RADIO WAVES ACT
17981 · 2009-09-10
RADIO WAVES ACT
Act No. 9780, Jun. 9, 2009
Wholly Amended by Act No. 6197, Jan. 21, 2000
Amended by Act No. 6315, Dec. 29, 2000
Act No. 6909, May 29, 2003
Act No. 6893, May 29, 2003
Act No. 7265, Dec. 30, 2004
Act No. 7264, Dec. 30, 2004
Act No. 7441, Mar. 31, 2005
Act No. 7559, May 31, 2005
Act No. 7796, Dec. 29, 2005
Act No. 7815, Dec. 30, 2005
Act No. 8091, Dec. 26, 2006
Act No. 8221, Jan. 3, 2007
Act No. 8199, Jan. 3, 2007
Act No. 8486, May 25, 2007
Act No. 8770, Dec. 21, 2007
Act No. 8776, Dec. 21, 2007
Act No. 8867, Feb. 29, 2008
Act No. 9128, Jun. 13, 2008
Act No. 9455, Feb. 6, 2009
Act No. 9482, Mar. 13, 2009
Act No. 9535, Mar. 25, 2009
Act No. 9773, Jun. 9, 2009
Act No. 9780, Jun. 9, 2009
CHAPTER I GENERAL PROVISIONS
법령보기 화면
Article 1 (Purpose)
The purpose of this Act is to provide matters relating to the efficient utilization and control of radio waves to facilitate the promotion of the field relating to radio waves and serve to promote public welfare by facilitating the utilization of radio waves and the development of radio-wave technologies.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 2 (Definitions of Terms)
For the purposes of this Act:
<Amended by Act No. 7815, Dec. 30, 2005; Act No. 8776, Dec. 21, 2007; Act No. 8867, Feb. 29, 2008; Act No. 9128, Jun. 13, 2008>
1.
The term "radio waves" means electromagnetic waves which propagate in space without any artificial guidance and vibrate at frequencies within the range determined by the International Telecommunication Union;
2.
The term "distribution of frequencies" means determining the use of specified frequencies;
3.
The term "allocation of frequencies" means granting specific persons the right to utilize specified frequencies;
4.
The term "designation of frequencies" means designating specific frequencies to be used by a wireless station opened by permission or by filing a report thereon;
4-2. The term "withdrawal of frequencies" means a withdrawal of all or some of an allocation of frequencies, designation of frequencies or approval for use of frequencies;
4-3. The term "reallocation of frequencies" means an allocation of frequencies, a designation of frequencies or approval for use of frequencies after a withdrawal of frequencies and in replacement thereof;
5.
The term "wireless facilities and equipment" means electrical facilities and equipment capable of sending or receiving radio waves;
5-2. The term "wireless communications" means sending or receiving information, such as all types of signs, signals, words, images and sounds, by using radio waves;
6.
The term "wireless station" means the integration of wireless facilities and equipment, and persons who operate such wireless facilities and equipment:
Provided
, That any wireless station opened only for the purpose of receiving broadcasts shall be excluded;
7.
The term "person engaged in wireless work" means any person who operates or does the work of installing wireless facilities and equipment and holds a technical qualification issued under
Article 70
(2);
8.
The term "installer" means any person who opens a wireless station after obtaining permission to open from, or filing a report on opening with, the Korea Communications Commission;
9.
The term "broadcasting station" means a wireless station opened for the purpose of enabling the public to directly receive broadcasting signals;
10.
The term "space station" means a wireless station opened in a manmade satellite;
11.
The term "earth station" means a wireless station opened on earth to communicate with a space station;
12.
The term "satellite network" means the integration of communications networks comprised of the space stations and the earth stations;
13.
The term "satellite orbit" means the location or path of the space station;
14.
The term "electromagnetic disturbance" means that electromagnetic waves emitted (referring to the propagation of electromagnetic energy in space) or conducted (referring to the flow of electromagnetic energy through power supply lines) by electromagnetic-wave-generating apparatuses disturb the performance of other apparatuses;
15.
The term "electromagnetic compatibility" means when an apparatus that causes electromagnetic disturbances (hereinafter referred to as "electromagnetic disturbance apparatus") or an apparatus affected by electromagnetic waves, is in conformity with the standards for the prevention of electromagnetic disturbances under
Article 56
and the standards for protection from electromagnetic waves.
법령보기 화면
Article 3 (Facilitating Utilization of Radio Wave Resources)
The government shall formulate and implement policy measures necessary to facilitate the utilization of radio wave resources for the purpose of maximizing the utilization of limited radio wave resources and promoting the public welfare.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 4 Deleted.<by Act No. 7815, Dec. 30, 2005>
CHAPTER II SECURING RADIO WAVE RESOURCES
법령보기 화면
Article 5 (Securing Radio Wave Resources)
(1)
In order to secure radio wave resources, the Korea Communications Commission shall formulate and implement policy measures containing matters falling under each of the following subparagraphs:
1.
The development of technologies for utilizing new frequencies;
2.
Increasing the efficient utilization of the frequencies in use;
3.
The international registration of frequencies;
4.
The consultations and coordination to remove and prevent radio wave interference between nations.
(2)
Necessary matters concerning frequencies subject to registration under paragraph (1) 3, registration expenses and registration procedures, etc. shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 6 (Improvement of Utilization Efficiency of Radio Waves Resource)
(1)
The Korea Communications Commission shall, if necessary to facilitate fair and efficient utilization of radio wave resources, implement matters falling under each of the following subparagraphs:
1.
Alteration of distribution of frequencies;
2.
Withdrawal of frequencies or reallocation of frequencies;
3.
Conversion to new technical modes;
4.
Joint use of frequencies.
(2)
The Korea Communications Commission may investigate or confirm a current status of use of frequency, as prescribed by Presidential Decree, in cases where necessary for implementing matters falling under each subparagraph of paragraph (1).
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 6-2 (Withdrawal of Frequencies or Reallocation of Frequencies)
(1)
The Korea Communications Commission may execute the withdrawal of frequencies or reallocation of frequencies under
Article 6
(1) 2, in cases where falling under any of the following subparagraphs:
1.
Where the distribution of frequencies has been altered;
2.
Where the actual record of frequency utilization has been inactive or where necessity exists for elevating the efficient utilization of frequency through a readjustment of frequency band.
(2)
Necessary matters concerning a withdrawal of frequencies or procedures for reallocation of frequencies under paragraph (1), a judgment standard for actual record of frequency utilization, and requisite, etc. for readjustment of frequency bands shall be prescribed by Presidential Decree.
(3)
Deleted. <by Act No. 9482, Mar. 13, 2009>
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 7 (Compensation, etc. for Loss)
(1)
In implementing a withdrawal of frequencies or reallocating frequencies under
Article 6-2
, the Korea Communications Commission shall compensate any loss normally arising to relevant installer and a person subject to approval of frequency use under
Article 19
(5) (hereinafter referred to as "installers, etc."):
Provided
, That the same shall not apply to cases under any of the following subparagraphs:
1.
Where following a request of installers, etc.;
2.
Where the International Telecommunication Union has altered a distribution of frequency, following an alteration of international distribution of frequency that is to be commonly adopted by all nations;
3.
Where using the frequency whose usage is a second-order business (referred to the business for which a first-order business is to be protected in operating the relevant frequency, and which is not to be protected from a first-order business; hereinafter the same shall apply).
(2)
The Korea Communications Commission may collect the amount of compensation under paragraph (1), where the loss has been compensated under the main sentence, with the exception of each subparagraph of paragraph (1), from a person newly subject to an allocation of frequencies, a designation of frequencies and approval for use of frequencies (hereinafter referred to as "new user") for the relevant frequencies.
(3)
When the Korea Communications Commission intends to determine the amount of loss compensation under paragraph (1), it shall hear, in advance, the opinions of relevant installers, etc.
(4)
Notwithstanding the main sentence, with the exception of each subparagraph of paragraph (1), the Korea Communications Commission may have the new user directly compensate such loss to the installers, etc.
(5)
Where the frequencies allocated under
Article 11
(1) fall under any subparagraph of
Article 6-2
(1) and the Korea Communications Commission has withdrawn them, it shall return, as prescribed by Presidential Decree, the consideration for allocation of frequencies corresponding to the remaining period of the utilization period under
Article 15
(1):
Provided
, That the same shall not apply to cases of alteration of a distribution of frequencies under the request of persons subject to an allocation of frequencies.
(6)
For the compensation of losses under the main sentence, with the exception of each subparagraph of paragraph (1) and the refund of the consideration for allocation of frequencies under the main sentence of paragraph (5), the financial resources of the information and communication promotion fund under
Article 33 of the Framework Act on Informatization Promotion
(hereinafter referred to as the "Information and Communication Promotion Fund") shall be used and the money collected under paragraph (2) shall become the revenue of the Information and Communication Promotion Fund.
(7)
Necessary matters concerning the main sentence, with the exception of each subparagraph of paragraph (1), the computation criteria for loss compensation money and payment procedures under paragraph (4), the collection of a money collected under paragraph (2), and the refund of the consideration for allocation of frequencies under paragraph (5), etc. shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 7-2 (Formal Objection, etc.)
(1)
Where installers, etc. have objections to the loss compensation money under
Article 7
(1), they may file an objection with the Korea Communications Commission within 30 days from the date of receiving the notice on the loss compensation money.
(2)
Where the Korea Communications Commission has received a formal objection under paragraph (1), it shall determine whether to increase or to decrease the loss compensation money within 30 days from the date of receiving such objection, and notify, without delay, the installers, etc. who raised the formal objection of the results thereof:
Provided
, That where any inevitable ground exists to the contrary, it may extend such period within the scope of 30 days.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 8 (Basic Plans for Radio Waves Promotion)
(1)
The Korea Communications Commission shall formulate a basic plan for radio waves promotion for the purpose of promoting the utilization of radio waves, developing new technology relating to radio waves and developing the radio wave broadcasting equipment industry (hereinafter referred to as "basic plan") every five years.
<Amended by Act No. 9482, Mar. 13, 2009>
(2)
The Korea Communications Commission shall, when it formulates a basic plan or alters important matters determined by Presidential Decree, such as plans for the distribution of frequencies in the basic plan, finalize such plans after seeking opinions through hearings, etc.
(3)
The basic plan shall include the following matters:
1.
Basic direction for developing the radio wave broadcasting industry;
2.
Medium-and long-term plan for the utilization of frequencies;
3.
Development of new radio wave resources;
4.
Support for the sophistication of technologies and facilities utilizing radio waves;
5.
Development and propagation of radio-wave media;
6.
Development of space communications;
7.
Establishment of order in the utilization of radio waves;
8.
Matters relating to the standardization of radio waves;
9.
Improvement of radio wave environment;
10.
Other necessary matters concerning the promotion of radio wave broadcasting.
(4)
The Korea Communications Commission shall formulate and execute a detailed implementation plan (hereinafter referred to as "implementation plan") based on the basic plan.
(5)
Necessary matters concerning the formulation or execution of the basic plan and implementation plan shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
CHAPTER III DISTRIBUTION AND ALLOCATION OF RADIO WAVE RESOURCES
법령보기 화면
Article 9 (Distribution of Frequencies)
(1)
The Korea Communications Commission shall take into account matters falling under each of the following subparagraphs when distributing frequencies:
1.
The necessity of national security, the maintenance of order or the safety of human lives, such as national defense, public safety, the rescue of persons in trouble;
2.
The domestic conditions for the utilization of frequencies, such as current status of utilization of frequencies;
3.
Trends in international use of frequencies;
4.
Trends in the development of radio-wave-utilization technology;
5.
The demand for services utilizing radio waves.
(2)
Where the Korea Communications Commission makes a distribution of frequencies under paragraph (1), it may distribute frequencies by dividing the business which uses frequency in the first order and that which uses frequency usage in the second order.
(3)
The Korea Communications Commission shall, when it has distributed frequencies in accordance with paragraph (1), announce their distribution. The same shall apply to cases where it alters the distribution of frequencies.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 10 (Allocation of Frequencies)
(1)
The Korea Communications Commission may allocate frequencies to be used directly by any person for business falling under any of the following subparagraphs, which the person intends to run. In such cases, the Korea Communications Commission shall publicly announce the matters prescribed by Presidential Decree, such as the scope of those who may apply for the allocation of frequencies, the usage of allocated frequency, technical mode, etc., by taking into account the influence afforded to the key communications business, etc. by the relevant allocation of frequencies:
1.
The key communications business under
Article 4 (2) of the Telecommunications Business Act
;
2.
The CATV broadcasting business under subparagraph 2 (b) of
Article 2 of the Broadcasting Act
or the signal transmission network business under subparagraph 13 of the same Article.
(2)
Any person who intends to have announced frequencies allocated for him/her under paragraph (1) shall file an application for the allocation of frequencies with the Korea Communications Commission, as prescribed by Presidential Decree.
(3)
The Korea Communications Commission may, where it allocates frequencies, attach conditions to such allocation, as prescribed by Presidential Decree, to prevent any person to be allocated frequencies and any other person in a special relationship with him/her prescribed by Presidential Decree from dominating radio wave resources and to facilitate competition at a proper level.
(4)
The Korea Communications Commission may, where the application under paragraph (2) is not appropriate for the matters announced under paragraph (1) or the applicant falls under the disqualification under
Article 13
, return the relevant written application.
(5)
Deleted. <by Act No. 9482, Mar. 13, 2009>
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 11 (Allocation of Frequencies for Consideration)
(1)
The Korea Communications Commission may, in cases where the frequencies announced in accordance with
Article 10
(1) fall under any of the following subparagraphs, allocate such frequencies in exchange for the consideration:
1.
