ENFORCEMENT DECREE OF THE ACT ON CONTRACTS TO WHICH THE STATE IS A PARTY

11353 · 1997-01-01

ENFORCEMENT DECREE OF THE ACT ON CONTRACTS TO WHICH THE STATE IS A PARTY  Presidential Decree No. 15186, Dec. 31, 1996   Presidential Decree No. 14710, Jul. 6, 1995 Amended by Presidential Decree No. 14973, Apr. 8, 1996 Presidential Decree No. 15186, Dec. 31, 1996 CHAPTER Ⅰ GENERAL PROVISIONS 법령보기 화면  Article 1 (Purpose) The purpose of this Decree is to prescribe the matters delegated by the Act on the Contracts to Which the State is a Party (hereinafter referred to as the “Act”) and the matters necessary for its enforcement. 법령보기 화면  Article 2 (Definitions) For the purpose of this Decree, the definitions of the terms shall be as follows: <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 1. The term “estimated price”means the price which is calculated pursuant to the provisions of Article 7 of this Decree in order to be used as criteria for judging whether or not goods, construction works, services, etc. are an object of international tender pursuant to the provisions of Article 4 of the Act before determining the projected price in concluding the procurement contracts for goods, construction works, services, etc; 2. The term “projected price”means the price which is determined in advance and maintained pursuant to the provisions of Article 8 of this Decree in order to be used as criteria for determining the successful bidder and contract amount before proceeding with the tender or the conclusion of contract; 3. The term “notified amount”means the amount notified by the Minister of Finance and Economy pursuant to the provisions of the main sentence of Article 4 (1) of the Act ; and 4. The term “performance bond for construction work” means a written undertaking to perform any contractual obligations under a contract for construction work on behalf of the other party if the other party thereto fails to perform contractual obligations for construction work, and guarantees to pay a fixed amount if the guarantor fails to perform any obligation under a guarantee. 법령보기 화면  Article 3 (Relationship with Other Acts and Subordinate Statutes) (1) With respect to the contracts to which the State is a party, except as otherwise provided for in other Acts and subordinate statutes such contracts shall be governed by the provisions of this Decree. (2) Matters which are applicable only to government procurement contracts through international tender shall be prescribed separately by the Presidential Decree. 법령보기 화면  Article 4 (Principles of Contract) The head of each central government agency or any public official who is delegated and commissioned by a central government agency(hereinafter referred to as the “public official in charge of contracts”), when concluding the contract, shall not enter into any special agreements or stipulate any conditions which unfairly limit the contractual profit of the other party to the contract prescribed in the Act, this Decree, and related Acts and subordinate statutes. 법령보기 화면  Article 5 (Notification of Proxy, Taking Partial Charge of Duties, and Appointment of Contract Official) (1) If the head of a central government agency has appointed an official who takes charge of the duties regarding a contract (hereinafter referred to as the “contract official”) or has caused others to act for the contract official or to take partial charge of the duties of contract official pursuant to the provisions of Article 6 (1) of the Act , he shall notify the finance officer and the disbursement officer provided for in the provisions of Article 61 of the Budget and Accounts Act and the Board of Audit and Inspection respectively. (2) The public official who takes charge of all of the duties of the public official pursuant to the provisions of Article 6 (1) of the Act shall be referred to as the “proxy contract official”; the public official who takes charge of a part thereof as the public official in partial charge of contracts; and the public official who acts for the duties of the public official in partial charge of contracts as the “proxy public official in partial charge of contracts”, respectively. (3) The head of each central government agency, when intending to commission the duties of the public official to the public official under the control of another central government agency pursuant to the provisions of Article 6 (2) of the Act , shall obtain the approval in advance of the head of the other central government agency with respect to the public official to be entrusted with such duties and the scope of duties which the head of each central government agency intends to entrust to him, and shall notify the Board of Audit and Inspection thereof. In case of appointing the public official who acts for the whole duties or in partial charge of duties of the contract official, the same shall apply. (4) The provisions of paragraph (3) of this Article shall apply mutatis mutandis to cases where the head of each central government agency commissions the duties regarding the contract falling under the jurisdiction of the head of each central government agency to another government agency pursuant to the provisions of Article 6 (3) of the Act . 법령보기 화면  Article 6 (Financial Guarantee for Public Official in Charge of Contracts) (1) The head of each central government agency shall prescribe and operate matters concerning the financial guarantee for the public official under its control pursuant to the provisions of Article 6 (5) of the Act . (2) Common matters necessary for the financial guarantee pursuant to the provisions of paragraph (1) of this Article shall be prescribed by the Minister of Finance and Economy. CHAPTER Ⅱ ESTIMATED PRICE AND PROJECTED PRICE 법령보기 화면  Article 7 (Calculation of Estimated Price) The head of each central government agency or the public official in charge of contracts shall calculate the estimated price by using the amount, etc. appropriated in the budget as the criteria therefor and it shall be equal to the amount pursuant to the criteria falling under any of the following subparagraphs: 1. In case of a contract for construction work, the amount exclusive of the price for the portion to be furnished as government supplied resources; 2. In case of a unit cost contract, the amount calculated by multiplying the estimated price of the goods concerned by the estimated volume to be procured; 3. In case of a contract in which an individual remand for procurement is made in a multiple or divided way, the amount to be chosen from any one of the following items: (a) The amount adjusted by the total amount of similar contracts which were concluded for the fiscal year immediately preceding or the twelve months immediately preceding the year when the related contract was concluded by taking into consideration the estimated fluctuating portion of the volume and the amount for the immediately following twelve months; and (b) The total amount of the contract which shall be concluded for the same fiscal year or the immediate next twelve months. 4. In case of a contract in which the total amount of the contract for lease, rent, or purchase by installment of goods or services is not fixed, the amount falling under any of the following items: (a) In case of a contract in which the duration of the contact is fixed, the amount to be estimated based on the entire duration of the contract; and (b) In case of a contract in which the duration of the contract is not fixed or is vague, the amount calculated by multiplying the estimated payment for one month by 48. 5. In case where optional items are included in the targeted goods or services to be procured, the maximum amount including such optional items to be procured. [This Article Newly Inserted by Presidential Decree No. 15186, Dec. 31, 1996] 법령보기 화면  Article 7-2 (Making Projected Price Available) (1) The head of each central government agency or the public official in charge of contracts shall determine the projected price based on the related specifications and the design, etc. with regard to those matters which shall be referred to a public tender or negotiated contract, etc., and shall have them tightly sealed to be made available in advance at the place where the tender will be opened and the price will be negotiated in such a way that the projected price shall not be disclosed: Provided , That if the successful bidder shall be determined pursuant to the provisions of Article 42 (3) of this Decree, the estimated price may be disclosed under the conditions determined by the Minister of Finance and Economy. (2) The head of each central government agency or the public official in charge of contracts, when intending to conclude a negotiated contract pursuant to the provisions of Article 26 (1) 3 and 5 of this Decree or a contract based on a rough estimate pursuant to the provisions of Article 70 of this Decree, may not determine the projected price, and in case of a tender on a package deal basis and a shop design and construction tender pursuant to the provisions of Article 78 of this Decree, the estimated price may not be determined. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 8 (Methods for Determining Projected Price) (1) The projected price shall be determined with respect to the total amount of the items for which the contract is to be concluded: Provided , That in case of a contract under which the manufacture, construction work, repair, processing, purchase and sale, supply, and renting are performed continually during a certain fixed period, the estimated price may be determined with respect to the unit cost. (2) In case of a construction work which takes some years to perform and under which the contents of the whole business are fixed in accordance with the design, etc. (hereinafter referred to as “long-term continuous construction work”) and a contract for the manufacture, etc. of goods which takes some years to perform and under which the contents of the object of the contract are fixed in accordance with the design or the specifications, etc. (hereinafter referred to as the “long-term manufacture, etc. of goods”), the projected price shall be determined within the limits of the total amount of the construction work or the total amount of the manufacture, etc. appropriated in the budget. 법령보기 화면  Article 9 (Criteria for Determination of Projected Price) (1) The head of each central government agency or the public official in charge of contracts shall determine the projected price by using the price prescribed in the following subparagraphs as the criteria: 1. In a case where a suitable transaction is executed, an actual example price of that transaction (in a case where the price is determined pursuant to the provisions of Acts and subordinate statutes, an actual price of that transaction within the limit of the determined price); 2. In case where there is no suitable actual example price of a transaction due to a newly-developed product or to special characteristics of a contract for special goods such as goods of extraordinary dimension, special construction work, or special services, etc., the price calculated by cost accounting. In this case, the price calculated by cost accounting shall be calculated on the basis of the cost of materials, labor cost, overhead expenses, general management expenses, and profits necessary for goods, construction work, and services, etc., which are the object of a contract; 3. In case of a construction work, the price approved by the head of a central government agency as the construction work performance cost which is accumulated on the basis of the construction work which has been already performed; and 4. In case where it is impossible to use the price pursuant to the provisions of subparagraphs 1 through 3 above , an appraised value, and an actual example price or an estimated cost of transaction of similar goods, similar construction works, and similar services, etc.. (2) The head of each central government agency or the public official in charge of contracts, in determining the projected price pursuant to the provisions of paragraph (1) of this Article, shall take into consideration the volume of contract, duration of performance, supply and demand situation, contractual conditions or other various conditions. (3) Matters necessary for the determination of the projected price, except for the matters prescribed in paragraphs (1) and (2) of this Article shall be determined by the Minister of Finance and Economy. CHAPTER Ⅲ METHOD OF CONTRACTING 법령보기 화면  Article 10 (Methods for Competition) (1) Competition pursuant to the provisions of Article 7 of the Act shall be conducted by method of tender. (2) The head of each central government agency or the public official in charge of contracts, if it is deemed necessary for the sale of movables, may put such movables to auction, instead of using the method of tender pursuant to the provisions of this Decree. 법령보기 화면  Article 11 (Effectuation of Competitive Tender) A competitive tender shall be effected by a valid tender in which two or more persons participate. 법령보기 화면  Article 12 (Qualifications to Participate in Competitive Tender) The head of each central government agency or the public official in charge of contracts shall allow only those persons who satisfy the necessary conditions referred to in the following subparagraphs to participate in a competitive tender: <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 1. A person who possesses or leases the facilities and the shops necessary for the manufacture and supply of materials for the related tender; 2. A person who has obtained a license, approval, or registration, and has filed a report, etc. if such items are required pursuant to the provisions of other Acts and subordinate statutes or who has satisfied certain qualifications if such qualifications are required; 3. A person who has been judged suitable by a related government agency in cases where investigations, such as a security inspection, are required; and 4. A person who has satisfied any other necessary conditions prescribed by the Ordinance of the Prime Minister. 법령보기 화면  Article 13 (Prequalification to Participate in Tender) (1) The head of each central government agency or the public official in charge of contracts, in the case of construction work as prescribed by the Ordinance of the Prime Minister, may examine the qualifications to participate in the tender in advance with respect to an applicant for prequalification to participate in the tender, and may select eligible persons to participate in the competitive tender. In this case, the result of the selection shall be notified to the eligible persons to be selected. (2) The head of each central government agency or the public official in charge of contracts, when intending to examine the qualifications of a participant in a tender pursuant to paragraph (1) of this Article, shall determine detailed standards for examination on qualification to participate in the tender in accordance with standards for examination determined by the Minister of Finance and Economy, and shall make them available for inspection by the persons who intend to participate in the tender prior to the tender. (3) The head of each central government agency or the public official in charge of contracts, if the related Acts and subordinate statutes prescribe the procedures for selection of a businessman with respect to services, etc., may select the eligible persons to participate in the competitive tender according to such procedures, etc. 법령보기 화면  Article 14 (Tender for Construction Work) (1) The head of each central government agency or the public official in charge of contracts, when intending to put construction work to the tender, shall prepare and keep a design, and a bill of materials required for each type of construction work(hereinafter referred to as the “bill of materials”), detailed explanatory notes necessary for the calculation of the unit cost of the volume of materials, or other documents concerning the tender as prescribed by the Ordinance of the Prime Minister (hereinafter referred to as the “documents for the tender”), and shall make them available for inspection at the request of the persons who intend to participate in the tender from the date of the public notice of the tender to the closing day of registration for the tender: Provided , That in the case of construction work of which the estimated price is equal to or exceeds the posted amount, if there are requests by persons who intend to participate in the tender, the head of each central government agency or the public official in charge of contracts shall deliver those documents to such persons. (2) In case of construction work of which the estimated price is a hundred million won or more but less than the posted amount, the design, the bill of materials, and detailed explanatory notes necessary for calculation of the unit cost of the volume of materials from among the documents for the tender pursuant to paragraph (1) of this Article shall be delivered to the successful bidder. (3) The head of each central government agency or the public official in charge of contracts, when intending to put construction work to the tender, shall make an explanation of the construction work site in advance before the closing day of the submission of documents for the tender: Provided , That if an explanation on the construction work site is deemed unnecessary due to the characteristics of the construction work, this shall not apply. (4) An explanation of the construction work site pursuant to the provisions of paragraph (3) of this Article shall be made according to the size of construction work before the period prescribed in each of the following subparagraphs to be calculated from the day preceding the closing day of the submission of the documents for the tender: Provided , That if the provisions of Article 35 (2) of this Decree are applicable, such period may be shortened: 1. In case where the estimated price is less than one billion won, ten days; 2. In case where the estimated price is one billion won or more but less than the posted amount, twenty days; and 3. In case where the estimated price is equal to or exceeds the posted amount, thirty three days. (5) The head of each central government agency or the public official in charge of contracts, when making an explanation of the construction work site pursuant to the provisions of paragraphs (3) and (4) of this Article in the case of tender for construction work of which the estimated price is equal to or exceeds the posted amount, shall enable only those persons who have participated in such explanation of the construction work site to participate in the tender. (6) The head of each central government agency or the public official in charge of contracts, in case of a tender for construction work, shall cause the bidders to indicate the total amount of the tender price in the documents for the tender, but in the case of construction work of which the estimated price is equal to or exceeds