PROMOTION OF DISTRIBUTION COMPLEX DEVELOPMENT ACT
8946 · 1996-06-30
PROMOTION OF DISTRIBUTION COMPLEX DEVELOPMENT ACT
Act No. 5105, Dec. 29, 1995
Act No. 5105, Dec. 29, 1995
CHAPTER Ⅰ GENERAL PROVISIONS
법령보기 화면
Article 1 (Purpose)
The purpose of this Act is to strengthen competition in the distribution industry and contribute to the development of the national economy through improving the distribution industry and its structure by the efficient supply of land for distribution facilities and efficient deployment of distribution facilities.
법령보기 화면
Article 2 (Definitions)
For the purpose of this Act, the definition of terms shall be as follows:
1.
The term “Distribution complex” means the land designated and developed for the distribution and support facilities pursuant to
Article 5
;
2.
The term “Distribution facilities” means facilities mentioned below used for transport, custody, packing, shipping and discharging, manufacturing, customs clearance, marketing and data processing of products:
(a)
Freight depot station and warehouse mentioned in subparagraphs 7 and 9 of
Article 2 of the Goods Distribution Promotion Act
;
(b)
Market place, department store, retail store of large scale, wholesale store, delivery center, delivery complex mentioned in Article 2 of the Wholesale and Retail Trade Promotion Act;
(c)
Wholesale store for agricultural products and agricultural goods distribution center mentioned in
Article 2 of the Act on Distribution and Price Stabilization of Agricultural and Fishery Products
;
(d)
Workshop mentioned in
Article 3 of the Sanitary Processing of Livestock Products Act
;
(e)
Shipping and discharging facilities and products custody and processing facilities among the function facilities provided for in subparagraph 6 (b) of Article 2 of the Ports Act;
(f)
Facilities for products transports mentioned in
Article 2 (6) of the Aviation Act
;
(g)
Facilities for transport, loading and unloading, custody of the products used by the business entity while engaged in the business mentioned in the
Railroad Act
;
(h)
The cooperatives association or the facilities of purchase or sales business installed by the central council of the cooperatives association pursuant to the provisions of the Agricultural Cooperatives Act, the Livestock Industry Cooperatives Act, the Fisheries Cooperatives Act, Forestry Cooperatives Act and the
Small and Medium Enterprise Cooperatives Act
;
(i)
Garage, freight office and other facilities for freight processing used in the automobile transport brokerage business and the truck transport business pursuant to the provisions of
Articles 2 (3) and 3 (1) 2 of the Automobile Transport Business Act
;
(j)
Warehouse and business office for the medicine wholesale business pursuant to the provisions of
Article 36 (1) 2 of the Pharmaceutical Affairs Act
;
(k)
The other facilities designated by the Presidential Decree; and
(l)
Incidental facilities to facilities mentioned in item (a) through (k) (including facilities mentioned in subparagraph 3 (a) and (b), which is installed in facilities mentioned in item (a) through (k) of this subparagraph).
3.
“Support facilities” means the facilities mentioned below built in the distribution complex to support efficient management of the distribution complex:
(a)
Facilities for manufacturing and processing of the products designated by the Presidential Decree;
(b)
Facilities for data processing;
(c)
Facilities for finance, insurance, medical service, education and research;
(d)
Convenience facilities for employee and customer of the distribution facilities; and
(e)
The other facilities designated by the Presidential Decree to improve the function of the distribution complex.
4.
A “development project of the distribution complex” means the projects mentioned below for constructing the distribution complex:
(a)
Preparing the land for the distribution and support facilities;
(b)
Construction of road, railway, track, harbor and airport;
(c)
Construction of the facilities for supply of electricity, gas and water and facilities for electric telecommunication;
(d)
Construction of the facilities for environmental protection including the sewer system and the waste water disposal facilities;
(e)
Construction of residences for the employees of the distribution facilities; and
(f)
The other projects entailing the projects mentioned in item (a) through (e).
5.
The term “Operator” means those who appointed as an operator of the distribution complex development plan under
Article 10
;
6.
The term “Management of the distribution complex” means the management task maintaining repairing and improving the land and the facilities included in the distribution complex;
7.
The term “Occupant company” means the company having entered or wishing to enter in the distribution complex to operate the distribution facilities;
8.
The term “support agency” means the agency having entered or wishing to enter in the distribution complex to operate the support facilities; and
9.
The term “management agency” means the occupant company consultative committee, operator and the management body which maintains the distribution complex pursuant to
Article 32
.
법령보기 화면
Article 3 (Distribution Complex Deliberative Council)
(1)
The Distribution Complex Deliberative Council (hereinafter referred to as the “Deliberative Council”) shall be established under the Ministry of Construction and Transportation for deliberation and decision on important matters relating to the arrangement and development of the distribution complex.
(2)
The Deliberative Council shall deliberate matters under the following subparagraphs:
1.
Matters relating to the establishment of the comprehensive plan for development of the distribution complex pursuant to the provisions of
Article 4
;
2.
Matters relating to designation of the distribution complex pursuant to the provisions of
Article 5
;
3.
Matters relating to preparing the guidelines for management of the distribution complex pursuant to the provision of
Article 33
;
4.
Matters relating to support for development of the distribution complex; and
5.
Other matters designated by the Presidential Decree.
(3)
Necessary matters relating to constituting and operating the Deliberative Council shall be prescribed by the Presidential Decree.
(4)
The local Distribution Complex Deliberative Council (hereinafter “local Deliberative Council”) shall be established in the Shis/Dos to advise the Special Metropolitan City Mayor, the Metropolitan City Mayor and the
Do
governor (hereinafter “Mayor/
Do
governor”), and to deliberate matters relating to the distribution complex development project operated by the Special Metropolitan City, the Metropolitan City and the
Do
(hereinafter “City/
Do
”).
(5)
Necessary matters relating to constituting and operating the local Deliberative Council shall be determined by the Municipal Ordinance of the related local government municipality.
