SCHOOL FACILITIES PROJECTS PROMOTION ACT
39625 · 2014-07-15
SCHOOL FACILITIES PROJECTS PROMOTION ACT
Act No. 12248, Jan. 14, 2014
Act No. 3634, Dec. 31, 1982
Amended by Act No. 3740, Aug. 2, 1984
Act No. 4268, Dec. 27, 1990
Act No. 4429, Dec. 14, 1991
Act No. 4881, Jan. 5, 1995
Act No. 5069, Dec. 29, 1995
Act No. 5454, Dec. 13, 1997
Act No. 5453, Dec. 13, 1997
Act No. 5893, Feb. 8, 1999
Act No. 6210, Jan. 28, 2000
Act No. 6400, Jan. 29, 2001
Act No. 6656, Feb. 4, 2002
Act No. 6841, Dec. 30, 2002
Act No. 7678, Aug. 4, 2005
Act No. 8014, Sep. 27, 2006
Act No. 8338, Apr. 6, 2007
Act No. 8352, Apr. 11, 2007
Act No. 8709, Dec. 21, 2007
Act No. 8852, Feb. 29, 2008
Act No. 8974, Mar. 21, 2008
Act No. 8976, Mar. 21, 2008
Act No. 9313, Dec. 31, 2008
Act No. 9763, Jun. 9, 2009
Act No. 10331, May 31, 2010
Act No. 10599, Apr. 14, 2011
Act No. 11690, Mar. 23, 2013
Act No. 12248, Jan. 14, 2014
법령보기 화면
Article 1 (Purpose)
The purpose of this Act is to simplify the procedures necessary for execution of projects to establish, relocate, and expand elementary, middle, high, and special school facilities, to prescribe special cases relating to building permission, etc., and to facilitate school facilities projects, thereby contributing to the improvement of the educational environment and the enhancement of education quality.
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 2 (Definitions)
The definitions of terms used in this Act shall be as follows:
1.
The term "school facilities" means any of the following facilities:
(a)
Sites of school buildings, playgrounds and practice areas;
(b)
School buildings, gymnasiums, dormitories and school meal facilities;
(c)
Other facilities prescribed by Presidential Decree, which are installed primarily for the purpose of learning support;
2.
The term "school facilities project" means any project designed to install, relocate or expand school facilities.
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 3 (Scope of Application)
Schools to which this Act applies (hereinafter referred to as "school") shall be elementary, middle, high, and special schools.
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 4 (Approval, etc. of Execution Plan for School Facilities Project)
(1)
Any person who intends to undertake a school facilities project (except the State and a local government) shall, as prescribed by Presidential Decree, prepare a plan to execute the school facilities project (hereinafter referred to as "execution plan") by including the site of execution, scale, and financial resources of the project in the plan and obtain approval from the supervisory agencies referred to in
Article 6 of the Elementary and Secondary Education Act
(hereinafter referred to as "supervisory authority"):
Provided
, That this shall not apply to any execution plan, when construction, building, substantial repair or alteration of use (hereinafter referred to as the "construction, etc.") is intended for school facilities within the school facilities project execution site that has passed the completion inspection referred to in
Article 13
(2) upon completion of the school facilities project.
(2)
Any person who intends to modify an execution plan approved under the main sentence of paragraph (1) shall obtain the supervisory authority's approval for modification:
Provided
, That the this shall not apply where any minor matter determined by Presidential Decree is modified.
(3)
In approving execution plans or modifications to such plans under paragraph (1) or (2), a supervisory authority shall in advance consult with the heads of the competent administrative agencies that have jurisdiction over the matters referred to in each subparagraph of
Article 5
, as prescribed by Presidential Decree.
(4)
In executing a school facilities project, the State or a local government shall prepare the execution plan and consult in advance with the heads of the competent administrative agencies that have jurisdiction over the matters referred to in each subparagraph of
Article 5
, as prescribed by the Presidential Decree:
Provided
, That this shall not apply to any execution plan, when construction, etc. of school facilities is intended on a school facilities project execution site where the school facilities project has been already completed.
(5)
Matters to be included in execution plans referred to in paragraphs (1) and (4) shall be determined by Presidential Decree.
