ACT ON CONSTRUCTION OF DAMS AND ASSISTANCE TO THEIR ENVIRONS
6338 · 2009-01-01
ACT ON CONSTRUCTION OF DAMS AND ASSISTANCE TO THEIR ENVIRONS
Act No. 9037, Mar. 28, 2008
Act No. 6021, Sep. 7, 1999
Amended by Act No. 6587, Dec. 31, 2001
Act No. 6656, Feb. 4, 2002
Act No. 6655, Feb. 4, 2002
Act No. 6841, Dec. 30, 2002
Act No. 6916, May 29, 2003
Act No. 7158, Jan. 29, 2004
Act No. 7678, Aug. 4, 2005
Act No. 7715, Dec. 7, 2005
Act No. 8014, Sep. 27, 2006
Act No. 8283, Jan. 26, 2007
Act No. 8338, Apr. 6, 2007
Act No. 8371, Apr. 11, 2007
Act No. 8352, Apr. 11, 2007
Act No. 8351, Apr. 11, 2007
Act No. 8659, Oct. 17, 2007
Act No. 8733, Dec. 21, 2007
Act No. 8820, Dec. 27, 2007
Act No. 8852, Feb. 29, 2008
Act No. 8976, Mar. 21, 2008
Act No. 9037, Mar. 28, 2008
CHAPTER Ⅰ GENERAL PROVISIONS
법령보기 화면
Article 1 (Purpose)
The purpose of this Act is to develop the national economy through the rational development and utilization of water resources by providing for the construction and management of dams, the reuse of construction costs, post-dam-construction environment measures and assistance to the residents of areas adjacent to dams.
법령보기 화면
Article 2 (Definitions)
The definitions of terms used in this Act shall be as follows:
<Amended by Act No. 6656, Feb. 4, 2002; Act No. 7158, Jan. 29, 2004; Act No. 8659, Oct. 17, 2007; Act No. 8852, Feb. 29, 2008>
1.
The term "dam" means a structure of a height of 15 meters or higher, blocking the flowing of a river to utilize the reserved water for tap water, industrial water, agricultural water, water for improvement of environment, hydraulic power generation, flood control, water transport and other purposes (hereinafter referred to as "specific purposes"), and it shall include spillways, auxiliary dams and other facilities or structures which function en bloc with the relevant dam and effect its full utility;
2.
The term "multipurpose dam" means a dam which is constructed by the Minister of Land, Transport and Maritime Affairs to be used for not less than two specific purposes (excluding facilities and installations used exclusively for the specific purpose);
3.
The term "right to use the dam" means the right to use a certain quantity of water from a multipurpose dam for specific purposes by securing it in a certain area; and
4.
The term "person migrating from the area to be submerged" means those who are to lose their living basis due to an implementation of dam construction projects, and who are subject to the countermeasures for migrations as referred to in
Article 78 (1) of the Act on the Acquisition of Land, etc. for Public Works and the Compensation Therefor
.
법령보기 화면
Article 3 (Scope of Applications)
This Act shall apply to any multipurpose dam and dams as constructed by persons falling under each of the following subparagraphs in order to supply the tap and industrial water or to make the flood control:
Provided
, That the provisions of
Article 4
shall apply to all kinds of dams:
<Amended by Act No. 7158, Jan. 29, 2004; Act No. 8852, Feb. 29, 2008>
1.
The Minister of Land, Transport and Maritime Affairs;
2.
Special Metropolitan City Mayor, Metropolitan City Mayor or
Do
governor (hereinafter referred to as the "Mayor/
Do
governor"); and
3.
Other persons prescribed by Presidential Decree.
CHAPTER Ⅱ CONSTRUCTION AND MANAGEMENT OF DAMS
Section 1 Construction of Dams
법령보기 화면
Article 4 (Long-Term Plans for Dam Construction)
(1)
The Minister of Land, Transport and Maritime Affairs shall formulate a long-term plan for dam construction every ten years in order to develop water resources efficiently and environment-friendly, which includes matters falling under each of the following subparagraphs:
<Amended by Act No. 8852, Feb. 29, 2008>
1.
Basic principle for dam construction;
2.
Prospects of the supply and demand of water for various purposes;
3.
Dam construction plans by water system (a dam for agricultural purpose shall be limited to one with storing capacity of not less than ten million tons);
4.
Plans for securing financial resources;
5.
Standards for selecting a dam construction site;
6.
Means to minimize the environmental impact of dam construction; and
7.
Other matters as prescribed by Presidential Decree.
(2)
The Minister of Land, Transport and Maritime Affairs shall, where he/she intends to formulate a long-term plan for dam construction under paragraph (1), ask in advance the heads of central administrative agencies concerned to devise and furnish him/her respective long-term plans for dam construction by jurisdiction.
<Amended by Act No. 8852, Feb. 29, 2008>
(3)
When the Minister of Land, Transport and Maritime Affairs intends to formulate the long-term plan for dam construction as referred to in paragraph (1), he/she shall go through a deliberation by the Central River Management Committee as referred to in
Article 87
of the Rivers Act, after hearing the opinions of the competent Mayor/
Do
governor and holding a consultation with the heads of related central administrative agencies. In such cases, the matters concerning the dams that have gone through a deliberation of the Electric Source Development Project Promotion Committee as referred to in
Article 4
of the Act on Special Cases concerning Electric Source Development, shall be excluded from the matters for deliberation.
<Added by Act No. 7158, Jan. 29, 2004; Act No. 8338, Apr. 6, 2007; Act No. 8852, Feb. 29, 2008>
(4)
The Minister of Land, Transport and Maritime Affairs shall examine every five years whether or not the long-term plan for dam construction is compatible with its propriety, and reflect the results therefrom to the long-term plan for dam construction.
<Added by Act No. 7158, Jan. 29, 2004; Act No. 8852, Feb. 29, 2008>
(5)
Provisions of paragraph (3) shall apply
mutatis mutandis
to alterations of the long-term plan for dam construction:
Provided
, That the same shall not apply to the minor matters as prescribed by Presidential Decree.
<Added by Act No. 7158, Jan. 29, 2004>
(6)
When the Minister of Land, Transport and Maritime Affairs has formulated or altered the long-term plan for dam construction as referred to in paragraphs (1) and (5), he/she shall promptly notify the heads of related central administrative agencies and the competent Mayor/
Do
governor thereof.
<Added by Act No. 7158, Jan. 29, 2004; Act No. 8852, Feb. 29, 2008>
법령보기 화면
Articles 5 and 6 Deleted.<by Act No. 7715, Dec. 7, 2005>
법령보기 화면
Article 7 (Basic Plans)
(1)
An implementer of a dam construction project shall devise a basic plan for dam construction (hereinafter referred to as the "basic plan") which includes matters falling under each of the following subparagraphs:
<Amended by Act No. 6587, Dec. 31, 2001; Act No. 7158, Jan. 29, 2004>
1.
Objective of the construction;
2.
Title of a project, location and size of a place for project implementation;
3.
Scale and type;
4.
Quantity of the stored water, and matters concerning a distribution by use of such stored water;
5.
Name or title of a person scheduled to be granted a right to use the dam (hereinafter referred to as the "person to be granted a right for dam use"), and the details of a right to use the dam;
6.
Dam construction costs (including expenses required for the consolidation of dam environs born by the implementer of dam construction project under
Article 42)
and the details of the sharing thereof;
7.
Implementer of dam construction project;
8.
Project period;
9.
If lands or buildings to be expropriated or used, and other goods or rights are in existence, details thereof;
10.
Damages on environments expected by a dam construction, and matters concerning the means for reducing them and for preserving water quality;
11.
Matters concerning the project capable of contributing to the social, cultural and economic development of the dam environs, and the
project for promoting the usefulness of a dam; and
12.
Other principal matters concerning the dam construction.
(2)
An implementer of dam construction project who is not the Minister of Land, Transport and Maritime Affairs or the Mayor/
Do
governor shall, when he/she intends to formulate a basic plan under paragraph (1), obtain permission from the Minister of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
(3)
The Minister of Land, Transport and Maritime Affairs or the Mayor/
Do
governor shall, when he/she intends to formulate a basic plan or grant permission under paragraph (1) or (2), consult in advance with the heads of administrative agencies concerned, and seek the opinions from a person to be granted a right for dam use.
