ACT ON SPECIAL CASES CONCERNING SUPPORT FOR TECHNOPARKS
32775 · 2014-11-21
ACT ON SPECIAL CASES CONCERNING SUPPORT FOR TECHNOPARKS
Act No. 12606, May 20, 2014
Act No. 5578, Sep. 23, 1998
Amended by Act No. 6406, Jan. 29, 2001
Act No. 6642, Jan. 26, 2002
Act No. 6841, Dec. 30, 2002
Act No. 6842, Dec. 30, 2002
Act No. 7604, Jul. 21, 2005
Act No. 7749, Dec. 23, 2005
Act No. 8188, Jan. 3, 2007
Act No. 8337, Apr. 6, 2007
Act No. 8345, Apr. 11, 2007
Act No. 8352, Apr. 11, 2007
Act No. 8852, Feb. 29, 2008
Act No. 8974, Mar. 21, 2008
Act No. 9071, Mar. 28, 2008
Act No. 9401, Jan. 30, 2009
Act No. 9500, Mar. 18, 2009
Act No. 9979, Jan. 27, 2010
Act No. 10220, Mar. 31, 2010
Act No. 10589, Apr. 14, 2011
Act No. 11690, Mar. 23, 2013
Act No. 11830, May 28, 2013
Act No. 12606, May 20, 2014
CHAPTER I GENERAL PROVISIONS
법령보기 화면
Article 1 (Purpose)
The purpose of this Act is to contribute to creating jobs, stimulating regional economies, and promoting national competitiveness by clustering human and physical resources of enterprises, universities, research institutes, etc. in certain places to jointly develop technology and by bringing about regional innovation under close connections and collaboration among such entities.
<Amended by Act No. 12606, May 20, 2014>
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 2 (Definitions)
The terms used in this Act shall be defined as follows:
<Amended by Act No. 11690, Mar. 23, 2013>
1.
The term "Technopark" means a cluster of land, buildings, facilities, etc. which functions as a base of regional innovation so that enterprises, universities, research institutes, local governments, and other entities can jointly conduct the following business activities:
(a)
Establishment of a cooperative system among enterprises, universities, research institutes, and local governments or supportive institutions for technology or corporate management with the aim of creating, utilizing, and expanding the capability of regional development according to respective local conditions and characteristics in the aspects of development of human resources, development of science and technology, industrial production, and business support;
(b)
Assistance to the formulation of regional development strategies in industries and technology;
(c)
Joint research or development and the transfer and commercialization of technology;
(d)
Education and training of human resources for industries and technology;
(e)
Distribution of information about industries and technology;
(f)
Protection and fostering of new technology and business start-ups;
(g)
Supply of facilities for joint research and development;
(h)
Test production;
(i)
Production and sale of commodities utilizing the outcomes of research or development;
(j)
Other activities prescribed by Ministerial Decree of Trade, Industry and Energy to commercialize technology and stimulate a cooperative system between enterprises, universities, research institutes, local governments or supportive institutions for technology or corporate management;
2.
The term "urban factories" means urban factories prescribed in
Article 28 of the Industrial Cluster Development and Factory Establishment Act
.
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 2-2 (Relationship with other Acts)
Even where there exist provisions in any other Act which are different from those of this Act with respect to the management and supervision, etc. of a person designated as a project implementer under
Article 4
, this Act shall apply on the preferential basis thereto.
[This Article Added by Act No. 12606, May 20, 2014]
CHAPTER II DEVELOPMENT, ETC. OF TECHNOPARKS
법령보기 화면
Article 3 (Formulation of Plans to Develop Technoparks)
(1)
The Minister of Trade, Industry and Energy shall formulate, and publicly notify a plan to develop Technoparks to facilitate the development thereof.
<Amended by Act No. 11690, Mar. 23, 2013>
(2)
Matters necessary for the formulation of the plan to develop Technoparks shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 4 (Designation of Project Implementers)
(1)
The Minister of Trade, Industry and Energy may designate a person who shall develop and operate a Technopark (hereinafter referred to as "project implementer").
