ACT ON THE IMPROVEMENT OF URBAN AREAS AND RESIDENTIAL ENVIRONMENTS
19052 · 2010-12-01
ACT ON THE IMPROVEMENT OF URBAN AREAS AND RESIDENTIAL ENVIRONMENTS
Act No. 10331, May 31, 2010
Act No. 6841, Dec. 30, 2002
Act No. 6852, Dec. 30, 2002
Act No. 6893, May 29, 2003
Act No. 6916, May 29, 2003
Act No. 7056, Dec. 31, 2003
Act No. 7335, Jan. 14, 2005
Act No. 7392, Mar. 18, 2005
Act No. 7459, Mar. 31, 2005
Act No. 7428, Mar. 31, 2005
Act No. 7597, Jul. 13, 2005
Act No. 7678, Aug. 4, 2005
Act No. 7715, Dec. 7, 2005
Act No. 7960, May 24, 2006
Act No. 7959, May 24, 2006
Act No. 8014, Sep. 27, 2006
Act No. 8338, Apr. 6, 2007
Act No. 8371, Apr. 11, 2007
Act No. 8370, Apr. 11, 2007
Act No. 8369, Apr. 11, 2007
Act No. 8352, Apr. 11, 2007
Act No. 8404, Apr. 27, 2007
Act No. 8466, May 17, 2007
Act No. 8785, Dec. 21, 2007
Act No. 8852, Feb. 29, 2008
Act No. 8966, Mar. 21, 2008
Act No. 8967, Mar. 21, 2008
Act No. 8970, Mar. 21, 2008
Act No. 8974, Mar. 21, 2008
Act No. 8976, Mar. 21, 2008
Act No. 9045, Mar. 28, 2008
Act No. 9047, Mar. 28, 2008
Act No. 9401, Jan. 30, 2009
Act No. 9444, Feb. 6, 2009
Act No. 9632, Apr. 22, 2009
Act No. 9729, May 27, 2009
Act No. 9763, Jun. 9, 2009
Act No. 9770, Jun. 9, 2009
Act No. 9774, Jun. 9, 2009
Act No. 10268, Apr. 15, 2010
Act No. 10331, May 31, 2010
CHAPTER I GENERAL PROVISIONS
법령보기 화면
Article 1 (Purpose)
The purpose of this Act is to contribute to the improvement of urban environments and the elevation of quality of residential life by prescribing matters necessary for the planned rearrangement of areas which are in need of restoring urban functions or whose residential functions are inferior, and for the efficient improvement of worn-out and inferior structures.
법령보기 화면
Article 2 (Definitions of Terms)
The definitions of terms used in this Act shall be as follows:
<Amended by Act No. 7960, May 24, 2006; Act No. 9444, Feb. 6, 2009>
1.
The term "rearrangement zone" means an area designated and publicly announced under
Article 4
in order to implement a planned rearrangement project;
2.
The term "rearrangement project" means a project falling under each of the following, which rearranges rearrangement basis facilities within a rearrangement zone and improves or builds structures, such as the housing, etc., in order to reinstate urban functions pursuant to the procedures stipulated in this Act:
Provided
, That in the case of item (c), housing reconstruction projects implemented in areas other than a rearrangement zone shall be included:
(a)
Residential environment improvement projects: Projects implemented to improve residential environments in areas where low-income urban residents reside collectively, whose rearrangement basis facilities are extremely inferior and where worn-out and inferior structures are excessively concentrated;
(b)
Housing redevelopment projects: Projects implemented to improve residential environments in areas whose rearrangement basis facilities are inferior and where worn-out and inferior structures are concentrated;
(c)
Housing reconstruction projects: Projects implemented to improve residential environments in the area whose rearrangement basis facilities are good, but where the worn-out and inferior structures are concentrated;
(d)
Urban environment rearrangement projects: Projects implemented to improve urban environments in the areas, such as the commercial area and industrial area, wherein an efficient utilization of lands, a restoration of urban functions, such as the center or secondary center of the city, and a revitalization of commercial zone are required;
3.
The term "worn-out and inferior structures" means the structures falling under any of the following items:
(a)
Structures with a concern over the collapse and other accidents, since they have been damaged or a part of them has been demolished;
(b)
Structures determined by Municipal Ordinance of City/
Do
as prescribed by Presidential Decree which meet the following requirements:
(i)
To be located in the place where the residential environments are inferior in view of the utilization status of surrounding lands;
(ii)
To be able to expect that, where the structures are removed and new structures are built, the usefulness is to be remarkably increased in comparison with the costs required therefor;
(c)
Structures determined by Municipal Ordinance of City/
Do
as prescribed by Presidential Decree, which are to be inevitably removed due to the impediments to urban scenery, functional deficits of structures, unreliable works or structural defects by deterioration;
4.
The term "rearrangement basis facilities" means the roads, waterworks and sewage systems, parks, public parking lots, utility tunnels (referring to the utility tunnel under subparagraph 9 of
Article 2 of the National Land Planning and Utilization Act
; hereinafter the same shall apply), and other supply facilities of gas, etc. required for residents' living, which are prescribed by Presidential Decree;
5.
The term "jointly utilized facilities" means the play grounds, village halls, joint operation places used jointly by the residents, and other facilities prescribed Presidential Decree;
6.
The term "site" means the land created by the rearrangement project;
7.
The term "housing complex" means a group of lands whereon the housing and accessory or welfare facilities are built or which are to be created as the sites, and which is a group of lands falling under any of the following items;
(a)
A group of lands on which housing and accessory or welfare facilities are built with approval for the project plan under
Article 16 of the Housing Act
;
(b)
Each land managed respectively, after being divided into a road, which belongs to urban planning facilities, or other similar facilities from among a group of lands under item (a);
(c)
The entire land, in cases where a group of two or more lands under item (a) is jointly managed;
(d)
Land that has been divided or land to be divided away under
Article 41
;
(e)
A group of lands on which apartment buildings or tenement houses have been built with permission for construction under
Article 11 of the Building Act
;
8.
The term "project implementer" means the person who implements a rearrangement project;
9.
The term "owners of lands, etc." means the persons falling under each of the following items:
(a)
In the cases of the residential environment improvement project, housing redevelopment project, or urban environment rearrangement project, the owners of lands or structures located within the rearrangement zone, or the persons with their superficies;
(b)
In the case of the housing reconstruction project, the persons falling under one of the following:
(ⅰ)
Owners of the structures located within the rearrangement zone, and their appurtenant lands;
(ⅱ)
Owners of the housing and their appurtenant lands or owners of the accessory or welfare facilities and their appurtenant lands, all of which are located within other zones than the rearrangement zone and prescribed by Presidential Decree;
10.
The term "Housing Corporation, etc." means the Korea National Housing Corporation established under the Korea National Housing Corporation Act, or the local corporations established for implementing the housing projects under the
Local Public Enterprises Act
;
11.
The term "articles of association, etc." means those falling under each of the following items:
(a)
Articles of association under
Article 20
;
(b)
Covenants set forth and operated autonomously by the owners of lands, etc.;
(c)
Implementation regulations prepared under subparagraph 8 of
Article 30
by the head of a
Si
/
Gun
/autonomous
Gu
(hereinafter referred to as the "head of
Si
/
Gun
"), or the Housing Corporation, etc.
CHAPTER II FORMULATION OF BASIC PLAN AND DESIGNATION OF REARRANGEMENT ZONE
법령보기 화면
Article 3 (Formulation of Basic Plan for Urban and Residential Environment Rearrangement)
(1)
The Special Metropolitan City Mayor, a Metropolitan City Mayor, or the head of a
Si
shall formulate the basic plan for urban and residential environment rearrangement containing matters falling under each of the following subparagraphs (hereinafter referred to as "basic plan") every ten years:
Provided
, That the basic plan may not be devised when the city is not a big city with a population of not less than 500,000 (hereinafter referred to as "big city"), other than the Seoul Special Metropolitan City and Metropolitan Cities under
Article 175 of the Local Autonomy Act
, excluding a city for which the relevant
Do
Governor deems it necessary to establish a basic plan:
<Amended by Act No. 7960, May 24, 2006; Act No. 9444, Feb. 6, 2009>
1.
Basic directions for the rearrangement project;
2.
Planning period of the rearrangement project;
3.
Current status of the population, structures, land utilization, rearrangement basis facilities, topography and environment, etc.;
4.
Plans for the residential area management;
5.
Land utilization plan, plans for rearrangement basis facilities, plans for installing the joint utilization facilities, and traffic plan;
6.
Plans for the environment concerning green area, landscape gardening, energy supply, waste treatment, etc.;
7.
Plans for installing the social welfare facilities and residents' culture facilities, etc.;
7-2. Basic directions for the wide rearrangement of a city;
8.
Rough extent of zones scheduled to be designated (hereinafter referred to as "zones scheduled to be rearranged") as the rearrangement zone under Article 4;
9.
Plans for promoting the rearrangement project by phase (including the period for formulation of a rearrangement plan for each zone scheduled to be rearranged);
10.
Plans for the structures' density as to the building-to-land ratio and building volume ratio, etc.;
11.
Countermeasures for a residential stabilization for the tenants;
12.
Other matters necessary for improving residential environment, etc., which are prescribed by Presidential Decree.
(2)
The Special Metropolitan City Mayor, a Metropolitan City Mayor, or the head of a
Si
shall examine every five years whether or not the basic plan is pertinent, and reflect its outcomes on the basic plan.
(3)
When the Special Metropolitan City Mayor, a Metropolitan City Mayor, or the head of a
Si
intends to formulate or alter the basic plan under paragraph (1), he/she shall offer it for a public perusal for not less than 14 days and hear the opinions of the relevant local council (In such cases, the local council shall present its opinion within 60 days from the date when the Special Metropolitan City Mayor, the Metropolitan City Mayor, or the head of a
Si
announced the basic plan, and no objection shall be deemed to be raised when such 60 days have passed without its presenting opinion), and thereafter submit it for the deliberation (excluding cases where the head of a
Si
, who is not the head of a big city, intends to formulate or alter a basic plan) of the Local Urban Planning Committee (hereinafter referred to as the "Local Urban Planning Committee") under
Article 113 (1) and (2) of the National Land Planning and Utilization Act
:
Provided
, That the same shall not apply to the cases of altering the minor matters as prescribed by Presidential Decree.
<Amended by Act No. 9444, Feb. 6, 2009>
(4)
When the head of a
Si
, who is not the head of a big city, has formulated or altered the basic plan under paragraphs (1) and (3), he/she shall obtain an approval of the
Do
Governor, and the latter shall grant approval after going through a deliberation by the Local Urban Planning Committee:
Provided
, That the same shall not apply an alteration falling under the proviso of paragraph (3).
<Amended by Act No. 9444, Feb. 6, 2009>
(5)
The Special Metropolitan City Mayor, a Metropolitan City Mayor, or a
Do
Governor (hereinafter referred to as "Mayor/
Do
Governor") or the head of a big city shall hold a consultation with the heads of relevant administrative agencies prior to going through a deliberation by the Local Urban Planning Committee.
<Amended by Act No. 7960, May 24, 2006; Act No. 8852, Feb. 29, 2008; Act No. 9444, Feb. 6, 2009>
(6)
When a basic plan has been formulated or altered, the Special Metropolitan City Mayor, Metropolitan City Mayors, or the head of a
Si
shall promptly announce it publicly on the official bulletin of the local government concerned.
(7)
When the Special Metropolitan City Mayor, a Metropolitan City Mayor, or the head of a
Si
has formulated or altered a basic plan, he/she shall report to the Minister of Land, Transport and Maritime Affairs according to the methods and procedures stipulated by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
(8)
The Minister of Land, Transport and Maritime Affairs shall determine the criteria for and methods of formulating a basic plan.
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 4 (Formulation of Rearrangement Plan and Designation of Rearrangement Zone)
(1)
The head of a
Si
/
Gun
shall formulate, within the limit compatible with the basic plan, a rearrangement plan containing the following matters, for the zones meeting the requirements prescribed by Presidential Decree, such as the concentration of worn-out and inferior structures, etc., and hold an explanatory meeting for residents after notifying residents thereof in writing, and make it available for public perusal for not less than 30 days, and hear the opinions of the local council (the local council shall present its opinion within 60 days from the date when the head of a
Si
/
Gun
announced the rearrangement plan, and no objection shall be deemed to be raised when such 60 days have passed without its presenting opinion), and thereafter file a request for a designation of a rearrangement zone with the Mayor/
Do
Governor by appending it, and when it is necessary to modify any detail of the rearrangement plan, he/she shall file a request for the modified designation by undergoing the same procedures:
Provided
, That the procedures for a written notification and explanatory meeting for residents, residents' perusal and hearing the opinions of local council may be omitted where minor matters prescribed by Presidential Decree are to be modified:
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 8785, Dec. 21, 2007; Act No. 9444, Feb. 6, 2009; Act No. 9729, May 27, 2009>
1.
Title of the rearrangement project;
2.
Rearrangement zone and its size;
3.
Plans for installing urban planning facilities (hereinafter referred to as "urban planning facilities") under subparagraph 7 of
Article 2 of the National Land Planning and Utilization Act
;
4.
Plans for installing facilities for a joint use;
5.
Plans for the main usage, building-to-land ratio, building volume ratio, and height of structures;
6.
Plans for preservation of the environment and prevention of disasters;
6-2. Plans for the protection of educational environment in the vicinity of a rearrangement zone;
7.
Period scheduled for the implementation of a rearrangement project;
7-2.
Deleted; <by Act No. 9632, Apr. 22, 2009>
7-3. Plans for the matters of each subparagraph of
Article 52 (1) of the National Land Planning and Utilization Act
(limited to the necessary cases);
8.
Other matters prescribed by Presidential Decree as necessary for the implementation of a rearrangement project.
(2)
The head of a big city shall directly designate a rearrangement zone without applying for the designation of a rearrangement zone to the Mayor/
Do
Governor, notwithstanding paragraph (1).
<Added by Act No. 9047, Mar. 28, 2008; Act No. 9444, Feb. 6, 2009>
(3)
When the owners of lands, etc. fall under any of the following subparagraphs, they may propose the formulation of a rearrangement plan under paragraph (1) to the head of a
Si
/
Gun
, and necessary matters concerning the consent of the owners of land, etc. for the proposal of the rearrangement plan, and handling, etc. of a written proposal shall be determined by Presidential Decree:
<Added by Act No. 9444, Feb. 6, 2009>
1.
Where one or more years have passed since the expiration of a period for formulating a rearrangement plan under the plans for promoting the rearrangement project by phase under
Article 3
(1) 9 (when Municipal Ordinance of City/
Do
prescribes that the period shall be not less than a year, such number of years shall be applied), but the rearrangement plan has not been formulated;
2.
Cases where the owners of lands, etc. intend to request that the Housing Corporation, etc. be a project implementer under
Article 8
(4);
3.
Cases of
Si
or
Gun
, other than a big city, which is determined by Municipal Ordinance of City/
Do
.
(4)
Where the Mayor/
Do
Governor or the head of a big city intends to make a designation or a modified designation of a rearrangement zone, he/she shall do so by going through a deliberation by the local urban planning committee as prescribed by Presidential Decree:
Provided
, That when the Mayor/
Do
Governor or the head of a big city intends to modify minor matters under the proviso to paragraph (1), he/she may not go through the deliberation by the local urban planning committee
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 9047, Mar. 28, 2008; Act No. 9444, Feb. 6, 2009>
(5)
Where the Mayor/
Do
Governor or the head of a big city has made a designation or modified designation of a rearrangement zone under paragraphs (2) or (4), he/she shall announce the details of such designation or modified designation containing the relevant rearrangement plans on the official bulletin of relevant local government, and thereafter file a report on the details of such designation or modified designation with the Minister of Land, Transport and Maritime Affairs under the methods and procedures as stipulated by Ministerial Decree of Land, Transport and Maritime Affairs, and allow the public to peruse the relevant documents.
<Amended by Act No. 8852, Feb. 29, 2008; Act No. 9047, Mar. 28, 2008; Act No. 9444, Feb. 6, 2009>
(6)
Where there exists a public announcement for the designation or modified designation of a rearrangement zone under paragraph (5), the matters falling under each subparagraph of
Article 52 (1) of the National Land Planning and Utilization Act
out of the relevant rearrangement zone and rearrangement plan, shall be deemed to have been determined and publicly announced as the Class-Idistrict unit planning and the Class-Idistrict unit planning zone under
Articles 49
and
51 of the same Act
.
<Amended by Act No. 9047, Mar. 28, 2008; Act No. 9444, Feb. 6, 2009>
(7)
Where the district unit planning including all of the matters of each subparagraph of paragraph (1) on the district unit planning zone under the
National Land Planning and Utilization Act
is decided and publicized (including the cases of making an altered decision or public notice), the relevant district unit planning zone shall be deemed to be decided and publicized as a rearrangement zone.
<Added by Act No. 7392, Mar. 18, 2005>
(8)
The provisions concerning relaxation of the building-to-land ratio, etc. under
Article 52 (3) of the National Land Planning and Utilization Act
shall apply
mutatis mutandis
to the rearrangement planning under paragraph (1) in order to facilitate the effective use of land through rearrangement planning. In such cases, "district unit planning zone" shall be deemed "rearrangement zone", and "district unit planning" shall be deemed "rearrangement planning".
<Added by Act No. 7392, Mar. 18, 2005>
(9)
Deleted. <by Act No. 9632, Apr. 22, 2009>
(10)
When the head of a
Si
/
Gun
intends to formulate a rearrangement plan including attribution and disposal of rearrangement basis facilities and State or public properties under
Articles 65
,
66
,
68
, etc., he/she shall first hear the opinions of the managing authority of the relevant rearrangement basis facilities and State or public properties.
<Added by Act No. 9444, Feb. 6, 2009>
(11)
The standards and methods of formulating a rearrangement plan shall be prescribed by the Minister of Land, Transport and Maritime Affairs.
<Added by Act No. 9444, Feb. 6, 2009>
법령보기 화면
Article 4-2 (Size of Houses and Construction Ratio)
(1)
The Minister of Land, Transport and Maritime Affairs may decide and publish the following matters within the scope prescribed by Presidential Decree with regard to the houses to be constructed under a rearrangement project in order to stabilize the supply of and demand for houses and to expand the opportunities for occupancy of low-income residents, and project implementers shall construct houses according to the published matters. In such cases, the Minister of Land, Transport and Maritime Affairs may publish the following matters by categorizing them into regional groups in consideration of their regional peculiarity:
<Amended by Act No. 9047, Mar. 28, 2008; Act No. 9632, Apr. 22, 2009>
1.
The maximum and minimum size of houses to be provided by a rearrangement project, or the ratio occupied by the size of houses per scale in the total ground area;
2.
The size of rental houses and the construction ratio by scale.
(2)
The head of a
Si
/
Gun
shall reflect the details of public notice of the Minister of Land, Transport and Maritime Affairs under paragraph (1) in the rearrangement planning under
Article 4
.
<Amended by Act No. 8852, Feb. 29, 2008>
[This Article Added by Act No. 7392, Mar. 18, 2005]
법령보기 화면
Article 5 (Limitation, etc. on Acts)
(1)
Any person who intends to do any act in a rearrangememt zone as prescribed by Presidential Decree, such as the construction of a structure, installation of an engineering work, change of the form and quality of land, collection of earth and sand, partition of land and an act having the goods heaped up, shall obtain permission of the head of
Si
/
Gun
. The same shall also apply when he intends to change the permitted matters.
(2)
Any act falling under any of the following subparagraphs may be performed without obtaining permission, notwithstanding the provisions of paragraph (1):
1.
Act performed for a makeshift measure necessary for restoring from a disaster or for coping with a calamity;
2.
Other acts prescribed by Presidential Decree.
(3)
Any person who has commenced the work or project with regard to any act which requires permission under paragraph (1), where permission to act has already been obtained at the time of the designation and public announcement of the rearrangement zone under the relevant Acts and subordinate statutes or no permission is required to obtain, may continue such work or project after reporting to the head of
Si
/
Gun
thereon under the conditions prescribed by Presidential Decree.
(4)
The head of
Si
/
Gun
may order any person who violates the provisions of paragraph (1) to restore to the original state. In this case, when the person who has received the order fails to perform the relevant obligation, the head of
Si
/
Gun
may execute it by proxy under the
Administrative Vicarious Execution Act
.
(5)
Except for the provisions prescribed in this Act with regard to the permission under paragraph (1), the provisions of
Articles 57 through 60
, and
62 of the National Land Planning and Utilization Act
shall apply
mutatis mutandis
.
(6)
Where permission has been obtained under paragraph (1), the permission shall be deemed to have been obtained under
Article 56 of the National Land Planning and Utilization Act
.
(7)
The Minister of Land, Transport and Maritime Affairs, the Mayor/
Do
governor, or the head of
Si
/
Gun
may determine a period not exceeding three years (the period may be extended just one time up to one year) and restrict the following acts in a zone scheduled to be rearranged the basic plan of which is offered for public perusal under
Article 3
(3) and an area where a rearrangement plan is being formulated by the methods and procedures determined by Presidential Decree so as to prevent uneconomical constructions and inflow of a speculative demand:
<Added by Act No. 9444, Feb. 6, 2009>
1.
Construction of a structure;
2.
Division of land.
[This Article Wholly Amended by Act No. 7715, Dec. 7, 2005]
CHAPTER III IMPLEMENTATION OF REAR-RANGEMENT PROJECTS
Section1 I mplementation of Rearrangement Projects
법령보기 화면
Article 6 (Implementation Methods for Rearrangement Projects)
(1)
The residential environment improvement projects shall be based on the methods falling under one of the following subparagraphs or the combination of such methods:
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 9444, Feb. 6, 2009>
1.
Methods whereunder the implementer of the residential environment improvement project under
Article 7
newly installs or expands the rearrangement basis facilities within the rearrangement zone, the owners of lands, etc. improve the housing by themselves;
2.
Methods whereunder the implementer of the residential environment improvement projects under
Article 7
expropriates the whole or part of the rearrangement zone under
Article 38
and builds the housing, and thereafter supplies preferentially to the owners of lands, etc.;
3.
Methods whereunder the implementer of the residential environment improvement projects under
Article 7
supplies as the substituted land under
Article 43
(2).
(2)
The housing redevelopment projects shall be based on the methods of building and supplying the housing and the accessory and welfare facilities under the management and disposal plans authorized under
Article 48
within the rearrangement zone, or on those of supplying as the substituted land under
Article 43
(2).
(3)
The housing reconstruction projects shall be based on the methods of building and supplying the housing and the accessory and welfare facilities under the management and disposal plans authorized under
Article 48
within the rearrangement zone, or in other zones than the rearrangement zone:
Provided
, That in the cases of the structures outside a housing complex, it shall be limited to the case inevitable for implementing the projects in view of the topographic conditions and surrounding environments, and to the projects to be implemented within the rearrangement zone.
<Amended by Act No. 9444, Feb. 6, 2009>
(4)
The urban environment rearrangement projects shall be based onthe methods of building and supplying the structures within the rearrangement zone under the management and disposal plans authorizedunder
Article 48
, or on those of supplying as the substituted land under
Article 43
(2).
법령보기 화면
Article 7 (Implementers of Residential Environment Improvement Projects)
(1)
The head of
Si
/
Gun
may directly execute or have the Housing Corporations, etc. execute the urban environment rearrangement projects by designating them as the project implementers by obtaining consent of not less than 2/3 (referring to the majority in cases under
Article 6
(1) 1) of the owners or persons with superficies of lands or structures in the relevant zones scheduled to be rearranged, as of the date of public notification of the perusal under
Article 4
(1) and of the majority of households of tenants (referring to the persons residing for not less than three months in zones scheduled to be rearranged three months prior to the public notice date for public perusal under
Article 4
(1)):
Provided
, That procedures for the consent of tenants may not be taken where there exist reasons as prescribed by Presidential Decree, such as the number of households of tenants is not more than one half of the owners of lands, etc.
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 9444, Feb. 6, 2009>
(2)
Where the head of
Si
/
Gun
deems that the rearrangement project is to be urgently implemented since there exists a concern over the collapse of structures due to the natural disasters and other inevitable causes, he may directly implement the project without any consent of the owners of lands, etc. and the tenants, notwithstanding the provisions of paragraph (1), or may let the Housing Corporation, etc. implement it by designating it as the project implementer. In this case, the head of
Si
/
Gun
shall promptly notify the owners of lands, etc. of the causes, methods and scheduled period of the rearrangement project to be urgently implemented.
<Amended by Act No. 7392, Mar. 18, 2005>
법령보기 화면
Article 8 (Implementers of Housing Redevelopment Projects, etc.)
(1)
A housing redevelopment project may be implemented by the partnership under
Article 13
(hereinafter referred to as the "partnership"), or by the said partnership, by obtaining the consent of majority of partnership members, jointly with the head of a
Si
/
Gun
, the Housing Corporation, etc., the construction project operators under
Article 9 of the Framework Act on the Construction Industry
(hereinafter referred to as the "construction project operators"), the registered project operators to be deemed as the construction project operators under
Article 12 (1) of the Housing Act
(hereinafter referred to as the "registered project operators"), or the persons equipped with the requirements as prescribed by Presidential Decree.