<Amended by Act No. 8852, Feb. 29, 2008>
(4)
The Minister of Land, Transport and Maritime Affairs or the Mayor/
Do
governor shall, when he/she has formulated a basic plan or granted permission, publish it under conditions prescribed by Presidential Decree.
<Amended by Act No. 8852, Feb. 29, 2008>
(5)
The provisions of paragraphs (1) through (4) shall apply
mutatis mutandis
to the alteration of basic plans (excluding an alteration of minor matters as prescribed by Presidential Decree) or the abolition thereof.
법령보기 화면
Article 8 (Implementation Plan)
(1)
An implementer of dam construction project shall devise an implementation plan relating to dam construction (hereinafter referred to as the "implementation plan") under conditions prescribed by Presidential Decree, after devising a basic plan.
(2)
An implementer of dam construction project who is neither the Minister of Land, Transport and Maritime Affairs nor the Mayor/
Do
governor shall, when he/she intends to formulate an implementation plan, obtain approval from the Minister of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
(3)
The Minister of Land, Transport and Maritime Affairs or the Mayor/
Do
governor shall, when he/she has formulated an implementation plan or granted approval under paragraph (1) or (2), promptly publish the details thereof, and notify the heads of administrative agencies concerned and a person to be granted a right for dam use thereof.
<Amended by Act No. 8852, Feb. 29, 2008>
(4)
The provisions of paragraphs (1) through (3) shall apply
mutatis mutandis
to the alteration of an implementation plan (excluding an alteration of minor matters prescribed by Presidential Decree), or the abolition thereof.
법령보기 화면
Article 9 (Legal Fiction of Authorization and Permission, etc. under Other Acts)
(1)
When the Minister of Land, Transport and Maritime Affairs or the Mayor/
Do
governor has formulated, altered, or approved an implementation plan under
Article 8
(1) or (2), the permission, report, cancellation, consultation, approval, authorization or designation, etc. falling under each of the following subparagraphs (hereinafter referred to as the "authorization or permission, etc.") shall be deemed to have been made, and when an implementation plan has been published under
Article 8
(3), the publication or public notice of the authorization or permission, etc. falling under each of the following subparagraphs shall be deemed to have been made:
<Amended by Act No. 6655, Feb. 4, 2002; Act No. 6841, Dec. 30, 2002; Act No. 7158, Jan. 29, 2004; Act No. 7678, Aug. 4, 2005; Act No. 8014, Sep. 27, 2006; Act No. 8283, Jan. 26, 2007; Act No. 8338, Apr. 6, 2007; Act Nos. 8351 & 8352, Apr. 11, 2007; Act No. 8733, Dec. 21, 2007; Act No. 8820, Dec. 27, 2007; Act No. 8852, Feb. 29, 2008; Act No. 8976, Mar. 21, 2008>
1.
Permission for occupancy and use of public waters under
Article 5 of the Public Waters Management Act
;
2.
Permission for or consultation on the diversion of farmland under
Article 34 of the Farmland Act
;
3.
Permission for or a report on the diversion of a mountainous district under
Articles 14
and 15 of the Management of Mountainous Districts Act, permission for gathering earth and stones (limited to building stones) under
Article 25
of the same Act, and permission for and report on the cutting, etc. of standing timber under
Articles 36
(1) and (4) and 45 (1) and (2) of the Creation and Management of Forest Resources Act;
4.
Permission for the deforestation, etc. under Article 14 of the Work against Land Erosion or Collapse Act, and the cancellation of designation of an erosion control area under
Article 20
of the same Act;
5.
Permission for a reburial of the grave referred to in
Article 23
(1) of the Funeral Services, etc. Act;
6.
Consultation on or approval of the matters subject to permission of the river management agency under
Article 6 of the River Act
, permission for implementation of river conservation work under
Article 30
of the same Act, permission for occupancy of a river under
Article 33
of the same Act and permission for use of river water under
Article 50
of the same Act;
7.
Approval of the installation of public sewerage (limited to excreta treatment facilities) under
Article 11 of the Sewerage Act
;
8.
Approval of or report on the installation of waste treatment facilities under
Article 29 of the Wastes Control Act
;
9.
Permission for the implementation of a road work under
Article 34 of the Road Act
, and permission for the occupancy of a road under
Article 38
of the same Act;
10.
Permission for the implementation of a public sewerage work under
Article 16 of the Sewerage Act
, and permission for the occupancy under
Article 24
of the same Act;
11.
License for the reclamation under
Article 9 of the Public Waters Reclamation Act
, and approval for the implementation plan under
Article 15
of the same Act;
12.
Permission for opening a private road under
Article 4 of the Private Road Act
;
13.
Permission for occupancy and use under
Article 23 of the Natural Parks Act
;
14.
Permission for the creation of a grassland under
Article 5
of the Grassland Act, and permission for the diversion of a grassland under
Article 23
of the same Act;
15.
Consultation on permission, etc. of an administrative agency under
Article 13
of the Protection of Military Bases and Installations Act;
16.
Approval of other uses of an agricultural infrastructure than its objectives under Article 22 of the Rearrangement of Agricultural and Fishing Villages Act;
17.
Decision on the urban management plans under
Article 30 of the National Land Planning and Utilization Act
(limited to the facilities under subparagraph 6 of
Article 2
of the same Act), permission for the development activities under
Article 56
of the same Act, designation of the implementer of an urban planning facilities project under
Article 86
of the same Act, and authorization for an implementation plan under
Article 88
of the same Act; and
18.
Permission for occupancy under
Article 14 of the Small River Maintenance Act
.
(2)
When the Minister of Land, Transport and Maritime Affairs or the Mayor/
Do
governor intends to formulate, alter or approve an implementation plan which includes the details falling under any subparagraph of paragraph (1), he/she shall consult in advance with the heads of administrative agencies concerned. In such cases, the heads of administrative agencies in receipt of a request for such consultations shall furnish their opinions within 30 days from the date when such a request is received.
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 10 (Access to Land, etc.)
(1)
When an implementer of a dam construction project is in need of an examination or survey for a dam construction or if necessary for such dam construction, he/she may enter or temporarily use the other person’s land, and if especially necessary, he/she may alter or remove the bamboo, trees, earth, stones and other obstacles therein.
(2)
When an implementer of a dam construction project intends to enter the other person’s land under paragraph (1), he/she shall notify the owner, occupant, or manager of the relevant land of the relevant date and place not later than three days prior to the date when he/she intends to enter. In such cases, an implementer of dam construction project who is not an administrative agency shall obtain in advance permission from the head of
Si
/
Gun
/autonomous
Gu
(hereinafter referred to as the "head of
Si
/
Gun
/Gu").
<Amended by Act No. 7715, Dec. 7, 2005>
(3)
When an implementer of a dam construction project intends to alter or remove the bamboo, trees, earth, stones and other obstacles under paragraph (1), he/she shall obtain consent from the owner, occupant or manager of such obstacles.
(4)
When an implementer of a dam construction project is unable to obtain consent under paragraph (3) from the owner, occupant or manager of the obstacles due to an obscurity of the address or residence of such owner, occupant or manager, he/she may alter or remove such obstacles after filing notice thereof with the head of
Si
/
Gun
/
Gu
;
Provided
, That where the implementer of dam construction project is not an administrative agency, he/she shall obtain permission therefor in advance from the head of
Si
/
Gun
/Gu.
(5)
A person who intends to alter or remove the obstacles pursuant to paragraph (3) shall notify the owner, occupant or manager of the obstacles thereof not later than three days prior to the date when he/she intends to alter or remove such obstacles:
Provided
, That the same shall not apply to the case of paragraph (4).
(6)
No one shall enter the building sites or other person’s lands girded by walls or fences, without consent of the land occupant before the sunrise or after the sunset.
(7)
No land occupant shall obstruct nor refuse the acts of an implementer of dam construction project under paragraph (1), without justifiable grounds.
(8)
A person who intends to perform the acts under paragraph (1) shall carry a certificate showing his/her identity, and produce it to the persons concerned as prescribed by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
(9)
An implementer of dam construction project shall, where any person has suffered a loss arising from the acts under paragraph (1), compensate such loss.
(10)
With respect to a compensation for losses under paragraph (9), an implementer of dam construction project and the person suffered from such loss shall reach an agreement through consultations.
