NEW HARBOR CONSTRUCTION PROMOTION ACT
27911 · 2013-03-23
NEW HARBOR CONSTRUCTION PROMOTION ACT
Act No. 11690, Mar. 23, 2013
Act No. 5251, Dec. 31, 1996
Amended by Act No. 5453, Dec. 13, 1997
Act No. 5454, Dec. 13, 1997
Act No. 5864, Feb. 8, 1999
Act No. 5893, Feb. 8, 1999
Act No. 5911, Feb. 8, 1999
Act No. 5914, Feb. 8, 1999
Act No. 5922, Feb. 8, 1999
Act No. 6095, Dec. 31, 1999
Act No. 6656, Feb. 4, 2002
Act No. 6841, Dec. 30, 2002
Act No. 6842, Dec. 30, 2002
Act No. 6893, May 29, 2003
Act No. 7304, Dec. 31, 2004
Act No. 7386, Jan. 27, 2005
Act No. 7459, Mar. 31, 2005
Act No. 7678, Aug. 4, 2005
Act No. 8042, Oct. 4, 2006
Act No. 8338, Apr. 6, 2007
Act No. 8352, Apr. 11, 2007
Act No. 8369, Apr. 11, 2007
Act No. 8370, Apr. 11, 2007
Act No. 8371, Apr. 11, 2007
Act No. 8404, Apr. 27, 2007
Act No. 8466, May 17, 2007
Act No. 8819, Dec. 27, 2007
Act No. 8820, Dec. 27, 2007
Act No. 8852, Feb. 29, 2008
Act No. 8974, Mar. 21, 2008
Act No. 8976, Mar. 21, 2008
Act No. 9037, Mar. 28, 2008
Act No. 9071, Mar. 28, 2008
Act No. 9313, Dec. 31, 2008
Act No. 9763, Jun. 9, 2009
Act No. 9770, Jun. 9, 2009
Act No. 9773, Jun. 9, 2009
Act No. 10272, Apr. 15, 2010
Act No. 10331, May 31, 2010
Act No. 10599, Apr. 14, 2011
Act No. 10672, May 19, 2011
Act No. 11037, Aug. 4, 2011
Act No. 11690, Mar. 23, 2013
법령보기 화면
Article 1 (Purpose)
The purpose of this Act is to prepare for rapidly increasing demand for harbors and further to contribute to the development of the national economy with the efficient promotion of new harbor construction projects by prescribing matters required for expeditious construction of new harbors.
법령보기 화면
Article 2 (Definitions)
The terms used in this Act shall be defined as follows: <Amended by Act No. 8042, Oct. 4, 2006; Act No. 8852, Feb. 29, 2008; Act No. 9763, Jun. 9, 2009; Act No. 11690, Mar. 23, 2013>
1.
The term "new harbor" means a harbor constructed for the smooth transportation of exporting and importing goods, etc., which is designated and announced by the Minister of Oceans and Fisheries;
2.
The term "new harbor construction project" means any of the following projects necessary for constructing and operating a new harbor:
(a)
A construction project for harbor facilities defined in subparagraph 5 of
Article 2 of the Harbor Act
;
(b)
A construction project for a road, railroad or canal to connect a new harbor with the rear arterial network to transport goods, passengers, etc. utilizing a new harbor;
(c)
A project for creating infrastructure for harbor-related facilities, such as goods distribution facilities, information and communications facilities, amenities for passengers utilizing harbors and those engaged in harbor-related business, marine friendly space, etc.;
(d)
A project for creating infrastructure for residential facilities for those engaged in harbor-related business and settlers;
(e)
A project for reclaiming public waters to create an area prearranged for the construction of a new harbor.
법령보기 화면
Article 3 (Formulation, etc. of Master Plan for Construction of New Harbor)
(1)
When it is necessary to construct a new harbor, the Minister of Oceans and Fisheries shall formulate a master plan for construction of a new harbor (hereinafter referred to as "master plan"), as prescribed by Presidential Decree. <Amended by Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(2)
Where the Minister of Oceans and Fisheries intends to formulate a master plan pursuant to paragraph (1), he/she shall consult in advance with the Metropolitan City Mayors or
Do
Governors related to the master plan (hereinafter referred to as "Mayor/
Do
Governor") and the heads of the relevant central administrative agencies, and submit the plan to the New Harbor Construction Steering Committee prescribed by Presidential Decree (hereinafter referred to as the "Steering Committee") for deliberation. <Amended by Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(3)
When the Minister of Oceans and Fisheries has formulated a master plan pursuant to paragraph (1), he/she shall publicize the plan as prescribed by Presidential Decree, and send it to the relevant Mayor/
Do
Governor to make it available for public inspection for no less than 14 days. <Amended by Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(4)
The provisions of paragraphs (2) and (3) shall apply
mutatis mutandis
where the Minister of Oceans and Fisheries intends to change the master plan formulated pursuant to paragraph (1):
Provided
, That this shall not apply when he/she changes minor matters prescribed by Presidential Decree.
<Amended by Act No. 11690, Mar. 23, 2013>
법령보기 화면
Article 4 (Details of Master Plan)
The master plan shall include the following:
1.
