Act on the Promotion of and Support for Water Circulation
276735 · 2026-01-02
ACT ON THE PROMOTION OF AND SUPPORT FOR WATER CIRCULATION
CHAPTER I GENERAL PROVISIONS
Article 1 (Purpose)
The purpose of this Act is to establish a sound water circulation system by implementing integrated water management policies to effectively respond to water shortages, deterioration of water quality, changes in aquatic ecosystems, and disasters such as droughts and floods caused by climate change and urbanization.
Article 2 (Definitions)
The terms used in this Act are defined as follows:
1. "Water circulation" means water circulation under Article 3, subparagraph 1 of the Framework Act on Water Management.
2. "Water circulation promotion" means inducing the following matters to proceed in a sound manner during water circulation:
(a) Supplying clean and safe drinking water;
(b) Conserving and managing aquatic ecosystems and improving water quality;
(c) Preventing disasters caused by droughts, floods, etc.;
(d) Improving water circulation systems, including the infiltration and storage of precipitation;
(e) Recycling water, including the reuse of sewage and installation of intermediate water supply systems.
3. "Water circulation facilities" means the following facilities installed to promote water circulation:
(a) Water reuse facilities under Article 2, subparagraph 2 of the Act on the Promotion of and Support for Water Reuse;
(b) Water pollution prevention facilities under Article 2, subparagraph 12 of the Water Environment Conservation Act;
(c) Water supply systems under Article 3, subparagraph 5 of the Water Supply and Waterworks Installation Act;
(d) Water resources facilities under Article 2, subparagraph 4 of the Act on the Investigation, Planning and Management of Water Resources;
(e) Groundwater development and utilization facilities under Article 2, subparagraph 4 of the Groundwater Act and discharged groundwater utilization facilities under subparagraph 4-2 of the same Article;
(f) Sewerage systems under Article 2, subparagraph 3 of the Sewerage Act;
(g) River facilities under Article 2, subparagraph 3 of the River Act;
(h) Other facilities prescribed by Presidential Decree as necessary for the promotion of water circulation.
4. "Water circulation promotion zone" means an area designated and publicly notified under Article 6 for concentrated implementation of water circulation promotion policies, projects, etc., because promoting water circulation in the area is urgent or is expected to have a substantial ripple effect.
5. "Water circulation promotion project" means a project implemented in a water circulation promotion zone under water circulation promotion policies or plans prescribed by this Act, including the installation or improvement of water circulation facilities.
Article 3 (Responsibilities of the State, local governments, etc.)
① The State shall formulate and implement comprehensive policies to promote water circulation so as to establish a sustainable water utilization system and enable both nature and people to enjoy the benefits of water equitably.
② Each local government having jurisdiction over a water circulation promotion zone shall formulate and implement detailed water circulation promotion policies in consideration of the social and environmental characteristics of its jurisdiction.
③ Citizens shall actively participate in and cooperate with policies for promoting water circulation implemented by the State or local governments.
Article 4 (Establishment of national basic policy for water circulation promotion)
① The Minister of Climate, Energy and Environment shall establish every ten years a national strategy and basic policy for comprehensively and systematically promoting water circulation (hereinafter referred to as the "national basic policy for water circulation promotion"). <Amended on 2025.10.1>
② The national basic policy for water circulation promotion shall conform to the national master plan for water management under Article 27 (1) of the Framework Act on Water Management.
③ The national basic policy for water circulation promotion shall include the following matters:
1. The significance and objectives of water circulation promotion;
2. Water circulation promotion policies on which the State shall place priority;
3. Basic directions and principles for establishing a comprehensive plan for water circulation promotion under Article 8 and preparing an implementation plan for water circulation promotion projects under Article 16;
4. Other matters prescribed by Presidential Decree as necessary for water circulation promotion.
④ When five years have passed since the national basic policy for water circulation promotion was established or when the Minister of Climate, Energy and Environment deems it necessary to amend that policy, the Minister may review its validity and amend it. <Amended on 2025.10.1>
⑤ To establish or amend the national basic policy for water circulation promotion, the Minister of Climate, Energy and Environment shall consult with the heads of relevant central administrative agencies and the chairpersons of river basin water management committees under Article 23 of the Framework Act on Water Management (hereinafter referred to as "river basin water management committees"), collect the opinions of the Special Metropolitan Mayor, Metropolitan Mayors, Special Self-Governing City Mayors, Do Governors, and Special Self-Governing Province Governors (hereinafter referred to as "Mayors/Do Governors"), and undergo deliberation by the National Water Management Committee under Article 22 of the same Act (hereinafter referred to as the "National Water Management Committee"): Provided, That this shall not apply to amendments to minor matters prescribed by Presidential Decree. <Amended on 2025.10.1>
⑥ Upon establishing or amending the national basic policy for water circulation promotion, the Minister of Climate, Energy and Environment shall notify the heads of relevant central administrative agencies and the Mayors/Do Governors thereof and publicly announce the policy as prescribed by Presidential Decree. <Amended on 2025.10.1>
⑦ Other matters necessary for procedures for establishing the national basic policy for water circulation promotion shall be prescribed by Presidential Decree.