(11)
An implementer of dam construction project or a person suffered from loss may, in cases where they fail to reach an agreement under paragraph (10) or unable to hold such consultations, apply the competent Land Expropriation Committee for an adjudication.
법령보기 화면
Article 11 (Expropriation and Use of Land, etc.)
(1)
An implementer of dam construction project may expropriate or use any land, buildings and other articles attached to the land, rights other than ownership, mining right, fishing right, and right for water use (hereinafter referred to as the "land, etc."), which are required for the dam construction.
(2)
In applying the provisions of paragraph (1), where a basic plan is published under
Article 7
(4), a project approval and a publication of such project approval under
Articles 20 (1) and 22 of the Act on the Acquisition of Land, etc. for Public Works and the Compensation Therefor
shall be deemed to have been made; and an application for adjudication shall be filed within a period of project as fixed in a basic plan, notwithstanding the provisions of
Articles 23 (1) and 28 (1) of the Act on the Acquisition of Land, etc. for Public Works and the Compensation Therefor
.
<Amended by Act No. 6656, Feb. 4, 2002>
(3)
The Act on the Acquisition of Land, etc. for Public Works and the Compensation Therefor shall apply
mutatis mutandis
to the expropriation and use of the land, etc. under paragraph (1), except as otherwise provided for in this Act.
<Amended by Act No. 6656, Feb. 4, 2002>
법령보기 화면
Article 12 (Publication of Completion of Dam Construction)
(1)
The Minister of Land, Transport and Maritime Affairs or the Mayor/
Do
governor shall, when the construction of dam is complete, promptly publish matters falling under each of the following subparagraphs:
<Amended by Act No. 8338, Apr. 6, 2007; Act No. 8852, Feb. 29, 2008>
1.
Purport that dam construction has been completed;
2.
River area under subparagraph 2 of
Article 2 of the River Act
, from among the area for dam construction; and
3.
Purport that the relevant dam is facilities of a river under subparagraph 3 of
Article 2 of the River Act
.
(2)
An implementer of dam construction project who is not the Minister of Land, Transport and Maritime Affairs or the Mayor/
Do
governor shall, when he/she has completed a dam construction, promptly file an application for an authorization for the completion of construction with the Minister of Land, Transport and Maritime Affairs under conditions as prescribed by Presidential Decree, and the Minister of Land, Transport and Maritime Affairs shall, where deemed that the dam has been constructed in compliance with an implementation plan, deliver an ending certificate of authorization for work completion, and publish matters of each subparagraph of paragraph (1).
<Amended by Act No. 8852, Feb. 29, 2008>
(3)
When a publication of paragraph (1) or (2) is made, it shall be deemed that consent under the proviso to the part other than the items of subparagraph 3 of
Article 2 of the River Act
has been obtained and that a decision and a publication of a river area under
Article 10 (3) of the River Act
have been made.
<Amended by Act No. 8338, Apr. 6, 2007>
(4)
When a publication under paragraph (1) or (2) is made, a completion inspection or a completion authorization of the relevant work or project ensuing an authorization or permission, etc. as fictionized under
Article 9
(1) as well as a publication thereof shall be deemed to have been made.
법령보기 화면
Article 13 (Reversion of Public Facilities, etc.)
(1)
Where an implementer of a dam construction project installs, through his dam construction project, new public facilities or other public facilities to substitute the existing public facilities, the former public facilities shall revert without compensation to the implementer of dam construction project, and the new public facilities shall revert without compensation to the State or a local government in charge of managing the relevant public facilities, notwithstanding the provisions of the
State Properties Act
and the
Local Finance Act
.
(2)
When the Minister of Land, Transport and Maritime Affairs or the Mayor/
Do
governor intends to formulate, alter or approve an implementation plan which includes matters relating to the reversion of the public facilities under paragraph (1), he/she shall hear in advance the opinions of a management agency of such public facilities:
Provided
, That when the management agency has yet to be designated, he/she shall hear the opinions of a management agency, after such management agency is designated, and prior to granting a completion authorization.
<Amended by Act No. 8852, Feb. 29, 2008>
(3)
An implementer of a dam construction project shall notify the relevant management agency of the kinds and details of public facilities to revert to himself/herself and the State or local governments prior to the completion of dam construction, and the relevant public facilities shall revert to each person described in paragraph (1) respectively on the date when the completion of dam construction is published under Article 12.
(4)
In registering the public facilities and land under paragraphs (1) through (3), the publication of the implementation plan under the provisions of Article 8 and the publication of completion of a dam construction under Article 12 shall substitute the document attesting a cause of registration under Article 40 of the
Registration of Real Estate Act
.
(5)
The scope of public facilities under paragraphs (1) through (4) shall be prescribed by Presidential Decree.
법령보기 화면
Article 14 (Disposal of State and Public Property)
(1)
Any property owned by the State or local government in a project implementation area may be rented or transferred by a free contract to an implementer of dam construction project, notwithstanding the provisions of the
State Properties Act
or the
Local Finance Act
.
<Amended by Act No. 7715, Dec. 7, 2005>
(2)
The Minister of Land, Transport and Maritime Affairs or the Mayor/
Do
governor shall, when he/she intends to formulate, alter or approve an implementation plan which includes matters relating to the disposal of State and public properties under paragraph (1), consult in advance with the management agency in charge of such properties.
<Amended by Act No. 8852, Feb. 29, 2008>
(3)
From among the State properties to be rented or transferred to an implementer of a dam construction project under paragraph (1), the Minister of Strategy and Finance shall be deemed the management agency, with respect to any property for which the competent management agency is obscure.
<Amended by Act No. 8852, Feb. 29, 2008>
Section 2 Management of Dams
법령보기 화면
Article 15 (Dam Management Agency and Entrusted Dam Manager)
(1)
The Minister of Land, Transport and Maritime Affairs shall manage dams:
Provided
, That the dams constructed by the Mayor/
Do
governor shall be managed by the relevant Mayor/
Do
governor.
<Amended by Act No. 8852, Feb. 29, 2008>
(2)
The Minister of Land, Transport and Maritime Affairs or the Mayor/
Do
governor who manages dams under paragraph (1) (hereinafter referred to as the "dam management agency") may, where deemed necessary for managing such dams, entrust the dam management to a person granted the right to use a dam (hereinafter referred to as the "person who has holding a right for dam use") or a government-invested institution performing the business of constructing and managing dams.
<Amended by Act No. 8852, Feb. 29, 2008>
(3)
Matters necessary for the entrustment of dam management under paragraph (2) shall be prescribed by Presidential Decree.
법령보기 화면
Article 16 (Basic Principle of Dam Management)
In managing dams, the propriety shall be ensured so as to enhance the public interest by storing water in dams, to take heed to removal or minimization of any damages, and not to infringe a right for dam use.
법령보기 화면
Article 17 (Dam Management Regulations)
(1)
The dam management agency shall set forth a regulation for dam management according to the basic principle of dam management under
Article 16,
under conditions prescribed by Presidential Decree.
(2)
A person entrusted with the dam management under
Article 15
(2) (hereinafter referred to as the "person entrusted with dam management") shall set forth a regulation for dam management, and obtain approval thereof from the dam management agency. The same shall also apply to a case where he/she intends to alter a regulation for dam management.
(3)
A dam management agency shall, when it sets forth or approves a regulation for dam management under paragraph (1) or (2), consult in advance with the head of the related central administrative agency, and hear the opinions of a person to be granted a right for dam use or a person holding the right for dam use. The same shall also apply to a case where it intends to alter a regulation for dam management.
(4)
A dam management agency may, where deemed necessary to efficiently manage water resources, order a person entrusted with dam management to alter a regulation for dam management under paragraph (2), or have him/her file a report necessary for dam management, or give him/her an instruction thereof.
법령보기 화면
Article 18 (Measures to Prevent Dangers)
A dam management agency or a person entrusted with dam management shall, where deemed that a discharge of stored water in a dam results in marked changes in the downstream, notify in advance the relevant Mayor/
Do
governor under conditions prescribed by Presidential Decree, in order to prevent possible dangers ensuing such discharge, and take necessary measures for making such dangers known to the public.