Basic direction of construction of a new harbor;
2.
An outline of a construction plan;
3.
A mid-to long-term development plan;
4.
A land utilization plan and an infrastructure plan;
5.
Other matters prescribed by Presidential Decree.
법령보기 화면
Article 5 (Designation, etc. of Prearranged Areas)
(1)
The Minister of Oceans and Fisheries may designate any waters and area required for the implementation of a new harbor construction project as an area prearranged for the construction of a new harbor (hereinafter referred to as "prearranged area"), or change a designated prearranged area. <Amended by Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(2)
When the Minister of Oceans and Fisheries intends to designate a prearranged area or change a designated prearranged area pursuant to paragraph (1), he/she shall consult in advance with the relevant Mayor/
Do
Governor and the heads of the relevant central administrative agencies and then submit the issue to the Steering Committee for deliberation. <Amended by Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(3)
When the Minister of Oceans and Fisheries designates a prearranged area or changes a designated prearranged area pursuant to paragraph (1), he/she shall publicize such, as prescribed by Presidential Decree. <Amended by Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(4)
When the head of a relevant administrative agency intends to grant permission, approval, authorization, license or registration (hereafter in this paragraph referred to as "permission, etc.") acts prescribed by Presidential Decree, such as change of the form and quality of land, construction of buildings, installation of structures or extraction of earth and stone, gravel, or sand, or capture, gathering, or cultivation of marine animals and plants in a prearranged area pursuant to paragraph (1), he/she shall hear the opinion of the Minister of Oceans and Fisheries. The foregoing shall also apply when he/she gives permission, etc. for change of matters already permitted. <Added by Act No. 5922, Feb. 8, 1999; Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
법령보기 화면
Article 6 Deleted. <by Act No. 5922, Feb. 8, 1999>
법령보기 화면
Article 7 (Developers of New harbor Construction Projects)
(1)
A person who is designated by the State or the Minister of Oceans and Fisheries (hereinafter referred to as "project developer") shall implement a new harbor construction project:
Provided
, That where a new harbor construction project is implemented as a private investment project under the
Act on Private Participation in Infrastructure
, such project developer shall be deemed a project developer under this Act pursuant to
Article 13 (4) of the same Act
. <Amended by Act No. 8042, Oct. 4, 2006; Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(2)
Any person who wants to be designated as a project developer pursuant to paragraph (1) shall formulate a business plan for construction of a new harbor (hereinafter referred to as "business plan") as prescribed by Presidential Decree in accordance with a master plan publicized pursuant to
Article 3
(3), and shall obtain approval from the Minister of Oceans and Fisheries. The foregoing shall also apply when he/she intends to change approved matters. <Amended by Act No. 8042, Oct. 4, 2006; Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
법령보기 화면
Article 8 (Approval of Action Plan)
(1)
A project developer shall prepare an action plan for new harbor construction project (hereinafter referred to as "action plan") within the extent of a business plan, as prescribed by Presidential Decree, and shall obtain approval from the Minister of Oceans and Fisheries. In such cases, where necessary for the efficient implementation of a new harbor construction project, a project developer may formulate an action plan for each stage or facility within the extent of a business plan. <Amended by Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(2)
When the Minister of Oceans and Fisheries intends to approve an action plan pursuant to paragraph (1), he/she shall review each of the following matters: <Amended by Act No. 8042, Oct. 4, 2006; Act No. 8852, Feb. 29, 2008; Act No. 9037, Mar. 28, 2008; Act No. 9071, Mar. 28, 2008; Act No. 11690, Mar. 23, 2013>
1.
Whether details of the action plan conform to the master plan and the business plan;
2.
Whether the results of consultation with the heads of the relevant administrative agencies pursuant to
Article 9
and the results of deliberation of the New Harbor Construction Deliberative Committee pursuant to
Article 10
are implemented;
3.
Whether preparation of construction design specifications and drawings and matters concerning supervision, consulting and deliberation of design comply with the relevant statutes;
4.
Whether a financing plan, such as an annual investment plan and an annual fund raising plan, is feasible;
5.
Whether plans for purchasing and compensation of land, etc. in a project implementation area and measures for relocating residents are appropriate;
6.
Whether the results of assessment under the
Environmental Impact Assessment Act
are confirmed;
6-2.
Whether the results of review of traffic assessment analysis and review of measures for improvement under the
Urban Traffic Improvement Promotion Act
are confirmed;
7.
Whether matters concerning the investigation of direct and indirect damage impacts caused by implementation of a harbor project are included.
(3)
When the Minister of Oceans and Fisheries has approved an action plan pursuant to paragraph (1), he/she shall publicize it as prescribed by Presidential Decree, and send a copy of the relevant document to the head of the relevant local government. <Added by Act No. 8042, Oct. 4, 2006; Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(4)
The head of a local government in receipt of a copy of the relevant document pursuant to paragraph (3) shall, where decisions of urban and
Gun
management planning are included in the relevant document, take necessary measures, such as an application for approval of a topographic map pursuant to
Article 32 of the National Land Planning and Utilization Act
. In such cases, a project developer shall submit documents required for publication, etc. of a topographic map to the head of the relevant local government.
