EARTHQUAKE RECOVERY PLANS ACT
33534 · 2014-11-19
EARTHQUAKE RECOVERY PLANS ACT
Act No. 12844, Nov. 19, 2014
Act No. 9001, Mar. 28, 2008
Amended by Act No. 9636, Apr. 22, 2009
Act No. 10445, Mar. 9, 2011
Act No. 10754, May 30, 2011
Act No. 10911, Jul. 25, 2011
Act No. 11020, Aug. 4, 2011
Act No. 11495, Oct. 22, 2012
Act No. 11690, Mar. 23, 2013
Act No. 12001, Aug. 6, 2013
Act No. 11994, Aug. 6, 2013
Act No. 12844, Nov. 19, 2014
CHAPTER I GENERAL PROVISIONS
법령보기 화면
Article 1 (Purpose)
The purpose of this Act is to prescribe matters necessary for the observation of, prevention of, provision against and action against earthquakes and tsunami, earthquake-proof measures, and research and technical development or such, to reduce earthquake disasters in order to protect the life and property of the people and major infrastructure from disasters due to earthquakes and tsunami.
법령보기 화면
Article 2 (Definitions)
The definitions of terms used in this Act shall be as follows:
1.
The term "earthquake disasters" means direct damage by earthquake ground vibrations (namely, ground vibrations caused by earthquakes) as the damage caused by earthquakes or tsunami under subparagraph 1 (a) of
Article 3 of the Framework Act on the Management of Disasters and Safety
, and fire, explosion and disasters caused by other phenomena;
2.
The term "prevention of earthquake disasters" means preventing earthquake disasters and taking measures to reduce damage when earthquake disasters have occurred;
3.
The term "earthquake risk" means the degree of risk of earthquakes calculated by collectively analyzing the past record of earthquakes, geology and characteristics of the ground or such, in order to establish earthquake zones which are the base of earthquake-proof design;
4.
The term "measurement of seismic acceleration" means acts that a person who builds various structures or installs equipment or such (hereinafter referred to as "facilities") or manages them detects, by making use of seismic accelerometer, moving characteristics (hereinafter referred to as "motion characteristics of earthquakes") of facilities in response to outside force due to earthquakes;
5.
The term "earthquake-proof reinforcement" means all acts improving the endurable performance of all facilities from earthquakes.
법령보기 화면
Article 3 (Responsibility of State and Agency in Charge of Emergency Management)
(1)
The State and local governments shall take responsibility for formulating and implementing a plan for observation of, prevention of, provision against, and action against earthquakes and tsunami, earthquake-proof measures, and research and technical development, etc., to reduce earthquake disasters in order to protect the life and property of the people and major infrastructure from earthquake disasters in accordance with the purposes of the
Framework Act on the Management of Disasters and Safety
and this Act, and shall provide financial and technical support for the performance thereof.
<Amended by Act No. 12001, Aug. 6, 2013>
(2)
The head of the agency in charge of emergency management under subparagraph 5 of
Article 3 of the Framework Act on the Management of Disasters and Safety
(hereinafter referred to as "agency in charge of emergency management") shall take necessary measures for matters prescribed by Presidential Decree, among the following affairs, to reduce earthquake disasters:
1.
Prevention of and provision against earthquake disasters:
(a)
Taking measures for reducing earthquake disasters;
(b)
Formulating and performing an emergency plan for facilities under its jurisdiction;
(c)
Producing and utilizing coastal flooding forecast maps and flood trace maps, etc. of coastal regions due to tsunami;
(d)
Education, training, and publicity of the prevention of earthquake disasters;
2.
Earthquake-proof measures:
(a)
Establishing the objective of national earthquake-proof performance and the objective of tolerable damage by facility;
(b)
Establishing standards for classification of earthquake-proof grades and producing and utilizing maps indicating earthquake risk (hereinafter referred to as "earthquake risk maps");
(c)
Establishing and operating earthquake-proof design standards and confirming the actual result of the application thereof;
(d)
Evaluating earthquake-proof performance of the existing facilities and preparing measures for reinforcement;
(e)
Taking earthquake-proof measures for public facilities and low-rise buildings, etc.;
3.
Seismic observation, analysis, reporting, spread of warning, and countermeasures:
(a)
Building and managing seismic observation facilities;
(b)
Seismic and tsunami observation and reporting thereon;
(c)
Constructing the system for action in the fact of earthquake disasters and emergency support;
(d)
Preparing and utilizing the outline for coping with earthquakes and tsunami;
(e)
Research and technical development for reducing earthquake disasters;
(f)
Conducting investigation and analysis of causes of earthquake disasters and risk assessment of damaged facilities;
4.
Other matters deemed necessary by the head of the agency in charge of emergency management.
(3)
The director of City/
Do
emergency management headquarters or the director of
Si
/
Gun
/
Gu
emergency management headquarters under
Article 16 of the Framework Act on the Management of Disasters and Safety
(hereinafter referred to as "director of regional management headquarters") shall determine the specific outline for coping with emergencies in consideration of earthquake disasters and regional characteristics, and utilize it positively as material for education of and public relations with residents and relevant public officials.
<Amended by Act Nos. 11994 & 12001, Aug. 6, 2013>
법령보기 화면
Article 4 (Relationship with other Acts)
Matters not specifically prescribed by this Act, such as recovery from earthquake disasters, shall be in accordance with the
Countermeasures against Natural Disasters Act
.
CHAPTER II SEISMIC AND TSUNAMI OBSERVATION
법령보기 화면
Article 5 (Building of Seismic or Tsunami Observation Facilities)
(1)
The Administrator of the Korea Meteorological Administration shall formulate and promote a comprehensive plan for seismic and tsunami observation network:
Provided
, That with respect to a comprehensive plan for tsunami observation network, he/she shall formulate and promote it jointly with the Minister of Oceans and Fisheries.