<Amended by Act No. 7392, Mar. 18, 2005>
(2)
A housing reconstruction project may be executed by the partnership or jointly with the head of a
Si
/
Gun
or the Housing Corporation, etc. by obtaining the consent of the majority of partnership members.
<Added by Act No. 7392, Mar. 18, 2005>
(3)
An urban environment rearrangement project may be implemented by the partnership or the owners of lands, etc., or by the partnership or owners of lands, etc. jointly with the head of a
Si
/
Gun
, the Housing Corporation, etc. the Korea Land Corporation under the Korea Land Corporation Act (excluding the case of the urban environment rearrangement projects in the zone including factories), the construction project operators, the registered project operators, or the persons equipped with the requirements as prescribed by Presidential Decree, by obtaining the consent of majority of the partnership members or the owners of lands, etc.
<Amended by Act No. 7392, Mar. 18, 2005>
(4)
When the rearrangement project falls under one of the following subparagraphs, the head of a
Si
/
Gun
may directly implement such rearrangement project (excluding a residential environment improvement project; hereafter in this Article and
Article 9
, the same shall apply), notwithstanding paragraphs (1) through (3), or let the owners of lands, etc., private and public joint corporations under subparagraph 12 of
Article 2 of the Act on Private Participation in Infrastructure
or trust companies under
Article 8 (7) of the Financial Investment Services and Capital Markets Act
, who satisfy the requirements as prescribed by Presidential Decree (limited to the cases of subparagraphs 1 and 2; hereinafter referred to as "designated developer") or the Housing Corporation, etc. to implement such rearrangement project by designating them as the project implementer:
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 9444, Feb. 6, 2009>
1.
When deemed necessary to urgently implement the rearrangement project due to the natural disasters and other inevitable causes;
2.
When failing to file an application for an authorization for project implementation under
Article 28
(hereinafter referred to as "authorization for project implementation") within 2 years from the scheduled date of execution of rearrangement project as provided in rearrangement planning publicized under
Article 4
(4), or the details of application for authorization for project implementation are deemed to be unlawful or unreasonable (excluding the case of housing reconstruction project);
2-2. When the partnership establishment promotion committee (hereinafter referred to as the "promotion committee") under
Article 13
has failed to apply for the authorization of establishment of a partnership under
Article 16
within three years after obtaining approval of the head of a
Si
/
Gun
for composition of the promotion committee, or a partnership has failed to apply for the authorization of implementation of the project under
Article 28
within three years after obtaining authorization of the establishment of a partnership under
Article 16
(In such cases, the head of a
Si
/
Gun
shall deem that authorization of the composition of the promotion committee or the establishment of a partnership is cancelled on the day after a date on which designation of the project implementer is publicly notified under paragraph (5));
3.
When deemed necessary to implement the rearrangement project in parallel with the urban planning project under subparagraph 11 of
Article 2 of the National Land Planning and Utilization Act
, which is implemented by the head of a local government;
4.
When deemed necessary to implement the rearrangement project under the mode of circulative rearrangement under
Article 35
(1);
5.
When the authorization for project implementation has been cancelled under
Article 77
;
6.
When the size of the State or public lands or the combined size of the State or public lands and lands owned by the Housing Corporation, etc. within the relevant rearrangement zone is more than one half of the size of whole lands and the majority of owners of lands, etc. consents to designation of the head of a
Si
/
Gun
or the Housing Corporation, etc. as the project implementor;
7.
When landowners possessing not less than one half of the land area within the relevant rearrangement zone, and the persons equivalent to 2/3 or more of the owners of lands, etc., request for the designation of the head of a
Si
/
Gun
or the Housing Corporation, etc. as the project implementer. In such cases, when the owners of lands, etc. propose drawing up a rearrangement plan under
Article 4
(3) 2, the owners of lands, etc., who have consented to such proposal, shall be deemed to have consented to the designation of the Housing Corporation, etc. as the project implementor:
Provided
, That this shall not apply to cases where the owners of lands, etc. have voiced opposing opinions on the designation of the project implementor to the head of a
Si
/
Gun
and at the resident representatives'meeting under
Article 26
before a request of designation of the project implementor is made.
(5)
When the head of a
Si
/
Gun
directly implements the rearrangement project under paragraph (4), or designates the designated developer or the Housing Corporation, etc. as the project implementer, he/she shall publicly announce the matters requiring a notice to the owners of lands, etc. such as the zone for implementing a rearrangement project, which are prescribed by Presidential Decree, on the official bulletin of relevant local government.
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 9444, Feb. 6, 2009>
법령보기 화면
Article 9 (Designation, etc. of Project Agents)
(1)
When the head of a
Si
/
Gun
deems that it is impossible to continue to promote a rearrangement project implemented by the relevant partnership or owners of lands, etc. due to the postponement of the rearrangement project for a long time or conflicts, etc. related to the relationship of rights and duties, he/she may directly implement the rearrangement project on behalf of the relevant partnership or the owners of lands, etc., or have the designated developer or the Housing Corporation, etc. implement the rearrangement project on behalf of the relevant partnership or the owners of lands, etc.
<Amended by Act No. 9444, Feb. 6, 2009>
(2)
The head of a
Si
/
Gun
, a designated developer or the Housing Corporation, etc. (hereinafter referred to as "project agent") executing a rearrangement project as proxy under paragraph (1) may seize the sites or structures to be reverted to a project implementer by the rights to the repayment of remunerations or costs claimable against the project implementer.
(3)
Matters necessary for the decision on undertaking and a public announcement, effect of a decision on undertaking, performance of duties of project agents, completion of vicarious execution of projects and their public announcements, etc. in connection with vicarious execution of projects under paragraph (1) shall be prescribed by Presidential Decree.
법령보기 화면
Article 10 (Succession to Rights and Duties of Project Implementers, etc.)
When a project implementer and a rightful claimant relating to a rearrangement project (hereinafter referred to as "rightful claimant") are changed, the rights and duties of the previous project implementer and rightful claimant shall be succeeded by the new project implementer and the new rightful claimant.
법령보기 화면
Article 11 (Selection, etc. of Work Executors)
(1)
Any partnership shall select a constructor or a registered project operator as a work executor by the method of competitive bidding determined by the Minister of Land, Transport and Maritime Affairs at a general meeting of the partnership after obtaining approval for the establishment of the partnership under
Article 16
:
Provided
, That in cases of a rearrangement project, the size of which is smaller than a size determined by Presidential Decree, a work executor may be selected in accordance with the articles of the association at a general meeting of the partnership.
<Amended by Act No. 9444, Feb. 6, 2009>
(2)
When the owners of lands, etc. conduct an urban environment rearrangement project under
Article 8
(3), they shall select a constructor or a registered project operator as a work executor in accordance with covenants under subparagraph 11 (b) of
Article 2
after obtaining approval for the implementation of the project.
<Amended by Act No. 9444, Feb. 6, 2009>
(3)
When the head of a
Si
/
Gun
directly carries out a rearrangement project or designates the Housing Corporation, etc. as a project implementer under
Article 8
(4), the project implementor shall select a constructor or a registered project operator as a work executor after the designation of a project implementer is publicly announced under
Article 8
(5). In such cases, the resident representatives' meeting under
Article 26
may recommend a work executor by the method of competitive bidding determined by Presidential Decree, and when the resident representatives' meeting has recommended a work executor, the head of a
Si
/
Gun
or the Housing Corporation, etc. shall select such recommended person as a work executor, notwithstanding
Article 9 of the Act on Contracts to which a Local Government is a Party
or
Article 39 of the Act on the Management of Public Institutions
.
<Added by Act No. 9444, Feb. 6, 2009>
(4)
A project implementer (including a project agent) shall include matters concerning the removal work of existing structures in a contract when entering into a contract for construction work with a work executor selected pursuant to paragraph (1) through (3).
<Added by Act No. 10268, Apr. 15, 2010>
법령보기 화면
Article 12 (Safety Diagnosis and Decisions, etc. on Whether or Not to Implement Housing Reconstruction Project)
(1)
The head of a
Si
/
Gun
shall carry out safety diagnosis in cases falling under any of the following subparagraphs, so as to decide whether or not to formulate a rearrangement plan or implement a housing reconstruction project:
Provided
, That the head of a
Si
/
Gun
may have a person who makes a request for the relevant safety diagnosis bear the expenses incurred in such diagnosis in cases of subparagraphs 2 and 3:
<Amended by Act No. 9444, Feb. 6, 2009>
1.
When the time has arrived to formulate a rearrangement plan of the housing reconstruction project for each zone scheduled to be rearranged under
Article 3
(1) 9;
2.
When a person who intends to propose the formulation of a rearrangement plan under
Article 4
(3) makes a request for safety diagnosis after obtaining consent of not less than 1/10 of the owners of structures and appurtenant land located in the relevant zone scheduled to be rearranged, before making such proposal;
3.
When a person who intends to implement the housing reconstruction project in a zone other than a rearrangement zone makes a request for safety diagnosis after obtaining consent of not less than 1/10 of the owners of structures and appurtenant land located in the scheduled zone concerned, before applying for the approval for composition of the promotion committee.
(2)
Structures located in a housing complex shall be subject to any safety diagnosis of the housing reconstruction project under paragraph (1):
Provided
, That structures located in a housing complex determined by Presidential Decree may be exempted from such safety diagnosis.
<Amended by Act No. 9444, Feb. 6, 2009>
(3)
The head of a
Si
/
Gun
shall conduct on-the-spot inspection, etc. to review the safety of the structures concerned, interior of the constructions, degree of deterioration of facilities, and suitability of a residential environment, and so on, and decide whether or not to carry out the safety diagnosis and when he/she decides that the safety diagnosis needs to be carried out, such diagnosis shall be entrusted to an institution determined by Presidential Decree.
<Amended by Act No. 9444, Feb. 6, 2009>
(4)
The institution charged with safety diagnosis entrusted by the head of a
Si
/
Gun
under paragraph (3) shall implement a safety diagnosis pursuant to the criteria stipulated and publicly announced on the Official Gazette by the Minister of Land, Transport and Maritime Affairs, and prepare a written report on results of a safety diagnosis under the methods and procedures stipulated by Ministerial Decree of Land, Transport and Maritime Affairs, and submit it to the head of a
Si
/
Gun
and a person who has made a request for safety diagnosis under the proviso to paragraph (1).
<Amended by Act No. 8852, Feb. 29, 2008; Act No. 9444, Feb. 6, 2009>
(5)
The head of a
Si
/
Gun
shall make a decision on whether or not to formulate a rearrangement plan or implement the housing reconstruction project by taking comprehensive account of the results of a safety diagnosis under paragraph (4) and the urban planning and the local conditions, etc.
<Amended by Act No. 9444, Feb. 6, 2009>
(6)
Where the head of a
Si
/
Gun
has decided to formulate a rearrangement plan or implement the reconstruction project under paragraph (5), he/she shall promptly submit the details of decision and a written report on the result of relevant safety diagnosis to the Mayor/
Do
Governor.
<Added by Act No. 7960, May 24, 2006; Act No. 9444, Feb. 6, 2009>
(7)
The Mayor/
Do
Governor who has received a written report on the results of the safety diagnosis under paragraph (6) may, if it is deemed necessary, entrust the Korea Infrastructure Safety and Technology Corporation or the Korea Institute of Construction Technology to examine whether the result of the safety diagnosis is proper or not.
<Added by Act No. 7960, May 24, 2006; Act No. 8967, Mar. 21, 2008; Act No. 9444, Feb. 6, 2009>
(8)
The Minister of Land, Transport and Maritime Affairs may request the Mayor/
Do
Governor to submit the material received under paragraph (6), and request, when necessary, the Mayor/
Do
Governor to examine whether the result of the safety diagnosis is proper or not.
<Added by Act No. 7960, May 24, 2006; Act No. 8852, Feb. 29, 2008; Act No. 9444, Feb. 6, 2009>
(9)
The Mayor/
Do
Governor may request the head of a
Si
/
Gun
to take a necessary measure, such as a cancellation of the decision to formulate a rearrangement plan or implement the reconstruction project, based on the result of the examination under paragraphs (7) and (8), and the head of the
Si
/
Gun
shall comply with the request unless he/she has a special reason to the contrary.
<Added by Act No. 7960, May 24, 2006; Act No. 9444, Feb. 6, 2009>
(10)
Detailed matters necessary for the object, criteria, executing institution, designation procedures and service fees for the safety diagnosis, an assessment of the result of the safety diagnosis, a decision on whether or not to implement the housing reconstruction project, etc. under paragraphs (1) through (9) shall be prescribed by Presidential Decree.
<Amended by Act No. 7960, May 24, 2006; Act No. 9444, Feb. 6, 2009>
Section 2 Partnership Establishment Promotion Committee, and Establishment of Partnership
법령보기 화면
Article 13 (Establishment of Partnership and Composition of Promotion Committee)
(1)
Where a person who is not the head of a
Si
/
Gun
or the Housing Corporation, etc. intends to implement a rearrangement project, he/she shall establish a partnership composed of the owners of lands, etc.:
Provided
, That the same shall not apply to cases where the owners of lands, etc. intend to implement the urban environment rearrangement project under
Article 8
(3).
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 9444, Feb. 6, 2009>
(2)
When a person intends to establish a partnership under paragraph (1), he/she shall obtain consent from five or more members including the chairperson and the majority of the owners of lands, etc. on the operation provisions under
Article 15
(2) after public notice of the designation of a rearrangement zone under
Article 4
(referring to a decision to implement a housing reconstruction project under
Article 12
(5) in the case of a housing reconstruction project in a zone other than a rearrangement zone), form the promotion committee for the establishment of the partnership, and then obtain approval from the head of a
Si
/
Gun
by methods and procedures determined by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 9444, Feb. 6, 2009>
(3)
The owners of lands, etc. who have consented to composition of the promotion committee (hereinafter referred to as "consenter to the promotion committee) under paragraph (2) shall be deemed to have consented to the establishment of the partnership under
Article 16
(1) through (3);
Provided
, That this shall not apply to a consenter to the promotion committee who has voiced opposing opinions on the establishment of the partnership to the head of a
Si
/
Gun
and the promotion committee before application for approval for the establishment of the partnership under
Article 16
.
<Added by Act No. 9444, Feb. 6, 2009>
(4)
When a person intends to obtain consent of the owners of land, etc. under paragraph (2) shall explain and announce details defined in paragraph (3) according to the methods and procedures prescribed by Presidential Decree before obtaining their consent.
<Added by Act No. 9444, Feb. 6, 2009>
(5)
Article 23
shall apply
mutatis mutandis
to the members of a promotion committee under paragraph (2). In such cases, the term "partnership" shall be deemed to be "promotion committee", "executives" to be "members", "partnership members" to be "owners of lands, etc.", and "head of the partnership" to be "chairperson of the promotion committee".
<Amended by Act No. 9444, Feb. 6, 2009>
(6)
Deleted. <by Act No. 9632, Apr. 22, 2009>
법령보기 화면
Article 14 (Functions of Promotion Committee)
(1)
A promotion committee may perform any of the following affairs:
<Amended by Act No. 9444, Feb. 6, 2009; Act No. 10268, Apr. 15, 2010>
1.
Deleted; <by Act No. 9444, Feb. 6, 2009>
2.
Selection of a specialized manager of rearrangement project under
Article 69
(hereinafter referred to as "specialized manager of rearrangement project");
2-2. Selection and alteration of a designer;
3.
Preparation of a summarized written implementation plan for a rearrangement project;
4.
Preparatory affairs for obtaining authorization for the establishment of a partnership;
5.
Other affairs prescribed by Presidential Decree as necessary for promoting the establishment of a partnership.
(2)
When a promotion committee intends to select a specialized manager of rearrangement project, it shall select such manager by the method of competitive bidding determined by the Minister of Land, Transport and Maritime Affairs after obtaining approval for the promotion committee from the head of a
Si
/
Gun
under
Article 13
.
<Amended by Act No. 9444, Feb. 6, 2009>
(3)
A promotion committee shall hold an inaugural general meeting for the establishment of a partnership by methods and procedures determined by Presidential Decree before applying for an approval for the establishment of a partnership under
Article 16
(1) and (2).
<Added by Act No. 9444, Feb. 6, 2009>
(4)
Where the details of affairs performed by a promotion committee under paragraph (1) accompany the cost bearing by the owners of lands, etc., or cause the alterations in the rights and duties of the owners of lands, etc., which are determined by Presidential Decree, the promotion committee shall obtain consent from the owners of lands, etc. of not less than the ratio prescribed by Presidential Decree before performing such affairs.
<Amended by Act No. 9444, Feb. 6, 2009>
법령보기 화면
Article 15 (Composition and Operation of Promotion Committee)
(1)
A promotion committee shall have one chairperson representing the promotion committee and the auditor, and the matters necessary for its operation shall be prescribed by Presidential Decree.
(2)
The Minister of Land, Transport and Maritime Affairs shall set forth the operational rules of a promotion committee containing the following details for a fair operation of the promotion committee, and publicly announce them on the Official Gazette:
<Amended by Act No. 8852, Feb. 29, 2008; Act No. 9444, Feb. 6, 2009>
1.
Matters concerning the method of selecting the members of the promotion committee and their alterations;
2.
Matters concerning the rights and duties of the members of the promotion committee;
3.
Matters concerning the scope of affairs of the promotion committee;
4.
Matters concerning the methods of operation of the promotion committee;
5.
Matters concerning the payment of operational expenses by the owners of lands, etc.;
5-2. Matters concerning the borrowing of operation funds of the promotion committee;
6.
Other matters necessary for the operation of the promotion committee, which are prescribed by Presidential Decree.
(3)
A promotion committee shall be operated pursuant to its operational rules, and the owners of lands, etc. shall pay the expenses incurred in its operation, as stipulated by its operational rules.
(4)
A promotion committee shall report the affairs performed by the promotion committee with the general meeting under
Article 24
(hereinafter referred to as "general meeting"), and the rights and duties relating to the affairs performed by the promotion committee shall be succeeded by a universal title by the partnership.
(5)
A promotion committee shall transfer the accounting books indicating the spent expenses and the related documents to the partnership within 30 days from the date of authorization for the partnership's establishment.
(6)
The owners of lands, etc. may request a promotion committee to replace and dismiss its members in accordance with the operational rules of the promotion committee.
<Amended by Act No. 9444, Feb. 6, 2009>
(7)
Detailed matters on the procedures, etc. for a replacement and dismissal of the members of the promotion committee under paragraph (6) shall be governed by the operational rules.
법령보기 화면
Article 16 (Approval, etc. for Establishment of Partnership)
(1)
When a promotion committee for the housing redevelopment project and the urban environment rearrangement project intends to establish a partnership, it shall obtain the consent of not less than 3/4 of the owners of lands, etc., and a landowner possessing not less than 1/2 of the land area, and then obtain authorization from the head of a
Si
/
Gun
by appending the following matters. The same shall also apply to any modification of the authorized matters:
Provided
, That when intending to modify minor matters prescribed by Presidential Decree, it may modify them by filing a report thereon with the head of a
Si
/
Gun
without obtaining consent from the partnership members.
<Amended by Act No. 8785, Dec. 21, 2007; Act No. 8852, Feb. 29, 2008; Act No. 9444, Feb. 6, 2009; Act No. 10268, Apr. 15, 2010>
1.
The articles of association;
2.
Documents stipulated by Ministerial Decree of Land, Transport and Maritime Affairs;
3.
Other documents stipulated by Municipal Ordinance of the relevant Special Metropolitan City, Metropolitan City,
Do
or Special Self-Governing Province.
(2)
When a promotion committee for a housing reconstruction project intends to establish a partnership, it shall obtain the consent of not less than 2/3 (excluding the cases where the number of sectional owners in each building of a collective housing is five or fewer) of the sectional owners by each building of the collective housing within the housing complex (in the case of welfare facilities, the whole welfare facilities within the housing complex shall be regarded as a single building) and a landowner possessing not less than 1/2 of the land area, and that of not less than 3/4 of all sectional owners within the housing complex and a landowner possessing not less than 3/4 of the land area, notwithstanding
Article 47 (1) and (2) of the Act on the Ownership and Management of Aggregate Buildings
, and obtain authorization from the head of a
Si
/
Gun
by appending the articles of association and the documents stipulated by the Minister of Land, Transport and Maritime Affairs. The same shall also apply to any modification of the authorized matters:
Provided
, That when intending to modify minor matters under the proviso to paragraph (1), it may modify them by filing a report thereon with the head of a
Si
/
Gun
without obtaining consent from the partnership members.
<Amended by Act No. 8785, Dec. 21, 2007; Act No. 8852, Feb. 29, 2008; Act No. 9444, Feb. 6, 2009>
(3)
Notwithstanding paragraph (2), when an area which is not the housing complex is included in a rearrangement zone, not less than 3/4 of the owners of lands or structures within such area, and a landowner possessing not less than 2/3 of the land area, shall consent thereto.
<Amended by Act No. 8785, Dec. 21, 2007>
(4)
Where a partnership performs a rearrangement project under this Act, the partnership shall be regarded as a project proprietor under subparagraph 5 of
Article 2 of the Housing Act
and as having registered the housing construction business, etc. under
Article 9
of the same Act from the authorization date of the establishment of the partnership, in applying the provisions of
Article 38
of the same Act.
<Amended by Act No. 6916, May 29, 2003; Act No. 7392, Mar. 18, 2005>
(5)
Necessary matters concerning the object of and procedures for the consent of the owners of lands, etc., the application for the establishment of a partnership and the procedures for its authorization under paragraphs (1) through (3) shall be prescribed by Presidential Decree.
<Amended by Act No. 9444, Feb. 6, 2009>
법령보기 화면
Article 17 (Method of Consent, etc. by Owners of Lands, etc.)
(1)
The consent (including cancellation of matters, to which consent has been given, or expression of opposing opinions under
Article 8
(4) 7, and
Articles 13
(3) and 26 (3)) under
Articles 7
(1),
8
(1) through (4),
13
(2),
14
(4),
16
(1) through (3),
26
(3),
28
(7),
33
(2) shall be given in writing by making use of a registered seal with a certificate of personal seal impression attached thereto. In such cases, when a certificate of personal seal impression has been previously submitted, it may not be attached, but this shall not apply to cases where it is deemed necessary to attach such certificate due to a change, etc. in a registered seal.
<Amended by Act No. 9444, Feb. 6, 2009>
(2)
Necessary matters concerning the method of and procedures, etc. for counting the number of owners of lands, etc. who have consented, under paragraph (1) and
Article 12
, shall be prescribed by Presidential Decree.
<Added by Act No. 9444, Feb. 6, 2009>
법령보기 화면
Article 18 (Juristic Personality, etc. of Partnership)
(1)
The partnership shall be a juristic person.
(2)
The partnership shall be established by effecting registration of the matters as prescribed by Presidential Decree at the seat of its principal office, within 30 days from the day of receiving an authorization for the establishment of partnership.
(3)
The partnership shall use the letters of "rearrangement project partnership" in its title.
법령보기 화면
Article 19 (Qualifications, etc. for Members of Partnership)
(1)
Members of the partnership for the rearrangement project (excluding the rearrangement project performed by the head of
Si
/
Gun
or the Housing Corporation, etc.) shall be the owners of lands, etc. (limited to the persons consented to the housing reconstruction project in the cases of the housing reconstruction project), but when it falls under any of the following subparagraphs, one person representing such several persons shall be deemed to be a member of the partnership.
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 9444, Feb. 6, 2009>
1.
When the ownership and superficies of the lands or structures belong to several co-owners;
2.
When several owners of lands, etc. belong to one household (spouses and unmarried lineal descendants under the age of 20 who are not registered on a resident registration card of the same household shall be deemed to belong to one household, and even when several owners of lands, etc., who have made up one household, separate the household and do not belong to the same household after approval for the establishment of the partnership, they shall be deemed to belong to one household, excluding cases of divorce and statutory branch family set up by offsprings who are 20 years old or above;
3.
When the ownership or superficies of the lands or structures aretransferred to several persons from one owner of lands, etc. after approval is granted to the establishment of the partnership, and several persons own such ownership and superficies.
(2)
Where a housing reconstruction project is implemented within an area designated as the overheated speculative zone (hereinafter referred to as "overheated speculative zone") set forth in
Article 41 (1) of the Housing Act
, a person who has taken over (including sale, donation, or other acts causing the change of any right, but excluding transfer or taking-over followed by inheritance or divorce; hereafter in this Article the same shall apply) a structure or land involved in the relevant rearrangement project after the authorization of the establishment of partnership is granted under
Article 16
shall be disqualified for a member of the partnership regardless of the provisions of paragraph (1):
Provided
, That where the transferor falls under any of the following subparagraphs, this shall not apply with respect to the person who has taken over the structure or land from the transferor:
<Added by Act No. 7056, Dec. 31, 2003; Act No. 7392, Mar. 18, 2005; Act No. 9444, Feb. 6, 2009>
1.