<Amended by Act No. 11690, Mar. 23, 2013>
(2)
Matters necessary for the qualifications, etc. for designation of project implementers under paragraph (1) shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 4-2 (Business, etc. of Project Implementers)
(1)
In order to facilitate regional technological innovation and to make a Technopark perform functions as a base of regional innovation, a project implementer may perform the following business:
1.
Support for the business referred to in items of subparagraph 1 of
Article 2
;
2.
Promotion of regional industries and creation of jobs;
3.
Management of and support for a Technopark;
4.
Business related to a regional industrial policy, such as survey, analysis and performance evaluation, and finding, planning, etc. of regional research and development projects;
5.
Other business prescribed by Ministerial Decree of Trade, Industry and Energy.
(2)
In order to create jobs and stimulate regional economy, a project implementer may conduct surveys on the following matters and provide the outcomes thereof to local residents:
1.
Present status of industrial and technical equipment that can be utilized in the region;
2.
Information on employment and job finding;
3.
Information on training of human resources;
4.
Information on regional exhibitions related to the fields of industries and technology;
5.
Information on regional support related to the fields of industries, technology and finance;
6.
Other information prescribed by Ministerial Decree of Trade, Industry and Energy.
(3)
In order to conduct surveys on matters referred to in subparagraphs of paragraph (2), a project implementer may request cooperation from a local government and other agencies prescribed by Presidential Decree. In such cases, an agency, in receipt of such request, shall comply therewith, except in extenuating circumstances.
(4)
The State or a local government may subsidize funds required to conduct the surveys and to provide the outcomes thereof under paragraph (2).
[This Article Added by Act No. 12606, May 20, 2014]
법령보기 화면
Article 5 (Applications, etc. for Designation as Project Implementers)
(1)
Any person who intends to be designated as a project implementer shall file an application for designation as a project implementer with the Minister of Trade, Industry and Energy.
<Amended by Act No. 11690, Mar. 23, 2013>
(2)
Any person who files an application for designation as a project implementer pursuant to paragraph (1) shall be a corporation.
(3)
When a corporation under paragraph (2) appoints its executives, it shall evenly select persons who have abundant experiences in the respective areas of technology, business management, and public administration, from among those who have served, or are serving, for an enterprise, university, research institute, etc.
(4)
Except as otherwise expressly stipulated in this Act, the provisions of the
Civil Act
governing incorporated foundations shall apply
mutatis mutandis
to the corporations under paragraph (2).
(5)
Matters necessary for the procedures for filing applications for designation as a project implementer shall be prescribed by Ministerial Decree of Trade, Industry and Energy.
<Amended by Act No. 11690, Mar. 23, 2013>
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 5-2 (Revocation, etc. of Designation of Project Implementers)
(1)
Where any of the following applies to a project implementer designated under
Article 4
(1), the Minister of Trade, Industry and Energy may revoke such designation, suspend construction, rebuild or remove manmade structures, or take other necessary measures:
Provided
, That in cases falling under subparagraph 1, he/she shall revoke such designation:
<Amended by Act No. 11690, Mar. 23, 2013>
1.
Where the project implementer has been designated by fraudulent or other illegal means;
2.
Where the project implementer fails to construct and operate a Technopark by no later than five years from the date of designation as a project implementer;
3.
Where the project implementer no longer meets the qualifications for designation under
Article 4
(2).
(2)
Where the Minister of Trade, Industry and Energy revokes the designation of a project implementer under paragraph (1), he/she shall hold a hearing.
<Amended by Act No. 11690, Mar. 23, 2013>
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 6 (Procedures for Development of Technoparks)
Notwithstanding
Articles 3
and
4
, if an industrial complex or a regional comprehensive development district is required when promoting the development of a Technopark, such Technopark may be designated and developed as a national industrial complex, a general industrial complex, or an up-to-date city industrial complex under the
Industrial Sites and Development Act
, and may be developed as a regional comprehensive development district under the
Balanced Regional Development and Support for Local Small and Medium Enterprises Act
.
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 7 (Guidelines for Operating Technoparks)
The Minister of Trade, Industry and Energy shall establish and publicly notify guidelines regulating fundamental matters concerning the operation of Technoparks, as prescribed by Presidential Decree. The foregoing shall also apply to amendments to such guidelines.