(6)
Where a supervisory authority intends to approve an execution plan or any modification thereto under paragraph (1) or (2) or where the State or a local government intends to prepare execution plans under paragraph (4), it shall hear opinions of the interested parties, such as the land owner, when there are land, buildings and other fixtures on the land within the relevant execution site, or rights other than the ownerships thereof, which are needed to be expropriated or utilized under
Article 10
.
(7)
Where a supervisory authority approves execution plans or modifications thereto under paragraph (1) or (2), it shall without delay notify such approval to the agencies consulted and interested parties referred to in paragraphs (3) and (6) and publicly notify it, as prescribed by Presidential Decree. The same shall also apply when the State or a local government completes the consultation referred to in paragraph (4).
(8)
Any person who intends to execute a school facilities project may apply simultaneously for approval of an execution plan or approval for any modification to such plan under paragraph (1) or (2) and the approval for construction, etc. of school facilities under
Article 5-2
(1).
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 5 (Relation with other Acts)
Where a person who intends to execute a school facilities project has obtained approval of execution plans or approval for any modification to such plans under
Article 4
(1) or (2), or has completed a consultation under paragraph (4) of the same Article, the following determination, permission, authorization, approval, designation, agreement, consultation, report, or cancellation shall be deemed obtained or made:
<Amended by Act No. 8976, Mar. 21, 2008; Act. No. 9313, Dec. 31, 2008; Act No. 9763, Jun. 9, 2009; Act No. 10331, May 31, 2010; Act No. 10599, Apr. 14, 2011; Act No. 12248, Jan. 14, 2014>
1.
Determination of urban and
Gun
management planning referred to in
Article 30 of the National Land Planning and Utilization Act
;
2.
Permission for development acts referred to in
Article 56 of the National Land Planning and Utilization Act
, designation of the project executor for the urban and
Gun
planning facility project referred to in
Article 86 of the same Act
, and preparation and authorization of the execution plan for the urban and
Gun
planning facility project referred to in
Article 88 of the same Act
;
3.
Permission for road construction works by a person other than a road management office under
Article 36 of the Road Act
, permission to occupy a road by a person other than the road management office under
Article 61 of the same Act
, and consultation with or approval by the road management office on national projects under
Article 107 of the same Act
;
4.
Execution permission for construction of the public sewerage system referred to in
Article 16 of the Sewerage Act
;
5.
Permission for activities in the park area as referred to in
Article 23 of the Natural Parks Act
and consultation on a state project as referred to in
Article 71 (1) of the same Act
;
6.
Permission for diversion of the use of farmlands under
Article 34 (1) of the Farmland Act
;
7.
Permission for and reports on conversion of use of mountainous districts under
Articles 14 and 15 of the Mountainous Districts Management Act
, permission for and reports on temporary use of mountainous districts under
Article 15-2 of the same Act
, permission for and reports on the cutting of standing trees, etc. under
Article 36 (1) and (4) of the Creation and Management of Forest Resources Act
, permission for and reports on activities conducted in forest conservation zones (excluding forest genetic resources protection zones) under
Article 9 (1) and (2) 1 and 2 of the Forest Protection Act
, and cancellation of designation of forest conservation zones under
Article 11 (1) 1 of the same Act
;
8.
Permission for timber-cutting, etc. in the erosion control area referred to in
Article 14 of the Erosion Control Work Act
and cancellation of the designation of the erosion control area under
Article 20 of the same Act
;
9.
Permission for changes in the form and quality of land referred to in
Article 9 of the Urban Development Act
;
10.
Permission for occupation of rivers under
Article 33 of the River Act
and permission for use of river water under
Article 50 of the same Act
.
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 5-2 (Construction, etc. of School Facilities)
(1)
When a person who has obtained approval of an execution plan or approval for modifications to such plan under the main sentence of
Article 4
(1) or
Article 4
(2) intends to implement the construction, etc. of school facilities, he/she shall obtain approval of or report it to a supervisory authority as prescribed by Presidential Decree, notwithstanding the provisions of
Articles 11
and
14 of the Building Act
. The same shall also apply where he/she intends to implement the construct, etc. of school facilities under the proviso to
Article 4
(1).