법령보기 화면
Article 18-2 (Project for Management of Dams)
Where the dam management agency or the person entrusted with dam management deems it necessary to ensure the propriety of dam management, it or he/she may implement the projects falling under each of the following subparagraphs under conditions prescribed by Presidential Decree:
1.
Project for a removal or mitigation of inundation damages or traffic inconveniences etc. that are caused by dams; and
2.
Project for an increase of usefulness of dams, such as a creation of relaxation space and installation of athletic facilities, etc.
[This Article Added by Act No. 7158, Jan. 29, 2004]
Section 3 Special Case for Construction and Management of Multipurpose Dams
법령보기 화면
Article 19 (Person to be Granted Right for Dam Use)
(1)
A person to be granted a right for dam use shall be one who has filed an application for establishment of a right for dam use, and who satisfies the requirements under Article 25.
(2)
A successor, a corporation incorporated due to a merger, and a general successor to the person to be granted a right for dam use, shall succeed to the status under this Act which is held by such a person.
법령보기 화면
Article 20 (Bearing of Multipurpose Dam Construction Costs)
(1)
A person to be granted a right for dam use shall bear the cost computed under conditions prescribed by Presidential Decree, from among the construction costs of a multipurpose dam.
(2)
The cost to be born under paragraph (1) shall be computed taking into account the amount falling under each of the following subparagraphs:
1.
An estimated investment amount computed from the usefulness which is obtained by using the stored water in a multipurpose dam for the purpose for which a right for dam use is to be established; and
2.
An estimated cost amount necessary for a setup of installations having the same usefulness as the installations exclusively used for the purpose for which a right for dam use is to be established.
(3)
An amount calculated by deducting the cost to be born under paragraph (1) from the construction costs for a multipurpose dam shall be born by the National Treasury.
(4)
The State shall, when a person to be granted a right for dam use has failed to have a right for dam use, refund the cost paid by such person under paragraph (1):
Provided
, That such refund may be suspended until a new person to be granted a right for dam use is decided, except for a case where the basic plan is abolished.
(5)
The State shall, where it suspends the refund of costs under the proviso to paragraph (4), pay the interest under conditions prescribed by Presidential Decree during the period of suspension.
(6)
Matters necessary for the scope of costs required for the construction of a multipurpose dam, the method of paying the cost to be born, the deadline for such payment, and the refund of the cost to be born, etc. shall be prescribed by Presidential Decree.
법령보기 화면
Article 21 (Preceding Investment by State)
The Minister of Land, Transport and Maritime Affairs may, when there exist a need for flood control and other special needs, construct a multipurpose dam without designating a person to be granted a right for dam use. In such cases, the provisions concerning a person to be granted a right for dam use or a person holding a right for dam use shall be applied from the time when such person is designated.
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 22 (Bearing of Costs by Local Governments)
The Minister of Land, Transport and Maritime Affairs may have a local government which benefits significantly due to the construction of a relevant dam (excluding a local government having jurisdiction over the dam construction area) bear a part of the costs to be born by the National Treasury pursuant to
Article 20
(3) from among the costs required for the construction of a multipurpose dam, under conditions prescribed by Presidential Decree.
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 23 (Shared Amount by Beneficiaries)
(1)
The Minister of Land, Transport and Maritime Affairs may, where there exists any person who benefits significantly due to the construction of a multipurpose dam, have such person bear a part of the costs required for the construction of relevant multipurpose dam, within the limit of his/her relevant benefits.
<Amended by Act No. 8852, Feb. 29, 2008>
(2)
Matters necessary for the scope of persons to bear the shared amount under paragraph (1), the computation and the collection methods of shared amounts shall be prescribed by Presidential Decree.
법령보기 화면
Article 24 (Establishment of Right for Dam Use)
(1)
The Minister of Land, Transport and Maritime Affairs shall, upon a request from a person who intends to use the stored water in a multipurpose dam for a specific purpose, establish a right to use such dam.
<Amended by Act No. 8852, Feb. 29, 2008>
(2)
The Minister of Land, Transport and Maritime Affairs shall, where he/she establishes a right to use a dam under paragraph (1), clarify matters falling under each of the following subparagraphs:
<Amended by Act No. 8852, Feb. 29, 2008>
1.
Objective of establishment; and
2.
Maximum and minimum water level and quantity of stored water to be secured by the establishment of a right for dam use.
(3)
Matters of paragraph (2) 2 shall be prescribed so as to have the relevant dam exhibit its utility without a hitch.
(4)
The Minister of Land, Transport and Maritime Affairs shall, when he/she has published the completion of dam construction under
Article 12,
promptly establish a right to use such dam, for a person to be granted a right for dam use.
<Amended by Act No. 8852, Feb. 29, 2008>
(5)
A person to be granted a right for dam use may use the stored water in a multipurpose dam for a specific purpose, after obtaining permission from the Minister of Land, Transport and Maritime Affairs even prior to the establishment of a right to use a dam under paragraph (1).
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 25 (Requirements for Establishment of Right for Dam Use)
The Minister of Land, Transport and Maritime Affairs shall, only where an applicant satisfies requirements falling under any of the following subparagraphs, establish a right to use a dam for him/her:
<Amended by Act No. 8852, Feb. 29, 2008>
1.
Where the use of stored water in a multipurpose dam for the purpose of establishing a right to use a dam is in conformity with the basic plan; and
2.
Where permission or authorization, etc. required for running a business which uses the stored water in a multipurpose dam is obtained.
법령보기 화면
Article 26 (Restrictions on River Occupancy for Specific Purpose)
A person who intends to use the stored water in a multipurpose dam for a specific purpose shall obtain permission for occupancy of a river under
Article 33 of the River Act
and permission for use of river water under
Article 50
of the same Act, and have a right for dam use under
Article 24
established.
<Amended by Act No. 8338, Apr. 6, 2007>`
법령보기 화면
Article 27 (Rejection of Establishment of Right for Dam Use)
(1)
The Minister of Land, Transport and Maritime Affairs may reject an establishment of a right for dam use to a person who is not designated as a person to be granted a right for dam use in the basic plan.
<Amended by Act No. 8852, Feb. 29, 2008>
(2)
The Minister of Land, Transport and Maritime Affairs shall reject an establishment of a right for dam use to a person to be granted a right for dam use, in cases where he/she falls under any of the following subparagraphs:
<Amended by Act No. 8852, Feb. 29, 2008>
1.
Where a person to be granted a right for dam use fails to conform with the requirements of
Article 25;
and
2.
Where a person to be granted a right for dam use fails to pay the shared amount under
Article 20
(1).
법령보기 화면
Article 28 (Area to Secure Stored Water)
An area in which the stored water is to be secured by a right for dam use shall be the area surrounded by the line which is formed by a contact of the maximum water level of stored water under
Article 24
(2) 2 to the land.
법령보기 화면
Article 29 (Nature of Right for Dam Use)
A right for dam use shall be deemed the property rights, and the provisions concerning the real estate shall apply
mutatis mutandis
to a right for dam use, except as otherwise provided in this Act.
법령보기 화면
Article 30 (Restrictions on Disposal of Right for Dam Use)
(1)
A right for dam use shall not be a subject-matter of other rights than a succession, a merger of corporations and other general successions, a transfer, a disposition taken against arrears, a compulsory execution and a mortgage.
(2)
A right for dam use for which a mortgage creation is registered shall not be divided or merged, and its purpose of creation shall not be altered or waived, without consent of the mortgagee.
법령보기 화면
Article 31 (Revocation etc. against Right for Dam Use)
(1)
The Minister of Land, Transport and Maritime Affairs shall, where he/she cancels in whole or in part the permission for occupancy of a river under
Article 33 of the River Act
and permission for use of river water under
Article 50
of the same Act against a person holding a right for dam use, and where he/she is unable to recognize use of a river as before with respect to other persons than those holding a right for dam use, take the disposition of revocation or alteration corresponding thereto against a right for dam use.
<Amended by Act No. 8338, Apr. 6, 2007; Act No. 8852, Feb. 29, 2008>
(2)
The Minister of Land, Transport and Maritime Affairs may, where he/she cancels in whole or in part the permission for occupancy of a river under
Article 33 of the River Act
and permission for use of river water under
Article 50
of the same Act against a person holding a right for dam use, and where there exists a need to recognize anew use of a river to other persons than one holding a right for dam use, order the relevant holder of a right for dam use, with fixing a considerable period, to transfer in whole or in part his/her right for dam use to other persons.