Article 5 (Relationship with other Acts)
Chapter II (Articles 6 through 18) and Articles 28 and 29 of this Act, which prescribe matters concerning the implementation of water circulation promotion projects, shall prevail over other Acts.
CHAPTER II IMPLEMENTATION OF WATER CIRCULATION PROMOTION PROJECTS
Article 6 (Designation of water circulation promotion zones)
① When intending to implement a water circulation promotion project in any of the following areas, the Minister of Climate, Energy and Environment may designate the area as a water circulation promotion zone either directly or upon receiving a proposal under Article 7: <Amended on 2025.10.1>
1. An area meeting the criteria prescribed by Presidential Decree in which water circulation is substantially distorted or vulnerability in water management is severe;
2. An area where stable water supply is disrupted due to a shortage of water resources, etc., or where damage has occurred due to droughts, floods, etc.
② In designating a water circulation promotion zone under paragraph ①, the Minister of Climate, Energy and Environment shall consider the following matters: <Amended on 2025.10.1>
1. Whether the designation conforms to the national master plan for water management under Article 27 of the Framework Act on Water Management;
2. Whether social and economic benefits will arise from implementing the water circulation promotion project;
3. Whether the public necessity of the project is balanced against interests infringed upon by its implementation;
4. Whether implementing the project is unlikely to cause disputes concerning the development, utilization, management, etc. of water resources;
5. Whether financing and investment plans for implementing the project are feasible;
6. Whether other requirements prescribed by Presidential Decree are satisfied.
③ When intending to designate or alter a water circulation promotion zone, the Minister of Climate, Energy and Environment shall consult in advance with the heads of relevant central administrative agencies and collect the opinions of the Mayors/Do Governors and the heads of Si/Gun/Gu (meaning the heads of autonomous Gus; hereinafter the same) having jurisdiction over the relevant zone. <Amended on 2025.10.1>
④ When intending to designate a water circulation promotion zone or change important matters prescribed by Presidential Decree, the Minister of Climate, Energy and Environment shall undergo deliberation by the relevant river basin water management committee. <Amended on 2025.10.1>
⑤ Where the grounds for designating a water circulation promotion zone cease to exist or the necessity for maintaining the designation has substantially diminished, or in other circumstances where cancellation of the designation is deemed necessary, the Minister of Climate, Energy and Environment may cancel the designation. <Amended on 2025.10.1>
⑥ Where necessary to designate, alter, or cancel a water circulation promotion zone, the Minister of Climate, Energy and Environment may request the heads of relevant central administrative agencies, Mayors/Do Governors, heads of Si/Gun/Gu, heads of institutions or organizations, etc. to provide necessary data or information. A person receiving such a request shall comply unless there is a compelling reason not to do so. <Amended on 2025.10.1>
⑦ Upon designating, altering, or canceling a water circulation promotion zone, the Minister of Climate, Energy and Environment shall notify the heads of relevant central administrative agencies, Mayors/Do Governors, and heads of Si/Gun/Gu thereof and publicly notify the designation, alteration, or cancellation as prescribed by Presidential Decree. <Amended on 2025.10.1>
⑧ Detailed criteria, procedures, and other necessary matters for designation, alteration, and cancellation of water circulation promotion zones under paragraphs ① through ⑦ shall be prescribed by Presidential Decree.
Article 7 (Proposals for designation or alteration of water circulation promotion zones)
① A Mayor/Do Governor or head of a Si/Gun/Gu may propose to the Minister of Climate, Energy and Environment that a water circulation promotion zone be designated or altered. Where the proposed zone extends across two or more Special Metropolitan Cities, Metropolitan Cities, Special Self-Governing Cities, Dos, Special Self-Governing Provinces, or Sis/Guns/Gus (meaning autonomous Gus), the relevant Mayors/Do Governors or heads of Sis/Guns/Gus shall submit a joint proposal. <Amended on 2025.10.1>
② Before requesting the designation of a water circulation promotion zone under paragraph ①, the Mayor/Do Governor or head of a Si/Gun/Gu shall collect opinions from residents, relevant experts, etc., as prescribed by Presidential Decree.