CHAPTER Ⅱ DEVELOPMENT OF THE DISTRIBUTION COMPLEX
법령보기 화면
Article 4 (Establishment of Comprehensive Plan for Development of Distribution Complex)
(1)
The Minister of Construction and Transportation shall establish the comprehensive plan for development of the distribution complex pursuant to the comprehensive plan for land development mentioned in
Article 2
of the Act on Comprehensive Plans for Construction in the National Territory.
(2)
The comprehensive plan for development of the distribution complex should include the matters of subparagraphs mentioned below:
1.
Matters relating to the demand of the land for the distribution facilities;
2.
Matters relating to the systematic supply of the land for the distribution facilities;
3.
Matters relating to designation and development of the distribution complex;
4.
Matters relating to deployment of the distribution complex by region and size;
5.
Matters relating to the repair and transportation to the suburb area of the distribution facilities located in the urban area; and
6.
Other matters designated by the Presidential Decree.
(3)
When the Minister of Construction and Transportation establishes a comprehensive plan for the development of a distribution complex, he shall collect the planning reports by the heads of the related central administrative agency and shall make a comprehensive plan for development of the distribution complex based on those planning reports, and shall notify the comprehensive plan for development of the distribution complex on the official gazette after consultation with the Mayor/
Do
governor of the related region and consultation with the heads of the related central administrative agencies and the Deliberative Council. The above procedure same shall apply when the Minister of Construction and Transportation wants to change the comprehensive plan for development of the distribution complex:
Provided
, That the Minister of Construction and Transportation does not have to follow this paragraph when he modifies insignificant matters designated by the Presidential Decree.
(4)
The heads of related central agencies may request modification of the comprehensive plan for development of the distribution complex when necessary.
(5)
The Minister of Construction and Transportation, pursuant to the Presidential Decree, may request the related agencies to submit the data needed for the establishment of the comprehensive plan for development of the distribution complex or for the agencies assistance, and the agencies requested as such shall accomodate such request unless there is a good reason.
(6)
Matters necessary for the establishment of the comprehensive plan for development of the distribution complex shall be prescribed by the Presidential Decree.
법령보기 화면
Article 5 (Designation of Distribution Complex)
(1)
The Minister of Construction and Transportation shall designate the distribution complex:
Provided
, That the distribution complex with a scale less than those designated by the Presidential Decree shall be designated by the related Mayor/
Do
governor.
(2)
When the Minister of Construction and Transportation designates the distribution complex, he shall establish a plan for the development of the distribution complex and consult with the Deliberative Council after hearing opinion of the related Mayor/
Do
governor and the heads of the related administrative agencies. When Mayor/
Do
governor designates the distribution complex, he shall establish the plan for development of the distribution complex and consult with the local Deliberative Council after hearing the opinions of the heads of the related administrative agencies. The important matters designated by the Presidential Decree relating to designation of the distribution complex may be modified by the above method as provided for in this paragraph.
(3)
The heads of the related administrative agencies and the persons mentioned in the provisions of
Article 10
(2) 2 through 5 may request the Minister of Construction and Transportation or Mayor/
Do
governor (hereinafter the “distribution complex designator”) to designate the distribution complex. In this case, the persons other than the heads of central administrative agencies shall submit a draft plan for development of the distribution complex.
(4)
A plan for the development of the distribution complex pursuant to the provision of paragraph (2) shall include the matters of subparagraphs mentioned below:
Provided
, That in an unavoidable case, matters specified in subparagraph 3 or 8 may be included after designation of the distribution complex:
1.
Name, location and size of the distribution complex;
2.
The purpose for designation of the distribution complex;
3.
Operator of the plan for development of the distribution complex;
4.
Duration and operating method of the distribution complex development project;
5.
The plan for land development and the plan for the main infrastructure;
6.
Matters relating to the main target facilities and their criteria;
7.
The plan for fund supply;
8.
Detailed information about the land, buildings and other movables and rights to be expropriated or used for the distribution complex; and
9.
Other matters designated by the Presidential Decree.
법령보기 화면
Article 6 (Public Notice of Designation of Distribution Complex)
(1)
The distribution complex designator shall notify the matters designated by the Presidential Decree on the official gazettes and send the copies of the related documents to the head of
Si
/
Gun
/
Gu
(referred to as the head of
Gu
of the autonomous
Gu
; hereinafter the same shall apply) concerned when he designates the distribution complex or modifies the contents of the designation pursuant to the provisions of
Article 5
.
(2)
When there are lands, buildings, other things or rights to be expropriated or used, detailed information about them shall be included in a public notice under paragraph (1).
(3)
The head of
Si
/
Gun
/
Gu
who receives the documents concerned pursuant to the provision of paragraph (1) shall have them available for review by the public for at least 14 days.
법령보기 화면
Article 7 (Hearing Opinion of Residents)
(1)
The distribution complex designator shall hear the opinion of residents and advice of specialists, and shall take these opinions into consideration if deemed proper:
Provided
, That the hearing of opinions may be omitted when national security or insignificant matters designated by the Presidential Decree is concerned.
(2)
Matters relating to hearing opinion of the residents and the specialists is designated by the Presidential Decree.
법령보기 화면
Article 8 (Limitation on Acts)
(1)
Those who want to change land character, construct buildings, make installations, get sand or gravel or do the other Acts and subordinate statutes designated by the Presidential Decree in the area designated and notified as a distribution complex shall obtain a license from the head of
Si
/
Gun
/Ku:
Provided
, That the matters already approved by the head of
Si
/
Gun
/
Gu
pursuant to the provisions of other acts are exceptions of this paragraph.
(2)
License of the head of
Si
/
Gun
/
Gu
is needed to modify the contents of a license under paragraph (1).
(3)
Paragraph (1) or (2) shall not be applied to those who (including those who have already begun to change land character or build supporting structures in cases where a license is not needed by the Acts and subordinate statutes concerned) obtained a license already relating to the change of land character or building supporting structures under other related Acts and subordinate statutes at the time of designation and public notice of the distribution complex.
