship;
2. A person declared bankrupt and not yet reinstated;
3. A person for whom 2 years have not passed since the completion (including deemed completion) of, or exemption from, execution of imprisonment without labor, declared by a court for violation of Article 172, 172-2, 173, 173-2, 174 (excluding attempts under Article 164(1), 165, or 166 (1)), or 175 (excluding those who prepared or conspired to commit crimes under article 164 (1), 165, or 166 (1)) of the Criminal Act or this Act;
4. A person who is under suspension of the execution of imprisonment without labor or heavier punishment declared by a court for commiting a crime specified in subparagraph 3;
5. A corporation that has any of the persons specified in subparagraphs 1 through 4 as its representative.
Article 20 (Succession of business) (1) Any of the following persons who intends to succeed to the status of a storage business entity shall file a report with the Minister of Climate, Energy and Environment, as prescribed by Presidential Decree: <Amended on Oct. 1, 2025>
1. A transferee, if the storage business entity has transferred all or part of the business;
2. A surviving or newly established corporation, if a storage business entity has merged with another corporation.
(2) A person who has acquired all storage facilities of a storage business entity in accordance with any of the following procedures intends to succeed to the status of the previous storage business entity, the person shall file a report with the Minister of Climate, Energy and Environment, as prescribed by Presidential Decree. <Amended on Oct. 1, 2025>
1. Auction under the Civil Execution Act;
2. Realization under the Debtor Rehabilitation and Bankruptcy Act;
3. The sale of seized property under the National Tax Collection Act, the Customs Act, or the Local Tax Collection Act;
4. Other procedures corresponding to those specified in subparagraphs 1 through 3.
(3) In the event of the death of a storage business entity, the heir who intends to succeed to the status of such entity shall file a report with the Minister of Climate, Energy and Environment within 30 days from the date of death, as prescribed by Decree of the Ministry of Climate, Energy and Environment. <Amended on Oct. 1, 2025>
(4) Upon receipt of a report under paragraphs (1) through (3), the Minister of Climate, Energy and Environment shall review the details and accept the report if it complies with this Act; provided, if a person who intends to succeed to the status of a storage business entity falls under any ground for disqualification prescribed in Article 19, the report must not be accepted. <Amended on Oct. 1, 2025>
(5) If a report under paragraph (1) or (2) is accepted, the transferee, the newly established or surviving corporation resulting from a merger, or the person who has acquired all of the storage sites and related facilities of a storage business entity shall succeed to the status of the previous storage business entity from the date of such transfer, merger, or acquisition.
(6) When a report under paragraph (3) is accepted, the heir shall succeed to the status of the predecessor as a storage business entity, and permission for storage business granted to the predecessor shall be deemed such permission granted to the heir during the period from the date of death of the predecessor to the date of acceptance of the report.
Article 21 (Succession of disposition effects) If a person succeeds to the status of a storage business entity under Article 20, the effect of an order to suspend or restrict storage business under Article 23 (including a penalty surcharge imposed in lieu of an order to suspend business operations under Article 24) against the previous storage business entity shall succeed to the person who has succeeded to such status for 1 year from the expiration date of the disposition period, and if disposition procedures are in progress, such procedures may continue against the person who has succeeded to the status; provided, this shall not apply where the person who has succeeded to the status proves that such person was unaware of such disposition or violation at the time of succession.
Article 22 (Reporting on commencement of business) (1) If a storage business entity intends to commence storage business, such entity shall file a report with the Minister of Climate, Energy and Environment; provided, the entity intends to temporarily or permanently close all or part of storage business, the entity shall obtain permission from the Minister of Climate, Energy and Environment. <Amended on Oct. 1, 2025>
(7) Upon receipt of a report under the main clause of paragraph (1), the Minister of Climate, Energy and Environment shall review the details and accept the report if it complies with this Act. <Amended on Oct. 1, 2025>
(3) Necessary matters for the requirements, procedures, and other relevant details for reporting and permission under paragraph (1) shall be prescribed by Presidential Decree.