<Amended by Act No. 8042, Oct. 4, 2006; Act No. 10599, Apr. 14, 2011>
(5)
When the Minister of Oceans and Fisheries has formulated or approved an action plan which requires expropriation or use of land pursuant to
Article 16
(1), he/she shall publicize the name of a project developer and the type of a project and details of the land, etc. to be expropriated or used, and shall notify the owner and the right holder of such land thereof:
Provided
, That this shall not apply where a project developer has consulted in advance with the owner and the right holder of land, etc., when he/she applies for approval of an action plan. <Amended by Act No. 8042, Oct. 4, 2006; Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(6)
Where a project developer intends to revise or disuse matters prescribed by Presidential Decree of an action plan approved pursuant to paragraph (1), he/she shall obtain approval from the Minister of Oceans and Fisheries. In such cases, paragraphs (1) through (5) shall apply
mutatis mutandis
, excluding the proviso to paragraph (5). <Amended by Act No. 8042, Oct. 4, 2006; Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(7)
The Minister of Oceans and Fisheries shall notify whether he/she has approved such application or a reason for delay in processing approval, within 60 days from the date of receiving an application for approval, revision or disuse of an action plan pursuant to paragraphs (1) and (6). In such cases, if he/she fails to notify whether he/she has approved such application or a reason for delay in approval process within the above period, he/she shall be deemed to have approved the application on the day following the expiration date of such period. <Added by Act No. 10672, May 19, 2011; Act No. 11690, Mar. 23, 2013>
(8)
Where the Minister of Oceans and Fisheries notifies a reason for delay in approval process pursuant to paragraph (7), he/she may extend approval process period up to 20 days. <Added by Act No. 10672, May 19, 2011; Act No. 11690, Mar. 23, 2013>
법령보기 화면
Article 9 (Legal Fiction of Approval, Permission, etc. under Provisions of other Acts)
(1)
Where the Minister of Oceans and Fisheries intends to formulate or approve an action plan containing matters referred to in the subparagraphs of paragraph (2), he/she shall consult in advance with the heads of relevant administrative agencies along with the relevant document submitted by a project developer. In such cases, the heads of the relevant administrative agencies shall submit their opinions within a period prescribed by Presidential Decree from the date of receiving a request for consultation. <Amended by Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(2)
When the Minister of Oceans and Fisheries has formulated or approved an action plan pursuant to
Article 8
in consultation with the heads of the relevant administrative agencies pursuant to paragraph (1), the following approval, permission, authorization or decision, license, consultation, agreement, cancellation, deliberation, registration, etc. (hereinafter referred to as "authorization, permission, etc.") shall be deemed granted or made, and when an action plan has been approved or publicized, an announcement or publication of authorization, permission, etc. pursuant to the following Acts shall be deemed made: <Amended by Act No. 5454, Dec. 13, 1997; Act No. 5864, Feb. 8, 1999; Act No. 6095, Dec. 31, 1999; Act No. 6841, Dec. 30, 2002; Act No. 6893, May 29, 2003; Act No. 7304, Dec. 31, 2004; Act No. 7459, Mar. 31, 2005; Act No. 7678, Aug. 4, 2005; Act No. 8042, Oct. 4, 2006; Act No. 8338, Apr. 6, 2007; Act No. 8352, Apr. 11, 2007; Act No. 8404, Apr. 27, 2007; Act No. 8466, May 17, 2007; Act No. 8820, Dec. 27, 2007; Act No. 8974; Mar. 21, 2008; Act No. 9037, Mar. 28, 2008; Act No. 9313; Dec. 31, 2008; Act No. 9763, Jun. 9, 2009; Act No. 10272, Apr. 15, 2010; Act No. 10331, May 31, 2010; Act No. 10672, May 19, 2011; Act No. 10599, Apr. 14, 2011; Act No. 11037, Aug. 4, 2011; Act No. 11690, Mar. 23, 2013>
1.
Deleted;
<by Act No. 8042, Oct. 4, 2006>
2.
Decision on urban and
Gun
management planning pursuant to
Article 30 of the National Land Planning and Utilization Act
(limited to harbor facilities referred to in subparagraph 6 (a) of
Article 2 of the same Act
), permits to engage in development activities pursuant to
Article 56 of the same Act
, designation of an developer of urban and
Gun
planning facility project pursuant to
Article 86 of the same Act
, preparation and authorization of an implementation plan for urban planning facility project pursuant to
Article 88 of the same Act
;
3.
Authorization of a general waterworks project pursuant to
Article 17 (1) of the Water Supply and Waterworks Installation Act
, authorization of a waterworks project for industrial use pursuant to
Article 49 of the same Act
, authorization to install exclusive water supply facilities pursuant to
Article 52 of the same Act
, and authorization to install exclusive water supply facilities for industrial use pursuant to
Article 54 of the same Act
;
4.
Permission to implement public sewerage works pursuant to
Article 16 of the Sewerage Act
, permits to occupy and use public sewerage pursuant to
Article 24 of the same Act
and reporting on installation of a private sewerage treatment facility pursuant to
Article 34 (2) of the same Act
;
5.