<Amended by Act No. 8338, Apr. 6, 2007; Act No. 8852, Feb. 29, 2008>
(3)
In cases where a person holding a right for dam use fails to transfer in whole or in part his/her right for dam use to other persons within the specified period under paragraph (2), the Minister of Land, Transport and Maritime Affairs may, only where a person other than one holding a right for dam use is deemed eligible for obtaining permission for use of river water with the same details as permission for use of river water granted to the relevant person holding a right for dam use, take a disposition to revoke in whole or in part the relevant right for dam use.
<Amended by Act No. 8338, Apr. 6, 2007; Act No. 8852, Feb. 29, 2008>
(4)
Where the Minister of Land, Transport and Maritime Affairs deems it difficult to maintain the right for dam use as it is, which are the cases falling under each of the following subparagraphs, he/she may take dispositions of revocation or alteration against the right for dam use. In such cases, he/she shall hear in advance the opinions from the holders of rights for dam uses:
<Added by Act No. 7158, Jan. 29, 2004; Act No. 8852, Feb. 29, 2008>
1.
Where the quantity of water-storage has been changed due to an expansion or reconstruction etc. of dams; and
2.
Where the status of utilization etc. of the water-storage in dams has been changed.
(5)
Where the Minister of Land, Transport and Maritime Affairs takes dispositions of revocation or alteration against the right for dam use as referred to in paragraph (4), he/she shall alter the matters concerning a distribution of water-storage by usages from among the publicized basic plans as referred to in
Article 7
(4), and make a public notification thereof.
<Added by Act No. 7158, Jan. 29, 2004; Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 32 (Registration)
(1)
A right for dam use and the creation, alteration, transfer, extinction, and restrictions on disposals, of a mortgage with a subject-matter of a right for dam use, shall be null and void unless they are registered in the registration ledger of rights for dam use which is kept in the Ministry of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
(2)
Matters necessary for the registration of a right for dam use, and of any mortgage created with a subject-matter of a right for dam use, other than those under paragraph (1), shall be prescribed by Presidential Decree.
법령보기 화면
Article 33 (Fees)
A person holding a right for dam use shall, except for a case where his/her right for dam use is established under
Article 24
(4), pay the fees computed under conditions prescribed by Presidential Decree to the National Treasury. In such cases, in computing such fees, the estimated investment amount computed under
Article 20
(2) 1 shall be taken into account.
법령보기 화면
Article 34 (Refund of Shared Amount, etc.)
(1)
The State shall, when it takes a disposition to revoke or alter a right for dam use under Article 31, refund a part of the shared amount paid under Article 20 (1) or of the fees paid under Article 33.
(2)
The amount to be refunded under paragraph (1) shall be computed in the same manner as that for computing the relevant shared amount or the fees, and the amount to be refunded to a person who has had his/her right for dam use established under Article 24 (4) shall not exceed the amount calculated by deducting the depreciation amount computed under conditions as prescribed by Presidential Decree from the shared amount under Article 20 (1).
(3)
The State shall, where a mortgage creation is registered on a right for dam use which has been extinguished by a disposition of revocation or alteration under Article 31, deposit a refund payment under paragraph (1), except for a case of the consent by a mortgagee. In such cases, such mortgagee on a right for dam use may exercise his/her right on the refund payment deposited.
법령보기 화면
Article 35 (Collection of Fees)
(1)
A person holding a right for dam use or a person to be granted a right for dam use may collect the fees from a person who uses the stored water in the relevant dam:
Provided
, That the same shall not apply to the case of using the river water by obtaining permission for use of river water under
Article 50 of the River Act
prior to the construction of such dam.
<Amended by Act No. 8338, Apr. 6, 2007>
(2)
The fees under paragraph (1) shall be determined by taking into account the quantity of water used by a person using the stored water in a dam, within the limit of the shared amount under
Article 20
(1) or the paid fees under
Article 33
by a person holding a right for dam use or a person to be granted a right for dam use.
(3)
A person holding a right for dam use or a person to be granted a right for dam use shall, where he/she intends to collect the fees under paragraph (1), set forth a computation manner, a method and period of collection, and obtain in advance permission thereof from the Minister of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 36 (Bearing of Expenses for Management of Multipurpose Dam)
(1)
Expenses required for maintenance, repair and other management of multipurpose dams shall be born by the National Treasury, a person holding a right for dam use, or a person entrusted with the dam management. In such cases, the expenses to be born by a person entrusted with the dam management shall be within the limit of revenues accruing from the entrusted management of a relevant dam.
(2)
Matters necessary for the bearing of expenses under paragraph (1) shall be prescribed by Presidential Decree.
법령보기 화면
Article 37 (Compulsory Collection of Shared Amount, etc.)
(1)
The Minister of Land, Transport and Maritime Affairs shall, where there exists a person who fails to pay the shared amount or the fees falling under each of the following subparagraphs, fix a payment period and urge in writing:
<Amended by Act No. 8852, Feb. 29, 2008>
1.
Shared amount under Article 20 (1);
2.
Shared amount by beneficiaries under Article 23;
3.
Fees under Article 33; and
4.
Shared amount by a person holding a right for dam use under Article 36.
(2)
The Minister of Land, Transport and Maritime Affairs may, where a person urged under paragraph (1) fails to pay the shared amount or fees by a specified period, collect them according to the example of taking a disposition to collect national taxes in arrears.
<Amended by Act No. 8852, Feb. 29, 2008>
(3)
A right to collect the shared amount and fees under paragraph (1) shall be extinguished by prescription when it has not been exercised for five years.
법령보기 화면
Article 38 (Recognition of Multipurpose Dam, etc.)
(1)
The Minister of Land, Transport and Maritime Affairs may, with respect to a dam constructed by other person than himself/herself, which is deemed a multipurpose dam with a great usefulness, consult with a person who has constructed such dam, and properly compensate him/her, and make the relevant dam a multipurpose dam under this Act. In such cases, the Minister of Land, Transport and Maritime Affairs may establish a right for dam use to a person who has constructed the relevant dam under conditions prescribed by Presidential Decree.
<Amended by Act No. 8852, Feb. 29, 2008>
(2)
Where the Minister of Land, Transport and Maritime Affairs has made
the dam that is not a multipurpose one as a multipurpose dam under paragraph (1), he/she shall promptly make a public notification of the matters falling under each of the following subparagraphs under conditions prescribed by Presidential Decree:
<Added by Act No. 7158, Jan. 29, 2004; Act No. 8852, Feb. 29, 2008>
1.
Reasons for a recognition of the multipurpose dam;
2.
Matters falling under
Article 7
(1) 2 through 4; and
3.
Matters concerning the compensation to the builders of relevant dams.
(3)
With respect to a dam constructed by other person than the Minister of Land, Transport and Maritime Affairs, which is deemed as a multipurpose dam with a great usefulness, the State may provide the subsidies or arrange the loans, for a person constructing the relevant dam, to cover part of the costs required for such construction.
<Amended by Act No. 8852, Feb. 29, 2008>
(4)
The Minister of Land, Transport and Maritime Affairs may, where he/she has provided subsidies or arranged the loans under paragraph (3), give instructions required for a construction of the relevant dam to a person benefited from such subsidies or loans, or have him/her check the facilities of the relevant dam which is an objective of construction, or report thereon.
<Amended by Act No. 7158, Jan. 29, 2004; Act No. 8852, Feb. 29, 2008>
CHAPTER Ⅲ SUPPORT FOR RESIDENTS OF DAM CONSTRUCTION AREA
법령보기 화면
Article 39 (Support for Unsettled Persons etc. into Resettlement Lands)
The implementer of the dam construction project may, under conditions prescribed by Presidential Decree, support a person who fails to migrate to resettlement lands and other persons prescribed by Presidential Decree, from among the persons migrating from the area to be submerged, taking into account a loss of hometown and living basis, etc. due to a dam construction.
<Amended by Act No. 7158, Jan. 29, 2004>
[This Article Wholly Amended by Act No. 6587, Dec. 31, 2001]
법령보기 화면
Article 40 (Support for Persons Migrating from Area to be Submerged)
(1)
The Minister of Land, Transport and Maritime Affairs may, where deemed necessary to create a living basis such as a new construction of housing so as to have the persons migrating from the area to be submerged migrate and settle smoothly, support them preferentially with the National Housing Fund pursuant to the
Housing Act
.