Article 23 (Revocation of permission for storage business) (1) The Minister of Climate, Energy and Environment may revoke permission granted to a storage business entity or order the suspension or restriction of the business operations for a fixed period of up to 6 months in any of the following cases; provided, the Minister shall revoke such permission in the case of subparagraph 1 or 3: <Amended on Oct. 1, 2025>
1. Where the business entity has obtained permission for storage business under the main clause of Article 18(1) by fraud or other improper means;
2. Where the business entity ceases to meet the permission standards under Article 18(4);
3. Where the business entity comes to fall under the grounds for disqualification for storage business permission under Article 19; provided, this shall not apply where an heir specified in any of subparagraphs 1 through 4 of Article 19 transfers the business to another person within 6 months from the date of death of the decedent, or where a corporation comes to fall under subparagraph 5 of that Article appoints a new representative within 3 months;
4. Where the business entity fails to obtain permission under the proviso of Article 22(1);
5. Where the business violates the obligations regarding the state of carbon dioxide to be stored under Article 27.
(2) The standards for the disposition for each violation under paragraph (1) shall be prescribed by Decree of the Ministry of Climate, Energy and Environment, taking into account the reaspn and degree of the violation. <Amended on Oct. 1, 2025>
Article 24 (Penalty surcharges) (1) The Minister of Climate, Energy and Environment may impose a penalty surcharge not exceeding 30 million won in lieu of an order to suspend business operations under Article 23. <Amended on Oct. 1, 2025>
(2) The Minister of Climate, Energy and Environment shall collect a penalty surcharge from a person obliged to pay such surcharge under paragraph (1) who fails to do so by the payment deadline, in the same manner as compulsory collection of national taxes. <Amended on Oct. 1, 2025>
(3) The types of violations subject to penalty surcharges under paragraph (1), the amounts of penalty surcharges based on the degree of violation, and other necessary matters shall be prescribed by Presidential Decree.
Article 25 (Formulation of monitoring plans) (1) A storage business entity shall formulate a monitoring plan for matters prescribed by Presidential Decree (hereinafter referred to as "monitoring plan") and obtain approval of such plan from the Minister of Climate, Energy and Environment before closing the relevant storage site. In such cases, the monitoring plan shall include post-closure monitoring for a period, prescribed by Presidential Decree, of at least 15 years after the closure of the storage site. <Amended on Oct. 1, 2025>
(2) If the Minister of Climate, Energy and Environment intends to approve a monitoring plan under paragraph (1), the Minister shall have a prior consultation with the heads of relevant central administrative agencies prescribed by Presidential Decree. <Amended on Oct. 1, 2025>
(3) A storage business entity shall regularly report to the Minister of Climate, Energy and Environment on the implementation of the relevant monitoring plan approved under paragraph (1). <Amended on Oct. 1, 2025>
(4) Matters necessary for the procedures for approval under paragraph (1), for reporting under paragraph (3), and for other relevant details, shall be prescribed by Presidential Decree.
Article 26 (Prohibited acts) No storage business entity that operates a storage site shall conduct any of the following acts: <Amended on Oct. 1, 2025>
1. Releasing carbon dioxide stored in the storage site without approval from the Minister of Climate, Energy and Environment;
2. Operating the storage site in a manner different from the monitoring plan approved under Article 25;
3. Other acts of modifying a storage site or monitoring facility for reasons other than those prescribed by Presidential Decree or failing to operate such site or facility normally without approval.
Article 27 (State of carbon dioxide to be stored) (1) A storage business entity must not include impurities prescribed by Presidential Decree in the carbon dioxide to be stored.
(2) A storage business entity shall inject and store carbon dioxide in a compressed state in accordance with the standards prescribed by Presidential Decree.
Article 28 (Operation of storage sites) (1) When operating a storage site and related facilities, a storage business entity shall take necessary measures, as prescribed by Presidential Decree, to prevent hazards and disasters to prevent hazards and disasters by ensuring that stored carbon dioxide does not leak.
(2) When a storage business entity becomes aware that stored carbon dioxide has leaked at or above the threshold prescribed by Presidential Decree, such entity shall notify the Minister of Climate, Energy and Environment without delay of the amount leaked, the time of leakage, the cause of leakage, and other relevant matters. <Amended on Oct. 1, 2025>
(3) Upon receipt of a leakage notification under paragraph (2), the Minister of Climate, Energy and Environment shall conduct an investigation as prescribed by Presidential Decree and report the causes and amount of a leakage to the National Climate Crisis Response Commission. <Amended on Oct. 1, 2025, Nov. 11, 2025>
(4) When a storage business entity intends to temporarily suspend the operation of a storage site, such entity shall obtain prior approval from the Minister of Climate, Energy and Environment, as prescribed by Presidential Decree. <Amended on Oct. 1, 2025>
(5) A storage business entity operating a storage site shall record and retain information regarding the operation of such facilities and other relevant details, as prescribed by Presidential Decree.