Permits to occupy and use, or use public waters pursuant to
Article 8 of the Public Waters Management and Reclamation Act
, approval or reporting on an action plan to occupy and use, or use pursuant to
Article 17 of the same Act
, formulation or revision of a master plan for reclamation pursuant to
Articles 22
and
27 of the same Act
, a license to reclaim public waters pursuant to
Article 28 of the same Act
, consultation or approval of reclamation implemented by the State, etc. pursuant to
Article 35 of the same Act
, and approval of an action plan for reclamation of public waters pursuant to
Article 38 of the same Act
;
6.
Deleted;
<by Act No. 10272, Apr. 15, 2010>
7.
Consultation with a river management agency or approval pursuant to
Article 6 of the River Act
(limited to matters concerning permission to implement river works pursuant to
Article 30 of the same Act
, permits to occupy and use, or use a river pursuant to
Article 33 of the same Act
, and permits to use river water pursuant to
Article 50 of the same Act
);
8.
Consultation with a road supervisory agency or approval pursuant to
Article 5 of the Road Act
(limited to matters concerning public announcement of approval of a route pursuant to
Article 17 of the same Act
, decision on a road zone pursuant to
Article 24 of the same Act
, permission to implement road works to a person who is not a management agency pursuant to
Article 34 of the same Act
, and permits to occupy and use a road pursuant to
Article 38 of the same Act
);
9.
Permission for or consultation on conversion of farmland pursuant to
Article 34 of the Farmland Act
;
10.
Permission for deforestation or extraction of sand and gravel or such pursuant to
Article 14 of the Erosion Control Work Act
and the cancellation of designation of treated-land for erosion control pursuant to
Article 20 of the same Act
;
11.
Permission for conversion of a mountainous district and reporting on conversion of a mountainous district pursuant to
Articles 14
and
15 of the Management of Mountainous Districts Act
, permission for or reports on the temporary use of mountainous districts pursuant to
Article 15-2 of the same Act
, permission for or reporting on deforestation of standing trees pursuant to
Article 36 (1) and (4) of the Creation and Management of Forest Resources Act
, permission of or reporting on activities in a forest protection district (excluding any forest hereditary resources protection district) pursuant to
Article 9 (1) and (2) 1 and 2 of the Forest Protection Act
, and the cancellation of designation of a forest protection district pursuant to
Article 11 (1) 1 of the same Act
;
12.
Consent to a building permit, etc. pursuant to
Article 7 (1) of the Installation, Maintenance, and Safety Control of Fire-Fighting Systems Act
, reporting on installation of a fire-fighting system pursuant to
Article 13 (1) of the Fire-Fighting System Installation Business Act
and permission for building of a factory, etc. pursuant to
Article 6 (1) of the Safety Control of Dangerous Substances Act
;
13.
Approval of and approval for change of an action plan of a railroad construction project pursuant to
Article 9 of the Railroad Construction Act
;
14.
Consultation with a park management agency pursuant to
Article 71 (1) of the Natural Parks Act
(limited to matters concerning permission of acts other than a park project pursuant to
Article 23 of the same Act
);
15.
Review of traffic impact analysis and measures for improvement pursuant to
Article 16 of the Urban Traffic Improvement Promotion Act
;
16.
Approval of the establishment of a factory pursuant to
Article 13 of the Industrial Cluster Development and Factory Establishment Act
(limited to factories built during the construction period as facilities for construction purposes directly required for a new harbor construction project);
17.
Deliberation by a building committee pursuant to
Article 4 of the Building Act
, a building permit pursuant to
Article 11 of the same Act
, a building permit of a temporary building pursuant to
Article 20 (1) of the same Act
, and consultation on building pursuant to
Article 29 of the same Act
;
18.
Approval for or reporting on building of waste disposal facilities pursuant to
Article 29 of the Wastes Control Act
;
19.
Deleted;
<by Act No. 10672, May 19, 2011>
20.
Permission for or reporting on installation of emission or discharge facilities pursuant to
Article 23 of the Clean Air Conservation Act
,
Article 33 of the Water Quality and Ecosystem Conservation Act
and
Article 8 of the Noise and Vibration Control Act
;
21.
Registration of integrated logistics terminal business pursuant to
Article 7 of the Act on the Development and Management of Logistics Facilities
and approval to implement construction works of an integrated logistics terminal project or a general logistics terminal project pursuant to
Article 9 of the same Act
;
22.
Permits to extract aggregate pursuant to
Article 22 of the Aggregate Extraction Act
;
23.
Deliberation by a construction technology deliberative committee pursuant to
Article 5 of the Construction Technology Management Act
;
24.
Designation of a developer of an industrial complex development project pursuant to
Article 16 of the Industrial Sites and Development Act
and approval of an action plan pursuant to
Article 17 of the same Act
.