③ Matters necessary for proposals to designate or alter water circulation promotion zones under paragraph ①, processing such proposals, and related procedures shall be prescribed by Presidential Decree.
Article 8 (Establishment of comprehensive plans for water circulation promotion)
① The Minister of Climate, Energy and Environment may establish a comprehensive plan to promote and continually manage water circulation in a water circulation promotion zone designated under Article 6 in accordance with the national basic policy for water circulation promotion (hereinafter referred to as a "comprehensive plan for water circulation promotion"): Provided, That where a master plan for a specified urban river has been established and publicly notified in the water circulation promotion zone under Article 6 (1) and (4) of the Act on Countermeasures against Flood Damage in Urban River Basins, the comprehensive plan for water circulation promotion shall be established excluding flood prevention facilities under Article 2, subparagraph 5 of the same Act. <Amended on 2025.10.1>
② A comprehensive plan for water circulation promotion shall include the following matters:
1. Comprehensive implementation objectives and basic directions;
2. An overall project implementation plan, including:
(a) Details and duration of the project;
(b) Project costs and a financing plan;
(c) An annual project implementation plan;
3. Expected effects;
4. Areas subject to restrictions on acts under Article 11;
5. Other matters prescribed by Presidential Decree.
③ To establish or amend a comprehensive plan for water circulation promotion, the Minister of Climate, Energy and Environment shall request in advance that the heads of relevant central administrative agencies, Mayors/Do Governors, and heads of Sis/Guns/Gus submit plans within their respective jurisdictions concerning policies and projects to be reflected in the comprehensive plan and data prescribed by Presidential Decree, and shall hear the opinions of local residents, relevant experts, etc. <Amended on 2025.10.1>
④ Where five years have passed since the establishment of a comprehensive plan for water circulation promotion or the Minister of Climate, Energy and Environment deems amendment necessary, the Minister may review its validity and amend the plan. <Amended on 2025.10.1>
⑤ When intending to establish or amend a comprehensive plan for water circulation promotion based on the plans and data submitted under paragraph ③, the Minister of Climate, Energy and Environment shall consult with the heads of relevant central administrative agencies, Mayors/Do Governors, and heads of Sis/Guns/Gus and then undergo deliberation by the relevant river basin water management committee: Provided, That this shall not apply to amendments to minor matters prescribed by Presidential Decree. <Amended on 2025.10.1>
⑥ Upon establishing or amending a comprehensive plan for water circulation promotion, the Minister of Climate, Energy and Environment shall notify the heads of relevant central administrative agencies, Mayors/Do Governors, and heads of Sis/Guns/Gus thereof and publicly notify it as prescribed by Presidential Decree. <Amended on 2025.10.1>
⑦ When the Minister of Climate, Energy and Environment establishes or amends a comprehensive plan for water circulation promotion, the following plans or measures shall be deemed amended accordingly; and upon public notification of the comprehensive plan under paragraph ⑥, public notification or announcement of the amendment of the relevant plan or measure shall be deemed made: <Amended on 2025.10.1>
1. The master plan for water reuse under Article 5 and the water reuse management plan under Article 6 of the Act on the Promotion of and Support for Water Reuse;
2. The master plan for total pollution load management under Article 4-3, the implementation plan for total pollution load management under Article 4-4, the national master plan for water environment management and the water environment management plans for each water-system impact area under Articles 23-2 and 24 through 26, the aquatic ecosystem restoration plan under Article 27-2, the master plan for public wastewater treatment facilities under Article 49, and the comprehensive countermeasures for managing non-point pollution sources under Article 53-5 of the Water Environment Conservation Act;
3. The national water supply master plan under Article 4, the waterworks improvement plan under Article 5, comprehensive and implementation plans under Article 6, and the water quality management plan for water source protection areas under Article 8-2 (1) of the Water Supply and Waterworks Installation Act;
4. The long-term comprehensive water resources plan under Article 17, the water resources management plan for river basins under Article 18, the regional water resources management plan under Article 19, and the flood control plan for specified river basins under Article 20 of the Act on the Investigation, Planning and Management of Water Resources;
5. The groundwater management master plan under Article 6 and the regional groundwater management plan under Article 6-2 of the Groundwater Act;
6. The national comprehensive sewerage plan under Article 4, the river basin sewerage improvement plan under Article 4-2, and the sewerage improvement master plan under Article 6 of the Sewerage Act;
7. The river master plan under Article 25 of the River Act.
Article 9 (Effect of comprehensive plans for water circulation promotion)
① A comprehensive plan for water circulation promotion shall take effect on the date it is publicly notified under Article 8 (6).