the posted amount, the statement of particulars concerning the calculation of the amount tendered where a unit cost is indicated in the bill of materials which is distributed pursuant to paragraph (1) of this Article (hereinafter referred to as the “statement of particulars concerning the calculation”) shall be attached to the documents for tender by the bidder. (7) If the construction work for which the estimated price is less than the posted amount and the construction work which is equal to or exceeds the posted amount is put to a tender again under the provisions of Article 20 (1), the successful bidder shall be required to submit a statement of particulars concerning the calculation by the time a written notice to proceed is submitted. (8) In case of long-term continuous construction work, the whole construction work shall be put to tender. [This Article Wholly Amended by Presidential Decree No. 15186, Dec. 31, 1996] 법령보기 화면  Article 15 (Restriction on Participation in Tender for Continuous Construction Work) The head of each central government agency or the public official in charge of contracts, in case of construction work for which a negotiated contract may be concluded with an immediately preceding or current person carrying out construction work pursuant to the provisions of Article 26 (1) 4 (a) through (c) (hereinafter referred to as the “continuous construction work”), shall prevent those persons who have not concluded a negotiated contract participating in a competitive tender related to a related construction work. [This Article Wholly Amended by Presidential Decree No. 15186, Dec. 31, 1996] 법령보기 화면  Article 16 (Tender for Manufacture and Purchase of Goods, and for Services, etc.) (1) The head of each central government agency or the public official in charge of contracts, when intending to put the manufacture and purchase of goods, and services, etc. to the tender, shall prepare and keep documents concerning the tender, and if there are requests by those persons who intend to participate in the tender, shall make those documents available for inspection from the date of the public notice for the tender to the closing day of the registration for the tender: Provided , That in the case of a tender for the manufacture and purchase of goods, or of services, etc. of which the estimated price is equal to or exceeds the posted amount, if there are requests by those persons who intend to participate in the tender, the head of each central government agency or the public official in charge of contracts shall deliver those documents to such persons. (2) The head of each central government agency or the public official in charge of contracts, if deemed necessary due to the special characteristics of the contract when carrying out software business pursuant to the provisions of Article 2 of the Software Development Promotion Act , may put goods and services on a package deal basis for a tender pursuant to the provisions of Article 14 (2) of the Enforcement Decree of the said Act . (3) The head of each central government agency or the public official in charge of contracts, when putting goods and services on a package deal basis for a tender pursuant to the provisions of paragraph (2) of this Article, shall choose a method for selecting a successful bidder which is deemed to be suitable in view of the special characteristics of the contract, from the methods of selecting the successful bidder pursuant to the provisions of Articles 42 (1) and (5), and 43 of this Decree, and shall clearly indicate such method in the public notice for the tender. (4) A tender for the manufacture and purchase of goods, and of services, etc. shall be conducted by means of the documents for the tender in the forms prescribed by the Ordinance of the Prime Minister, and in case of a tender which is conducted with respect to the total amount, the amount tendered shall be indicated as the total amount, and in case of a tender which is conducted with respect to the unit cost, the amount tendered shall be indicated as the unit cost. (5) The provisions of Article 14 (8) of this Decree shall apply mutatis mutandis to the long-term manufacture of goods, etc. [This Article Wholly Amended by Presidential Decree No. 15186, Dec. 31, 1996] 법령보기 화면  Article 17 (Tender for Large Quantity of Goods) (1) A general competitive tender, when selling off a large quantity of goods, may be conducted for the quantity of goods which a consumer desires to purchase and for the unit cost of that quantity of goods within the limits of the quantity of goods which will be sold. (2) A general competitive tender, when manufacturing and purchasing a large quantity of required goods, may be conducted for the quantity of goods which a supplier desires to supply and for the unit cost of that quantity of goods within the limits of the quantity of goods which will be required. (3) The scope of the goods for a competitive tender in a desired quantity pursuant to paragraphs (1) and (2)of this Article shall be prescribed by the Ordinance of the Prime Minister. 법령보기 화면  Article 18 (Tender by Dual Stage Competition, etc.) (1) The head of each central government agency or the public official in charge of contracts, if it is difficult to prepare appropriate specifications in advance or it is deemed necessary in view of the special characteristics of the contract in case of a contract for the manufacture and purchase of goods and for services, may conduct a tender for the price of goods after conducting first a tender for the specifications or the technology. (2) In a case of paragraph (1) of this Article, the qualifications to participate in a tender for the price of goods shall be granted only to those persons who have been confirmed as eligible persons after opening the tender for the specifications or the technology. (3) The head of each central government agency or the public official in charge of contracts, if it is deemed necessary in view of the special characteristics of the contract, notwithstanding the provisions of paragraphs (1) and (2) of this Article, may conduct a tender for the specifications and the price of the goods or a tender for the technology and the price of the goods at the same time. In this case, a tender for the price of goods shall be open only to those persons who have been confirmed as an eligible person after opening the tender for the specifications or the tender for the technology. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (4) The head of each central government agency, when intending to perform a tender pursuant to the provisions of paragraphs (1) through (3) of this Article, shall determine the criteria and procedures for evaluation before the tender, and shall make them avaliable for inspection by the person who intends to participate in the tender. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 19 (Incidental Tender) (1) The head of each central government agency or the public official in charge of contracts, when putting to a tender construction work falling under the criteria prescribed by the Ordinance of the Prime Minister, shall cause the bidder to specify the matters concerning the subcontract, such as the part of the work to be subcontracted, the amount of the subcontract, and the subcontractor, from among the construction work constituting the tendered amount in the statement of particulars concerning calculation and shall cause the bidder to submit them: Provided , That in cases falling under one of the following subparagraphs this shall not apply: 1. In case of a re-tender pursuant to the provisions of Article 20 (1); 2. In case of a tender for an urgent construction work; 3. In case of a tender for construction work for which no specialized contractor intends to conclude a subcontract due to the requirement of special technology or regional characteristics; and 4. In case of a tender for construction work which is deemed to be inappropriate for a subcontract due to the performance of obligations, process control or security, etc. necessitated by defects of construction work. (2) When causing bidders to specify the matters concerning the subcontract pursuant to the provisions of paragraph (1) of this Article, for long-term continuous construction work, the head of each central government agency or the public official in charge of contracts shall cause them to indicate the tendered amount of the whole construction work: Provided , That if it is deemed necessary after taking into consideration the terms for the performance of construction work, the head of each central government agency or the public official in charge of contracts may cause the bidders to indicate the tendered amount of construction work which is to be performed in the first year of construction work. (3) Procedures incidental to a tender or other necessary matters pursuant to the provisions of paragraph (1) of this Article shall be determined and notified publicly by the Minister of Finance and Economy. 법령보기 화면  Article 20 (Re-Tender and Tender by Second Public Notice) (1) If there are not two or more valid bidders or there is no successful bidder in the competitive tender, a re-tender may be conducted at the same place as the place of that competitive tender. In this case, the re-tender shall not be considered as a new tender, and no limitations on the bidders or on the number of tenders shall be made. (2) If there is no bidder or no successful bidder or if a successful bidder does not conclude the contract, a tender by second public notice may be conducted. 법령보기 화면  Article 21 (Contract to be subject to Limited Competitive Tender, and Limited Matters) (1) In case where qualifications of a participant in the competition may be limited and the limited matters under the provisions of Article 7 of the Act are specified in the following subparagraphs and criteria for limitation of such limited matters as referred to in subparagraphs 1 through 6, and 9 of this Article shall be prescribed by the Ordinance of the Prime Minister: <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 1. In case of a contract for construction work the amount of which is determined by the Ordinance of the Prime Minister, the maximum amount to be contracted, the construction capabilities or the past records of construction performances which belong to the same type as the construction work concerned; 2. In case of a contract for construction work in which a special technology or a special method of construction is required, the status of possessing the technology necessary for the performance of the construction work concerned, or the past records of construction performance which belong to the same type as the construction work concerned; 3. In case of a contract for manufacture of goods in which special facilities or a special technology is required, the status of possessing the facilities and technology necessary for the manufacture of the goods concerned, or the past records of manufacture of goods which belong to the same type as the goods concerned; 4. In case of a contract for purchase of goods which requires a special capacity or quality, the capability to deliver the goods concerned; 5. In case of a contract for service which requires a special technology, the status of possessing the technology necessary for the performance of the service concerned, or the past records of performance of a service which belongs to the same type as the service concerned; 6. In case of a contract for which the estimated price is less than the amount as prescribed by the Ordinance of the Prime Minister, the location of the principal place of business; 7. If the contract for construction work is concluded on the basis of limitations pursuant to the provisions of Article 22 , the criteria for such limitations; 8. If the goods publicly notified by the Minister of Trade, Industry and Energy, in consultation with the Minister of Finance and Economy pursuant to the provisions of the Promotion of Small and Medium Enterprises and Encouragement of Purchase of Their Products Act are manufactured and purchased, a small and medium entrepreneur referred to in Article 2 of the Framework Act Small and Medium Enterprises ; and 9. If the head of each central government agency or the public official in charge of contracts specially deems it necessary to avoid the event of a failure to perform the contract, the financial status of a participant in the competition. (2) The head of each central government agency or the public official in charge of contracts, when intending to limit the qualification of participants in the competition, shall specify the limited matters and the criteria for limitation in the public notice of the tender. (3) The head of each central government agency or the public official in charge of contracts, when it is deemed necessary for construction work in which the qualification of participants in the competition is limited pursuant to the provisions of paragraph (1) 6 of this Article, may substitute public notice of the tender pursuant to the provisions of paragraph (2) of this Article by notifying the persons eligible to participate in the tender of the matters prescribed in each subparagraphs of Article 36 under the provisions of the Ordinance of the Prime Minister. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 22 (Tender by Limitation according to Character and Size of Construction Work) (1) The head of each central government agency or the public official in charge of contracts may cause the persons eligible to participate in the tender to apply for registration by categorizing the construction work according to character and size thereof, by determining the criteria for limitation of competition corresponding to each category, and by notifying them publicly by means of publishing the criteria in advance in the Gazette or daily newspapers. (2) The head of each central government agency or the public official in charge of contracts, when receiving an application for registration pursuant to the provisions of paragraph (1) of this Article, may make the registration by examining the application for registration, by registering persons eligible to participate in the tender after selecting persons eligible to participate in the tender according to the character and size of construction work, and by notifying those persons eligible of the matters prescribed in each subparagraphs of Article 36 every time the tender for construction work is conducted to enable them to participate in the tender. (3) The head of each central government agency, when intending to determine the criteria for limitation of the competition pursuant to the provisions of paragraph (1) of this Article, shall consult with the Minister of Finance and Economy. 법령보기 화면  Article 23 (Contract Subject to Nominated Competitive Tender) (1) Cases which may be put to a nominated competitive tender pursuant to the provisions of proviso of Article 7 of the Act falling under any of the following subparagraphs: 1. In case where less than 10 persons are expected to participate in the tender since it is difficult to accomplish the purpose of contract when judging by the character and purpose of the contract unless the prospective participants possess special facilities, technology, materials, goods, or past records of performances; 2. In case where construction work or manufacture of which the estimated price is one hundred million won or less; 3. In case where selling or purchasing properties of which the estimated price is thirty million won or less; 4. In case where leasing out or hiring articles of which the total amount of the estimated rental charge for hiring or leasing is thirty million won or less; 5. In case where a contract, other than contracts to subcontract construction work, for manufacture and for selling of properties, or leasing out or hiring articles, of which the estimated price is three million won or less; 6. In case of manufacturing or buying those articles authorized to bear the mark indicating the mining and manufacturing standards pursuant to the provisions of Article 11 of the Industrial Standardization Act or certified or rated by the Quality Management Promotion Act; 7. In case of concluding a contract with a person who is designated as an excellent contractor or an excellent service entrepreneur under the provisions of the Ordinance of the Prime Minister; 8. In case where the negotiated contract may be concluded pursuant to the proviso of Article 7 of the Act and Article 26 of this Decree; 9. In case of manufacturing or buying recyclable products or the products authorized to bear the certified environmental mark in compliance with the request to take the necessary measures such as preferential purchase, etc. pursuant to the provisions of Article 30 (2) of the Act on the Promotion of Saving and Recycling of Resources and the provisions of Article 11 of the Development of Environmental Technology Act ; and 10. In case of concluding a contract with the small and medium entrepreneur referred to in Article 2 of the Framework Act on Small and Medium Enterprises for the manufacture or purchase of goods which are publicly announced by the Minister of Trade, Industry and Energy in consultation with the Minister of Finance and Economy pursuant to the provisions of the Promotion of Small and Medium Enterprises and Encouragement of Purchase of Their Products Act . (2) Those public officials who are entrusted by the head of each central government agency, when intending to conclude a contract by nominated competitive tender pursuant to the provisions of paragraph (1) 1 of this Article, shall obtain the approval of the head of the central government agency which they belong to, and when the head of each central government agency has given his approval, the Board of Audit and Inspection shall be notified thereof. 법령보기 화면  Article 24 (Nomination of Prospective Participants in Nominated Competitive Tender) (1) The head of each central government agency or the public official in charge of contracts, when intending to conduct a nominated competitive tender pursuant to the provisions of Article 23 , shall nominate five or more prospective participants in the tender, and thereafter three or more prospective participants shall apply for participation in the tender: Provided , That if the prospective participants to be nominated are less than five persons, this shall not apply. (2) In case of paragraph (1) of this Article, the matters referred to in each subparagraphs of Article 36 shall be announced to each prospective participant in the tender. (3) The head of each central government agency or the public official in charge of contracts, when intending to nominate prospective participants in the tender pursuant to the provisions of paragraph (1) of this Article, shall notify them thereof under the provisions of the Ordinance of the Prime Minister, and thereafter shall confirm as to whether the prospective participants will participate in the tender or not. 