<Amended by Act No. 11690, Mar. 23, 2013>
(2)
If the head of any of the following agencies (hereinafter referred to as "seismic or tsunami observation agency") intends to build seismic or tsunami observation facilities, he/she shall prepare a plan for seismic or tsunami observation. In such cases, the head of an agency excluding the Administrator of the Korea Meteorological Administration shall consult with the Administrator of the Korea Meteorological Administration in advance:
<Amended by Act No. 11690, Mar. 23, 2013>
1.
Korea Meteorological Administration;
2.
Korea Institute of Geoscience and Mineral Resources established under
Article 8 of the Act on the Establishment, Operation and Fostering of Government-Funded Science and Technology Research Institutes
;
3.
Korea Institute of Nuclear Safety under the
Korea Institute of Nuclear Safety Act
;
4.
An agency which engages in research related to electric power under the control of the Korea Electric Power Corporation under the
Korea Electric Power Corporation Act
;
5.
An agency which engages in investigation and research related to the sea under the control of the Ministry of Oceans and Fisheries;
6.
Other agencies prescribed by Presidential Decree as agencies and organizations, etc. conducting seismic or tsunami observation by installing seismic or tsunami observation equipment.
(3)
The following matters shall be included in a plan for seismic or tsunami observation referred to in paragraph (2):
1.
The purpose of seismic or tsunami observation and reasons for installation of observation equipment;
2.
Location of installation, performance, and specifications of seismic or tsunami observation equipment;
3.
Methods of acquisition, transmission, and storage of seismic or tsunami observation data;
4.
A plan for utilization of the results of seismic or tsunami observation.
(4)
Standards for installation of seismic or tsunami observation equipment installed under paragraph (2) shall be prescribed by Presidential Decree
법령보기 화면
Article 6 (Measurement of Seismic Acceleration of Major Facilities)
(1)
Each person who builds or manages major facilities apprehended to be damaged by earthquakes shall measure seismic acceleration of such facilities.
(2)
Standards for facilities, scale, etc. subject to measurement of seismic acceleration referred to in paragraph (1) shall be prescribed by Presidential Decree among facilities, the standards of earthquake-proof design of which are determined under
Article 14
.
(3)
Any person who measures seismic acceleration under paragraph (1) shall submit the data of measurement, including the following matters, to the Minister of Public Safety and Security. In such cases, standards for time, method, etc. of the presentation of data shall be prescribed by Ordinance of the Prime Minster:
<Amended by Act No. 11690, Mar. 23, 2013; Act No. 12844, Nov. 19, 2014>
1.
The date and time of the acquisition of data;
2.
A manufacturing company, serial number, and location of seismic acceleration measuring equipment by which the data of measurement have been acquired;
3.
Extraordinary matters at the time of the acquisition of data;
4.
Information on ground conditions;
5.
Information on the location of measurement;
6.
Information on facilities, etc.
(4)
Where a relevant central administrative agency requires data submitted pursuant to paragraph (3), the Minister of Public Safety and Security shall provide such agency with the data.
<Amended by Act No. 12844, Nov. 19, 2014>
법령보기 화면
Article 7 (Measurement of Seismic Acceleration and Management thereof)
(1)
Each person who measures seismic acceleration pursuant to
Article 6
(1) shall manage a seismic acceleration measuring instrument to function normally at all times.
(2)
Standards for measurement of seismic acceleration and management thereof, etc. under paragraph (1) shall be prescribed by Ordinance of the Prime Minster.
<Amended by Act No. 11690, Mar. 23, 2013; Act No. 12844, Nov. 19, 2014>
법령보기 화면
Article 8 (Reporting on Seismic or Tsunami Observation)
(1)
The Administrator of the Korea Meteorological Administration shall report the results of observation on earthquakes, volcanic activities, etc. and the forecast and results of observation of tsunami both in Korea and abroad to the director of central emergency management headquarters under
Article 14 of the Framework Act on the Management of Disasters and Safety
(hereinafter referred to as "director of central management headquarters").
<Amended by Act No. 11994 & 12001, Aug. 6, 2013>
(2)
Where any person, other than the Administrator of the Korea Meteorological Administration, intends to announce information on earthquakes and tsunami, he/she shall consult with the Administrator of the Korea Meteorological Administration.
(3)
Matters necessary for reporting on the results of observation under paragraph (1) shall be prescribed by Presidential Decree.
법령보기 화면
Article 9 (Organization, etc. of Council of Seismic and Tsunami Observation Agencies)
(1)
The Administrator of the Korea Meteorological Administration may establish a council of seismic and tsunami observation agencies in which seismic or tsunami observation agencies participate for the operation of seismic or tsunami observation network, intensification of collaboration on seismic affairs, etc. among seismic or tsunami observation agencies, installation of seismic or tsunami observation equipment under
Article 5
, business cooperation necessary for sharing and reporting on the results of seismic or tsunami observation.
(2)
Matters necessary for the organization, function and operation of a council of seismic and tsunami observation agencies pursuant to paragraph (1) shall be prescribed by Presidential Decree.
(3)
When the Administrator of the Korea Meteorological Administration establishes a council of seismic and tsunami observation agencies pursuant to paragraph (1), he/she shall report the details thereof to the director of central management headquarters.
<Amended by Act No. 11994 & 12001, Aug. 6, 2013>
CHAPTER III PREVENTION AND PROVISION
법령보기 화면
Article 9-2 (Formulation, Implementation, etc. of Comprehensive Plans for Preventing Earthquake Disasters)
(1)
In order to protect the life and property of the people and the major infrastructure from earthquake disasters and to continuously develop the affairs of preventing earthquake disasters, the director of central management headquarters shall formulate a comprehensive plan on a five-year basis to prevent earthquake disasters, including the following matters (hereinafter referred to as “comprehensive plan”) and shall report to the Central Safety Management Committee under
Article 9 of the Framework Act on the Management of Disasters and Safety
:
1.