② A person who commenced a project or construction work before the date on which a comprehensive plan for water circulation promotion was publicly notified (where permission, authorization, approval, etc. is required under another Act, a person who commenced the project or construction work after obtaining such permission, authorization, approval, etc.) may continue the project or construction work notwithstanding the public notification of the comprehensive plan.
Article 10 (Loss of effect of comprehensive plans for water circulation promotion)
① Where an implementer of a water circulation promotion project fails to request approval of an implementation plan under Article 16 by the third anniversary of the date of public notification of the comprehensive plan for water circulation promotion, or the Minister of Climate, Energy and Environment deems the objectives for establishing that plan unattainable, the Minister may revoke the plan after consulting with the heads of relevant central administrative agencies, Mayors/Do Governors, heads of Sis/Guns/Gus, and the chairperson of the relevant river basin water management committee. <Amended on 2025.10.1>
② Upon revoking a comprehensive plan for water circulation promotion under paragraph ①, the Minister of Climate, Energy and Environment shall notify the heads of relevant central administrative agencies, Mayors/Do Governors, and heads of Sis/Guns/Gus thereof and publicly notify the revocation as prescribed by Presidential Decree. <Amended on 2025.10.1>
Article 11 (Restrictions on acts)
From the date a comprehensive plan for water circulation promotion is publicly notified under Article 8 (6), a person who intends to conduct any act prescribed by Presidential Decree, including constructing buildings, installing structures, changing the form and quality of land, extracting soil and stones, subdividing land, or stacking objects in a water circulation promotion zone under Article 8 (2) 4 in a manner not conforming to the comprehensive plan shall obtain permission from the head of the local government having jurisdiction. The same shall apply where a person intends to change any matter for which permission has been obtained.
Article 12 (Fact-finding surveys)
① The Minister of Climate, Energy and Environment may conduct fact-finding surveys on the state of water circulation, the status of water circulation facilities, etc. for the efficient establishment and implementation of the national basic policy for water circulation promotion and comprehensive plans for water circulation promotion. <Amended on 2025.10.1>
② Where necessary to conduct a fact-finding survey under paragraph ①, the Minister of Climate, Energy and Environment may request the heads of relevant central administrative agencies, heads of local governments, or relevant corporations or organizations to submit related data. A person requested to submit data shall comply unless there is a compelling reason not to do so. <Amended on 2025.10.1>
③ The scope, procedures, methods, and other necessary matters concerning fact-finding surveys shall be prescribed by Presidential Decree.
Article 13 (Evaluation of comprehensive plans for water circulation promotion)
① The Minister of Climate, Energy and Environment shall evaluate the performance in implementing comprehensive plans for water circulation promotion and publicly disclose the results. <Amended on 2025.10.1>
② Criteria, periods, procedures, and methods for evaluation under paragraph ①, the scope and methods of disclosure of the results, and other necessary matters shall be prescribed by Presidential Decree.
Article 14 (Implementation of water circulation promotion projects)
① Matters concerning the implementation of water circulation promotion projects not provided for in this Act shall be governed by the relevant Acts prescribing those matters.
② Where a project for installing or improving water circulation facilities that is already underway or whose implementation has been finalized in a water circulation promotion zone before public notification of a comprehensive plan for water circulation promotion is included in that plan, such project shall be deemed a water circulation promotion project under this Act.
Article 15 (Implementers of water circulation promotion projects)
① Unless otherwise expressly prescribed by another Act regarding persons who implement water circulation promotion projects by installing, improving, operating, or managing water circulation facilities in water circulation promotion zones (hereinafter referred to as "project implementers"), the Minister of Climate, Energy and Environment may designate a project implementer from among the following entities: <Amended on 2025.10.1>
1. The State or a local government;
2. An entity prescribed by Presidential Decree from among public institutions under the Act on the Management of Public Institutions;
3. A local public enterprise established under the Local Public Enterprises Act.
② For a project deemed a water circulation promotion project under Article 14 (2), the person installing, improving, operating, or managing the relevant water circulation facilities shall be deemed the project implementer under paragraph ①.