법령보기 화면  Article 25 (Plural Competition of Similar Goods) The head of each central government agency or the public official in charge of contracts, when intending to designate and purchase goods meeting certain requirements for quality, performance, or efficiency, etc. from among similar goods having a different quality, performance, or efficiency, etc., may put them to a plural competition. In this case, the bidder presenting the lowest rate of the tendered amount for the projected price set for such similar goods shall become the successful bidder. 법령보기 화면  Article 26 (Cases Allowing Negotiated Contract) (1) Cases which allow a negotiated contract to be concluded pursuant to the proviso of Article 7 of the Act shall be prescribed in the following subparagraphs: <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 1. Cases where there is no time to conduct a competitive tender due to natural disasters, movement of military forces for military operations, urgent event, emergency disaster, or other events similar thereto; 2. Cases where it is necessary to conduct the activities of government agencies in secret; 3. Case where the contract is concluded with other government agencies and local government; 4. Cases falling under one of the following items where it is impossible to compete due to the technology and service of a particular person, or a particular location, structure, quality, performance, or efficiency, etc.; (a) Cases where the contract is concluded with a person having carried out or carrying out construction work at the present time or at the time immediately preceding the present time for whom it is difficult to specify liability for the future defects of the facilities built under construction work; (b) Cases where a contract is concluded with a person having carried out or carrying out construction work at the present time or at the time immediately preceding the present time since two or more contractors shall not carry out the construction work in the same place due to disorderly working conditions; (c) Cases where the contract is concluded with a person having carried out or carrying out construction work at the present time or at the time immediately preceding the present time for finishing the work; (d) Cases where it is actually impossible to conduct a competitive tender since the construction work is in a special region such as a region adjacent to an enemy; (e) Cases where it is actually impossible to conduct a competitive tender since the construction work is by a patented method of construction where construction work is by a new technology notified publicly pursuant to the provisions of Article 18 of the Construction Technology Management Act (limited to the protection period designated pursuant to the said Act); (f) Cases where a person manufacturing or supplying related articles directly installs or assembles them; (g) Cases where articles are manufactured or purchased which are patented or registered as a utility model or as a design: Provided , That cases where the articles can be manufactured by presenting their specifications and their contents, or cases where the purpose of business may be accomplished even by purchasing other articles shall be excluded; (h) Cases where it is impossible to accomplish the purpose of business by having other articles manufactured or purchasing other articles because the said articles are manufactured or held by only one person; (I) Cases where parts are purchased of foreign capital facilities, machines, and equipment which may not be substituted by domestic goods but have been already introduced; (j) Cases where a service contract is concluded for the examination, design, supervision, special surveying, training, and facilities management which require the technology of a particular person or where a design service contract is concluded with a person who has won the prize in an open contest for the design; (k) Cases where real estate such as land and buildings, etc. of a particular person is purchased, or where the properties are leased out to or hired from a particular person; and (l) Cases where articles are procured to exchange for parts or to expand facilities already procured and their compatibility is lost if they are manufactured or supplied by others than the person who has manufactured and supplied them. 5. Cases where a contract is concluded for construction work, of which the estimated price is less than fifty million won and a manufacture, purchase, and service contract or other contracts are concluded for articles of which the estimated price is less than twenty million won(in the case of hiring or leasing out articles, the basis is the annual amount or the total amount). 6. Case where a particular entrepreneur is caused to purchase or manufacture special articles and special properties pursuant to the provisions of other Act such as those falling under any of the following items: (a) Cases where products are purchased which are authorized to bear the mark indicating the mining and industry standards pursuant to the provisions of Article 11 of the Industrial Standardization Act or products certified or rated by the Quality Management Promotion Act from a manufacturer of the said products if he is the only manufacturer; (b) Cases where a collective negotiated contract is concluded under Article 9 of the Promotion of Small and Medium Enterprises and Encouragement of Purchase of Their Products Act ; (c) Cases where defense equipment and materials are manufactured by an entrepreneur in the defense industry and they are purchased from the said enterprise pursuant to the Act on Special Measures for Defense Industry ; and (d) Cases where articles are produced by a factory located in an agricultural and industrial complex (including a factory) pursuant to the Act on the Special Measures for Development of Agricultural and Fishing Villages and they are purchased from that factory. 7. Cases where a contract is required to be concluded with a person with a special relationship, a local resident, the producer of particular articles or where other reasons similar thereto exist such as those falling under each of the following items: (a) Cases of disposing of certain properties by selling or leasing them for valuable consideration to a person to whom those properties may be transferred or rented free of charge pursuant to the provisions of other Acts; (b) Cases of selling state-owned materials for reconstruction to persons who have suffered damage due to the occurrence of an emergency or disaster; (c) Cases of selling or leasing out a discarded official residence to a person with a special relationship or leasing out forests and fields to a person with a special relationship; (d) Cases of selling materials necessary for developing an overseas market to the person who has developed the overseas market; (e) Cases of concluding the contract for construction work of which the estimated price is less than twenty million won or the contract for cultivating young trees of which the estimated price is less than twenty million won directly with local residents or representatives thereof designated by the Ordinance of the Prime Minister if the majority of the local residents need to participate therein for the development of a local community; (f) Cases of causing a producer to manufacture the articles directly produced by a welfare factory of a self-support collective village by persons with distinguished services to the state as designated by the Minister of Patriots and Veterans Affairs or purchasing them from the producer thereof, or selling or leasing out such articles directly to the producer; (g) Cases of causing a producer to manufacture the products based on new technology or products selected for development as recognized or designated by the competent Minister (including a person who has been entrusted by the competent Minister) in order to promote the localization of the products or purchasing them from the producer thereof within two years after confirming that the development thereof has been completed; and (h) Cases where the Minister of National Defense causes an enterprise engaged in research and development of standardized products for military use or an enterprise mobilized in time of war pursuant to the Emergency Resources Management Act to manufacture standardized products for military use or purchase standardized products for military use from an enterprise engaged in the research and development thereof or an enterprise mobilized in time of war(in the case of an enterprise mobilized in time of war, only standardized products for military use as designated by the Minister of National Defense). 8. Cases where other unavoidable reasons in view of the purpose and character of the contract exist such as those falling under each of the following items: (a) Cases of purchasing materials used by overseas diplomatic and consular missions in an overseas location; (b) Cases where it is deemed disadvantageous to make any person process, load and unload, transport, or take custody of products under a competitive tender; (c) Cases of concluding a contract for the manufacture, purchase, or service of products with juristic persons established pursuant to special Acts who produce such products directly by carrying on a line of businesses prescribed by the relevant special Act, or selling or leasing out products directly to such juristic persons; (d) Cases where juristic persons established pursuant to the Social Services Act directly manufactures the products or the products are purchased from such juristic persons; (e) Cases of concluding a contract for the manufacture, purchase, or service of products with an association consisting of wounded persons from among associations established pursuant to the provisions of Article 1 of the Act on the Establishment of Associations by Persons etc. of Distinguished Services to the State , or selling, or leasing out products directly to those associations; (f) Cases where the products are manufactured directly by an organization for the welfare of disabled persons established pursuant to Article 45 of the Welfare of Disabled Persons Act from among the incorporated associations established pursuant to the provisions of Article 32 of the Civil Act and the products are purchased from such organizations; (g) Cases where the products are manufactured directly by UNICEF, Korea Commission established pursuant to the provisions of Article 32 of the Civil Act and the products are purchased from such organization; and (h) Cases of concluding a contract for a relevant project with persons who may be entrusted with a national project or may carry out such project vicariously pursuant to the provisions of other Acts and subordinate statutes. (2) The public official in charge of contracts, when intending to conclude a negotiated contract pursuant to the provisions of paragraphs 4 (1) and 7 (a) through (e), (g), (h), paragraph (1) 8 (b), (c) and (e) through (h) of this Article, shall obtain the approval of the head of a central government agency to which the public official in charge of contracts belongs, and when the head of such central government agency approves the contract pursuant to the provisions of paragraph (1) 4 of this Article, he shall notify the Board of Audit and Inspection thereof. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 27 (Tender by Second Public Notice, etc. and Negotiated Contract) (1) If there is no bidder or successful bidder for a tender conducted by second public notice under the provisions of Article 20 (2) and a competitive tender has been conducted under the provisions of Article 10 but there is only one tender and it is deemed clear that there shall be only one person qualified to participate in a competitive tender pursuant to the provisions of Article 12 even if the tender is conducted by second public notice, the tender may be conducted on the basis of a negotiated contract. In this case, the price and other conditions determined for the first tender shall not be modified except for the guaranty money and time limit. (2) The provisions of paragraph (1) of this Article shall apply mutatis mutandis to a second nominated competitive tender. 법령보기 화면  Article 28 (Negotiated Contract When Successful Bidder Fails to Conclude Contract) (1) When a successful bidder fails to conclude the contract, a negotiated contract may be concluded in an amount not less than the lowest tender price: Provided , That the price and other conditions determined for the first tender shall not be modified except for the time limit. (2) The provisions of paragraph (1) of this Article shall apply mutatis mutandis to cases where a successful bidder does not commence to carry out the contract within the prescribed date after concluding the contract or where the contract is cancelled or terminated because the successful bidder fails to fulfill contractual obligations after commencing to carry out the contract. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 29 (Divided Negotiated Contract ) In the case of Articles 26 (1) 6 (c), 27 , and 28 , only if it is possible to divide and calculate the estimated price or the lowest tender price, the contract may be concluded by dividing it among several persons in an amount not less than the estimated price or the lowest tender price. 법령보기 화면  Article 30 (Request for Submission of Written Estimate) (1) If the tender is to be conducted on the basis of a negotiated contract, written estimates shall be received from two or more persons: Provided , That in the case of a contract pursuant to the provisions of the Articles 26 (1) 4, 6 (a) and (b), 27 , and 28 or in the case of a contract the amount of which is twenty million won or less, a written estimate may be received from one person. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (2) Notwithstanding the provisions of paragraph (1) of this Article, in those cases prescribed by the Ordinance of the Prime Minister, a submission of a written estimate may be dispensed with. 법령보기 화면  Article 31 (Contract Amount of Negotiated Contract for Continuous Construction Work) In case of continuous construction work, the contract amount, after the relevant construction work has been completed, shall not exceed the amount calculated by multiplying the estimated price by the ratio at which the first construction work has been awarded (meaning the ratio of the successful tender price or the contracted price of the first construction work to the estimated price): Provided , That in cases determined by the Minister of Finance and Economy, this shall not apply. 법령보기 화면  Article 32 (Application Mutatis Mutandis to Competitive Contracts) The provisions of Article 12 shall apply mutatis mutandis to the case of a negotiated contract: Provided , That in the case of Article 26 (1) 6 (b) this shall not apply. CHAPTER Ⅳ PROCEDURE FOR TENDER AND SUCCESSFUL TENDER 법령보기 화면  Article 33 (Public Notice of Tender) (1) When a competition is to be conducted by method of tender, this shall be notified publicly in the Gazette or daily newspapers or in a notice on a bulletin board, unless otherwise prescribed by this Decree: Provided , That if the estimated price is more than the amount prescribed by the Ordinance of the Prime Minister, it shall be notified publically in the Gazette or daily newspapers. (2) The head of each central government agency or the public official in charge of contracts, when giving the public notice pursuant to the provisions of paragraph (1) of this Article, may conduct the public notice by concurrently using a communications network of the telecommunications service provider pursuant to the Telecommunications Business Act . 법령보기 화면  Article 34 (Notification for Participation in Tender) The head of each central government agency or the public official in charge of contracts, if necessary for the maintenance of the security of the State, notwithstanding the provisions of Article 33 , may give notification of the matters referred to in Article 36 to the persons eligible to participate in the tender under the provisions of the Ordinance of the Prime Minister and cause them to submit an application for participation in the tender. In this case, with respect to the time for the notification, the provisions of Article 35 shall apply mutatis mutandis . 법령보기 화면  Article 35 (Time for Public Notice of Tender) (1) Public notice of tender shall be given at least ten days in advance to be calculated from the day preceding the closing day for submission of the tender documents before the tender is conducted . <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (2) In case of a tender for construction work, notwithstanding the provisions of paragraph (1) of this Article, the public notice of tender shall be given at least seven days in advance to be calculated from the day preceding the day for explanation of the construction work site pursuant to the provisions of Article 14 (4), before the tender is conducted: Provided , That in case of a tender for constraction work referred to in Article 13 , the public notice of tender shall be given at least thirty days in advance to be calculated from the date preceding the date for explanation of the construction work site. <Newly Inserted by Presidential Decree No. 15186, Dec. 31, 1996> (3) When an explanation of the construction work site is not conducted pursuant to the proviso of Article 14 (3) in the case of a tender for construction work, notwithstanding the provisions of paragraphs (1) and (2) of this Article, the public notice of tender shall be given at least as many days as prescribed in the following subparagraphs to be calculated from the day preceding the closing day for the submission of the tender documents before the tender is conducted. <Newly Inserted by Presidential Decree No. 15186, Dec. 31, 1996> 1. In case where the estimated price is less than one billion won, ten days, 2. In case where the estimated price is one billion won or more, and less than the notified amount, twenty days; and 3. In case where the estimated price is more than the notified amount, forty days. (4) Notwithstanding the provisions of paragraphs (1) through (3) of this Article, in case of an emergency and of a tender by second public notice pursuant to the provisions of Article 20 (2), the public notice of tender shall be given at least five days in advance to be calculated from the day preceding the closing day for the submission of the tender documents. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 36 (Contents of Public Notice for Tender) Matters prescribed in each of the following subparagraphs shall be specified in the public notice of the tender: 1. Matters to be put to the tender; 2. Place, and date and time of the tender or the opening of the tender; 3. In case of a tender for construction work, matters concerning the place, and date and time of an explanation of the construction work site, qualifications to participate in the public tender, and obligation to participate in the public tender; 4. Matters concerning the qualifications of participants in the tender; 5. Matters concerning a bid bond, and the reversion thereof to the national treasury; 6. Methods to decide a successful tender; 7. Commencement day and completion day of the contract; 8. Place where the contractual conditions are publicly notified; 9. Matters concerning the invalidity of a tender pursuant to the provisions of Article 39 (3); 10. Place where the documents for the tender can be made available for inspection, or delivered as well as the cost for delivery thereof; 11. Address, etc. of an agency from which additional information may be obtained; 12. In case of permitting the tender by mail, etc., the address to which the notice to that effect and the documents for the tender shall be sent; 13. In case of permitting a joint contract pursuant to the provisions of Article 72 , the fact that a joint contract may be concluded (in case of a joint contract pursuant to the provisions of Article 72 (3) and (4), including matters concerning the limitations on qualifications of the members of a joint supply and demand organization)and methods of performing the joint contract; 14. In case of an incidental tender pursuant to the provisons of Article 19 , a statement to that effect; 15. In case of a tender pursuant to the provisons of Article 78 , matters concerning a tender by an alternative proposal, a tender on a package deal basis, or a shop design and construction tender, etc.; and 16. Other necessary matters concerning the tender. [This Article Wholly Amended by Presidential Decree No. 15186, Dec. 31, 1996] 법령보기 화면  Article 37 (Amount of Bid Bond) (1) The amount of the bid bond pursuant to the provisions of Article 9 of the Act shall be 5/100 or more of the tendered amount (in case of a tender by the unit cost, the amount calculated by multiplying the unit cost by the total estimated quantity of the tender). <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (2) The amount of the bid bond shall be paid in cash (including a cheque on the drawer himself issued by postal service organizations or by financial institutions governed by the Banking Act . The same shall apply to the following provisions.) or with a certificate of guarantee prescribed in each of the following subparagraphs: <Amended by Presidential Decree No. 14973, Apr. 8, 1996; Presidential Decree No. 15186, Dec. 31, 1996> 1. Certificate of payment guarantee issued by the financial institutions pursuant to the provisions of Article 135 of the Enforcement Decree of the Budget and Accounts Act (hereinafter referred to as “financial institutions”) and foreign financial institutions pursuant to the Banking Act ; 2. Negotiable instruments referred to in Article 21 of the Enforcement Decree of the Furtherance of the Capital Market Act ; 3. Policy of reassurance issued by an insurance company pursuant to the Insurance Business Act ; 4. Guarantee of payment to cover the amount owed by the construction industry’s mutual aid association, the specialized construction industry’s mutual aid association and mutual aid association according to the line of business pursuant to the Specialized Construction Mutual Aid Association Act , the electricity work mutual aid association pursuant to the Electricity Construction Mutual Aid Association Act , the credit guarantee fund pursuant to the Credit Guarantee Fund Act , the technology credit guarantee fund pursuant to the Financial Assistance to New Technology Businesses Act , the telecommunications mutual aid association pursuant to the Telecommunications Work Business Act , the engineering mutual aid association pursuant to the Engineering Technology Promotion Act , the organization of mutual aid business pursuant to the Industrial Development Act , the agency of mutual aid business notified publicly by the Minister of Information and Communication pursuant to the Software Development Promotion Act , or the Korea Society for the Advancement of Machine Industry for environmental facilities pursuant to the Act on the Promotion of the Conversion into Environment-Friendly Industrial Structure ; 5. Certificate of time deposit issued by financial institutions and foreign financial institutions, and postal service organizations referred to in subparagraphs 1 of this paragraph; 6. Beneficiary certificate issued by a trust company pursuant to the Trust Business Act ; and 7. Beneficiary certificate issued by a management company pursuant to the Securities Investment Trust Business Act . (3) Persons who are exempted from paying in whole or in part of the amount of the bid bond pursuant to the proviso of Article 9 (1) of the Act , shall be specified in each of the following subparagraphs: <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 1. Government agencies and local governments; 2. Government-invested institutions pursuant to the Framework Act on the Management of Government-Invested Institutions . 3. Juristic persons to which the government contributes 50/100 or more of the basic property(including the property reverted to the national treasury in accordance with the relevant Acts. The same shall apply to the following provisions); 4. National Agricultural Cooperatives and the National Agricultural Cooperatives Federation pursuant to the Agricultural Cooperatives Act , Livestock Industry Cooperatives Association and the National Livestock Industry Cooperatives Federation pursuant to the Livestock Industry Cooperatives Act , Fisheries Cooperatives Association, fishing village mutual loan clubs and the National Fisheries Cooperatives Federation pursuant to the Fisheries Cooperatives Act , Forestry Cooperatives Association and the National Forestry Cooperatives Federation pursuant to the Forestry Cooperatives Act , Small and Medium Enterprise Cooperative Association and the National Small and Medium Enterprise Cooperatives Federation pursuant to the Small and Medium Enterprise Cooperatives Act ; and 5. Juristic persons who have obtained the license, permission or approval, etc. pursuant to the Acts and subordinate statutes such as the Construction Business Act , the Electrical Construction Business Act , or the Telecommunications Work Business Act , etc., and meet the criteria determined by the Minister of Finance and Economy. (4) The head of each central government agency or the public official in charge of contracts, when the events for the reversion to the national treasury arise pursuant to the provisions of Article 9 (3) of the Act , shall ask a person who is exempted from paying in whole or in part of the amount of the bid bond pursuant to the provisions of paragraph (3) of this Article to submit the document of undertaking to pay in order to ensure the payment of an amount corresponding to the amount of the bid bond. 법령보기 화면  Article 38 (Reversion of Amount of Bid Bond to National Treasury) (1) If the head of each central government agency or the public official in charge of contracts has received the certificates of guarantee pursuant to the provisions of Article 37 (2), the head of each central government agency or the public official in charge of contracts, when the events for the reversion to the national treasury arise pursuant to the provisions of Article 9 (3) of the Act , shall immediately give notification of that fact to the financial institutions or the guarantee institutions which fall under each subparagraphs of Article 37 (2), and the related competent revenue collectors or the public officials in charge of securities, etc., and shall have the relevant amount of the bid bond collected in cash or converted into securities possessed by the government under the provisions of the Ordinance of the Prime Minister. (2) The head of each central government agency or the public official in charge of contracts, when the events for the reversion to the national treasury pursuant to Article 9 (3) of the Act arise to a person who is exempted from paying in whole or in part of the amount of the bid bond pursuant to the proviso of Article 9 (1) of the Act , shall give notification of that fact to the competent revenue collectors with the document of undertaking to pay pursuant to the provisions of Article 37 (4), and shall ask the competent revenue collectors to collect in cash the amount corresponding to the amount of the bid bond from the related successful bidder. 법령보기 화면  Article 39 (Submission and Receipt of Documents for Tender, and Invalidity of Tender) (1) The documents for tender shall be submitted directly by the bidder at the place, and time and date indicated in the public notice for the tender in principle: Provided , That in case of permitting the tender by mail, etc., the documents for the tender may be submitted by mail. (2) The bidder may not exchange, modify, or cancel the documents for tender which have been already submitted: Provided , That in cases prescribed by the Minister of Finance and Economy, this shall not apply. (3) A tender performed by a person lacking the qualifications to participate in a competitive tender pursuant to the provisions of Articles 12 and 21 , a tender in violation of the terms and conditions of the tender and a tender falling under reasons prescribed by the Ordinance of the Prime Minister shall be invalidated. 법령보기 화면  Article 40 (Opening of Tender) The opening of tender shall be conducted in the presence of bidders at the place, and time and date indicated in the public notice for the tender. In this case, when there are persons not present at the opening of the tender, a public official not related to the tender shall be asked to participate in the opening of the tender. 법령보기 화면  Article 41 (Determination of Successful Bidder in Competitive Tender Which Becomes Source of Revenue) In a competitive tender which becomes a source of revenue, a bidder participating in the tender with a digest price which is more than the estimated price shall become the successful bidder. 법령보기 화면  Article 42 (Determination of Successful Bidder in Competitive Tender Which Charged to National Treasury) (1) In a public tender which is a charge to the national treasury, a bidder participating in the tender with the lowest price which is less than the projected price, shall become the successful bidder: Provided , That in a case of a contract for construction work, goods, and service, etc. of which the estimated price is more than the notified amount, before determining the successful bidder, the capabilities of participants in the tender to perform the contract shall be examined according to the order starting with the bidder who has quoted the lowest price which is less than the projected price. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 1 and 2 Deleted. <by Presidential Decree No. 15186, Dec. 31, 1996> (2) In examination pursuant to the provisions of paragraph (1) of this Article, whether any bidder is eligible or not shall be determined on the basis of detailed examination criteria determined according to the examination criteria prescribed by the Minister of Finance and Economy by taking into consideration comprehensively the past records of performances by related bidders, technological capabilities, financial status, sincerity shown in performance of contracts in past, the appropriateness of the price for the supply of materials and manpower, the degree to which the contractual order is observed, the quality of the past construction performance, and the tendered price, etc. and a person deemed eligible as a result of the examination shall become the successful bidder: Provided , That if deemed necessary in view of the specific character of construction work or goods, etc., the head of each central government agency may directly determine the examination criteria through consultation with the Minister of Finance and Economy, and person who holds a past record of having supplied goods which are as good as or better than the goods to be supplied under the contract to the public agency referred to in Article 2 of the Promotion of Small and Medium Enterprises and Encouragement of Purchase of Their Products Act (hereinafter referred to as the “public agency”) may be chosen as the successful bidder without undergoing an examination of whether that person is eligible or not. (3) In case of a contract for construction work, manufacture of goods, and service of which the projected price is less than the notified amount, the head of each central government agency or the public official in charge of contracts shall choose as the successful bidder the participant in the tender who has quoted a price equal to 90/100 or more of the estimated price which is the lowest price from among the participants in the tender who have quoted the price which is less than the projected price. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (4) The Minister of Finance and Economy may prescribe the detailed criteria and procedures, etc. for the determination of the successful bidder pursuant to the provisions of paragraph (3) of this Article. (5) In case of a tender by dual stage competition, etc. pursuant to the provisions of Article 18 , notwithstanding the proviso of paragraphs (1) and (2) through (4) of this Article, the participant in the tender who has quoted a price which is less than the projected prices hall be determined as the successful bidder. <Amended by Presidential Decree No.15186. Dec. 31,1996> 법령보기 화면  Article 43 (Conclusion of Contract by Negotiation) (1) If deemed necessary in view of the special characteristics and urgency of a contract or national security, etc., the head of each central government agency or the public official in charge of contracts, notwithstanding the provisions of Article 42 , may conclude a contract by negotiation with a person deemed to be most favorable to the State after evaluating the written proposals submitted by many suppliers. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (2) The head of each central government agency or the public official in charge of contracts, when intending to conclude a contract pursuant to the provisions of paragraph (1) of this Article, shall state clearly that the contract is a contract by negotiation at the time of the public notice. <Newly Inserted by Presidential Decree No. 15186, Dec. 31, 1996> (3) The head of each central government agency or the public official in charge of contracts shall issue and deliver the necessary documents such as a written request for proposal, etc. to a persons who intend to participate in a contract by negotiation. <Newly Inserted by Presidential Decree No. 15186, Dec. 31, 1996> (4) The head of each central government agency shall determine the criteria and procedures necessary for concluding a contract pursuant to the provisions of paragraph (1) of this Article, and shall make them available for inspection by those persons who intend to participate in a contract by negotiation. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 44 (Determination of Successful Bidder according to Quality, etc.) (1) If deemed necessary for a contract for the manufacture and purchase of goods which are designated and notified publicly by the Minister of Finance and Economy, the head of each central government agency or the public official in charge of contracts, notwithstanding the provisions of Article 42 , shall determine the participant in the tender who has quoted the most economical price as the successful bidder by taking into consideration comprehensively not only the tendered price but also the quality, etc. of the related goods. (2) The head of each central government agency or a public official in charge of contracts, when intending to determine the successful bidder pursuant to the provisions of paragraph (1) of this Article, shall determine the criteria for evaluation of the quality, etc. concerning related goods according to the criteria prescribed by the Minister of Finance and Economy, and shall make them available for inspection by the participants in the tender. 법령보기 화면  Article 45 (Determination of Successful Bidder When Selling Off Large Quantity of Goods) When intending to sell off a large quantity of goods by dividing them according to the desired quantity to be sold pursuant to the provisions of Article 17 (1), notwithstanding the provisions of Article 41 , the successful bidders shall be determined according to the order of the bidders who have quoted the highest price from among the participants in the tender who have quoted a unit price which is more than the projected price until the required quantity is reached. 법령보기 화면  Article 46 (Determination of Successful Bidder When Manufacturing and Purchasing Large Quantity of Goods) When intending to manufacture and purchase a large quantity of goods by dividing them according to the desired quantity to be manufactured or purchased pursuant to the provisions of Article 17 (2), notwithstanding the provisions of Article 41 , the successful bidders shall be determined according to the order of the bidders who have quoted the lowest price from among the participants in the tender who have quoted a unit price which is less than the projected price until the required quantity is reached: Provided , That in case of goods designated and publically notified by the Minister of Finance and Economy, the successful bidders shall be determined according to the order of the bidders who have quoted the most economical price until the required quantity is reached. 법령보기 화면  Article 47 (Determination of Successful Bidder in Case of Tender with Equal Price) (1) The head of each central government agency or the public official in charge of contracts, when there are more than two persons who have quoted the same price which may be the successful price, shall determine immediately the successful bidder by means of drawing lots: Provided , That in case of a tender by 2 stage competitive tender, etc. pursuant to the provisions of Article 18 , a person who has excellent specifications and technology shall be determined as the successful bidder, and in case of determining the successful bidder pursuant to the proviso of Article 42 (1), the participant who has obtained the best marks as a result of examining the capability to perform the contract shall be determined as the successful bidder. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (2) In case of paragraph (1) of this Article, when there are persons not present or persons not drawing lots from among the bidders, the public officials not related to the tender may be asked to draw lots instead of those persons. (3) If there are more than two persons who have quoted the same price for a general competitive tender according to a desired quantity pursuant to the provisions of Article 17 (1) or (2), the participant who has tendered for more quantity than other participants shall be determined as the successful bidder. CHAPTER Ⅴ CONCLUSION AND PERFORMANCE OF CONTRACT 법령보기 화면  Article 48 (Preparation of Written Contract) (1) The form of the contract which the head of each central government agency or the public official in charge of contracts prepares pursuant to the provisions of the main text of Article 11 (1) of the Act and other necessary matters shall be prescribed by the Ordinance of the Prime Minister. (2) The public official in charge of contracts shall write the name and seal the written contract: Provided , That if the contract is concluded with a foreigner or where there are special reasons, the signature may take the place of writing the name and of the seal. 