<Amended by Act No. 8974, Mar. 21, 2008>
(2)
When a supervisory authority has granted approval or received a report under paragraph (1), it shall notify the head of a
Si
/
Gun
/
Gu
(referring to the head of an autonomous
Gu
; hereinafter the same shall apply) of the matters concerned.
(3)
When the State or a local government intends to perform the construction, etc. of school facilities, it shall notify the head of a
Si
/
Gun
/
Gu
of the matters concerned, notwithstanding the provisions of
Article 29 (1) of the Building Act
.
<Amended by Act No. 8974, Mar. 21, 2008>
(4)
When the State, a local government, or a supervisory authority has notified the head of a
Si
/
Gun
/
Gu
of the matters concerning the construction, etc. of school facilities under paragraph (2) or (3), building permission or building report shall be deemed to have been granted or filed under
Article 11
or
14 of the Building Act
or consultation shall be deemed to have been conducted with the head of a
Si
/
Gun
/
Gu
under
Article 29 (1) of the same Act
.
<Amended by Act No. 8974, Mar. 21, 2008>
(5)
With respect to school facilities for which building permission or building report is deemed to have been granted or filed or consultation is deemed to have been conducted under paragraph (4), a supervisory authority shall grant permission, etc. in accordance with the same provisions notwithstanding the provisions of
Article 16
,
17
,
20
(1) and (2),
21
(1),
25
,
27
,
36
(1) and
79 of the Building Act
.
<Amended by Act No. 8974, Mar. 21, 2008>
(6)
Where a supervisory authority deems it necessary after examining whether the school facilities for which it has granted approval or received a report under paragraphs (1) and (2) violate this Act or the
Building Act
, it shall issue an order to take measures necessary to correct the relevant violation and notify the head of
Si
/
Gun
/
Gu
of the result thereof.
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 6 (Consultation on Activities Conducted within School Facilities)
When administrative agencies of various levels, after approval (referring to consultation in the case of the State or a local government; hereinafter the same shall apply) of execution plans has been obtained under
Article 4
, intend to implement any of the following projects within school facilities (including a scheduled site for school facilities for which the execution plan has been approved under
Article 4
) or to approve such projects or take any other disposition, they shall consult with the supervisory authority of the school concerned:
1.
Installation of roads, water-supply systems, sewerages, waterways, and fixtures thereon;
2.
Excavation of the ground, reclamation, and other changes in the form and quality of the land.
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 7 (Priority Given to Construction of Public Facilities)
When execution plans referred to in
Article 4
have been approved, an administrative agency in charge of public facilities determined by Presidential Decree, such as roads, water-supply systems, sewerages, shall give priority to the installation of public facilities related to school facilities projects within its budget limits to ensure such projects are smoothly implemented.
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 8 (Entry to and Exit from Land, etc.)
(1)
Any person who has obtained approval of execution plans referred to in
Article 4
(hereinafter referred to as "project operator") may enter third parties' land or use it temporarily in order to execute school facilities project and, if necessary, may change or eliminate standing trees, earth and rocks, or other obstacles thereon.
(2)
The provisions of
Article 130 of the National Land Planning and Utilization Act
shall apply
mutatis mutandis
to paragraph (1).
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 9 (Compensation for Losses)
(1)
When any person has suffered a loss due to the activities referred to in
Article 8
, a project operator shall compensate him/her for such loss.
(2)
The provisions of
Article 131 of the National Land Planning and Utilization Act
shall apply
mutatis mutandis
to compensation for loss referred to in paragraph (1).
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 10 (Expropriation and Utilization)
(1)
Where a project operator requires land, buildings and other fixtures on the land within the relevant execution site or rights other than the ownerships thereof in order to execute the school facilities project, he/she may expropriate or use such land, buildings, other fixtures on the land, or rights other than the ownerships thereof.
(2)
With regard to the expropriation or utilization referred to in paragraph (1), the
Act on Acquisition of and Compensation for Land, etc. for Public Works Projects
shall apply, except as otherwise provided in this Act.
(3)
In applying the
Act on Acquisition of and Compensation for Land, etc. for Public Works Projects
under paragraph (2), the approval of an execution plan shall be deemed the approval of a project referred to in
Article 20 (1) of the same Act
, and the public notice under
Article 4
(7) shall be deemed the public notice stipulated in
Article 22 (1) and (2) of the same Act
, and, notwithstanding the provisions of
Articles 23
(1) and
28 (1) of the same Act
, an application for adjudication shall be filed within a school facilities project execution period determined at the time when the execution plan is approved.