Where all members of the household (referring to the members of the household in which the head of the household is included; hereafter in this Article the same shall apply) move to the Special Metropolitan City, a Metropolitan City,
Si
, or
Gun
in which the project zone is not located, due to any change in the place of work, the maintenance of livelihood, treatment of disease, school attendance, or marriage of a member of the household;
2.
Where all members of the household move to the housing acquired by inheritance;
3.
Where all members of the household move to a foreign country or intend to sojourn in a foreign country for two years or more;
4.
Where the structure or land is transferred for unavoidable reasonsas prescribed by Presidential Decree.
(3)
With respect to a person who has taken over a structure or land involved in the rearrangement project after the establishment authorization of the partnership is granted in accordance with the main sentence of paragraph (2) other than its subparagraphs but is disqualified for a member of the partnership, the project implementer shall make a settlement in cash for the structure or land by applying
mutatis mutandis
the provisions of
Article 47
.
<Added by Act No. 7056, Dec. 31, 2003; Act No. 9444, Feb. 6, 2009>
법령보기 화면
Article 20 (Preparation and Alteration of Articles of Association)
(1)
The partnership shall prepare the articles of association containing the matters falling under each of the following subparagraphs:
1.
Title and address of the partnership;
2.
Matters concerning the qualification of members of the partnership;
3.
Matters concerning the expulsion, withdrawal and replacement of members of the partnership;
4.
Location and size of the area scheduled for a rearrangement project;
5.
Number of the executives of a partnership under
Article 21
(hereinafter referred to as the "partnership's executives") and the scope of duties;
6.
Matters concerning the rights, duties, remunerations, selection methods, alteration and dismissal of the partnership's executives;
7.
Number of the representatives, resolving methods, selection methods and selection procedures;
8.
Bearing of the partnership's expenses and the partnership's accounting;
9.
Implementation year and implementing methods of a rearrangement project;
10.
Opening procedure, period and resolving methods of the general meeting;
11.
Matters concerning the opening of general meeting and the request for convening the general meeting by the members;
12.
Bearing time and procedures for expenses incurred in the rearrangement project, such as work costs, etc. (hereinafter referred to as "rearrangement project costs");
13.
Settlement procedures when the rearrangement project has been completed;
14.
Collection, payment method, and procedures for the settlement money;
15.
Selection of the work executor and the designer, and the contents to be included in the written contract;
16.
Procedures for altering the articles of association;
17.
Other matters necessary for the promotion of rearrangement project and the operation of the partnership, which are prescribed by Presidential Decree.
(2)
The Minister of Land, Transport and Maritime Affairs may prepare and diffuse the standard articles of association which contain the contents listed in each subparagraph of paragraph (1).
<Amended by Act No. 8852, Feb. 29, 2008>
(3)
Where the partnership intends to alter the articles of association, an authorization of the head of a
Si
/
Gun
shall be obtained after the consents of the majority of partnership members (referred to not less than two thirds of such members in the cases of paragraph (1) 2 through 4, 8, 12 or 15) by holding a general meeting, notwithstanding the provisions of
Article 16
(1) through (3):
Provided
, That when the partnership intends to alter minor matters prescribed by Presidential Decree, it shall alter such matters by methods determined by this Act or the articles of association, and report them to the head of a
Si
/
Gun
.
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 9444, Feb. 6, 2009>
(4)
Deleted. <by Act No. 9444, Feb. 6, 2009>
법령보기 화면
Article 21 (Executives of Partnership)
(1)
A partnership shall have the executives falling under each of the following subparagraphs:
1.
One head of the partnership;
2.
Directors;
3.
Auditors.
(2)
Matters necessary for the number of the directors and auditors falling under paragraph (1) shall be determined by the articles of association within the scope prescribed by Presidential Decree.
(3)
A promotion committee or partnership may entrust election management concerning the election of the members of a promotion committee or executives of the partnership to the Election Commission under the
Election Commission Act
, following the resolution by a general meeting.
<Added Act No. 10268, Apr. 15, 2010>
법령보기 화면
Article 22 (Duties, etc. of Partnership's Executives)
(1)
The head of a partnership shall represent the partnership, exercise the overall control over its affairs, and preside over a general meeting or the representatives' meeting under
Article 25
.
(2)
and (3)
Deleted. <by Act No. 9444, Feb. 6, 2009>
(4)
Auditors shall represent the partnership with regard to any contract with or litigations against the partnership by the head of the partnership or directors for themselves.
(5)
No executive of the partnership shall concurrently take the position of an executive or staff member of another partnership carrying out rearrangement projects with identical objectives.
법령보기 화면
Article 23 (Grounds for Disqualification and Dismissal of Partnership's Executives)
(1)
No person falling under one of the following subparagraphs shall become an executive of the partnership:
<Amended by Act No. 7428, Mar. 31, 2005; Act No. 9444, Feb. 6, 2009>
1.
A minor, incompetent or quasi-incompetent;
2.
A person who was declared bankrupt and has not been reinstated yet;
3.
A person for whom two years have not elapsed since the day on which his/her sentence execution was terminated (including the case where it is deemed to have been terminated) or exempted, after he/she was sentenced to an imprisonment without prison labor or a heavier punishment by a court;
4.
A person who is under the suspension of an execution of imprisonment without prison labor or a heavier punishment by a court;
5.
A person for whom five years have not elapsed since he/she was sentenced to a fine of not less than one million won in violation of this Act.
(2)
When any partnership's executive has been found that he/she has become to fall under any subparagraph of paragraph (1) or that he/she falls thereunder at the time of his/her appointment, he/she shall deservedly retire.
(3)
Any acts participated by an executive who has retired under paragraph (2) before his/her retirement shall not lose their validity.
(4)
Any dismissal of the partnership's executives, notwithstanding
Article 24
, may be made at a general meeting convened by the proposal of not less than 1/10 of the partnership members with the attendance of majority of its members and the concurrent votes of majority of those present:
Provided
, That the articles of association shall govern where the articles of association separately prescribe provisions regarding dismissal. In such cases, a person who has been appointed as the representative of proposers, shall exercise the authority on behalf of the head of the partnership in convening and conducting a general meeting for dismissal of the partnership's executives.
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 9444, Feb. 6, 2009>
(5)
Deleted. <by Act No. 9444, Feb. 6, 2009>
법령보기 화면
Article 24 (Holding of General Meetings and Matters to be Resolved)
(1)
A partnership shall have a general meeting which consists of its members.
(2)
Except the cases under
Article 23
(4), a general meeting shall be convened by the partnership head, either
ex officio
or upon request by not less than 1/5 of its members or 2/3 of its representatives.
<Amended by Act No. 9444, Feb. 6, 2009>
(3)
The following matters shall pass through a resolution by a general meeting:
<Amended by Act No. 9444, Feb. 6, 2009; Act No. 9729, May 27, 2009; Act No. 10268, Apr. 15, 2010>
1.
Alteration of the articles of association (limited to an alteration of minor matters under the proviso to
Article 20
(3) determined to be resolved at a general meeting by this Act or the articles of association);
2.
Borrowing of funds and method thereof, interest rate, and method of repayment;
3.
Amount and collection method of the costs under
Article 61
;
4.
Spending of the rearrangement project costs;
5.
Contracts to be charged to members other than the matters appropriated in the budget;
6.
Selection and alteration of a work executor or designer, and the appraisal business operator (excluding a housing reconstruction project):
Provided
, That selection and alteration of an appraisal business operator may be entrusted to the head of a
Si
/
Gun
after going through a resolution by a general meeting;
7.
Selection and alteration of a specialized manager of a rearrangement project;
8.
Selection and dismissal of partnership's executives;
9.
Details of the rearrangement project costs shared by partnership members;
9-2. Formulation and alteration of a written project implementation plan under
Article 30
(including matters concerning suspension or abolishment of a rearrangement project under
Article 28
(1), and excluding minor alterations under the proviso to
Article 28
(1));
10.
Formulation and alteration of the management and disposal plans under
Article 48
(excluding minor alterations under the proviso to
Article 48
(1)). In such cases, resolutions shall be made by the consent of not less than a majority of the total number of the partnership members;
11.
Collection and payment of the settlement money under
Article 57
(including the installment collection and installment payment) and the accounting report at the time of dissolution of the partnership;
12.
Other matters prescribed by Presidential Decree or the articles of association as necessary for the decision on principal matters, such as the matters causing an economic burden to the partnership members.
(4)
Matters requiring a consent of the partnership members under this Act or the articles of association, among the matters under each subparagraph of paragraph (3), shall be referred to a general meeting.
(5)
Holding procedure, time and methods of passing a resolution, etc. of a general meeting shall be stipulated by the articles of association:
Provided
, That when a general meeting passes a resolution, not less than 10/100 of the partnership members shall attend it in person.
<Amended by Act No. 9729, May 27, 2009>
법령보기 화면
Article 25 (Board of Representatives)
(1)
A partnership having not less than 100 members shall have a board of representatives.
<Amended by Act No. 9444, Feb. 6, 2009>
(2)
The board of representatives shall consist of not less than 1/10 of the partnership members, but where the number of 1/10 of the partnership members exceeds 100, it may consist of not less than 100 persons within the scope of 1/10 of the number of partnership members, and it may carry out the authority of a general meeting as proxy, except for the matters prescribed by Presidential Decree from among those subject to a resolution by the general meeting.
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 9444, Feb. 6, 2009>
(3)
The partnership's executives other than the head of partnership under
Article 21
shall not become a representative.
(4)
The number of representatives, method of resolution, method of appointment, procedure for appointment, etc. shall be stipulated by the articles of association within the limit prescribed by Presidential Decree.
법령보기 화면
Article 26 (Resident Representatives' Meeting)
(1)
When the owners of lands, etc. in a rearrangement zone (when a housing reconstruction project is carried out in a zone other than a rearrangement zone under subparagraph 9 (b) (ii) of
Article 2
, such zone shall be included) want the head of a
Si
/
Gun
or the Housing Corporation, etc. to implement the project, the resident representative's organization (hereinafter referred to as "resident representatives' meeting") to ensure the smooth implementation of the rearrangement project shall be established after the designation of a rearrangement zone is publicly announced.
<Amended by Act No. 6916, May 29, 2003; Act No. 9444, Feb. 6, 2009>
(2)
The resident representatives' meeting shall be composed of not less than five but not more than 25 persons.
<Amended by Act No. 8785, Dec. 21, 2007>
(3)
The resident representatives' meeting shall be composed by obtaining the consent of majority of the owners of lands, etc.(in such cases, a person who has consented to the organization of the resident representatives' meeting shall be deemed to have consented to the designation of a project implementer under
Article 8
(4) 7:
Provided
, That this shall not apply to the owners of lands, etc. who have voiced opposing opinions on designation of a project implementer to the head of a
Si
/
Gun
and at the resident representatives' meeting before a request for the designation of a project implementer is made), and when it has been composed, it shall obtain approval from the head of a
Si
/
Gun
under the method and procedure stipulated by Ordnance of the Ministry of Land, Transport and Maritime Affairs.
<Amended by Act No. 9444, Feb. 6, 2009>
(4)
The resident representatives' meeting or a tenant (including a shop tenant; hereinafter the same shall apply) may present its opinions when a project implementer sets forth an implementation rule under subparagraph 8 of
Article 30
for the following matters. In such cases, the project implementer shall endeavor to reflect the opinions of resident representative''s meetings or tenants in the implementation rule:
<Amended by Act No. 9729, May 27, 2009>
1.
Matters concerning the demolition of structures;
2.
Matters concerning the migration of residents (including matters concerning the eviction of tenants);
3.
Matters concerning the compensation for land and structures (including matters concerning compensation for moving expenses, etc. to tenants);
4.
Matters concerning the bearing of rearrangement project costs;
4-2. Matters concerning the provision of rental housing to tenants and occupancy eligibility of tenants;
5.
Other matters prescribed by Presidential Decree as necessary for implementing a rearrangement project.
(5)
Matters necessary for the operation, cost bearing, methods and procedures for selecting members, etc. shall be prescribed by Presidential Decree.
법령보기 화면
Article 27 (Mutatis Mutandis Application of Civil Act)
Except as provided for in this Act, the provisions concerning an incorporated association in the
Civil Act
shall apply
mutatis mutandis
to the partnership.
Section 3 Project Implementation Plans, etc.
법령보기 화면
Article 28 (Authorization for Project Implementation)
(1)
Where any project implementer (including cases of joint implementation under
Article 8
(1) through (3), but excluding cases where the project implementer is the head of a
Si
/Gun) intends to implement a rearrangement project, he/she shall submit to the head of a
Si
/
Gun
a written project implementation plan under
Article 30
(hereinafter referred to as "written project implementation plans") accompanied by the articles of association, etc. and other documents stipulated by Ministerial Decree of Land, Transport and Maritime Affairs, and obtain an authorization for project implementation. The same shall also apply where a project implementer intends to modify the authorized details or to suspend or discontinue a rearrangement project:
Provided
, That when intending to alter minor matters as prescribed by Presidential Decree, he/she shall report to the head of a
Si
/
Gun
.
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 8852, Feb. 29, 2008>
(2)
Where the head of a
Si
/
Gun
intends to grant an authorization for project implementation for a housing reconstruction project to be implemented in a zone other than a rearrangement zone under
Article 4
(1), he/she shall undergo deliberation on the matters prescribed by Presidential Decree, such as the height, number of floors, building volume ratio, etc. of the structures, by the construction committee (hereinafter referred to as the "construction committee") to be established in
Si
/
Gun
/
Gu
(referring to an autonomous
Gu
) under
Article 4 of the Building Act
.
<Amended by Act No. 9444, Feb. 6, 2009>
(3)
The head of a
Si
/
Gun
shall, when he/she intends to grant authorization for project implementation (including cases where the head of a
Si
/
Gun
directly prepares a written project implementation plan) pursuant to paragraph (1) (including cases where any authorized matters are intended to be changed), and if any educational facility is located within 200 meters from the rearrangement zone, consult with the superintendent or director of an office of education of the relevant local government.
<Added by Act No. 8785, Dec. 21, 2007>
(4)
Where the head of a
Si
/
Gun
grants an authorization for project implementation under paragraph (1) (including cases where the head of a
Si
/
Gun
has prepared a written project implementation plan) or alters, suspends or discontinues the said rearrangement project, he/she shall announce the said details on the official gazette of relevant local government under the methods and procedures as stipulated by Ministerial Decree of Land, Transport and Maritime Affairs:
Provided
, That the same shall not apply to the cases where it is intended to alter minor matters under the proviso to paragraph (1).
<Amended by Act No. 8852, Feb. 29, 2008>
(5)
A project implementer (excluding the head of a
Si
/
Gun
or the Housing Corporation, etc.) shall, before filing an application for an authorization for project implementation (including the cases where intending to alter the authorized contents or to suspend or close the rearrangement project), obtain the consent of the majority of the partnership members by holding a general meeting in advance as prescribed in the articles of association, etc.:
Provided
, That in cases where the project implementer is the designated developer, the consent of the landowners possessing not less than 50% of the land area within a rearrangement zone and that of the majority of owners of lands, etc. shall be respectively obtained, and resolution of a general meeting is not needed for minor alterations under the proviso to paragraph (1).
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 9444, Feb. 6, 2009>
(6)
Deleted. <by Act No. 9444, Feb. 6, 2009>
(7)
When the owners of lands, etc. intend to implement an urban environment rearrangement project under
Article 8
(3), they shall obtain the consent of not less than 3/4 of the owners of lands, etc. on a written project implementation plan under
Article 30
before applying for the approval for an implementation of the project:
Provided
, That when the owners of lands, etc. intend to alter any authorized matter, they shall obtain the consent of the majority of owners of lands, etc., as set out in the bylaws, but consent of the owners of lands, etc. is not needed for any minor alteration under the proviso to paragraph (1).
<Added by Act No. 9444, Feb. 6, 2009>
법령보기 화면
Article 29 (Deposit, etc. of Rearrangement Project Costs by Designated Developer)
(1)
Where the head of a
Si
/
Gun
intends to grant an authorization for project implementation of an urban environment rearrangement project, if the project implementer of the relevant rearrangement project is a designated developer, he/she may have the project implementer deposit the amount stipulated by Municipal Ordinance of the Special Metropolitan City, Metropolitan City, or
Do
(hereinafter referred to as the "City/
Do
Municipal Ordinance") within the limit of 20/100 of the rearrangement project costs.
(2)
Deposits under paragraph (1) shall be repaid at the time of completion of the payment of settlement money under
Article 57
(1).
(3)
Matters necessary for the deposit and repayment, etc. under paragraph (1) shall be stipulated by the City/
Do
Municipal Ordinance.
법령보기 화면
Article 30 (Preparation of Written Project Implementation Plan)
Any project implementer shall prepare a written project implementation plan including the matters falling under each of the following subparagraphs according to the rearrangement plan announced publicly under
Article 4
(5).
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 8785, Dec. 21, 2007; Act No. 9444, Feb. 6, 2009; Act No. 9729, May 27, 2009>
1.
Land utilization plans (including a plan for allotment of structures);
2.
Installation plans for rearrangement basis facilities and joint utilization facilities;
3.
Countermeasures for resident migration including temporary admittance facilities;
4.
Countermeasures for the residence and migration of tenants;
5.
Building plans for rental housing (referring to building plans for small houses subject to reconstruction under
Article 30-3
(2) in the case of a housing reconstruction project);
6.
Building plans for the height, building volume ratio, etc. of structures;
7.
Treatment plans for the waste generated in the process of implementing rearrangement projects;
7-2. Plans for the protection of educational environment of educational facilities (limited to cases where any educational facility is located within 200 meters from a rearrangement zone);
8.
Implementation rules (limited to rearrangement projects implemented independently by the head of a
Si
/
Gun
or the Housing Corporation, etc.);
9.
Other matters necessary for project implementation, which are prescribed by the City/
Do
Municipal Ordinance, as prescribed by Presidential Decree.
법령보기 화면
Article 30-2
Deleted.<by Act No. 9632, Apr. 22, 2009>
법령보기 화면
Article 30-3 (Relaxation of Floor Area Ratio of Housing Reconstruction Projects, Construction of Small Houses, etc.)
(1)
Where a housing reconstruction project is carried out in an overconcentration control region under
Article 6 (1) 1 of the Seoul Metropolitan Area Readjustment Planning Act
, the project implementer (hereafter referred to as "project implementer" in this Article) may build houses up to the ceilings (hereafter referred to as "legal ceiling of floor area ratio" in this Article) of a floor area ratio under
Article 78 of the National Land Planning and Utilization Act
and relevant Acts, after going through deliberation by the local urban planning committee under
Article 4
(4), notwithstanding the floor area ratio determined by a rearrangement plan (including a plan deemed as a rearrangement plan under this Act: hereafter the same shall apply in this Article) under
Article 4
, and when the project implementer intends to build houses in excess of the floor area ratio determined by a rearrangement plan, the following subparagraphs shall not be applicable to the project implementer:
1.
Restriction on the floor area ratio prescribed by Municipal Ordinance of the Special Metropolitan City, a Metropolitan City,
Si
or
Gun
under
Article 78 of the National Land Planning and Utilization Act
;
2.
Restriction on the number of permitted households determined by a rearrangement plan.
(2)
A project implementer shall construct small houses (hereinafter referred to as "small houses subject to reconstruction") with the residential floor area of not more than 60㎡ in the area equivalent to a proportion determined by Municipal Ordinance of City/
Do
, within the scope of not less than 30/100 but not more than 50/100 of the floor area ratio which is obtained by deducting a floor area ratio determined by a rearrangement plan from the legal ceiling of the floor area ratio.
(3)
When a project implementer builds houses in excess of the floor area ratio in a rearrangement plan under paragraph (1), small houses subject to reconstruction which have been built under paragraph (2) shall be supplied to the Minister of Land, Transport and Maritime Affairs, the Mayor/
Do
Governor, the head of a
Si
/
Gun
, or the Housing Corporation, etc. (hereafter referred to as "acceptor" in this Article) in the area equivalent to the floor area ratio, which is obtained by multiplying the excessive floor area ratio by a ratio determined by Municipal Ordinance of City/
Do
under paragraph (2). In such cases, the supply prices of small houses subject to reconstruction shall be the standard construction costs of public rental housing publicly announced by the Minister of Land, Transport and Maritime Affairs under
Article 16 (3) of the Rental Housing Act
, and it shall be deemed to have made a donation of the relevant appended lands to the acceptor.
(4)
The ceiling of a floor area ratio in accordance with the relevant Acts under paragraph (1) refers to the floor area ratio, by which the project implementer is permitted to build houses, in cases where constructions are limited by falling under any of the following subparagraphs:
1.
Restriction on the number of floors of constructions under
Article 76 of the National Land Planning and Utilization Act
;
2.
Restriction on the heights under
Article 60 of the Building Act
;
3.
Restriction on the heights of constructions for the purpose of securing sunlight, etc. under
Article 61 of the Building Act
;
4.
Restriction on the heights of constructions in the flight safety zone under
Article 82 of the Aviation Act
;
5.
Restriction on the heights of constructions in the flight safety zone under
Article 10 of the Protection of Military Bases and Installations Act
;
6.
Restriction on construction for the purpose of protecting cultural properties when constructions are made under
Article 90 of the Cultural Heritage Protection Act
;
7.
Other cases where the head of a
Si
/
Gun
presents grounds of the relevant Acts, which indicate that it is impossible to relax a floor area ratio due to a restriction on constructions under Acts related to construction, and it is deemed that it is not possible to relax the floor area ratio after going through deliberation of the local urban planning committee under paragraph (1) or the building committee located in City/
Do
under
Article 4 of the Building Act
.
(5)
When a project implementer intends to build houses in excess of the floor area ratio in a rearrangement plan under paragraph (1), he/she shall consult with an acceptor about matters concerning small houses subject to reconstruction, before applying for the authorization of project implementation, and then reflect them in a written project implementation plan.
(6)
Necessary matters concerning the procedures for and methods of taking over small houses subject to reconstruction under paragraph (3) may be separately determined by Presidential Decree, and such small houses subject to reconstruction shall be utilized as rental houses or houses on a deposit basis as prescribed by Municipal Ordinance of City/
Do
.
[This Article Added by Act No. 9632, Apr. 22, 2009]
법령보기 화면
Article 31 (Perusal of Related Documents and Hearing of Opinions)
(1)
Where the head of a
Si
/
Gun
intends to grant an authorization for the project implementation or to prepare the written project implementation plan, he/she shall make a copy of related documents available for the public perusal for not less than 14 days under the methods and procedures as prescribed by Presidential Decree:
Provided
, That the same shall not apply to the cases where intending to alter minor matters under the proviso to
Article 28
(1).
<Amended by Act No. 9444, Feb. 6, 2009>
(2)
Owners of lands, etc. or the partnership members and other interested parties relating to the rearrangement projects, may present their opinions in writing to the head of a
Si
/
Gun
within the period of public perusal under paragraph (1).
(3)
When the head of a
Si
/
Gun
has examined the opinions presented under paragraph (2) and deems that it is necessary to adopt them, he/she shall adopt them, and where it is not so, he/she shall notify the presenter of opinions of such reasons.
법령보기 화면
Article 32 (Authorization, Permission, etc. Deemed Granted under other Acts)
(1)
When a project implementer has received an authorization for project implementation (referring to the time when a written plan for project implementation has been prepared where the head of a
Si
/
Gun
directly implements a rearrangement project; hereafter the same shall apply in this Article), it shall be deemed that the authorization, permission, approval, report, registration, consultation, consent, examination or revocation (hereinafter referred to as "authorization or permission, etc.") has been granted or filed, and when an authorization for project implementation under
Article 28
(4) has been publicly announced, it shall be deemed that the public announcement and public notice, etc. of the authorization or permission, etc. has been made under the related Acts falling under each of the following subparagraphs:
<Amended by Act No. 6841, Dec. 30, 2002; Act No. 6916, May 29, 2003; Act No. 7392, Mar. 18, 2005; Act No. 7678, Aug. 4, 2005; Act No. 8014, Sep. 27, 2006; Act No. 8338, Apr. 6, 2007; Act Nos. 8352 & 8370, Apr. 11, 2007; Act No. 8785, Dec. 21, 2007; Act Nos. 8974 & 8976, Mar. 21, 2008; Act No. 9401, Jan. 30, 2009; Act No. 9444, Feb. 6, 2009; Act Nos. 9763 & 9774, Jun. 9, 2009; Act No. 10331, May 31, 2010>
1.
Approval of a project plan under
Article 16 of the Housing Act
;
2.
Permission for construction under
Article 11 of the Building Act
, permission for construction of or report on building a temporary structure under
Article 20
of the same Act and consultation on construction under
Article 29
of the same Act;
3.
Permission for the implementation of road works under
Article 34 of the Road Act
, and permission for road occupancy under
Article 38
of the same Act;
4.
Revocation of the designation of erosion control areas under Article 20 of the Work against Land Erosion or Collapse Act;
5.