Article 16 (Establishment of implementation plans for water circulation promotion projects)
① To implement a water circulation promotion project in a water circulation promotion zone, a project implementer shall prepare an implementation plan for the water circulation promotion project (hereinafter referred to as an "implementation plan") containing the following matters and request approval thereof from the Minister of Climate, Energy and Environment. The same shall apply to amendments to an implementation plan. <Amended on 2025.10.1>
1. Name, purpose, and necessity of the project;
2. Name and address of the project implementer (for a corporation, the name of the corporation and the name of its representative);
3. Location and area of the project site (including a location map), project cost, and project implementation period;
4. Outline of installation plans and operation and management plans for each water circulation facility;
5. An environmental conservation plan and a pollution prevention plan;
6. A financing plan and an annual investment plan;
7. A plan for dividing or combining water circulation promotion zones where necessary;
8. Matters concerning the expected effects of the project;
9. Other matters prescribed by Presidential Decree as necessary for project implementation.
② Before approving an implementation plan under paragraph ①, the Minister of Climate, Energy and Environment shall consult with the heads of relevant administrative agencies: Provided, That this shall not apply to amendments to minor matters prescribed by Presidential Decree. <Amended on 2025.10.1>
③ Upon approving an implementation plan under paragraph ①, the Minister of Climate, Energy and Environment shall notify the heads of relevant administrative agencies of its details and publicly notify the approval as prescribed by Presidential Decree. <Amended on 2025.10.1>
④ Procedures and methods for preparing and approving implementation plans under paragraphs ① through ③ and other necessary matters shall be prescribed by Ordinance of the Ministry of Climate, Energy and Environment. <Amended on 2025.10.1>
Article 17 (Legal fiction of authorization, permission, etc.)
① When the Minister of Climate, Energy and Environment approves or approves amendments to an implementation plan under Article 16 (1), any permission, approval, deliberation, authorization, report, license, consultation, designation, cancellation, disposition, etc. under the attached Table (hereinafter referred to as "authorization and permission, etc.") for which prior consultation has been conducted with the head of the relevant administrative agency shall be deemed obtained; and when the implementation plan is publicly notified under paragraph (3) of the same Article, the public notice or announcement of authorization and permission, etc. under the relevant Acts shall be deemed made. <Amended on 2025.10.1>
② Where authorization and permission, etc. under other Acts are deemed obtained under paragraph ①, license taxes and fees imposed under the relevant statutes shall be exempted.
③ Except as provided in paragraphs ① and ②, Articles 24 through 26 of the Framework Act on Administration shall apply mutatis mutandis to the standards and effects of the legal fiction under this Article.
Article 18 (General managers of water circulation promotion projects)
① To systematically and efficiently implement water circulation promotion projects, the Minister of Climate, Energy and Environment may designate one of the following entities as a general manager of water circulation promotion projects (hereinafter referred to as a "general project manager") for each water circulation promotion zone: <Amended on 2025.10.1>
1. The State or a local government;
2. An entity prescribed by Presidential Decree from among public institutions under the Act on the Management of Public Institutions;
3. A local public enterprise established under the Local Public Enterprises Act.
② The Minister of Climate, Energy and Environment may authorize or entrust a general project manager designated under paragraph ① to perform all or part of the following duties on the Minister's behalf: <Amended on 2025.10.1>
1. Duties related to reviewing the establishment or amendment of implementation plans;
2. Business feasibility analysis for water circulation promotion projects and overall management of designs and construction processes;
3. Overall management of implementation, operation, and maintenance of water circulation promotion projects;
4. Interim evaluations of water circulation promotion projects;
5. Other duties prescribed by Presidential Decree.
③ Where necessary to perform duties under paragraph ②, a general project manager may request cooperation from a project implementer, who shall comply unless there is a compelling reason not to do so.
CHAPTER III ESTABLISHMENT OF INFRASTRUCTURE FOR WATER CIRCULATION PROMOTION
Article 19 (Designation and operation of water circulation promotion support centers)
① The Minister of Climate, Energy and Environment may designate and operate a water circulation promotion support center to perform the following duties: <Amended on 2025.10.1>
1. Surveys and research for the development of systems relating to water circulation promotion;
2. Support for the establishment of the national basic policy for water circulation promotion, comprehensive plans for water circulation promotion, and implementation plans;