(4)
The head of
Si
/
Gun
/
Gu
may order the restoration to the offender of paragraph (1) or (2). If the offender does not comply with the order, the head of
Si
/
Gun
/
Gu
may do the restoration instead of the offender under the
Administrative Vicarious Execution Act
.
법령보기 화면
Article 9 (Cancellation of Designation of Distribution Complex)
(1)
In the case approval on the whole or part of the distribution complex mentioned in
Article 11
is not applied from the date of designation and notification, within the period designated by the Presidential Decree, designation of the distribution complex shall be deemed canceled on the day following the expiration of such period.
(2)
In a case where the development project on the whole or the part of the distribution complex is finished, or there is no more prospect of development, the designator of the distribution complex may cancel the designation of the distribution complex pursuant to the Presidential Decree.
(3)
In a case where the designation of the distribution complex is cancelled, the designator concerned shall notify the heads of the central administrative agencies concerned and Mayor/
Do
governor of this fact, and shall make a public notice thereof. Mayor/
Do
governor notified shall order without delay the head of
Si
/
Gun
/
Gu
to have them available for review by the public for not less than 14 days.
(4)
In a case where land for specific use mentioned in the
Act on the Utilization and Management of the National Territory
or region mentioned in the
Urban Planning Act
is changed and determined by designation of the distribution complex, and then, the designation is canceled pursuant to paragraph (1) or (2), the land for specific use or region in the distribution complex is regarded to be restored as previous land for specific use or region irrespective of the provisions of the
Act on the Utilization and Management of the National Territory
or the Urban Planning Act:
Provided
, That in case where designation is cancelled because the development project of the distribution complex is finished, this paragraph shall not be applied.
(5)
The head of
Si
/
Gun
/
Gu
shall make a public notice without delay when land for specific use or region is restored pursuant to the provision of paragraph (4).
법령보기 화면
Article 10 (Operator of Distribution Complex Development Project)
(1)
Those who want to operate the distribution complex development project shall be designated as an operator by the designator pursuant to the Presidential Decree.
(2)
The persons mentioned below may be designated as the operator of a distribution complex development project:
1.
The State or local government;
2.
Government-invested institution designated by the Presidential Decree;
3.
Local public corporation pursuant to the provisions of the
Local Public Enterprises Act
;
4.
Legal persons established by the special Act; and
5.
Legal persons established by the
Civil Act
and the
Commercial Act
.
(3)
Those who want to be designated as an operator shall apply to the distribution complex designator pursuant to the Presidential Decree.
(4)
In a case where the operator mentioned in paragraph (2) 5 fails to finish the distribution complex development project within the period determined by the plan for implementation of the distribution complex development project approved by the provision of
Article 11
, the distribution complex designator may designate other persons mentioned in each subparagraph of paragraph (2) and let them operate the distribution complex development project.
(5)
The operators mentioned in paragraph (2) 1 through 4 may allow the occupant company or the support agency to operate some part of the distribution complex development project vicariously pursuant to the Presidential Decree in cases where it is considered necessary. In these cases, the operator shall obtain an approval by the distribution complex designator in advance.
법령보기 화면
Article 11 (Approval of Implementation Plan for Distribution Complex Development)
(1)
The operator shall establish the implementation plan for the distribution complex development (hereinafter “implementation plan”) pursuant to the Presidential Decree and shall obtain the approval thereof by the distribution complex designator. The same shall also apply when the operator wishes to modify matters approved.
(2)
An implementation plan shall include matters relating to the disposition of land or facilities developed.
(3)
The distribution complex designator shall consult with the heads of the administrative agency concerned when he approves or modifies matters approved pursuant to the provisions of paragraph (1):
Provided
, That this paragraph shall not apply in cases where the designator approves insignificant matters prescribed by the Presidential Decree.
법령보기 화면
Article 12 (Public Notification of Approval of Implementation Plan)
(1)
The distribution complex designator shall notify matters designated by the Presidential Decree in the official gazette or the public bulletin of City/
Do
, and shall send the copies of the documents concerned to the head of
Si
/
Gun
/
Gu
competent when he approves or modifies matters approved pursuant to the provision of
Article 11
.
(2)
The head of
Si
/
Gun
/
Gu
sent the documents concerned pursuant to the provision of paragraph (1) shall have these documents available for review by the public for not less than 14 days.
(3)
The head of
Si
/
Gun
/
Gu
who have received the documents concerned pursuant to the provision of paragraph (1) shall take proper measures such as an application for public notification of a land register pursuant to the provision of
Article 13 of the Urban Planning Act
in cases where an implementation plan includes matters relating to an urban planning decision. In this case, the operator shall submit the necessary documents for application for public notification of a land register to the head of
Si
/
Gun
/Ku.
법령보기 화면
Article 13 (Deemed Authorization and License)
(1)
In a case where the operator obtains a license of an implementation plan pursuant to the provision of
Article 11
, he is deemed to have obtained a license, decision, authorization, permission, consent, approval, dissolution or disposition (hereinafter “authorization and license”). The public notice of approval of an implementation plan is deemed as the public notice of authorization and license pursuant to the related Acts mentioned below:
1.
License of change of land character mentioned in
Article 4 of the Urban Planning Act
, decision of urban planning mentioned in
Article 12 of the same Act
, designation of the urban planning project operator mentioned in
Article 23 of the same Act
and authorization of the implementation plan mentioned in
Article 25 of the same Act
;
2.
License of farmland conversion and consultation mentioned in
Article 36 of the Farmland Act
;
3.
License of conversion of preserved forest land mentioned in
Article 18 of the Forestry Act
, license of lumbering mentioned in
Article 62 of the same Act
, license of living tree lumbering mentioned in
Article 90 of the same Act
and approval or consent of lumbering in nation-owned forest land mentioned in
Article 73 of the same Act
;
4.
License of conversion of grassland mentioned in Article 23 of the Grassland Act;
5.