<Amended by Act No. 11690, Mar. 23, 2013>
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 7-2 (Evaluation of Management Accomplishments)
(1)
The Minister of Trade, Industry and Energy may evaluate the management accomplishments of project implementers each year.
<Amended by Act No. 11690, Mar. 23, 2013>
(2)
The Minister of Trade, Industry and Energy may request the project implementers to submit data prescribed by Presidential Decree, such as a report on the management accomplishments of the previous year to evaluate management accomplishments under paragraph (1).
<Amended by Act No. 11690, Mar. 23, 2013>
(3)
The Minister of Trade, Industry and Energy may apply differential rates of wages paid by achievements at work to a project implementer who has shown exemplary management accomplishments and recommend a project implementer who has shown poor management accomplishments as a result of evaluation of management accomplishments under paragraph (1) to take measures, etc. in relation to human resources management, budget or business management necessary for the improvement of management.
<Amended by Act No. 11690, Mar. 23, 2013; Act No. 12606, May 20, 2014>
(4)
The Minister of Trade, Industry and Energy may differentially subsidize funds referred to in
Article 19
(1), taking into account the outcomes of evaluation of management accomplishments conducted under paragraph (1). <Added by Act No. 12606, May 20, 2014>
(5)
Methods of evaluating management accomplishments prescribed in paragraph (1), procedures therefor, and any other necessary matters shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
CHAPTER III MEASURES FOR SMOOTH SUPPLY OF SITES
법령보기 화면
Article 8 (Special Cases on Establishment, etc. of Factories)
(1)
Notwithstanding
Article 2 of the Industrial Cluster Development and Factory Establishment Act
and
Article 2 of the Industrial Sites and Development Act
, any facility for test production prescribed by Presidential Decree and installed inside a Technopark (excluding Technoparks developed in accordance with the procedures for designation of national industrial complexes, general industrial complexes, or up-to-date city industrial complexes pursuant to
Article 6
) in order to carry on test production referred to in subparagraph 1 (h) of
Article 2
shall be deemed excluded from the scope of factories.
(2)
An enterprise prescribed by Presidential Decree, which has relocated to a Technopark developed and operated in an area, other than the areas prescribed by Presidential Decree, to perform the production and sale of commodities utilizing the outcomes of research or development prescribed in subparagraph 1 (i) of
Article 2
, among the specific-use areas prescribed in
Article 36 of the National Land Planning and Utilization Act
, may establish an urban factory prescribed by Presidential Decree in such Technopark insofar as it does not pose a threat to structural safety, notwithstanding the following provisions:
1.
Article 19 (1) of the Building Act
;
2.
Article 76 (1) of the National Land Planning and Utilization Act
;
3.
Articles 6
and
9 of the Act on Designation and Management of Free Economic Zones
.
(3)
An enterprise intending to establish an urban factory under paragraph (2) shall obtain approval from a project implementer, and the project implementer shall obtain confirmation on the structural safety of the building from the Governor of a Special Self-Governing Province or the head of a
Si
/
Gun
/
Gu
(referring to the head of an autonomous
Gu
) under
Article 48 of the Building Act
before granting such approval.
<Amended by Act No. 12606, May 20, 2014>
(4)
The total area of an urban factory established under paragraph (2) (referring to the sum of areas of respective factories, if at least two urban factories exist) shall not exceed the area calculated by multiplying the total floor area of all buildings within the relevant Technopark by the rate prescribed by Presidential Decree.
(5)
The Governor of a Special Self-Governing Province, the head of a
Si
/
Gun
/
Gu
(referring to the head of an autonomous
Gu
) shall, upon receiving an application for registration of an urban factory established in accordance with paragraph (2) from an enterprise that has relocated into a Technopark, shall register the factory in accordance with
Article 16 of the Industrial Cluster Development and Factory Establishment Act
.
(6)
Except as otherwise expressly prescribed in paragraphs (2) through (5), matters necessary for the establishment and operation of urban factories, and any other matters shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 9 (Restrictions on Installation of Facilities and Occupancy)
(1)
The Minister of Trade, Industry and Energy may impose restrictions on installation, inside a Technopark, of any building or facility, other than buildings or facilities necessary for carrying on the activities referred to in the items of subparagraph 1 of
Article 2
, as prescribed by Presidential Decree.