3. Support for implementing, operating, and managing water circulation promotion projects;
4. Other duties determined by the Minister of Climate, Energy and Environment.
② Matters necessary for designating and operating water circulation promotion support centers shall be determined and publicly notified by the Minister of Climate, Energy and Environment. <Amended on 2025.10.1>
Article 20 (Establishment and operation of water circulation information systems)
① The Minister of Climate, Energy and Environment may establish and operate an information system for efficiently managing and utilizing data or information relating to water circulation promotion (hereinafter referred to as the "water circulation information system"). <Amended on 2025.10.1>
② To establish and operate the water circulation information system, the Minister of Climate, Energy and Environment may request the heads of relevant central administrative agencies and local governments and the heads of relevant institutions or organizations to submit necessary data or information. The heads of relevant central administrative agencies, etc. shall comply unless there is a compelling reason not to do so. <Amended on 2025.10.1>
③ Matters necessary for establishing and operating the water circulation information system shall be determined and publicly notified by the Minister of Climate, Energy and Environment. <Amended on 2025.10.1>
Article 21 (Quality certification)
① To promote water circulation, the Minister of Climate, Energy and Environment may certify products or equipment used in water circulation facilities for which quality certification is deemed necessary. <Amended on 2025.10.1>
② The Minister of Climate, Energy and Environment may designate certification bodies for certification under paragraph ①. If a certification body no longer meets the designation criteria, its designation may be canceled. <Amended on 2025.10.1>
③ A person who has obtained certification under paragraph ① may display the certification mark on the relevant products or equipment or advertise that certification has been obtained.
④ Matters concerning the certification criteria for products and equipment subject to certification, criteria for designation and cancellation of certification bodies, certification procedures, methods of displaying certification marks, etc. shall be prescribed by Ordinance of the Ministry of Climate, Energy and Environment. <Amended on 2025.10.1>
⑤ The Minister of Climate, Energy and Environment may request public institutions prescribed by Presidential Decree to give priority in purchasing products or equipment certified for water circulation quality under paragraph ① and may recommend preferential purchasing to private organizations or enterprises. <Amended on 2025.10.1>
Article 22 (Training and support of specialized personnel)
① To train specialized personnel for water circulation promotion, the Government may designate universities, research institutes, and other institutions as specialized personnel training institutions, as prescribed by Presidential Decree, and have them provide necessary education and training.
② The Government may support all or part of the expenses necessary for education and training at specialized personnel training institutions designated under paragraph ①.
③ Where a specialized personnel training institution no longer meets the designation requirements, the Government may cancel its designation.
④ Criteria for designation and cancellation of specialized personnel training institutions and other related matters shall be prescribed by Presidential Decree.
Article 23 (Technology development)
① The Minister of Climate, Energy and Environment may undertake the following activities to develop technology relating to water circulation promotion: <Amended on 2025.10.1>
1. Surveys of trends in and demand for water circulation promotion technology;
2. Research on water circulation promotion technology;
3. Technical cooperation among institutions and exchanges of personnel, information, etc.;
4. Other matters necessary for research and development of water circulation promotion technology.
② To develop technology under paragraph ①, the Minister of Climate, Energy and Environment may provide necessary financial support to persons engaged in research and development of water circulation promotion technology. <Amended on 2025.10.1>
Article 24 (Establishment of Water Circulation Association)
① Academic circles, enterprises, institutions, organizations, and persons engaged in duties relating to water circulation promotion may establish a Water Circulation Association (hereinafter referred to as the "Association") with permission from the Minister of Climate, Energy and Environment. <Amended on 2025.10.1>
② The Association under paragraph ① shall be a legal entity.
③ The Association shall be established upon registration of its establishment at the location of its principal office.
④ The Association shall perform the following duties concerning water circulation promotion:
1. Supporting the training of specialized personnel;
2. Conducting surveys, research, public relations, and consultations, and publishing materials;
3. Collecting and analyzing relevant information;
4. Performing duties entrusted by the State or local governments;
5. Other duties prescribed by the articles of incorporation of the Association.
⑤ Except as otherwise provided in this Act, the provisions of the Civil Act concerning incorporated associations shall apply mutatis mutandis to the Association.
Article 25 (Enactment of ordinances)
A local government may prescribe by ordinance matters necessary for formulating and implementing policies for water circulation promotion, etc.
CHAPTER IV SUPPLEMENTARY PROVISIONS
Article 26 (State subsidies)
① Within budgetary limits, the State may subsidize all or part of the following expenses for a person implementing the relevant project or performing the relevant duties. Such subsidies shall not be used for any purpose other than those specified in an implementation plan approved under Article 16:
1. Expenses necessary for water circulation promotion projects;
2. Expenses necessary to acquire land, objects, or rights for water circulation promotion projects;
3. Other expenses prescribed by Presidential Decree as necessary for water circulation promotion.
② Taking into account the results of the evaluation of comprehensive plans for water circulation promotion under Article 13, the State shall suspend or reduce State subsidies under paragraph ① or take other necessary measures prescribed by Presidential Decree.