Authorization of water supply business mentioned in
Article 12 of the Water Supply and Waterworks Installation Act
, authorization of water supply business for industry mentioned
Article 33-2 of the same Act
, authorization of exclusive waterworks mentioned in
Article 36 of the same Ac
t and authorization of exclusive waterworks for industry mentioned in
Article 38 of the same Act
;
6.
License of public sewer system construction mentioned in
Article 13 of the Sewerage Act
;
7.
License of occupation and use of public water surface mentioned in Article 4 of the Public Water Management Act;
8.
Public water surface reclamation permission mentioned in
Article 4 of the Public Waters Reclamation Act
, authorization of the implementation plan mentioned in
Article 9-2 of the same Act
and consultation or approval mentioned in
Article 29 of the same Act
;
9.
License of river construction mentioned in Article 23 of the Rivers Act and license of river occupation mentioned in Article 25 of the same Act;
10.
License of road construction mentioned in
Article 34 of the Road Act
, license of road occupation mentioned in
Article 40 of the same Act
, license of act in the zone adjacent to the road mentioned in
Article 50 (5) of the same Act
and license of act in the roadside zone mentioned in
Article 51 (3) of the same Act
;
11.
License of relocation of an unknown person’s grave mentioned in Article 16 (2) of the Burial and Burial Grounds, etc. Act;
12.
Approval of use other than for the purpose of basic facilities for agricultural industry mentioned in Article 20 of the Rearrangement of Agricultural and Fishing Villages Act;
13.
Disapproval to mining claim mentioned in
Article 29 of the Mining Industry Act
and cancellation of mining claim or mining area reduction measure mentioned in
Article 39 of the same Act
;
14.
License of port construction mentioned in Article 9 (2) of the Ports Act and approval of port construction plan mentioned in
Article 10
(2);
15.
License of private road construction mentioned in
Article 4 of the Private Road Act
;
16.
Approval of use of the land survey result mentioned in
Article 25 of the Land Survey Act
;
17.
License of exploiting, etc. mentioned in Article 14 of the Work against Land Erosion or Collapse Act and cancellation of designation as the land against land erosion or collapse mentioned in Article 20 of the same Act; and
18.
Cancellation of dairy farming area designation mentioned in
Article 7 (1) of the Dairy Promotion Act
.
(2)
The distribution complex designator shall consult with heads of administrative agencies concerned in advance when he wants to approve the implementation plan including matters mentioned in each subparagraph of paragraph (1).
법령보기 화면
Article 14 (Consignment Implementation of Distribution Complex Development Project)
(1)
The operator may, pursuant to the Presidential Decree, consign the implementation of port, water supply facilities and the other public facilities construction designated by the Presidential Decree and public water surface reclamation to State, local government or governmentinvested institutions designated by the Presidential Decree.
(2)
The operator may consign land purchasing and compensation task to Mayor/
Do
governor, the head of
Si
/
Gun
/
Gu
pursuant to the Presidential Decree.
법령보기 화면
Article 15 (Expropriation of Land, etc.)
(1)
The operator may expropriate or use land, buildings or items attached to the land or rights other than ownership, mining claim, fishery right, rights relating to use of water (hereinafter “land, etc.”) for the distribution complex development project:
Provided
, That the operator mentioned in
Article 10
(2) 5 shall expropriate or use land, etc. after purchasing more than two thirds of land for the distribution complex development project.
(2)
In cases where paragraph (1) is applied, authorization of the project and public notice thereof mentioned in
Articles 14
and
16 of the Land Expropriation Act
are deemed to be made when public notification of distribution complex designation mentioned in
Article 6
(1) is a made (in cases where the operator and the detailed matters are included in the distribution complex development plan after designation of the distribution complex pursuant to the proviso of
Article 5
(4), when public notification of that inclusion is made).
(3)
Adjudication on land, etc. of the distribution complex designated by the Minister of Construction and Transportation is under competence of the Central Land Expropriation Committee, and adjudication on land, etc. of the distribution complex designated by Mayor/
Do
governor is under competence of a competent local land expropriation committee. In this case, the application of adjudication may be made within the period determined by the distribution complex development plan irrespective of
Articles 17
and
25 (2) of the Land Expropriation Act
.
(4)
The
Land Expropriation Act
shall apply
mutatis mutandis
to expropriation or use mentioned in paragraph (1) in cases where there is no special provision.
법령보기 화면
Article 16 (Special Case of National Territory Utilization Plan, etc.)
(1)
In cases where a distribution complex designation and public notification thereof are made, the public waters reclamation plan mentioned in
Article 3-2 of the Public Waters Reclamation Act
or the national territory utilization plan mentioned in
Article 8 of the Act on the Utilization and Management of the National Territory
is deemed to be established or modified within the range of the contents of those designation and public notification.
(2)
Articles 21-3 and 21-7 of the Act on the Utilization and Management of the National Territory
is not applied in cases where the operator who obtained the approval of the implementation plan pursuant to the provision of
Article 11
enters into a land purchase contract in the distribution complex area.
(3)
The provisions relating to prohibition and limitation of construction in the area designated by the
Urban Planning Act
shall not be applied to support facilities irrespective of
Article 45 of the Building Act
.
법령보기 화면
Article 17 (Land Substitution to Landowner)
(1)
The operator, in cases where those who own land in the distribution complex want to manage the distribution facilities designated by the distribution complex development project, may operate the distribution complex development project including that land, and may give substituted land to the land owner pursuant to the Presidential Decree after finishing the distribution complex development project.
(2)
The provisions relating to land substitution and liquidation of the
Land Compartmentalization and Rearrangement Projects Act
shall apply
mutatis mutandis
to the case of land substitution mentioned in paragraph (1) except matters designated by the Presidential Decree.
법령보기 화면
Article 18 (Entry on Land, etc.)
(1)
In cases where it is necessary for a designation of the distribution complex or implementation of the distribution complex development project, the designator or the operator may enter on to the land of others or use it temporarily, and may modify or eliminate trees, earth and stones and other obstacles.