Permission and consultation for farmland diversion under
Article 34 of the Farmland Act
, and report on farmland diversion under
Article 35
of the same Act;
6.
Permission for the conversion of mountainous districts and report on the conversion of mountainous districts under
Articles 14
and
15 of the Management of Mountainous Districts Act
, permission for and report on the temporary use of mountainous districts under
Article 15-2
of the same Act, permission for the cutting of standing timbers, etc. under
Article 36 (1) and (4) of the Creation and Management of Forest Resources Act
, permission for an act within a forest protection zone under Article 9 (1) and (2) 1 of the Forest Protection Act:
Provided
, That a seed-growing forest and an experimental forest under the
Creation and Management of Forest Resources Act
, and the protection zone of forest genetic resources under the Forest Protection Act, shall be excluded;
7.
Permission for implementation of river works and authorization for implementation plans for river works under
Article 30 of the River Act
, permission for occupancy and use of a river under
Article 33
of the same Act and permission for use of river water under
Article 50
of the same Act;
8.
Authorization for a general water-supply project under
Article 17 of the Water Supply and Waterworks Installation Act
, and authorization for the installation of exclusive water supply or exclusive industrial water supply under
Article 52 or 54 of the same Act
;
9.
Permission for a public sewerage project under
Article 16 of the Sewerage Act
and report on installment of individual sewage treatment facilities under
Article 34
(2) of the same Act;
10.
Examination for the publication of maps, etc. under Article 15 (3) of the Act on Land Survey, Waterway Survey and Cadastral Records;
11.
Registration of a large-scale store under
Article 8 of the Distribution Industry Development Act
;
12.
Permission for the use under Article 30 of the State Property Act (limited to housing redevelopment projects and urban environment rearrangement projects);
13.
Permission for the use and profit-making under
Article 82 of the Local Finance Act
(limited to housing redevelopment projects and urban environment rearrangement projects);
14.
Report on the undertaking and alteration of a project under Article 86 (1) of the Act on Land Survey, Waterway Survey and Cadastral Records;
15.
Permission for development acts under
Article 56 of the National Land Planning and Utilization Act
, designation of a project implementer of urban planning facilities under
Article 86
of the same Act, and authorization for implementation planning under
Article 88
of the same Act;
16.
Authorization of and report on plans on construction of electric installations for private use under
Article 62 of the Electric Utility Act
;
17.
Consent to permission, etc. for construction under
Article 7 (1) of the Installation, Maintenance, and Safety Control of Fire-Fighting Systems Act
and permission for the establishment of factories, etc. under
Article 6 (1) of the Safety Control of Dangerous Substances Act
(factories, etc. shall be limited to what is related to factory buildings or their accessory facilities).
(2)
When a project implementer has received an authorization for project implementation with regard to an urban environment rearrangement project for an area including factories, it shall be deemed that an authorization or permission, etc. under each of the following subparagraphs has been granted in addition to an authorization or permission, etc. under paragraph (1), and when an authorization for project implementation under
Article 28
(4) has been publicly announced, it shall be deemed that a public announcement or public notice, etc. of an authorization or permission, etc. has been made under the related Acts listed in each of the following subparagraphs:
<Amended by Act No. 6893, May 29, 2003; Act No. 7459, Mar. 31, 2005; Act No. 8014, Sep. 27, 2006; Act Nos. 8369 & 8372, Apr. 11, 2007; Act No. 8404, Apr. 27, 2007; Act No. 8466, May 17, 2007; Act No. 8785, Dec. 21, 2007; Act No. 9770, Jun. 9, 2009>
1.
Approval for a factory establishment, etc. under
Article 13 of the Industrial Cluster Development and Factory Establishment Act
, and report on completion of factory establishment, etc. under
Article 15
of the same Act;
2.
Deleted; <by Act No. 9444, Feb. 6, 2009>
3.
Approval for or report on the installation of waste disposal facilities under
Article 29 (2) of the Wastes Control Act
(including a modified approval or a modified report);
4.
and 5.
Deleted; <by Act No. 9444, Feb. 6, 2009>
6.
Permission for or report on the installation of emission facilities under
Article 23 of the Clean Air Conservation Act
,
Article 33 of the Water Quality and Ecosystem Conservation Act
and
Article 8 of the Noise and Vibration Control Act
;
7.
Permission for an installation of the explosives repository under
Article 25 (1) of the Control of Firearms, Swords, Explosives, etc. Act
.
(3)
Where a project implementer intends to receive a legal fiction of an authorization or permission, etc. under paragraphs (1) and (2) for a rearrangement project, he/she shall concurrently submit the related documents when filing an application for an authorization for project implementation under
Article 28
(1):
Provided
, That where the related documents are not able to be submitted as the work executer has not been selected when an application has been filed for an authorization for project implementation, or approval for implementation of the project under paragraph (5) is given, they may be submitted by the time fixed by the head of a
Si
/Gun.
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 9444, Feb. 6, 2009>
(4)
Where the head of a
Si
/
Gun
grants an authorization for project implementation under
Article 28
(1) or intends to prepare the written project implementation plan, if there exist any matters falling under the authorization or permission, etc. which are legally fictionalized under each subparagraph of paragraphs (1) and (2), he/she shall hold in advance a consultation with the head of the related administrative agency, and the head of the related administrative institution in receipt of a request for consultation shall submit his/her opinions within 20 days from the date of receiving a request (in the case of the proviso to paragraph (3), referred to the date on which the documents have arrived to the head of the related administrative institution). In this case, the head of the related administrative agency shall not comply with the consultation in violation of the standard for the authorization or permission, etc. stipulated by the relevant Acts.
<Amended by Act No. 7392, Mar. 18, 2005>
(5)
When the head of a
Si
/
Gun
deems it necessary to urgently implement a rearrangement project due to a natural disaster or other inevitable reasons, notwithstanding the provisions of paragraph (4), the head of a
Si
/
Gun
may give approval for implementation of the project under
Article 28
(1) before consultation with the head of the relevant administrative agency is completed. In such cases, until such consultation is completed, it shall be deemed that approval and permission, etc. under paragraphs (1) and (2) are not given.
<Added by Act No. 9444, Feb. 6, 2009>
(6)
In cases where it is deemed under paragraphs (1) and (2) that there have existed the authorization or permission, etc. under other Acts with regard to the rearrangement project, the service fees, etc. to be imposed for the price of relevant authorization or permission, etc. under the related Acts or the City/
Do
Municipal Ordinances, shall be exempted.
법령보기 화면
Article 33 (Special Cases for Authorization for Project Implementation)
(1)
A project implementer may file an application for the authorization for project implementation by preparing the written project implementation plans which contain the details on the retention or remodeling of a part of structures (referring to expanding, rebuilding or major repairs for suppressing the deterioration of structures or improving their functions; hereinafter the same shall apply). In this case, even if structures to be retained or remodelled, and the parcel of land on which the structures are located, are not compatible with the standards relating to constructions falling under each of the following subparagraphs in the
Housing Act
and the
Building Act
, the head of
Si
/
Gun
may grant an authorization for project implementation under the standards prescribed by Presidential Decree:
<Amended by Act No. 6916, May 29, 2003; Act No. 8974, Mar. 21, 2008>
1.
Scope of the housing complex under subparagraph 8 of
Article 2 of the Housing Act
;
2.
Installation standards for accessory facilities and welfare facilitiesunder
Article 21 (1) 2 and 3 of the Housing Act
;
3.
Relations between the sites and roads under
Article 44 of the Building Act
;
4.
Designation of building lines under
Article 46 of the Building Act
;
5.
Limitations on the heights of structures for securing sunlight, etc. under
Article 61 of the Building Act
.
(2)
Where a project implementer intends to prepare a written project implementation plan under paragraph (1), he shall obtain consent of the owners of structures to be retained or remodelled (where there exist divided owners under subparagraph 2 of
Article 2 of the Act on the Ownership and Management of Aggregate Buildings
, there shall be consent of not less than 2/3 of the divided owners and those of the divided owners of not less than 2/3 of the total area of relevant structures).
<Amended by Act No. 9444, Feb. 6, 2009>
법령보기 화면
Article 34 (Division and Combination of Rearrangement Zones)
(1)
When the head of a
Si
/
Gun
deems that it is necessary to efficiently implement a rearrangement project and protect urban scenery, he/she may divide a rearrangement zone referred to in
Article 4
into two or more zones, or apply for the designation of two or more separate zones (limited to a zone that meets the requirements prescribed by Presidential Decree under
Article 4
(1)) or a rearrangement zone as one rearrangement zone under
Article 4
(1).
<Amended by Act No. 9444, Feb. 6, 2009>
(2)
When the head of a
Si
/
Gun
intends to divide a rearrangement zone or designate separate areas as one rearrangement zone under paragraph (1) to implement a rearrangement project, details concerning the methods of and procedures for its implementation shall be determined by City/
Do
Municipal Ordinances.
<Added by Act No. 9444, Feb. 6, 2009>
법령보기 화면
Article 35 (Rearrangement Projects under Circulative Rearrangement Mode)
(1)
A project implementer shall, in order to smoothly implement a rearrangement project under subparagraph 2 (a) through (d) of
Article 2
, establish countermeasures for the migration of house owners or tenants by rearranging the rearrangement zone in order by the mode such as having the owners or tenants of houses to be removed due to the implementation of the said rearrangement project (limited to the persons actually residing within the rearrangement zone; hereafter the same shall apply in this paragraph and
Article 36
(1)) temporarily reside in the housing newly built or already built in and outside the rearrangement zone.
<Amended by Act No. 8125, Dec. 28, 2006; Act No. 9729, May 27, 2009>
(2)
Where a project implementer implements a rearrangement project by the mode under paragraph (1), he/she may use the housing for temporary residence (hereinafter referred to as "circulative housing") as facilities for temporary admittance under
Article 36
or lease such housing, notwithstanding
Article 38 of the Housing Act
, and may request that public rental housing held by the Housing Corporation, etc. should be preferentially provided as circulative housing, pursuant to means and procedures prescribed by Presidential Decree.
<Amended by Act No. 6916, May 29, 2003; Act No. 9729, May 27, 2009>
(3)
When a person who temporarily resides at the circulative housing hopes to continue residing at the circulative housing even after the completion of a rearrangement project, the circulative housing may be parcelled out or continue to be leased. In such cases, the circulative housing possessed by a project implementer shall be deemed disposed of to the owners of lands, etc. under the management and disposal plan authorized under
Article 48
.
<Added by Act No. 9729, May 27, 2009>
Section 4 Measures, etc. for Implementation of Rearrangement Projects
법령보기 화면
Article 36 (Installation, etc. of Facilities for Temporary Admittance)
(1)
A project implementer shall have the owners or tenants of the housing to be removed due to the implementation of a residential environment improvement project and housing redevelopment project temporarily reside in the facilities, such as the rental housing, etc. located in and outside the relevant rearrangement zone, or take measures corresponding to a temporary admittance, such as a loan arrangement for housing funds. In such cases, the project implementer may temporarily use the facilities or lands of the State, local governments, other public organizations, or private persons when it is necessary for such temporary admittance.
<Amended by Act No. 8125, Dec. 28, 2006>
(2)
When the State or local governments have received a request for using the structures or lands required for facilities for temporary admittance under paragraph (1) from the project implementer, they shall not refuse it unless there exist the reasons prescribed by Presidential Decree. In such cases, any fees for such use or lease shall be exempted.
(3)
When the project implementer has completed the works for a rearrangement project, he/she shall remove facilities for temporary admittance within 30 days from the day of such completion, and reinstate the said structures or lands.
법령보기 화면
Article 37 (Loss Compensation)
(1)
Where any persons have suffered any losses from the temporary use of the facilities or lands of public organizations (excluding local governments) or private persons under
Article 36
, the project implementer shall compensate for such losses, and hold a consultation with such persons, in compensating for the losses.
(2)
Where the consultation for loss compensation under paragraph (1) is not attained or it is impossible to hold a consultation, the project implementer or the persons who have suffered losses may make a request for an adjudication to the competent land expropriation committee established under
Article 49 of the Act on the Acquisition of Land, etc. for Public Works and the Compensation therefor
.
(3)
Except as otherwise stipulated in this Act, the
Act on the Acquisition of Land, etc. for Public Works and the Compensation therefor
shall apply
mutatis mutandis
to the loss compensation.
법령보기 화면
Article 38 (Expropriation or Use of Lands, etc.)
Where it is necessary to implement a rearrangement project within a rearrangement zone (in the case of a housing reconstruction project, limited to any project corresponding to
Article 8
(4) 1; hereafter in this Article, the same shall apply), the project implementer may expropriate or use the lands, articles or other rights under
Article 3 of the Act on the Acquisition of Land, etc. for Public Works and the Compensation therefor
.
<Amended by Act No. 7392, Mar. 18, 2005>
법령보기 화면
Article 39 (Request for Sales)
When a project implementer implements any housing reconstruction project, he/she may file, by applying
mutatis mutandis
Article 48 of the Act on the Ownership and Management of Aggregate Buildings
, a request for sales of the lands and structures of the persons who fall under any of the following subparagraphs. In such cases, the resolution of reconstruction shall be deemed to be a consent (referring to a consent to the designation of a project implementer in the case of subparagraph 3) to the establishment of a partnership, and the sectional ownership and the right to use sites shall be deemed to be the ownership of land or structure subject to a request for sales within the project implementation zone, and other rights:
<Amended by Act No. 9444, Feb. 6, 2009>
1.
A person who has not consented to the establishment of a partnership under
Article 16
(2) and (3);
2.
A person who owns only structures or lands;
3.
A person who has not consented to the designation of the head of a
Si
/
Gun
or the Housing Corporation, etc. as a project implementer under
Article 8
(4).
법령보기 화면
Article 40 (Mutatis Mutandis Application of Act on Acquisition of Land, etc. for Public Works and Compensation therefor)
(1)
Except as otherwise provided for in this Act, the
Act on the Acquisition of Land, etc. for Public Works and the Compensation therefor
shall apply
mutatis mutandis
to any expropriation or use of the ownership and other rights to the lands or structures for an implementation of the rearrangement project within the rearrangement zone:
Provided
, That standards and procedures for compensation for losses incurred in the implementation of a rearrangement project may be separately determined by Presidential Decree.
<Amended by Act No. 9444, Feb. 6, 2009; Act No. 9729, May 27, 2009>
(2)
When there has been a public announcement of the authorization for project implementation (referring to a public announcement of the written project implementation plan under
Article 28
(4) where the head of a
Si
/
Gun
directly implements a rearrangement project; hereafter in this Article the same shall apply) in applying
mutatis mutandis
the
Act on the Acquisition of Land, etc. for Public Works and the Compensation therefor
under paragraph (1), it shall be deemed that there have been a project authorization and its public announcement under
Articles 20
(1) and
22 (1) of the Act on the Acquisition of Land, etc. for Public Works and the Compensation therefor
.
<Amended by Act No. 8785, Dec. 21, 2007>
(3)
A request for adjudication for an expropriation or use under paragraph (1) shall be filed within the project implementation period set forth at the time of authorization for project implementation, notwithstanding
Articles 23
and
28 (1) of the Act on the Acquisition of Land, etc. for Public Works and the Compensation therefor
.
(4)
Where sites or structures are compensated in kind, the said compensation in kind may be made only after the authorization for work completion under
Article 52
, notwithstanding
Article 42 of the Act on the Acquisition of Land, etc. for Public Works and the Compensation therefor
.
법령보기 화면
Article 40-2 (Special Cases for Floor Area Ratio)
When a project implementer pays moving expenses to a tenant or compensates losses incurred by the closure or suspension of business operation, in excess of the standards for compensation for losses separately determined by Presidential Decree under the proviso to
Article 40
(1), the floor area ratio may be relaxed and determined within the extent of not more than 125/100 of the floor area ratio applicable to the relevant rearrangement zone by Municipal Ordinance of the Special Metropolitan City, each Metropolitan City, Special Self-Governing Province,
Si
or
Gun
, notwithstanding
Article 78 (1) of the National Land Planning and Utilization Act
.
[This Article Added by Act No. 9729, May 27, 2009]
법령보기 화면
Article 41 (Special Cases for Scope of Housing Reconstruction Projects)
(1)
Where a project implementer or a promotion committee implements a housing reconstruction project in a housing complex wherein two or more structures are located, which have been built by receiving an authorization for the project plans under
Article 16 (1) of the Housing Act
, if it is necessary to satisfy the requirements for a consent to the establishment of a partnership under
Article 16
(2), a request for land division may be filed for a part of lands within the said housing complex notwithstanding
Article 57 of the Building Act
, even if the area of lands intended for a division falls short of the area stipulated by the same Article of the same Act.
<Amended by Act No. 6916, May 29, 2003; Act No. 8974, Mar. 21, 2008>
(2)
When the project implementer or the promotion committee files a request for the land division under paragraph (1), he/she or it shall hold a consultation with the owners of lands, etc. in connection with the lands and structures thereon subject to a land division.
(3)
Where the consultation on a land division under paragraph (2) has not been attained, the project implementer or the promotion committee may file a request for land division with the court.
(4)
Where any land division has been requested under paragraph (3), if the lands and structures thereon, which are to be divided away, satisfy the requirements falling under each of the following subparagraphs, the head of a
Si
/
Gun
may grant an authorization for establishment of partnership under
Article 16
and an authorization for project implementation under
Article 28
by going through a deliberation by the construction committee, even if it falls short of the requirement for consent under paragraph (1) on the ground that the land division has not been completed:
1.
The number of the owners of lands, etc. relating to the relevant land and structure shall be not more than 1/10 of the total;
2.
Structures on the land to be divided away shall not be located on a dividing line;
3.
Other matters necessary for an authorization for project implementation shall be compatible with the requirements prescribed by Presidential Decree.
법령보기 화면
Article 42 (Special Cases for Application of
Building Act, etc.)
(1)
Regulations concerning a purchase of the national housing bondsunder
Article 68 of the Housing Act
shall not be applicable when receiving a construction permission, and when making a registration of real estates (limited to the preservation registration or transfer registration of ownerships) pursuant to the residential environment improvement project.
<Amended by Act No. 6916, May 29, 2003>
(2)
Standards, etc. for the decision, structure and installation of theurban planning facilities under
Article 43 (2) of the National Land Planning and Utilization Act
within the residential environment improvement zone shall be under the conditions as separately stipulated by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
(3)
With regard to the matters falling under each of the following subparagraphs within the residential environment improvement zone, the project implementer may separately determine the standards thereforunder the conditions as stipulated by the City/
Do
municipal ordinances:
<Amended by Act No. 8974, Mar. 21, 2008>
1.
Relations between the sites and roads under
Article 44 of the Building Act
(limited to the cases where there is no impediment to fire-fighting activities);
2.
Limitations on the heights of structures under
Articles 60 and 61 of the Building Act
(limited to the cases where the project implementer constructs or provides the collective housing).
법령보기 화면
Article 43 (Application and Exclusion of other Acts and Subordinate Statutes)
(1)
A residential environment improvement zone shall, from the date of public announcement of the designation of the relevant rearrangement zone, be deemed to have been determined and publicly announced as an area prescribed by Presidential Decree, from among the areas determined by subdividing the residential area under
Article 36 (1) 1 (a) and (2) of the National Land Planning and Utilization Act
:
Provided
, That this shall not apply to a case falling under any of the following subparagraphs:
<Amended by Act No. 9444, Feb. 6, 2009>
1.
When the relevant rearrangement zone is a development-restricted zone determined under
Article 3 (1) of the Act on Special Measures for Designation and Management of Areas of Restricted Development
;
2.
When a rearrangement plan is formulated to maintain a previous specific use area in parts of the relevant rearrangement zone or change its location within the same area, as the head of
Si
/
Gun
deems it necessary to do so for a residential environment improvement project.
(2)
Provisions of
Articles 28
through
49 of the Urban Development Act
shall apply
mutatis mutandis
to the land substitution relating to a rearrangement project. In such cases, the term "when a disposition of land substitution is performed" in
Article 41
(2) of the same Act shall be read as "when an authorization for project implementation is granted."
<Amended by Act No. 8970, Mar. 21, 2008>
(3)
The provisions of
Article 78 (4) of the Act on the Acquisition of Land, etc. for Public Works and the Compensation Therefor
shall not apply to a residential environment improvement project.
<Added by Act No. 9444, Feb. 6, 2009>
법령보기 화면
Article 44 (Termination of Contracts, Such as Superficies, etc.)
(1)
When it becomes impossible to accomplish the purpose of establishing the superficies, right to lease on a deposit basis, or right to lease due to the implementation of rearrangement project, any holders of said rights may terminate the contracts.
(2)
Any right of claim on returning the key money for lease on deposit basis, deposit money, and other money for contracts, which are held by the person entitled to terminate the contract under paragraph (1), may be exercised against the project implementer.
(3)
Any project implementer who has paid the relevant money following an excercise of right to request a return under paragraph (2) may demand its reimbursement against the owners of relevant lands, etc.
(4)
When the demand for reimbursement under paragraph (3) has not been attained, the project implementer may seize the site or structuresto be reverted to the owners of relevant lands, etc. In this case, the seized rights shall hold the same effect as the mortgage.
(5)
Provisions of
Articles 280, 281 and 312 (2) of the Civil Act
, of
Article 4 (1) of the Housing Lease Protection Act
, and of
Article 9 (1) of the Commercial Building Lease Protection Act
shall not apply to contract periods of the contracts for establishing the superficies, right to lease on a deposit basis, or contracts for lease, when approval for the management and disposal plans is given under
Article 48
.
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 9444, Feb. 6, 2009>
법령보기 화면
Article 45 (Disposal of Structures, etc. Confirmation of Owners of which is Difficult)
(1)
Where it is remarkably difficult to confirm whereabouts of the owners of structures or lands as of the date of authorization (referring to the date of public announcement under
Article 8
(5), when the head of a
Si
/
Gun
directly implements a rearrangement project or the Housing Corporation, etc. is designated as a project implementer under
Article 8
(4); hereafter the same shall apply in this Article) for the establishment of a partnership under
Article 16
, the project implementer may make a public announcement twice or more on two or more daily newspapers with a nationwide distribution, and when not less than 30 days have passed from the date of such public announcement, he/she may deposit to the court an amount equivalent to the appraised values of the structures or lands for which a confirmation of whereabouts of such owners is remarkably difficult, and implement the rearrangement project.
<Amended by Act No. 9444, Feb. 6, 2009>
(2)
In implementing a housing reconstruction project, lands or structures which are jointly owned by the whole members of partnership as of the date of authorization for the establishment of a partnership, shall be deemed to be the lands or structures owned by the partnership.
(3)
Matters concerning the disposal of the lands or structures to be regarded as owned by a partnership under paragraph (2) shall be clarified in the management and disposal plans under
Article 48
(1).
(4)
Article 48
(5) 1 shall apply
mutatis mutandis
to the appraisal and assessment of the lands or structures under paragraph (1).
<Amended by Act No. 9729, May 27, 2009>
Section 5 Management and Disposal Plans, etc.
법령보기 화면
Article 46 (Public Notice of Parcelling-Out, and Application for ParcellingOut)
(1)
A project implementer shall notify, within 60 days from the date of public announcement (the date when a contract with a work executor is concluded, where a work executor is selected after authorization for a project implementation) of authorization for a project implementation under
Article 28
(4), the owners of lands, etc. of the summarized details of sharing amount, period for application for parcelling-out, and other matters prescribed by Presidential Decree, and shall publicly notify the matters prescribed by Presidential Decree, such as the details of sites or structures subject to parcelling-out, on daily newspapers published in the relevant area. In such cases, the period for application for parcelling-out shall be set for not less than 30 days but not more than 60 days from the date of such notification:
Provided
, That where it is deemed that there exists no impediment to the formulation of management and disposal plans under
Article 48
(1), a project implementer may extend the period for application for parcelling-out within the limit of 20 days.
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 8785, Dec. 21, 2007; Act No. 9444, Feb. 6, 2009>
(2)
Any owner of land, etc. who intends to receive a parcelling-out of the land or structures shall, within the period for application for parcelling-out under paragraph (1), file an application for parcelling out the land or structures with the project implementer under the methods and procedures prescribed by Presidential Decree.
법령보기 화면
Article 47 (Measures for Persons Failing to File Application for ParcellingOut, etc.)
When the owners of lands, etc. fall under one of the following subparagraphs, a project implementer shall make a settlement in cash for the lands, structures or other rights within 150 days from the date such owners of lands, etc. fall under the following, under the procedures prescribed by Presidential Decree:
1.
Persons who have failed to file an application for parcelling-out;
2.
Persons who have withdrawn an application for parcelling-out;
3.
Persons who have been excluded from those subject to a parcelling-out by the management and disposal plans authorized under Article 48.