Article 27 (Cooperation of relevant agencies)
Where the Minister of Climate, Energy and Environment deems it necessary to achieve the objectives of this Act, the Minister may request the heads of relevant central administrative agencies or local governments and relevant institutions or organizations to submit necessary data, state their opinions, etc. The heads of institutions or organizations receiving such a request shall comply unless there is a compelling reason not to do so. <Amended on 2025.10.1>
Article 28 (Disposal, etc. of State and public property)
① Where the Minister of Climate, Energy and Environment intends to approve an implementation plan that includes disposal of State property or public property managed by the head of another central government agency, etc., the Minister shall consult in advance with the agency having general jurisdiction over State property and the head of the relevant central government agency, or the agency managing the public property (hereinafter referred to as the "managing agency"). Where the managing agency of property is unclear, the Minister of Land, Infrastructure and Transport shall be deemed the managing agency for roads, ditches, etc., and the Minister of Finance and Economy shall be deemed the managing agency for other property. <Amended on 2025.10.1>
② A managing agency consulted under paragraph ① shall present its opinion within 20 days; where it fails to present an opinion within that period, it shall be deemed to have no opinion.
③ State or public property required for a water circulation promotion project within a water circulation promotion zone (limited to an area for which a comprehensive plan for water circulation promotion has been established) shall not be disposed of for purposes other than water circulation promotion projects.
Article 29 (Expropriation and use of land, etc.)
① Where necessary to implement a water circulation promotion project, a project implementer may expropriate or use land, objects, or rights under Article 3 of the Act on Acquisition of and Compensation for Land, etc. for Public Works Projects (hereinafter referred to as "land, etc.").
② Where an implementation plan is approved and publicly notified under Article 16, project approval and public notification thereof under Articles 20 (1) and 22 of the Act on Acquisition of and Compensation for Land, etc. for Public Works Projects shall be deemed granted and made; and notwithstanding Articles 23 (1) and 28 (1) of that Act, an application for adjudication may be filed within the implementation period of the water circulation promotion project prescribed in the implementation plan.
③ Except as otherwise expressly provided in this Act, the Act on Acquisition of and Compensation for Land, etc. for Public Works Projects shall apply mutatis mutandis to expropriation or use of land, etc.
Article 30 (Inspection and retention of related documents)
① Where necessary for implementing a water circulation promotion project, a project implementer may request a registry office or the head of another relevant administrative agency to allow free inspection or copying of necessary documents or to issue certified copies or abstracts thereof free of charge.
② A project implementer shall disclose the following matters by publication in the Official Gazette, a public bulletin, a daily newspaper, or on the Internet so that landowners and other interested persons can be informed:
1. Matters that the project implementer is required to make available for public inspection, publicly announce, or give notice of;
2. Details of the establishment or approval of plans relating to water circulation promotion projects;
3. Other matters prescribed by Presidential Decree concerning the implementation of water circulation promotion projects.
③ A project implementer shall keep documents, drawings, etc. relating to the matters in each subparagraph of paragraph ② at its principal office located in the area where the water circulation promotion project is implemented and, when a rights holder requests inspection or copying with respect to buildings, etc. in that area, shall permit inspection or copying, excluding personal information. The actual costs of copying may be charged to the requesting person.
Article 31 (Succession to rights and obligations)
Where a project implementer or a person holding rights to buildings, etc. in an area where a water circulation promotion project is implemented (hereinafter referred to as "interested persons, etc.") is replaced, dispositions, procedures, and other acts taken by or toward the former interested persons, etc. shall be deemed taken by or toward the new interested persons, etc.
Article 32 (Reports and inspections)
Where the Minister of Climate, Energy and Environment deems it necessary in connection with implementing a water circulation promotion project, the Minister may require a project implementer to make necessary reports or submit data and may have public officials under the Minister's jurisdiction inspect matters concerning the affairs and accounting of the project. <Amended on 2025.10.1>
Article 33 (Delegation and entrustment of authority or duties)
① Part of the authority of the Minister of Climate, Energy and Environment under this Act may be delegated to Mayors/Do Governors or heads of agencies under the Minister's jurisdiction as prescribed by Presidential Decree; and a Mayor/Do Governor may re-delegate part of the delegated authority to the head of a Si/Gun/Gu with approval from the Minister of Climate, Energy and Environment. <Amended on 2025.10.1>
② Part of the duties of the Minister of Climate, Energy and Environment under this Act may be entrusted to the following specialized institutions as prescribed by Presidential Decree: <Amended on 2025.10.1>
1. Korea Water Resources Corporation under the Korea Water Resources Corporation Act;
2. Korea Environment Corporation under the Korea Environment Corporation Act;
3. Korea Water and Wastewater Works Association under the Water Supply and Waterworks Installation Act;
4. Korea Water Technology Certification Institute under the Act on the Development of Water Management Technologies and Promotion of the Water Industry;
5. Water Circulation Association established under Article 24.
CHAPTER V PENALTY PROVISIONS
Article 34 (Administrative fines)
① A person who displays a certification mark or advertises certification in violation of Article 21 (3) shall be subject to an administrative fine not exceeding five million won.