Matters concerning basic direction-setting for policies for preventing earthquake disasters;
2.
Matters concerning systematic development of the affairs of preventing earthquake disasters;
3.
Matters concerning promotion of research and development to prevent earthquake disasters;
4.
Matters concerning cooperation between domestic and overseas authorities relevant to the affairs of preventing earthquake disasters;
5.
Other matters that the director of central management headquarters deems necessary for policies for preventing earthquake disasters.
(2)
Where the director of central management headquarters intends to formulate a comprehensive plan, he/she shall first consult with the heads of relevant central administrative agencies and the directors of regional management headquarters; and where the comprehensive plan is formulated, he/she shall, without delay, notify it to the heads of relevant central administrative agencies and the directors of regional management headquarters.
(3)
Where the director of central management headquarters deems necessary to formulate a comprehensive plan, he/she may request the head of a relevant central administrative agency and the director of regional management headquarters to submit relevant data. In such cases, the head of the relevant central administrative agency and the director of regional management headquarters upon receipt of such request shall comply therewith, except in extenuating circumstances.
(4)
The head of the relevant central administrative agency and the director of regional management headquarters shall formulate and promote necessary implementation plans pursuant to the comprehensive plan, and report or notify the status of promotion and implementation thereof to the director of central management headquarters.
(5)
Other matters necessary for formulation, promotion, etc. of comprehensive plans and implementation plans shall be prescribed by Presidential Decree.
[This Article Added by Act No. 12001, Aug. 6, 2013]
법령보기 화면
Article 9-3 (Deliberative Council for Earthquake Disasters Prevention Policy)
(1)
To review the following matters concerning policies for preventing earthquake disasters, a deliberative council for earthquake disasters prevention policy (hereafter in this Article, referred to as the “council”) shall be established under the director of central management headquarters:
1.
Comprehensive plans;
2.
Matters to be commonly applied to the goal of national earthquake-proof performance and the standards of earthquake-proof design as prescribed in
Article 14
(4);
3.
Master plans for earthquake-proof reinforcement of existing facilities as prescribed in
Article 15
;
4.
Other matters prescribed by Presidential Decree, relevant to policies for preventing earthquake disasters.
(2)
The affairs of the council shall be conducted by the Ministry of Public Safety and Security.
<Amended by Act No. 12844, Nov. 19, 2014>
(3)
The council shall be comprised of not exceeding 15 members prescribed by Presidential Decree, including one chairperson and one deputy chairperson.
(4)
Other matters necessary for composition, operation, etc. of the council shall be prescribed by Presidential Decree.
[This Article Added by Act No. 12001, Aug. 6, 2013]
법령보기 화면
Article 10 (Production, Utilization, etc. of Coastal Flooding Forecast Maps)
(1)
The director of central management headquarters and the director of regional management headquarters shall produce and utilize flooding forecast maps (hereinafter referred to as "coastal flooding forecast maps") which forecast the range of flooding of coastal regions due to tsunami, for reducing earthquake disasters and promptly evacuating residents.
<Amended by Act No. 11994, Aug. 6, 2013>
(2)
In order to produce coastal flooding forecast maps, the director of central management headquarters and the director of regional management headquarters may request agencies producing and managing land topographical maps, marine charts, etc. to provide related maps, etc. In such cases, agencies so requested shall provide such related maps, etc. except in extenuating circumstances.
(3)
Where a coastal region suffers flood damage due to tsunami, the director of regional management headquarters shall investigate such traces of damage (hereinafter referred to as "flood traces"), prepare and keep flood trace maps, and indicate and manage flood traces on the actual spots.
<Amended by Act No. 11994, Aug. 6, 2013>
(4)
The head of the relevant administrative agency shall utilize coastal flooding forecast maps under paragraph (1) and flood trace maps under paragraph (3) for prior examination and consultation of disaster impact under
Article 4 of the Countermeasures against Natural Disasters Act
, designation of areas to be improved for dealing with natural disaster risks under
Article 12 of the same Act
, formulation of a rearrangement plan for areas to be improved for dealing with natural disaster risks under
Article 13 of the same Act
, formulation of a rearrangement project plan for areas to be improved for dealing with natural disaster risks under
Article 14 of the same Act
, formulation of a comprehensive plan for mitigation of damage from storms and floods under
Article 16 of the same Act
.
<Amended by Act No. 11495, Oct. 12, 2012>
(5)
Other detailed matters concerning the preparation, keeping, and utilization of coastal flooding forecast maps under paragraph (1) and of flood trace maps under paragraph (3), the location of installation, method of indication, and maintenance and management of flood traces, etc. shall be prescribed by Presidential Decree.
법령보기 화면
Article 10-2 (Formulation, etc. of Resident Evacuation Plans against Tsunami)
(1)
In order to minimize loss of human lives caused by tsunami, the director of regional management headquarters shall formulate and implement a resident evacuation plan against tsunami (hereinafter referred to as “resident evacuation plan against tsunami”), including designating resident evacuation areas and maintaining evacuation shelters and routes.
(2)
Where a resident evacuation plan against tsunami is formulated, the director of regional management headquarters shall submit it to the director of central management headquarters.
(3)
Where the director of central management headquarters deems necessary to supplement certain portion of the resident evacuation plan against tsunami formulated by the director of regional management headquarters, he/she may request the director of the relevant regional management headquarters to supplement the evacuation plan. In such cases, the director of the relevant regional management headquarters in receipt of such request shall comply therewith, except in extenuating circumstances.