(6) A storage business entity shall undergo a periodic inspection conducted annually and an occasional inspection irregularly by the Minister of Climate, Energy and Environment with respect to the management of the relevant storage site. <Amended on Oct. 1, 2025>
(7) Matters necessary for the criteria, items, and methods for periodic inspections and occasional inspections under paragraph (6) shall be prescribed by Presidential Decree.
CHAPTER VI DESIGNATION AND OPERATION OF CARBON DIOXIDE CAPTURE, STORAGE, AND UTILIZATION CLUSTERS
Article 29 (Designation of carbon dioxide capture, storage, and utilization clusters) (1) The Minister of Climate, Energy and Environment may designate an area where CCUS-related enterprises and supporting facilities may collectively settle and generate mutual industrial synergies, as a carbon dioxide capture, storage, and utilization cluster (hereinafter referred to as “cluster”), upon application of the Special Metropolitan City Mayor, a Metropolitan City Mayor, a Special Self-Governing City Mayor, a Do Governor, or a Special Self-Governing Province Governor (hereinafter referred to as "Mayor/Do Governor"), for the development of the carbon dioxide capture, storage, and utilization industry. In such cases, the Minister may, in advance, seek the opinions of the heads of relevant central administrative agencies. <Amended on Oct. 1, 2025>
(2) A Mayor/Do Governor who intends to obtain the designation of a cluster shall formulate a cluster promotion plan that includes the following and file an application for such designation with the Minister of Climate, Energy and Environment: <Amended on Oct. 1, 2025>
1. The name, location, and area of the complex;
2. The necessity and expected effects of the designation of a cluster;
3. Measures for fostering the cluster;
4. Regulatory exemptions that apply to the cluster and their necessity and scope;
5. Other matters necessary for the application for the designation of a complex, etc., as prescribed by Presidential Decree.
(3) An enterprise, a public institution, or the head of a Si, Gun, or Gu (the head of a Gu refers to the head of an autonomous Gu) may propose a cluster fostering plan that contains the matters specified in the subparagraphs of paragraph (2) to the Mayor/Do Governor having jurisdiction over the relevant area.
(4) Upon receipt of an application for the designation of a cluster under paragraph (2), the Minister of Climate, Energy and Environment may designate a cluster after deliberation by the National Climate Crisis Response Commission. The same shall also apply to the modification of the designated complex. <Amended on Oct. 1, 2025; Nov. 11, 2025>
(5) When the Minister of Climate, Energy and Environment designates a cluster under paragraph (4), the Minister shall publicly notify the details, as prescribed by Presidential Decree. In such cases, Article 8 of the Framework Act on the Regulation of Land Use shall apply to the public notice of topographic maps and other relevant matters. <Amended on Oct. 1, 2025>
(6) Other matters necessary for the application, procedures, and other relevant details for the designation of clusters shall be prescribed by Presidential Decree.
Article 30 (Support for clusters) (1) The Government may conduct the following projects within a cluster and provide subsidies to cover the necessary expenses, and details related thereto shall be prescribed by Presidential Decree:
1. Installation and operation of facilities for capture and other similar purposes;
2. Installation and operation of industrial infrastructure and joint research and development infrastructure;
3. Other matters prescribed by Presidential Decree for the creation and activation of clusters.
(2) Except as provided in paragraph (1), matters necessary for the support of clusters shall be prescribed by Presidential Decree.
Article 31 (Revocation of designation of clusters) (1) A Mayor/Do Governor may file an application with the Minister of Climate, Energy and Environment for the revocation of the designation of a cluster under their jurisdiction, in any of the following cases: <Amended on Oct. 1, 2025>
1. Where the purpose of designating the cluster is or is expected to be unattainable;it is impractical or expected to be impractical to achieve ;
2. Where the application of regulatory exemptions or other similar measures within the cluster causes serious adverse effects;
3. Where any ground prescribed by Presidential Decree exists.
(2) Where the Minister of Climate, Energy and Environment receives an application pursuant to paragraph (1), the Minister shall cancel the designation of the integrated complex after deliberation by the National Climate Crisis Response Committee. <Amended by Act No. 2025-10-1, 2025-11-11>
(3) Even if a Mayor/Do Governor has not filed an application for revocation of the designation of the relevant cluster, the Minister of Climate, Energy and Environment may revoke such designation after deliberation by the National Climate Crisis Response Commission in any of the cases specified in subparagraphs of paragraph (1). <Amended on Oct. 1, 2025; Nov. 11, 2025>
(4) When the designation of a cluster is revoked under paragraphs (2) and (3), the details of such revocation shall be publicly notified.