② Administrative fines under paragraph ① shall be imposed and collected by the Minister of Climate, Energy and Environment or the head of a local government as prescribed by Presidential Decree. <Amended on 2025.10.1>
ADDENDA <Act No. 19758, 2023.10.24>
Article 1 (Enforcement date)
This Act shall enter into force one year after the date of its promulgation.
Article 2 (Special rule concerning establishment of national basic policy for water circulation promotion)
The Minister of Environment shall establish the initial national basic policy for water circulation promotion under Article 4 within one year after this Act enters into force.
ADDENDA (GOVERNMENT ORGANIZATION ACT) <Act No. 21065, 2025.10.1>
Article 1 (Enforcement date)
This Act shall enter into force on the date of its promulgation: Provided, That among the Acts amended under Article 7 of these Addenda, the portions amending Acts promulgated before the enforcement of this Act but not yet in force shall enter into force on the enforcement dates of the relevant Acts; and the following amended provisions shall enter into force on the dates specified in their respective subparagraphs:
1. The following amended provisions shall enter into force on January 2, 2026: Provided, That among the Acts amended under Article 7 of these Addenda (limited to parts relating to the amended provisions under items (a) and (b)), the portions amending Acts promulgated before the enforcement date specified in the main sentence but not yet in force shall enter into force on the enforcement dates of the relevant Acts:
(a) The amended provisions of Article 19 (4), Article 23, Article 29 (1) 1, and Article 30;
(b) The amended provisions of Article 12 (2), Article 19 (3), Article 22, and the proviso to Article 29 (2) (limited to provisions concerning the Minister of Finance and Economy and the Ministry of Finance and Economy);
(c) The Acts amended under Article 7 of these Addenda (limited to the parts relating to the amended provisions under items (a) and (b)).
2. Omitted.
Articles 2 through 6 Omitted.
Article 7 (Amendments to other Acts)
① through <342> Omitted.
<343> Part of the Act on the Promotion of and Support for Water Circulation shall be amended as follows:
In Article 4 (1) and (4), the main sentence of paragraph (5) of the same Article, paragraph (6) of the same Article; Article 6, the portion other than the subparagraphs of paragraph (1), the portion other than the subparagraphs of paragraph (2), paragraphs (3) through (5), the former part of paragraph (6), and paragraph (7); the former part of Article 7 (1); Article 8, the main sentence of paragraph (1), paragraphs (3) and (4), the main sentence of paragraph (5), paragraph (6), and the portion other than the subparagraphs of paragraph (7); Article 10 (1) and (2); Article 12 (1) and the former part of paragraph (2); Article 13 (1); Article 15, the portion other than the subparagraphs of paragraph (1); Article 16, the former part of the portion other than the subparagraphs of paragraph (1), the main sentence of paragraph (2), and paragraph (3); Article 17 (1); Article 18, the portion other than the subparagraphs of paragraph (1) and the portion other than the subparagraphs of paragraph (2); Article 19, the portion other than the subparagraphs of paragraph (1), subparagraph 4 of that paragraph, and paragraph (2); Article 20 (1), the former part of paragraph (2), and paragraph (3); Article 21 (1), the former part of paragraph (2), and paragraph (5); Article 23, the portion other than the subparagraphs of paragraph (1) and paragraph (2); Article 24 (1); the former part of Article 27; the former part of Article 28 (1); Article 32; Article 33 (1), the portion other than the subparagraphs of paragraph (2); and Article 34 (2), each occurrence of "the Minister of Environment" shall be replaced with "the Minister of Climate, Energy and Environment."
In Article 16 (4) and Article 21 (4), each occurrence of "Ordinance of the Ministry of Environment" shall be replaced with "Ordinance of the Ministry of Climate, Energy and Environment."
In the latter part of Article 28 (1), "the Minister of Economy and Finance" shall be replaced with "the Minister of Finance and Economy."
<344> through <626> Omitted.
Article 8 Omitted.