법령보기 화면
Article 48 (Authorization, etc. for Management and Disposal Plans)
(1)
When the period for application for parcelling-out under
Article 46
has expired, a project implementer (excluding residential environment improvement projects) shall formulate a management and disposal plan containing matters falling under each of the following subparagraphs, on the basis of the current status of applications for parcelling-out under
Article 46
, and obtain an approval therefor from the head of a
Si
/
Gun
, and the same shall also apply where the head of a
Si
/
Gun
intends to amend, suspend or discontinue any management and disposal plans, and in such cases, the partnership shall notify, in writing, its members of the matters falling under subparagraphs 3 through 5 one month prior to the date on which a general meeting is to be held to decide matters under
Article 24
(3) 10:
Provided
, That when intending to alter minor matters prescribed by Presidential Decree, he/she shall report thereon to the head of a
Si
/
Gun
:
<Amended by Act No. 9444, Feb. 6, 2009; Act No. 9729, May 27, 2009>
1.
Design for parcelling-out;
2.
Addresses and names of persons subject to parcelling-out;
3.
Estimated amounts of the sites or structures scheduled for parcellingout by persons subject to parcelling-out;
4.
Specifications of the previous lands or structures by persons subject to parcelling-out, and prices (prices as of the date on which approval by the head of a
Si
/
Gun
has been given, in the case of structures demolished under
Article 48-2
(2) before authorization for the implementation of the project is granted) on the basis of the date of public announcement of authorization for project implementation;
5.
Estimated amounts (including matters concerning rebuilding charges under the Restitution of Excess Rebuilding Gains Act, in the case of a housing reconstruction project) of the rearrangement project costs, and the consequent scale and period of the amount to be shared by the partnership members;
6.
Specifications of rights other than the ownership to previous lands or structures of persons subject to parcelling-out;
7.
Specifications of rights for loss compensation by tenants, and the appraised amount thereof;
8.
Other matters prescribed by Presidential Decree for the rights, etc. relating to rearrangement projects.
(2)
Details of the management and disposal plans under paragraph (1) shall be governed by the standards falling under each of the following subparagraphs:
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 9444, Feb. 6, 2009; Act No. 9729, May 27, 2009>
1.
The sites or structures shall be allocated in a balanced manner to the applicants for parcelling-out and utilized rationally in a comprehensive consideration of the size, utilization status and environment of previous lands or structures and other matters;
2.
Where necessary for the unduly narrow or broad lands or structures, the sites or structures shall become a reasonable size after increasing or reducing the size thereof;
3.
Settlement may be performed in cash for persons who have acquired unduly narrow lands or structures or lands divided after the designation of a rearrangement zone;
4.
When deemed especially necessary to adjust the land size in order to prevent disasters or hygiene hazards, one may increase the unduly narrow land, make compensations in lieu of the land, or deliver the co-owning shares of a part of structures and the sites on which such structures are located;
5.
Plans for the design for parcelling-out shall be formulated on the basis of an expiration date of the period for application for parcelling-out under Article 46;
6.
When one household or one person owns one or more houses or lands, one house shall be supplied, and when two or more persons who do not belong to the same household jointly own one house or land, only one house shall be supplied:
Provided
, That a house may be supplied as prescribed by City/
Do
Municipal Ordinance, where two or more persons jointly own one land and City/
Do
Municipal Ordinance separately determines the supply of land, and the same number of houses owned may be provided to the owners of lands, etc. who fall under any of the following:
(a)
Owners of lands, etc. of a housing reconstruction project whose location is not within an over-concentration control region of the Seoul Metropolitan Area under
Article 6 (1) 1 of the Seoul Metropolitan Area Readjustment Planning Act
;
(b)
Owners of lands, etc. who own houses for the use as lodgings or dormitories for workers (including workers who are public officials);
(c)
The State, local governments and the Housing Corporation, etc.;
7.
Deleted. <by Act No. 7392, Mar. 18, 2005>
(3)
Where there exist any remaining portions after receiving the applications for parcelling-out under
Article 46
, a project implementer may set them as reserved lands (including structures) for purposes prescribed by the articles of association, etc. or project implementation plans, or parcel them out to persons other than the partnership members. In such cases, necessary matters such as a public notice of parcelling-out and procedures for applications for parcelling-out shall be prescribed by Presidential Decree.
(4)
The sites and structures created by the implementation of rearrangement projects shall be disposed of or managed according to the management and disposal plans.
(5)
In housing redevelopment projects or urban environment rearrangement projects, the property and rights under paragraph (1) 3, 4 and 7 shall be appraised by the following methods:
<Amended by Act No. 7335, Jan. 14, 2005; Act No. 9729, May 27, 2009>
1.
Obtaining the arithmetic mean of the amount appraised by two or more appraisal business operators selected and contracted by the head of a
Si
/
Gun
, from among appraisal business operators under the
Public Notice of Values and Appraisal of Real Estate Act
:
Provided
, That when intending to amend, suspend or discontinue a management and disposal plan, the estimated amounts of the sites or structures scheduled for parcelling-out and the price of the former land and structures may be computed by the unanimous consent of a project implementer and the owners of land, etc.;
2.
When compensation for losses is required due to a tenant of a partnership member in computing the prices of the former lands or structures held by the partnership members under paragraph (1) 4, the price less than the amount of compensation for the tenant of the relevant partnership member pursuant to the articles of association of the partnership may be computed as the prices of the former lands or structures;
3.
When a project implementer intends to conduct an appraisal under subparagraph 1, the project implementer shall request the head of a
Si
/
Gun
to select and conclude a contract with an appraisal business operator, and deposit, in advance, expenses to be incurred in the appraisal. The head of a
Si
/
Gun
shall directly pay the expenses incurred in the appraisal from the deposited amount and settle the remaining amount to the project implementer once the appraisal is completed.
(6)
Where a project implementer intends to receive an assessment by an appraisal business operator under the
Public Notice of Values and Appraisal of Real Estate Act
for the properties under paragraph (1) 3 and 4 in a housing reconstruction project, he/she may do so by applying
mutatis mutandis
the provisions of each subparagraph of paragraph (5).
<Amended by Act No. 7335, Jan. 14, 2005>
(7)
Matters necessary for the details of management and disposal plans and the method and standards for the management and disposal under paragraph (1) shall be prescribed by Presidential Decree.
(8)
Details of management and disposal plans under each subparagraph of paragraph (1) and paragraphs (2) through (7) shall apply
mutatis mutandis
to the management and disposal plans formulated directly by the head of a
Si
/
Gun
.
법령보기 화면
Article 48-2 (Removal of Structures)
(1)
A project implementer shall remove existing structures after receiving authorization for a management and disposal plan under
Article 48
(1).
(2)
When there exist concerns for negligent accidents, including collapse of existing structures, etc., under the related Acts and subordinate statutes, including the
Framework Act on the Management of Disasters and Safety
,
Housing Act
, and
Building Act
, notwithstanding the provisions of paragraph (1), the project implementer may remove the relevant structures after obtaining consent of owners of the existing structures and approval of the head of
Si
/
Gun
. In such cases, notwithstanding removal of the structures, rights and duties of owners of lands, etc. shall not be affected.
[This Article Added by Act No. 9444, Feb. 6, 2009]
법령보기 화면
Article 49 (Perusal of Management and Disposal Plans and Its Authorization Procedures)
(1)
A project implementer shall make a copy of the related documents available for a perusal by the owners of lands, etc. for not less than 30 days before applying for authorization for the management and disposal plans under
Article 48
, and hear the opinions thereof:
Provided
, That when the project implementer intends to alter minor matters prescribed by Presidential Decree under the proviso to
Article 48
(1), he/she may omit the procedures for perusal by the owners of lands, etc. and hearing the opinions.
<Amended by Act No. 9444, Feb. 6, 2009>
(2)
The head of a
Si
/
Gun
shall make a decision on whether or not granting an authorization within 30 days from the date on which a project implementer files an application for authorization for the management and disposal plans, and notify the project implementer thereof.
(3)
When the head of a
Si
/
Gun
grants an authorization for the management and disposal plans under paragraph (2), he/she shall publicly announce the details thereof on the official bulletin of relevant local government.
(4)
When a project implementer intends to offer a copy of the related documents for perusal, and a public announcement by the head of a
Si
/
Gun
is made under paragraph (1) or (3), he/she shall notify the owners of lands, etc., or a person who has applied for parcelling-out of the details of a plan about public perusal or authorization of the management and disposal plan by methods and procedures determined by Presidential Decree.
<Amended by Act No. 9444, Feb. 6, 2009>
(5)
Provisions of paragraphs (1), (3) and (4) shall apply
mutatis mutandis
to the cases where the head of a
Si
/
Gun
directly formulates the management and disposal plans.
(6)
When a public announcement under paragraph (3) has been made, a rightful claimant, such as the owner, person with superficies, person with a right to lease on deposit basis, and person with a right to lease, etc. for the previous lands or structures shall be forbidden from exercising them on the previous lands or structures or making a profit on such lands or structures until the public announcement of transfer under
Article 54
:
Provided
, That the same shall not apply where the consent of a project implementer has been obtained, or to a rightful claimant to whom compensation for losses under
Article 40
and under the
Act on the Acquisition of Land, etc. for Public Works and the Compensation therefor
is not completed.
<Amended by Act No. 9729, May 27, 2009>
법령보기 화면
Article 50 (Supply, etc. of Housing)
(1)
A project implementer shall supply the structures built by the implementation of a rearrangement project (excluding residential environment improvement projects) to the owners of lands, etc. under the management and disposal plans authorized under
Article 48
.
(2)
Where a project implementer builds houses within a rearrangement zone, he/she may, notwithstanding
Article 38 of the Housing Act
, and within the scope prescribed by Presidential Decree, separately determine the conditions, methods, procedures for recruitment of moving-in persons, and the methods of payment, period, procedures for the payments for a housing unit (referring to the down payment, part payment and balance), and the methods and procedures for housing supply, etc. after obtaining approval from the head of a
Si
/
Gun
.
<Amended by Act No. 6916, May 29, 2003>
(3)
The Minister of Land, Transport and Maritime Affairs, the Mayor/
Do
Governor, the head of a
Si
/
Gun
, or the Housing Corporation, etc. shall, upon a request from a partnership, acquire rental housing constructed as a result of a housing redevelopment project. In such cases, the procedures, methods, prices, etc. of the acquisition of redeveloped rental housing shall be prescribed by Presidential Decree.
<Added by Act No. 9047, Mar. 28, 2008; Act No. 9729, May 27, 2009>
(4)
Where a rental housing is built by the implementation of a rearrangement project, a project implementer may, notwithstanding
Articles 20
and
21 of the Rental Housing Act
, and within the scope prescribed by Presidential Decree, separately determine the standards for rental conditions such as the qualification for and selection method of tenants, rental key money, rental charges, etc., and the standards for preferential sale to the houseless head of a family, by obtaining approval from the head of a
Si
/
Gun
:
Provided
, That in the case of redeveloped rental housing and where it is not the first selection of tenants, an acquirer shall separately determine such standards, within the scope prescribed by Presidential Decree.
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 8966, Mar. 21, 2008; Act No. 9047, Mar. 28, 2008; Act No. 9632, Apr. 22, 2009>
(5)
A project implementer may supply the residuary housing subsequent to the housing supply to the persons subject to supplies under paragraphs (1) through (4) to those other than the persons subject to supplies under paragraphs (1) through (3). In such cases, Article 38 of the
Housing Act
shall apply
mutatis mutandis
to the methods and procedures, etc. for housing supply:
Provided
, That when a project implementer has received favorable judgment in the complaint seeking for sales under
Article 39
, and then has deposited liquidation money and has taken buildings to be parcelled out as security so as not to cause damage to persons scheduled for moving-in, he/she may recruit moving-in persons, notwithstanding
Article 38 of the Housing Act
even before the favorable judgment is confirmed, but he/she shall secure the ownership of land on which the relevant buildings are to be built, before applying for authorization of completion under
Article 52
.
<Amended by Act No. 6916, May 29, 2003; Act No. 9047, Mar. 28, 2008; Act No. 9444, Feb. 6, 2009>
(6)
A project implementer shall be governed by
Article 48
(2) 6 when he/she supplies housing under paragraph (2).
<Amended by Act No. 7392, Mar. 18, 2005>
(7)
The Minister of Land, Transport and Maritime Affairs, the Mayor/
Do
Governor, the head of a
Si
/
Gun
, or the Housing Corporation, etc. shall, if requested by a tenant or person who owns land or a house not exceeding the area prescribed by Presidential Decree in a rearrangement zone, convert part of rental housing acquired pursuant to paragraph (3) into land-leasehold housing units under the Act on Special Measures for Facilitating the Supply of Land-Leasehold Housing Units and supply them to such a tenant or person.
<Added by Act No. 9729, May 27, 2009>
법령보기 화면
Article 50-2 (Reference Date of Evaluation of Rights to Purchase Structures, Including Houses)
(1)
When structures, including houses, are supplied in accordance with a rearrangement project, the right to purchase lands or structures shall be evaluated on the basis of a reference date, in cases falling under any of the following subparagraphs from a day after a date on which public announcement is made under
Article 4
(4), or after a date (hereafter referred to as "reference date" in this Article) separately determined by the Mayor/
Do
Governor before designation and public announcement of a rearrangement zone after formulating a basic plan so as to curb any speculative transaction:
1.
When one piece of land is divided into several pieces of land;
2.
When a detached house or a multi-family house is converted to a multi-household house;
3.
When lands and structures, including houses, of the same person within the bounds of one building site are owned after lands and structures, including houses, are separated, respectively;
4.
When the number of owners of lands, etc. increases, as new buildings are built on lots, or multi-household houses or other apartment houses are built after existing structures are removed.
(2)
The Mayor/
Do
Governor shall publicly announce a reference date, a cause for designation, and standards, etc. for evaluation of the right to purchase structures on the official bulletin of the relevant local government, in cases where the reference date is separately determined under paragraph (1).
[This Article Added by Act No. 9444, Feb. 6, 2009]
법령보기 화면
Article 51 (Work Execution Guarantee)
(1)
Where any partnership has selected a person other than the head of a
Si
/
Gun
, the Housing Corporation, etc. as a work executor for the implementation of a rearrangement project (including a case where project implementers jointly execute under
Article 8
(1) or (3)), such work executor shall submit a written work execution guarantee issued by an agency stipulated by Ordinance of the Minister of Land, Transport and Maritime Affairs to the partnership in order to guarantee the execution of contracted works (referring to what the guarantee agency shall guarantee, in lieu of the work executer, to take charge of a liability for contract performance or to pay amounts determined by the project implementer within the scope of not more than 50/100 of the total costs of construction and not less than the proportion determined by Presidential Decree, in cases where the said executer is incapable of performing the liability for the contracted works or fails to perform such liability).
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 8852, Feb. 29, 2008; Act No. 9444, Feb. 6, 2009>
(2)
Where the head of a
Si
/
Gun
receives a report on the commencement of execution of works under
Article 21 of the Building Act
, he/she shall confirm as to whether the written work execution guarantee under paragraph (1) is submitted.
<Amended by Act No. 8974, Mar. 21, 2008>
Section 6 Measures Following Work Completion
법령보기 화면
Article 52 (Authorization for Work Completion of Rearrangement Projects)
(1)
When a project implementer other than the head of a
Si
/
Gun
has completed the works relating to a rearrangement project, he/she shall obtain an authorization for work completion from the head of a
Si
/
Gun
under the methods and procedures as prescribed by Presidential Decree.
(2)
The head of a
Si
/
Gun
in receipt of an application for authorization for work completion under paragraph (1) shall promptly perform the work completion inspection. In this case, the head of a
Si
/
Gun
may, if deemed necessary for an efficient work completion inspection, entrust the related administrative agency, Government-invested institution, research institution, and other specialized agency or organization with a performance of work completion inspection.
(3)
When the head of a
Si
/
Gun
deems that the rearrangement project has been completed in pursuance of the project implementation plans subjected to an authorization as a result of performance of the work completion inspection under the former part or the latter part of paragraph (2), he/she shall grant an authorization for work completion, and make public notice of work completion on the official bulletin of relevant local government.
(4)
When the works relating to a rearrangement project which are directly implemented by the head of a
Si
/
Gun
has been completed, he/she shall make a public notice of work completion on the official bulletin of relevant local government.
(5)
Where the completed structures satisfy the standards as prescribed by Presidential Decree even if it is before the head of a
Si
/
Gun
grants an authorization for work completion under paragraph (1), he/she may permit the project implementer to let the persons scheduled for moving-in use the completed structures:
Provided
, That where the head of a
Si
/
Gun
himself is the project implementer, he/she may let the persons scheduled for movingin use the completed structures without obtaining any permission.
(6)
Procedures and methods for a public announcement of work completion under paragraphs (3) and (4) and other necessary matters shall be prescribed by Presidential Decree.
법령보기 화면
Article 53 (Legal Fiction of Related Authorization or Permission Following Work Completion)
(1)
In granting an authorization for work completion or making a public announcement of work completion under
Article 52
(1) through (4), with regard to the matters for which the head of a
Si
/
Gun
has held a consultation with the head of related administrative agency under paragraph (3) on the work completion inspection, authorization for work completion, use inspection, use approval, etc. following the authorization or permission, etc., which are legally fictionalized under
Article 32
(hereinafter referred to as "inspection or authorization, etc. for work completion"), they shall be deemed to have been granted the relevant inspection or authorization, etc. for work completion.
(2)
Where any project implementer who is not the head of a
Si
/
Gun
intends to obtain a legal fiction of the inspection or authorization, etc. for work completion under paragraph (1), he/she shall concurrently submit the documents as stipulated by the related Acts at the time of filing an application for the work completion authorization under
Article 52
(1).
(3)
In granting an authorization for work completion or making a public announcement of work completion under
Article 52
(1) through (4) by the head of a
Si
/
Gun
, when there have existed in the contents thereof any matters falling under the inspection or authorization, etc. for work completion following the authorization and permission, etc., which are legally fictionalized under
Article 32,
he/she shall hold in advance a consultation with the head of related administrative agency.
(4)
Provisions of
Article 32
(5) shall apply
mutatis mutandis
to a legal fiction of the inspection or authorization, etc. for work completion under paragraph (1).
법령보기 화면
Article 54 (Public Announcement, etc. of Transfer)
(1)
When there has existed a public announcement under
Article 52
(3) and (4), a project implementer shall promptly take a site-fixing survey, and notify a person subject to parcelling-out of the matters set in the management and disposal plans by going through procedures for dividing lands, and transfer the ownership of the sites or structures:
Provided
, That where it is necessary for an efficient promotion of the rearrangement project, the said implementer may transfer the ownership thereof by site or structure to the person subject to a parcelling-out, by obtaining an authorization for work completion for the completed portions before the works for relevant rearrangement project are entirely completed.
(2)
When a project implementer intends to transfer the ownership of sites and structures under paragraph (1), he/she shall make a public announcement of details thereof on the official bulletin of the relevant local government, and thereafter file a report thereon with the head of a
Si
/
Gun
. In such cases, a person who is subject to parcelling-out of the site or structures, shall acquire the ownership of the site or structures on a day after a date on which such public announcement is made.
<Amended by Act No. 9444, Feb. 6, 2009>
법령보기 화면
Article 55 (Confirmation of Rights to Sites and Structures)
(1)
Where the ownership has been transferred under
Article 54
(2) to a person subject to parcelling-out of the sites or structures, the registered rights, such as the superficies, right to lease on a deposit basis, mortgage, right to lease, provisionally registered security right, provisional seizure, etc., and the right to lease satisfying the requirements under
Article 3 (1) of the Housing Lease Protection Act
, which have been established on the previous lands or structures, shall be deemed to have been established on the sites or structures whose ownerships have been transferred.
(2)
Sites or structures to be parcelled-out to the owners of lands, etc. from among the sites or structures to be acquired under paragraph (1), shall be deemed to be the land substitution performed under
Article 40 of the Urban Development Act
, and the reserved land under
Article 48
(3) and the sites or structures to be parcelled-out to the general public shall be deemed to be the reserve land or the development recompense land under
Article 34 of the Urban Development Act
.
<Amended by Act No. 8970, Mar. 21, 2008>
법령보기 화면
Article 56 (Registration Procedures and Limitations on Alterations in Rights)
(1)
When there exists a public announcement of transfer under
Article 54
(2), the project implementer shall promptly entrust or apply for the registration of the sites and structures to a branch court of the district court or a registry.
(2)
Matters necessary for the registration under paragraph (1) shall be prescribed by the Supreme Court Regulations.
(3)
Other registrations such as a mortgage, etc. shall be prohibited from being made from the day of a public announcement of transfer under
Article 54
(2) to the time of registration under paragraph (1), with regard to the rearrangement project.
법령보기 화면
Article 57 (Settlement Money, etc.)
(1)
When there exist any differences between the prices of the lands or structures previously owned by a person subjected to a parceling-out of the site or structure and the prices of the parceled-out sites or structures, the project implementer shall collect the amount equivalent to said differences (hereinafter referred to as "settlement money") from, or pay such an amount to, the person subjected to a parcelling-out, subsequent to a public announcement of transfer under
Article 54
(2):
Provided
, That where any installed collection and installed payment are stipulated in the articles of association, etc. or separately stipulated by going through a resolution by the general meeting, an installment collection or installment payment may be performed by a specific period from after an authorization for the management and disposal plans to the date of public announcement of transfer under
Article 54
(2).
(2)
In applying the provisions of paragraph (1), the prices of previously-owned lands or structures and those of the parcelled-out sites or structures shall be assessed by taking account of the scale, location, usage, utilization status, rearrangement project costs, etc. of the relelvant lands or structures.
(3)
Matters necessary for the method and procedure for a price assessment under paragraph (2) shall be prescribed by Presidential Decree.
법령보기 화면
Article 58 (Collection Method, etc. for Settlement Money)
(1)
Where a person liable to pay the settlement money fails to pay it, the project implementer who is the head of a
Si
/
Gun
may collect it by referring to the practices of dispositions on default of local taxes (including an installed collection; hereafter in this Article the same shall apply), and the project implementer who is not the head of a
Si
/
Gun
may entrust the head of a
Si
/
Gun
with the collection of settlement money. In this case, the provisions of
Article 61
(5) shall apply
mutatis mutandis
.
<Amended by Act No. 9444, Feb. 6, 2009>
(2)
When a person entitled to receive the settlement money under
Article 57
(1) has been unable to receive it or refused to do so, the project implementer may deposit such settlement money.
(3)
Any right to receive the settlement money (including an installed payment) or to collect it shall be extinguished if it is not exercised for five years from the day next to that of a public announcement of transfer under
Article 54
(2).
법령보기 화면
Article 59 (Subrogation of Mortgages)
Any rightful claimant who has established the mortgage on the lands or structures located within the area wherein a rearrangement project is performed, may exercise the mortgage against the settlement money to be paid to the owner of the lands or structures on which a mortgage has been established, by going through the seizure procedure before the settlement money is paid.
CHAPTER IV BEARING, ETC. OF COSTS
법령보기 화면
Article 60 (Principles of Bearing Costs)
(1)
Except as specially stipulated in this Act or other Acts, the rearrangement project costs shall be borne by the project implementer.
(2)
With regard to the principal rearrangement basis facilities and the temporary admittance facilities under
Article 36
(hereinafter referred toas "temporary admittance facilities") as prescribed by Presidential Decree from among the urban planning facilities to be installed under the rearrangement plans for rearrangement projects performed by a project implementer who is not the head of
Si
/
Gun
, the head of
Si
/
Gun
may bear all or part of the costs required for such constructions.
<Amended by Act No. 7392, Mar. 18, 2005>
법령보기 화면
Article 61 (Raising Money for Costs)
(1)
A project implementer may impose on and collect from the owners of lands, etc. as the imposition money, the differences between the costs under
Article 60
(1) and the profits accrued in the process of performing rearrangement project.
(2)
A project implementer may impose and collect the arrearages when the owners of lands, etc. have neglected payment of the imposition money under paragraph (1).
(3)
Matters necessary for the imposition and collection of the imposition money and arrearages under paragraphs (1) and (2) shall be stipulated by the articles of association, etc.
(4)
When there exist any persons who are delinquent in paying the imposition money or arrearages, the project implementer who is not the head of a
Si
/
Gun
may entrust the head of a
Si
/
Gun
with the said imposition and collection.
(5)
Where the head of a
Si
/
Gun
has been entrusted with the imposition and collection under paragraph (4), he/she may impose and collect them by referring to the practices of dispositions on default of local taxes. In this case, the project implementer shall deliver the amount equivalent to 4/100 of the collected amounts to the head of relevant
Si
/
Gun
.
법령보기 화면
Article 62 (Bearing of Costs by Manager of Rearrangement Basis Facilities)
(1)
Where there exists any manager of the rearrangement basis facilities benefitted remarkably from a rearrangement project implemented by the head of a
Si
/
Gun
, he/she may let the said manager bear a part of costs for relevant rearrangement project under the method and procedure as prescribed by Presidential Decree, by holding a consultation with the said manager.
(2)
Where a project implementer installs the utility tunnel for installing the supply facilities of electricity, gas, etc. in an area on which a rearrangement project is performed, he/she may let the person liable to install the facilities to be admitted into said utility tunnel under other Acts and subordinate statutes bear the costs required for installing the utility tunnel.