(4)
To efficiently implement a resident evacuation plan against tsunami, the director of central management headquarters may take necessary administrative or financial measures, such as distributing guidelines for drafting evacuation plans and evaluating, examining, rewarding, etc. relevant facilities and readiness against tsunami.
(5)
Other matters necessary for efficiently implementing resident evacuation plans against tsunami shall be prescribed by Presidential Decree.
[This Article Added by Act No. 12001, Aug. 6, 2013]
법령보기 화면
Article 11 (Education, Training, and Publicity of Prevention of Earthquake Disasters)
(1)
The head of a central administrative agency and the director of regional management headquarters shall have educational institutions under their control conduct education of the prevention of earthquake disasters on the guidelines for necessary action at home and work in order to protect the life and property of an individual and protect facilities and equipment at his/her work from earthquake disasters.
<Amended by Act No. 11994, Aug. 6, 2013>
(2)
The director of central management headquarters and the director of regional management headquarters may establish a place of education for the experience of seismism and for the provision of education and training on the guidelines for necessary action, etc. in the event of an earthquake, hold a relevant event for technical development in the prevention of earthquake disasters, or provide administrative or financial support necessary to hold the relevant event.
<Amended by Act Nos. 11994 & 12001, Aug. 6, 2013>
(3)
The director of regional management headquarters shall conduct education and publicity of the prevention of earthquake disasters for residents of a district under his/her jurisdiction.
<Amended by Act No. 11994, Aug. 6, 2013>
(4)
The head of the agency in charge of emergency management shall conduct education of the prevention of earthquake disasters for persons engaged in affairs related to earthquake disasters.
CHAPTER IV EARTHQUAKE-PROOF MEASURES
법령보기 화면
Article 12 (Production, Utilization, etc. of National Earthquake Risk Maps)
(1)
The director of central management headquarters may produce and publish earthquake risk maps (hereinafter referred to as "national earthquake risk maps") which designate nationwide seismic areas in order to utilize them in earthquake-proof design, etc.
<Amended by Act No. 11994, Aug. 6, 2013>
(2)
The director of central management headquarters shall examine the appropriateness of national earthquake risk maps every five years from the date they are published and may modify them, if necessary.
<Amended by Act No. 11994, Aug. 6, 2013>
(3)
If the director of central management headquarters intends to produce or modify a national earthquake risk map under paragraphs (1) and (2), he/she shall consult with the head of the relevant central administrative agency. Where a national earthquake risk map is produced or modified, such fact shall be notified to the head of the relevant central administrative agency.
(4)
The head of the relevant central administrative agency shall utilize national earthquake risk maps under paragraph (1) in the reduction of earthquake disasters, such as earthquake-proof design.
(5)
The director of regional management headquarters may produce and utilize regional earthquake risk maps on a district under his/her jurisdiction.
<Amended by Act No. 11994, Aug. 6, 2013>
법령보기 화면
Article 13 (Accumulation, Management, etc. of Geological and Ground Survey Data)
(1)
The director of central management headquarters may integrate and manage geological and ground survey data (including drilling surveys and physical investigation, geological surveying of the surface of the earth, excavation surveying of the foundation, etc.) in order to utilize them in preparation of earthquake risk maps under
Article 12
and construction of a system to cope with earthquake disasters under
Article 19
.
<Amended by Act No. 11994, Aug. 6, 2013>
(2)
Geological and ground data surveyed in connection with investigation, research, formulation of various plans, execution of projects, etc. promoted by the head the agency in charge of emergency management shall be submitted to an agency designated by the Minister of Public Safety and Security, and the following matters shall be included therein:
<Amended by Act No. 12844, Nov. 19, 2014>
1.
The location, purpose, and date of geological and ground survey;
2.
An investigator and the method of survey;
3.
Geological and ground survey data;
4.
Other matters determined and publicly announced by the Minister of Public Safety and Security.
(3)
An agency designated by the Minister of Public Safety and Security under paragraph (2) shall manage geological and ground survey data conscientiously, and where the relevant central administrative agency or relevant research institutions, organizations, schools, etc. request the relevant data, it shall provide them with such data, except in extenuating circumstances.
<Amended by Act No. 12844, Nov. 19, 2014>
법령보기 화면
Article 14 (Establishment of Standards of Earthquake-Proof Design)
(1)
The head of the relevant central administrative agency shall determine the standards for earthquake-proof design by the relevant Acts and subordinate statutes, etc. for facilities prescribed by Presidential Decree among the following facilities apprehended to suffer from a disaster in the event of an earthquake, and shall take necessary measures for the implementation thereof:
<Amended by Act No. 9636, Apr. 22, 2009; Act No. 10754, May 30, 2011; Act No. 10911, Jul. 25, 2011; Act No. 12001, Aug. 6, 2013>
1.
Buildings prescribed by the
Building Act
;
2.
Floodgates built and managed under the relevant Acts and subordinate statutes, such as the
Public Waters Management Reclamation Act
and the
Tide Embankment Management Act
;
3.
Airport facilities prescribed by the
Aviation Act
;
4.
Sluice gates of national rivers prescribed by the
River Act
;
5.
Agricultural production infrastructure prescribed by the
Rearrangement of Agricultural and Fishing Villages Act
;
6.
Multi-purpose dams prescribed by the
Act on Construction of Dams and Assistance, etc. to their Environs
;
7.
Dams prescribed by Acts, other than the
Act on Construction of Dams and Assistance, etc. to their Environs
;
8.
Road facilities established pursuant to the
Road Act
;
9.
Gas supply facilities established pursuant to the
Urban Gas Business Act
, high-pressure gas storing places established pursuant to the
High-Pressure Gas Safety Control Act
, and liquefied petroleum gas storing facilities established pursuant to the
Safety Control and Business of Liquefied Petroleum Gas Act
;
10.