법령보기 화면
Article 10 (New Harbor Construction Deliberative Committee)
(1)
A New Harbor Construction Deliberative Committee (hereinafter referred to as the "Deliberative Committee") shall be established under the Ministry of Oceans and Fisheries to deliberate on important matters concerning building technology, construction technology, traffic impact, etc. of a new harbor construction project. <Amended by Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(2)
Where the Minister of Oceans and Fisheries intends to formulate or approve an action plan containing matters referred to in
Article 9
(2)
15
,
17
(excluding a building permit of a temporary building pursuant to
Article 20 (1) of the Building Act
) or
23
, he/she shall submit it in advance to the Deliberative Committee for deliberation. <Amended by Act No. 5922, Feb. 8, 1999; Act No. 8042, Oct. 4, 2006; Act No. 8852, Feb. 29, 2008; Act No. 8974, Mar. 21, 2008; Act No. 11690, Mar. 23, 2013>
(3)
Matters necessary for the organization, functions, operation, etc. of the Deliberative Committee pursuant to paragraph (1) shall be prescribed by Presidential Decree.
법령보기 화면
Article 11 (Special Cases for Facilitation, Quality Improvement, etc. of New Harbor Construction Projects)
(1)
Where any harbor facility falls under any of the following subparagraphs,
Articles 49
,
50
and
53 of the Building Act
,
Article 5 (4) of the Safety Control of Dangerous Substances Act
and
Article 9 (1) of the Installation, Maintenance, and Safety Control of Fire-Fighting Systems Act
shall not apply to the relevant harbor facility: <Amended by Act No. 6893, May 29, 2003; Act No. 8042, Oct. 4, 2006; Act No. 8852, Feb. 29, 2008; Act No. 8974, Mar. 21, 2008; Act No. 11037, Aug. 4, 2011; Act No. 11690, Mar. 23, 2013>
1.
Where special technology or special equipment acknowledged by the Minister of Oceans and Fisheries upon deliberation by the Deliberative Committee has been utilized;
2.
Where the Minister of Oceans and Fisheries acknowledges, upon deliberation by the Deliberative Committee, that the structure and form of the harbor facility conform to or excel the standards concerning fire-fighting, prevention of disasters, fire prevention, evacuation, etc. prescribed in the relevant statutes.
(2)
Where a project developer places orders for construction works of main harbor facilities with various functions and characteristics, such as container terminals, if there is difficulty in placing separate orders for construction works, electrical works, and electrical and telecommunications works due to the nature or technical management of the construction works, he/she may place a bulk order, as prescribed by Presidential Decree.
(3)
Notwithstanding
Article 20 of the Industrial Cluster Development and Factory Establishment Act
, a project developer may newly build, extend, or relocate, in a prearranged area or its neighboring area, manufacturing facilities for various construction materials which are required for a new harbor construction project and deemed by the Minister of Oceans and Fisheries as directly necessary for a new harbor construction project. In such cases, such facilities for manufacturing construction materials shall be built during the construction period for the purposes of construction. <Amended by Act No. 6842, Dec. 30, 2002; Act No. 8042, Oct. 4, 2006; Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(4)
The Minister of Oceans and Fisheries may entrust a project developer who is not the State with business on the construction of basic facilities of harbor facilities referred to in subparagraph 2 (a) of
Article 2
and implemented by the State, as prescribed by Presidential Decree. <Amended by Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
법령보기 화면
Article 12 (Restrictions on Disposition, etc. of State or Public Land)
(1)
Any land in a prearranged area, owned by the State or a local government and required for a new harbor construction project shall not be sold or transferred for purposes, other than the new harbor construction project.
(2)
Notwithstanding the
State Property Act
, the
Public Property and Commodity Management Act
and other statutes, any property of the State or a local government in a prearranged area may be sold to a project developer by a private contract. In such cases, the Minister of Oceans and Fisheries shall consult in advance with the heads of the relevant administrative agencies on disuse of such property (limited to administrative property; hereinafter the same shall apply) and sale. <Amended by Act No. 8042, Oct. 4, 2006; Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(3)
When the heads of the relevant administrative agencies receive a request for consultation pursuant to the latter part of paragraph (2), they shall take necessary measures, such as disuse or sale of property, within 90 days after receipt of such request.
(4)
Notwithstanding the provisions of other statutes, the Minister of Strategy and Finance shall manage or dispose of property to be sold to a project developer pursuant to paragraph (2), the management agency of which is unknown.
<Amended by Act No. 10672, May 19, 2011>
법령보기 화면
Article 13 (Confirmation of Completion)
(1)
When a project developer has completed construction works of a new harbor construction project, it shall promptly submit a project completion report to the Minister of Oceans and Fisheries and obtain confirmation of completion. In such cases, the Minister of Oceans and Fisheries in receipt of a request to confirm completion may request the head of a relevant central administrative agency, local government, government-funded institution, research institution or other specialized institution to conduct inspections required for confirmation of completion. <Amended by Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(2)
When the Minister of Oceans and Fisheries receives a request to confirm completion pursuant to paragraph (1), he/she shall confirm the completion, as prescribed by Presidential Decree and then, where such construction works are deemed performed in compliance with approved details, shall issue a certificate of completion. <Amended by Act No. 5922, Feb. 8, 1999; Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(3)
When a project developer has received a certificate of completion pursuant to paragraph (2), it shall be deemed to have received the inspection or approval of the completion of the relevant project in accordance with the authorization, permission, etc. referred to in the subparagraphs of
Article 9
(2).