법령보기 화면  Article 49 (Ommission of Preparation of Written Contract) Cases where preparation of a written contract may be omitted pursuant to the proviso of Article 11 (1) shall be specified in each of the following subparagraphs: 1. Cases of concluding a contract of which the amount is less than twenty million won; 2. Cases of conducting an auction; 3. Cases where a buyer instantly pays the price and acquires the goods when related goods are sold; 4. Cases where each government agency and a local government conclude a contract each other; and 5. Cases where the preparation of a written contract is not required due to the characteristics of the contract such as a contract for the supply of electricity, gas, and piped water, etc. 법령보기 화면  Article 50 (Deposit for Contract) (1) The head of each central government agency or the public official in charge of contracts shall cause the deposit for the contract pursuant to the provisions of Article 12 of the Act to be paid for 10/100 or more of the contract amount. (2) In case of a unit-cost contract to be performed by being divided into several stages, notwithstanding the provisions of paragraph (1) of this Article 10/1000 or more of the amount calculated by multiplying the maximum quantity out of the estimated quantities which shall be performed at each stage by the contractual unit cost shall be made to be paid as the deposit for the contract. (3) In case of a continuous long-term contract, 10/100 or more of the amount of the whole construction work or the whole manufacture, etc., which is recorded in the books at the time of concluding the first contract, shall be made to be paid as the deposit for the contract. In this case, the related deposit for the contract shall be considered as the deposit for the contract for the whole of the construction work or the whole manufacture, etc. (4) In cases of not finding a joint and several sureties pursuant to the provisions of Article 52 for the contract for construction work, notwithstanding the provisions of paragraphs (1) and (3), the deposit for the contract shall be made to be paid for 20/100 or more of the contract amount, or a performance bond for construction work which guarantees to pay 40/100 or more of the contract amount shall be made to be submitted. (5) The Minister of Finance and Economy may determine necessary matters concerning the submission of the performance bond for construction work, etc. pursuant to the provisions of paragraphs (4) and (7) of this Article. (6) Cases where one may be exempted from paying in whole or in part of the deposit for the contract pursuant to the proviso of Article 12 (1) of the Act shall be specified in each of the following subparagraphs: 1. Cases of concluding a contract with a person referred to in the of Article 37 (3) 1 through 4; 2. Cases of concluding a collective negotiated contract with Small and Medium Enterprises Cooperatives pursuant to the provisions of Article 9 of the Promotion of Small and Medium Enterprises and Encouragement of Purchase of Their Products Act ; 3. Cases of concluding the contract of which the contract amount is less than twenty million won; and 4. Cases where the collection of the deposit is not appropriate in view of contractual customs generally recognized to be fair and reasonable. (7) The deposit shall be made to be paid in cash or with the certificates of guarantee prescribed in each subparagraphs of Article 37 (2): Provided , That if the successful tender price is less than 70/100 of the projected price, the deposit shall be made to be paid in cash only, but if the deposit is paid with a performance bond for construction work pursuant to the provisions of paragraph (4) of this Article, the performance bond for construction work shall guarantee to pay 60/100 or more of the contract (8) If the other party to the contract due to special reasons has made a request to replace the deposit paid in cash or with negotiable instruments prescribed in Article 21 of the Enforcement Decree of the Futherance of the Capital Market Act by a certificate of guarantee, etc. prescribed in the Article 37 (2) 1 through 5, it may be paid with such certificate of guarantee in an amount corresponding to the said cash or securities. (9) If the deposit has been paid only in cash pursuant to the proviso of paragraph (7), the provisions of paragraph (8) shall not apply: Provided , That if the other party to the contract has made a request to replace the deposit by a certificate of guarantee, etc. because the period of the contract is prolonged due to events not attributable to the other party to the contract, the deposit may be paid by such certificates of guarantee in the amount corresponding to the said cash after the expiration of the original period of the contract. (10) The provisions of Article 37 (4) shall be applied mutatis mutandis to the cases where the payment of in whole or in part of the deposit for the contract may be exempted pursuant to the provisions of paragraph (6) 1 or 2 of this Article. (11) Matters concerning the joint and several sureties or the performance bond for construction work under the provisions of paragraphs (4) and (7) of this Article shall apply mutatis mutandis to the case of a contract for the services. [This Article Wholly Amended by Presidential Decree No. 15186, Dec. 31, 1996] 법령보기 화면  Article 51 (Reversion of Deposit for Contract to National Treasury) (1) The head of each central government agency and the public official in charge of contracts, when the other party to the contract fails to fulfill contractual obligations without justifiable reasons, shall revert the deposit for the contract pursuant to the provisions of Article 50 (including an amount guaranteed by performance bond for construction work pursuant to the provisions of Article 50 (4) and (7). The same shall apply to the following provisions.) to the national treasury pursuant to the provisions of Article 12 (3) of the Act . In this case, the provisions of Article 75 (1) shall apply mutatis mutandis . <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (2) The provisions of paragraph (1) of this Article shall apply mutatis mutandis to cases where the other party to a continuous long-term contract fails to conclude the contract for construction work or manufacture, etc. after the second stage pursuant to the provisions of the latter part of Article 69 (2) and the provision of Article 69 (3). <Newly Inserted by Presidential Decree No. 15186, Dec. 31, 1996> (3) In reverting the deposit for the contract to the national treasury pursuant to the provisions of paragraphs (1) and (2) of this Article, that deposit may not be offset by any unpaid amount for the completed parts. <Newly Inserted by Presidential Decree No. 15186, Dec. 31, 1996> (4) The provisions of Article 38 (1) and (2) shall apply mutatis mutandis to cases of reversion of the deposit for the contract to the national treasury. 법령보기 화면  Article 52 (Performance Bond for Contract for Construction Work) (1) The head of each central government agency or the public official in charge of contracts, when concluding a contract for a construction work, shall ask the other party to the contract to find one or more joint and several sureties who guarantee the performance of the relevant contractual obligations: Provided , That if an amount more than double the deposit for the contract is paid pursuant to the provisions of Article 50 (4) and (7) or if a performance bond for the construction work is submitted, this shall not apply. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (2) A joint and several surety shall be a person who has qualifications equal to or superior to those required in the public notice, etc. pursuant to Article 36 , and other matters necessary for a joint and several surety shall be prescribed by the Ordinance of the Prime Minister. (3) The provisions of paragraphs (1) and (2) of this Article shall apply mutatis mutandis to the case of a service contract. <Newly Inserted by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 53 (Insuring of Insurance Against Loss) (1) The head of each central government agency or the public official in charge of contracts, if it is deemed necessary in concluding a contract, may have objects under the related contract insured against loss, or may ask the other party to the contract to insure them insurance against loss. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (2) The Minister of Finance and Economy shall determine the necessary matters concerning the insurance against loss pursuant to the provisions of paragraph (1) of this Article. 법령보기 화면  Article 54 (Supervision) The term “the contract prescribed by the Presidential Decree” referred to in the proviso of Article 13 (1) of the Act means a contract falling under one of the following subparagraphs: 1. A contract for construction work for which the responsible supervision is executed pursuant to the provisions of Article 27 of the Construction Technology Management Act ; and 2. A contract for manufacture and any other contract for work for which the supervision prescribed in the text of Article 13 (1) may not be executed due to the need for expert knowledge or technology or due to other unavoidable reasons. 법령보기 화면  Article 55 (Inspection) (1) An inspection pursuant to the provisions of Article 14 (1) of the Act shall be completed within 14 days from the date on which the notice has been received from the other party to the related party to the effect that the performance of the related contract has been completed: Provided , That if is prescribed by the Minister of Finance and Economy, the inspection period may be extended within the limit of seven days. (2) When executing the inspection pursuant to paragraph (1) of this Article, in case of a research and design service contract, the question of whether the other party to the related service contract has calculated reasonably the total costs of the project shall be also examined. (3) The term “the contract as prescribed by the Presidential Decree” referred to in the proviso of Article 14 (1) of the Act means a contract falling under any of the following subparagraphs of Article 54 . (4) In case of concluding contracts by separating the basic design (including a feasibility study; the same shall apply to the following provisions.) from the shop design, when inspecting the performance of the shop design service pursuant to paragraph (1) of this Article, the question of whether the calculation of the total costs of the project under the shop design is reasonable shall be examined by comparing the total costs under the basic design with the total costs under the shop design. In this case, if there is a difference between the total costs under the basic design and the total costs under the shop design, the other party to the contract for the shop design service shall be asked to present the materials and data which explain the reasons therefor. (5) In case the inspection has failed to be completed due to force majeure such as natural disasters during the prescribed period pursuant to paragraph (1) of this Article, the inspection shall be completed within 3 days from the date on which such force majeure has disappeared. (6) The head of each central government agency and the public official in charge of contracts, when discovering the fact that in whole or in part of the contract performed by the other party to the contract violates the original contract or is inappropriate in course of the inspection pursuant to Article 14 (1) of the Act , shall take corrective actions without delay. In this case, the period pursuant to paragraph (1) of this Article shall be calculated from the date on which the notice has been received from the other party to the contract to the effect that such corrective actions have been completed. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (7) In case where the inspection of the completed parts at the time of paying the costs for the completed parts pursuant to Article 58 (3) may be replaced by an inspection by the person executing the supervision pursuant to Article 13 of the Act : Provided , That every three times such an inspection is executed, the inspection pursuant to Article 14 shall be executed once. <Newly Inserted by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 56 (Ommission of Preparation of Protocol of Inspection) Cases where preparation of a protocol of inspection may be omitted pursuant to the proviso of Article 14 (2) of the Act shall be specified in each of the following subparagraphs: 1. Cases of a contract whose contract amount is less than twenty million won; 2. Cases of a contract for sale; and 3. Cases of a contract not requiring the preparation of a protocol of inspection due to the characteristics of the contract such as the contract for supply of electricity, gas, and piped water, etc.. 법령보기 화면  Article 57 (Concurrent Performance of Supervision Duty and Inspection Duty by Same Person) The duty for supervision pursuant to Article 54 and the duty for inspection pursuant to Article 55 may not be concurrently performed by the same person: Provided , That in cases falling under any of the following subparagraphs this shall not apply: <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 1. Cases where it is extremely difficult to ask a person other than the one who executes the supervision to execute the inspection if the inspection requires a special technology; 2. Cases where it is difficult to confirm the performance without inspecting the performance of a related contract immediately after the completion of the performance of the contract such as a contract for construction work and for the repair and maintenance therof; 3. Cases of a contract for the manufacture of goods or construction work of which the contract amount is less than three hundred million won; 4. Cases of a contract for construction work prescribed in subparagraph 1 of Article 54 ; and 5. Cases of an inspection pursuant to the text of Article 55 (7). 법령보기 화면  Article 58 (Payment of Cost) (1) The cost of a contract which becomes a burden on the national treasury pursuant to Article 15 (2) of the Act shall be paid within 14 days from the date on which a request of the other party to the contract has been received after the inspection pursuant to Article 55 has been completed. In this case, a special agreement which may postpone the time limit for payment of the cost may be concluded within a limit not exceeding 14 days. (2) If it is impossible to make the payment of the cost due to force majeure such as natural disasters within the time limit of payment, the cost shall be paid within 3 days from the date on which that force majeure has disappeared. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (3) In case of paying the cost for completed parts or supplied parts pursuant to Article 15 of the Act , notwithstanding paragraph (1) of this Article, the cost for the completed parts or the supplied parts shall be paid at least every 30 days by taking into consideration the contract volume, the prospect for performance, and the period of performance, etc.. <Newly Inserted by Presidential Decree No. 15186, Dec. 31, 1996> (4) For the payment of the cost pursuant to paragraph (3) of this Article, the other party to the contract may be asked to request the payment of the cost before the date on which the inspection pursuant to Article 55 is completed, and the cost shall be finalized and paid according to the inspected contents within 7 days from the date on which the inspection is completed: Provided , That when the other party to the contract requests the payment of the cost after the date on which the inspection is completed, the cost shall be paid within 7 days from the date on which such request has been received. <Newly Inserted by Presidential Decree No. 15186, Dec. 31, 1996> (5) The head of each central government agency or the public official in charge of contracts, when discovering the fact that in whole or in part of the contents of the request is inappropriate after the request for the payment of the cost pursuant to paragraph (1) or (4) of this Article has been received, may return the related request to the other party to the contract by clearly stating the reasons therefor. In this case, the period from the date on which the request is returned to the date on which the re-request has been received shall not be included in the payment period pursuant to paragraph (1) or (4) of this Article. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 59 (Interest for Delayed Payment of Cost) If the head of each central government agency or the public official in charge of contracts fails to pay the cost by the time limit for the payment period of the cost pursuant to Article 58 (in case of a contract by an action of the national treasury to bear the liability, 20 days from the date on which the related budget is allocated pursuant to the Budget and Accounts Act after the next fiscal year has started.) after having received the request for the payment of the cost pursuant to Article 15 (2) of the Act , the unpaid amount plus the interest on such unpaid amount calculated by multiplying the number of days from the day following the time limit for the payment to the day on which the payment has been made. (hereinafter referred to as the “number of days of the delayed payment of the cost”) at the interest rate for the overdue payment applicable to general loans by financial institutions. 법령보기 화면  Article 60 (Defect Security Liability Period of Contract for Construction Work) The head of each central government agency or the public official in charge of contracts, when concluding a contract for construction work, shall determine the defect security liability period in order to guarantee the repair of a defect in the related construction work during the period prescribed by the Ordinance of the Prime Minister within the limit of one year to ten years from the earlier of either the first date on which the objections have been delivered or the date on which the inspection on the completion of the construction work has been finished: Provided , That if it is not required to repair the defect in view of the nature of the construction work under the provisions of the Ordinance of the Prime Minister, this shall not apply. 