<Amended by Act No. 11690, Mar. 23, 2013>
(2)
The Minister of Trade, Industry and Energy may impose restrictions on occupancy, within a Technopark, of any person, other than those related to the activities referred to in the items of subparagraph 1 of
Article 2
, as prescribed by Presidential Decree.
<Amended by Act No. 11690, Mar. 23, 2013>
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 10 (Sale, etc. of State or Public Property)
(1)
Notwithstanding the
State Property Act
or the
Public Property and Commodity Management Act
, the State or any local government may sell or lease any State or public property to a project implementer or a person who relocates into a Technopark (hereinafter referred to as "occupant") based on a free contract, if deemed necessary for developing or operating the Technopark. In such cases, such property may be gratuitously leased to any of the following persons:
<Amended by Act No. 12606, May 20, 2014>
1.
A project implementer, which is a non-profit corporation, to which contributions are made by the State or a local government;
2.
A project implementer, which is a non-profit corporation, to which contribution are made by a national school or public school under
Article 3 of the Higher Education Act
.
(2)
Notwithstanding
Article 18 of the State Property Act
,
Article 13
,
19
, or
28 of the Public Property and Commodity Management Act
, and the
Higher Education Act
or the
Private School Act
, the State, any local government, or the educational foundation of a private school may lease part of any State or public land or part of the site of a university or college to a project implementer or an occupant to build a building or any other permanent structure thereon. In such cases, the condition that such building or structure shall be donated to the State, the local government, or the educational foundation, or that the land or the site of the school shall be reinstated, upon expiration of the lease contract, shall be attached to the lease.
(3)
The educational foundation of a private school may lease part of the site of a university or college gratuitously to a project implementer which is a non-profit corporation, when it leases part of the site pursuant to paragraph (2).
(4)
No occupant may lease any structure built pursuant to paragraph (2) to a third party.
(5)
Notwithstanding
Article 30 (2) of the State Property Act
,
Article 20 (3) of the Public Property and Commodity Management Act
, and the
Higher Education Act
or the
Private School Act
, any project implementer may allow a third person who intends to use a structure built in accordance with paragraph (2) for the same purpose as the purpose of lease to use it or profit therefrom.
(6)
The sale price of State or public property under paragraph (1) shall be the arithmetical average of the prices appraised by at least two appraisal corporations (referring to the appraisal corporations under
Article 28 of the Public Notice of Values and Appraisal of Real Estate Act
). <Added by Act No. 12606, May 20, 2014>
(7)
Notwithstanding
Articles 32 through 34 of the State Property Act
or
Articles 22 through 24 of the Public Property and Commodity Management Act
, rental fees for lease of the State or public property under paragraph (1) or (2) shall be governed by Presidential Decree. <Added by Act No. 12606, May 20, 2014>
(8)
The lease period of State and public property under paragraphs (1) and (2) shall not exceed 20 years. <Added by Act No. 12606, May 20, 2014>
(9)
A lease contract referred to in paragraphs (1) through (3) may be renewed:
Provided
, That the lease period under a renewed lease contract for National property shall not exceed the period prescribed in paragraph (8) whenever a renewal is made. <Added by Act No. 12606, May 20, 2014>
(10)
In renewing a lease contract under paragraph (9), if a project implementer or an occupant requests the renewal of the lease contract during a period between six to one month before the expiration of the lease period, the State, a local government or the educational foundation of a private school shall not reject such request except in cases prescribed by Presidential Decree, such as continuous delay in payment of rental fees by the requester for at least three months.
<Added by Act No. 12606, May 20, 2014>
(11)
Matters necessary for the method of leasing State or public property or the site of a private school prescribed in paragraphs (1) through (3), and other matters necessary for the sale or lease at cost or gratuitous lease of State or public property or the site of a private school shall be prescribed by Presidential Decree. <Amended by Act No. 12606, May 20, 2014>
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 10-2 (Cancellation of Gratuitous Lease)
The State or any local government may cancel gratuitous lease referred to in the latter part of the main body of
Article 10
(1) or
Article 10
(3) if any of the following events occurs:
<Amended by Act No. 12606, May 20, 2014>
1.
Where the purposes of the gratuitous lease have been achieved;
2.