<Amended by Act No. 5922, Feb. 8, 1999>
(4)
No project developer shall use land created or facilities built for a new harbor construction project before he/she receives a certificate of completion pursuant to paragraph (2):
Provided
, That this shall not apply where it has reported to the Minister of Oceans and Fisheries, as prescribed by Ministerial Decree of Oceans and Fisheries. <Amended by Act No. 5922, Feb. 8, 1999; Act No. 8042, Oct. 4, 2006; Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
(5)
If necessary for the efficient implementation of a new harbor construction project, a project developer may request confirmation of completion for each stage or facility within the scope of an action plan.
법령보기 화면
Article 14 (Reversion, etc. of Facilities)
(1)
The
Harbor Act
shall apply to reversion of land created or facilities built by a new harbor construction project and calculation of the total project cost, and use of facilities.
<Amended by Act No. 8042, Oct. 4, 2006>
(2)
Where a project developer is an implementor of a private investment project pursuant to the
Act on Private Participation in Infrastructure
, the same Act shall apply to reversion of land created or facilities built by a new harbor construction project and calculation of the total project cost and use of facilities, notwithstanding paragraph (1).
<Amended by Act No. 7386, Jan. 27, 2005; Act No. 8042, Oct. 4, 2006>
법령보기 화면
Article 15 (Access to and Use of Land, etc.)
(1)
Where necessary for investigation and survey for the formulation of an action plan or implementation of a new harbor construction project, a project developer may have access to land of another person or use it temporarily as a storage yard for materials, a passage or a temporary road and, where especially necessary, may change or remove bamboos and trees, earth and stones and other obstacles.
(2)
Articles 130
(2) through (7) and
131 of the National Land Planning and Utilization Act
shall apply to cases falling under paragraph (1).
<Amended by Act No. 8042, Oct. 4, 2006>
법령보기 화면
Article 16 (Expropriation of Land, etc.)
(1)
Where necessary for implementing a new harbor construction project, a project developer may expropriate or use land, objects or rights prescribed in
Article 3 of the Act on Acquisition of and Compensation for Land, etc. for Public Works Projects
(hereinafter referred to as "land or such").
<Amended by Act No. 6656, Feb. 4, 2002; Act No. 8042, Oct. 4, 2006>
(2)
When an action plan is publicized pursuant to
Article 8
(2), a project approval under
Article 20 (1) of the Act on Acquisition of and Compensation for Land, etc. for Public Works Projects
approval and public announcement thereof under
Article 22 of the same Act
shall be deemed made, and an application for adjudication may be filed within the implementation period of a project fixed in an action plan, notwithstanding
Articles 23 (1) and 28 (1) of the same Act
.
<Amended by Act No. 6656, Feb. 4, 2002; Act No. 8042, Oct. 4, 2006>
(3)
The competent land expropriation committee having jurisdiction over adjudication on expropriation or use of land or such pursuant to paragraph (1) shall be the Central Land Expropriation Committee.
(4)
Except as otherwise provided in this Act, the
Act on Acquisition of and Compensation for Land, etc. for Public Works Projects
shall apply
mutatis mutandis
to the expropriation or use of land or such pursuant to paragraph (1).
<Amended by Act No. 6656, Feb. 4, 2002; Act No. 8042, Oct. 4, 2006>
법령보기 화면
Article 17 (Advance Payment, etc.)
(1)
A project developer may receive, in advance, all or part of the land supply price, as prescribed by Presidential Decree, from persons to be supplied with a parcel of land created by the implementation of a new harbor construction project, as prescribed in an action plan.
(2)
A project developer may issue bonds redeemable with land (hereinafter referred to as "bonds redeemable with land") to persons to be supplied with a parcel of land created by the implementation of a new harbor construction project, according to an action plan.
(3)
Necessary matters for procedures, methods, conditions, etc. of the issuance of bonds redeemable with land shall be prescribed by Presidential Decree.
(4)
Where a project developer intends to receive advance payment pursuant to paragraph (1) or issue bonds redeemable with land pursuant to paragraph (2), it shall formulate a plan on the same and obtain approval from the Minister of Oceans and Fisheries. <Amended by Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
법령보기 화면
Article 18 (Supervision)
(1)
Where a project developer falls under any of the following subparagraphs, the Minister of Oceans and Fisheries may revoke permission or approval granted under this Act, or order suspension or change of construction works, or rebuilding, change or relocation of facilities or objects:
Provided
, That where a project developer falls under subparagraph 3 and the reason is not attributed to intention or gross negligence of the project developer, the Minister of Oceans and Fisheries shall not render a disposition of revoking permission, etc. or issue an order for suspension of construction works, etc. <Amended by Act No. 8852, Feb. 29, 2008; Act No. 10672, May 19, 2011; Act No. 11690, Mar. 23, 2013>
1.
Where it obtains permission or approval under this Act by unlawful means;
2.
Where it violates this Act, or an order or disposition under this Act;
3.
Where it substantially falls behind a scheduled progress due to its own fault;
4.
When a change in circumstances makes continuous implementation of the new harbor construction project impossible.