<Amended by Act No. 6916, May 29, 2003; Act No. 8852, Feb. 29, 2008>
(2)
An implementer of dam construction project may, where deemed necessary to create a living basis for the persons migrating from the area to be submerged, ask the Minister of Land, Transport and Maritime Affairs for a preferential support with the National Housing Fund pursuant to the
Housing Act
.
<Amended by Act No. 6916, May 29, 2003; Act No. 8852, Feb. 29, 2008>
(3)
The head of a local government having jurisdiction over a dam construction area or an area to benefit from a water supply due to a dam construction, and a person scheduled to be entrusted with dam management, may take measures necessary for support to the livelihood of the persons migrating from the area to be submerged, such as conducting a vocational training program, under conditions prescribed by Presidential Decree.
법령보기 화면
Article 41 (Consolidation Projects for Dam Environs)
(1)
The head of
Si
/
Gun
/
Gu
having jurisdiction over the environs of a dam which exceeds the standards prescribed by Presidential Decree shall undertake a consolidation project (hereinafter referred to as the "consolidation project for dam environs") during a dam construction period in order to promote the economy and improve the living environment of relevant dam environs, paying due regards to the changes in given conditions due to the construction of a relevant dam.
(2)
When the basic plan for a dam corresponding to the standards of paragraph (1) is published, the Mayor/
Do
governor having jurisdiction over an area where an intrinsic entity of a dam is located shall promptly devise a plan for the consolidation project for dam environs, and obtain approval from the Minister of Land, Transport and Maritime Affairs:
Provided
, That in the case of the dam constructed by the Mayor/
Do
governor, no approval of the Minister of Land, Transport and Maritime Affairs shall be required.
<Amended by Act No. 8852, Feb. 29, 2008>
(3)
The Mayor/
Do
governor shall, when he/she intends to devise a plan for a consolidation project for dam environs under paragraph (2), consult with an implementer of dam construction project and the head of competent
Si
/
Gun
/Gu.
(4)
Matters necessary for the scope of dam environs under paragraph (1) and the specific details of projects to be executed as a consolidation project for dam environs shall be prescribed by Presidential Decree.
법령보기 화면
Article 42 (Financial Resources for Consolidation Projects for Dam Environs)
(1)
A consolidation project for dam environs shall be executed within the limit of standard amount including additional amounts, as computed by the method prescribed by Presidential Decree, taking account of the basic amount of 30 billion won and reservoir area, total volume of reservoir, submerged households and demands for development pursuant to the local features, etc.
<Amended by Act No. 6587, Dec. 31, 2001>
(2)
Financial resources required for the consolidation project for dam environs shall be born by an implementer of dam construction project and the head of the competent
Si
/
Gun
/Gu.
(3)
Matters necessary for the specific standards for bearing financial resources required for the consolidation project for dam environs under paragraph (2) and their management shall be prescribed by Presidential Decree.
법령보기 화면
Article 43 (Support Project for Dam Environs)
(1)
A dam management agency or a person entrusted with the dam management shall devise a plan for the support project for dam environs (hereinafter referred to as a "plan for the support project for dam environs") every year under conditions prescribed by Presidential Decree, after the completion of a dam construction, in order to increase the income of residents in dam environs and to promote the welfare prescribed by Presidential Decree.
<Amended by Act No. 6587, Dec. 31, 2001>
(2)
A dam management agency or a person entrusted with the dam management shall, where he/she intends to devise a plan for the support project for dam environs under paragraph (1), consult in advance with the head of
Si
/
Gun
/
Gu
having jurisdiction over the dam environs.
(3)
A person entrusted with the dam management shall, when he/she has devised the plan for support projects for dam environs under paragraph (1), furnish such plan to the dam management agency.
(4)
The support project for dam environs shall be executed by a person falling under each of the following subparagraphs, under conditions prescribed by Presidential Decree:
1.
A dam management agency or a person entrusted with the dam management; and
2.
The head of
Si
/
Gun
/
Gu
having jurisdiction over the dam environs.
(5)
The scope of areas for which a plan for support project for dam environs under paragraph (1) is to be devised, shall be prescribed by Presidential Decree.
법령보기 화면
Article 44 (Financial Resources for Support Project for Dam Environs)
(1)
Financial resources required for the support project for dam environs shall be raised with the funds falling under each of the following subparagraphs:
Provided
, That the contributions falling under subparagraphs 1 and 2 shall be limited to the dams subject to the support project for dam environs under the provisions of Article 43:
1.
Contributions by a dam management agency or a person holding a right for dam use;
2.
Contributions by a tap water business operator from the dams for
living and industrial water;
3.
Borrowings; and
4.
Revenues accruing from the operation of raised funds.
(2)
A dam management agency, a person holding a right for dam use or a tap water business operator from the dams for living and industrial
water shall pay the amount of the ratio falling under each of the following subparagraphs as contributions under paragraph (1) 1 and 2:
<Amended by Act No. 6587, Dec. 31, 2001; Act No. 7158, Jan. 29, 2004>
1.
Not more than 6/100 of revenues from the sale of power during the year before last year; and
2.
Not more than 20/100 of the amount that derives from multiplying the quantity of tap and industrial water sold during the year before last year by a unit price of dam water, which is set by the Korea Water Resources Corporation, during the year before last year.
(3)
Financial resources raised under paragraph (1) for the support project for dam environs shall be managed by a dam management agency or a person entrusted with the dam management. In such cases, a dam management agency or a person entrusted with the dam management shall manage the financial resources for support projects for dam environs under paragraph (1) by dividing them as a separate account.
법령보기 화면
Article 44-2 (Creation of Environment-Friendly Space in Dam Environs)
(1)
The head of
Si
/
Gun
/
Gu
having jurisdiction over the multipurpose dam environs under
Articles 41
and 43 may, under conditions as prescribed by Presidential Decree, execute the projects to create the space for recreation, culture, leisure activities, etc. (hereinafter referred to as the "environment-friendly space"), such as the nature learning place, ecology park, aquatic physical facilities by taking advantage of lakes of dam or the neighboring scenery, etc. in order to ensure the development of dam environs, within the scope harmless to the gross amount management of pollution under the relevant Acts, such as the Water Quality and Ecosystem Conservation Act, etc.
<Amended by Act No. 8466, May 17, 2007>
(2)
The head of
Si
/
Gun
/
Gu
shall, where he/she intends to execute the projects to create the environment-friendly space in the dam environs under paragraph (1), consult in advance with the dam management agency.
[This Article Added by Act No. 6587, Dec. 31, 2001]
법령보기 화면
Article 44-3 (Preferential Installment of Public Facilities, etc.)
The head of a central administrative agency and the head of the competent
Si
/
Gun
/
Gu
may preferentially execute the installment of public facilities such as roads, bridges, tap water, etc. and other projects as prescribed by Presidential Decree, in order to develop the economy in dam environs and to improve living environments.
<Amended by Act No. 7158, Jan. 29, 2004>
[This Article Added by Act No. 6587, Dec. 31, 2001]
법령보기 화면
Article 44-4 (Installation of Public Sewerage)
(1)
Where deemed necessary for an implementation of the details of consultation under the provisions of
Articles 16 through 20 of the Environmental Impact Assessment Act
(including the details consulted again pursuant to
Article 21
of the same Act and an environmental conservation plan under
Article 22
of the same Act), the implementer of dam construction project may obtain an entrustment of installation of public sewerage from the Public Sewerage Management Agency as referred to in
Article 74 (3) of the Sewerage Act
and install public sewerage during the dam construction period.
<Amended by Act No. 8014, Sep. 27, 2006; Act No. 9037, Mar. 28, 2008>
(2)
Persons falling under each of the following subparagraphs may bear all or part of the local cost shares, from among the expenses required for installing public sewerage as referred to in paragraph (1):
1.
In cases of the multipurpose dams, persons to be granted a right for dam use, who are scheduled to utilize the water-storage of dams for living and industrial water; and
2.
In cases of the dams for living and industrial water, the tap water business operators.