Where the economic value and technical ripple-effects of the frequencies concerned are expected to be substantial;
2.
Where the existence of a competing demand for the frequencies concerned is recognized;
3.
Where it is deemed necessary to promote the field relating to radio waves.
(2)
The Korea Communications Commission may, where it falls under any of the following subparagraphs, make an allocation by examining the matters of each subparagraph of
Article 12
and the influence afforded to the key communications business by the relevant allocation of frequencies:
1.
Where intending to allocate the frequencies under paragraph (1);
2.
Where a person already subject to an allocation of frequencies whose allocated frequencies, and usage and technical mode are same thereto, applies for an allocation of frequencies;
3.
In addition thereto, where falling under the grounds prescribed by Presidential Decree for the efficiency and fairness of allocation of frequencies.
(3)
The consideration for allocation of frequencies shall be computed by considering the economic value of frequencies, such as the turnover expected from the business operated by receiving allocated frequencies, frequencies subject to allocation, and the bandwidth.
(4)
The Korea Communications Commission may have a person applying for allocation of frequencies under
Article 10
(2) pay the guarantee prescribed by Presidential Decree within the scope of 10/100 of the consideration for allocation of frequencies under paragraph (1) at the time of applying for allocation of frequencies.
(5)
The Korea Communications Commission shall incorporate the guarantee under paragraph (4) into the revenue of the Information and Communication Promotion Fund in cases where the person who applied for allocation of frequencies withdraws his/her application after completion of the relevant application period for allocation of frequencies or returns the allocated frequencies without using them.
(6)
The consideration for allocation of frequencies paid by any person who is allocated frequencies under paragraph (1) shall become revenues for the Information and Communications Promotion Fund.
(7)
Necessary matters concerning the method of computing the consideration for allocation of frequencies, the collection procedures, etc. shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 12 (Allocation of Frequencies through Examination)
With respect to the frequencies announced in accordance with
Article 10
(1), the Korea Communications Commission shall, where it does not allocate the frequencies, as prescribed in
Article 11
, allocate such frequencies after examining matters falling under each of the following subparagraphs:
1.
The efficiency of the utilization of radio wave resources;
2.
The applicant's financial capability;
3.
The applicant's technical capability;
4.
Characteristics of frequencies to be allocated or other necessary matters for the utilization of frequencies.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 13 (Disqualification for Allocation of Frequencies)
No person falling under any of the following subparagraphs shall be allocated frequencies:
1.
Any person who is disqualified from opening any wireless station under
Article 20
(1);
2.
Any person who intends to run the key communications business and is disqualified from the license of a key communications business under
Article 5-2 of the Telecommunications Business Act
;
3.
Any person who intends to run a CATV broadcasting business or a signal transmission network business and is disqualified from permission for a CATV broadcasting business or registration for a signal transmission network business under
Article 13 of the Broadcasting Act
.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 14 (Rights to Utilize Frequencies)
(1)
Any person who has been allocated frequencies under
Article 11
shall hold the rights to exclusively utilize the frequencies concerned (hereinafter referred to as "rights to utilize frequencies").
<Amended by Act No. 9128, Jun. 13, 2008>
(2)
Any person who has been allocated frequencies under
Article 11
may transfer or lease the rights to utilize frequencies after the period prescribed by Presidential Decree:
Provided
, That in cases where the person allocated the frequencies falls under causes, such as bankruptcy, or a drastic change in economic conditions, etc. prescribed by Presidential Decree, he/she may transfer or lease his/her right to utilize frequencies prior to the end of such period.
<Amended by Act No. 9128, Jun. 13, 2008>
(3)
Any person who intends to transfer or lease the right to utilize frequencies under paragraph (2) shall obtain approval from the Korea Communications Commission in advance, as prescribed by Presidential Decree.
<Amended by Act No. 9128, Jun. 13, 2008>
(4)
Where granting approval under paragraph (3), the Korea Communications Commission shall take into account the matters referred to in each subparagraph of
Article 12
and may attach necessary conditions for the efficient and fair utilization of radio wave resources.
<Amended by Act No. 9128, Jun. 13, 2008>
(5)
Any person who has been granted approval for transfer of the right to utilize frequencies under paragraph (3) shall succeed to the status of the person allocated the frequencies under
Article 11
and that of the installer (limited to the case where a person, who has been granted frequencies, has obtain permission for or filed a report with respect to the opening of a wireless station).
<Amended by Act No. 7815, Dec. 30, 2005; Act No. 8776, Dec. 21, 2007>
(6)
Article 13
shall apply
mutatis mutandis
to the disqualification of any person who intends to transfer or lease the right to utilize frequencies.
<Amended by Act No. 9128, Jun. 13, 2008>
법령보기 화면
Article 15 (Utilization Period of Allocated Frequencies)
(1)
The Korea Communications Commission shall determine a utilization period within the scope of 20 years for the frequencies allocated under
Article 11,
and within the scope of ten years for the frequencies allocated under
Article 12,
taking into account circumstances surrounding the utilization of frequencies, and announce such period.
(2)
The utilization period of the frequencies transferred under
Article 14
(2) shall be the remainder of the utilization period under paragraph (1).
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 15-2 (Revocation of Allocation of Frequencies)
(1)
The Korea Communications Commission may revoke an allocation of frequencies where the recipient of the allocation of frequencies under
Article 10
falls under any of the following subparagraphs:
Provided
, That the allocation of frequencies shall be revoked in cases under subparagraph 1:
1.
Where the recipient of an allocation of frequencies falsely or in any other unlawful manner;
2.
Where the recipient of an allocation of frequencies under
Article 10
is subject to revocation of the license of a key communications business under
Article 15 of the Telecommunications Business Act
or revocation of the license for CATV broadcasting business or the registration of the signal transmission network business under
Article 18 of the Broadcasting Act
;
3.
Where the recipient of an allocation of frequencies has violated the frequency usage or technical mode designated at the time the relevant frequencies were allocated under
Article 10
(1);
4.
Where the recipient of the allocation of frequencies has failed to perform the conditions under
Article 10
(3);
5.
Where the recipient of the allocation of frequencies has failed to pay the consideration for allocation of frequencies under
Article 11
(3).
(2)
The Korea Communications Commission may order the rectification only once before revoking the allocation of frequencies under paragraph (1) (excluding subparagraph 1).
(3)
Deleted. <by Act No. 9482, Mar. 13, 2009>
[This Article Added by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 16 (Reallocation)
(1)
The Korea Communications Commission may reallocate the frequencies, the utilization period of which expires to any frequency utilizers at the time of completion of utilization period:
Provided
, That the same shall not apply in cases falling under any of the following subparagraphs:
1.
Where a frequency utilizer does not desire such reallocation;
2.
Where any need to use the relevant frequencies for the purposes of national defense, public safety and the rescue of people in trouble exists;
3.
Where the International Telecommunication Union has distributed the relevant frequencies for other business or usages;
4.
Where any condition under
Article 10
(3) has been violated.
(2)
Where the Korea Communications Commission intends to make a reallocation under paragraph (1), it may have any interested parties submit their opinions.
(3)
Where the Korea Communications Commission intends not to make any reallocation, falling under paragraph (1) 2 or 3, or intending to attach new conditions, such as make a reallocation by receiving the consideration for allocation of frequencies as the frequency allocated under
Article 12
falls under each subparagraph of
Article 11
(1), it shall notify thereof to the utilizers of frequency, in advance, one year before the completion of the utilization period.
(4)
The provisions from
Article 11
(3) through (5) shall apply
mutatis mutandis
to a reallocation falling under each subparagraph of paragraph (1) of the same Article, and
Article 12
shall apply
mutatis mutandis
to other cases.
(5)
In cases of reallocating frequencies, the conditions under
Article 10
(3) may be attached.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 17 (Alternation of Status)
(1)
The Korea Communications Commission may, in cases where the frequencies allocated after deliberation in accordance with
Article 12
are deemed to fall under any subparagraph of
Article 11
(1), deem the status of the person allocated the frequencies concerned as a person allocated the frequencies for consideration under
Article 11
.
<Amended by Act No. 9128, Jun. 13, 2008>
(2)
With respect to any person who intends to have his/her allocated frequencies altered under paragraph (1), the Korea Communications Commission may require him/her to pay the amount computed according to the standards prescribed by Presidential Decree.
<Amended by Act No. 9128, Jun. 13, 2008>
(3)
Deleted. <by Act No. 8776, Dec. 21, 2007>
(4)
Articles 10
(3) and
11
(6) shall apply
mutatis mutandis
to an alternation of status referred to in paragraph (1).
<Amended by Act No. 9128, Jun. 13, 2008>
(5)
Necessary matters concerning the procedures, etc. for an alternation of status under paragraph (1) shall be prescribed by Presidential Decree.
<Amended by Act No. 9128, Jun. 13, 2008>
법령보기 화면
Article 18 (Ledger Managing Rights to Utilize Frequencies)
(1)
The Korea Communications Commission shall keep and manage a ledger entered with matters relating to the right to utilize frequencies (hereinafter referred to as "ledger managing rights to utilize frequencies") to efficiently manage the rights to utilize frequencies, as prescribed by Presidential Decree.
(2)
Any person who intends to gain access to or to obtain a copy of the ledger managing rights to utilize frequencies shall file an application thereof with the Korea Communications Commission, as prescribed by Presidential Decree.
(3)
The ledger managing right to utilize frequencies under paragraph (1) shall be maintained and managed in an electronic method unless any special ground exists to make electronic handling impossible.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
CHAPTER IV UTILIZATION OF RADIO WAVE RESOURCES
Section 1 Permission for and Operation of Wireless Station
법령보기 화면
Article 19 (Establishment of Wireless Station)
(1)
Any person who intends to open a wireless station shall obtain permission from the Korea Communications Commission, as prescribed by Presidential Decree:
Provided
, That any person who intends to open a wireless station, which falls under any of the following subparagraphs and is prescribed by Presidential Decree, such as a wireless station for which it is deemed unnecessary to limit frequencies or power of aerial lines for prevention of radio wave interference between nations or regions, or the wireless station whose purpose of establishment is not for safety of human lives, etc., shall file a report thereon with the Korea Communications Commission, as prescribed by Presidential Decree:
<Amended by Act No. 7815, Dec. 30, 2005; Act No. 8776, Dec. 21, 2007; Act No. 8867, Feb. 29, 2008; Act No. 9128, Jun. 13, 2008>
1.
A wireless station which emits weak radio waves or a wireless station requiring no installation work for wireless equipment;
2.
A wireless station used exclusively to receive signals;
3.
A wireless station opened by a person who is allocated frequencies under
Article 11
or
12
for the purpose of rendering telecommunications services, etc.
(2)
Notwithstanding the main sentence of paragraph (1) with the exception of each subparagraph, where a person who intends to open a wireless station prescribed by Presidential Decree to receive telecommunications services under subparagraph 7 of
Article 2 of the Framework Act on Telecommunications
enters into a service contract with a person who renders
such telecommunications services, the wireless station concerned shall be deemed to be granted permission by the Korea Communications Commission. In such cases,
Articles 22
,
24
,
26
,
32
and
69
(1) 2 shall not apply.
<Amended by Act No. 9128, Jun. 13, 2008>
(3)
Any operator of telecommunications business shall, when he/she has
entered into a service contract with a person who intends to open a wireless station under paragraph (2), notify the number of subscribers who have newly entered into a service contract and the total number of subscribers, with the Korea Communications Commission, as prescribed by Presidential Decree.
<Amended by Act No. 9128, Jun. 13, 2008>
(4)
Notwithstanding the proviso to paragraph (1) with the exception of each subparagraph, any person may open a wireless station which emits weak radio waves and is prescribed by Presidential Decree without filing a report thereof with the Korea Communications Commission.
<Amended by Act No. 9128, Jun. 13, 2008>
(5)
Notwithstanding paragraph (1), any person who has obtained approval from the Korea Communications Commission for use of frequencies, as prescribed by Presidential Decree, may open a wireless station.
<Amended by Act No. 9128, Jun. 13, 2008>
(6)
Services rendered by the wireless station and the classification of the wireless station shall be prescribed by Presidential Decree.
<Amended by Act No. 9128, Jun. 13, 2008>
법령보기 화면
Article 20 (Disqualifications for Opening of Wireless Station)
(1)
A person falling under any of the following subparagraphs shall be prohibited from opening any wireless station:
Provided
, That the same shall not apply to cases where wireless stations are opened under
Article 19
(1) 1 and 2, (2) and (4):
<Amended by Act No. 7815, Dec. 30, 2005; Act No. 8776, Dec. 21, 2007; Act No. 9128, Jun. 13, 2008>
1.
A person who does not hold nationality of the Republic of Korea;
2.
Any foreign government or its representative;
3.
Any foreign corporation or any foreign organization;
4.
A person who has been sentenced to imprisonment without prison labor or a heavier punishment for violating this Act and for whom two years have not passed from the date on which the execution of such sentence terminated or the exemption of such execution was confirmed;
5.
A person in the period of a stay after having been sentenced to a stay of execution of imprisonment without prison labor or a heavier punishment for violating this Act;
6.
A person who has been sentenced to a punishment for committing the crime of insurrection and foreign aggression under the
Criminal Act
, the crime of serving the interest of the enemy under the Military Criminal Act, or the crime of violating the
National Security Act
, and for whom two years have not passed from the date on which the execution of such sentence terminated or the exemption of such execution was confirmed;
7.