(5) Except as provided in paragraphs (1) through (4), matters necessary for the revocation of the designation of clusters, such as the methods and procedures for filing an application for such revocation, shall be prescribed by Presidential Decree.
Article 32 (Evaluation of operation of clusters) (1) The Minister of Climate, Energy and Environment may conduct a periodic or occasional evaluation of the operation of clusters. <Amended on Oct. 1, 2025>
(2) If necessary for conducting an evaluation under paragraph (1), the Minister of Climate, Energy and Environment may request the heads of relevant central administrative agencies and the competent Mayor/Do Governor having jurisdiction over the cluster to submit relevant materials. In such cases, the heads and the Mayor/Do Governor shall comply with such request unless there a compelling reason not to do so. <Amended on Oct. 1, 2025>
(3) The Minister of Climate, Energy and Environment shall finalize the results of an evaluation under paragraph (1) following deliberation and resolution by the National Climate Crisis Response Commission and shall notify the results to the competent Mayor/Do Governor, who shall take improvement measures based on the results unless there is a compeling reason not to do so. <Amended on Oct. 1, 2025; Nov. 11, 2025>
(4) Except as provided in paragraphs (1) through (3), matters necessary for the standards, methods, procedures, and other details for the evaluation of the operation of clusters shall be prescribed by Presidential Decree.
CHAPTER VII DEVELOPMENT OF CCUS INDUSTRY
Article 33 (Special cases regarding supply of carbon dioxide supply) (1) A capture business entity may supply carbon dioxide to facilities and places of business for research, experiments, and demonstration for the utilization of carbon dioxide.
(2) If a capture business entity that supplies carbon dioxide under paragraph (1) is a controlled emitter under Article 27 of the Framework Act on Carbon Neutrality and Green Growth for Coping with Climate Crisis or an allocation target entity under Article 8 of the Act on the Allocation and Trading of Greenhouse Gas Emissions Permits, the emissions may be calculated in consideration of the amount supplied.
(3) Matters necessary for the calculation of emissions under paragraphs (1) and (2) shall be governed by the Act on the Allocation and Trading of Greenhouse-Gas Emission Permits.
Article 34 (Certification of carbon dioxide utilization technology and products) (1) The Minister of Science and ICT and the Minister of Climate, Energy and Environment may certify technologies and products that utilize captured carbon dioxide to promote the development and commercialization of such technologies and products. <Amended on Oct. 1, 2025>
(2) The Minister of Science and ICT and the Minister of Climate, Energy and Environment shall revoke the certification of technologies and products under paragraph (1), in any of the following cases: <Amended on Oct. 1, 2025>
1. Where the certification has been obtained by fraud or other improper means;
2. Where the certification is deemed inappropriate due to significant defects;
3. Where the certification is deemed to infringe the rights of others, including intellectual property rights.
(3) A person who has obtained certification under paragraph (1) may affix a certification mark on the relevant technologies and products, as prescribed by Joint Decree of the Ministry of Science and ICT and the Ministry of Climate, Energy and Environment. <Amended on Oct. 1, 2025>
(4) No certification marks under paragraph (3) or any similar marks shall be affixed on technologies and products that have not been certified under paragraph (1).
(5) Matters necessary for the standards, subjects, and procedures for certification under paragraph (1), the revocation procedures under paragraph (2), the certification marks under paragraph (3), other relevant details shall be prescribed by Presidential Decree.
Article 35 (Certification of specialized carbon dioxide utilization enterprises) (1) If necessary to promote the utilization of carbon dioxide, the Minister of Science and ICT may certify an enterprise that meets all of the following requirements, as a specialized carbon dioxide utilization enterprise and may provide necessary support therefor:
1. The enterprise’s investment in research and development, etc. related to carbon dioxide utilization technologies accounts for a proportion of total sales as prescribed by Presidential Decree;
2. The enterprise shall meet other requirements, such as technological level and management capability, as prescribed by Presidential Decree.