Urban railroads prescribed by the
Urban Railroad Act
;
11.
Pressure vessels, cranes, and lifts prescribed by the
Occupational Safety and Health Act
;
12.
Petroleum refineries, petroleum reservoirs, and petroleum storing facilities prescribed by the
Petroleum and Petroleum Substitute Fuel Business Act
;
13.
Oil pipelines prescribed by the
Oil Pipeline Safety Control Act
;
14.
Wastewater treatment facilities of industrial complexes among wastewater treatment facilities prescribed by the
Water Quality and Aquatic Ecosystem Conservation Act
;
15.
Water supply and waterworks prescribed by the
Water Supply and Waterworks Installation Act
;
16.
Fishery harbors prescribed by the
Fishing Villages and Fishery Harbors Act
;
17.
Nuclear reactors and related facilities prescribed by the
Nuclear Safety Act
;
18.
Hydraulic power facilities and thermal power facilities for the production of electric power, power transmission facilities, power distribution facilities, and power transformation facilities prescribed by the
Electric Utility Act
;
19.
Railroad facilities prescribed by the
Framework Act on Railroad Industry Development
;
20.
Reclamation facilities prescribed by the
Wastes Control Act
;
21.
Public sewage treatment plants prescribed by the
Sewerage Act
;
22.
High-speed railroads prescribed by the
Railroad Construction Act
;
23.
Harbor facilities prescribed by the
Harbor Act
;
24.
Utility-pipe conduits prescribed by the
National Land Planning and Utilization Act
;
25.
School facilities prescribed by the
School Facilities Projects Promotion Act
;
26.
Tramways prescribed by the
Tramway Transportation Act
;
27.
Amusement facilities prescribed by the
Tourism Promotion Act
;
28.
General hospitals, hospitals, and intermediate care hospitals prescribed by the
Medical Service Act
;
29.
Telecommunications facilities prescribed by the
Framework Act on Telecommunications
;
30.
Other facilities prescribed by Presidential Decree.
(2)
The head of the relevant central administrative agency who has determined standards for earthquake-proof design under paragraph (1) shall notify the director of the central management headquarters thereof, and the director of the central management headquarters may require the head of the relevant central administrative agency to complement them, if necessary.
<Amended by Act No. 11994, Aug. 6, 2013>
(3)
Where the head of a local government grants permission, etc. for facilities subject to earthquake-proof design under paragraph (1), he/she shall ascertain whether they are designed to be earthquake-proof.
(4)
The director of central management headquarters may determine the design ground motions which commonly apply to the goals of State earthquake-proof performance, each standard of earthquake-proof design, and other matters prescribed by Presidential Decree, after consulting with the relevant central administrative agency, to utilize them for the standards for earthquake-proof design under paragraph (1) or other affairs.
<Added by Act No. 12001, Aug. 6, 2013>
(5)
Where the head of a relevant central administrative agency deems necessary considering the characteristics, etc. of the relevant facilities, he/she may determine separate standards after consulting with the director of central management headquarters, notwithstanding the matters to be commonly applied to standards for earthquake-proof design under paragraph (4).
<Added by Act No. 12001, Aug. 6, 2013>
법령보기 화면
Article 15 (Formulation, etc. of Master Plans for Earthquake-Proof Reinforcement of Existing Facilities)
(1)
The director of central management headquarters shall formulate a master plan for earthquake-proof reinforcement of existing facilities (hereinafter referred to as "master plan"), on a five-year basis, for the improvement in earthquake-proof performance of public facilities built before the relevant Acts and subordinate statutes are enacted or public facilities, the standards for earthquake-proof design of which have been intensified after the relevant Acts and subordinate statutes are enacted (hereinafter referred to as "existing facilities") among facilities subject to earthquake-proof design under
Article 14
, and report it to the central safety supervision committee under
Article 9 of the Framework Act on the Management of Disasters and Safety
.
<Amended by Act No. 11994, Aug. 6, 2013>
(2)
The following matters shall be included in a master plan:
1.
Basic direction-setting concerning measures for earthquake-proof reinforcement;
2.
Matters concerning evaluation of earthquake-proof performance;
3.
Matters concerning a mid-term and long-term plan of earthquake-proof reinforcement;
4.
Matters concerning the promotion of earthquake-proof reinforcement projects;
5.
Research and development of technologies necessary for measures for earthquake-proof reinforcement;
6.
Other matters prescribed by Presidential Decree concerning measures for earthquake-proof reinforcement.
(3)
Where the director of central management headquarters intends to formulate a master plan, he/she shall consult with the heads of the relevant central administrative agencies, and where he/she formulates a master plan, he/she shall notify the heads of the relevant central administrative agencies and the heads of local governments.
<Amended by Act No. 11994, Aug. 6, 2013>
(4)
Where the director of central management headquarters deems necessary to formulate a master plan, he/she may request the head of the relevant central administrative agency and the head of a local government to submit related material.
<Amended by Act No. 11994, Aug. 6, 2013>
(5)
Paragraphs (1) through (4) shall apply
mutatis mutandis
where a master plan is amended.
법령보기 화면
Article 16 (Promotion, etc. of Earthquake-Proof Reinforcement of Existing Facilities)
(1)
The head of the relevant central administrative agency and the head of each local government shall formulate and promote measures for earthquake-proof reinforcement on facilities under his/her jurisdiction in accordance with a master plan, and notify or report to the director of the central management headquarters of the promotion conditions, etc.
<Amended by Act No. 11994, Aug. 6, 2013>
(2)
The head of the relevant central administrative agency shall instruct the head of the agency in charge of emergency management who manages facilities under his/her jurisdiction to take measures for earthquake-proof reinforcement formulated pursuant to paragraph (1), and take measures necessary for the implementation thereof.