A person for whom permission to open a wireless station has been revoked under
Article 72
(2) or who has been ordered to close the wireless station for which a report on opening was filed and the relevant ground has not ceased to exist.
(2)
The provisions of paragraph (1) 1 through 3 shall not apply to any wireless station falling under any of the following subparagraphs:
<Amended by Act No. 9128, Jun. 13, 2008>
1.
An experimental wireless station (referring to a wireless station used exclusively for conducting experiments for the development of science or technology; hereinafter the same shall apply);
2.
A wireless station of a ship under
Article 29 of the Ship Safety Act
;
3.
A wireless station operated for the domestic aviation of aircraft for which permission has been granted under the proviso to
Articles 145 (proviso) and 148 of the Aviation Act
;
4.
A wireless station falling under any of the following items, for one of which the Republic of Korea grants permission to the government, representatives and citizens of a foreign nation to open in its territory in the same manner as such foreign nation does for the government, representatives and citizens of the Republic of Korea in its territory:
(a)
A wireless station opened in a diplomatic mission, such as an embassy in which diplomatic and consular affairs of a foreign nation are carried out in the Republic of Korea for communications between specific points;
(b)
An amateur wireless station (referring to a wireless station used exclusively for self-training and technical research out of a personal interest in wireless technology; hereinafter the same shall apply);
(c)
A wireless station which renders ground mobile services and is prescribed by Presidential Decree;
5.
A wireless station permitted by the Korea Communications Commission to open only during a period of international or national events held within the Republic of Korea;
6.
An amateur wireless station opened by a person falling under any of the following items:
(a)
A person who has acquired the qualification as an amateur radio operator of the Republic of Korea granted under
Article 70
;
(b)
A person who intends to operate a wireless station during his/her temporary stay in the Republic of Korea after obtaining recommendation from an organization designated by the Korea Communications Commission (limited to any person who has acquired the qualification of an amateur radio operator in his/her country);
7.
A wireless station opened within the aircraft or ship for offering telecommunications services in the relevant aircraft or ship entering or leaving the Republic of Korea.
법령보기 화면
Article 20-2 (Conditions for Opening of Wireless Station)
(1)
Each wireless station shall satisfy the following conditions for opening:
<Amended by Act No. 8867, Feb. 29, 2008>
1.
The content of communications shall be appropriate for the purpose of opening;
2.
No relevant wireless facility shall be provided to persons, other than installers:
Provided
, That the same shall not apply to any wireless station leased to another persons under
Article 48
(1), opened for
smooth communication between those closely related for business and recognized by the Korea Communications Commission or that conducts urgency communications under
Article 25
(2) 4;
3.
No purpose of opening, content of communications nor selection of correspondents shall violate Acts and subordinate statutes;
4.
The minimum frequencies and power of aerial necessary for the achievement of the purpose of opening shall be used;
5.
The wireless facilities shall be installed at a place that does not cause any interference to the human life, property and safety of aircraft;
6.
No wireless station shall cause any inference to the operation of other wireless stations already installed.
(2)
Any necessary matters concerning the conditions for opening according to the classification of wireless station under
Article 19
(6), other than those under paragraph (1), shall be prescribed by Presidential Decree.
[This Article Added by Act No. 8776, Dec. 21, 2007]
법령보기 화면
Article 21 (Permission for Opening Wireless Station)
(1)
Any person who intends to obtain permission to open a wireless station shall file an application for such permission with the Korea Communications Commission, as prescribed by Presidential Decree.
<Amended by Act No. 9128, Jun. 13, 2008>
(2)
The Korea Communications Commission, upon receiving an application for permission under paragraph (1), shall examine matters falling under each of the following subparagraphs:
<Amended by Act No. 8776, Dec. 21, 2007; Act No. 8867, Feb. 29, 2008; Act No. 9128, Jun. 13, 2008>
1.
Whether the designation of frequencies is possible;
2.
Whether wireless facilities to be installed and operated are in conformity with the technical standards under
Article 45
;
3.
Whether plans for posting persons engaged in wireless work are in conformity with the standards for the qualification and the posting of a fixed number of persons engaged in wireless work under
Article 71
;
4.
Whether opening a wireless station is in conformity with
Article 20-2
.
(3)
The Korea Communications Commission may, when it deems it necessary to make the examination referred to in paragraph (2), require an applicant to furnish data or listen to his/her opinion.
<Amended by Act No. 9128, Jun. 13, 2008>
(4)
The Korea Communications Commission shall, if it deems an application is appropriate based on the result of the examination made under paragraph (2), grant the applicant permission to open a wireless station and issue a certificate of permission stating a deadline for completing the construction of a wireless station and other matters prescribed by Presidential Decree, to the applicant.
<Amended by Act No. 9128, Jun. 13, 2008>
(5)
The Korea Communications Commission shall, when it grants permission to open a wireless station prescribed by Presidential Decree, announce it, as prescribed by Presidential Decree.
<Amended by Act No. 9128, Jun. 13, 2008>
법령보기 화면
Article 22 (Effective Term of Permission for Opening Wireless Station and Approval for Use of Frequencies)
(1)
The effective term of permission to open a wireless station under
Article 19
(1) shall be prescribed by Presidential Decree within not more than seven years, and that of approval for use of frequencies under paragraph (5) of the same Article shall be prescribed by Presidential Decree within not more than ten years, and when the relevant period has expired, repermission or re-approval may be rendered.
<Amended Act No. 9455, Feb. 6, 2009>
(2)
Notwithstanding paragraph (1), the effective term of permission to open a wireless station in any ship, aircraft or light aircraft, which is mandatory under the
Ship Safety Act
or the
Aviation Act
, shall be indefinite.
<Amended by Act No. 9773, Jun. 9, 2009>
(3)
The effective term of permission or approval under paragraph (1) shall be reckoned from the date provided for in any of the following subparagraphs:
1.
Permission to open a wireless station shall be on the date subject to an issuance of certificate of the inspection of work completion under
Article 24
(3):
Provided
, That permission to open a wireless station under each subparagraph of
Article 25
(1) shall be on the date on which the relevant permission is obtained;
2.
Approval for use of frequencies shall be on the date on which the relevant approval is obtained.
(4)
The procedures for re-permission or re-approval under paragraph (1) and other necessary matters shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 23 (Succession of Permission)
(1)
Any person falling under any of the following subparagraphs shall succeed the status of the installer (excluding any person succeeding the status of the installer under
Article 14
(5); hereafter in this Article the same shall apply):
<Amended by Act No. 8776, Dec. 21, 2007; Act No. 9128, Jun. 13, 2008>
1.
The transferee, in cases where the installer transfers his/her wireless station related to his/her business while transferring his/her business;
2.
A corporation that survives a merger or a corporation that is incorporated by a merger in cases where the corporation that is an installer is merged;
3.
The heirs, in cases where the installer is deceased;
4.
A person who operates a ship or an aircraft in cases where there is a change in the operator of the ship or aircraft equipped with a wireless station due to the transfer of the ownership of, or a lease contract, etc. for such ship or such aircraft.
(2)
Any person falling under paragraph (1) 1 or 2 shall obtain authorization from the Korea Communications Commission, as prescribed by Presidential Decree.
<Amended by Act No. 9128, Jun. 13, 2008>
(3)
Any person who falls under paragraph (1) 3 or 4, or any other person who intends to succeed a wireless station prescribed by Presidential Decree shall file a report thereof with the Korea Communications Commission, as prescribed by Presidential Decree.
<Amended by Act No. 9128, Jun. 13, 2008>
(4)
Article 20
shall apply
mutatis mutandis
to the disqualification of authorization under paragraph (2) and the report under paragraph (3).
<Amended by Act No. 9128, Jun. 13, 2008>
(5)
In cases where not less than two persons succeed the status of the installer through a corporate merger or inheritance, one of such persons shall be selected as the representative.
<Amended by Act No. 9128, Jun. 13, 2008>
법령보기 화면
Article 24 (Inspection)
(1)
Any person who has been granted permission to open a wireless station under
Article 21
(4) shall, if an installation of wireless facilities and equipment is completed, file a report of completion with the Korea Communications Commission and then undergo an inspection to determine whether the wireless facilities and equipment installed are in conformity with the technical standards and the standards for the qualification and the posting of a fixed number of persons engaged in wireless work (hereinafter referred to as "inspection of completion").
<Amended by Act No. 8776, Dec. 21, 2007; Act No. 8867, Feb. 29, 2008>
(2)
The Korea Communications Commission may, if it receives an application for extending the deadline for completing the work stated in the certificate issued under
Article 21
(4) from a person who has been granted permission to open a wireless station under same paragraph, extend such deadline when it deems the relevant grounds appropriate. In such cases, the total extended period shall not exceed one year.
<Amended by Act No. 9128, Jun. 13, 2008>
(3)
The Korea Communications Commission shall, when wireless facilities and equipment are found to conform with the technical standards under
Article 45
and qualifications and a fixed number of persons engaged in wireless work are found to conform with the standards for the qualification and the posting of a fixed number of persons engaged in wireless work under
Article 71
as a result of the inspection under paragraph (1), issue without delay a certificate of the completion of inspection to the applicant.
<Amended by Act No. 9128, Jun. 13, 2008>
(4)
The Korea Communications Commission shall conduct regular inspections of any wireless station that has been granted permission to open such wireless station under
Article 21
(4) for every period prescribed by Presidential Decree for each wireless station within the limit of five years. Necessary matters concerning the time, methods and procedures for regular inspections shall be prescribed by Presidential Decree.
<Amended by Act No. 9128, Jun. 13, 2008>
(5)
The Korea Communications Commission may, when any domestic ship or aircraft equipped with the wireless station is about to sail or fly out of the country to any foreign destination or it is deemed especially necessary to efficiently utilize or control the radio waves, inspect the technical standards for wireless facilities and equipment, the qualification and a fixed number of persons engaged in wireless work and other necessary matters, etc.
<Amended by Act No. 9128, Jun. 13, 2008>
(6)
Notwithstanding paragraph (4), with respect to the wireless station of any ship or aircraft which is overseas during the regular inspection period and other wireless station which is deemed unnecessary to undergo the regular inspection, the Korea Communications Commission may extend, exempt or omit such regular inspection.
<Amended by Act No. 9128, Jun. 13, 2008>
법령보기 화면
Article 25 (Operation of Wireless Station)
(1)
Each wireless station shall go into operation after undergoing the inspection of completion under
Article 24
(1):
Provided
, That this shall not apply to a wireless station falling under any of the following subparagraphs:
<Amended by Act No. 9128, Jun. 13, 2008>
1.
A wireless station installed in a fishing boat, a small-sized wireless station and an amateur wireless station, all of which are prescribed by Presidential Decree;
2.
A wireless station, permission for which is renewed under
Article 22
(1);
3.
A simple wireless station which does not require the work of installing wireless facilities and equipment and is prescribed by Presidential Decree;
4.
The wireless station of a ship or aircraft, which has failed to arrive in a destination in Korea after having been acquired overseas;
5.
The wireless station whose installer is a foreigner from among the wireless stations falling under
Article 20
(2) 7.
(2)
Each wireless station shall be operated within the scope reported under the proviso to
Article 19
(1), with the exception of each subparagraph and the scope of matters entered in the certificate of permission issued under
Article 21
(4):
Provided
, That the same shall not apply to cases where communications falling under any of the following subparagraphs are made:
<Amended by Act No. 9128, Jun. 13, 2008>
1.
Distress communications (referring to wireless communications made after sending out distress signals in cases where any ship or aircraft is in a grave, impending crisis; hereinafter the same shall apply);
2.
Emergency communications (referring to wireless communications made after sending out emergency signals in cases where any ship or aircraft is likely to face a grave and impending danger and a tense situation occurs; hereinafter the same shall apply);
3.
Safety communications (referring to wireless communications made after sending out safety signals to prevent any grave danger for any navigating ship and aircraft; hereinafter the same shall apply);
4.
Emergency communications (referring to wireless communications made to rescue human lives, give disaster relief, secure traffic communications or maintain order in cases where an emergency situation occurs or is likely to occur following earthquake, typhoon, flood, tidal wave or fire, or wire communications are unavailable or it is difficult to utilize such wire communications; hereinafter the same shall apply);
5.
Other communications prescribed by Presidential Decree.
(3)
The wireless station under
Article 9
(1) 3 may be operated after filing a report of completion under
Article 24
(1) or
26
(2) to be applied
mutatis mutandis
under
Article 33
:
Provided
, That the operation of the wireless station shall be suspended and the reinspection shall be conducted in cases where the wireless station fails to pass the inspection under
Article 24
(1) or
26
(2).
<Added by Act No. 8776, Dec. 21, 2007>
법령보기 화면
Article 26 (Permission for Alteration)
(1)
When any person who has been granted permission to open a wireless station under
Article 21
(4) intends to alter a permitted matter prescribed by Presidential Decree, he/she shall obtain permission thereof from the Korea Communications Commission, as prescribed by Presidential Decree.
<Amended by Act No. 9128, Jun. 13, 2008>
(2)
Any person who has been granted permission for alteration under paragraph (1) shall file a report of completion with the Korea Communications Commission in cases where the wireless facilities and equipment have been completed and undergo an inspection to determine whether the alteration has been made as permitted.
<Amended by Act No. 8776, Dec. 21, 2007; Act No. 8867, Feb. 29, 2008>
(3)
Articles 21
(2) through (4),
24
(2), (6) and the main sentence of
Article 25
(1), with the exception of each subparagraph, shall apply
mutatis mutandis
to permission granted for the alteration under paragraph (1). In such cases, "wireless station" in
Articles 21
(4),
24
(2) and the main sentence of
Article 25
(1), with the exception of each subparagraph, shall be deemed "wireless facilities and equipment".