(3)
Necessary matters for the ratio of bearing costs under paragraph (2), method of its bearing and management of the utility tunnel, shall be stipulated by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 63 (Subsidy and Loan)
(1)
The State or City/
Do
may subsidize or loan part of the expenses incurred in the construction of rearrangement basis facilities and facilities for temporary admittance prescribed by Presidential Decree, which are required for a basic survey for a rearrangement project implemented by the head of a
Si
/
Gun
or the Housing Corporation, etc. and the implementation of a rearrangement project.
<Amended by Act No. 7392, Mar. 18, 2005>
(2)
Where rearrangement basis facilities and facilities for temporary admittance under paragraph (1) are constructed in relation to a residential environment improvement project for which the project implementer is the Housing Corporation, etc., the head of a
Si
/
Gun
shall subsidize all or part of the expenses to be incurred in construction to the Housing Corporation, etc.
<Amended by Act No. 7392, Mar. 18, 2005>
(3)
The State or local governments may subsidize, loan, or arrange for a loan part of the expenses to be incurred in a rearrangement project implemented by the project implementer who is not the head of a
Si
/
Gun
.
(4)
Where the State or a local government subsidizes or loans the expenses to be incurred in a rearrangement project under paragraphs (1) and (2), it may give preferential support to a rearrangement project with circulative rearrangement mode referred to in
Article 35
(1). In such cases, the State or a local government may subsidize or loan part of the construction cost of the circulative housing under
Article 35
(2) and the vacant housing management expenses in order to smoothly implement the rearrangement project with circulative rearrangement mode.
<Added by Act No. 8125, Dec. 28, 2006>
(5)
The State or a local government may subsidize or loan all or part of the expenses under the following subparagraphs to a local government or the Housing Corporation, etc.:
<Added by Act No. 9729, May 27, 2009>
1.
When public rental housing held by the Housing Corporation, etc. is provided to a partnership as circulative housing under
Article 35
(2): The construction costs thereof and expenses such as vacant housing management expenses, etc.;
2.
When the Minister of Land, Transport and Maritime Affairs, the Mayor/
Do
Governor, the head of a
Si
/
Gun
, or the Housing Corporation, etc. acquires redeveloped rental housing under
Article 50
(3): The acquisition costs thereof.
(6)
The State or a local government may subsidize or loan, to a person who is supplied with a land-leasehold housing unit pursuant to
Article 50
(7), all or part of the relevant expenses incurred therein.
<Added by Act No. 9729, May 27, 2009>
법령보기 화면
Article 64 (Installation, etc. of Rearrangement Basis Facilities)
(1)
A project implementer shall install rearrangement basis facilities within a rearrangement zone by going through a consultation with the head of the competent local government.
(2)
Any person whose lands or structures have been expropriated for the installation of rearrangement basis facilities under paragraph (1) may make a purchase request for the sites or structures to be subject to a sale, which are the sites or structures located within the relevant rearrangement zone, in preference to other persons, notwithstanding
Article 50
(5). In such cases, when the relevant sites or structures are owned by the State or a local government, they may be sold under a free contract, notwithstanding a plan for the administration of State or public property under
Article 9 of the State Property Act
or
Article 77 of the Local Finance Act
, and contract methods under
Article 43 of the State Property Act
or
Article 61 of the Local Finance Act
.
<Amended by Act No. 9401, Jan. 30, 2009; Act No. 9444, Feb. 6, 2009>
(3)
When the Mayor/
Do
Governor or the head of a big city designates a rearrangement zone under
Article 4
, if it is necessary for the installation of an access road into such zone, he/she may designate a rearrangement zone including the area of access road and its surrounding areas.
<Amended by Act No. 9047, Mar. 28, 2008>
(4)
Matters necessary for the method of fixing a purchase price, its payment period, and payment method, etc. under paragraph (2) shall be prescribed by Presidential Decree.
법령보기 화면
Article 65 (Reversion of Rearrangement Basis Facilities and Lands, etc.)
(1)
Where the head of a
Si
/
Gun
or the Housing Corporation, etc. has newly installed rearrangement basis facilities due to the implementation of a rearrangement project, or installed the rearrangement basis facilities replacing the existing ones, the previous rearrangement basis facilities shall revert free of charge to the project implementer, and the newly-installed rearrangement basis facilities shall revert free of charge to the State or local government to manage them, notwithstanding the provisions of the
State Property Act
or the
Local Finance Act
.
(2)
Rearrangement basis facilities newly installed by a project implementer who is not the head of a
Si
/
Gun
or the Housing Corporation, etc. due to an implementation of the rearrangement project, shall revert free of charge to the State or local government to manage them, and the rearrangement basis facilities owned by the State or local government which fall into disuse due to an implementation of the rearrangement project shall transfer free of charge to the project implementer within the extent equivalent to the costs for installing the rearrangement basis facilities newly installed by him.
(3)
Where the head of a
Si
/
Gun
intends to implement a rearrangement project including matters of reversion and transfer of rearrangement basis facilities under paragraphs (1) and (2), or to authorize its implementation, he/she shall hear in advance the opinions of their managing authorities. The same shall also apply to the cases of modifying the authorized matters.
(4)
A project implementer shall notify the managing authority of the types and particulars of the rearrangement basis facilities to be reverted to the managing authority and the properties to be reverted or transferred to the project implementer under paragraphs (1) and (2), prior to the completion of rearrangement project, and the relevant rearrangement basis facilities shall be deemed to have been reverted to the State or local government, or reverted or transferred to the project implementer, when an authorization for work completion was granted to the relevant rearrangement project and such authorization has been notified to the management office.
(5)
In making a registration of the rearrangement basis facilities under paragraph (4), a written authorization for implementation and that for work completion of the rearrangement project (referring to a public announcement of authorization for project implementation under
Article 28
(4) and a public announcement of work completion under
Article 52
(4), in cases where the head of a
Si
/
Gun
directly implements a rearrangement project) shall substitute for the documents attesting the causes of registration under the
Registration of Real Estate Act
.
<Amended by Act No. 8785, Dec. 21, 2007>
법령보기 화면
Article 66 (Disposal, etc. of State or Public Properties)
(1)
When any details of disposal of the State or public property are contained in a project implementation plan which the head of a
Si
/
Gun
intends to authorize under
Articles 28
and
30
or a written project implementation plan which the head of a
Si
/
Gun
directly prepares, the head of a
Si
/
Gun
shall hold in advance consultation with the managing authority. In such cases, the Minister of Land, Transport and Maritime Affairs shall be deemed to be the managing authority for the roads, rivers, ditches, etc. from among the property whose managing authorities are obscure, and the Minister of Strategy and Finance shall be deemed to be the said authority for any other property.
<Amended by Act No. 8852, Feb. 29, 2008>
(2)
The managing authority subjected to a consultation under paragraph (1) shall present its opinions within 20 days therefrom.
(3)
The State or public property within a rearrangement zone shall not be sold or transferred for any other purposes than a rearrangement project.
(4)
Notwithstanding the State property management plans or public property management plans under
Article 9 of the State Property Act
or
Article 77 of the Local Finance Act
, and the contract method under
Article 43 of the State Property Act
or
Article 61 of the Local Finance Act
, the State or public property within a rearrangement zone may be sold or leased under a free contract to the project implementer, or occupants and users in preference to other persons.
<Amended by Act No. 9401, Jan. 30, 2009>
(5)
Notwithstanding the
State Property Act
, the
Local Finance Act
and other Acts and subordinate statutes stipulating the management and disposal of the State or public lands, the previous usage of the State or public properties, which may be sold or leased in preference to other persons under paragraph (4), shall be deemed to fall into disuse from the date of a public announcement of the authorization for project implementation.
(6)
An assessment of the State or public lands to be preferentially sold for the purpose of rearrangement projects under paragraph (4) shall be performed on the basis of the date of public announcement of an authorization for the project implementation, and the purchase prices in the case of a residential environment improvement project shall be 80/100 of said assessment values:
Provided
, That the State or public lands the sales and purchase agreement of which has not been concluded within three years from the date of public announcement of an authorization for the project implementation shall be governed by the
State Property Act
or the
Local Finance Act
.
법령보기 화면
Article 67 (Lease of State or Public Properties)
(1)
Where a local government or the Housing Corporation, etc. builds a rental housing (referring to the rental housing under subparagraph 1 of
Article 2 of the Rental Housing Act
; hereinafter the same shall apply) in a residential environment improvement zone or housing redevelopment zone, they may lease the State or public lands during the period fixed through consultation with the State or public land managing authorities, notwithstanding the provisions of
Article 46 (1) of the State Property Act
or
Article 83 of the Local Finance Act
.
<Amended by Act No. 9401, Jan. 30, 2009>
(2)
The head of a
Si
/
Gun
may let the collective housing and other permanent structures be built on the State or public lands leased under paragraph (1), notwithstanding the provisions of
Article 47 of the State Property Act
or
Article 83 of the Local Finance Act
. In such cases, when the lease period for relevant structures expires, he/she shall donate the said lands, or return them by restoring to their original state, to the managing authority of the leased State or public lands, or purchase them from the managing authority of the State or public lands.
<Amended by Act No. 9401, Jan. 30, 2009>
(3)
Rental fees for the State or public lands leased under paragraph (1) shall be governed by the provisions of the
State Property Act
or the
Local Finance Act
.
법령보기 화면
Article 68 (Vicarious Transfer of State or Public Lands)
(1)
Previous usages of the lands owned by the State or local governments in the residential environment improvement zone shall be deemed to fall into disuse from the date of public announcement of the authorization for project implementation under
Article 28
(4), and they shall be free of charge transferred to relevant project implementer, notwithstanding the
State Property Act
, the
Local Finance Act
and other Acts and subordinate statutes stipulating the management and disposal of the State or public lands:
Provided
, That the same shall not apply to administrative property under
Article 6 (2) of the State Property Act
or administrative property or reserved property under
Article 72 (2) of the Local Finance Act
, and the lands for which the State or local government concluded a transfer contract and has received a part of their prices as of the date of public announcement of a designation of the rearrangement zone.
<Amended by Act No. 8785, Dec. 21, 2007; Act No. 9401, Jan. 30, 2009>
(2)
The lands owned by the State or local governments within a residential environment improvement zone shall not be transferred or sold for any other purposes than a rearrangement project from the date of public announcement of the designation of the rearrangement zone under
Article 4
(5).
<Amended by Act No. 9444, Feb. 6, 2009>
(3)
The earnings from use, or gains from disposal, of the lands transferred free of charge under paragraph (1) shall not be disbursed for other usages than the residential environment improvement project.
(4)
The head of a
Si
/
Gun
shall hold consultation with the State or a local government which owns or manages the State or public lands to be subject to the vicarious transfer under paragraph (1).
(5)
Matters necessary for the management and disposal of lands transferred to a project implementer shall be stipulated by the relevant City/
Do
Municipal Ordinances or the enforcement regulations of the Housing Corporation, etc. with the approval of the Minister of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
CHAPTER V SPECIALIZED MANAGEMENT BUSINESS OF REARRANGEMENT PROJECTS
법령보기 화면
Article 69 (Registration of Specialized Management Business of Rearrangement Projects)
(1)
Any person who intends to be entrusted by a promotion committee or a project implementer with the matters falling under each of the following subparagraphs required for the implementation of rearrangement projects, or to provide advice relating thereto, shall register or make a modified registration (excluding the alteration of minor matters prescribed by Presidential Decree) with the Mayor/
Do
Governor upon meeting the standards for capital, technological manpower, etc. prescribed by Presidential Decree:
Provided
, That the same shall not apply to the case of an institution prescribed by Presidential Decree, such as government-invested institutions, etc. running business relating to rearrangement projects such as the construction or appraisal and assessment of housing:
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 8125, Dec. 28, 2006; Act No. 9444, Feb. 6, 2009; Act No. 10268, Apr. 15, 2010>
1.
Vicarious execution concerning the consents to partnership establishment and to rearrangement projects;
2.
Vicarious execution concerning the business to apply for an authorization for a partnership establishment;
3.
Examination of the business feasibility and preparation of a written implementation plan for a rearrangement project;
4.
Supports concerning the business to select a designer and work executor;
5.
Vicarious execution concerning the business to apply for an authorization for project implementation;
6.
Vicarious execution concerning the business of formulating management and disposal plans;
7.
Affairs under the following which are required for the establishment of a promotion committee where the head of a
Si
/
Gun
has selected a specialized manager of a rearrangement project under
Article 77-4
(2) 2:
(a)
Demand for a written consent;
(b)
Support for the preparation of operational regulations;
(c)
Other matters stipulated by Municipal Ordinance;
8.
Deleted. <by Act No. 9444, Feb. 6, 2009>
(2)
Matters necessary for the procedures and method for a registration under paragraph (1), the registration fees, etc. shall be prescribed by Presidential Decree.
(3)
The Mayor/
Do
Governor shall report to the Minister of Land, Transport and Maritime Affairs on the present status of the registration or modified registration of the specialized management business of rearrangement projects, and on the present status of the cancellations of registration or that of the orders given to suspend business pursuant to the provisions of paragraph (1) and
Article 73
(1) under the method and procedures prescribed by the Minister of Land, Transport and Maritime Affairs.
<Added by Act No. 8125, Dec. 28, 2006; Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 70 (Limitations on Business Affairs of Specialized Managers of Rearrangement Projects)
No specialized manager of a rearrangement project shall perform any of the following affairs in parallel with the identical rearrangement project:
1.
Removal of the structures;
2.
Design for the rearrangement projects;
3.
Work execution for the rearrangement projects;
4.
Auditing for the rearrangement projects;
5.
Other affairs prescribed by Presidential Decree by deeming that it is necessary for maintaining the fair order in the rearrangement projects.
법령보기 화면
Article 71 (Relations between Specialized Managers of Rearrangement Projects and Trusters)
Except as provided for in this Act, the provisions concerning an entrustment as referred to in the
Civil Act
shall apply
mutatis mutandis
to the relations between the specialized managers of rearrangement projects and the persons who have entrusted the business with, or requested the advice from such managers.
법령보기 화면
Article 72 (Grounds for Disqualification of Specialized Managers of Rearrangement Projects)
(1)
No person falling under any of the following subparagraphs may apply for registration of a specialized management business of rearrangement projects or become an executive or employee representing or assisting the business of the specialized manager of rearrangement projects:
<Amended by Act No. 7428, Mar. 31, 2005; Act No. 8125, Dec. 28, 2006; Act No. 9444, Feb. 6, 2009>
1.
A minor (limited to the case where he/she becomes a representative or an executive), incompetent or quasi-incompetent person;
2.
A person who was declared bankrupt and has not been reinstated yet;
3.
A person for whom two years have not elapsed from the day on which his/her sentence execution has been terminated (including the case where it is deemed to have been terminated) or has been exempted, after he/she was sentenced to an imprisonment without prison labor or heavier punishment due to criminal acts related to the implementation of a rearrangement project;
4.
A person who was sentenced to the suspension of an execution of imprisonment without prison labor or heavier punishment due to criminal acts related to the implementation of a rearrangement project, and is under the said suspension;
5.
A person who was sentenced to a fine or heavier punishment due to a violation of this Act, and for whom two years have not elapsed;
6.
A person (referring to a representative in the case of a corporation) for whom two years have not elapsed after the registration was revoked under
Article 73
;
7.
A corporation in which the executives or employees representing or assisting the business of the corporation fall under one of subparagraphs 1 through 6.
(2)
When the executives or employees representing or assisting the business of the specialized managers of a rearrangement project fall under any subparagraph of paragraph (1) or have been found that they corresponded thereto at the time of appointment, they shall deservedly retire.
(3)
Any acts participated by executives and employees who have retired under paragraph (2), before their retirement, shall not lose their validity.
법령보기 화면
Article 73 (Cancellation of Registration, etc. of Specialized Managers of Rearrangement Projects)
(1)
When a specialized manager of rearrangement projects falls under any of the following subparagraphs, the Mayor/
Do
Governor may cancel registration thereof, or order to suspend all or part of business for a fixed period not exceeding one year:
Provided
, That when he/she falls under subparagraphs 1, 6 and 7, the Mayor/
Do
Governor shall cancel registration thereof:
<Amended by Act No. 8125, Dec. 28, 2006; Act No. 9444, Feb. 6, 2009; Act No. 10268, Apr. 15, 2010>
1.
When he/she has registered by deceit or other illegal means;
2.
When he/she has ceased to meet the standards for registration under
Article 69
(1);
2-2. When he/she has performed affairs prescribed under the subparagraphs of
Article 69
(1) without entrustment from a promotion committee, project implementer or the head of a
Si
/
Gun
, or without entering into a contract for consultation;
3.
When he/she has caused by intent or negligence any loss on the property of a partnership equivalent to not less than 1/3 of the contract amount (referring to the gross amount of a contract concluded by the specialized managers of rearrangement projects with the partnership);
4.
When he/she has failed to submit a report or data under
Article 74
or submitted a false report or data, or he/she has refused, obstructed or evaded any investigation or inspection;
5.
When he/she has failed to submit a report or data under
Article 75
or submitted a false report or data, or he/she has refused, obstructed or evaded any investigation;
6.
When he/she has been subject to dispositions of business suspension at least twice during the latest three years, whose aggregate period of such disposition of suspension exceeded 12 months;
7.
When he/she has had other persons perform the business stipulated by this Act by using his/her name or business title, or leased his/her certificate of registration;
8.
When he/she has been sentenced to a fine or heavier punishment, in violation of this Act (including executives or employees in the case of a corporation);
9.
When he/she has violated this Act, or any orders or dispositions under this Act.
(2)
The standards for cancellation of registration and disposition of business suspension under paragraph (1) shall be prescribed by Presidential Decree.
(3)
The specialized manager of a rearrangement project shall promptly notify the project implementer of relevant details where he/she has received a disposition of registration cancelation under paragraph (1).
<Added by Act No. 7392, Mar. 18, 2005>
(4)
The specialized manager of a rearrangement project may continuously perform business whose contract has been concluded before his/her registration is cancelled under paragraph (1). In such cases, the specialized manager of a rearrangement project shall be deemed the specialized manager of a rearrangement project until relevant business is completed.
<Added by Act No. 7392, Mar. 18, 2005>
(5)
The specialized manager of rearrangement project may not continuously perform business where he/she falls under any of the following subparagraphs, notwithstanding the former part of paragraph (4):
<Added by Act No. 7392, Mar. 18, 2005>
1.
Where the project implementer has received the notice under paragraph (3) or has terminated the relevant contract within three days from the date of knowing the fact of disposition by going through a resolution of the general meeting or the representatives' meeting;
2.
Where the specialized managers of rearrangement projects have failed to receive the consent of continuous execution of business from the project implementer within three months from the date of being subject to a disposition of registration cancellation. In this case, when the project implementer intends to make a consent, he/she shall go through a resolution of the general meeting or the representatives' meeting;
3.
Where the registration has been canceled under the proviso to paragraph (1).
법령보기 화면
Article 74 (Investigation, etc. on Specialized Managers of Rearrangement Projects)
(1)
When deemed necessary for the supervision over business, the Minister of Land, Transport and Maritime Affairs or the Mayor/
Do
Governor may order the specialized managers of rearrangement projects to report their business or to submit data, issue other necessary orders, or have the public officials under his/her control enter the business places, etc. to examine or inspect the books, documents, etc.
<Amended by Act No. 8125, Dec. 28, 2006; Act No. 8852, Feb. 29, 2008>
(2)
A public official who enters the business places and perform investigations, etc. under paragraph (1) shall carry with him/her an identification indicating his/her authority and present it to the interested parties.
법령보기 화면
Article 74-2 (Education)
The Minister of Land, Transport and Maritime Affairs, the Mayor/
Do
Governor, or the head of a
Si
/
Gun
may provide education to the chairperson and auditor of a promotion committee, executives of a partnership, the representative of the specialized manager of a rearrangement project, technical personnel, etc., as prescribed by Presidential Decree.
[This Article Added by Act No. 9444, Feb. 6, 2009]
법령보기 화면
Article 74-3 (Comprehensive Management of Information on Specialized Management Business of Rearrangement Projects)
(1)
The Minister of Land, Transport and Maritime Affairs may establish and operate a comprehensive information system for the specialized management business of rearrangement projects in order to manage information on the capital, track record, management status, etc. of specialized managers of rearrangement projects in a comprehensive and systematic manner, and provide promotion committees, project implementers, etc. with such information.
(2)
Necessary matters for the establishment and operation of the comprehensive information system for the specialized management business of rearrangement projects under paragraph (1) shall be prescribed by Ministerial Decree of Land, Transport and Maritime Affairs.
[This Article Added by Act No. 10268, Apr. 15, 2010]
법령보기 화면
Article 74-4 (Establishment, etc. of Association)
(1)
The specialized managers of rearrangement projects may establish an association for specialized managers of rearrangement projects (hereinafter referred to as "association") in order to strive for the specialization of the specialized management business of rearrangement projects, and sound development of rearrangement projects.
(2)
The association shall be a juristic person.
(3)
The association shall be established by effecting the registration of association in the place in which its main office is located.
(4)
When intending to establish an association, 50 or more promoters qualified as the members of such association shall prepare the articles of association and obtain authorization therefor from the Minister of Land, Transport and Maritime Affaires, following the resolution by the inaugural general meeting. The same shall also apply when the association intends to amend its articles of association.
(5)
The duties and rights of a member who is subject to the disposition of suspension of service taken by the Mayor/
Do
Governor under this Act shall be suspended during the period of business suspension, whereas a member whose registration of the specialized management business of a rearrangement project is revoked shall forfeit his/her membership.
(6)
The articles of association, revocation of authorization for establishment, and other necessary matters shall be prescribed by Presidential Decree.
(7)
Except as provided for in this Act, the provisions concerning an incorporated foundation under the
Civil Act
shall apply
mutatis mutandis
to the association.
[This Article Added by Act No. 10268, Apr. 15, 2010]
법령보기 화면
Article 74-5 (Affairs of Association and Supervision)
(1)
The association shall perform the following affairs:
1.
Investigation and research for the sound development of the specialized management business of rearrangement projects and rearrangement projects;
2.
Promoting mutual cooperation between its members;
3.
Education and training for improving the quality of technical personnel for the specialized management of rearrangement projects, and persons engaging in the specialized management business of rearrangement projects;
4.
Other affairs prescribed by Presidential Decree.
(2)
The Minister of Land, Transport and Maritime Affairs may, if necessary for supervision, require the association to report matters concerning its affairs or to present materials, or issue other necessary orders, and investigation into and inspection of the association and other necessary matters for the supervision of the association shall be prescribed by Presidential Decree.
[This Article Added by Act No. 10268, Apr. 15, 2010]
CHAPTER VI SUPERVISION, ETC.
법령보기 화면
Article 75 (Submission, etc. of Data)
(1)
The Mayor/
Do
Governor shall file a report on actual records of the promotion of rearrangement projects for each quarter with the Minister of Land, Transport and Maritime Affairs under the methods and procedures stipulated by Ministerial Decree of Land, Transport and Maritime Affairs, and the head of a
Si
/
Gun
shall file a report on actual records of the promotion of rearrangement projects with the Mayor/
Do
Governor as stipulated by City/
Do
Municipal Ordinances.
<Amended by Act No. 8852, Feb. 29, 2008>
(2)
When the Minister of Land, Transport and Maritime Affairs, the Mayor/
Do
Governor, or the head of a
Si
/
Gun
deems it necessary for his/her supervision for the purpose of a smooth implementation of rearrangement projects, he/she may order the persons performing the business under this Act, such as the promotion committee, project implementers, specialized managers of rearrangement projects, operators of demolition business, designers and work executors, etc. to file a report or to submit materials pursuant to the contents stipulated by Ministerial Decree of Land, Transport and Maritime Affairs, and have the public officials under his/her command investigate the matters relating to their business.
<Amended by Act No. 8852, Feb. 29, 2008>
(3)
Public officials who investigate business under paragraph (2) shall notify in advance of the date and purpose, etc. of their investigations, under the methods and procedures stipulated by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
법령보기 화면
Article 76 (Accounting Audit)
(1)
Any project implementer, other than the head of a
Si
/
Gun
or the Housing Corporation, etc. shall undergo an accounting audit by an auditor under
Article 3 of the Act on External Audit of Stock Companies
under the methods and procedures prescribed by Presidential Decree at the time falling under any of the following subparagraphs, and the results of such audit shall be reported to the head of a
Si
/
Gun
within 15 days from the date of completion of the accounting audit, and further reported to the relevant partnership so as to make them available for the perusal to the partnership members:
<Amended by Act No. 8785, Dec. 21, 2007>
1.
Within seven days from the date when the promotion committee transfers its business to the partnership under
Article 15
(5);
2.
Within 20 days from the date of public announcement of an authorization for project implementation under
Article 28
(4);
3.
Within seven days from the date of application for an authorization for work completion under
Article 52
(1).