(3)
The head of the agency in charge of emergency management shall promote earthquake-proof reinforcement, etc. in accordance with measures for earthquake-proof reinforcement instructed pursuant to paragraph (2).
(4)
The director of the central management headquarters may inspect or evaluate the promotion conditions of measures for earthquake-proof reinforcement prescribed in paragraphs (1) through (3).
<Amended by Act No. 11994, Aug. 6, 2013>
(5)
Matters necessary for facilities subject to formulation of measures for earthquake-proof reinforcement prescribed in paragraph (1) and methods thereof, etc. shall be prescribed by Presidential Decree.
(6)
The director of the central management headquarters shall publicly announce the results of promoting measures for earthquake-proof reinforcement, as prescribed by Presidential Decree.
<Added by Act No. 10754, May 30, 2011; Act No. 11994, Aug. 6, 2013>
법령보기 화면
Article 16-2 (Support for Earthquake-Proof Reinforcement of Privately-Owned Buildings)
(1)
In order to encourage earthquake-proof reinforcement of existing privately-owned buildings that are not earthquake-proof, the head of a local government may grant a tax reduction or exemption, as prescribed by the
Restriction of Special Local Taxation Act
, and an insurance-related entity, institution, etc. prescribed by Presidential Decree may apply differential insurance premium rates in relation to earthquake disasters.
(2)
Procedures, etc. for providing support for earthquake-proof reinforcement under paragraph (1) shall be prescribed by Ordinance of the Prime Minster. <Amended by Act No. 11690, Mar. 23, 2013; Act No. 12844, Nov. 19, 2014>>
(3)
Details of support referred to in paragraph (1) may apply to buildings that adopt an earthquake-proof design at the time of initial construction, among buildings prescribed in the
Building Act
which are not subject to the standards for earthquake-proof design determined under
Article 14
(1).
[This Article Added by Act No. 10754, May 30, 2011]
법령보기 화면
Article 17 (Earthquake-Proof Measures of Regional Disaster and Safety Measure Headquarters and General Situation Room)
(1)
The head of a local government shall establish a regional disaster and safety measure headquarters under
Article 16 of the Framework Act on the Management of Disasters and Safety
(hereinafter referred to as "regional measure headquarters") and a disaster and safety management room under
Article 18 of the same Act
in facilities which have been earthquake-proof designed under
Article 14
or for which earthquake-proof reinforcement has been finished under
Article 16
.
<Amended by Act No. 11994, Aug. 6, 2013>
(2)
The head of a local government shall prepare for earthquakes, etc. by taking earthquake-proof measures for related facilities, such as electric power and telecommunications, to maintain functions of the regional measure headquarters and the general situation room.
CHAPTER V COUNTERMEASURES
법령보기 화면
Article 18 (Construction of System to Cope with Earthquake Disasters)
(1)
The director of central management headquarters and the director of regional management headquarters shall construct and operate a system to cope with earthquake disasters (hereinafter referred to as "system to cope with earthquake disasters") for the prompt initial action, such as forecast of areas to be damaged and degree of damage, etc. through the prompt collection and analysis of seismic information, emergency rescue and aid, and extinguishment of a fire, in order to reduce damage when earthquake disasters occur.
<Amended by Act No. 11994, Aug. 6, 2013>
(2)
The council of seismic and tsunami observation agencies under
Article 9
shall construct a system for real-time sharing of seismic observation data and provide the director of central management headquarters and the director of regional management headquarters under paragraph (1) with such data.
<Amended by Act No. 11994, Aug. 6, 2013>
(3)
Where the director of central management headquarters and the director of regional management headquarters construct and operate a system to cope with earthquake disasters under paragraph (1), except cases where he/she cannot entrust the relevant project to the private sector or judges the development and operation of the relevant project by an administrative agency to be remarkably excellent in the aspects of economy, effectiveness, or security, he/she may entrust the private sector with the development and operation of the relevant project.
<Amended by Act No. 11994, Aug. 6, 2013>
(4)
Detailed matters of the system to cope with earthquake disasters, such as the scope of construction, procedures for operation, and a utilization plan, shall be prescribed by Ordinance of the Prime Minster.
<Amended by Act No. 11690, Mar. 23, 2013; Act No. 12844, Nov. 19, 2014>
법령보기 화면
Article 19 (Construction of Emergency Support System)
Where the head of a central administrative agency, the director of regional management headquarters, or the head of the agency in charge of emergency management who has jurisdiction over the whole or part of a City/
Do
and
Si
/
Gun
/
Gu
formulates an emergency support plan under
Articles 35
and
36 of the Countermeasures against Natural Disasters Act
, he/she shall formulate such emergency support plan by utilizing the system to cope with earthquake disasters.
<Amended by Act No. 11994, Aug. 6, 2013>
법령보기 화면
Article 20 (Investigation and Analysis of Causes of Earthquake Disasters and Organization, Operation, etc. of Earthquake Damage Investigation Committee)
(1)
If necessary, the director of central management headquarters and the director of regional management headquarters may investigate, analyze, and evaluate causes of earthquake disasters in areas where earthquake disasters occurred.
<Amended by Act No. 11994, Aug. 6, 2013>
(2)
The director of central management headquarters may organize and operate a central earthquake damage investigation committee, including experts in fields related to earthquakes, for the professional investigation, analysis, and evaluation on earthquake disasters.
<Amended by Act No. 11994, Aug. 6, 2013>
(3)
If earthquake disasters on a large scale occur in a foreign country, the director of central management headquarters may dispatch an overseas earthquake damage investigation committee comprised of experts in fields related to earthquakes to the actual place.