<Amended by Act No. 9128, Jun. 13, 2008>
법령보기 화면
Article 27 (Communications Methods, etc.)
Any wireless station shall be operated, as prescribed by the notification of the Korea Communications Commission in a manner consistent with the matters relating to the wireless station's calling method, responding methods, hours of operation, the obligation to listen and other communications methods.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 28 (Distress Communications, etc.)
(1)
Conditions, such as frequencies to be used and the type of radio waves, that must be met by any wireless station that is mandatorily installed in a ship, aircraft or light aircraft under the
Ship Safety Act
or the
Aviation Act
shall be prescribed by the notification of the Korea Communications Commission.
<Amended by Act No. 9780, Jun. 9, 2009>
(2)
Where any wireless station falling under any of the following subparagraphs receives any distress signal, it shall immediately respond to such emergence call prior to any other wireless communications and take every possible measure to notify a wireless station located most conveniently for rescuing the ship or the aircraft in trouble and when it receives emergency communications or safety communications, it shall take necessary measures, as prescribed by the notification of the Korea Communications Commission:
1.
Coastal wireless station (referring to a wireless station opened and fixed to the ground to communicate with ship wireless stations; hereinafter the same shall apply);
2.
Ship wireless station (referring to a wireless station opened in a ship to communicate with respect to its maritime mobile activities; hereinafter the same shall apply);
3.
Aviation wireless station (referring to a wireless station opened and fixed to the ground to communicate with aircraft stations; hereinafter the same shall apply);
4.
Aircraft wireless station (referring to a wireless station opened in aircraft to communicate with respect to its aerial mobile activities; hereinafter the same shall apply).
(3)
Any ship wireless station, when it moves into or out of the communications range of a coastal wireless station, shall give notice thereof to a coastal wireless station, as prescribed by Presidential Decree.
(4)
Any aircraft wireless station shall, when its aircraft is in the air, communicate with an aviation wireless station, as prescribed by the notification of the Korea Communications Commission.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 29 (Prevention of Radio Interference, etc.)
Each wireless station shall be operated in a manner that it does not cause any radio interference which impedes or obstructs the operation of other wireless stations:
Provided
, That the same shall not apply to the communications made under
Article 25
(2) 1 through 4.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 30 (Observance of Security of Communications)
(1)
Each installer, each person who engages in the business of wireless communications or any other person who utilizes wireless facilities and equipment shall observe matters relating to the security of communications provided for by the notification of the Korea Communications Commission, such as a designation of a person responsible for the security of communications, and completion of education for the security of communications, etc.
(2)
Necessary matters concerning education, etc. for the communications security under paragraph (1) shall be prescribed by the notification of the Korea Communications Commission.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 31 (Communications of Experimental Wireless Station, etc.)
(1)
Each experimental wireless station shall be prohibited from communicating with any experimental wireless station of a foreign country.
(2)
Each experimental wireless station and each amateur wireless station shall be prohibited from using secret codes when they communicate.
(3)
No amateur wireless station shall communicate for any third person:
Provided
, That the same shall not apply to the communication for an opener of other amateur wireless stations or the communication for emergency disaster relief.
(4)
Any amateur wireless station may make relay communications by linking the wire-wireless interface to wireless facilities and equipment for emergency disaster relief.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 32 (Close and Suspension of Wireless Station Operation)
(1)
The installer shall, when he/she intends to close his/her wireless station or suspend the operation of his/her wireless station for not less than one month, or re-operate a wireless station, the operation of which has been suspended not less than one month, file a report thereof with the Korea Communications Commission, as prescribed by Presidential Decree.
(2)
When the installer (limited to any person who has been granted permission for opening a wireless station under
Article 21
(4)) files a report with respect to the close of his/her wireless station, the validity of permission granted for his/her wireless station shall be terminated.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 33 (Provisions Applicable Mutatis Mutandis)
Articles 24 and 26 (excluding the main sentence of
Article 25
(1), with the exception of each subparagraph, to be applied
mutatis mutandis
under
Article 26
(3)) shall apply
mutatis mutandis
to any wireless station under
Article 19
(1) 3. In such cases, "permission to open" in
Article 24
shall be deemed "report on opening", and "permission to open", "permission" and "permission to alter" in
Article 26
shall be deemed the "report on opening", "report" and "report on alternation", respectively.
[This Article Wholly Amended by Act No. 8776, Dec. 21, 2007]
Section 2 Permission for Opening Broadcasting Station and Its Operation
법령보기 화면
Article 34 (Permission for Opening Broadcasting Station)
(1)
Deleted. <by Act No. 8867, Feb. 29, 2008>
(2)
The Korea Communications Commission shall, upon receiving an application for permitting the establishment of a broadcasting station under
Article 21
(1), examine matters falling under each of the following subparagraphs in addition to the matters under paragraph (2) 1 through 3 of the same Article:
<Amended by Act No. 9128, Jun. 13, 2008>
1.
Whether the conditions for opening a broadcasting station under
Article 35
are satisfied;
2.
Other matters necessary to run broadcasting business in a proper manner, which are prescribed by Presidential Decree.
법령보기 화면
Article 35 (Conditions for Opening Broadcasting Station)
(1)
Any person who intends to open a broadcasting station shall install such broadcasting station in a manner that it does not cause any radio interference with the reception of other broadcasts.
(2)
Necessary matters concerning conditions, such as the location of the station, the height of aerial transmission lines, generating power and directional characteristics, for opening a broadcasting station for the prevention of radio interferences shall be prescribed by Presidential Decree.
(3)
The Korea Communications Commission may, when details of an application for permission filed by a person who intends to open a broadcasting station, fail to conform to the conditions for opening a broadcasting station under paragraph (2), order a supplementation therefor, such as relocation of the place of installation.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 36 (Protection of Reception of Broadcasts)
(1)
Any person who owns any building causing interference with the reception of ordinarily receivable broadcasts shall take necessary measures to remove such interference.
(2)
The standards for ordinally receivable broadcasts referred to in paragraph (1) shall be prescribed by the notification of the Korea Communications Commission and matters necessary to remove the interference with the reception of broadcasts shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 37 (Standard Method of Broadcasting)
(1)
The Korea Communications Commission shall set and announce the standard methods of broadcasting to ensure the efficient utilization of frequencies used for broadcasting business and increase conveniences for its users.
(2)
The Korea Communications Commission shall, if it sets or alters the standard methods of broadcasting in accordance with paragraph (1), listen, in advance, to the opinion of interested parties.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
Section 3 Operation of Space Communications
법령보기 화면
Article 38 (Securing of Satellite Orbit and Frequencies)
The Korea Communications Commission shall take policy measures to secure a satellite orbit and frequencies (hereinafter referred to as "satellite orbit, etc.") for space communications.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 39 (International Registration of Satellite Orbits, etc.)
(1)
Any person who intends to secure a satellite orbit, etc. to open a space station shall request the Korea Communications Commission to file an application for the international registration of a satellite network, as prescribed by Presidential Decree.
(2)
The Korea Communications Commission shall, in cases where the details of the request for filing an application for the international registration of a satellite network under paragraph (1) satisfy matters falling under any of the following subparagraphs, file an application for the international registration of a satellite network with the International Telecommunication Union in accordance with the Radio Regulations of the International Telecommunication Union, and return such request or have such request supplemented by specifying the period, in cases where the details of such request do not satisfy matters falling under any of the following subparagraphs:
1.
The designation of frequencies in the space station to be opened by the applicant shall be possible;
2.
The satellite business plan shall be appropriate;
3.
The applicant shall have the capability to adjust the radio interference of satellite network.
(3)
Where an application for the international registration of a satellite network has been filed under paragraph (2), any person who has requested the filing of such application to the Korea Communications Commission under paragraph (1) shall bear costs involved in the international registration of a satellite network, as prescribed by the International Telecommunication Union.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 40 (Rectification of Radio Interference of Satellite Network)
(1)
The Korea Communications Commission shall take policy measures necessary to rectify any radio interference with satellite networks under the jurisdiction of foreign countries.
(2)
The Korea Communications Commission may require any person who has requested filing of an application for the international registration of a satellite network under
Article 39
(1) to furnish data necessary to rectify radio interferences.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 41 (Allocation, etc. of Satellite Orbits, etc.)
(1)
Where allowing a person falling under any of subparagraphs of Article 10 (1) to utilize the satellite orbits, etc., the allocation shall be made by applying
mutatis mutandis
Articles 10 through 18
.
(2)
Where allowing a person, other than the persons falling under each subparagraph of
Article 10
(1) to utilize the satellite orbits, etc., the satellite orbits, etc. shall be designated in the space station when granting permission to open the space station under
Article 21
.
(3)
When a satellite orbit, etc. has been secured under
Article 39
, the Korea Communications Commission shall allocate it under paragraph (1) or designate it under paragraph (2) preferentially to the relevant requester.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 42 (Conditions for Opening Space Station)
Any space station shall have a function to immediately halt the emission of radio waves and to change its orbit by means of the remote control from the control facilities and equipment.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 43 (Change of Satellite Orbit)
The Korea Communications Commission may, when it deems it necessary to rectify radio interference or efficiently utilize radio wave resources, allow an installer of a space station to change a satellite orbit to the extent it creates no serious impediment to attaining the objective.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 44 (Registration of Man-Made Satellite with United Nations)
(1)
The Korea Communications Commission shall register a man-made satellite launched by a citizen of the Republic of Korea with the United Nations in accordance with the Convention on Registration of Objects Launched into Outer Space.
(2)
The Korea Communications Commission may request any person who has launched a man-made satellite to submit the data required for registration of relevant man-made satellite.
(3)
Where registration has been obtained under paragraph (1), the Korea Communications Commission shall notify without delay the Minister of Education, Science and Technology of the results of registration.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
CHAPTER V PRESERVATION OF RADIO WAVE RESOURCES
법령보기 화면
Article 45 (Technical Standards)
Any wireless facilities and equipment (excluding those used only for the purpose of receiving broadcasts) shall conform with the technical standards prescribed by the notification of the Korea Communications Commission, such as the frequency tolerance and the power of an aerial (referring to the power supplied to the feeder of the aerial; hereinafter the same shall apply).
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 46 (Type Approval Test and Type Registration, etc.)
(1)
Any person who intends to manufacture or import apparatuses for wireless facilities and equipment shall undergo a type approval test conducted by the Korea Communications Commission or file a type registration with the Korea Communications Commission:
Provided
, That the same shall not apply to apparatuses, etc. for wireless facilities and equipment for experiment, research, or export prescribed by the notification of the Korea Communications Commission.
(2)
Necessary matters concerning apparatuses subject to a type approval test or type registration under paragraph (1), methods and procedures, etc. for such type approval test or type registration shall be prescribed by the notification of the Korea Communications Commission. In such cases, if it intends to determine the apparatuses subject to a type approval test or type registration, consult with the heads of central administrative agencies concerned.
(3)
The apparatuses subject to a type approval test or type registration under paragraph (2), for which a type approval test has passed or type registration has been filed, shall not be sold, manufactured, displayed, stored or transported for the purpose of selling them or kept in any wireless station before they are affixed a mark of the passing of a type approval test or a mark of type registration.
(4)
In conducting a type approval test or type registration under paragraph (1), the Korea Communications Commission may obtain testing institutions designated by the Korea Communications Commission (hereinafter referred to as "designated testing institutions") to conduct performance tests.
(5)
Articles 33-2 and 52 of the Framework Act on Telecommunications
shall apply
mutatis mutandis
to designation and revocation, etc. of any designated testing institution.
(6)
Where intending to alter matters provided for by notification of the Korea Communications Commission in relation to details, etc. of criteria under
Articles 45
and
47-2
for the apparatuses passing a type approval test or filing for type registration under paragraph (1), a report thereon shall be made to the Korea Communications Commission.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 47 (Installation of Safety Facilities)
Every wireless facility and equipment shall be installed according to the safety standards prescribed by the notification of the Korea Communications Commission so as not to harm human safety or damage goods.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 47-2 (Standards, etc. for Protection of Human Safety from Electromagnetic Waves)
(1)
The Korea Communications Commission shall set and announce standards for protection of the human body from electromagnetic waves, standards for measuring the intensity of electromagnetic waves, standards for measuring the absorption rate of electromagnetic waves, apparatuses subject to the measurement and measuring methods, etc., taking into account the impact of electromagnetic waves generating from wireless facilities, equipment, etc. on the human body.
(2)
The installer of a wireless station or any person who intends to manufacture or import apparatuses for wireless facilities and equipment shall keep the intensity of electromagnetic waves radiating from the wireless facilities and equipment from exceeding the standards for the protection of human safety from the electromagnetic waves and shall install safety facilities which prevent any person, other than authorized persons from gaining access to any place in which such electromagnetic waves are in excess of such standards.
(3)
The installer of a wireless station which falls under the standards prescribed by Presidential Decree in terms of the power of an aerial, the place of installation, etc. shall measure the intensity of electromagnetic waves in accordance with the standards for the protection of human safety from electromagnetic waves and the standards for measuring the intensity of electromagnetic waves publicly announced under paragraph (1), and report the results thereof to the Korea Communications Commission.