(2)
If an accounting audit is required pursuant to paragraph (1), a project implementer shall request the head of a
Si
/
Gun
to select and conclude a contract with an accounting audit agency, and the head of the
Si
/
Gun
, if requested, shall immediately select an accounting audit agency to conduct the audit.
<Added by Act No. 9729, May 27, 2009>
(3)
When the head of a
Si
/
Gun
shall, after having selected and entered into a contract with an accounting audit agency under paragraph (2), supervise the selected accounting audit agency to ensure the fair accounting audit, and may order a necessary measure or disposition.
<Added by Act No. 9729, May 27, 2009>
(4)
When a project implementer intends to make a request for the selection of and contract with an accounting audit agency under paragraph (2), the project implementer shall deposit, in advance, the expenses to be incurred in taking an accounting audit to the head of a
Si
/
Gun
. The head of a
Si
/
Gun
shall directly pay the expenses incurred in taking an accounting audit from the deposited amount and settle the remaining amount to the project implementor once the accounting audit is completed.
<Added by Act No. 9729, May 27, 2009>
법령보기 화면
Article 77 (Supervision)
(1)
When the implementation of a rearrangement project is recognized to be in violation of this Act, any orders or dispositions under this Act, a written project implementation plan, or a management and disposal plan, any cancellation, modification or suspension of such dispositions, any suspension or modification of such construction works, any advice on a replacement of executives, and any other necessary measures may be made or taken, within the limit required for a pertinent implementation of a rearrangement project; by the Minister of Land, Transport and Maritime Affairs on the Mayor/
Do
Governor, the head of a
Si
/
Gun
, the promotion committee, the resident representatives' meeting, the project implementer or the specialized managers of the rearrangement project; by the Mayor/
Do
Governor on the head of a
Si
/
Gun
, the promotion committee, the resident representatives' meeting, the project implementer or the specialized managers of the rearrangement project; and by the head of a
Si
/
Gun
on the promotion committee, the resident representatives' meeting, the project implementer or the specialized managers of the rearrangement project, respectively.
<Amended by Act No. 8852, Feb. 29. 2008; Act No. 9444, Feb. 6, 2009>
(2)
Deleted. <by Act No. 9444, Feb. 6, 2009>
(3)
The Minister of Land, Transport and Maritime Affairs may, for the purpose of the smooth implementation of a rearrangement project under this Act, take necessary measures, such as the dispute mediation and the request for correction of unlawful matters, etc. through the on-the-spot investigation of the rearrangement project, by constituting an inspection team composed of the related public officials and experts. In such cases, the head of a competent local government and a partnership, etc. shall render a positive cooperation to the activities of an inspection team, such as the submission, etc. of data prescribed by Presidential Decree.
<Amended by Act No. 8852, Feb. 29, 2008>
(4)
Article 75
(3) shall apply
mutatis mutandis
to public officials who perform the on-the-spot investigation of a rearrangement project under paragraph (3).
법령보기 화면
Article 77-2 (Organization, etc. of Urban Disputes Mediation Committee)
(1)
For the mediation of disputes resulting from the implementation of rearrangement projects, an urban dispute mediation committee (hereinafter referred to as "mediation committee") shall be established in a
Si
/
Gun
/
Gu
(referring to an autonomous
Gu
; hereafter the same shall apply in this Article) in which a rearrangement zone is designated.
(2)
A mediation committee, the chairperson of which is the vice-head of a
Si
/
Gun
/
Gu
, shall be comprised of not more than ten members and its members shall be appointed or commissioned by the head of a
Si
/
Gun
, from among any of the following persons. In such cases, two or more persons respectively falling under any of subparagraph 1 or 3 shall be included in its members:
1.
A public official of Grave V or higher who is engaged in affairs concerning rearrangement projects in the relevant
Si
/
Gun
/
Gu
:
2.
A person who serves as an associate professor or higher, or other position equivalent thereto, at a university or research institute;
3.
An attorney-at-law, architect, certified public appraiser, or certified public accountant;
4.
Other persons who have expert knowledge in rearrangement projects and who are determined by City/
Do
Municipal Ordinance.
(3)
A mediation committee may examine and mediate disputes related to the implementation of rearrangement projects and exclude matters subject to examination by a committee established under the
Housing Act
, the
Act on the Acquisition of Land, etc. for Public Works and the Compensation therefor
and other relevant Acts.
(4)
A subcommittee which is comprised of three members (hereinafter referred to as "subcommittee") shall be established under a mediation committee, and one or more persons falling under either paragraph (1) 1 or 3 shall be included in the subcommittee.
[This Article Added by Act No. 9729, May 27, 2009]
법령보기 화면
Article 77-3 (Mediation, etc. by Mediation Committee)
(1)
A disputing party related to a rearrangement project may apply for mediation to a mediation committee and the mediation committee shall complete mediation procedures within 60 days from the date on which an application for mediation is filed:
Provided
, That if the mediation committee deems it impossible to complete the mediation procedures within the specified period, it may extend a period therefor only once by not more than 30 days, following the resolution by the mediation committee.
(2)
The chairperson of a mediation committee may allow a subcommittee to take charge of a preliminary examination prior to the examination by the mediation committee, and if the members of the subcommittee deem, by their unanimous consent, that the examination by the mediation committee is not necessary, the examination of the subcommittee may complete mediation procedures without referring to the mediation committee.
(3)
A mediation committee or subcommittee shall, once completing the mediation procedures under paragraph (1), prepare a mediation proposal and present it to each party, and each party who receives the mediation proposal shall notify the mediation committee or subcommittee as to whether to accept it within 15 days from the date on which the mediation proposal is received.
(4)
When each party accepts the mediation proposal, the mediation committee shall immediately prepare a written mediation and the chairperson and each party shall sign and seal thereon. In such cases, an agreement the same as the details of the written mediation shall be deemed to have been reached between the relevant parties.
(5)
The composition and organization of a mediation committee, defrayment of costs, and other necessary matters shall be determined by City/
Do
Municipal Ordinance.
[This Article Added by Act No. 9729, May 27, 2009]
법령보기 화면
Article 77-4 (Public Management of Rearrangement Projects)
(1)
In order to enhance the transparency of a rearrangement project and to raise the efficiency thereof, the head of a
Si
/
Gun
may support the project implementation processes of a rearrangement project prescribed by City/
Do
Municipal Ordinance (hereinafter referred to as "public management"), or entrust the public management of such a project to the Housing Corporation, etc., a trust business entity under
Article 8 (7) of the Financial Investment Services and Capital Markets Act
, the Korea Housing Guarantee Co., Ltd. under
Article 76 (1) of the Housing Act
, or an agency prescribed by Presidential Decree under the proviso to the part other than the subparagraphs of
Article 69
(1) of this Act.
(2)
The head of a
Si
/
Gun
who conducts the public management of a rearrangement project or a person to whom the public management is entrusted (hereinafter referred to as "entrusted manager") under paragraph (1) shall carry out the following affairs:
1.
Supporting work for organizing a promotion committee or resident representatives'' meeting;
2.
Selecting the specialized manager of a rearrangement project (limited to support for selection, in the case of an entrusted manager);
3.
Supporting the selection methods, etc. of a designer or work executor;
4.
Other matters prescribed by City/
Do
Municipal Ordinance.
(3)
The head of a
Si
/
Gun
may take necessary measures, such as presentation and inspection of the relevant materials, site inspections, etc. for the fair performance of affairs by an entrusted manager, and external responsibility for any act committed by an entrusted manager shall be placed on the head of a
Si
/
Gun
.
(4)
Expenses incurred in public management shall be borne by the head of a
Si
/
Gun
and the Mayor/
Do
Governor may partially subsidize the expenses, as prescribed by City/
Do
Municipal Ordinance.
(5)
Article 14
(2) shall not apply where a promotion committee selects the specialized manager of a rearrangement project selected by the head of a
Si
/
Gun
under paragraph (2) 2.
(6)
The methods, procedures and standards of carrying out public management and necessary matters, such as the subsidization, etc. from the Fund for Maintenance and Improvement of Urban Areas and Residential Conditions shall be as prescribed by City/
Do
Municipal Ordinance.
[This Article Added by Act No. 10268, Apr. 15, 2010]
법령보기 화면
Article 78 (Hearings)
Where the Minister of Land, Transport and Maritime Affairs, a Mayor/
Do
Governor, or the head of a
Si
/
Gun
intends to make the dispositions falling under any of the following subparagraphs, he/she shall hold a hearing:
<Amended by Act No. 8852, Feb. 29, 2008; Act No. 9444, Feb. 6, 2009>
1.
Cancellation of registration of a specialized management business of rearrangement projects under
Article 73
(1);
2.
Cancellation of the approval for a promotion committee, cancellation of the authorization for the establishment of a partnership, cancellation of the authorization for a project implementation, or cancellation of the authorization for a management and disposal plan under
Article 77
(1).
CHAPTER VII SUPPLEMENTARY PROVISIONS
법령보기 화면
Article 79 (Maintenance and Management of Structures within Rearrangement Zones)
(1)
The head of a
Si
/
Gun
shall maintain and manage the structures built by a rearrangement project in a manner compatible with the building standards contained in the basic plan and rearrangement plan.
(2)
Where it is necessary to install rearrangement basis facilities after a public announcement of work completion under
Article 52
(3) and (4) has been made, the head of a
Si
/
Gun
may install them by applying the provisions concerning the installation of urban planning facilities under
Articles 85 through 100 of the National Land Planning and Utilization Act
, notwithstanding paragraph (1).
(3)
Where the owner of land, etc. enters into a contract for the transaction of real estate, such as purchase and sale, lease on a deposit basis, lease, the establishment of superficies, etc. with respect to land or structures possessed by himself/herself, the owner of land, etc. shall explain and notify the following matters to the other party to the transactions and sign and seal thereon after recording the same in a transaction contract:
<Added by Act No. 9729, May 27, 2009>
1.
Execution stage of the relevant rearrangement project;
2.
Scheduled time of eviction (including schedule time of demolition, in the case of structures);
3.
Limitations on rights under
Articles 5
,
19
,
44
(5) and
50-2
;
4.
Other matters prescribed by Presidential Decree that have significant influence on the rights and duties of the other party to the transactions.
(4)
Matters under the subparagraphs of paragraph (3) shall be deemed "matters relating to the restrictions of transaction or utilization under Acts and subordinate statutes" under
Article 25 (1) 2 of the Business Affairs of Licensed Real Estate Agents and Report of Real Estate Transactions Act
.
<Added by Act No. 9729, May 27, 2009>
법령보기 화면
Article 80 (Conversion of Implementation Mode of Housing Redevelopment Projects)
(1)
Where deemed necessary to designate a project agent under
Article 9
(1), or to convert the implementation mode of a housing redevelopment project under
Article 6
(2) as there exists a request by not less than 4/5 of the owners of lands, etc., the head of a
Si
/
Gun
may grant an approval for the conversion of the implementation mode for all or part of the rearrangement zone within the scope prescribed by Presidential Decree, even before the completion of the rearrangement project.
(2)
Where a project implementer intends to amend a management and disposal plan in order to convert the implementation mode under paragraph (1), he/she shall obtain the consent from not less than 2/3 of the land area and the consent of not less than 4/5 of the owners of lands, etc., and the provisions concerning the amendment of management and disposal plans under
Article 48
(1) shall apply
mutatis mutandis
to the procedure for alteration.
(3)
Where a project implementer intends to alter the implementation mode for a part of the rearrangement zone under paragraph (1), he/she shall make a public announcement of work completion for the portion for which a housing redevelopment project has been completed on the official bulletin of the relevant local government, by going through the authorization for work completion under
Article 52
, and with regard to the portion intended for an alteration, the implementation mode thereof shall be converted under the procedures stipulated in this Act.
(4)
When a public announcement of work completion has been made under paragraph (3), it shall be deemed that the transfer under
Article 54
has been made pursuant to the contents of management and disposal plans, notwithstanding Article 86 (3) of the Act on Land Survey, Waterway Survey and Cadastral Records.
<Amended by Act No. 9774, Jun. 9, 2009>
법령보기 화면
Article 81 (Disclosure, Preservation, etc. of Related Data)
(1)
The head of a promotion committee or a project implementer (in the case of a partnership, referring to the partnership's executives, and where the owner of lands, etc. solely implements a rearrangement project, referring to the relevant representative) shall make the following documents and related data concerning the implementation of a rearrangement project available to the partnership members or owners of lands, etc., through the Internet and by other means, and where the partnership members, owners of lands, etc., or tenants make a request for perusal or copy thereof, he/she shall promptly comply therewith. In such cases, the requester shall bear the costs required for making such copy within the extent of actual expenses:
<Amended by Act No. 8785, Dec. 21, 2007; Act No. 9729, May 27, 2009>
1.
Operational regulations and the articles of incorporation of the promotion committee, etc.;
2.
Contracts on the selection of service companies, such as designers, work executors, demolition companies and specialized managers for rearrangement projects, etc.;
3.
Minutes of the promotion committee, general meetings of residents, the plenary session of the partnership, the board of directors and the board of representatives of the partnership;
4.
Written project implementation plans;
5.
Management and disposal plans;
6.
Official documents related to the implementation of pertinent rearrangement projects;
7.
Accounting audit reports;
8.
Other documents and related data regarding the implementation of rearrangement projects and prescribed by Presidential Decree.
(2)
The chairperson of the promotion committee, the specialized managers of a rearrangement project or the project implementer (referring to executives of a partnership in the case of a partnership, and referring to a representative where the owners of lands, etc. carry out an urban environment rearrangement project under
Article 8
(3)), shall prepare documents or relevant data under paragraph (1), and stenographic records, sound recordings or image data when the general meeting or an important meeting is held, and keep them until the time of liquidation, and the list and details of documents and the relevant data undisclosed under paragraph (1), a place where such documents and data are undisclosed, and methods, etc. of perusal and copying thereof shall be notified in writing per each quarter to the partnership members or the owners of lands, etc. by methods and procedures determined by Presidential Decree.
<Amended by Act No. 9444, Feb. 6, 2009>
(3)
Matters necessary for the scope of and procedures, etc. for the application of a disclosure to the pubic or a public perusal under paragraph (1) shall be stipulated by Ministerial Decree of Land, Transport and Maritime Affairs.
<Amended by Act No. 8852, Feb. 29, 2008>
(4)
When a project implementer who is not the head of a
Si
/
Gun
or the Housing Corporation, etc. has completed or discontinued a rearrangement project, he/she shall hand over the related documents to the head of a
Si
/
Gun
under the conditions as stipulated by the City/
Do
Municipal Ordinances.
(5)
A project implementer who is the head of a
Si
/
Gun
or the Housing Corporation, etc. and the head of a
Si
/
Gun
who has taken over the related documents under paragraph (4) shall keep in custody the documents related to the relevant rearrangement project for five years.
법령보기 화면
Article 82 (Establishment of Urban and Residential Environment Rearrangement Fund)
(1)
The Special Metropolitan City Mayor, a Metropolitan City Mayor, a
Do
Governor, or the head of a
Si
, who formulates or approves a basic plan under
Article 3
, shall set up the Urban and Residential Environment Rearrangement Fund (hereinafter referred to as "Rearrangement Fund") for the purpose of a smooth performance of rearrangement projects.
(2)
The Rearrangement Fund shall be created by the financial resources of the amount falling under one of the following subparagraphs:
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 7959, May 24, 2006; Act No. 9045, Mar. 28, 2008; Act No. 9444, Feb. 6, 2009; Act No. 9632, Apr. 22, 2009>
1.
Amount of not less than a specific ratio as prescribed by the Presidential Decree from among the urban planning taxes;
2.
Part of the portion to be reverted to the local government from among the charges under
Article 62
, and the development burdens under the
Restitution of Development Gains Act
which have been generated by a rearrangement project;
2-2. Portion to be reverted to the local government under Article 4 (3) and (4) of the Restitution of Excess Rebuilding Gains Act from among the rebuilding charges under the same Act;
3.
Amount in excess of a specific ratio as prescribed by Presidential Decree from among the selling prices of the State or public lands within the rearrangement zone under
Article 66
(excluding the housing reconstruction zone);
4.
Rental guarantee money or rent for small houses subject to reconstruction supplied to the Mayor/
Do
Governor or the head of a
Si
/
Gun
under
Article 30-3
(3);
5.
Other financial resources as stipulated by the City/
Do
Municipal Ordinance.
(3)
The Rearrangement Fund may not be used for any purpose other than the uses falling under any of the following subparagraphs:
<Amended by Act No. 7959, May 24, 2006; Act No. 9444, Feb. 6, 2009>
1.
Rearrangement project under this Act, which falls under any of the following items:
(a)
Formulation of a basic plan;
(b)
Formulation of a plan on safety diagnosis and rearrangement;
(c)
Lending of operation fund of the promotion committee;
(d)
Other matters prescribed by this Act and City/
Do
Municipal Ordinance;
2.
Construction and management of rental houses;
3.
Aid to stabilize housing for tenants;
4.
Imposition and collection of rebuilding charges under the Restitution of Excess Rebuilding Gains Act.
(4)
Matters necessary for the management and operation of the Rearrangement Fund, and the ratio, etc. to be accumulated in the Rearrangement Fund from among the portion of development burdens to be reverted to local governments, shall be stipulated by the City/
Do
municipal ordinances.
법령보기 화면
Article 82-2 (Formulation of Improvement Plans for Worn-out and Inferior Residential Places)
The Minister of Land, Transport and Maritime Affairs shall identify the areas subject to improvement every five years, and formulate improvement plans for worn-out and inferior residential places including the financial support plans by fiscal years, in order to make an improvement of residential environment of residential places wherein houses or infrastructure facilities are inferior.
<Amended by Act No. 8852, Feb. 29, 2008>
[This Article Added by Act No. 7392, Mar. 18, 2005]
법령보기 화면
Article 83 (Delegation, etc. of Authorities)
(1)
The Minister of Land, Transport and Maritime Affairs may delegate part of his/her authority under this Act to a Mayor/
Do
Governor or the head of a
Si
/
Gun
, as prescribed by Presidential Decree.
<Amended by Act No. 8852, Feb. 29, 2008>
(2)
The Minister of Land, Transport and Maritime Affairs, a Mayor/
Do
Governor or the head of a
Si
/
Gun
may, if necessary for the efficient enforcement of this Act, entrust any of the following business affairs to an agency or organization prescribed by Presidential Decree, such as the association, etc., as prescribed by Presidential Decree:
<Added by Act No. 10268, Apr. 15, 2010>
1.
Provision of education under
Article 74-2
;
2.
Establishment and operation of a comprehensive information system for the specialized management business of rearrangement projects under
Article 74-3
;
3.
Other business affairs prescribed by Presidential Decree.
CHAPTER VIII PENAL PROVISIONS
법령보기 화면
Article 84 (Legal Fiction of Public Officials in Applying Penal Provisions)
The chairperson of a promotion committee, executives of a partnership and the representative (referring to the executives in the case of a corporation), employees of a specialized manager for a rearrangement project and his/her entrusted manager shall be deemed public officials, in applying
Articles 129 through 132 of the Criminal Act
.
<Amended by Act No. 9444, Feb. 6, 2009; Act No. 10268, Apr. 15, 2010>
법령보기 화면
Article 84-2 (Penal Provisions)
Any person who has forged a written consent of the owners of lands, etc. under
Article 17
shall be punished by imprisonment for not more than five years or a fine not exceeding fifty million won.
[This Article Added by Act No. 9444, Feb. 6, 2009]
법령보기 화면
Article 84-3 (Penal Provisions)
Any person who falls under one of the following subparagraphs shall be punished by imprisonment for not more than 3 years or a fine not exceeding thirty million won:
<Amended by Act No. 7392, Mar. 18, 2005; Act No. 9444, Feb. 6, 2009>
1.
A person who has selected the work executor and who has been selected as the work executor in contravention of
Article 11
;
2.
A person who has obtained qualifications for the member of the partnership by false or illegal means in violation of
Article 19
(2), and the owner of the land, etc. and the executive and employee of the partnership who have helped the person to obtain such qualifications;
3.
A person who has concealed the fact of transferring or taking over the structure or land for the purpose of transferring or taking over the housing to be sold in installments by eluding the provisions of
Article 19
(2);
4.
A person who has selected a specialized manager for a rearrangement project without obtaining approval for the promotion committee from the head of a
Si
/
Gun
under
Article 13
(2);
5.
The chairperson of a promotion committee who has selected a specialized manager for a rearrangement project by methods other than competitive bidding under
Article 14
(2);
6.
A person who has sold or purchased a written consent of the owners of lands, etc. under
Article 17
.
[This Article Added by Act No. 7056, Dec. 31, 2003]
법령보기 화면
Article 85 (Penal Provisions)
Any person who falls under one of the following subparagraphs shall be punished by imprisonment for not more than two years or a fine not exceeding twenty million won:
<Amended by Act No. 7715, Dec. 7, 2005; Act No. 9444, Feb. 6, 2009>
1.
Person who has performed an act without obtaining permission or changed permission in violation of the provisions of
Article 5
(1), or by obtaining permission or changed permission through false or other illegal means;
2.
Person who has prepared by falsity the written report on the result of safety diagnosis under
Article 12
(4);
3.
Person who has carried out tasks referred to in each subparagraph of
Article 14
(1) or has constituted and operated a resident representatives' meeting without obtaining approval from the promotion committee or the resident representatives' meeting in violation of
Article 13
(2) or
Article 26
(3);
4.
Person who continuously operates the promotion committee even though the partnership has been established under
Article 16
;
5.
Executives of the partnership who promote at will the projects under each subparagraph of
Article 24
(3) without going through a resolution by the general meeting under the same Article;
6.
Person who promotes the rearrangement project under this Act by voluntarily constituting a promotion committee or a resident representatives' meeting, even though the promotion committee or the resident representatives' meeting approved under
Article 13
(2) or
26
(3), has been constituted;
7.
Person who has implemented the rearrangement project without obtaining an authorization for project implementation under
Article 28
, and person who has built the structures in violation of the same written project implementation plan;
8.
Person who has made a transfer under
Article 54
without obtaining an authorization for management and disposal plans under
Article 48
;
9.
Person who has been entrusted to implement the rearrangement project under this Act, without making a registration under
Article 69
(1);
10.
Specialized manager for rearrangement project who has made a registration by deceit or other illegal means;
11.
Person who carries on the business even though the registration has been revoked under the proviso to
Article 73
(1);
12.
Project implementer and a specialized manager for rearrangement project who have failed to comply with the orders under
Article 77
(1) such as revocation, alteration or suspension of the dispositions and suspension and alteration of said works.
법령보기 화면
Article 86 (Penal Provisions)
Any person who falls under one of the following subparagraphs shall be punished by imprisonment for not more than one year or a fine not exceeding ten million won:
<Amended by Act No. 8785, Dec. 21, 2007; Act No. 9444, Feb. 6, 2009>
1.
Executives of the promotion committee who have failed to hand over the accounting books and related documents of the said committee to the partnership in violation of
Article 15
(5);
2.
Person who has used the structures, etc. without obtaining an authorization for work completion under
Article 52
(1) and person who uses the structures without obtaining a permission for use from the head of a
Si
/
Gun
under
Article 52
(5);
3.
Specialized manager of a rearrangement project who has let other persons perform the business stipulated by this Act by using his/her name or business title, or who has leased his/her registration certificate;
4.
Person who has failed to undergo the audit of accounts under
Article 76
;
5.
Deleted; <by Act No. 9444, Feb. 6, 2009>
6.
The chairperson of the promotion committee or the partnership's executive (in cases where the owner of lands, etc. solely implements a rearrangement project, referring to the relevant representative) who has failed to make documents and related data regarding the implementation of a rearrangement project available through the Internet and by other ways, or has failed to comply with a request for the perusal or copy thereof from the partnership members or owners of lands, etc. in violation of
Article 81
(1);
7.
The chairperson of the promotion committee or executives of the partnership who have failed to prepare the stenographic records, etc. or to keep the relevant data until the time of liquidation, in violation of
Article 81
(2)(referring to a representative, in cases where the owners of lands, etc. implement an urban environment rearrangement project under
Article 8
(3)).
법령보기 화면
Article 87 (Joint Penal Provisions)
If the representative of a corporation, a corporation, an agent, an employee or any other employed person of a corporation or an individual has committed an act in violation of
Articles 84-2
,
85
and
86
in connection with the affairs of the said corporation or individual, not only shall such an actor be punished accordingly, but the corporation or individual shall be punishedby a fine as prescribed in each of the respective Articles:
Provided
, That this shall not apply to cases where the corporation or individual has not neglected to give considerable attention to and supervise the relevant tasks so as to prevent such violations.
[This Article Wholly Amended by Act No. 9444, Feb. 6, 2009]
법령보기 화면
Article 88 (Fine for Negligence)
(1)
Any person who has refused, evaded or obstructed on-the-spot inspection by an inspection team shall be punished by a fine for negligence amounting to ten million won under
Article 77
(3).
<Amended by Act No. 9444, Feb. 6, 2009>
(2)
Any person who falls under any of the following subparagraphs shall be punished by a fine for negligence not exceeding five million won:
<Amended by Act No. 9444, Feb. 6, 2009>
1.