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 11 (Revocation, etc. of Approval of Execution Plan)
When a project operator (excluding a project operator which is the State or a local government) falls under any of the following cases, a supervisory authority may revoke approval granted under this Act or order modifications of the execution plan or other necessary measures:
1.
Where the project executor has obtained approval under this Act by unjust means;
2.
Where it is deemed that the execution of school facilities projects is impracticable to continue or is likely to be considerably delayed.
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 11-2 (Hearing)
Where a supervisory authority intends to revoke approval of an execution plan under
Article 11
, it shall hold a hearing.
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 12 (Supervision, etc.)
(1)
If a supervisory authority deems it necessary to conduct supervision, it may request a project operator (excluding a project operator which is the State or a local government) or a person in charge of the construction, etc. of school facilities under the proviso to
Article 4
(1) to file a necessary report or order him/her to submit materials, or have public officials under its control inspect school facilities projects.
(2)
Any public official who performs an inspection under paragraph (1) shall carry an identification that indicates his/her authority and present it to the party concerned.
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 13 (Completion Inspection, etc.)
(1)
When a project operator (excluding a project executor which is the State or a local government) completes a school facilities project, he/she shall file a report thereon with a supervisory authority and be subject to an inspection of completion as prescribed by Presidential Decree, and any person who carries out the construction, etc. of school facilities under the proviso to
Article 4
(1) shall, when he/she completes it, obtain approval to use such school facilities from a supervisory authority.
(2)
When a supervisory authority receives a report under the former part of paragraph (1), it shall perform an inspection of completion, and with respect to the school facilities which have passed an inspection of completion, it shall notify the results to the heads of the administrative agencies that have jurisdiction over the matters referred to in each subparagraph of
Article 5
and the head of a
Si
/
Gun
/
Gu
and shall publicly notify such results. The supervisory authority shall, when it grants approval to use school facilities in accordance with the latter part of paragraph (1), issue a written approval to use the school facilities and then notify such fact to the heads of administrative agencies that have jurisdiction over the matters stipulated in each subparagraph of
Article 5
and the head of a
Si
/
Gun
/
Gu
, respectively.
(3)
When the State or a local government has completed school facilities projects, it shall notify matters with regard thereto to the heads of the administrative agencies that have the jurisdiction over the matters provided in each subparagraph of
Article 5
and the head of a
Si
/
Gun
/
Gu
and shall publicly notify such results:
Provided
, That where the construction, etc. of school facilities is completed under the proviso to
Article 4
(1), it shall not publicly notify such matters.
(4)
When a supervisory authority publicly notifies the results of a completion inspection or issues a written approval for use and serves a notice thereof under paragraph (2), the school facilities concerned shall be deemed to have passed an inspection for approval for use referred to in
Article 22 of the Building Act
, and when the State or a local government has notified matters concerning the completion of the school facilities project to the head of a
Si
/
Gun
/
Gu
under paragraph (3), a notice shall be deemed to have been served under the proviso to
Article 29 (3) of the Building Act
.
<Amended by Act No. 8974, Mar. 21, 2008>
(5)
When the head of a
Si
/
Gun
/
Gu
has received notification under paragraph (2) or (3), he/she shall record it, without delay, in the building register or building control register referred to in building-related statutes.
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 14 (Rearrangement of Graves, etc.)
(1)
If a supervisory authority deems it necessary to execute school facilities projects (where the State or a local government is the school facilities project operator, the supervisory authority refers to the project operator concerned; hereafter in this Article the same shall apply), it may order the interers, owners or managers of graves, etc. or the relatives of the buried (hereinafter referred to as "relatives, etc.") to relocate or move graves, tombstones, and facilities attached thereto (hereinafter referred to as "graves, etc.") within the execution site of the school facilities.
(2)
When the relatives, etc. of graves, etc. referred to in paragraph (1) fail to comply with the order to relocate or move graves, etc., a supervisory authority may execute it vicariously as prescribed by the
Administrative Vicarious Execution Act
.