[This Article Added by Act No. 7158, Jan. 29, 2004]
CHAPTER Ⅳ SUPPLEMENTARY PROVISIONS
법령보기 화면
Article 45 (Authority of Minister of Land, Transport and Maritime Affairs, etc.)
(1)
When the basic plan for a dam construction is published, the dispositions, etc. falling under each of the following subparagraphs in the project implementation area and in the river area published under
Article 12
(1) and (2) shall be taken by the Minister of Land, Transport and Maritime Affairs, notwithstanding the provisions of the
River Act
and the
Aggregate Picking Act
:
Provided
, That in cases of a dam to be constructed by the Mayor/
Do
governor, the relevant Mayor/
Do
governor shall take it, and where a dam management is entrusted under
Article 15
(2), the dispositions, etc. belonging within the scope of such entrustment shall be taken by a person entrusted with a dam management under conditions prescribed by Presidential Decree:
<Amended by Act No. 7158, Jan. 29, 2004; Act No. 7715, Dec. 7, 2005; Act No. 8338, Apr. 6, 2007; Act No. 8852, Feb. 29, 2008>
1.
Permission for implementation of river conservation work under
Article 30 of the River Act
, permission for occupancy of a river under
Article 33
of the same Act and permission for use of river water under
Article 50
of the same Act;
2.
Acceptance of a report on succession of the rights and obligations under
Article 5 of the River Act
from a person who has obtained permission under subparagraph 1;
2-2. Designation of the areas in which such fishing activities are prohibited as are to pollute the rivers by making a camping or cooking, and by using the bait, such as the paste and fish meal, etc. prescribed under subparagraph 6 of
Article 46 of the River Act
;
3.
Permission for picking the aggregate under
Article 22 of the Aggregate Picking Act
; and
4.
Dispositions under the following items relating to dispositions, etc.
under subparagraphs 1 through 3:
(a)
Disposition of revocation of permission or suspension of work, etc. under
Article 69 or 70 of the River Act
; and
(b)
Revocation of permission for picking the aggregate or suspension of picking the aggregate under
Article 31 of the Aggregate Picking Act
, and orders to restore the original state, etc. under
Article 33
of the same Act.
(2)
The Minister of Land, Transport and Maritime Affairs, the Mayor/
Do
governor or a person entrusted with the dam management shall, where he/she intends to take the dispositions, etc. under paragraph (1), consult in advance with the heads of the related administrative agencies.
<Amended by Act No. 7158, Jan. 29, 2004; Act No. 8852, Feb. 29, 2008>
(3)
The Minister of Land, Transport and Maritime Affairs or the Mayor/
Do
governor shall, where he/she intends to take the dispositions, etc. under paragraph (1), hear in advance the opinions of a person entrusted with the dam management.
<Amended by Act No. 7158, Jan. 29, 2004; Act No. 8852, Feb. 29, 2008>
(4)
A person entrusted with the dam management may, notwithstanding the provisions of
Article 37 (1) through (4) of the River Act
, collect the occupancy fees or the use fees from a person granted a permission under paragraph (1) 1 through 3, and spend them for the management expenses.
<Amended by Act No. 8338, Apr. 6, 2007>
법령보기 화면
Article 46 (Relation with River Act)
The
River Act
shall apply to the matters necessary for a construction and management of a dam, except as otherwise provided in this Act.
<Amended by Act No. 8338, Apr. 6, 2007>
법령보기 화면
Article 47 (Hearings)
A dam management agency shall, where it intends to take the dispositions falling under each of the following subparagraphs, hold hearings:
1.
Orders to transfer a right for dam use under
Article 31
(2); and
2.
Revocation of a permission under
Article 45
(1) 4.
법령보기 화면
Article 48 (Delegation of Authority)
The Minister of Land, Transport and Maritime Affairs may delegate part of his/her authority under this Act to the heads of agencies belonging to him/her or the Mayor/
Do
governor under conditions prescribed by Presidential Decree.
<Amended by Act No. 8852, Feb. 29, 2008>
CHAPTER Ⅴ PENAL PROVISIONS
법령보기 화면
Article 49 (Penal Provisions)
Officers and employees of a person entrusted with the dam management who have caused damages to the public or obstacles to flood control in contravention of
Article 18
shall be punished by imprisonment for not more than five years or by a fine not exceeding thirty million won.
법령보기 화면
Article 50 Deleted.<by Act No. 7715, Dec. 7, 2005>
법령보기 화면
Article 51 (Penal Provisions)
A person falling under any of the following subparagraphs shall be punished by imprisonment for not more than six months or by a fine not exceeding three million won:
1.
A person who has obstructed or refused the acts under
Article 10
(1) without justifiable grounds; and
2.
A person other than administrative agencies, who has performed the acts under
Article 10
(1) without obtaining permission or consent under paragraphs (2) through (4) of the same Article.
법령보기 화면
Article 52 (Joint Penal Provisions)
If the representative of a corporation or the agent, servant or employee of a corporation or an individual performs the act of violating
Articles 49
through 51 in relation to the business of such corporation or individual, the corporation or the individual shall be fined according to the corresponding Article in addition to the punishment of the actor.
ADDENDA
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Article 2 (Repeal of Other Act)
The Specific Multipurpose Dams Act is hereby repealed.
Article 3 (General Transitional Measures)
Any disposition, process and other acts performed under the previous Specific Multipurpose Dams Act at the time when this Act is enforced shall be deemed to have been performed under the provisions of this Act unless they are in conflict of this Act.
Article 4 (Transitional Measures concerning Area Intended for Construction of Multipurpose Dam)
(1)
An area intended for a construction of multipurpose dam designated and published under Article 5-3 of the previous Specific Multipurpose Dams Act at the time when this Act is enforced shall be deemed to have been designated and published as an area intended for a construction of a dam under Article 5.
(2)
A permission granted by the Minister of Construction and Transportation for the acts under each subparagraph of Article 6 (1) in the area intended for a construction of a multipurpose dam under Article 5-3 (3) of the previous Specific Multipurpose Dams Act at the time when this Act is enforced shall be deemed to have been granted by the head of
Si
/
Gun
/
Gu
under Article 6 (1).
(3)
A person who raises livestock under Article 6 (1) 4 in the area intended for a construction of a multipurpose dam under Article 5-3 (3) of the previous Specific Multipurpose Dams Act at the time when this Act is enforced may continue to do so, notwithstanding the provisions of Article 6:
Provided
, That he shall file a report thereon with the head of
Si
/
Gun
/
Gu
within 3 months from the date on which this Act is enforced.
Article 5 (Transitional Measures concerning Area Intended for River of Dam)
(1)
An area intended for a river of dams being constructed for the tap and industrial water under the Acts and subordinate statutes other than the previous Specific Multipurpose Dams Act at the time when this Act is enforced shall be deemed to have been designated and published as an area intended for dam construction under Article 5.
(2)
A permission granted by a river management agency for the acts under each subparagraph of Article 6 (1) in the area intended for a river of dams for the tap and industrial water under construction under the Acts and subordinate statutes other than the previous Specific Multipurpose Dams Act at the time when this Act is enforced shall be deemed to have been granted by the head of
Si
/
Gun
/
Gu
under Article 6 (1).
(3)
A person who is performing the acts newly subjected to a permission under Article 6 (1) in the area intended for a river of a dam for the tap and industrial water under the Acts and subordinate statutes other than the previous Specific Multipurpose Dams Act may continue to do so, notwithstanding the provisions of Article (6):
Provided
, That he shall file a report thereon with the head of
Si
/
Gun
/
Gu
within 3 months from the date on which this Act is enforced.
Article 6 (Transitional Measures concerning Existing Multipurpose Dams)
(1)
A multipurpose dam constructed under the previous Specific Multipurpose Dams Act at the time when this Act is enforced shall be deemed to have been constructed under this Act.
(2)
Dam management regulations prepared or approved under Article 32 of the previous Specific Multipurpose Dams Act at the time when this Act is enforced shall be deemed to have been prepared or approved under Article 17.
(3)
A right for dam use established and any mortgage created for that purpose under Article 15 (1) of the previous Specific Multipurpose Dams Act at the time when this Act is enforced shall be deemed to have been established and created under Article 24.
(4)
A plan devised for support projects for dam environs under Article 42-3 of the previous Specific Multipurpose Dams Act at the time when this Act is enforced shall be deemed to have been devised under Article 43.