법령보기 화면  Article 61 (Inspection of Defects) (1) The head of each central government agency or the public official in charge of contracts shall inspect the defects periodically twice or more a year or entrust the inspection affairs to the public official under its control to ask him to inspect the said defects periodically twice or more often a year during the defect security liability period pursuant to the provisions of Article 60 of this Decree. (2) If the inspection of defects pursuant to paragraph (1) of this Article requires an expert knowledge or technology or is executed with respect to construction work awarded in the amount of less than 88/100 of the projected price(excluding construction work for the simple maintenance and repair), the head of each central government agency or the public official in charge of contracts shall request a specialized organization to perform the said inspection. (3) The person who inspects the defects pursuant to the provisions of paragraphs (1) and (2) of this Article shall prepare a protocol of defect inspection: Provided , That in case of a contract for construction work of which the contract amount is less than two hundred million won, the preparation of the said protocol may be dispensed with. 법령보기 화면  Article 62 (Deposit for Repair of Defects) (1) The deposit for the repair of defects pursuant to the provisions of Article 18 of the Act shall be between 2/100 or more and 10/100 or less of the contract amount under the provisions of the Ordinance of the Prime Minister: Provided , That if it is not required to repair the defects due to the nature of the construction work under the provisions of the Ordinance of the Prime Minister, the deposit for the repair of defects may not be paid. (2) The head of each central government agency or the public official in charge of contracts shall cause the deposit for the repair of defects pursuant to the provisions of paragraph (1) of this Article to be paid before paying the cost for construction work after the inspection on completion of the related construction work, and shall keep it during the defect security liability period pursuant to the provisions of Article 60 . (3) Cases where the payment of deposit for the repair of defects may be exempted pursuant to the proviso of Article 18 (1) of the Act shall be specified in each of the following subparagraphs: <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 1. Cases of concluding a contract pursuant to the provisions of Article 26 (1) 7 (e); and 2. Cases of concluding a contract with a person referred to in the provisions of Articles 37 (3) 1 through 4 and Article 38 . (4) The provisions of Articles 37 (2), (3) and 38 shall apply mutatis mutandis to the payment of deposit for the repair of defects and to the reversion thereof to the national treasury. 법령보기 화면  Article 63 (Direct Use of Deposit for Repair of Defects) (1) In case of intending to use directly the deposit for the repair of the related defects pursuant to the proviso of Article 18 (3) of the Act , the related deposit for the repair of defects shall not be paid into the revenue account but shall be entered separately under the title of accounts other than revenue and expenditure. (2) Procedures for the direct use of the deposit for the repair of defects pursuant to the provisions of paragraph (1) of this Article shall be prescribed by the Ordinance of the Prime Minister. 법령보기 화면  Article 64 (Adjustment of Contract Amount Due to Price Fluctuations) (1) The head of each central government agency or the public official in charge of contracts, when 120 days have passed since the date on which a contract which becomes a burden on the national treasury was concluded pursuant to the provisions of Article 19 of the Act (in the case of a continuous long-term construction and of a long-term manufacture of goods, etc., it means the conclusion of the first stage contract) and falling under any of the following subparagraphs is applicable at the same time, shall adjust the contract amount(in the case of a continuous long-term construction work and of a long-term manufacture of goods, etc., it means the amount of the whole construction work and the whole manufacture, etc. which was recorded at the time of concluding the first stage contract. The same shall apply in this Chapter). In this case, the contract amount shall not be adjusted again within 120 days from the base day of adjustment (meaning the date on which grounds of adjustment have occurred): 1. In case the adjustment rate for the categories of Articles which are calculated under the Ordinance of the Prime Minister increases or deceases by 5/100 or more; and 2. In case the adjustment rate for an index which is calculated under the Ordinance of the Prime Minister increases or deceases by 5/100 or more. (2) The provisions of paragraph (1) 1 and 2 shall not be applied to one contract at the same time, and the contract shall clearly indicate that the contract amount may be adjusted either pursuant to paragraph (1) 1 and 2 at the time of conclusion of the contract, but in the case of construction work of which the projected price is ten billion won or more, the contract shall clearly indicate that it shall comply with the method prescribed in paragraph (1) 2 unless special reasons to the contrary exist. (3) If any advance payment has been made to a related other party to the contract under the provisions of Article 56 (1) of the Enforcement Decree of the Budget and Accounts Act , the amount calculated under the Ordinance of the Prime Minister shall be deducted from the increased amount calculated according to the provisions of paragraph (1) of this Article. 법령보기 화면  Article 65 (Adjustment of Contract Amount Due to Modification of Design) (1) The head of each central government agency or the public official in charge of contracts, if the construction volume increases or decreases due to a modification of design in the case of a contract for construction work, shall adjust the said contract amount pursuant to the provisions of Article 19 of the Act . (2) When intending to increase by adjustment the contract amount of the construction work awarded successfully in the amount of less than 88/100 of the projected price pursuant to the provisions of paragraph (1) of this Article, if the contract amount increased by adjustment is 10/100 or more of the original contract amount, the public official in charge of contracts shall obtain the approval of the head of the central government agency to which the public official in charge of contracts belongs. (3) When adjusting the contract amount pursuant to the provisions of paragraph (1) of this Article, the criteria prescribed in each of the following subparagraphs shall be applied: <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 1. The unit cost for the increased volume of construction shall be the unit cost indicated in the statement of particulars concerning calculation which is submitted pursuant to the provisions of Article 14 (6) or (7) (hereinafter referred to as the “contractual unit cost”): Provided , That if the contractual unit cost is more than the unit cost of the projected price pursuant to the provisions of Article 9 (hereinafter referred to as the “unit cost of the projected price”) and if the volume is increased, the unit cost applicable to the increased volume shall be the unit cost of the projected price; 2. The unit cost for the new item in the absence of a contractual unit cost shall be the amount calculated by multiplying the unit cost calculated as of the time of modifying the design by the ratio of the successful tender price; and 3. If the government requests a modification of design, notwithstanding the provisions of subparagraphs 1 and 2 of this paragraph, the unit cost for the increased volume and the unit cost for the new items shall be determined by consultation between the contracting parties within the limits of the unit cost calculated as of the time of the modification of design and of the amount calculated by multiplying the said unit cost by the ratio of the successful tender price. (4) If the head of each central government agency or the public official in charge of contracts has conducted the necessary modification of design at the request of the other party to the contract because the use of the new technology and a new method of construction by the other party is deemed to have a remarkable effect on saving the costs of construction and shortening the construction period, etc. (including technology, method of construction, and equipment and materials, etc. equal to or superior to those of a design chosen by the government in terms of functions and effectiveness. The same shall apply to the following provisions.),he shall not reduce the contract amount when adjusting it. (5) In case of paragraph (4) of this Article, when objections are raised against the scope and limit of the new technology and method of construction, the head of each central government agency or the public official in charge of contracts shall request the Design Advisory Committee pursuant to the Enforcement Decree of the Construction Technology Management Act (hereinafter referred to as the “Design Advisory Committee”) to examine the said objections: Provided , That if the Design Advisory Committee is not established, the head of each central government agency or the public official in charge of contracts shall request the examination pursuant to the provisions of Article 39 of the Enforcement Decree of the Construction Technology Management Act . <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (6) The general and administrative expenses and profits, etc to be incurred or to be accrued in connection with the increased and the decreased portion of the construction volume shall be based on the rate of general and administrative expenses and the rate of profits specified in the statement of particulars concerning calculation submitted under the provisions of Article 14 (6) or (7), but shall not exceed the rate prescribed by the Ordinance of the Prime Minister. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (7) The provisions of paragraphs (1) through (6) may apply mutatis mutandis to an adjustment of the contract amount in the case of a contract for manufacture and service, etc.. 법령보기 화면  Article 66 (Adjustment of Contract Amount Due to Modification of Other Contents of Contract) (1) The head of each central government agency or the public official in charge of contracts, if it is necessary to adjust the contract amount in the case of a contract for manufacture and service, etc. pursuant to the provisions of Article 19 of the Act except for the cases pursuant to the provisions of Articles 64 and 65 , due to modifications of the contents of the contract such as modification of construction work, construction period and the transport distance, etc., shall adjust the contract amount within a limit not exceeding the actual expenses incurred according to the modified contents of the contract. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (2) The provisions of Article 65 (6) shall apply mutatis mutandis to paragraph (1) of this Article. 법령보기 화면  Article 67 (Conclusion of Contract before Commencement of Fiscal Year) (1) The public official in charge of contracts, when intending to conclude a contract before the fiscal year starts under the provisions of Article 20 of the Act , shall obtain the approval of the head of the central government agency to which the public official in charge of contracts belongs. (2) A contract pursuant to the provisions of paragraph (1) of this Article shall be made to come into force after the date on which the corresponding fiscal year starts. 법령보기 화면  Article 68 (Prohibition of Contract for Divided Construction Work) The head of each central government agency or the public official in charge of contracts may not conclude a contract by dividing it in terms of either the period or the volume of construction work on the same structure and the single construction work prescribed by the Minister of Finance and Economy of which the whole contents are finalized by design, etc.: Provided , That in the case of construction work which is deemed inappropriate for a contract on a package deal basis in view of the nature and purpose of the contract and due to the reasons specified in one of the following subparagraphs this shall not apply. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 1. Construction work which shall be ordered separately from other types of construction work pursuant to other Acts; 2. Construction work which can be efficiently carried out by being divided in view of the nature or the size, etc. thereof; and 3. Construction work in which separation of liability for defects is easy and no hindrance exists in process control. 법령보기 화면  Article 69 (Long-Term Continuous Contract and Contract by Continuing Expenditure) (1) In the case of a contract falling under one of the following subparagraphs when a long-term continuous contract pursuant to the provisions of Article 21 of the Act is to be concluded, a contract by unit cost may be concluded with the approval of the head of each competent central government agency: 1. A contract for service related to transport, custody, experiment, investigation, research, measurement, and facilities management, etc., or the lease contract; 2. A contract for the supply of electricity, gas, and piped water, etc.; and 3. A contract for the maintenance and repair of equipment. (2) Long-term continuous construction work shall be concluded in such a way that the amount of the whole construction work determined by the successful bidding, etc. may be recorded in a book and the first stage construction work may be executed within the limit of the budget of the corresponding year. In this case, a contract concerning the second-stage construction work shall stipulate additional clauses that the contract shall be concluded within the limit of the amount calculated by deducting the amount already contracted from the total amount of the construction work recorded in the book (in case the adjustment of the contract amount pursuant to the provisions of Articles 64 through 66 is performed, it means the total amount of the adjusted construction work). (3) With respect to methods for the conclusion of contracts for long-term manufacture of goods, the provisions of paragraph (2) of this Article shall be applied mutatis mutandis . (4) The contract amount following the first stage or the second stage construction work pursuant to the provisions of paragraphs (2) and (3) of this Article shall be determined in accordance with the contractual unit cost of the whole construction work and whole manufacture, etc.. (5) In case of construction work executed by continuing expenditure, the contract shall be concluded after specifying matters related to the whole construction work and the annual construction work. 법령보기 화면  Article 70 (Contract by Rough Estimate) (1) The head of each central government agency or the public official in charge of contracts, when intending to conclude a contract by rough estimate pursuant to the provisions of Article 23 of the Act , shall determine in advance the price roughly estimated. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (2) The head of each central government agency, when intending to conclude a contract by rough estimate pursuant to the provisions of paragraph (1) of this Article, shall determine the criteria and procedures, etc. necessary for the examination of the cost by taking into consideration the special characteristics of the objects of the contract, contracted volume, and performance period of the contract, etc. before the tender, and shall make them available for inspection by the persons who intend to participate in the tender. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (3) The public official in charge of contracts, when intending to conclude a contract by rough estimate pursuant to the provisions of paragraph (1) of this Article, shall inform the Board of Audit and Inspection thereof, and shall keep an accurate account according to the criteria, etc. under the provisions of Article 9 (2) of this Article and obtain the approval of the head of the competent central government agency after the performance of the contract has been completed. <Newly Inserted by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 71 (Integrated Contract) The Minister of Finance and Economy, if he deems it necessary to conclude an integrated contract pursuant to the provisions of Article 24 of the Act , may determine the methods to conclude the integrated contract and prescribe other necessary matters. 법령보기 화면  Article 72 (Joint Contract) (1) The Minister of Finance and Economy may determine methods to conclude a joint contract pursuant to the provisions of Article 25 of the Act and other necessary matters. (2) The head of each central government agency or the public official in charge of contracts, when intending to conclude a contract by competition, shall conclude a joint contract as far as possible, unless the joint contract is deemed inappropriate in light of the purpose and characteristics of the contract. (3) In case of a joint contract prescribed in paragraph (2) of this Article, the head of each central government agency or the public official in charge of contracts, if it is deemed necessary for the balanced development of the construction industry, etc., shall assign one or more persons from among a persons whose principal business places are located in Seoul Special Metropolitan City, a Metropolitan City, and the Dos which exercise jurisdiction over the site of construction work as the members of a joint supply and demand organization: Provided , That if persons who have the qualifications necessary for the performance of construction work are below ten persons in the related region, this shall not apply. (4) In case of a joint contract pursuant to the provisions of paragraph (3) of this Article, the relationship between the members of the joint supply and demand organization shall not be the same as that between affiliated companies prescribed in the Monopoly Regulation and Fair Trade Act . 