(4)
The installer of a wireless station obliged to report on the intensity of electromagnetic waves under paragraph (3) may request the Korea Communications Commission for measurement of the intensity of electromagnetic waves at the time of an inspection of the wireless station under
Articles 24
and
26
(including cases applied
mutatis mutandis
under
Article 33
). In such cases, the installer of he wireless station shall be deemed to have discharged his/her obligation to report on the intensity of electromagnetic waves under paragraph (3).
(5)
The Korea Communications Commission may measure or investigate the intensity of electromagnetic waves of any wireless station in cases where it determines that there is a possibility for the intensity of electromagnetic waves radiating from the wireless station to exceed the standards for the protection of human safety from electromagnetic waves publicly announced under paragraph (1), or that there is a necessity to confirm whether the results of measurement reported by an installer of the wireless station is false or not under paragraph (3).
(6)
The Korea Communications Commission may order to take necessary measures, such as an installation of safety facilities, restrictions on operation, suspension of operation, etc. in cases where the intensity of electromagnetic waves reported, measured, and investigated under paragraphs (3) through (5) exceed the standards for the protection of human safety from electromagnetic waves.
(7)
Necessary matters concerning the timing and methods of report on the intensity of electromagnetic waves under paragraph (3), and the timing and methods, etc. of measurement request for the intensity of electromagnetic waves under paragraph (4) shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 48 (Efficient Utilization of Wireless Facilities and Equipment)
(1)
The installer may, if he/she deems it necessary to efficiently utilize the wireless facilities and equipment, lease such wireless facilities and equipment of a wireless station, entrust their operation, in whole or part, or operate them in collaboration with other persons after obtaining approval from the Korea Communications Commission, as prescribed by Presidential Decree.
<Amended by Act No. 9128, Jun. 13, 2008>
(2)
The Korea Communications Commission may, where it deems it necessary to protect the natural environment, order the installer to use the wireless facilities and equipment of a wireless station, in whole or part, jointly with another person.
<Amended by Act No. 8867, Feb. 29, 2008>
(3)
Necessary matters concerning wireless facilities and equipment subject to the joint use or requisites referred to in paragraph (2) shall be prescribed by Presidential Decree.
<Amended by Act No. 9128, Jun. 13, 2008>
법령보기 화면
Article 49 (Monitoring of Radio Waves)
(1)
The Korea Communications Commission shall perform the duty of monitoring radio waves to facilitate the efficient utilization of radio waves and to maintain and protect order in utilizing radio waves by swiftly removing signal interference.
(2)
The duty of monitoring radio waves under paragraph (1) shall be as follows:
1.
Measurement of quality of radio waves, such as the variation and bandwidth of frequencies used by a wireless station;
2.
Detection of radio waves causing radio interference;
3.
Detection of radio waves emitted by an unlicensed wireless station;
4.
Detection of the orientation of the communications under
Article 28
(2) and the radio waves emitted by an unlicensed wireless station, and the radio waves for which a request is filed for a survey in connection with radio interference, etc.;
5.
Verification of whether matters under
Articles 25
and
27 through 30
are observed;
6.
Other matters prescribed by Presidential Decree in order to maintain and protect order in utilizing radio waves.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 50 (Monitoring of International Radio Waves)
(1)
The Korea Communications Commission shall perform the duty of monitoring international radio waves, which includes monitoring radio waves emitted by foreign wireless stations, and analyzing and removing radio interference caused by such foreign wireless stations.
(2)
The Korea Communications Commission shall install or operate facilities and equipment necessary for performing the duty referred to in paragraph (1).
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 51 (Investigation of Radio Interferences, etc.)
(1)
When the Korea Communications Commission acknowledges the occurrence of radio interference or electromagnetic disturbances caused by wireless facilities and equipment, high voltage power transmission lines or other electrical facilities, it shall investigate them.
(2)
The Korea Communications Commission may, where it determines the existence of any radio interference or any electromagnetic disturbance based on the result of the investigation referred to in paragraph (1), order necessary measures taken to improve, suspend or remove the wireless facilities and equipment concerned or request the heads of the central administrative agencies to issue orders for necessary measures to be taken.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 52 (Protection of Wireless Direction Finding Device)
(1)
Any person who intends to construct a building or a structure prescribed by Presidential Decree that is likely to disturb radio waves in the area where the wireless direction finding device is protected (referring to the area within one kilometer from the location of wireless direction finding devices installed by the Korea Communications Commission) shall obtain approval thereof from the Korea Communications Commission.
<Amended by Act No. 8776, Dec. 21, 2007; Act No. 8867, Feb. 29, 2008>
(2)
The place where the wireless direction finding devices are installed under paragraph (1) shall be announced by the Korea Communications Commission:
Provided
, That the Korea Communications Commission may, when it deems it necessary for the security of communications, notify the heads of administrative agencies concerned of the relevant location of installment and not announce such location.
<Amended by Act No. 9128, Jun. 13, 2008>
법령보기 화면
Article 53 (Investigation and Measures)
(1)
The Korea Communications Commission may, where any person violating
Articles 19
,
25
,
26
,
29
,
45
,
46
,
52
,
57
or
58
is deemed to exist, request officials under its jurisdiction to investigate him/her or make tests, as prescribed by the notification of the Korea Communications Commission.
(2)
The Korea Communications Commission may, when the fact of violation is confirmed as a result of the investigation or the tests under paragraph (1), order an installer, owner, or manufacturer of the wireless facilities and equipment concerned or any person who has sold, displayed, stored or transported them to take measures necessary to correct, remove, destroy, take away or discontinue utilizing them, etc., as prescribed by the notification of the Korea Communications Commission.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 54 (Provisions of Data)
(1)
The installer may, in cases where any dispute between installers over the utilization of radio waves exists, request the Korea Communications Commission to provide him/her with necessary data, such as the current utilization of radio waves in the disputed area. In such cases, the Korea Communications Commission shall comply with such request unless any special grounds exist to the contrary.
(2)
The Korea Communications Commission shall, where it deems it necessary to provide the data requested under paragraph (1), dispatch officials under its supervision to investigate or confirm necessary matters and notify parties involved in the dispute of the results.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 55 (Measurement, etc. of Radio Wave Environment)
(1)
The Korea Communications Commission shall take measures necessary to protect the radio wave environment, such as measurement of the radio wave environment.
(2)
Necessary matters concerning the measurement of the radio wave environment, etc. under paragraph (1) shall be prescribed by the notification of the Korea Communications Commission.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 56 (Standards, etc. for Prevention of Electromagnetic Disturbances)
Standards for preventing any electromagnetic disturbance apparatus from emitting electromagnetic disturbances and standards for protecting any apparatus affected by electromagnetic waves therefrom shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 57 (Registration of Electromagnetic Compatibility)
(1)
Any person who intends to manufacture or import any electromagnetic disturbance apparatus or any apparatus affected by electromagnetic waves shall file for registration with respect to the electromagnetic compatibility of such apparatus with the Korea Communications Commission:
Provided
, That the same shall not apply to apparatuses for wireless facilities and equipment, which are prescribed by the notification of the Korea Communications Commission, for experiment, research or export, and apparatuses falling under any of the following subparagraphs, which have undergone tests, etc. with respect to electromagnetic disturbances and protection from electromagnetic waves corresponding to the registration of electromagnetic compatibility under this Act in accordance with relevant Acts and subordinate statutes:
<Amended by Act No. 9535, Mar. 25, 2009>
1.
An item certified under
Article 15 of the Industrial Standardization Act
;
2.
Safety certification under
Article 3
, safety test under Article 5, report, etc. on confirmation of self-safety under
Article 11
, safety inspection under
Article 12
and confirmation of supplier's conformity under
Article 14-3 of the Electrical Appliances Safety Control Act
;
3.
Industrial products that have undergone safety tests under the
Quality Control and Safety Management of Industrial Products Act
;
4.
Telecommunications machinery and materials that have been granted type approval under the
Framework Act on Telecommunications
;
5.
Automobiles that have been granted self-certification under the
Automobile Management Act
;
6.
Fire-fighting machinery and equipment that have been granted type approval under the Installation, Maintenance, and Safety Control of Fire-Fighting Systems Act;
7.
Medical appliances that have been granted permission by item under the Medical Appliances Act.
(2)
The provisions of
Article 46
(2) through (6) shall apply
mutatis mutandis
to apparatuses subject to the registration of electromagnetic compatibility. In such cases, "mark of the passing of a type approval test" or "mark of type registration" prescribed in
Article 46
(3) shall be deemed "indication of registration of electromagnetic compatibility", and "
Articles 45
and
47-2
" in
Article 46
(6) shall be deemed "
Article 56
".
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 58 (Radio Wave Applied Facilities and Equipment, etc. for Industrial, Scientific and Medical Purposes)
(1)
Any person who intends to operate facilities and equipment falling under any of the following subparagraphs shall obtain permission from the Korea Communications Commission:
1.
Facilities and equipment, falling under standards prescribed by Presidential Decree, which are designed to generate the radio wave energy for industrial, scientific, medical, and housekeeping purposes or other similar purposes in a limited place;
2.
Facilities and equipment whose electric intensity, etc. satisfies the criteria prescribed by Presidential Decree, from among the communications facilities and equipment with entire lines having a flow of electric current of at least nine kilohertz.
(2)
The Korea Communications Commission shall, upon receiving an application for permission under paragraph (1), grant such permission if it recognizes that such application is in conformity with the technical standards under
Article 45
and does not obstruct other communications.
(3)
Articles 21
(4),
24
through
26
,
32
,
45
and
72
shall apply
mutatis mutandis
to any facilities and equipment that have been granted permission under paragraph (1).
(4)
The Korea Communications Commission may determine and publicly notify the frequency band the operation of which is to be restricted, so as to make the communications facilities and equipment with entire lines having a flow of electric current of at least nine kilohertz, not to impede other communications.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
CHAPTER VI PROMOTION OF RADIO WAVES
법령보기 화면
Article 59 Deleted.<by Act No. 9128, Jun. 13, 2008>
법령보기 화면
Article 59-2 Deleted.<by Act No. 9482, Mar. 13, 2009>
법령보기 화면
Article 60 (Disclosure of Current Status of Utilization of Frequencies)
(1)
The Korea Communications Commission shall, where deemed necessary to facilitate the utilization of radio waves, announce the current status of the utilization of frequencies.
(2)
Necessary matters concerning scope, procedures, timing, etc. with respect to the publication referred to in paragraph (1) shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 61 (Research on Radio Waves)
(1)
The Korea Communications Commission shall conduct various research necessary to facilitate and protect the utilization of radio waves.
(2)
The researches conducted under paragraph (1) shall be as follows:
1.
Research on technical standards;
2.
Research on the analysis of the propagation of radio waves and the technique of allocating frequencies;
3.
Research on standards for rectifying radio interference of satellite networks;
4.
Research on electromagnetic disturbances and harm caused by radio waves on the human safety;
5.
Research on the measurement of the absorption rate of electromagnetic waves;
6.
Research on the measuring method and technology for radio wave apparatus;
7.
Research on the technology for receiving space radio waves and analysis of the received data;
8.
Observation of geomagnetism and ionosphere;
9.
Observation of solar spots;
10.
Analysis of the results of the observations under subparagraphs 8 and 9, and forecasts and warnings.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 62 (Facilitation of Technology Development)
The Korea Communications Commission shall take measures falling under each of the following subparagraphs to facilitate the research, development and utilization of technologies to build infrastructure for the radio wave industry and the broadcasting equipment industry:
1.
Survey of technological levels, research and development, and evaluation and utilization of developed technologies;
2.
Cooperation, guidance and transfer of technologies;
3.
Smooth distribution of technical information;
4.
Joint research and development by industrial, academic and research circles;
5.
Other matters necessary for developing technologies.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 63 (Standardization)
(1)
The Korea Communications Commission shall promote measures falling under the following subparagraphs regarding the standardization of radio waves utilization technology in order to facilitate the efficient utilization of radio waves, maintain order in utilizing radio waves, protect utilizers, etc.:
Provided
, That matters for which the Korean Industrial Standards under
Article 12 of the Industrial Standardization Act
prescribe shall be governed by such Standards:
1.
Setting and propagation of standards for radio waves;
2.
Certification of conformity with the standards for radio waves;
3.
Other matters necessary for standardization.
(2)
Necessary matters concerning the promotion of the standardization of technologies utilizing radio waves under paragraph (1) shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 64 (Training of Manpower)
The Korea Communications Commission shall formulate and implement policy measures falling under each of the following subparagraphs in order to train manpower specializing in radio waves:
1.
Support for radio wave education conducted at schools of various levels and another educational institutions;
2.
Support for projects designed to train manpower specializing in radio wave and broadcasting technologies;
3.
Development and propagation of and support for educational programs on radio waves;
4.
Other matters necessary for training manpower specializing in radio waves.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 65 (Facilitation of International Cooperation)
The Korea Communications Commission may support international cooperation projects designed for international personnel and technological exchanges, international standardization and international joint research and development, etc. to upgrade radio-wave utilization technologies.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 66 (Korea Radio Promotion Agency)
(1)
The Korea Radio Promotion Agency (hereinafter referred to as the "Promotion Agency") shall be established to perform the work for efficient management and promotion of radio wave and that entrusted by the government.
(2)
The Promotion Agency shall be a corporation.
(3)
The Promotion Agency shall be constituted by making an establishment registration at the location of its main office.
(4)
The Promotion Agency shall perform the work falling under each of the following subparagraphs:
1.
Research on promotion of the radio wave utilization;
2.
Collection, investigation and analysis of information on technology inside and outside of Korea related to radio wave and broadcasting;
3.
Support to research, and education on radio wave and broadcasting;
4.
Work incidental to subparagraphs 1 through 3;
5.