(2)
Articles 5 and 6 of the Urban Planning Act
shall apply
mutatis mutandis
to matters relating to an entry into land of others mentioned in paragraph (1).
법령보기 화면
Article 19 (Attribution of Public Facilities and Land, etc.)
(1)
In cases where the operator of
Article 10
(2) 1 through 4 installs new public facilities or public facilities replacing existing public facilities in implementation of the distribution complex development project, the existing public facilities shall be attributed to the operator free of charge and the new public facilities shall be attributed to the State or local government free of charge which will maintain the facilities irrespective of the provisions of the
State Properties Act
and the
Local Finance Act
.
(2)
The new public facilities installed by the operator mentioned in
Article 10
(2) 5 in implementation of the distribution complex development project shall be attributed to the State or local government which will maintain the facilities and the properties of the State or local government whose use is quitted by implementation of the distribution complex development project may be assigned to the operator gratuitously to the extent of installation cost of the new public facilities irrespective of the provisions of the
State Properties Act
and the
Local Finance Act
.
(3)
The designator of the distribution complex shall hear the opinion of a competent agency when he wants to approve the implementation plan including matters relating to the attribution and assignment of the public facilities mentioned in paragraphs (1) and (2). The same shall also apply to cases where the designator wants to modify the implementation plan.
(4)
The operator shall notify kinds and detailed items of the public facilities supposed to be attributed to the competent agency and the properties supposed to be attributed or assigned to the operator to the competent agency before completion of the distribution complex development project, and those facilities and properties are deemed to be attributed to the State or local government or are deemed to be attributed or assigned to the operator when the notification of completion approval to the competent agency is made.
(5)
The approval certificate of the distribution complex development implementation plan and the documents certifying completion may be used in lieu of the documents certifying the cause of registration mentioned in the
Registration of Real Estate Act
in respect of the registration of the public facilities and the properties mentioned in paragraph (4).
(6)
The range of the public facilities mentioned in paragraphs (1) through (5) shall be designated by the Presidential Decree.
법령보기 화면
Article 20 (Disposal Limitation of Nation-owned Land and Public Land)
(1)
Land owned by the State or local government located within the distribution complex and necessary for the distribution complex development project shall not be sold or assigned and shall be used for any other purpose other than that of the distribution complex development project.
(2)
Properties owned by the State or local government in the distribution complex may be assigned to the operator, occupant company or support agency with a contract irrespective of the provisions of the
State Properties Act
, the
Local Finance Act
and the other Acts and subordinate statutes. In this case, the designator of the distribution complex shall consult with the heads of the administrative agencies concerned in respect of the abolition of use of properties (only in case of administrative properties, The same shall be applicable to the provisions below) and assignment of properties.
(3)
The heads of administrative agencies shall take measures of abolition of use, assignment, etc. within 30 days from the date when the consultation mention in the latter part of paragraph (2) was requested.
(4)
Properties which are supposed to be assigned to the operator, occupant company or support agency pursuant to the provision of paragraph (2) but whose competent agencies are not certain shall be maintained or disposed by the Minister of Finance and Economy irrespective of the provisions of other Acts and subordinate statutes.
법령보기 화면
Article 21 (Charge of Cost, etc.)
(1)
The cost of the distribution complex development project shall be borne by the operator:
Provided
, That the State or local government may provide subsidies or loans for some part of the costs pursuant to the Presidential Decree.
(2)
The state or local government shall, with priority, support installation of the infrastructure such as roads, railways, ports, waterworks, etc. which are necessary for efficient development of the distribution complex.
(3)
Those who have been supplying electricity, telecommunication, gas or heating in land used for the distribution complex shall install the facilities for electricity supply, telecommunication, gas supply and heating in the distribution complex pursuant to the Presidential Decree.
법령보기 화면
Article 22 (Keeping of Facilities)
In cases where the operator considers the existing facilities and installations are not in the way of the distribution complex development project, the operator may let such facilities and installations remain.
법령보기 화면
Article 23 (Advance)
The operator may receive the whole or the part of the purchase price in advance from those who want to purchase a part of the complex or lease from the distribution complex or those who want to use the facilities.
법령보기 화면
Article 24 (Charges for Public Facilities)
(1)
The designator of the distribution complex may let the operator construct roads, parks, green tracts of land and other public facilities designated by the Presidential Decree or maintain the existing facilities.
(2)
The operator may let the owner of the facilities mentioned in
Article 22
or the lotting-out taker pay the charges for the public facilities within the range of cost necessary for construction of the public facilities or management of the existing facilities mentioned in paragraph (1).
(3)
Matters relating to the calculation and collection of the charges for the public facilities mentioned in paragraph (2) shall be determined by the Presidential Decree.
법령보기 화면
Article 25 (Charges to Users and Charges to Causer)
(1)
The operator may charge the whole or the part of the construction cost of the support facilities to the users.
(2)
The operator may charge the whole or the part of the cost for the support facilities construction which are needed because of other construction projects or other acts, to those who shall pay the cost of other construction projects or other acts.
(3)
Matters relating to the calculation and collection of charges to the users and charges to the causers mentioned in paragraphs (1) and (2) shall be determined by the Presidential Decree.
법령보기 화면
Article 26 (Migration Plan, etc.)
(1)
The operator shall establish and implement a migration plan for those who will lose residence as a result of the construction of the distribution complex development project (hereinafter referred to as “migrant”) pursuant to the provisions of the Act on Special Cases concerning the Acquisition of Lands for Public Use and the Compensation for their Loss.
(2)
The occupant company and the support agencies shall employ preferentially the migrant or the residents of the vicinity unless justified by special grounds.
법령보기 화면
Article 27 (Completion Authorization of Distribution Complex Development Project)
(1)
The operator shall obtain the completion authorization of the distribution complex designator pursuant to the Presidential Decree when he completes the whole or the part of the distribution complex development project.
(2)
In cases where the application for the completion authorization mentioned in paragraph (1) is made, the distribution complex designator may ask an inspection needed for the completion authorization from the central administrative agencies concerned, local government or government-invested institution, research institute and the other specialized agencies designated by the Presidential Decree. In this case, the inspection on the public facilities shall be requested, in principle, to those who will maintain the facilities concerned.