(3)
In the case of paragraph (1), when the relatives, etc. of graves, etc. are unknown, a supervisory authority shall make public announcement ordering the moving or relocation of graves, etc. within a given period, and if the graves, etc. are not moved or relocated within the period, the supervisory authority may do so.
(4)
A supervisory authority shall pay the person, who has relocated or moved graves, etc. in compliance with an order referred to in paragraph (1), for the expenses incurred in doing so.
(5)
The cost of vicarious execution performed under paragraph (2), the cost of relocating or moving graves, etc. under paragraph (3), and the expenses referred to in paragraph (4) shall be borne by the project operator concerned.
(6)
Project operators shall include plans for rearrangement of graves, etc. in the execution plan.
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 15 (Delegation of Authority)
The Minister of Education may delegate part of his/her authority referred to in this Act to superintendents of education, as prescribed by the Presidential Decree.
<Amended by Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
[This Article Wholly Amended by Act No. 8709, Dec. 21, 2007]
법령보기 화면
Article 16 Deleted. <by Act No. 6210, Jan. 28, 2000>
ADDENDA
(1)
(Enforcement Date) This Act shall enter into force three months after the date of its promulgation.
(2)
(Special Cases for Application of the
Urban Planning Act
to Existing Schools) Among the facilities of elementary, middle, high schools, and special schools established under the
Education Act
before the enforcement of this Act, the school facilities established without obtaining the decision for urban planning referred to in Article 12 of the
Urban Planning Act
, the permission for urban planning project execution by any urban planning project executor, other than an administrative agency referred to in Article 24 of the same Act, and the authorization of urban planning project execution plan referred to in Article 25 of the same Act and conforming to the standards determined by Presidential Decree shall be deemed the facilities established with the decision for urban planning, the permission for urban planning project execution and the authorization of urban planning project execution plan referred to in Articles 12, 24 and 25, respectively, of the
Urban Planning Act
:
Provided
, That if the land register for the facilities is uncertain, it shall be established by the public notification of the land register referred to in Article 13 of the
Urban Planning Act
. In this case, a copy of the land registration map may substitute for the application draft for the public notification of land register.
ADDENDA <Act No. 3740, Aug. 2, 1984>
(1)
(Enforcement Date) This Act shall enter into force 30 days after the date of its promulgation.
(2)
(Transitional Measures) The public notice of the execution plan for any school facilities project and approval of that execution plan that has been approved or passed through consultation under the previous provisions before the enforcement of this Act shall be regarded as the public notice of the execution plan for school facilities project and approval of that execution plan under the amended provisions of
Article 10
.
ADDENDA <Act No. 4268, Dec. 27, 1990>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 10 Omitted.
ADDENDA <Act No. 4429, Dec. 14, 1991>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA <Act No. 4881, Jan. 5, 1995>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Article 2 (Special Cases for Application of
Urban Planning Act
and
Building Act
to Existing School Facilities)
(1)
Among the school facilities subject to this Act at the time this Act enters into force, the school facilities established or constructed, etc. without the permission for any action referred to in Article 4 of the
Urban Planning Act
, without the approval of the urban planning project execution plan referred to in Article 25 of the same Act obtained by the project operator referred to in Article 23 of the same Act, or without the construction permission, construction report, usability inspection, or agreement referred to in Article 8, 9, 18, or 25 of the
Building Act
, respectively, that have been confirmed under the provisions of paragraphs (2) through (4) to conform to the following standards shall be deemed the facilities that have been established or constructed, etc. in accordance with the applicable provisions of the
Urban Planning Act
and
Building Act
. In such cases, when the land register of the facilities is uncertain, it shall be established by the public notice of the land register referred to in Article 13 of the
Urban Planning Act
, and a copy of the land registration map may substitute for the application draft for public notice of the land register:
1.
Facilities shall be installed or constructed, etc. on a lot owned by the builder or manager of the school concerned (including land under another party's ownership for which approval for use has been obtained);
2.
Facilities shall comply with the provisions of Articles 33, 37, and 45 of the
Building Act
;
3.
Facilities shall comply with the provisions on structural safety, sanitation, and fire-resistance of buildings;
4.
Facilities shall not considerably hinder the execution of a urban planning project.