In addition thereto, works provided as business of the Promotion Agency in this Act or other Acts and subordinate statutes, and entrusted business, or business entrusted by the Korea Communications Commission.
(5)
Matters necessary for business, operation, etc. of the Promotion Agency shall be prescribed by Presidential Decree.
(6)
Except as provided for in this Act concerning the Promotion Agency, the provisions concerning the incorporated foundation referred to in the
Civil Act
shall apply
mutatis mutandis
.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 66-2 (Korea Radio Promotion Association)
(1)
The Korea Radio Wave Promotion Association (hereinafter referred to as the "Association") may be established in order to efficiently perform the following business:
1.
To promote a putting of the new technology for radio wave utilization to the practical use and dissemination;
2.
To efficiently perform the business of efficient utilization of radio wave resources, and the business concerning the creation of a basis for development of radio wave industry;
3.
Business concerning the standardization of radio wave utilization technology.
(2)
The Association shall be a juristic person.
(3)
The telecommunication business operator, installer, manufacturer of apparatus, systems and parts relating to radio waves, and other persons provided for by the articles of Association may become a member of the Association.
(4)
Matters necessary for the business, operation, etc. of the Association shall be prescribed by Presidential Decree.
(5)
Except as provided for in this Act concerning the Association, the provisions concerning the corporation as referred to in the
Civil Act
shall apply
mutatis mutandis
.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 66-3 (Operating Expenses, etc. of Promotion Agency)
(1)
Any expenses incurred in operating the Promotion Agency shall be used by the financial resources in the following subparagraphs:
1.
Fees for perusal of the ledger managing rights to utilize frequencies or for a copy of the ledger under
Article 69
(1) 1;
2.
Fees for inspection under
Article 69
(1) 3 (limited to inspection business entrusted by the Korea Communications Commission to the Promotion Agency);
3.
Fees for measurement of the intensity of electromagnetic waves under
Article 69
(1) 5;
4.
Fees for application for the technical qualification examination and fees for issuance of certificates of technical qualification under
Article 69
(1) 6 (excluding matters entrusted to the Human Resources Development Service of Korea under the
National Technical Qualifications Act
);
5.
Revenue according to the performance of work under
Article 66
(4) 1 through 4.
(2)
The government may subsidize any expenses incurred in performing the business of the Promotion Agency within the scope of the budget.
[This Article Added by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 67 (Radio Wave Fees)
(1)
The Korea Communications Commission may impose and collect fees from an installer (excluding a person who has opened a wireless station for exclusive use for reception) for radio waves used by his/her wireless station (hereinafter referred to as "radio wave fees"):
Provided
, That the radio wave fees shall be exempted for an installer of a wireless station falling under subparagraphs 1 through 3, and such radio wave fees may be reduced or exempted, in whole or part, for an installer of a wireless station falling under subparagraphs 4 through 6, as prescribed by Presidential Decree:
1.
Any wireless station opened by the State or a local government;
2.
Any broadcasting station which does not pursue profit-making as its purpose, and any broadcasting station of the ground broadcasting business operator that pays the broadcasting development fund under
Article 37 (2) of the Broadcasting Act
;
3.
Any wireless station under
Article 19
(2);
4.
Any broadcasting station of the satellite broadcasting business operator and CATV broadcasting business operator that pays the broadcasting development fund under
Article 37 (3) of the Broadcasting Act
;
5.
Any wireless station providing telecommunication services by utilizing the frequencies allocated under
Article 11
;
6.
Any wireless station prescribed by Presidential Decree from among the wireless stations opened not to pursue profit-making or to promote public welfare.
(2)
Radio wave fees shall be used for meeting expenses incurred in managing radio waves and promoting the field relating to radio waves.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 68 (Standards, etc. for Imposing Radio Wave Fees)
(1)
Radio wave fees imposed on any installer shall be computed based on the frequency band, the range of radio waves and the power of aerial lines, etc. used by the wireless station concerned, as prescribed by Presidential Decree:
Provided
, That in cases where the relevant installer is a key telecommunications business operator who provides the telecommunication services to subscribers by utilizing the frequencies allocated under
Article 10
, it may be computed based on the number of subscribers provided with relevant telecommunication services.
(2)
The Korea Communications Commission shall, when any person liable for payment of radio wave fees fails to make such payment by the payment deadline, collect the amount equivalent to the percentage prescribed by Presidential Decree within the limit of not exceeding 5/100 of radio wave fees in arrears as additional dues.
(3)
In cases where the radio wave fees and the additional dues referred to in paragraph (2) are in arrears, such radio wave fees and additional dues shall be collected by referring to the practices of dispositions on default of national taxes.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 69 (Fees)
(1)
Any person falling under any of the following subparagraphs shall pay fees, as prescribed by Presidential Decree:
1.
Any person who applies for a perusal of the ledger managing rights to utilize frequencies or for a copy of the ledger under
Article 18
;
2.
Any person who applies for permission, renewed permission or permission for modification under
Article 19
,
22
(1) or
26
(including cases where applied
mutatis mutandis
under
Article 58
(3));
3.
Any person who undergoes an inspection under
Articles 24
and
26
(including cases where the provisions are applied
mutatis mutandis
under
Article 58
(3));
4.
Any person who applies for a type approval test or type registration under
Article 46
, and for registration of electromagnetic compatibility under
Article 57
or reports on the apparatus alteration;
5.
Any person who requests measurement of the intensity of electromagnetic waves under
Article 47-2
(4);
6.
Any person who intends to apply for the technical qualification examination and who is granted the certificate of technical qualification under
Article 70
.
(2)
The fees referred to in paragraph (1) may, in cases where deemed necessary for promoting public welfare, be reduced or exempted, as prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
CHAPTER VII PERSONS ENGAGED IN WIRELESS WORK
법령보기 화면
Article 70 (Qualifications of Persons Engaged in Wireless Work)
(1)
Any person who intends to engage in wireless work shall pass the technical qualification test conducted, as prescribed by Acts and subordinate statutes governing the national technical qualifications or Presidential Decree.
(2)
The Korea Communications Commission shall issue a certificate of technical qualification to any person who has passed the technical qualification test under paragraph (1), as prescribed by Presidential Decree.
(3)
Qualification items for persons engaged in wireless work and the scope of engagement in wireless work by item of qualification shall be prescribed by Presidential Decree.
(4)
The wireless facilities and equipment of a wireless station shall be installed and constructed only by persons engaged in wireless work:
Provided
, That the same shall not apply to cases where persons engaged in wireless work are not available for any navigating ship or aircraft and other cases prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 71 (Posting of Persons Engaged in Wireless Work)
The installer shall post the persons engaged in wireless work at his/her wireless station according to standards for qualification and posting of a fixed number of persons engaged in wireless work prescribed by Presidential Decree:
Provided
, That no person falling under any of the following subparagraphs shall be posted at any wireless station:
1.
An incompetent person or a quasi-incompetent person;
2.
Any person sentenced to imprisonment without prison labor or a heavier punishment for committing a crime of insurrection and foreign aggression under the
Criminal Act
, a crime of serving the interest of the enemy under the Military Criminal Act, or a crime of violating the
National Security Act
and for whom five years have not passed from the date on which the execution of such sentence terminated or the exemption of such execution was confirmed.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
CHAPTER VIII SUPPLEMENTARY PROVISIONS
법령보기 화면
Article 72 (Revocation, etc. of Permission for Opening Wireless Station)
(1)
In cases where an installer who falls under the disqualification under
Article 20
(1) 1 through 3 or an installer who has received allocation of frequencies under
Article 10
is subject to revocation of allocation of frequencies under
Article 15-2
or fails to be reallocated under
Article 16
(1), permission granted for opening a wireless station or the report on opening shall lose the validity.
<Amended by Act No. 9128, Jun. 13, 2008>
(2)
The Korea Communications Commission may, when an installer falls under any of the following subparagraphs, revoke permission to open a wireless station or order the close of the wireless station that filed a report on opening or the operation of the wireless station suspended and the permitted operational hours, frequencies or aerial lines of the wireless station limited for a fixed period not exceeding six months:
Provided
, That in cases of subparagraphs 1 and 2, the Korea Communications Commission shall order the revocation or close of the wireless station:
<Amended by Act No. 8776, Dec. 21, 2007; Act No. 8867, Feb. 29, 2008; Act No. 9128, Jun. 13, 2008>
1.
Where he/she falls under any subparagraph of Article 20 (1);
2.
Where he/she has obtained permission to open a wireless station under
Article 21
or permission for modification under Article 26 falsely or in other unlawful manner;
3.
Where he/she fails to complete the work of opening a wireless station by the lapse of 30 days from the date on which a deadline for completing the construction (referring to the extended deadline if extended under
Article 24
(2)) entered in the certificate of permission for wireless station under
Article 21
(4) (including cases where applied
mutatis mutandis
under
Articles 26
(3) and 33) or the certificate in cases where a report on opening the wireless station has been filed under the proviso to
Article 19
(1) lapsed;
4.
Where he/she operates the wireless station without obtaining authorization under
Article 23
(2) or filing a report under (3);
5.
Where he/she rejects or obstructs an inspection under
Article 24
(4) and (5) (including cases applied
mutatis mutandis
under
Articles 33
and
58
(3));
6.
Where he/she operates his/her wireless station without undergoing an inspection of completion in contravention of the main sentence of
Article 25
(1), with the exception of each subparagraph (including cases where applied
mutatis mutandis
under
Articles 26
);
6-2. Where he/she has operated his/her wireless station under
Article 19
(1) 3 without reporting completion of work under
Article 24
(1) or
26
(2) to be applied
mutatis mutandis
under
Article 33
or without undergoing a reinspection, in violation of
Article 25
(3);
7.
Where he/she has continuously suspended operation of his/her wireless station for not less than six months without any justifiable ground;
8.
Where he/she fails to pay radio wave fees;
9.
Where he/she has operated his/her wireless stations beyond the scope of the matters permitted or reported, in violation of
Article 25
(2);
10.
Where he/she has not met conditions of wireless stations, such as frequencies to be used and type of frequencies that the mandatory ship wireless station and aircraft wireless station should install, in violation of
Article 28
(1);
11.
Where he/she has not observed matters on the security of communications, in violation of
Article 30
(1);
12.
Where he/she has communicated with an experimental wireless station of a foreign country, in violation of
Article 31
(1);
13.
Where any experimental wireless station and amateur wireless station have communicated by using secret codes, in violation of
Article 31
(2);
14.
Where technical standards for any wireless facilities and equipment are not appropriate, in violation of
Article 45
;
15.
Where any wireless facility and equipment have not been installed according to the safety standards, in violation of
Article 47
;
16.
Where he/she has leased, entrusted for operation of or used jointly with other persons any wireless facility and equipment without obtaining approval, in violation of
Article 48
(1);
17.
Where he/she has not paid fees, in violation of
Article 69
(1);
18.
Where any person engaged in wireless work has operated or constructed the wireless facilities and equipment beyond the scope of engagement in wireless work, in violation of
Article 70
(3);
19.
Where any person, other than the person engaged in wireless work has operated or constructed the wireless facilities and equipment, in violation of
Article 70
(4);
20.
Where he/she has not posted a person to be engaged in wireless work at the wireless station, in violation of
Article 71
or posted those falling under any subparagraph of
Article 71
at the wireless station.
(3)
The Korea Communications Commission may, in cases under any of the following subparagraphs, revoke permission for opening a wireless station or order the wireless station that has filed a report on opening closed or modified, or its operation limited or suspended:
<Amended by Act No. 9128, Jun. 13, 2008>
1.
Where a contingency situation is declared;
2.
Where it is necessary to prevent radio interference;
3.
Where frequencies has been withdrawn or reallocated under
Article 6-2
.
(4)
The Korea Communications Commission shall notify the installer in writing of a loss of validity in cases under paragraph (1) and of details of a disposition and grounds thereof in cases of the disposition taken under paragraph (2) or (3).
<Amended by Act No. 9128, Jun. 13, 2008>
(5)
Detailed standards for revocation of permission to open a wireless station or orders, etc. to close a wireless station that has filed a report on opening under paragraphs (2) and (3) and other necessary matters shall be prescribed by Presidential Decree.
<Added by Act No. 9128, Jun. 13, 2008>
법령보기 화면
Article 73 (Imposition and Collection of Penalty Surcharges)
(1)
The Korea Communications Commission may, in cases where it must issue an order to suspend operation of a wireless station or limit the use of frequencies, etc. in accordance with
Article 72
(2) and such suspension or limit is likely to cause severe inconveniences to the users of such wireless station or harm the public interest, impose and collect a penalty surcharge not exceeding 30 million won in lieu of such suspension or limit.
(2)
The categories of violation subject to the imposition of a penalty surcharge in accordance with paragraph (1), the amount of a penalty surcharge determined according to the extent of violation and other necessary matters shall be prescribed by Presidential Decree.
(3)
The Korea Communications Commission shall, when a person liable to pay a penalty surcharge under paragraph (1) fails to pay such penalty surcharge, urge him/her to make the payment by a given period, and, if he/she fails to pay the penalty surcharge within the given period, collect it by referring to the practices of dispositions on default of national taxes.
(4)
Article 72
(4) shall apply
mutatis mutandis
to the imposition and collection of penalty surcharges under paragraph (1).
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 74 (Revocation, etc. of Type Approval Test and Type Registration)
(1)
The Korea Communications Commission may, when a person, who has passed a type approval test or completed type registration under
Article 46
(1), falls under any of the following subparagraphs, revoke the passing of a type approval test or type registration of the apparatus concerned or order other necessary measures, such as suspension of production, as prescribed by notification of the Korea Communications Commission:
1.