(2) An enterprise seeking support under this Act may file an application with the Minister of Science and ICT for certification of whether it qualifies as a specialized carbon dioxide utilization enterprise.
(3) When an enterprise that has filed an application under paragraph (2) qualifies as a specialized carbon dioxide utilization enterprise, the Minister of Science and ICT shall issue a certificate of the carbon dioxide utilization specialized enterprise with a validity period, as prescribed by Presidential Decree.
(4) The Minister of Science and ICT shall revoke the certification of a specialized carbon dioxide utilization enterprise under paragraph (1) in any of the following cases:
1. Where the enterprise has obtained certification by fraud or other improper means;
2. Where the enterprise is deemed unable to continue its business activities due to insolvency, temporary or permanent closure, or any other similar reason;
3. Where the enterprise ceases to meet the requirements specified in the subparagraphs of paragraph (1).
(5) The procedures and methods for certification and support under paragraph (1), the application and issuance of certificates under paragraphs (2) and (3), the procedures for revocation under paragraph (4), and other necessary matters for investigation and post-management regarding the certification and revocation of specialized carbon dioxide utilization enterprises shall be prescribed by Presidential Decree.
Article 36 (Support for research, development, and dissemination of CCUS-related technologies) (1) The Government may establish and implement development policy measures necessary for the research, development, and commercialization of CCUS-related technologies and may provide necessary support therefor.
(2) The Government may provide support necessary for joint research (including international joint research) among public institutions, corporations, organizations, and universities to enhance the outcomes of research and development of CCUS-related technologies.
(3) Other matters necessary for supporting the development of CCUS technologies and other relevant activities shall be prescribed by Presidential Decree.
Article 37 (Implementation of demonstration projects) (1) The heads of the relevant central administrative agencies may implement a demonstration project utilizing CCUS-related technologies if deemed necessary to promote the utilization and dissemination of technologies developed through research and development projects on CCUS-related technologies.
(2) A CCUS-related business entity and other similar entities that intend to participate in a demonstration project under paragraph (1) shall obtain approval from the heads of relevant central administrative agencies, as prescribed by Presidential Decree.
(3) The heads of the relevant central administrative agencies may provide financial, administrative, and technical support to a CCUS-related business entity, etc. that have obtained approval under paragraph (2) (hereafter in this Article and Article 38 referred to as "business entity, etc. participating in a demonstration project"), and Article 40 shall apply mutatis mutandis to matters necessary for support.
Article 38 (Special cases for demonstration projects) A participating entity, etc. shall be deemed to have obtained the following permission, approval, registration, or other similar dispositions:
1. Registration of manufacturing containers, refrigerators, and specified equipment under Article 5 of the High-Pressure Gas Safety Control Act;
2. Permission to occupy or use public waters under Article 8 of the Public Waters Management and Reclamation Act, and approval of an implementation plan for occupation and use under article 17 of the same act
Article 39 (Subsidies and loans) (1) If necessary to develop CCUS-related industries, the Government may provide relevant business entities with subsidies or loans to cover any of the following expenses, as prescribed by Presidential Decree:
1. Expenses for research and development and the training of professional human resources to enhance the safety and efficiency of CCUS-related projects;
2. Expenses for international cooperation and technology exchange necessary for CCUS-related projects;
3. Expenses for investment in and operation of CCUS-related facilities;
4. Expenses for investment in and operation of domestic and overseas storage sites;
5. Other expenses necessary for the promotion of CCUS and prescribed by Presidential Decree.
(2) The Government may provide necessary financial support to relevant business entities for the development of CCUS-related industries, as prescribed by Presidential Decree.
(3) The Government or local governments may provide necessary support to purchasers of products utilizing captured carbon dioxide. <Added on Dec. 2, 2025>
Article 40 (Investment of funds in CCUS projects) A person who operates any of the following funds may invest or contribute such funds to CCUS projects:
1. Special accounts for environmental improvement under Article 45 of the Framework Act on Environmental Policy;
2. The Climate Response Fund under Article 69 of the Framework Act on Carbon Neutrality and Green Growth for Coping with Climate Crisis;
3. Other funds prescribed by Presidential Decree that have been established for purposes equivalent to that of the Fund specified in subparagraph 2.