(3)
When the distribution complex designator authorizes the completion of the distribution complex development project mentioned in paragraph (1), he shall make public notice thereof and notify it to the operator pursuant to the Presidential Decree.
(4)
In cases where the operator has obtained the completion authorization mentioned in paragraph (1), it is deemed that he has obtained inspection, authorization, report, confirmation, etc. of the completion of the distribution complex development project concerned pursuant to authorization and license deemed as an implementation plan approval pursuant to the provision of
Article 13
(1).
(5)
Land developed or facilities installed by the distribution complex development project shall not be used until the completion approval mentioned in paragraph (1) is granted:
Provided
, That this shall not apply in cases where the distribution complex designator has granted a license of use.
(6)
The operator shall hand over the documents needed for management of the distribution complex to the management agencies in cases where he obtains the completion authorization mentioned in paragraph (1).
CHAPTER Ⅲ LOTTING-OUT, LEASE AND MANAGEMENT OF DISTRIBUTION COMPLEX
법령보기 화면
Article 28 (Disposal of Land and Facilities Developed, etc.)
(1)
The operator shall establish a plan relating to the disposal of land and facilities developed by the distribution complex development project and shall obtain approval of such plan.
(2)
The operator shall use, lot-out or lease land and facilities pursuant to the disposal plan approved under the provision of paragraph (1).
(3)
Matters relating to the disposal method, disposal procedure and price standard, etc. of land and facilities mentioned in paragraph (2) shall be determined by the Presidential Decree.
법령보기 화면
Article 29 (Limitation on Disposal of Land and Facilities Developed)
(1)
In cases where an occupant company or support agency wants to dispose of land and facilities lotted out before the completion of installation of distribution facilities or support facilities, it shall assign them to the operator or the management agency:
Provided
, That the occupant company or support agency shall assign such land and facilities to another occupant company or support agency or the person mentioned below in cases where the operator and the management agency can not purchase such land and facilities:
1.
Korea Land Corporation;
2.
Financial institution which has obtained incorporation authorization under the provision of
Article 9 of the Banking Act
; and
3.
Other persons designated by the Presidential Decree.
(2)
In cases where the occupant industry or support agency disposes of distribution facilities or support facilities after completion of the installation of such facilities, it shall report to the management agency within 30 days from the date of disposal.
(3)
Assignment price of land mentioned in paragraph (1) shall be calculated by adding interest and costs determined by the Presidential Decree to purchase price, and assignment price of facilities, etc. may be decided considering the price assessed by the certified public appraiser mentioned in the
Public Notice of Values and Appraisal of Lands, etc. Act
.
(4)
Necessary matters relating to a selling price, selling procedure of land and facilities purchased by the persons mentioned in each subparagraph of paragraph (1) shall be determined by the Presidential Decree.
법령보기 화면
Article 30 (Construction Duty of Distribution Facilities, etc.)
(1)
Those who (hereinafter referred to as “occupant company, etc.”) use land and facilities developed pursuant to the provision of
Article 28
or those who purchased through lotting-out or leased such land or facilities, shall construct the distribution facilities or the support facilities within the period determined by the Presidential Decree.
(2)
In cases where an occupant company, etc. fails to begin to construct the distribution facilities or the support facilities without good reason in violation of the provision of paragraph (1), the operator or the management agency may purchase land and facilities lotted-out to the occupant company, etc:
Provided
, That land and facilities lotted out-to an occupant company, etc. may be assigned to another occupant company, support facilities or the persons mentioned in each subparagraph of
Article 29
(1) in cases where the operator or the management agency cannot purchase such land and facilities.
(3)
Article 29
(3) shall apply
mutatis mutandis
in respect of a purchase price mentioned in text of paragraph (2), and
Article 29
(4) shall apply
mutatis mutandis
in respect of selling price and selling procedure of land and facilities purchased by the persons mentioned in each subparagraph of
Article 29
(1) pursuant to the proviso of paragraph (2).
법령보기 화면
Article 31 (Construction License and Approval of Use of Distribution Facilities, etc.)
(1)
In cases where those who want to construct the distribution facilities or the support facilities obtains a construction license and approval of use mentioned in
Articles 8 and 18 of the Building Act
, license, authorization, report, inspection or approval mentioned below is deemed to have been made:
1.
License of road occupation mentioned in
Article 40 of the Road Act
and license of new construction, rebuilding or extension work of constructions and installations in the zone adjacent to the road mentioned in
Article 50 (5) of the same Act
;
2.
License of occupation of the public sewer system mentioned in
Article 20 of the Sewage Act
and report of the drainage facilities installation mentioned in
Article 24 (2) of the same Act
;
3.
Inspection of completion of the exclusive waterworks mentioned in
Article 37 or 38 of the Water Supply and Waterworks Installation Act
and authorization of the exclusive waterworks mentioned in
Article 36 or 38 of the same Act
;
4.
Authorization or report of electric installations for household construction plan mentioned in Article 32 of the Electricity Service Act;
5.
Consent of construction license, etc. mentioned in
Article 8 (1) of the Fire Services Act
, installation license of manufacturing factory, etc. mentioned in
Article 16 (1) of the same Act
, inspection of completion of manufacturing factory, etc. mentioned in
Article 17 (2) of the same Act
, report of change on the water supply facilities for fire fighting mentioned in
Article 43
(2), report of execution and inspection of completion of the fire fighting facilities mentioned in
Article 62 (1) and (2) of the same Act
;
6.
Construction license of temporary construction mentioned in
Article 15 (1) of the Building Act
;
7.
Installation approval and report of the waste disposal facilities mentioned in
Article 30 (2) of the Wastes Control Act
and report of the beginning of use mentioned in
Article 30 (4) of the same Act
;
8.