(2)
When the Minister of Oceans and Fisheries has rendered a disposition or issued an order pursuant to paragraph (1), he/she shall publicize such, as prescribed by Presidential Decree. <Amended by Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
법령보기 화면
Article 18-2 (Hearings)
Where the Minister of Oceans and Fisheries intends to revoke permission or approval pursuant to
Article 18
(1), he/she shall hold a hearing. <Amended by Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
[This Article Added by Act No. 5453 Dec, 13, 1997]
법령보기 화면
Article 19 Deleted. <by Act No. 5922, Feb. 8, 1999>
법령보기 화면
Article 20 (Government Subsidies, etc.)
The Government may fully or partially subsidize expenses incurred in carrying out a new harbor construction project or lend funds to a project developer within budgetary limits.
법령보기 화면
Article 21 (Implementation of Appurtenant Works)
(1)
A project developer may regard any construction works which does not fall under a new harbor construction project and becomes necessary due to the new harbor construction project or necessary to implement the new harbor construction project as a new harbor construction project (hereinafter referred to as "appurtenant works") and may implement the same together with the new harbor construction project.
(2)
The scope of appurtenant works pursuant to paragraph (1) shall be prescribed by Presidential Decree.
법령보기 화면
Article 22 (Entrustment of Land Purchases, etc.)
(1)
A project developer may entrust the head of the competent local government with land purchases, compensation for losses and countermeasure works for relocation or such for a new harbor construction project, as prescribed by Presidential Decree.
(2)
In case of entrusting land purchases, compensation for losses and countermeasure works for relocation or such pursuant to paragraph (1), entrustment fees shall be prescribed by Presidential Decree.
법령보기 화면
Article 23 (Delegation of Authority)
The Minister of Oceans and Fisheries may delegate part of his/her authority under this Act to the head of a Regional Maritime Affairs and Port Office or a Mayor/
Do
Governor, as prescribed by Presidential Decree. <Amended by Act No. 5922, Feb. 8, 1999; Act No. 8852, Feb. 29, 2008; Act No. 11690, Mar. 23, 2013>
법령보기 화면
Article 24 (Penalty Provisions)
Any person who uses land or facilities without reporting before confirmation of the completion thereof in violation of
Article 13
(4) shall be punished by imprisonment with labor for not more than one year or by a fine not exceeding five million won.
<Amended by Act No. 8042, Oct. 4, 2006>
[This Article Wholly Amended by Act No. 5922, Feb. 8, 1999]
법령보기 화면
Article 24-2 (Penalty Provisions)
Any person who violates an order issued or disposition made pursuant to
Article 18
(1) shall be punished by a fine not exceeding three million won.
[This Article Added by Act No. 5922, Feb. 8, 1999]
법령보기 화면
Article 25 (Joint Penalty Provisions)
When the representative of a juristic person or an agent, employee or other servant of a juristic person or individual commits an offence under
Article 24
or
24-2
in connection with the business of the juristic person or the individual, not only shall such offender be punished, but the juristic person or the individual shall also be punished by a fine under the relevant provisions:
Provided
, That this shall not apply where such juristic person or individual has not been negligent in giving due attention and supervision concerning the relevant duties to prevent such offence.
[This Article Wholly Amended by Act No. 10672, May 19, 2011]
법령보기 화면
Article 26 (Administrative Fines)
The Minister of Oceans and Fisheries shall impose on and collect from any person who refuses or interferes with acts of a project developer pursuant to
Article 15
(1) without any justifiable ground an administrative fine not exceeding three million won.
<Amended by Act No. 11690, Mar. 23, 2013>
[This Article Wholly Amended by Act No. 10672, May 19, 2011]
ADDENDA
(1)
(Enforcement Date) This Act shall enter into force three months after the date of its promulgation.
(2)
(Transitional Measures concerning Harbor Construction Projects in Progress) New construction of harbor facilities in progress under the
Harbor Act
or the
Promotion of Private Capital into Social Overhead Capital Investment Act
or a private investment project for harbor construction which has undergone deliberation by the Steering Committee, at the time this Act enters into force, shall be deemed a new harbor construction project in progress under this Act. In such cases, when a master plan has already been publicized pursuant to the provisions of the relevant statutes, the designation and announcement of a new harbor and the formulation and publication of a master plan shall be deemed to have been made under this Act with regard to the relevant harbor and harbor construction project, and when an action plan has already been approved pursuant to the provisions of the relevant statutes, the action plan shall be deemed to have been approved under this Act.
(3)
Omitted.
ADDENDA <Act No. 5453, Dec. 13, 1997>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 1998. (Proviso Omitted).
Article 2 Omitted.
ADDENDUM <Act No. 5454, Dec. 13, 1997>
This Act shall enter into force on March 1, 1998.
ADDENDA <Act No. 5864, Feb. 8, 1999>
Article 1 (Enforcement Date)
(1)
This Act shall enter into force six months after the date of its promulgation.
(2)
through (4) Omitted.
Articles 2 through 10 Omitted.
ADDENDA <Act No. 5893, Feb. 8, 1999>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA <Act No. 5911, Feb. 8, 1999>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 8 Omitted.