Where a project implementer has used State or public property for any purpose other than the purposes of gratuitous lease;
3.
Where a project implementer has violated any condition of gratuitous lease.
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 11 (Subsidization of Facility Costs)
The State or a local government may either fully or partially subsidize facility costs or operation expenses incurred in relation to the development of an industrial technology complex.
<Amended by Act No. 12606, May 20, 2014>
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 12 (Special Cases concerning Prohibition, etc. of Building Construction)
Notwithstanding
Article 76 (1) of the National Land Planning and Utilization Act
, prohibition and restriction of building construction within a Technopark shall be governed by an industrial complex development plan (referring to industrial complex development plans referred to in
Articles 6
,
7
and
7-2 of the Industrial Sites and Development Act
) and a master plan for the management of an industrial complex (referring to master plans for the management of an industrial complex under
Article 33 of the Industrial Cluster Development and Factory Establishment Act
).
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 13 (Establishment of Infrastructure)
The State or a local government shall give priority to supporting the establishment of infrastructure, such as roads, water supply systems, and sewerage systems, for the smooth development of a Technopark.
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 14 (Promotion of Informatization, etc.)
(1)
The State or a local government may provide support for matters necessary for facilitating informatization, such as the progress of information technology of Technoparks and the establishment and use of an information and communications network amongst Technoparks.
(2)
Any person who has a private telecommunications system installed in accordance with
Article 64 of the Telecommunications Business Act
may, if he/she has any spare facility, may allow a project implementer to use the spare facility.
(3)
Matters necessary for the use of any spare facility prescribed in paragraph (2) shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 15 (Assumption of Costs of Installing Electric Facilities)
Article 24 of the Act on Special Measures for the Deregulation of Corporate Activities
, which stipulate special cases related to the assumption of costs for industrial complex development projects, shall apply
mutatis mutandis
to the installation of electric facilities in Technoparks developed in accordance with the procedures for designation of a national industrial complex, a general industrial complex, or an up-to-date city industrial complex pursuant to
Article 6
, to the assumption of costs thereof, etc.
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 16 (Exemption, etc. from Various Charges)
(1)
Each Technopark is exempt from the following charges:
1.
Development charges referred to in
Article 5 of the Restitution of Development Gains Act
;
2.
Development costs of substitute forest resources referred to in
Article 19 of the Mountainous Districts Management Act
;
3.
Farmland preservation charges referred to in
Article 38 of the Farmland Act
;
4.
Development costs of substitute grasslands referred to in
Article 23 of the Grassland Act
;
5.
Traffic inducement charges referred to in
Article 36 of the Urban Traffic Improvement Promotion Act
.
(2)
The owner of a facility or the operator of any business within a Technopark is exempt from traffic inducement charges referred to in
Article 36 of the Urban Traffic Improvement Promotion Act
.
(3)
Notwithstanding
Article 9 of the Culture and Arts Promotion Act
, any person who intends to erect a building within a Technopark may choose not to install any artistic decoration.
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
CHAPTER IV MEASURES FOR SMOOTH FUNDING
법령보기 화면
Article 17 (Contributions, etc. by State and Local Governments)
(1)
The State or a local government may contribute funds to a project implementer to support the development and operation of a Technopark.
(2)
A public institution referred to in
Article 4 of the Act on the Management of Public Institutions
(hereinafter referred to as "public institutions"), Government-contributed institution, or Government-funded institution, etc. that is related to the projects of a Technopark may contribute funds to a project implementer.
(3)
A national school referred to in
Article 3 of the Higher Education Act
or an industry-academic cooperation foundation, established in a national school, under
Article 25 of the Industrial Education Enhancement and Industry-Academia-Research Cooperation Promotion Act
, which participates in the development and operation of a Technopark, may contribute part of the expenditure from the account of the school supporting association of such national school (referring to an account, other than the National Treasury accounts, which autonomously prepares and executes the revenue and expenditure budgets with sources of revenues, such as membership fees of the supporting association and earnings from profit-making projects, for the creation of an academic atmosphere and the improvement of educational conditions) or part of the disbursement of the relevant industry-academic cooperation foundation prescribed in
Article 32 of the Industrial Education Enhancement and Industry-Academia-Research Cooperation Promotion Act
to the project implementer to support the development and operation of the Technopark.