Article 41 (Development of professional human resources) (1) The Government may develop professional human resources necessary to promote the development of CCUS-related technologies and to revitalize the industry.
(2) For the purpose of training professional human resources under paragraph (1), the Government may designate and manage institutions or organizations equipped with appropriate facilities and personnel, such as universities and research institutes, as institutions for developing professional human resources.
(3) The Government may, within the budget and as prescribed by Presidential Decree, subsidize institutions for training professional human resources designated under paragraph (2) to cover the expenses incurred in such development.
(4) Matters necessary for the criteria and methods for the designation of institutions for developing professional human resources under paragraph (2) shall be prescribed by Presidential Decree.
Article 42 (Promotion of international cooperation) The Government may promote international cooperation for understanding international CCUS trends, securing overseas storage sites, and conducting other similar activities. In such cases, the Government may support projects such as the international exchange of CCUS-related technologies and experts and international joint research and development.
Article 43 (Standardization of technology) (1) The Government may promote the standardization of CCUS-related technologies to enhance their quality; provided, matters for which Korean Industrial Standards have been established under the Industrial Standardization Act shall follow such standards.
(2) The Government may recommend a capture business entity or storage business entity to use standards for CCUS-related technologies to promote standardization under paragraph (1).
(3) To efficiently perform tasks related to standardization under paragraph (1), the Government may designate a specialized institution or organization regarding CCUS-related technologies and have them conduct research, etc. for standardization and may fully or partially subsidize the relevant institution or organization to cover the necessary expenses.
(4) Matters necessary for designation, support, and other details under paragraph (3) shall be prescribed by Presidential Decree.
Article 44 (Establishment of Carbon Dioxide Capture, Storage, and Utilization Promotion Center) (1) To efficiently support the promotion of CCUS-related technology development and industries, the Minister of Climate, Energy and Environment may establish an institution or corporation that meets the requirements prescribed by Presidential Decree, such as professional human resources and facilities, as a promotion center for carbon dioxide capture, storage, and utilization (hereinafter referred to as "promotion center"). <Amended on Oct. 1, 2025>
(2) The Promotion Center shall conduct the following projects:
1. CCUS-related market research and analysis and the utilization of collected information;
2. Support for CCUS-related research and development projects;
3. Support for start-up and business management related to CCUS activities, and the collection and management of information thereon;
4. Projects entrusted by the heads of relevant central administrative agencies for fostering CCUS-rleated industries;
5. Projects for supporting the identification of CCUS-related new industries;
6. Support for professional human resources necessary for new product development and the discovery of new industries by small and medium enterprises related to CCUS activities;
7. Other projects prescribed by Presidential Decree that are necessary for promoting the development of new products or new industries related to CCUS activities.
(3) If necessary to perform the projects specified in the subparagraphs of paragraph (2), the Promotion Center may request universities, institutions, or organizations prescribed by Presidential Decree to dispatch their researchers, experts, other similar personnel.
(4) The heads of relevant central administrative agencies may fully or partially subsidize the Promotion Center to perform the projects specified in the subparagraphs of paragraph (2) within the budget.
(5) The head of a university, institution, or organization that dispatches its researchers, experts, or other similar personnel under paragraph (3) must not impose any disadvantages with respect to their status or remuneration on such dispatched personnel.
(6) Other matters necessary for the establishment and operation of a promotion center shall be prescribed by Presidential Decree.
CHAPTER VIII SUPPLEMENTARY PROVISIONS
Article 45 (Establishment and operation of public monitoring system) (1) The heads of relevant central administrative agencies may establish and operate a public monitoring system regarding CCUS (hereinafter referred to as "public monitoring") separately from monitoring planS of storage business entities under Article 25.
(2) The heads of relevant central administrative agencies may designate a dedicated institution (hereinafter referred to as "dedicated institution"), as prescribed by Presidential Decree, for the establishment and operation of the public monitoring system.
(3) Except as provided in paragraphs (1) and (2), matters necessary for the establishment and operation of the public monitoring system, the details to be included in the public monitoring result report, the submission cycle, and other relevant details shall be prescribed by Presidential Decree.
Article 46 (Disclosure of monitoring results) (1) The Government shall disclose the results of monitoring conducted by a storage business entity under Article 25 and the results of public monitoring under Article 45.