<Amended by Act No. 11994, Aug. 6, 2013>
(4)
Detailed matters necessary for the organization and operation of the central earthquake damage investigation committee under paragraph (2) and the overseas earthquake damage investigation committee under paragraph (3) shall be prescribed by Presidential Decree.
(5)
The director of regional management headquarters may organize and operate a regional earthquake damage investigation committee for investigation, analysis, and evaluation of causes of earthquake disasters in a region under his/her jurisdiction under paragraph (1), and detailed matters necessary therefor shall be prescribed by municipal ordinance.
<Amended by Act No. 11994, Aug. 6, 2013>
법령보기 화면
Article 21 (Risk Assesment of Damaged Facilities)
(1)
Where damage has occurred from an earthquake, the director of regional management headquarters shall assess risk (hereinafter referred to as "risk assessment") on whether facilities can be used.
<Amended by Act No. 11994, Aug. 6, 2013>
(2)
The director of regional management headquarters shall operate a risk assessment team of damaged facilities comprised of experts in related fields residing in a region under his/her jurisdiction for the prompt risk assessment under paragraph (1):
Provided
, That where experts in related fields residing in a region under his/her jurisdiction are insufficient, the risk assessment team may be comprised, including residents of a neighboring City/
Do
or
Si
/
Gun
/
Gu
.
(3)
Detailed matters necessary for the organization, operation, etc. of a risk assessment team of damaged facilities in a region under paragraph (2) shall be prescribed by municipal ordinance.
CHAPTER VI RESEARCH AND TECHNICAL DEVELOPMENT FOR REDUCTION OF EARTHQUAKE DISASTERS
법령보기 화면
Article 22 (Research and Technical Development for Mitigating Earthquake Disasters)
(1)
The director of the central management headquarters and the head of an agency in charge of emergency management prescribed by Presidential Decree shall conduct investigations, technical development, and research on matters under his/her jurisdiction as prescribed in
Article 3
(2) to conduct research on earthquakes and mitigate earthquake disasters, and may pursue an international joint research project on the technology, system, etc. for prevention of earthquake disasters.
<Amended by Act Nos. 11994 & 12001, Aug. 6, 2013>
(2)
The director of the central management headquarters shall set the earthquake-proof performance targets at the State level and conduct research and technical development on the classification, etc. of earthquake-proof grades.
<Amended by Act No. 11994, Aug. 6, 2013>
(3)
The director of the central management headquarters and the head of a relevant central administrative agency may request earthquake-related data or cooperation for necessary matters from the head of a relevant administrative agency or the head of a seismic or tsunami observation agency, if necessary to conduct research on earthquake prevention measures and mitigating earthquake disasters. In such cases, the head of the relevant administrative agency or the head of a seismic or tsunami observation agency shall comply with such request, except in extenuating circumstances.
<Amended by Act No. 11994, Aug. 6, 2013>
(4)
The director of the central management headquarters and the head of a relevant central administrative agency may provide administrative and financial support (including contributions to an institution or organization conducting research pursuant to
Article 14 (1) of the Basic Research Promotion and Technology Development Support Act
) for research and technical development by the head of an agency in charge of emergency management referred to in paragraph (1).
<Amended by Act No. 10445, Mar. 9, 2011; Act No. 11994, Aug. 6, 2013>
(5)
Matters necessary for administrative and financial support prescribed in paragraph (4) shall be prescribed by Presidential Decree.
법령보기 화면
Article 23 (Investigation and Research of Active Faults and Preparation, etc. of Active Fault Maps)
(1)
The director of the central management headquarters shall conduct an investigation and research on seismically capable faults (hereinafter referred to as "active faults") to ensure the safety of the ground for cities, industrial complexes defined in subparagraph 8 of
Article 2 of the Industrial Sites and Development Act
, and infrastructure facilities defined in subparagraph 1 of
Article 2 of the Act on Public-Private Partnerships in Infrastructure
.
<Amended by Act No. 11020, Aug. 4, 2011; Act No. 11994, Aug. 6, 2013>
(2)
The director of the central management headquarters shall build and manage a database on active faults investigated pursuant to paragraph (1), and may prepare and publish active fault maps.
<Amended by Act No. 11994, Aug. 6, 2013>
(3)
The director of the central management headquarters may advise complementation or reinforcement of existing facilities in areas with active faults under paragraph (2) in consultation with the head of a relevant central administrative agency, and when new facilities are built, he/she may advise that such new facilities be built in compliance with earthquake-proof standards established considering active faults.
<Amended by Act No. 11994, Aug. 6, 2013>
CHAPTER VII SUPPLEMENTARY PROVISIONS
법령보기 화면
Article 24 (Access to Land)
(1)
If necessary for the production and utilization of coastal flooding forecast maps and flood trace maps, production and utilization of earthquake risk maps, accumulation and management of geological and ground survey data, investigation and analysis of causes of earthquake disasters, risk assessment of damaged facilities, etc., investigation and research into active faults, and preparation of active fault maps, the director of central management headquarters, the head of a regional management headquarters, or a person who was ordered, delegated, or entrusted by the director of central management headquarters or the head of a regional management headquarters may access land of others or temporarily use land of others, and if particularly necessary, he/she may change or remove trees, soil, stones, or other obstacles.
<Amended by Act No. 11994, Aug. 6, 2013>
(2)
Any person who intends to access land of others or temporarily use land of others, or change or remove trees, soil, stones, or other obstacles shall first obtain consent from the owner, occupant, or manager (hereafter in this Article, referred to as "interested parties") of the relevant land or obstacles:
Provided
, That when persons concerned are not in a site or their domicile or residence are unclear, and it is impossible to obtain consent therefrom, he/she shall obtain permission from the head of the competent
Si
/
Gun
/
Gu
.