Report of installation of facilities for purifying sewage or septic tank mentioned in
Articles 9 (2) and 10 (2) of the Act on the Disposal of Sewage, Excreta and Livestock Wastewater
, inspection of completion mentioned in
Article 11 of the same Act
, license or report of installation of the livestock wastewater drainage facilities mentioned in
Article 24 of the same Act
and inspection of completion mentioned in
Article 26 of the same Act
;
9.
License of installation of the discharge facilities mentioned in
Article 10 of the Clean Air Conservation Act
,
Article 10 of the Water Quality Conservation Act
and
Article 9 of the Noise and Vibration Control Act
, approval of drawing, installation and execution of self prevention facilities mentioned in the proviso of
Article 12 (1) of the Clean Air Conservation Act
and the proviso of
Article 12 (1) of the Water Quality Conservation Act
;
10.
Report of beginning of operation and checking of operation condition of discharge facilities and prevention facilities mentioned in
Article 14 of the Clean Air Conservation Act
,
Article 14 of the Water Quality Conservation Act
and
Article 13 of the Noise and Vibration Control Act
;
11.
Inspection of completion of the telecommunication network on the premises construction work mentioned in Article 2 of the Telecommunication Work Business Act; and
12.
License of the explosive storage facilities installation mentioned in
Article 25 of the Control of Firearms, Swords, Explosives, etc. Act
and inspection of completion mentioned in
Article 43 of the same Act
.
(2)
In cases where matters mentioned in each subparagraph of paragraph (1) are under the competence of an administrative agencies other than the head of
Si
/
Gun
/
Gu
concerned, the head of
Si
/
Gun
/
Gu
concerned shall consult with the heads of those administrative agencies.
법령보기 화면
Article 32 (Management Agency of Distribution Complex)
(1)
The distribution complex shall be managed by council (hereinafter referred to as the “occupant company council”) which occupant company constitutes voluntarily:
Provided
, That the distribution complex may be managed by the operator until the occupant company council is constituted.
(2)
The distribution complex designator may let the management agency designated by the Presidential Decree manage the distribution complex irrespective of the provisions of paragraph (1) in cases where it is considered necessary for efficient management of the distribution complex.
(3)
An occupant company council mentioned in paragraphs (1) and (2) or those who want to establish the management body shall obtain authorization of the distribution complex designator after fulfilling the conditions designated by the Presidential Decree.
(4)
The distribution complex designator may cancel an authorization of establishment mentioned in paragraph (3) in cases where the occupant company council or management body comes under one of the following subparagraphs:
1.
In cases where there is a violation of this Act or a order pursuant to this Act;
2.
In cases where it is considered that the purpose of establishment is impossible to accomplish; and
3.
In cases where behavior harmful to public interest are made.
(5)
Necessary matters relating to the constitution and management of an occupant company council and management body mentioned in paragraphs (1) and (2) shall be determined by the Presidential Decree.
법령보기 화면
Article 33 (Management Guideline of Distribution Complex)
(1)
The Minister of Construction and Transportation shall make public a notice of management guidelines for the distribution complex (hereinafter referred to as the “distribution complex management guideline”) in the official gazette.
(2)
When the Minister of Construction and Transportation wants to write the distribution complex management guidelines, he shall hear the opinion of Mayor/
Do
governor concerned and consult with the heads with central administrative agencies, and shall go through deliberation of the Deliberative Council. The same shall be applied in cases where the Minister of Construction and Transportation wants to modify the distribution complex management guideline:
Provided
, That this shall not apply in cases where he modifies insignificant matters designated by the Presidential Decree.
(3)
Necessary matters relating to the contents, the method of making, etc. of the distribution complex management guidelines shall be determined by the Presidential Decree.
법령보기 화면
Article 34 (Distribution Complex Management Plan)
(1)
The management agency which obtained authorization of establishment mentioned in
Article 32
(3) shall establish the distribution complex management plan and make an application of approval to the distribution complex designator, and the distribution complex designator shall make public a notice pursuant to the Presidential Decree in cases where he approves the distribution complex management plan. The same shall be applied in cases where the distribution complex management plan is modified.
(2)
Matters mentioned in the following subparagraphs shall be included in the distribution complex management plan mentioned in paragraph (1):
1.
Matters relating to size and range of the distribution complex and how it is to be managed;
2.
Matters relating to installation and management of the distribution facilities and the support facilities; and
3.
Other matters necessary for the management of the distribution complex.
(3)
Matters necessary for making the distribution complex management plan mentioned in paragraph (1) shall be determined by the Presidential Decree.
법령보기 화면
Article 35 (Management Expenses, etc.)
(1)
The management agency may collect management expenses from one occupant company and support agency pursuant to the Presidential Decree for efficient management of the distribution complex.
(2)
The management agency may collect alloted charges from an occupant company and support agency with the approval of the distribution complex designator in cases where such charges are needed for installation, maintenance and repair of the waste disposal yard, street lamps in the distribution complex and other common facilities determined by the Presidential Decree.
(3)
Necessary matters relating to the standard and the method, etc. of management expenses mentioned in paragraph (1) and alloted charges mentioned in paragraph (2) shall be determined by the Presidential Decree.
법령보기 화면
Article 36 (Recommendation)
The distribution complex designator, for the efficient function of the distribution complex, may recommend necessary measures relating to the way the distribution complex is managed and operated and other matters determined by the Presidential Decree. In this case, when it is considered necessary, the distribution complex designator may let the person given the recommendation, report the measures contrived pursuant to recommendation.
법령보기 화면
Article 37 (Report of Occupation)
An occupant company shall make a report of occupation to the management agency pursuant to the Presidential Decree. In this case, a report is deemed to be made in cases where land and facilities are used or lotted-out or leased by the disposal plan mentioned in
Article 28
(1).
CHAPTER Ⅳ SUPPLEMENTARY PROVISIONS
법령보기 화면
Article 38 (Reduction and Exemption of Tax, etc.)