(2) The dedicated institution shall submit an annual public monitoring result report to the heads of relevant central administrative agencies and the National Climate Crisis Response Commission. <Amended on Nov. 11, 2025>
(3) Matters necessary for the details, methods, and other related requirements of the disclosure of the monitoring results under paragraph (1) shall be prescribed by Presidential Decree.
Article 47 (Reporting and inspection) (1) If deemed necessary for the safe and efficient management of CCUS, the heads of relevant central administrative agencies may require an exploration right holder, a pipeline installation and operation entity, a storage business entity, and an enterprise certified for technology or products under Article 34 to file a report or submit materials, as prescribed by Presidential Decree, and may authorize relevant public officials to enter offices, places of business, or other related sites and inspect relevant documents, facilities, equipment, and other related articles.
(2) When conducting an inspection under paragraph (1), the relevant inspection plan including the date and time, reasons, details, other related information of the inspection shall be notified to a person subject to the inspection at least 7 days prior to the inspection; provided, this shall not apply if the inspection is urgent or if it is deemed that the purpose of the inspection cannot be achieved due to destruction of evidence or similar reasons.
(3) A public official who accesses and conducts an inspection pursuant to paragraph (1) shall carry an identification verifying his or her authority and show it to interested parties.
Article 48 (Issuing orders to take measures to storage business entities) (1) If it is deemed that nonfulfillment of the obligations prescribed by this Act by an exploration right holder, a pipeline operator, a storage business entity, or a dedicated institution may cause significant hindrance to CCUS, the Minister of Climate, Energy and Environment may order the relevant entity to take corrective actions and other necessary measures within a specified period, as prescribed by Presidential Decree. <Amended on Oct. 1, 2025>
(2) To issue an order under paragraph (1), the Minister of Climate, Energy and Environment shall provide prior notification of the reasons for such order to the relevant exploration right holder, pipeline operator, storage business entity, or dedicated institution and shall give them an opportunity to submit opinions and evidence; provided, if it is urgent for the safe management of captured carbon dioxide or storage facilities, an opportunity to submit opinions and evidence may be afforded after the order is issued.
Article 49 (Hearings) The heads of relevant central administrative agencies shall hold a hearing before imposing any of the following dispositions:
1. Revocation of approval for exploration under Article 13(5);
2. Revocation of the selection of a storage candidate site under Article 16(1);
3. Revocation of permission for storage business under Article 23(1);
4. Revocation of the certification of technology and products under Article 34(2);
5. Revocation of the certification of a specialized carbon dioxide utilization enterprise under Article 35(4).
Article 50 (Delegation of authority and entrustment of tasks) (1) Part of the authority of the head of a central administrative agency under this Act may be delegated to the relevant Mayor/Do Governor, as prescribed by Presidential Decree.
(2) Part of the tasks of the head of a central administrative agency under this Act may be entrusted to the competent Mayor/Do Governor, as prescribed by Presidential Decree.
(3) A Mayor/Do Governor delegated with the authority of the head of a central administrative agency under paragraph (1) and an institution or organization entrusted with the tasks of such head under paragraph (2) shall notify the head of the results of the delegated or entrusted tasks.
(4) The head of a central administrative agency may subsidize an institution or organization entrusted with tasks under paragraph (2) to cover the expenses incurred in performing the tasks.
Article 51 (Legal fiction as public officials for purposes of applying penalty provisions) The executive officers and employees of a institution or organization entrusted with tasks under Article 50(2) shall be deemed public officials for purposes of applying penalty provisions under Articles 129 through 132 of the Criminal Act.
CHAPTER IX PENALTY PROVISIONS
Article 52 (Penalty provisions) (1) A person who damages or removes carbon dioxide capture facilities, transport facilities, storage facilities, or related facilities, or interferes with their functions and thereby obstructs CCUS, shall be punished by imprisonment with labor for not more than 5 years or by a fine not exceeding 100 million won.