Where he/she has had a type approval test passed or type registration made in any false or other unlawful manner;
2.
Where his/her apparatus, manufactured after a type approval test has been passed and type registration has been made, is found not to conform with the passing standards for a type approval test or type registration standards;
3.
Where he/she has failed to mark the passing of a type approval test or type registration in his/her apparatus or falsely marked them in his/her apparatus;
4.
Where he/she has failed to make a report under
Article 46
(6).
(2)
Any person, who has been subject to the revocation of the passing of a type approval test or type registration under paragraph (1), shall be prohibited from filing an application for a type approval test or type registration with respect to his/her apparatuses for wireless facilities and equipment during a period not exceeding six months from the date of revocation, which is prescribed as notified by the Korea Communications Commission.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 75 (Revocation of Registration of Electromagnetic Compatibility)
Article 74 shall apply
mutatis mutandis
to revocation of registration of electromagnetic compatibility under
Article 57
(1). In such cases, "type approval test" or "type registration" shall be deemed "registration of electromagnetic compatibility".
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 76 (Revocation, etc. of Technical Qualification for Persons Engaged in Wireless Work)
(1)
The Korea Communications Commission may, when any person engaged in wireless work falls under any of the following subparagraphs, revoke his/her technical qualification or order him/her not to be engaged in wireless work for a fixed period between six months and two years, as prescribed by Presidential Decree:
Provided
, That in cases under subparagraph 1, the technical qualification shall be revoked:
1.
Where he/she has obtained his/her technical qualification for wireless work in any false or other unlawful manner;
2.
Where he/she has operated a wireless station without undergoing the inspection of completion, in violation of
Article 25
(1) (including cases applied
mutatis mutandis
under
Articles 26
(3) and
33
);
3.
Where he/she has operated a wireless station beyond the scope of the matters permitted or reported, in violation of
Article 25
(2);
4.
Where he/she has operated a wireless station without observing the matters relating to the wireless station's calling method, responding methods, the hours of operation, the obligation to listen and other communications methods prescribed by the notification of the Korea Communications Commission, in violation of
Article 27
;
5.
Where he/she has not taken any necessary measures after receiving any distress signal, emergency communications or safety communications, in violation of
Article 28
(2);
6.
Where he/she has not given notice to a costal wireless station when any ship wireless station moves into or out of the communications range of a coastal wireless station, in violation of
Article 28
(3);
7.
Where any aircraft wireless station has failed to communicate with the an aviation wireless station, in violation of
Article 28
(4);
8.
Where he/she has failed to observe the matters relating to the security of communications, in violation of
Article 30
(1) or has not received education for the security of communications, in violation of paragraph (2) of the same Article;
9.
Where any experimental wireless station and amateur wireless station have communicated by using secret codes, in violation of
Article 31
(2);
10.
Where any person engaged in wireless work has operated or constructed the wireless facilities and equipment beyond the scope of engagement in wireless work, in violation of
Article 70
(3).
(2)
Detailed standards for revocation of technical qualifications of persons engaged in wireless work under paragraph (1) and other necessary matters shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 77 (Hearings)
The Korea Communications Commission shall, if it intends to take a disposition falling under any of the following subparagraphs, hold a hearing:
1.
Withdrawal of frequencies or reallocation of frequencies under
Article 6-2
;
2.
Revocation of an allocation of frequencies under
Article 15-2
;
3.
Revocation of permission to open a wireless station or close of the wireless station that has filed a report on opening under
Article 72
(2);
4.
Revocation of the passing of a type approval test or type registration under
Article 74
(1);
5.
Revocation of registration of electromagnetic compatibility under
Article 75
;
6.
Revocation of technical qualification under
Article 76
.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 78 (Delegation and Entrustment of Authority)
(1)
The Korea Communications Commission may delegate some of his/her authority under this Act to the heads of organs under the control of the Korea Communications Commission or the president of the Korea Post Office, as prescribed by Presidential Decree.
(2)
The Korea Communications Commission may entrust part of his/her duties under
Articles 18
,
24
(1), (4) and (5) (including cases applied
mutatis mutandis
under
Articles 33
and
58
),
26
(2) (including cases applied
mutatis mutandis
under
Articles 33
and
58
),
32
(1) (including cases applied
mutatis mutandis
under
Article 58
),
46
,
47-2
(4) and (5),
57
,
63
through
65
,
69
, and
70
(1) and (2) to the Promotion Agency, the Association or key telecommunications business operators prescribed in the
Telecommunications Business Act
, as prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 79 (Application Mutatis Mutandis of other Acts)
(1)
Article 33-3 of the
Framework Act on Telecommunications
shall apply
mutatis mutandis
to a type approval test or type registration under Article 46 and the registration of electromagnetic compatibility under
Article 57
.
(2)
Articles 33-3, 39 through 41, 44, 45, 47, and 51
, subparagraph 6 of
Article 70
, and subparagraphs 2 and 3 of
Article 73 of the Telecommunications Business Act
shall apply
mutatis mutandis
to construction or repair of the aerial lines and facilities attached thereto, which are used for managing radio waves:
Provided
, That when it is intended to construct or repair them on a road under the
Road Act
, on a river under the
River Act
, or on a designated harbor under the
Harbor Act
, prior consultations shall be made with the competent management agency.
<Amended by Act No. 9773, Jun. 9, 2009>
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
CHAPTER IX PENAL PROVISIONS
법령보기 화면
Article 80 (Penal Provisions)
(1)
Any person who sends communications by making use of wireless facilities and equipment or communications facilities and equipment with entire lines having a flow of electric current of at least nine kilohertz (referring to communications facilities and equipment excluding cable carrier facilities and equipment and balanced 2-line system spiral carrier facilities and equipment), which advocate destruction of the Constitution of the Republic of Korea or State institutions established by the Constitution of the Republic of Korea by violence, shall be punished by imprisonment or imprisonment without prison labor for a limited term of not less than three years.
(2)
Any criminal attempt under paragraph (1) shall be punished.
(3)
Any person who prepares or conspires to commit a crime under paragraph (1) shall be punished by imprisonment or imprisonment without prison labor for a limited term of not less than two years.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 81 (Penal Provisions)
(1)
Any person falling under any of the following subparagraphs shall be punished by imprisonment for a limited term of not less than one year:
1.
The captain of a ship or aircraft, who fails to issue a necessary order in a situation requiring sending of distress and emergency signals or safety signals, and any person engaged in wireless work, who receives an order to send such signals but fails to do so without delay;
2.
A person engaged in wireless work fails to take measures to send distress signals under
Article 28
(2) or delays sending such signals;
3.
A person who obstructs measures taken to send distress signals.
(2)
Any criminal attempt under paragraph (1) 2 and 3 shall be punished.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 82 (Penal Provisions)
(1)
Any person who damages wireless facilities and equipment of a wireless station, which are provided for services falling under the following subparagraphs or obstructs wireless communications by causing impediments to functions of wireless facilities and equipment by means of touching them or other means shall be punished by imprisonment for not more than ten years or by a fine not exceeding 50 million won:
1.
Telecommunications services;
2.
Broadcasting services;
3.
Public safety services;
4.
Meteorological services;
5.
Power supply services;
6.
Operational services of rails, ships and aircraft.
(2)
Any person who commits any act falling under paragraph (1) to wireless facilities and equipment, other than those of paragraph (1) shall be punished by imprisonment for not more than five years or by a fine not exceeding 30 million won.
(3)
Any criminal attempt paragraphs (1) and (2) shall be punished.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 83 (Penal Provisions)
(1)
Any person who sends false communications by making use of wireless facilities and equipment or communications facilities and equipment with entire lines having a flow of electric current of at least nine kilohertz (referring to communications facilities and equipment excluding the cable carrier facilities and equipment and balanced 2-line system spiral carrier facilities and equipment) for personal benefit or benefit of others or inflicting damages to any other person shall be punished by imprisonment for not more than three years or by a fine not exceeding 20 million won.
(2)
Any person who sends distress signals by means of wireless facilities and equipment despite the non-existence of any ship or aircraft in distress shall be punished by imprisonment for not more than five years.
(3)
Any person engaged in wireless work shall, when he/she commits an act falling under paragraph (1), be punished by imprisonment for not more than five years or by a fine not exceeding 20 million won, and any person commits the act falling under paragraph (2), he/she shall be punished by imprisonment for a limited term of not less than one year.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 84 (Penal Provisions)
Any person falling under any of the following subparagraphs shall be punished by imprisonment for not more than three years or by a fine not exceeding 20 million won:
1.
A person who opens or operates a wireless station under
Article 19
(1) 3 without obtaining permission under the main sentence of the same paragraph with the exception of each subparagraph or filing a report thereof under the proviso to the same paragraph, other than each subparagraph;
2.
A person who manufactures or imports apparatus for which a type approval test has not been passed or type registration has not been filed under the main sentence of
Article 46
(1) or other apparatus for which registration of electromagnetic compatibility has not been filed under the main sentence of
Article 57
(1) with the exception of each subparagraph for the purpose of selling them;
3.
A person who remodels, alters or replicates the performance of apparatus for which a type approval test has been passed or type registration has been filed under
Article 46
or the performance of other apparatuses for which registration of electromagnetic compatibility has been filed under
Article 57
;
4.
A person who installs or operates communications facilities and equipment under
Article 58
(1) 2 without obtaining permission under the same paragraph.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 85 (Penal Provisions)
Any person who sends obscene communications by means of wireless facilities and equipment or the communications facilities and equipment with entire lines having a flow of electric current of at least nine kilohertz (referring to the communications facilities and equipment excluding cable carrier facilities and equipment and balanced 2-line system spiral carrier facilities and equipment) shall be punished by imprisonment for not more than two years or by a fine not exceeding ten million won.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 86 (Penal Provisions)
Any person falling under any of the following subparagraphs shall be punished by imprisonment for not more than one year or by a fine not exceeding five million won:
<Amended by Act No. 8091, Dec. 26, 2006; Act No. 8199, Jan. 3, 2007; Act No. 8776, Dec. 21, 2007; Act No. 9128, Jun. 13, 2008>
1.
A person who refuses or obstructs an inspection, measurement, investigation or test under
Articles 24
(4) and (5) (including cases applied
mutatis mutandis
under
Articles 33
and
58
(3)),
47-2
(5) and
53
(1);
1-2. A person who sells any apparatus remodeled, altered or replicated under the provisions of subparagraph 3 of
Article 84
, or who displays, stores or transports or installs it at a wireless station for the purpose of sale;
2.
A person who sells any apparatus which has failed to pass a type approval test or obtain type registration, in violation of
Article 46
(1) or any apparatus which has failed to obtain registration of electromagnetic compatibility, in violation of
Article 57
(1), or who displays, stores or transports or installs it at a wireless station for the purpose of sale;
3.
A person who fails to carry out an order under the provisions of
Article 47-2
(6);
4.
A person who constructs buildings or installations without obtaining the approval under
Article 52
(1);
5.
A person who fails to execute an order given under
Article 53
(2);
6.
A person who operates a wireless station or wireless facilities and equipment which have been ordered to suspend their operation under the provisions of
Article 72
(2) or (3) (including cases applied
mutatis mutandis
under
Article 58
(3)) or communications facilities and equipment under
Article 58
(1) 2.
법령보기 화면
Article 87 (Penal Provisions)
Any person falling under any of the following subparagraphs shall be punished by a fine not exceeding one million won:
1.
A person who opens or operates a wireless station under
Article 25
(1) 1 through 3 without obtaining permission under the main sentence of
Article 19
(1);
2.
A person who operates facilities and equipment under
Article 58
(1) 1 whose operation has been suspended under
Article 72
(3) (including cases applied
mutatis mutandis
under
Article 58
(3)).
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 88 (Joint Penal Provisions)
(1)
When the representative, an agent, employee or the employed person of a corporation commits an act falling under
Article 84
or
86
in connection with the business of the corporation, such corporation shall be fined according to corresponding Article in addition to the punishment of the offender.
(2)
When an agent, employee or the employed person of an individual commits an act falling under
Article 84
or
86
in connection with the business
of the individual, such individual shall be fined according to the corresponding Article in addition to the punishment of the offender.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 89 (Legal Fiction as Public Official in Application of Penal Provisions)
Any person engaged in the duties entrusted by the Korea Communications Commission under
Article 78
(2) shall be deemed a public official in the application of
Articles 129 through 132 of the Criminal Act
.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 89-2 (Fines for Negligence)
Any person who fails to notify or notifies falsely the number of subscribers who have entered into a new service contract and the total number of subscribers under
Article 19
(3) shall be punished by a fine for negligence not exceeding ten million won.
[This Article Added by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 90 (Fines for Negligence)
Any person falling under any of the following subparagraphs shall be punished by a fine for negligence not exceeding three million won:
<Amended by Act No. 7264, Dec. 30, 2004; Act No. 8776, Dec. 21, 2007; Act No. 9128, Jun. 13, 2008>
1.
A person who operates wireless station without reporting it under
Article 19
(1) 1 and 2;
2.
A person who operates wireless facilities and equipment, in violation of the main sentence of
Article 25
(1) with the exception of each subparagraph (including cases applied
mutatis mutandis
under
Article 26
(3));
2-2. A person who operates a wireless station under
Article 19
(1) 3 without reporting the completion of work, in violation of
Article 24
(1) or
26
(2) to be applied
mutatis mutandis
under
Article 33
or without undergoing a reinspection, in violation of
Article 25
(3);
3.