(4)
Matters necessary for the granting, using and managing the contributions referred to in paragraphs (1) through (3) shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 18 (Contribution, etc. of Property by Private Schools, etc.)
(1)
Notwithstanding
Article 28 of the Private School Act
, the educational foundation of a private school may contribute, sell or permit the use of infrastructure facilities for research (hereinafter referred to as "research infrastructure"), such as research facilities and equipment for testing and evaluation that have been installed with subsidies from the State or a local government, to a project implementer.
<Amended by Act No. 12606, May 20, 2014>
(2)
Any person (excluding the educational foundation of a private school) who has any research infrastructure installed with subsidies from the State or a local government may contribute, sell or permit the use of such research infrastructure to a project implementer.
<Amended by Act No. 12606, May 20, 2014>
(3)
Any private school referred to in
Article 3 of the Higher Education Act
or any industry-academic cooperation foundation, established in a private school, referred to in
Article 25 of the Industrial Education Enhancement and Industry-Academia-Research Cooperation Promotion Act
, which participates in the development and operation of a Technopark, may contribute part of the expenditure from the account belonging to the duties of corporations under
Article 29 (1) of the Private School Act
of the relevant private school or part of the disbursement of the relevant industry-academic cooperation foundation prescribed in
Article 32 of the Industrial Education Enhancement and Industry-Academia-Research Cooperation Promotion Act
, to any project implementer to support the development and operation of the Technopark.
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 19 (Subsidization, etc.)
(1)
The State or any local government may give preferential treatment, such as subsidization, to project implementers and occupants of a Technopark, to support the business activities prescribed in the items of subparagraph 1 of
Article 2
.
(2)
The Minister of Trade, Industry and Energy shall publicly notify matters necessary for persons eligible for, eligibility criteria and procedures for, and the methods of support provided for in paragraph (1), and other relevant matters.
<Amended by Act No. 11690, Mar. 23, 2013>
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 20 (Taxation Support)
The State or a local government may grant an exemption or reduction of income tax, corporate tax, acquisition tax, property tax, registration license tax, etc., as prescribed by the
Restriction of Special Taxation Act
, the
Restriction of Special Local Taxation Act
, and any other relevant Acts, in order to support the development and operation of Technoparks.
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
CHAPTER V MEASURES FOR SMOOTH SUPPLY OF HUMAN RESOURCES
법령보기 화면
Article 21 (Permission for Leave of Absence or Concurrent Holding of Office by Public Educational Officials, etc.)
(1)
Notwithstanding the
Educational Officials Act
, the
State Public Officials Act
, and the
Local Public Officials Act
, any of the following persons may take a leave of absence to work as an executive or employee of a project implementer, or concurrently hold a position of the executive or employee of a project implementer:
1.
A teaching staff member of a school defined in
Article 2 of the Higher Education Act
(excluding various kinds of schools defined in subparagraph 7 of the same Article);
2.
A researcher in a national or public research institute (including a teaching staff member and a researcher under
Article 15 of the Korea Advanced Institute of Science and Technology Act
,
Article 14 of the Gwangju Institute of Science and Technology Act
and
Article 12-3 of the Educational Officials Act
).
(2)
The period of a leave of absence under paragraph (1) shall not exceed three years. In such cases, the period of leave of absence of any teaching staff member of a university or college may exceed the remaining term of his/her employment, notwithstanding
Article 45 (2) of the Public Educational Officials Act
.
(3)
Where teaching staff members of a university or college, or researchers of a national or public research institute take a leave of absence for at least six months pursuant to paragraph (1), such national or public research institute shall be deemed to have an additionally prescribed number of teaching staff member or researcher corresponding to the number of persons taking such leave of absence.
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 22 (Technical Guidance, etc.)
(1)
The State or a local government may second its subordinate public officials to the occupants of a Technopark to render guidance for technology and business management.
(2)
The State or a local government may request the Small Business Corporation established under
Article 68 of the Small and Medium Enterprises Promotion Act
, or a public institution, Government-contributed institution, or Government-funded institution prescribed by Presidential Decree (hereinafter referred to as "guiding institution") to render guidance for technology and business management to persons who relocate into a Technopark.