The state or local government may reduce and exempt national tax, local tax, conversion expenses of farmland or forest, substituted farmland creation expenses, substituted forest creation expenses, charges for development or charges of overcrowding, etc. pursuant to the
Regulation of Tax Reduction and Exemption Act
, the
Local Tax Act
, the Regulation for Local Tax Collection and the Act on the Special Measures for Development of Agricultural and Fishing Villages, the Farmlands Act, the
Forestry Act
, the
Restitution of Development Gains Act
and the
Seoul Metropolitan Area Readjustment Planning Act
, etc. for the purpose of developing the distribution complex and attracting occupant companies.
법령보기 화면
Article 39 (Fund Aid)
The state or local government may take measures for fund aid with the purpose of developing the distribution complex and attracting occupant companies.
법령보기 화면
Article 40 (Report)
(1)
The Minister of Construction and Transportation or Mayor/
Do
governor may let the operator report on the distribution complex development or submit the related documents, and may let public officials inspect the distribution complex development.
(2)
The Minister of Construction and Transportation or Mayor/
Do
governor may let a management agency, occupant company and support agency report on the management of the distribution complex or submit the related documents, and may let public officials inspect the management of the distribution complex development.
(3)
The public officials who inspect pursuant to the provisions of paragraphs (1) and (2) shall bring the certificate proving their inspecting right with them and show it to the persons concerned.
(4)
Necessary matters relating to the certificate mentioned in paragraph (3) shall be determined by the Decree of the Ministry of Construction and Transportation.
법령보기 화면
Article 41 (Supervision)
(1)
In cases where the operator comes under the following subparagraphs, the Minister of Construction and Transportation or Mayor/
Do
governor may cancel the designation or approval mentioned in this Act or take necessary measures such as suspension of construction, rebuilding and removal of constructions, etc:
1.
In cases where the operator violates this Act or the orders or the measures pursuant to this Act;
2.
In cases where the operator obtains designation or approval mentioned in this Act through illegal means such as fraud, etc; and
3.
In cases where continuous implementation of the distribution complex development project becomes impossible because of change of circumstances.
(2)
In cases where the Minister of Construction and Transportation or Mayor/
Do
governor takes measures mentioned in paragraph (1), he shall allow the counter parties of those measures or their agents to state their opinion pursuant to the Presidential Decree:
Provided
, That this shall not apply in cases where the counter parties or their agents do not state their opinion without justifiable reason or their domicile is impossible to find.
(3)
The Minister of Construction and Transportation or Mayor/
Do
governor shall make public notification pursuant to the Presidential Decree when he takes measures mentioned in paragraph (1).
법령보기 화면
Article 42 (Delegation of Authority)
(1)
Part of the Minister of Construction and Transportations authority may be delegated to Mayor/
Do
governor or the heads of related administrative agencies pursuant to the Presidential Decree.
(2)
Part of Mayor/
Do
governors authority may be delegated to the head of
Si
/
Gun
/
Gu
or the heads of related administrative agencies pursuant to the Presidential Decree.
법령보기 화면
Article 43 (Perusal of Related Documents, etc.)
(1)
The operator may request perusal or a copy of the documents to be given to the heads of the registry office or administrative agency concerned in cases where such perusal or a copy of the documents is considered necessary for implementation of the distribution complex development project.
(2)
The perusal or a copy of the documents mentioned in paragraph (1) may be free of charge pursuant to the Bylaw of local government or a Supreme Court Regulations Municipal Ordinance.
법령보기 화면
Article 44 (Penal Provisions)
Any person who comes under the following subparagraphs shall be punished by imprisonment for not more than one year or by a fine not more than ten million won:
1.
The person who changes the character of land in violation of
Article 8
(1) or (2);
2.
The person who obtains a designation or approval mentioned in
Articles 10
(1) and
11
(1), or
Article 28
(1) by false or illegal means; and
3.
The person who disposes of land or facilities in violation of
Article 29
(1).
법령보기 화면
Article 45 (Joint Penal Provision)
In cases where a representative of a legal person, agent and employee or another employed person of a legal person or individual violates
Article 44
relating to affairs of a legal person or individual, that legal person or individual shall also be punished by a fine stipulated in that Article in addition to the actor.
법령보기 화면
Article 46 (Fine for Negligence)
Any person who comes under the following subparagraphs shall be punished by a fine for negligence not more than three million won:
1.
The person who fails to make a report mentioned in
Article 29
(2) or makes a false report;
2.
The person who fails to make a report mentioned in
Article 37
or makes a false report; and
3.
The person who fails to make a report or document submission mentioned in
Article 40
(1) or (2), or the person who makes a false report or false document submission, or the person who bothers and rejects the inspection.
법령보기 화면
Article 47 (Imposition Procedure of Fine for Negligence)
(1)
The Minister of Construction and Transportation or Mayor/
Do
governor shall impose and collect a fine for negligence mentioned in
Article 46
pursuant to the Presidential Decree.
(2)
Any person who objects to a fine for negligence imposition mentioned in paragraph (1) may file an objection to the Minister of Construction and Transportation or Mayor/
Do
governor within 30 days from the date when he was notified such a imposition.
(3)
In cases where the person who is given a fine for negligence imposition mentioned in paragraph (1) files an objection pursuant to paragraph (2), the Minister of Construction and Transportation or Mayor/
Do
governor shall notify this to a competent court without delay, and the competent court notified shall make judgement on the fine for negligence pursuant to the
Non-Contentious Case Litigation Procedure Act
.
(4)
In cases where a fine for negligence is not collected without the filing of an objection within the period mentioned in paragraph 2, such a fine for negligence shall be collected pursuant to the cases of default of national tax or local tax.
ADDENDA
(1)
(enforcement Date) This Act shall enter into force on six months after the date of its promulgation.
(2)
(Transitional Measures on Distribution Facilities under Installation) This part of the Act may be applied
mutatis mutandis
pursuant to the Presidential Decree to the distribution facilities which are under installation licensed or approved under other Acts and approved by the Minister of Construction and Transportation through the deliberation of the deliberative council.
(3)
(Amendment of other Acts) (Mentioned in related Acts)
Last updated : 2009-07-26