법령보기 화면  Article 73 (Contract Subject to Condition of Ex Post Facto Examination of Prime Cost) (1) The head of each central government agency or the public official in charge of contracts, if he is unable to determine a part of the amount because of items having an the estimated price before the tender, may conclude the contract subject to an ex post facto examination of the prime cost. (2) The head of each central government agency, when intending to conclude a contract pursuant to the provisions of paragraph (1) of this Article, shall determine the criteria and procedures, etc. necessary for the ex post facto examination of the prime cost by taking into consideration the special characteristics of the objects of the contract, contracted volume, and performance period of the contract, etc. before the tender, and shall make them available for inspection by a persons who intend to participate in the tender. (3) The prime cost shall be examined and the accounts shall be settled according to the criteria, etc. pursuant to the provisions of Article 9 and paragraph (2) of this Article after the performance of the contract has been completed. [This Article wholly Amended by Presidential Decree No. 15186, Dec. 31, 1996] 법령보기 화면  Article 74 (Compensation for Delay) (1) The head of each central government agency or the public official in charge of contracts, if the other party to the contract (excluding government agencies and local governments) delays the performance of contractual obligations, shall ask the said other party to pay in cash an amount calculated by multiplying the contract amount by the rate prescribed by the Ordinance of the Prime Minister and the number of days delayed as compensation for delay. In this case, if the performance of the contract is deemed to be delayed due to events not attributable to the other party to the contract, the number of days delayed shall not be included in the number of days delayed. (2) In case of paragraph (1) of this Article, if the completed part or the supplied part is accepted through inspection, the compensation for delay shall be calculated on the basis of the amount calculated by deducting the amount corresponding to the said part form the contract amount. In this case, the acceptance of the completed part or the supplied part shall be limited to the completed part of the manufacture or the construction work which may not be divided in view of the characteristics thereof. 법령보기 화면  Article 75 (Cancellation and Termination of Contract) (1) When reverting the deposit for the contract to the national treasury pursuant to the provisions of Article 12 (3) of the Act , unless otherwise provided in the contract, the head of each central government agency or the public official in charge of contracts shall cancel or terminate the related contract and shall notify the other party to the contract of the reasons therefor. (2) If events to collect the compensation for delay pursuant to the provisions of Article 74 (1) have arisen and the amount of such compensation for delay has reached an amount corresponding to the deposit for the contract (including the deposit for the contract which is exempted) pursuant to the provisions of Article 50 (1)), and it is deemed clearly impossible to perform the contract due to cause imputable to the other party to the contract, the head of each central government agency or the public official in charge of contracts may revert the deposit for the contract to the national treasury pursuant to the provisions of Article 12 (3) of the Act and may cancel or terminate the related contract. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 76 (Limitation of Qualification of Unjust Persons to Participate in Tender) (1) The head of each central government agency, if there are persons who fall under one of the following subparagraphs (including the other party to the contract, or an agent, a manager or other employees of a bidder), shall limit the qualification of the other party to the contract or the bidder to participate in a tender up to a period between one month or more and two years or less without delay there after pursuant to the provisions of Article 27 of the Act : <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 1. A person who has performed poor construction or a poor design; 2. A person who has concluded a subcontract in violation of the provisions concerning the limitation of the subcontract (excluding the case of violating the liability for notification of the subcontract) pursuant to the Construction Business Act , the Electrical Construction Business Act , the Telecommunication Work Business Act , or other Acts and subordinate statutes and a person who has concluded a subcontract without the approval of the government agency which has placed the order or has modified the conditions of the subcontract approved by the said government agency; 3. A person who has received a request for a limitation of qualifications to participate in the tender from the Fair Trade Commission due to the violation of the Monopoly Regulation and Fair Trade Act or the Fair Transactions in Subcontracting Act ; 4. A person who has performed a contract in a shoddy or an unfair way or committed unfair acts in the course of performance of a contract, or a person who has failed to calculate appropriately the total expenses for the work intentionally or by gross negligence in a research and design service contract; 5. A person who has inflicted an injury on the general public by neglecting safety measures in the case of the construction work and the manufacture of goods, etc., or a person who has inflicted a serious injury, such as death, etc., on employees, etc. by neglecting safety and health measures at a work place pursuant to the Industrial Safety and Health Act ; 6. A person who has failed to conclude or perform a contract (including the performance of matters concerning an incidental tender pursuant to the provisions of Article 19 ) without justifiable reason; 7. A person who has agreed upon the tendered price in advance by having discussed it between bidders or has committed a collusion for the purpose of successful tender by a specific person; 8. A person who has forged or altered a document concerning qualifications and other documents concerning the contract pursuant to the provisions of Articles 12 and 21; 9. A person who has executed an invalid tender by intention; 10. A person who has offered bribes to a related public official in relation to conclusion of a contract and performance thereof; 11. A person who has failed to participate in the tender three times or more during the corresponding fiscal year without justifiable reasons even after having submitted a written application for participation in the tender or a written consent to participation in the tender; 12. A person who has interfered with participation in the tender or hinders a successful bidder from concluding the contract and performing it; and 13. A person who has interfered with the performance of duties in the course of supervision or inspection. (2) The detailed criteria for limitation of qualification to participate in a tender pursuant to the provisions of paragraph (1) of this Article shall be prescribed by the Ordinance of the Prime Minister. (3) In case of the joint contract, the provisions of paragraph (1) of this Article shall apply to a person who is directly responsible for the causes of limitation of qualification to participate in the tender. (4) If a person who is subject to limitation of the qualification to participate in the tender pursuant to the provisions of paragraphs (1) through (3) of this Article is a juristic person or another organization, the provisions of paragraph (1) of this Article shall apply to a representative of such juristic person or organization, and in case of a Small and Medium Enterprise Cooperative, the provisions of paragraph (1) of this Article shall apply to a member of such a cooperative who is directly responsible for the causes of limitation of qualification to participate in the tender: Provided , That if there are several representatives of such juristic person or organization, this shall not apply to the representatives who do not perform any duties related to the related tender or contract. (5) The head of each government agency, if an original representative is involved in the tender by using a person who is subject to limitation of qualification pursuant to the provisions of paragraphs (1) through (4) of this Article as a representative, shall apply paragraph (1) of this Article to the person who has used such representative. (6) The head of each government agency, when limiting the qualification to participate in the tender, shall specify the matters in each of the following subparagraphs and shall notify to the Minister of Finance and Economy thereof, and shall publish those matters in the Gazette. 1. Business(trade) name, address, name (in case of a juristic person, name of the representative, corporation registration number, etc.), resident registration number, trader’s registration number, license or registration number pursuant to related Acts and subordinate statutes; 2. Period of limitation of qualification to participate in the tender; and 3. Specific reasons for limiting the qualification to participate in the tender. (7) The head of each government agency shall prepare and maintain the necessary ledger or register with respect to a person who has received the notification of limitation of qualification pursuant to paragraph (6) to participate in a tender or was published in the Gazette as an unjust businessman, and shall prevent the said person form participating in all tenders which are executed by the government agency during the period of limitation of qualification to participate in the tender. (8) The head of each government agency, with respect to a person who has received the notification of limitation of qualification to participate in a tender or was published in the Gazette according to the provisions of other Acts and subordinate statutes may prevent the said person from participating in a tender: Provided , That with respect to a persons whose qualification is limited due to the causes prescribed in paragraph (1) 1 through 5, 7 and 8, the head of each government agency shall prevent the said person from participating in the tender without fail. (9) The head of each government agency shall identify the resident registration number, corporation registration number, licence or registration number pursuant to related Acts and subordinate statutes, etc. in order to prevent a persons whose qualification is limited pursuant to the provisions of paragraphs (1) through (4) of this Article from participating in a tender during the period of limitation by means of changing its trade name and its representatives, etc. 법령보기 화면  Article 77 (Procedure for Hearing) (1) When intending to open a hearing pursuant to the provisions of Article 27 (2) of the Act , the causes, date and time, and place, etc. for the hearing shall be notified in writing to the other party who is subject to limitation of qualification or his agent seven days before the date of the hearing. (2) The other party who is subject to limitation or qualification or his agent who has received the notification pursuant to the provisions of paragraph (1) may attend the hearing at the designated date and time, and may state his opinion or submit his opinions in writing. (3) When the other party who is subject to limitation of qualification or his agent attends the hearing at the designated date and time and state his opinion pursuant to the provisions of paragraph (2) of this Article, the related public official shall prepare a document concerning his stated opinion and shall ask him to sign and seal the document after confirming it. (4) The notification pursuant to the provisions of paragraph (1) of this Article shall specify that if the other party or his agent fails to comply with the notification without justifiable reasons, he shall be considered as having waived an opportunity to state his opinion. CHAPTER Ⅵ CONTRACT FOR LARGE CONSTRUCTION WORK 법령보기 화면  Article 78 (Applicable Object, etc.) A contract based on a tender by alternative design, a tender on a package deal basis, or a shop design and a tender for construction out of the contracts for large construction work, and a contract for specified construction work shall be governed by the provisions of this Chapter, but the matters not prescribed specially in this Chapter shall be governed by the provisions of other Chapters of this Decree. 법령보기 화면  Article 79 (Definitions) (1) For the purpose of this Chapter, the definitions of the terms shall be as follows: 1. The term “large construction work” means construction work type of new complex of which the estimated price of the whole construction cost is ten billion won or more; 2. The term “specified construction work” means construction work for which the head of a central government agency deems it profitable to execute it by means of a tender based on an alternative design, a tender on a package deal basis, or a shop design and a construction tender out of the construction works type of new complex of which the estimated price of the whole construction cost is ten billion won or more; 3. The term “alternative design” means a design by new methods of construction and new technology, etc. having functions and efficiency equal to or superior to the design prepared by the Government, which can replace the design prepared by the Government without changing a basic plan for the type of work which may be replaced out of the types of work indicated in the design prepared by the government (limited to the whole work for which the design is completed) whose price indicated in the said design is less than the estimated price indicated in the design prepared by the government and which may be carried out by methods of construction not exceeding the period determined by the design prepared by the government; 4. The term “tender by alternative design” means a tender for construction work in which an alternative design pursuant to the provisions of subparagraph 3 of this paragraph is permitted according to the separate will of the bidders together with a tender by original design; 5. The term “tender on a package deal basis” means a tender of the combined design and construction under which a design of construction work and other necessary drawings and documents in carrying out the construction work (hereinafter referred to as the “drawings and documents”) shall be prepared and submitted together with the documents for tender at the time of the tender in accordance with the basic plan and guidelines of the tender for construction on a package deal basis presented by the Government; 6. The term “tender by basic design” means a tender under which a basic design, and drawings and documents thereof shall be prepared and submitted together with the documents for tender prior to the shop design in accordance with the government’s basic plan and guidelines for a tender on a package deal basis; 7. The term “shop design and construction tender” means a tender under which a shop design of construction work and other necessary drawings and documents in carrying out the construction work shall be prepared and submitted together with the documents for tender at the time of tender in accordance with the government’s basic plan and guidelines for the tender for construction work; 8. The term “design document” means a necessary design document in carrying out construction work which is prepared in detail in accordance with the basic plan and guidelines, and the basic design (including drawings and documents to be attached to the design document); 9. The term “large construction work by continuing expenditure” means a large construction work of which the construction cost is earmarked in the budget as a continuing expenditure; and 10. The term “general large construction work” means a large construction work of which the construction cost is not earmarked in the budget as a continuing expenditure. (2) If any objections are raised against the scope and limit of design which can be replaced as referred to in paragraph (1) 3 of this Article, the head of each central government agency shall determine such scope and limit by undergoing the deliberation of the Central Construction Technology Deliberation Committee pursuant to the Construction Technology Management Act (hereinafter referred to as the “Central Construction Technology Deliberation Committee”). 법령보기 화면  Article 80 (Public Notice of Construction Work, etc. Subject to Tender by Alternative Design) (1) The head of each central government agency shall submit the basic plan for execution of large scale construction work and specify the construction work to be executed after the current year to the Minister of Construction and Transportation under the provisions of the Ordinance of the Prime Minister before preparing the basic design: Provided , That if the deliberation on methods of the tender is difficult without relying on the basic design, the plan for execution shall be submitted to the Minister of Construction and Transportation immediately after preparing the basic design. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (2) The Minister of Construction and Transportation shall give a public notification of the basic plan for executing the large construction work submitted under the provisions of paragraph (1) of this Article or the construction work to be executed based on the tender by alternative design, a tender on a package deal basis, or a shop design and construction tender and the specified construction work out of the basic plan for execution. <Newly Inserted by Presidential Decree No. 15186, Dec. 31, 1996> (3) The head of each central government agency, shall conduct the tender for large construction work by alternative design, a tender on a package deal basis, or a shop design and construction tender according to the result of the deliberation of the Central Construction Technology Deliberation Committee unless other special reasons to the contrary exist. 법령보기 화면  Article 81 Deleted. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 82 Deleted. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 83 Deleted. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 84 (Qualification to Participate in Tender of Tender on Package Deal Basis, etc.) The head of each central government agency or the public official in charge of contracts shall ask only those persons having the qualification specified in each of the following subparagraphs to participate in a tender on a package deal basis or a tender by a shop design and construction tender: Provided , That if a persons who have one of the necessary conditions prescribed in the subparagraphs 1 and 2 of this Article intend to participate in a tender on a package deal basis or a tender by a shop design and construction tender by jointly meeting the requirements specified in each of the following subparagraphs the head of each central government agency or the public official in charge of contracts shall permit such persons to participate in the tender: 1. A person who has obtained a license for construction business necessary for carrying out the related construction work pursuant to the provisions of Article 6 of the Construction Business Act ; and 2. A service businessmen for design, etc. pursuant to the provisions of Article 20-6 of the Construction Technology Management Act , certified engineers and technicians who have completed the registration for opening an office of certified engineers and technicians pursuant to the Certified Technicians and Engineers Act, and persons who have completed the registration of a certified architect’s office pursuant to the provisions of Article 23 of the Certified Architects Act from among a persons acting as engineers pursuant to the Engineering Technology Promotion Act . 