A person who operates a wireless station beyond matters permitted or reported, in violation of the main sentence of
Article 25
(2) with the exception of each subparagraph;
3-2. A person who manufactures, displays, stores or transports or installs in the wireless station the apparatus without affixing the mark of the passing of a type approval test, the mark of type registration or the mark of the registration of electromagnetic compatibility for the purpose of sales, in violation of
Article 46
(3) (including cases applied
mutatis mutandis
under
Article 57
(2));
4.
A person who operates a wireless station, in violation of an order issued under
Article 51
(2);
5.
A person who operates facilities and equipment without obtaining permission under
Article 58
(1) 1;
6.
A person who violates restrictions on operation under
Article 72
(2) or (3) (including cases applied
mutatis mutandis
under
Article 58
(3)).
법령보기 화면
Article 91 (Fines for Negligence)
Any person falling under any of the following subparagraphs shall be punished by a fine for negligence not exceeding two million won:
1.
A person who fails to perform his/her responsibility with respect to urgency communications, safety communications or emergency communications, in violation of
Article 28
(2);
2.
A person who operates a wireless station, in violation of the main sentence of
Article 29
;
3.
A person who fails to observe matters relating to the security of communications under
Article 30
(1) or to receive education for the security of communications under paragraph (2) of the same Article;
4.
A person who operates wireless facilities and equipment which are not in conformity with technical standards for wireless facilities and equipment or standards for safety facilities, in violation of
Articles 45
and
47
;
5.
A person who fails to report on the results of measurement of the intensity of electromagnetic waves, in violation of
Article 47-2
(3), or who has made a false report thereon;
6.
A person who operates or installs wireless facilities and equipment, in violation of the main sentence of
Article 70
(4);
7.
A person who operates or installs wireless facilities and equipment during a period for which he/she has been subject to suspension of his/her business under
Article 76
.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 92 (Fines for Negligence)
Any person falling under any of the following subparagraphs shall be punished by a fine for negligence not exceeding one million won:
1.
A person who fails to obtain approval, in violation of
Article 14
(3);
2.
A person who fails to obtain authorization, in violation of
Article 23
(2) or fails to file a report, in violation of paragraph (3) of the same Article;
3.
A person who fails to file a report, in violation of
Article 32
(1);
4.
A person who fails to file a report on alteration of apparatus, in violation of
Article 46
(6) (including cases applied
mutatis mutandis
under
Article 57
(2)).
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
법령보기 화면
Article 93 (Imposition and Collection of Fines for Negligence)
(1)
The Korea Communications Commission shall impose and collect fines for negligence under
Articles 90
through
92
, as prescribed by Presidential Decree.
(2)
Any person dissatisfied with a fine for negligence imposed on him/her under paragraph (1) may raise an objection to the Korea Communications Commission within 30 days from the date on which a notice with respect to such disposition was served on him/her.
(3)
When a person subject to a disposition taken to impose a fine for negligence on him/her under paragraph (1) raises an objection under paragraph (2), the Korea Communications Commission shall promptly notify the competent court of the fact and the competent court, upon receiving the notice, shall put the case on trial in accordance with the
Non-Contentious Case Litigation Procedure Act
.
(4)
When no objection is raised and no fine for negligence is paid within the period prescribed in paragraph (2), the fine for negligence in question shall be collected by referring to the practices of dispositions on default of national taxes.
[This Article Wholly Amended by Act No. 9128, Jun. 13, 2008]
ADDENDA
Article 1 (Enforcement Date)
This Act shall enter into force on April 1, 2000.
Article 2 (Transitional Measures concerning Structures Impeding Reception of Broadcasts)
The provisions of Article 36 shall apply to structures subject to the application of structures impeding the reception of broadcasts under
Article 74-4 of the Radio Waves Act
amended by Act No. 4193 at the time this Act enters into force.
Article 3 (Transitional Measures concerning Allocation of Frequencies)
Frequencies allocated by the Minister of Information and Communication to a person, at the time this Act enters into force, who has been granted permission as a key communications business operator under the provisions of
Article 5 of the Telecommunications Business Act
shall be deemed frequencies allocated under the provisions of
Article 12
.
Article 4 (Transitional Measures concerning Permission for Opening Wireless Station)
Notwithstanding the provisions of
Articles 21
(2) and
34
(2), a person who files an application for permission of opening a wireless station under the previous provisions at the time this Act enters into force shall be governed by the previous provisions.
Article 5 (Transitional Measures concerning Apparatus Undergoing Electromagnetic Disturbance Test)
Any apparatus that underwent an electromagnetic disturbance test at the time the
Radio Waves Act
amended by Act No. 5218 was enforced shall be deemed to have been registered for the electromagnetic compatibility under the provisions of
Article 57
.
Article 6 (Transitional Measures concerning Qualification Certificate for Person Engaged in Wireless Work)
Any qualification certificate for a person engaged in wireless work, which is granted at the time this Act enters into force, shall be deemed the technical qualification certificate under
Article 70
(2).
Article 7 (Transitional Measures concerning Area for Prevention of Radio Wave Disturbances)
The area for prevention of radio wave disturbances, which was designated under the previous provisions at the time the
Radio Wave Act
amended by Act No. 5637 entered into force shall be governed by the provisions prior to the enforcement of the same Act until the time determined and announced by the Minister of Information and Communication notwithstanding the provisions of
Articles 74-2 and 74-3 of the same Act
.
Article 8 (Transitional Measures concerning Penalty Surcharge, Penal Provisions and Fine for Negligence)
The application of penalty surcharges, penal provisions and fines for negligence to any act committed prior to the enforcement of this Act shall be governed by the previous provisions.
Article 9 Omitted.
Article 10 (Relation to other Acts and Subordinate Statutes)
In cases where previous provisions are cited in other Acts or subordinate statutes at the time this Act enters into force, and there are corresponding provisions in this Act, the corresponding provisions of this Act shall be considered to be cited in substitution for the previous provisions.
ADDENDA<Act No. 6315, Dec. 29, 2000>
Article 1 (Enforcement Date)
This Act shall enter into force on July 1, 2001.
Articles 2 through 7 Omitted.
ADDENDA<Act No. 6893, May 29, 2003>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA<Act No. 6909, May 29, 2003>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA<Act No. 7264, Dec. 30, 2004>
(1)
(Enforcement Date) This Act shall enter into force six months after the date of its promulgation.
(2)
(Transitional Measures concerning Reckoning Date of Effective Period of Approval for Use of Frequencies) Any person who has obtained approval for use of frequencies under
Article 19
(5) before this Act enters into force shall be deemed that he/she has obtained approval for use on the enforcement date of this Act.
(3)
(Transitional Measures concerning Penal Provisions) The previous provisions shall govern the application of penal provisions to the acts performed before this Act enters into force.
ADDENDA<Act No. 7265, Dec. 30, 2004>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 2005.
Articles 2 and 3 Omitted.
ADDENDA<Act No. 7441, Mar. 31, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 5 Omitted.
ADDENDUM<Act No. 7559, May 31, 2005>
This Act shall enter into force six months after the date of its promulgation.
ADDENDA<Act No. 7796, Dec. 29, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force on July 1, 2006.
Articles 2 through 6 Omitted.
ADDENDA<Act No. 7815, Dec. 30, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Article 2 (Transitional Measures concerning Frequency Utilization Period)
Notwithstanding the amended provisions of
Article 15
(1), a person subject to an allocation of frequencies under the provisions of
Article 12
before this Act enters into force shall be deemed to be granted with the utilization period of five years from the enforcement date of this Act.
Article 3 (Special Example of Reallocation)
In cases of making a reallocation, as the frequency utilization period is completed, to a key telecommunication business operator who has obtained permission under Article 5 of the Telecommunications Business Act in order to provide the telecommunication services as provided for by Ministerial Decree of Information and Communication before this Act enters into force, who is deemed to have been granted a utilization period of five years from the enforcement of this Act under the provisions of Article 2 of the Addenda, the allocation of frequencies for consideration shall be made under the amended provisions of
Article 11
.
Article 4 (Establishment Registration of Korea Radio Promotion Agency, and Transitional Measures, etc.)
(1)
The head of the Korea Radio Wave Management Business Group (hereinafter referred to as the "Business Group") established under the provisions of previous
Article 66
shall prepare the articles of association of the Korea Radio Promotion Agency under the amended provisions of
Article 66
without delay after the enforcement of this Act, and obtain approval of the Minister of Information and Communication.
(2)
When the head of the Business Group has obtained approval under the provisions of paragraph (1), he/she shall file an establishment registration of the Promotion Agency without delay.
(3)
Notwithstanding the provisions of dissolution and liquidation of a juristic person of the
Civil Act
. when the establishment registration of the Promotion Agency has been completed under the provisions of paragraph (2), the Business Group shall be deemed to have been dissolved.
(4)
Where the head of the Business Group obtains approval under the provisions of paragraph (1), when he/she has obtained approval of the Minister of Information and Communication through a resolution of the board of directors concerning the comprehensive succession of the Business Group's property, rights and obligations, the property, rights and obligations of the Business Group shall be succeeded comprehensively by the Promotion Agency on the establishment registration date of the Promotion Agency. In such cases, the value of the succeeded property shall be the book allocation on the previous day of the establishment registration date.
(5)
The name of the Business Group indicated on the register for the property, rights and obligations to be succeeded by the Promotion Agency at the time of completion of establishment registration under the provisions of paragraph (2), and in other official books, shall be deemed to be the name of the Promotion Agency.
(6)
When the establishment registration under the provisions of paragraph (2) has been completed, the acts performed by the Business Group before this Act enters into force shall be deemed acts performed by the Promotion Agency, and the acts taken with respect to the Business Group shall be deemed the acts performed with respect to the Promotion Agency.
(7)
When the establishment registration under the provisions of paragraph (2) has been completed, officers and staff members of the Business Group shall be deemed to be selected or appointed as officers and staff members of the Promotion Agency under this Act. In such cases, the terms of the Promotion Agency's officers shall be reckoned from the time of selection as officers of the Business Group under the previous provisions.
(8)
The head of the Business Group may, in cases necessary for preparation for the establishment of the Promotion Agency, take the acts for a preparation of establishment, such as preparation, etc. of the articles of association under the provisions of paragraph (1), even before this Act enters into force.
Article 5 (Transitional Measures concerning Penal Provisions)
The application of penal provisions to the acts performed before this Act enters into force shall be governed by the previous provisions.
Article 6 Omitted.
ADDENDUM<Act No. 8091, Dec. 26, 2006>
This Act shall enter into force six months after the date of its promulgation.
ADDENDUM<Act No. 8199, Jan. 3, 2007>
This Act shall enter into force three months after the date of its promulgation.
ADDENDA<Act No. 8221, Jan. 3, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force ten months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 16 Omitted.
ADDENDA<Act No. 8486, May 25, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 10 Omitted.
ADDENDA<Act No. 8770, Dec. 21, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 2009.
Articles 2 through 5 Omitted.
ADDENDA<Act No. 8776, Dec. 21, 2007>
(1)
(Enforcement Date) This Act shall enter into force six months after the date of its promulgation.
(2)
(Transitional Measures concerning Opening of Wireless Station) Any wireless station subject to file a report on opening under the proviso to
Article 19
(1) with the exception of each subparagraph in accordance with the amended provision of
Article 19
(1) 3 from among wireless stations which obtained permission to open before this Act enters into force shall be deemed to have filed a report on opening under this Act, and other wireless station subjected to file a report on opening under the main sentence of
Article 19
(1) with the exception of each subparagraph in accordance with the amended provision of
Article 19
(1) from among the wireless stations which obtained permission to open before this Act enters into force shall obtain permission to open under this Act within six months from the enforcement date of this Act.
(3)
(Transitional Measures concerning Penal Provisions and Fines for Negligence) The previous provisions shall govern the application of penal provisions or fines for negligence to the acts performed before this Act enters into force.
(4)
Omitted.
ADDENDA<Act No. 8867, Feb. 29, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force ten months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 12 Omitted.
ADDENDA<Act No. 9128, Jun. 13, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation:
Provided
, That the amended provisions of
Article 57
(1) 2 shall enter into force on January 1, 2009.
Article 2 (Transitional Measures concerning Transfer and Lease of Right for Utilization of Frequencies)
Notwithstanding the amended provision of
Article 14
(3), the previous provisions shall govern the approval for transfer or lease of the right to utilize frequencies in cases where it has been transferred or leased before this Act enters into force.
Article 3 (Transitional Measures concerning Penal Provisions and Fines for Negligence)
The previous provisions shall govern the application of penal provisions and fines for negligence to the acts performed before this Act enters into force.
Article 4 Omitted.
ADDENDA<Act No. 9455, Feb. 6, 2009>
(1)
(Enforcement Date) This Act shall enter into force three months after the date of its promulgation.
(2)
(Transitional Measures concerning Effective Term of Permission for Opening Wireless Station) Notwithstanding the amended provision of
Article 22
(1), the previous provisions shall govern the effective term of permission for a person who has been granted permission to open a wireless station under the previous provision at the time when this Act enters into force.
ADDENDUM<Act No. 9482, Mar. 13, 2009>
This Act shall enter into on the date of its promulgation.
ADDENDA<Act No. 9535, Mar. 25, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 2010. (Proviso Omitted.)
Articles 2 and 3 Omitted.
ADDENDA<Act No. 9773, Jun. 9, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 10 Omitted.
ADDENDA<Act No. 9780, Jun. 9, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force three months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 12 Omitted.
Last updated : 2010-04-24