(2) Any of the following persons shall be punished by imprisonment without labor of up to 3 years or by a fine not exceeding 30 million won:
1. A person who installs and operates a capture facility without filing a report under Article 7(1) or filing a report on modification under paragraph (3) of that Article;
2. A person who conducts transport business without obtaining approval under the main clause of Article 8(1);
3. A person who installs and operates a carbon dioxide transport pipeline without obtaining approval of the safety management regulations or approval for modification of such regulations under Article 9(1);
4. A person who violates the obligation to comply with the safety management regulations under Article 9(2);
5. A person who fails to appoint a safety manager, in violation of Article 10(1);
6. A person who conducts storage business without obtaining permission or permission for modification, in violation of the main clause of Article 18(1);
7. A person who commits any of the prohibited acts specified in the subparagraphs of Article 26;
8. A person who fails to take necessary measures, in violation of Article 28(1).
(3) Any of the following persons shall be punished by imprisonment with labor for up to 1 year or by a fine not exceeding 10 million won, or shall be punished by both:
1. A person who refuses, obstructs, or evades a safety inspection under Article 11(1);
2. A person who has conducted exploration without obtaining exploration approval under Article 13(1);
3. A person who uses a storage site without filing a report under Article 18(5);
4. A person who temporarily or permanently closes business without obtaining permission under the proviso of Article 22(1);
5. A person who obtains certification of technologies and products under Article 34(1) by fraud or improper means;
6. A person who obtains certification of a specialized carbon dioxide utilization enterprise under Article 35 by fraud or improper means;
7. A person who fails to comply with an order to take measures under Article 48(1).
(4) Any of the following persons shall be punished by a fine of up to 20 million won:
1. A person who commits any of the acts specified in Article 23(1)1 through 4;
2. A person who participates in a demonstration project without obtaining approval under Article 37(2).
Article 53 (Joint penalty provision) If the representative of a corporation or an agent or employee of, or any other person employed by, the corporation commits any violation described in Article 52 in conducting the business affairs of the corporation, the corporation shall be punished by a fine prescribed in that Article in addition to punishing the violator accordingly; provided, this shall not apply if the corporation has not been negligent in giving due attention and supervision in connection with the relevant business affairs to prevent such violation.
Article 54 (Administrative fines) (1) Any of the following persons shall be subject to an administrative fine of up to 30 million won:
1. A person who has commenced storage business without filing a report under the main clause of Article 22(1);
2. A person who has failed to obtain approval of a monitoring plan under Article 25(1);
3. A person who affixes a certification mark or any similar mark to technologies or products without obtaining certification, in violation of Article 34(4);
(2) Any of the following persons shall be subject to an administrative fine not exceeding 5 million won:
1. A person who refuses, obstructs, or evades an inspection of compliance with the safety management regulations under Article 9(3);
2. A person who fails to file a report on the appointment of a safety manager under Article 10(1) or who files a false report;
3. A person who fails to file a report on succession to the status of a storage business entity under Article 20(1) through (3) or who files a false report;
4. A person who fails to provide leakage-related notification, in violation of Article 28(2);
5. A person who refuses, obstructs, or evades entry or an inspection under Article 47(1).
(3) An administrative fine under paragraphs (1) and (2) shall be imposed and collected by the heads of relevant central administrative agencies, as prescribed by Presidential Decree.
20240206
20203
ADDENDA <Act No. 20203, Feb. 6, 2024>
Article 1 (Enforcement date)
This Act shall enter into force one year after the date of its promulgation.
Article 2 (Transitional measures regarding permission for submarine underground storage)
Any person who obtained permission for the storage of carbon dioxide streams in a marine geological structure under the Management of Marine Debris and Contaminated Marine Sediment Act before this Act enters into force shall be deemed to have obtained permission for storage business under this Act.
20251001
21065
ADDENDA <Act No. 21065, Oct. 1, 2025>
Article 1 (Enforcement date)
This Act shall enter into force on the date of its promulgation; provided, the amendments to the statutes to be amended under Article 7 of the Addenda, which were promulgated before this Act enters into force but the enforcement dates of which have yet to arrive, shall enter into force ... <omitted> ... on the enforcement date of the relevant statute.
1. and 2. Omitted.
Articles 2 through 6 Omitted.
Article 7 Omitted.
Article 8 Omitted.
20251111
21122
ADDENDA <Act No. 21122, Nov. 11, 2025>
Article 1 (Enforcement date)
This Act shall enter into force 6 months after the date of its promulgation; provided, the following amended provisions shall enter into force on the date specified in the relevant subparagraph:
1. and 2. Omitted.
3. Statutes to be amended under Article 6: January 1, 2026;
4. Omitted.
Articles 2 through 5 Omitted.
Article 6 Omitted.
20251202
21150
ADDENDUM <Act No. 21150, Dec. 2, 2025>
This Act shall enter into force on the date of its promulgation.