법령보기 화면  Article 85 (Procedures for Tender on Package Deal Basis) (1) Under a tender on a package deal basis, only a person who is selected as a person eligible for the shop design pursuant to the provisions of Article 87 (1) after having executed the tender by basic design shall be allowed to submit the shop design document. (2) If the participant in the alternative tender submits an alternative together with the original tender, then the drawings and documents prescribed in each of the following subparagraphs shall be submitted accompanied by the documents for the tender: Provided , That two or more alternative tenders may not be submitted at the same time: 1. A concrete explanatory note concerning the design of the alternative tender; 2. Related documents pursuant to the provisions of Article 13 of the Enforcement Decree of the Construction Technology Management Act ; 3. A statement of particulars concerning calculation in which the unit cost and quantity of the alternative tender and the original tender are specified; and 4. Documents in which the advantages derived from the adoption of an alternative tender, and other reference matters are specified. (3) A bidder on a package deal basis shall submit the documents for tender by basic design or shop design documents accompanied by the drawings and documents thereto classified according to each of the following subparagraphs: 1. In case of the documents for tender by basic design: (a) An explanatory note concerning the basic design; (b) Related documents pursuant to the provisions of Article 13 of the Enforcement Decree of the Construction Technology Management Act ; and (c) Other matters required by public notice. 2. In case of shop design documents: (a) A concrete explanatory note concerning the shop design; (b) Related documents pursuant to the provisions of Article 13 of the Enforcement Decree of the Construction Technology Management Act ; (c) A statement of particulars concerning calculation in which the unit cost and quantity are specified; and (d) Documents in which other reference matters are specified. (4) A bidder by shop design and construction shall submit the shop design document at the time of the tender accompanied by the drawings and documents thereto specified in each of the following subparagraphs: 1. A concrete explanatory note concerning the shop design; 2. Related documents pursuant to the provisions of Article 13 of the Enforcement Decree of the Construction Technology Management Act ; 3. A statement of particulars concerning calculation in which the unit cost and quantity are specified; and 4. Documents in which other reference matters are specified. (5) If documents for an alternative tender eligible for successful tender which is selected pursuant to the provisions of Article 86 (1), the documents for tender by basic design or shop design pursuant to the provisions of paragraph (3) of this Article, or shop design documents pursuant to the provisions of paragraph (4) of this Article have been submitted to the head of each central government agency or the public official in charge of contracts, he shall request the Central Construction Technology Deliberation Committee to deliberate on the eligibility of the design, and the Central Construction Technology Deliberation Committee shall examine the technical feasibility of the design and shall give notification of the document which specifies the eligibility of design to the related head of each central government agency or the related public official in charge of contracts. In this case, with regard to documents for an alternative tender, an opinion concerning the adoption by types of construction work shall be notified together with such documents, and with regard to documents for tender by basic design or with regard to documents for tender by shop design and construction, the marks scored by the design shall be notified together with such documents. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (6) The head of each central government agency or the public official in charge of contracts may replace the deliberation on the shop design under the provisions of paragraph (3) of this Article with a deliberation by the Design Advisory Committee on the shop design: Provided , That if the Design Advisory Committee is not established, this shall not apply. <Newly Inserted by Presidential Decree No. 15186, Dec. 31, 1996> (7) If the documents for an alternative tender, a tender by basic design, or shop design documents or drawings and documents attached to the documents for tender by shop design and construction are unsatisfactory or vague in view of the contents of the basic plan and guidelines for the tender or the contents of the basic design, the Central Construction Technology Deliberation Committee or the Design Advisory Committee may request corrective measures to be taken in conducting the deliberation on the design pursuant to the provisions of paragraphs (5) and (6) of this Article. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 86 (Selection of Successful Bidder in Alternative Tender) (1) The head of each central government agency or the public official in charge of contracts, if an alternative tender has been submitted pursuant to the provisions of Article 85 (2), shall select as the tender eligible as the successful tender all alternative tenders of which the tendered amount is lower than the tendered amount of the original tender, which is the lowest price equal to or less than the projected price when comparing the original tender accompanied by that alternative tender, of which the tendered amount is the lowest price equal to or less than the projected price, with the tendered amount of the alternative tender: Provided , That if there are no original tenders of which the tendered amount is equal to or less than the projected price, all tenders of which the tendered amount is equal to or less than the projected price shall be selected as the tender eligible for the successful tender. (2) Deleted. <by Presidential Decree No. 15186, Dec. 31, 1996> (3) The head of each central government agency or the public official in charge of contracts, when receiving the notification provided in Article 85 (5), shall determine the adoption of the related alternative tender, and shall determine as the successful bidder a person who has submitted the alternative tender in which the tendered amount of the whole construction work is the lowest price from among the adopted tenders eligible for successful tender and has met the criteria for examination on eligibility prescribed in Article 42 (2). (4) If no persons have submitted an alternative proposal for an alternative tender or there is no successful bidder pursuant to the provisions of paragraph (3) of this Article, a person whose tendered amount of the alternative tender is equal to or less than the projected price and meets the criteria for examination on eligibility prescribed in Article 42 (2) shall be determined as the successful bidder. (5) The determination of the successful bidder pursuant to the provisions of paragraphs (1) through (4) of this Article shall be completed within 80 days from the date of the tender unless unavoidable reasons exist. 법령보기 화면  Article 87 (Selection of Successful Bidder in Tender on Package Deal Basis) (1) The head of each central government agency or the public official in charge of contracts, when receiving the notification pursuant to the provisions of Article 85 (5) in respect of a tender by basic design, shall select four persons whose design has scored high marks from among participants in the tender and shall determine the persons eligible for the shop design who have met the criteria for examination on eligibility provided in Article 42 (2). (2) The head of each central government agency or the public official in charge of contracts, when receiving the notification on the eligibility of related shop design from the Central Construction Technology Deliberation Committee or the Design Advisory Committee pursuant to the provisions of Article 85 (5) and (6) shall determine a person who has submitted the related shop design as the successful bidder. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (3) The head of each central government agency or the public official in charge of contracts, if the tendered amount pursuant to the provisions of paragraph (2) of this Article exceeds the budget of continuing expenditure in the case of large scale construction work by continuing expenditure and the budget of the whole construction work in the case of general large scale construction work respectively, shall consult with the bidder in order to adjust the tendered amount within the limit of the budget, and unless the consultation is successfully completed, the head of each central government agency or the public official in charge of contracts shall conduct the tender by a second public notice. (4) The determination of the successful bidder pursuant to the provisions of paragraphs (1) and (2) of this Article shall be completed within 60 days from the date on which the shop design has been submitted unless unavoidable reasons exist. 법령보기 화면  Article 88 (Selection of Successful Bidder in Tender by Shop Design and Construction) (1) The head of each central government agency or the public official in charge of contracts, when receiving the notification pursuant to the provisions Article 85 (5) in respect of a tender by shop design and construction, shall select four persons as the successful bidders whose design has scored high marks and have met the criteria for examination on eligibility in Article 42 (2) from among participants in the tender. (2) The provisions of Article 87 (3) and (4) shall be applicable mutatis mutandis to a tender by shop design and construction. 법령보기 화면  Article 89 (Compensation for Design Cost) (1) With respect to persons who were not determined as the successful bidder from among persons selected pursuant to the provisions of Articles 87 and 88 , the head of each central government agency or the public official in charge of contracts may compensate them for a part of the design cost within the limit of budget. (2) Necessary matters related to the criteria and procedures, etc. for the payment of compensation for design cost pursuant to the provisions of paragraph (1) of this Article shall be prescribed by the Minister of Finance and Economy. 법령보기 화면  Article 90 (Adoption of Alternative Tender) (1) The head of each central government agency or the public official in charge of contracts, when intending to determine the adoption of an alternative tender pursuant to the provisions of Article 86 (3), shall determine first the adoption of the alternative tender by types of work, and if there are types of work which are not adopted as an alternative, the head of each central government agency or the public official in charge of contracts shall determine as the successful bidder a persons who meet the criteria for examination on eligibility provided in Article 42 (2) as the successful bidder, after adjusting the tendered amount by replacing it with the tendered amount of related types of work specified in the statement of particulars concerning calculation submitted by the related alternative bidder when he submitted the original tender. In this case, the adjusted tendered amount of the alternative tender shall be equal to the tendered amount eligible for a successful tender pursuant to the provisions of Article 86 (1). (2) The head of each central government agency or the public official in charge of contracts, even when modifying a part of the alternative tender concerning types of work adopted from among alternative tenders adjusted pursuant to the provisions of paragraph (1) of this Article, may not increase the tendered amount of the related type of work. (3) The adjustment or modification pursuant to the provisions of paragraphs (1) and (2) of this Article shall be preceded by the deliberation of the Central Construction Technology Deliberation Committee. 법령보기 화면  Article 91 (Restriction of Adjustment of Contract Amount Due to Change of Design) (1) Even if the contents of contract for large scale construction work are changed due to a change of design concerning an alternative tender, a tender on a package deal basis, or a tender by shop design and construction, the contract amount shall not be increased unless such change is due to causes attributable to the government or force majeure such as natural disasters. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (2) In case of paragraph (1) of this Article, when intending to adjust the contract amount, it shall be adjusted in accordance with the criteria specified in each of the following subparagraphs: 1. The unit cost of increased or decreased quantity of construction work shall be the unit cost specified in the statement of particulars concerning calculation which is submitted pursuant to the provisions of Article 85 (2) through (4); and 2. The unit cost of a new item not specified in the provisions of subparagraphs 1 of this paragraph shall be the unit cost calculated on the basis of the time when the design is changed. 법령보기 화면  Article 92 (Evaluation) The head of each central government agency or the public official in charge of contracts may organize a group for evaluation and conduct an evaluation with respect to a business plan, construction process, performances, and effects, etc. of the related construction work after inspection of the completion of large scale construction. CHAPTER Ⅶ REPORT AND OTHER MATTERS 법령보기 화면  Article 93 (Report on Performances of Contract) (1) The public official in charge of contracts shall prepare a written report concerning performance of the contract at the end of every year, and submit it to the head of an affiliated central government agency within 30 days from the end of the corresponding year. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> (2) The head of each central government agency shall prepare a whole written report concerning performance of the contract in the form prescribed by the Minister of Finance and Economy, according to a written report concerning performance of the contract submitted pursuant to paragraph (1) and submit it to the Minister of Finance and Economy within 60 days from the end of the corresponding year. <Amended by Presidential Decree No. 15186, Dec. 31, 1996> 법령보기 화면  Article 94 (Report on Current Status of Appointment of Public Officials in Charge of Contracts) The head of the central government agency shall prepare a document related to the current status of the appointment of public officials in charge of contracts (including proxy public officials in charge of contracts, public officials in partial charge of contracts, and proxy public officials in partial charge of contracts) as of the end of the fiscal year, and shall report it to the Minister of Finance and Economy before the end of February of the next year. ADDENDA Article 1 (Enforcement Date) This Decree shall enter into force on July 6, 1995: Provided , That the provisions of Article 9 (1) 3 shall enter into force on January 1, 1996. Article 2 Deleted. <by Presidential Decree No. 15186, Dec. 31, 1996> Article 3 (Transitional Measures concerning Conclusion of Contract, etc.) With respect to a tender, the determination of a successful bidder, and the conclusion of contracts which are executed after the enforcement of this Decree where public notice of the tender has been made before the enforcement of this Decree, and with respect to contracts concluded after the enforcement of this Decree after being selected as the successful tender in a tender conducted before the enforcement of this Decree, the previous provisions shall apply. Article 4 (Repeal and Amendment of Other Acts and Subordinate Statutes) (1) The Special Regulations of the Enforcement Decree of the Act on the Budget and Accounts Related to Contracts for Large Scale Construction Work shall be repealed. (2) through (6) Omitted. Article 5 (Relation to Other Acts and Subordinate Statutes) If Chapter 6 of the Enforcement Decree of the Budget and Accounts Act or the provision of the said Chapter of the said Decree have been cited in other Acts and subordinate statutes at the time when this Decree enters into force, or if the Special Regulation of the Enforcement Decree of the Act on Budget and Accounts Related to Contracts for Large Scale Construction Work or the provisions of the said Special Regulations have been cited in other Acts and subordinate statutes, this Decree and Chapter 6 of this Decree, or the corresponding provisions of this Decree shall be deemed to have been cited therein. ADDENDA <Presidential Decree No. 14973, Apr. 8, 1996> Article 1 (Enforcement Date) This Decree shall enter into force on the date of its promulgation. ADDENDA <Presidential Decree No. 15186, Dec. 31, 1996> Article 1 (Enforcement Date) This Decree shall enter into force on January 1, 1997. Article 2 (Examples of Application concerning Replacement of Guarantee Certificate of Deposit for Difference to be Paid in Cash) (1) The head of each central government agency or the public official in charge of contracts, if it is confirmed that construction work is carried out normally after performing a safety check-up with respect to construction work of which the progress is 50/100 or more from among construction works of which the deposit for the difference is paid in cash pursuant to the proviso of Article 123 (1) of the Enforcement Decree of the Budget and Accounts Act amended by Presidential Decree No. 14295, may cause the cash corresponding to the progress ratio out of the cash paid to be replaced by a guarantee certificate in an amount twice as much as the cash. (2) The execution of the safety check-up and the methods and procedures, etc. related to the replacement by guarantee certificate pursuant to the provisions of paragraph (1) of this Article shall be prescribed by the Minister of Finance and Economy. Article 3 (Examples of Application concerning Treatment of Deposit for Difference Paid in Cash at Time of Prolongation of Contract Period) If the head of each central government agency or the public official in charge of contracts has received the deposit in cash under the proviso of Article 123 (1) of the Enforcement Decree of the Budget and Accounts Act amended by Presidential Decree No. 14295, may allow the other party to the contract to replace the cash with a guarantee certificate in an amount equal to or exceeding the said cash to be paid after the expiration of the original period of the contract upon the request of the said other party to the contract when the period of the contract is extended due to causes not attributable to the said other party. Article 4 (Transitional Measures concerning Conclusion of Contract, etc.) With respect to the tender, the determination of successful bidder, and the conclusion of the contract which are executed after the enforcement of this Decree where public notice of the tender has been made before the enforcement of this Decree, and with respect to contracts concluded after the enforcement of this Decree after being selected as a successful tender in a tender executed before the enforcement of this Decree, the previous provisions shall apply. Last updated : 2009-07-26