(2)
The school founder or operator who owns the school facilities (except the State or a local government who establishes and manages facilities) falling under paragraph (1), shall apply to the supervisory authority for confirmation of their suitability by submitting the application form for suitability confirmation determined by the Minister of Education, together with the blueprint and on the spot inspection record of the school facilities concerned.
(3)
When the school facilities for which application was filed for the confirmation of its suitability under paragraph (2) satisfy the criteria under each subparagraph of paragraph (1), a supervisory authority shall notify the matters concerning it to the head of the administrative agencies that have jurisdiction over the matters referred to in each subparagraph of
Article 5
and the head of a
Si
/
Gun
/
Gu
, with the draft for the placement of facilities, the protocol of the building list, the draft for the progress of constructions and the materials that may prove the land ownership or right of use attached, and give a public notice of the fact.
(4)
When the school facilities falling under paragraph (1) are confirmed to conform to the standards referred to in each subparagraph of paragraph (1), the State or a local government who owns such facilities shall notify the matters concerning it to the head of the administrative agencies that have jurisdiction over the matters referred to in each subparagraph of
Article 5
and the head of
Si
/
Gun
/
Gu
, with the materials referred to in paragraph (3) attached, and give a public notice of the fact.
(5)
When a public notice has been given under paragraph (3), the school facilities concerned shall be considered to have passed the use inspection referred to in Article 18 of the
Building Act
, notwithstanding the provisions of the
Urban Planning Act
and
Building Act
, and when the State or a local government notifies the head of
Si
/
Gun
/
Gu
as prescribed in paragraph (4), it shall be considered to have been notified under the proviso to Article 25 (3) of the
Building Act
.
Article 3 Omitted.
ADDENDA <Act No. 5069, Dec. 29, 1995>
Article 1 (Enforcement Date)
This Act shall enter into force on March 1, 1996.
Articles 2 through 4 Omitted.
ADDENDA <Act No. 5453, Dec. 13, 1997>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 1998. (Proviso Omitted.)
Article 2 Omitted.
ADDENDUM <Act No. 5454, Dec. 13, 1997>
This Act shall enter into force on January 1, 1998. (Proviso Omitted.)
ADDENDA <Act No. 5893, Feb. 8, 1999>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDUM <Act No. 6210, Jan. 28, 2000>
This Act shall enter into force six months after the date of its promulgation.
ADDENDA <Act No. 6400, Jan. 29, 2001>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 4 Omitted.
ADDENDA <Act No. 6656, Feb. 4, 2002>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 2003.
Articles 2 through 12 Omitted.
ADDENDA <Act No. 6841, Dec. 30, 2002>
Article 1 (Enforcement Date)
This Act shall enter into force nine months after the date of its promulgation.
Articles 2 through 12 Omitted.
ADDENDA <Act No. 7678, Aug. 4, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 12 Omitted.
ADDENDA <Act No. 8014, Sep. 27, 2006>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 11 Omitted.
ADDENDA <Act No. 8338, Apr. 6, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 17 Omitted.
ADDENDA <Act No. 8352, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 16 Omitted.
ADDENDUM <Act No. 8709, Dec. 21, 2007>
This Act shall enter into force on the date of its promulgation:
Provided
, That the amended provisions of subparagraph 10 of
Article 5
shall enter into force on April 7, 2008.
ADDENDA <Act No. 8852, Feb. 29, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 7 Omitted.
ADDENDA <Act No. 8974, Mar. 21, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 14 Omitted.
ADDENDA <Act No. 8976, Mar. 21, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 10 Omitted.
ADDENDA <Act No. 9313, Dec. 31, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 and 3 Omitted.
ADDENDA <Act No. 9763, Jun. 9, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force nine months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 8 Omitted.
ADDENDA <Act No. 10331, May 31, 2010>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 13 Omitted.
ADDENDA <Act No. 10599, Apr. 14, 2011>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 9 Omitted.
ADDENDA <Act No. 11690, Mar. 23, 2013>
Article 1 (Enforcement Date)
(1)
This Act shall enter into force on the date of its promulgation.
(2)
Omitted.
Articles 2 through 7 Omitted.
ADDENDA <Act No. 12248, Jan. 14, 2014>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 25 Omitted.