Article 7 (Transitional Measures concerning Multipurpose Dam under Construction)
(1)
A basic plan or an implementation pan devised for multipurpose dams under construction in accordance with Articles 5 and 5-2 of the previous Specific Multipurpose Dams Act at the time when this Act is enforced shall be deemed to have been devised under Articles 7 and 8:
Provided
, That where a basic plan under Article 5 of the previous Multipurpose Dams Act has been devised, and where an implementation plan under Article 5-2 of the same Act has yet to be devised, the provisions of Article 5-2 and 5-5 of the previous Specific Multipurpose Dams Act shall apply to a formulation of an implementation plan and a land expropriation with respect to a construction of the relevant dam.
(2)
In the case of a dam for which an implementation plan has been devised and published under Article 5-2 of the previous Specific Multipurpose Dams Act prior to December 31, 1996 from among the multipurpose dams under construction under the previous Specific Multipurpose Dams Act, the support for those unsettled into resettlement lands under Article 39 shall be governed by Article 42 of the previous Specific Multipurpose Dams Act.
(3)
With respect to a multipurpose dam under construction in accordance with the previous Specific Multipurpose Dams Act at the time when this Act is enforced, the consolidation project for dam environs under Articles 41 and 42 may be implemented under the conditions as prescribed by the Presidential Decree.
Article 8 (Transitional Measures concerning Existing Dam for Tap and Industrial Water)
A dam constructed for the tap and industrial water under the Acts and subordinate statutes other than the previous Specific Multipurpose Dams Act at the time when this Act is enforced shall be deemed a dam constructed for the tap and industrial water under this Act.
Article 9 (Transitional Measures concerning Dam for Tap and Industrial Water Under Construction)
With respect to a dam for the tap and industrial water under construction under the Acts and subordinate statutes other than the previous Specific Multipurpose Dams Act at the time when this Act is enforced, the relevant Acts and subordinate statutes shall apply until a construction of such dam is completed, and with respect to a management after the completion of its construction, this Act shall govern:
Provided
, That with respect to a dam other than those already in use by obtaining an approval for use prior to the authorization of a completion of construction under relevant Acts and subordinate statutes, the consolidation project for dam environs may be executed by the
mutatis mutandis
application of Articles 41 and 42 under the conditions as prescribed by the Presidential Decree.
Article 10 (Transitional Measures concerning River Area in Dam Construction Area)
(1)
In applying the provisions of Article 45 with respect to permission, etc. for a river area in an area intended for dam construction or a dam construction area, the river area falling under each of the following subparagraphs shall be deemed a river area in an area intended for dam construction or a dam construction area under this Act:
1.
A river area in an area intended for dam construction or in a dam construction area, in which a multipurpose dam was constructed or is under construction under the previous Specific Multipurpose Dams Act; and
2.
A river area in which a dam for the tap or industrial water was constructed or is under construction under the Acts and subordinate statutes other than the previous Specific Multipurpose Dams Act.
(2)
In case where a permission has been granted under the
River Act
or the
Aggregate Picking Act
with respect to the acts falling under each subparagraph of Article 45 (1) in the river area under paragraph (1) 2 at the time when this Act is enforced shall be deemed to have been granted under Article 45 (1).
Article 11 (Transitional Measures concerning Penal Provisions)
In applying the penal provisions to any act committed prior to the enforcement of this Act, the provisions of the previous Specific Multipurpose Dams Act shall apply.
Article 12 Omitted.
Article 13 (Relation with Other Acts and Subordinate Statutes)
Where the previous Specific Multipurpose Dams Act or its provisions are cited by other Acts and subordinate statutes at the time when this Act is enforced, and where this Act has any provisions corresponding to such citation, this Act or the corresponding provisions of this Act shall be deemed to have been cited.
ADDENDA<Act No. 6587, Dec. 31, 2001>
Article 1 (Enforcement Date)
This Act shall enter into force sic months after the date of its promulgation.
Article 2 (Application Example to Supports for Those Unsettled into Resettlement Lands)
The amended provisions of Article 39 shall apply from the dam for which a basic plan pursuant to Article 7 has been first devised and publicly notified after January 1, 2001.
Article 3 (Application Example to Financial Resources for Consolidation Projects for Dam Environs)
The amended provisions of Article 42 shall apply from the dam for which a basic plan pursuant to Article 7 has been first devised and publicly notified after January 1, 2001.
Article 4 (Transitional Measures for Existing Dams)
(1)
With respect to the dams which have been completed and publicly notified before March 7, 2000, the consolidation projects for dam environs may be executed by applying mutatis mutandis the provisons of Article 41 and previous Article 42.
(2)
The expenses to be borne by the implementer of a dam construction project from among the expenses for consolidation projects of dam environs under paragraph (1), shall be borne by the dam management agency, a person holding a right for dam use, or the tap water business operator from the dams for living and industrial water.
(3)
The amount borne by a person holding a right for dam use under paragraph (2) shall, in applying the provisions of Article 35 (2), be included in the shares of the relevant person to be granted a right for dam use or in the paid amount of the relevant person holding a right for dam use.
(4)
The dam subject to a consolidation project for dam environs under paragraph (1), devising of plans and time for execution and financial resources shall be prescribed by the Presidential Decree.
Article 5 (Application Example to Financial Resources for Support Projects for Dam Environs)
The amended provisions of Article 44 shall apply from the portion of the first contributions by a person holding a right for dam use to create the financial resources for a support project for dam environs after January 1, 2003.
ADDENDA<Act No. 6655, Feb. 4, 2002>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 2003.
Articles 2 through 25 Omitted.
ADDENDA<Act No. 6656, Feb. 4, 2002>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 2003.
Articles 2 through 12 Omitted.
ADDENDA<Act No. 6841, Dec. 30, 2002>
Article 1 (Enforcement Date)
This Act shall enter into force nine months after the date of its promulgation.
Articles 2 through 12 Omitted.
ADDENDA<Act No. 6916, May 29, 2003>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 13 Omitted.
ADDENDA<Act No. 7158, Jan. 29, 2004>
(1)
(Enforcement Date) This Act shall enter into force six months after the date of its promulgation.
(2)
(Application Example concerning Financial Resource for Supporting Project to Dam Environs) The amended provisions of
Article 44
shall apply from the portion of contributions by the dam management agency, the holder of rights to use the dam or the tap water business operator from dams for living and industrial water, for the first time after an enforcement of this Act, in order to create the financial resource for supporting project to dam environs.
(3)
(Transitional Measures concerning Dams for Flood Control under Construction) With regard to a construction of dams for flood control under construction as referred to other Acts at the time of enforcement of this Act, the relevant Act shall be applied not later than the time when the relevant construction is completed, notwithstanding the amended provisions of
Article 3,
but with regard to the management after the completion of construction, this Act shall govern; provided, the consolidation project for dam environs may be implemented by applying mutatis mutandis the provisions of
Articles 41
and 42, under conditions as prescribed by Presidential Decree.
ADDENDA<Act No. 7678, Aug. 4, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 12 Omitted.
ADDENDA<Act No. 7715, Dec. 7, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 7 Omitted.
ADDENDA<Act No. 8014, Sep. 27, 2006>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 11 Omitted.
ADDENDA<Act No. 8283, Jan. 26, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 12 Omitted.
ADDENDA<Act No. 8338, Apr. 6, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 17 Omitted.
ADDENDA<Act No. 8351, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 15 Omitted.
ADDENDA<Act No. 8352, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 16 Omitted.
ADDENDA<Act No. 8371, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 10 Omitted.
ADDENDA<Act No. 8466, May 17, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 5 Omitted.
ADDENDUM<Act No. 8659, Oct. 17, 2007>
This Act shall enter into force on April 7, 2008.
ADDENDA<Act No. 8733, Dec. 21, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force nine months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 11 Omitted.
ADDENDA<Act No. 8820, Dec. 27, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 9 Omitted.
ADDENDA<Act No. 8852, Feb. 29, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 7 Omitted.
ADDENDA<Act No. 8976, Mar. 21, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 10 Omitted.
ADDENDA<Act No. 9037, Mar. 28, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 2009.
Articles 2 through 19 Omitted.
Last updated : 2009-11-02