(3)
Any person who intends to perform any act under paragraph (1) shall carry a certificate evidencing his/her authority and produce it to interested parties.
법령보기 화면
Article 25 (Compensation for Losses)
(1)
The State or local governments shall compensate for losses incurred by measures under
Article 24
(1).
(2)
With respect to compensation for losses under paragraph (1), a person who was incurred losses and the head of a central administrative agency, Mayor/
Do
Governor or head of a
Si
/
Gun
/
Gu
who took such measure shall consult.
(3)
Where consultation under paragraph (2) is not effected, parties concerned may file an application for decision with the competent land expropriation committee under
Article 51 of the Act on Acquisition of and Compensation for Land, etc. for Public Works Projects
, as prescribed by Presidential Decree.
(4)
Articles 83 through 86 of the Act on Acquisition of and Compensation for Land, etc. for Public Works Projects
shall apply
mutatis mutandis
to a decision under paragraph (3).
법령보기 화면
Article 26 (Government Subsidies, etc.)
If necessary to smoothly promote the prevention of, provision against, action against, and recovery from earthquake disasters, the State may fully or partially bear expenses (including expenses for formulating and implementing measures for earthquake-proof reinforcement under
Article 16
and compensation for losses under
Article 25
) or subsidize such expenses to the agency in charge of emergency management, such as a local government.
<Amended by Act No. 12001, Aug. 6, 2013>
법령보기 화면
Article 27 (Delegation and Entrustment of Authority)
(1)
The director of central management headquarters and the director of regional management headquarters may delegate affairs, such as inspection of facilities, etc. referred to in
Article 24
(1), investigation into and analysis of causes of earthquake disasters, and risk assessment of damaged facilities, to the head of an agency under his/her control or the head of a local government, as prescribed by Presidential Decree.
<Amended by Act No. 11994, Aug. 6, 2013>
(2)
The director of central management headquarters and the director of regional management headquarters may entrust affairs concerning
Article 24
(1) to an expert, specialized institution, etc., as prescribed by Presidential Decree.
<Amended by Act No. 11994, Aug. 6, 2013>
CHAPTER VIII PENAL PROVISIONS
법령보기 화면
Article 28 (Penal Provisions)
Any person who refuses or interferes with access to land, temporary use thereof or alteration or removal of obstacles under
Article 24
without justifiable grounds shall be punished by a fine not exceeding two million won.
법령보기 화면
Article 29 (Fines for Negligence)
(1)
Any of the following persons shall be punished by a fine for negligence not exceeding three million won:
1.
Any person who fails to measure seismic acceleration of major facilities, in violation of
Article 6
(1);
2.
Any person who interferes with investigation of flood traces, etc. or destroys an indication of flood traces without permission under
Article 10
(3);
3.
Any person who refuses the presentation of geological and ground survey data under
Article 13
(2) or presents false data.
(2)
Fines for negligence under paragraph (1) shall be imposed and collected by the Minister of Public Safety and Security, Mayor/
Do
Governor, or head of a
Si
/
Gun
/
Gu
(hereinafter referred to as "imposing agency"), as prescribed by Presidential Decree.
<Amended by Act No. 12844, Nov. 19, 2014>
(3)
Any person who is dissatisfied with a disposition of a fine for negligence under paragraph (2) may raise an objection to the imposing agency within 30 days from the date he/she has received a notice of such disposition.
(4)
If any person subject to a disposition of a fine for negligence under paragraph (2) raises an objection under paragraph (3), the imposing agency shall notify the competent court of such fact, without delay, and the competent court, which, in turn, shall proceed to a trial on a fine for negligence pursuant to the
Non-Contentious Case Litigation Procedure Act
.
(5)
If neither objection is raised nor is a fine for negligence paid within the period under paragraph (3), the fine for negligence shall be collected in the same manner as delinquent national or local taxes are collected.
ADDENDA
(1)
(Enforcement Date) This Act shall enter into force on the date prescribed by Presidential Decree, but in any event, within one year after the date of its promulgation.
(2)
Omitted.
ADDENDA <Act No. 9636, Apr. 22, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the day of its promulgation.
Articles 2 through 8 Omitted.
ADDENDA <Act No. 10445, Mar. 9, 2011>
Article 1 (Enforcement Date)
This Act shall enter into force three months after the date of its promulgation.
Articles 2 through 4 Omitted.
ADDENDUM <Act No. 10754, May 30, 2011>
This Act shall enter into force six months after the date of its promulgation:
Provided
, That the amended provisions of
Article 14
(1) 21 shall enter into force on the date of its promulgation.
ADDENDA <Act No. 10911, Jul. 25, 2011>
Article 1 (Enforcement Date)
This Act shall enter into force three months after the date of its promulgation.
Articles 2 through 5 Omitted.
ADDENDA <Act No. 11020, Aug. 4, 2011>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 11 Omitted.
ADDENDA <Act No. 11495, Oct. 22, 2012>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 5 Omitted.
ADDENDA <Act No. 11690, Mar. 23, 2013>
Article 1 (Enforcement Date)
(1)
This Act shall enter into force on the date of its promulgation.
(2)
Omitted.
Articles 2 through 7 Omitted.
ADDENDA <Act No. 11994, Aug. 6, 2013>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Article 2 Omitted.
ADDENDUM <Act No. 12001, Aug. 6, 2013>
This Act shall enter into force one year after the date of its promulgation.
ADDENDA <Act No. 12844, Nov. 19, 2014>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation:
Provided
, That among the Acts to be amended pursuant to Article 6 of the Addenda, each amended provision of an Act promulgated before this Act enters into force, but the date on which they are to enter into force, has not yet arrived, shall enter into force on the date the relevant Act enters into force, respectively.
Articles 2 through 7 Omitted.
Last updated : 2016-02-16