ADDENDA <Act No. 5914, Feb. 8, 1999>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 5 Omitted.
ADDENDA <Act No. 5922, Feb. 8, 1999>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation:
Provided
, That the amended provisions of
Article 19
shall enter into force on the date of its promulgation.
Article 2 (Applicability for Confirmation of Completion)
The amended provisions of
Article 13
(2) shall apply to applications for confirmation of completion filed on or after the date this Act enters into force.
Article 3 (Transitional Measures concerning Orders for Reinstatement and Vicarious Execution)
The previous provisions shall apply to an order for reinstatement and the vicarious execution thereof with regard to a person who has violated the previous
Article 6
(1) at the time this Act enters into force.
Article 4 (Transitional Measures concerning Permission for Use Before Completion)
A person who has obtained or applied for permission for use before completion pursuant to the proviso to previous
Article 13
(4) at the time this Act enters into force shall be deemed a person who has filed a report of use before completion or a person who has obtained or applied for permission before completion pursuant to the amended provisions of the proviso to the same paragraph of the same Article.
Article 5 (Transitional Measures concerning Penalty Provisions)
The previous provisions shall apply to the penalty provisions applicable to acts committed before this Act enters into force.
ADDENDA <Act No. 6095, Dec. 31, 1999>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 2001.
Articles 2 through 10 Omitted.
ADDENDA <Act No. 6656, Feb. 4, 2002>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 2003.
Articles 2 through 12 Omitted.
ADDENDA <Act No. 6841, Dec. 30, 2002>
Article 1 (Enforcement Date)
This Act shall enter into force nine months after the date of its promulgation.
Articles 2 through 12 Omitted.
ADDENDA <Act No. 6842, Dec. 30, 2002>
Article 1 (Enforcement Date)
This Act shall enter into force on July 1, 2003.
Articles 2 through 8 Omitted.
ADDENDA <Act No. 6893, May 29, 2003>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA <Act No. 7304, Dec. 31, 2004>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 10 Omitted.
ADDENDA <Act No. 7386, Jan. 27, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 6 Omitted.
ADDENDA <Act No. 7459, Mar. 31, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA <Act No. 7678, Aug. 4, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 12 Omitted.
ADDENDA <Act No. 8042, Oct. 4, 2006>
(1)
(Enforcement Date) This Act shall enter into force three months after the date of its promulgation.
(2)
(Transitional Measures concerning Penalty Provisions) The previous provisions shall apply to the penalty provisions applicable to acts committed before this Act enters into force.
ADDENDA <Act No. 8338, Apr. 6, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 17 Omitted.
ADDENDA <Act No. 8352, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 16 Omitted.
ADDENDA <Act No. 8369, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 16 Omitted.
ADDENDA <Act No. 8370, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 20 Omitted.
ADDENDA <Act No. 8371, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 10 Omitted.
ADDENDA <Act No. 8404, Apr. 27, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 14 Omitted.
ADDENDA <Act No. 8466, May 17, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 5 Omitted.
ADDENDA <Act No. 8819, Dec. 27, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 9 Omitted.
ADDENDA <Act No. 8820, Dec. 27, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 9 Omitted.
ADDENDA <Act No. 8852, Feb. 29, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 7 Omitted.
ADDENDA <Act No. 8974, Mar. 21, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 14 Omitted.
ADDENDA <Act No. 8976, Mar. 21, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 10 Omitted.
ADDENDA <Act No. 9037, Mar. 28, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 2009.
Articles 2 through 19 Omitted.
ADDENDA <Act No. 9071, Mar. 28, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 2009. (Proviso Omitted.)
Articles 2 through 11 Omitted.
ADDENDA <Act No. 9313, Dec. 31, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation.
Articles 2 and 3 Omitted.
ADDENDA <Act No. 9763, Jun. 9, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force nine months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 8 Omitted.
ADDENDA <Act No. 9770, Jun. 9, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force nine months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 7 Omitted.
ADDENDA <Act No. 9773, Jun. 9, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 10 Omitted.
ADDENDA <Act No. 10272, Apr. 15, 2010>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 14 Omitted.
ADDENDA <Act No. 10331, May 31, 2010>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 13 Omitted.
ADDENDA <Act No. 10599, Apr. 14, 2011>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 9 Omitted.
ADDENDA <Act No. 10672, May 19, 2011>
(1)
(Enforcement Date) This Act shall enter into force on the date of its promulgation.
(2)
(Applicability to Approval of Action Plans) The amended provisions of
Article 8
(7) and (8) shall apply beginning from the first action plans for new harbor construction projects filed for approval after this Act enters into force.
(3)
(Period of Validity) The amended provisions of the proviso to
Article 18
(1) shall be effective until December 31, 2012.
ADDENDA <Act No. 11037, Aug. 4, 2011>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 6 Omitted.
ADDENDA <Act No. 11690, Mar. 23, 2013>
Article 1 (Enforcement Date)
(1)
This Act shall enter into force on the date of its promulgation.
(2)
Omitted.
Articles 2 through 7 Omitted.
Last updated : 2016-02-22