A person who has neglected to make a public announcement under
Article 49
(4) or
54
(1);
2.
A person who has neglected to make a report or submit data under
Article 74
(1) and
75
(2);
3.
A person who has neglected to hand over relevant documents under
Article 81
(4).
(3)
A fine for negligence under paragraphs (1) and (2) shall be imposed and collected by the Minister of Land, Transport and Maritime Affairs, the Mayor/
Do
Governor, or the head of a
Si
/
Gun
by methods and procedures determined by Presidential Decree.
<Amended by Act No. 9444, Feb. 6, 2009>
(4)
and (5)
Deleted. <by Act No. 9444, Feb. 6, 2009>
ADDENDA
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Article 2 (Abrogated Acts)
The
Urban Redevelopment Act
and the Act on Temporary Measures for the Improvement of Dwelling and Other Living Conditions for Low-Income Urban Residents shall be abrogated.
Article 3 (General Transitional Measures)
Any dispositions, procedures and other acts performed at the time of enforcement of this Act under the provisions relating to the reconstruction (hereinafter referred to as "previous Acts") of the
Urban Redevelopment Act
, the Act on Temporary Measures for the Improvement of Dwelling and Other Living Conditions for Low-Income Urban Residents, and the
Housing Construction Promotion Act
, shall be deemed to have been performed under the provisions of this Act.
Article 4 (Transitional Measures for Formulation of Basic Plans and Designation of Rearrangement Zone)
(1)
Heads of local governments who are to formulate the basic plan under
Article 3
of this Act shall formulate it within 3 years after an enforcement of this Act:
Provided
, That the same shall not apply where an approval of the Minister of Construction and Transportation has been granted since there exist inevitable reasons, such as the said plan is to be formulated by stages, etc. because the regional scope subject to the formulation of basic plan is extensive.
(2)
A redevelopment basic plan which has been formulated under
Article 3 of the Urban Redevelopment Act
before the enforcement of this Actshall be regarded as the basic plan under
Article 3
of this Act (limited to housing redevelopment projects and urban environment rearrangement projects).
(3)
Even during the period for which any basic plan has not been formulated under paragraph (1), a rearrangement zone under
Article 4
of this Act may be designated.
Article 5 (Transitional Measures for Residental Environment Improvement Zone, etc.)
(1)
A residential environment improvement area and a residential environment improvement plan which have been designated or formulated under the Act on Temporary Measures for the Improvement of Dwelling and Other Living Conditions for Low-Income Urban Residents at the time of enforcement of this Act, shall be regarded as a residential environment improvement zone and a rearrangement plan designated or formulated under the provisions of this Act, and the rearrangement projects may be implemented by applying the provisions of the previous Act on Temporary Measures for the Improvement of Dwelling and Other Living Conditions for Low-Income Urban Residents not later than 4 years after the enforcement of this Act.
<Amended by Act No. 7597, Jul. 13, 2005>
(2)
A redevelopment zone which has been designated under the
Urban Redevelopment Act
before the enforcement of this Act shall be regarded as a housing redevelopment zone and a urban environment rearrangement zone which have been designated under the provisions of this Act.
(3)
The specific-use district as prescribed by the Presidential Decree from among the specific-use districts under the
National Land Planning and Utilization Act
, and any zone for which a reconstruction is intended to be promoted under the previous provisions of the
Housing Construction Promotion Act
, which is the zone determined by the district unit planning under the
National Land Planning and Utilization Act
, shall be regarded as the housing reconstruction zone under this Act, and the basic plan for the apartment district development and the district unit planning which have been formulated under
Article 20 of the Housing Construction Promotion Act
shall be regarded as the rearrangement plans which havebeen formulated under Article 4 of this Act.
(4)
Where a partnership has been established upon receipt of an authorization of the head of
Si
/
Gun
under
Article 44 (1) of the Housing Construction Promotion Act
by regarding as the wornout inferior housing under
Article 4-2 (2) of the Enforcement Decree of the Housing Construction Promotion Act
before an enforcement of this Act, the area intended for a reconstruction shall be regarded as the rearrangement zone designated under Article 4 of this Act.
Article 6 (Transitional Measures for Residential Environment Improvement Project, etc.)
The residential environment improvement project, housing redevelopment project, reconstruction project, downtown redevelopment project,and factory redevelopment project which are being implemented uponreceipt of an approval for project plans or an authorization for project implementation under the previous Acts, shall be regarded as the residential environment improvement project, housing redevelopment project, housing reconstruction project, and urban environment rearrangement project under this Act, respectively.
Article 7 (Transitional Measures for Project Implementation Mode)
(1)
What are being implemented upon receipt of an approval for project plans or an authorization for project implementation under the previous Acts, shall be governed by the previous provisions.
(2)
If a partnership, having received an authorization for partnership establishment, has reported to the head of
Si
/
Gun
on the rearrangement project for which a work execution contract has been already concluded after selecting the work executor by obtaining the consent of not lessthan one half of the owners of lands, etc., or the housing reconstruction project for which the work executor has been selected by obtaining the consent of not less than one half of the owners of lands, etc. before August 9, 2002, under the methods and procedures as stipulated by the Ministerial Decree of Construction and Transportation within 2 months after the enforcement date of this Act, the relevant work executor shall be regarded as the work executor who has been selected under
Article 11
of this Act.
Article 8 (Transitional Measures for Safety Diagnosis for Reconstruction Project)
(1)
Any safety diagnosis for a reconstruction project which has been requested or implemented under
Article 44-3 (1) through (3) of the Housing Construction Promotion Act
at the time of enforcement of this Act, shall be regarded as the safety diagnosis which has been requested or implemented under
Article 12
(1) or (4) of this Act.
(2)
Any reconstruction project for which a decision on whether or not permitting a reconstruction has been made under the conditions as stipulated by
Article 44-3 (1) through (3) of the Housing Construction Promotion Act
at the time of enforcement of this Act, shall be regarded as the reconstruction project for which a decision on whether or not implementing a reconstruction has been made under
Article 12
(5) of this Act.
Article 9 (Transitional Measures for Promotion Committee)
If any existing promotion committee, which is operated by the owners of lands, etc. in order to establish a partnership for the purpose of implementing the redevelopment project or reconstruction project at the time of enforcement of this Act, equiped itself with the requirement for constituting the consent under
Article 13
(2) of this Act, and has obtained an approval of the head of
Si
/
Gun
within 6 months from the enforcement date of this Act, it shall be regarded as the promotion committee under this Act.
Article 10 (Transitional Measures for Establishment of Partnership)
(1)
A partnership having received an authorization for partnership establishment under the previous Acts shall be deemed to have been established by effecting registration at the place where its main office is located under
Article 18
(2) of this Act:
Provided
, That the partnership which is not a corporation established under the previous Acts (excluding the partnership having received an authorization for work completionunder the previous Acts) shall make a registration within one month from the enforcement date of this Act.
(2)
Any covenant of the partnership which is regarded as the corporation under paragraph (1) shall be regarded as the articles of association under Article 20 of this Act.
Article 11 (Measures for Constitution of Representatives'' Meeting)
The representatives'' meeting which has been constituted under the previous
Urban Redevelopment Act
shall be regarded as the representatives'' meeting under
Article 25
of this Act.
Article 12 (Transitional Measures for Project Implementation Plans)
An approval for project implementation plans or an authorization for project implementation under the previous Acts shall be regarded as the project implementation plans which have been authorized under
Article 28
of this Act.
Article 13 (Transitional Measures for Specialized Management Businessman of Rearrangement Project)
The owners of lands, etc. and partnership aiming at the implementation of the redevelopment project or the reconstruction project under the related Acts at the time of enforcement of this Act, or the persons who are entrusted with rearrangement projects or give advices by concluding a civil contract with the existing promotion committee under
Article 9
, shall equip themselves with the registration standard under
Article 69
(1) of this Act within nine months from the enforcement date of this Act and make a registration with the Minister of Construction and Transportation.
Article 14 (Transitional Measures for Conversion of Promotion Mode of Housing Redevelopment Projects)
Provisions of
Article 80
of this Act shall apply only to the rearrangement zone designated after the enforcement of this Act:
Provided
, That in case where not less than 2/3 of the owners of lands, etc. make a request or the head of competent
Si
/
Gun
deems, by going through a deliberation of the Regional Urban Planning Committee, that it is necessary for the public interests, they may also be applied to the rearrangement project which has been implemented before the enforcement of this Act.
Article 15 (Transitional Measures for Opening to Public and Preservation of Related Data)
Provisions of
Article 81
(1) of this Act shall apply to all rearrangement projects from the enforcement date of this Act, and provisions of
Article 81
(2), (4) and (5) shall apply from what occurs after the enforcement date of this Act.
Article 16 (Transitional Measures for Penal Provisions)
In applying the penal provisions and the fine for negligence against the acts committed before the enforcement of this Act, the provisions of previous Acts shall govern.
Article 17 (Relations with Other Acts)
In case where the provisions of previous Acts are quoted in other Acts at the time of enforcement of this Act, if there exist any corresponding provisions in this Act, this Act or the corresponding provisions in this Act shall be deemed to have been quoted.
Article 18
Omitted.
ADDENDA<Act No. 6841, Dec. 30, 2002>
Article 1 (Enforcement Date)
This Act shall enter into force nine months after the date of its promulgation.
Articles 2 through 12
Omitted.
ADDENDA<Act No. 6893, May 29, 2003>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 6
Omitted.
ADDENDA<Act No. 6916, May 29, 2003>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 13
Omitted.
ADDENDA<Act No. 7056, Dec. 31, 2003>
(1)
(Enforcement Date) This Act shall enter into force on the date of its promulgation.
(2)
(Special Cases concerning Qualifications for Members of Partnership for Housing Reconstruction Project Implemented within Overheated Speculative Zone) Any person who has taken over a structure or land from the owners of lands, etc. of the rearrangement project for which authorization for establishment of housing reconstruction and rearrangement project partnership was obtained prior to enforcement of this Act (limited to the persons who have acquired the structures or lands prior to December 31, 2003) may obtain the qualifications for a member of the partnership notwithstanding the amended provisions of
Article 19
(2).
<Amended by Act No. 7392, Mar. 18, 2005>
ADDENDA<Act No. 7335, Jan. 14, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation.
Articles 2 through 12
Omitted.
ADDENDA<Act No. 7392, Mar. 18, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation;
Provided
, That the amended provisions of
Article 4
(1) 7-2, (2) and (7), and
Articles 4-2
,
13
(4),
30-2
,
50
(3) and
82
(2) 4 shall enter into force from the date on which two months have elapsed after its promulgation.
Article 2 (Application Example Concerning the Provision of Reconstruction Rental Houses)
The amended provisions of
Article 30-2
shall apply starting from theportion of filing an application for an approval of recruitment of moving-in persons under
Article 38 of the Housing Act
in order to provide the housing to other persons than the members of partnership first after enforcement of this Act; provided, in the case where it is not subject to the approval for recruitment of moving-in persons under
Article 38
of the same Act, they shall apply starting from the portion of commencing the conclusion of housing provision contract.
Article 3 (Special Cases concerning Housing Reconstruction Project subjected to Designation, etc. of Rearrangement Districts)
(1)
The Mayor/
Do
governor shall publicly notify the matters concerning the reconstruction rental houses, such as the size of reconstruction rental houses, within nine months after enforcement of this Act under the provisions as prescribed by the Presidential Decree, with regard to the housing reconstruction project which may become the object of providing the reconstruction rental houses under the amended provisions of
Article 30-2
(1), which is the housing reconstruction project for which a housing reconstruction rearrangement district was designated or an approval of establishment of a promotion committee was granted at the time of enforcement of this Act, and notify the project implementer and the head of
Si
/
Gun
thereof.
(2)
Where the project implementer intends to file an application for an authorization of project implementation before a publication or noticeunder paragraph (1) (including a modified authorization of important matters as prescribed by the Presidential Decree; hereafter in this Article, the same shall apply), he shall hold in advance a consultation on the matters of reconstruction rental houses with the head of
Si
/
Gun
. In this case, the head of
Si
/
Gun
shall make a decision on them within 30 days from the date on which the project implementer has requested a consultation and give notification thereof.
(3)
Where the project implementer has applied for an authorization for project implementation before an enforcement of this Act, the head of
Si
/
Gun
shall make a consultation with the Mayor/Do governor on the matters of reconstruction rental houses within 30 days from the date of enforcement of this Act, and notify the project implementer thereof.
Article 4 (Special Cases concerning Housing Reconstruction Project Subjected to Authorization for Project Implementation)
(1)
The housing reconstruction project subjected to an authorization for project implementation (excluding a modified authorization of important matters as prescribed by the Presidential Decree under
Article 3
(2) of the Addenda) at the time of enforcement of this Act shall provide, as the reconstruction rental houses, the number of houses equivalent to the ratio as prescribed by the Presidential Decree within the scope of not more than 10/100 from the building volume ratio to be increased by the reconstruction, notwithstanding a provision ratio of reconstruction rental houses under the amended provisions of
Article 30-2
(1).
(2)
Where the reconstruction rental houses are provided under paragraph (1), the amended provisions of
Article 30-2
(3) and (4) shall not be applied.
(3)
In the case of reconstruction project for which a management and disposal plan has been authorized under
Article 48
at the time of enforcement of this Act, if the number of houses under the plans for providing to other persons than the partnership members is less than the number of houses under the provision ratio of reconstruction rental houses under paragraph (1), the number of houses to be provided as the reconstruction rental houses shall be governed by the number of houses to be provided to the other persons than the Partnership members, notwithstanding the provision of paragraph (1).
Article 5 (Transitional Measures concerning District Unit Planning)
The amended provisions of Article 4 (5) shall also apply to the district unit planning which has been decided and publicized before enforcement of this Act.
Article 6 (Transitional Measures concerning Consent to Project Implementation Plans)
The previous provisions shall govern the consent of owners of lands, etc. to the project implementation plans, notwithstanding the amended provisions of Article 28 (4) not later than the amendment of relevant articles of association, etc.
Article 7 (Transitional Measures concerning Application of Housing Provision Criteria)
The criteria for housing provision to the owners of lands, etc. of the rearrangement project subjected to an authorization for partnership establishment at the time of enforcement of this Act shall be governed by the previous provisions, notwithstanding the amended provisions of
Articles 48
(2)
6
and
7
and
50
(5):
Provided
, That the same shall not apply to the case of owners of lands, etc. equivalent to
Article 48
(2) 6 (b) and (c).
ADDENDA<Act No. 7428, Mar. 31, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 6
Omitted.
ADDENDA<Act No. 7459, Mar. 31, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 6
Omitted.
ADDENDUM<Act No. 7597, Jul. 13, 2005>
This Act shall enter into force on the date of its promulgation.
ADDENDA<Act No. 7678, Aug. 4, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 12
Omitted.
ADDENDA<Act No. 7715, Dec. 7, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 7
Omitted.
ADDENDA<Act No. 7959, May 24, 2006>
Article 1 (Enforcement Date)
This Act shall enter into force four months after the date of its promulgation.
Articles 2 and 3
Omitted.
ADDENDA<Act No. 7960, May 24, 2006>
(1)
(Enforcement Date) This Act shall enter into force three months after the date of its promulgation.
(2)
(Application Examples concerning Selection of Work Executor) The cases of housing redevelopment projects and urban environment rearrangement projects in the amended provisions of
Article 11
(2) shall apply to the portion for which the promotion committee approves on or after the date when this Act enters into force.
ADDENDA<Act No. 8014, Sep. 27, 2006>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 11
Omitted.
ADDENDUM<Act No. 8125, Dec. 28, 2006>
This Act shall enter into force on the date of its promulgation.
ADDENDA<Act No. 8338, Apr. 6, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 17
Omitted.
ADDENDA<Act No. 8352, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 16 Omitted.
ADDENDA<Act No. 8369 , Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 16
Omitted.
ADDENDA<Act No. 8370, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 20
Omitted.
ADDENDA<Act No. 8371, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 10
Omitted.
ADDENDA<Act No. 8404, Apr. 27, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 14
Omitted.
ADDENDA<Act No. 8466, May 17, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 5
Omitted.
ADDENDA<Act No. 8785, Dec. 21, 2007>
(1)
(Enforcement Date) This Act shall enter into force on the date of its promulgation; provided, the amended provisions of subparagraph 7-2 of
Article 30
,
Article 81
(1) and subparagraph 6 of
Article 86
shall enter into force three months after the date of its promulgation.
(2)
(Applicability to Establishment of Project Implementation Plans for Protection of Educational Environment) The amended provisions of subparagraph 7-2 of
Article 30
shall apply from the first authorization for project implementation granted after this Act enters into force.
ADDENDA<Act No. 8852, Feb. 29, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 7
Omitted.
ADDENDA<Act No. 8966, Mar. 21, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force three months after the date of its promulgation.
Articles 2 through 13
Omitted.
ADDENDA<Act No. 8967, Mar. 21, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 7
Omitted.
ADDENDA<Act No. 8970, Mar. 21, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on April 12, 2008.
Articles 2 through 10
Omitted.
ADDENDA<Act No. 8974, Mar. 21, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 14
Omitted.
ADDENDA<Act No. 8976, Mar. 21, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 10
Omitted.
ADDENDA<Act No. 9045, Mar. 28, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force three months after the date of its promulgation.
Articles 2 through 8
Omitted.
ADDENDUM<Act No. 9047, Mar. 28, 2008>
This Act shall enter into force three months after the date of its promulgation.
ADDENDA<Act No. 9401, Jan. 30, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 11
Omitted.
ADDENDA<Act No. 9444, Feb. 6, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation:
Provided
, That the amended provisions of
Article 4
(3) and (11),
Article 5
(7), main sentence other than each subparagraph of
Article 8
(4),
Articles 11
(3),
12
,
13
,
14
(2) and (3),
19
(1),
26
,
28
, and
40
(1) shall enter into force six months after the date of its promulgation.
Article 2 (Applicability to Formulation of Basic Plans)
(1)
The amended provisions of Article 3 shall apply starting from thefirst perusal by residents for formulation of a basic plan after this Act enters into force.
(2)
The Special Metropolitan City Mayor, a Metropolitan City Mayor or the head of
Si
in an area where a basic plan is formulated at the time of the enforcement of this Act, shall reflect the period for formulating a rearrangement plan in each zone scheduled to be rearranged in the basic plan within 12 months after the enforcement of this Act in accordance with the revised provisions of Article 3 (1); provided, this shall not apply to cases where an approval from the Minister of Land, Transport and Maritime Affairs has been granted due to inevitable reasons.
Article 3 (Applicability to Approval for Promotion Committee)
The amended provisions of
Article 13
(2) shall apply starting from the first application for approval for composition of a promotion committee after the enforcement of this Act; provided, when a person who intends to establish a partnership obtains consent of the owners of lands, etc. under the previous provisions, and applies for the approval for composition of the promotion committee within three months after enforcement of this Act, he shall be deemed to apply for the approval for composition of the promotion committee under this Act.
Article 4 (Applicability to Consent Agenda of Consenters to Promotion Committee and Resident Representatives'' Meeting)
The amended provisions of
Articles 13
(3) and
26
(3) shall apply starting from the portion of obtaining consent to the composition of the promotion committee or the resident representatives'' meeting after the enforcement of this Act.
Article 5 (Applicability to Grounds for Disqualification of Officers of Partnership)
(1)
The amended provisions of
Article 23
(1) 5 shall apply starting from the first appointment of officers after the enforcement of this Act.
(2)
The amended provisions of
Article 72
(1) shall apply starting from the intention to make a registration as the specialized management businessmen for a rearrangement project or become its officers or employees for the first time after the enforcement of this Act.
Article 6 (Applicability to Authorization of Project Implementation)
The amended provisions of
Article 28
shall apply starting from the first application for authorization of the implementation of a project after the enforcement of this Act:
Provided
, That when a project implementer obtains consent of the owners of lands, etc. under the previous provisions, and applies for an approval for the implementation of the project within three months after the enforcement of this Act, he shall be deemed to apply for an approval for the implementation of the project under this Act.
Article 7 (Transitional Measures and Application Examples concerning Formulation of Rearrangement Plans)
(1)
The amended provisions of
Article 4
shall apply starting from the first convocation of an explanatory meeting for residents for the purpose of formulating or altering a rearrangement plan, or designating a rearrangement zone, or filing a request for modified designation for the first time after the enforcement of this Act.
(2)
In cases where procedures for a public perusal or hearing opinions of a local council for the purpose of formulating a rearrangement plan under the previous provisions are under way, or a request for designation or modified designation of a rearrangement zone is filed to
Si
/
Do
at the time when this Act enters into force, the previous provisions shall prevail, notwithstanding the amended provisions of
Article 4
.
Article 8 (Transitional Measures concerning Project Implementers of Housing Redevelopment Projects)
"Three years" referred to in the former part of Article 8 (4) 2-2 shall be "three years after the date on which this Act enters into force", in cases where an approval has already been granted to the composition of a promotion committee when this Act enters into force, and "three years" referred to in the latter part of the same paragraph shall be "three years after the date on which this Act enters into force", in cases where an authorization has already been given to the establishment of a partnership at the time when this Act enters into force:
Provided
, That "three years" shall be "three years after the designation of a rearrangement zone", in cases where an approval has been granted to the composition of a promotion committee, but a rearrangement zone has not been designated.
Article 9 (Transitional Measures concerning Safety Diagnosis of Housing Reconstruction Projects)
In cases where an approval has been granted to the composition of a promotion committee at the time when this Act enters into force, notwithstanding the amended provisions of
Article 12
(1), the head of
Si
/
Gun
may carry out safety diagnosis when the promotion committee makes a request for such safety diagnosis.
ADDENDA<Act No. 9632, Apr. 22, 2009>
(1)
(Enforcement Date) This Act shall enter into force on the date of its promulgation.
(2)
(Applicability to Housing Reconstruction Projects with Approval for Management and Disposal Plans) When a housing reconstruction partnership which received an authorization of the management and disposal plan under
Article 48
at the time when this Act enters into force, has failed to receive an approval for the recruitment of moving-in persons under
Article 38 of the Housing Act
, it shall obtain consent of not less than 3/4 of the owners of lands, etc. when it intends to alter a written project implementation plan under
Article 30
in accordance with this Act.
(3)
(Transitional Measures concerning Housing Reconstruction Projects with Authorization of Management and Disposal Plans) When an authorization has been granted to a management and disposal plan under
Article 48
at the time when this Act enters into force, the previous provisions shall govern the housing reconstruction project.
ADDENDA<Act No. 9729, May 27, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation:
Provided
, That the amended provisions of
Articles 35
(2),
50
(3),
7
,
63
(5) and (6),
77-2
and
77-3
shall enter into force on January 1, 2010.
Article 2 (Applicability to Number of Partnership Members Present Required for Resolutions of General Meeting)
The amended provisions of the proviso to
Article 24
(5) shall apply starting from the resolved matters at the first general meeting convened after this Act enters into force.
Article 3 (Applicability to Organization of Resident Representatives' Meeting and Presentation of Opinions)
The amended provisions of
Article 26
shall apply starting from the first resident representative's meeting organized after this Act enters into force.
Article 4 (Applicability to Request for Use and Lease as Circulative Housing and Determination of Floor Area Ratio)
The amended provisions of
Articles 35
(2) and
40-2
shall apply starting from the first rearrangement project implemented after this Act enters into force.
Article 5 (Transitional Measures concerning Preparation of Project Implementation Plans)
The amended provisions of
Article 30
shall apply starting from the first application for authorization of the implementation of a project filed after this Act enters into force.
Article 6 (Transitional Measures concerning Authorization of Management and Disposal Plans)
The amended provisions of
Article 48
(1) 7 and (2) 6 (a) shall apply starting from the first management and disposal plan established under
Article 48
(1) after this Act enters into force.
ADDENDA<Act No. 9763, Jun. 9, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force nine months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 8 Omitted.
ADDENDA<Act No. 9770, Jun. 9, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force on July 1, 2010 (Proviso Omitted.)
Articles 2 through 7 Omitted.
ADDENDA<Act No. 9774, Jun. 9, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 19 Omitted.
ADDENDA<Act No. 10268, Apr. 15, 2010>
(1)
(Enforcement Date) This Act shall enter into force on the date of its promulgation:
Provided
, That the amended provisions of
Articles 69
(1),
74-3 through 74-5
,
77-4
,
83
(2) and
84
shall enter into force three months after the date of its promulgation.
(2)
(Applicability to Selection, etc. of Work Executors) The amended provisions of
Articles 11
(4) and
24
(3) 6 shall apply starting from the first authorization of the establishment of a partnership granted after this Act enters into force.
(3)
(Applicability to Public Management) The amended provisions of
Article 77-4
shall apply starting from the rearrangement project for which a work executor or designer is not selected at a general meeting under
Article 24
as at the time this Act enters into force.
ADDENDA<Act No. 10331, May 31, 2010>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 13 Omitted.
Last updated : 2011-02-12