(3)
The State or a local government may fully or partially subsidize expenses incurred in rendering guidance for technology and business management under paragraph (2) to guiding institutions.
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
CHAPTER V-2 MANAGEMENT, SUPERVISION, ETC. OF PROJECT IMPLEMENTERS
법령보기 화면
Article 22-2 (Approval, etc. of Articles of Incorporation)
(1)
A project implementer shall obtain approval of its articles of incorporation from the Minister of Trade, Industry and Energy within three months after being designated as a project implementer under
Article 4
(1). In such cases, the articles of incorporation of the project implementer shall comply with the provisions of this Chapter.
(2)
Where a project implementer intends to modify the articles of incorporation approved under paragraph (1), it shall pass a resolution thereon with concurrent vote of at least two thirds of all incumbent directors at a meeting of the board of directors and obtain approval from the Minister of Trade, Industry and Energy.
[This Article Added by Act No. 12606, May 20, 2014]
법령보기 화면
Article 22-3 (Organization of Executives)
(1)
A project implementer shall have up to 15 directors, including a chairperson and a president, and two auditors, as its executives; and all of the executives shall be non-standing, except for the president.
(2)
The president shall be appointed by the board of directors following recommendation by the committee for recommendation of the president prescribed by the articles of incorporation, and the appointment shall require approval from the Minister of Trade, Industry and Energy.
(3)
The president shall represent the project implementer and direct and supervise the employees belonging thereto, and shall have overall control over all business performed by the project implementer as the person finally responsible.
[This Article Added by Act No. 12606, May 20, 2014]
법령보기 화면
Article 22-4 (Board of Directors)
(1)
A project implementer shall have the board of director to pass resolutions on important matters prescribed by Presidential Decree, such as the matters related to the enactment and amendment of the articles of incorporation, and the dissolution and liquidation of the corporation.
(2)
Meetings of the board of directors shall be classified into ordinary meetings and extraordinary meetings.
(3)
An extraordinary meeting of the board of directors shall be convened by the chairperson if requested by the chairperson, president, auditor or by the majority of incumbent directors, or by the Minister of Trade, Industry and Energy.
(4)
Where the performance of duties of the president is deemed to be obviously impeded due to such reasons as his/her violation of any Act or subordinate statute or the articles of incorporation, or negligence in performing his/her duties, etc., the board of directors may request the Minister of Trade, Industry and Energy to cancel approval under
Article 22-3
(2).
[This Article Added by Act No. 12606, May 20, 2014]
법령보기 화면
Article 22-5 (Property and Accounting)
(1)
The property of a project implementer shall be classified into ordinary property and permanent property.
(2)
A project implementer shall obtain approval from the Minister of Trade, Industry and Energy following a resolution of the board of directors to:
1.
Alter his/her permanent property (including the alteration of types and amount of permanent property);
2.
Bear an extra-budgetary debt;
3.
Waive receivables;
4.
Borrow funds (limited to where at least 5% of the amount computed by deducting the total amount of liabilities as at the time of borrowing from the total amount of permanent property is borrowed for at least one year).
(3)
The fiscal year of a project implementer shall coincide with the fiscal year of the Government for general accounting.
(4)
In order to make management results and financial status clear, a project implementer shall manage the accounting of economic transactions, etc. occurring in the course of conducting management activities in accordance with the double entry bookkeeping system based on the time of their occurrence.
(5)
The standards and methods for accounting necessary for the management of accounting under paragraph (4) shall be prescribed and publicly notified by the Minister of Trade, Industry and Energy.
[This Article Added by Act No. 12606, May 20, 2014]
법령보기 화면
Article 22-6 (Supervision of Personnel Affairs, Budget, etc.)
(1)
The Minister of Trade, Industry and Energy may prepare and publicly notify the standards for the personnel affairs, budget, organization and other operation of a project implementer.
(2)
A project implementer shall comply with standards publicly notified under paragraph (1), except in extenuating circumstances.
[This Article Added by Act No. 12606, May 20, 2014]
법령보기 화면
Article 22-7 (Inspection, Management, Supervision, etc.)
(1)
The Minister of Trade, Industry and Energy shall manage and supervise the business affairs of a project implementer, including inspection of property or accounting, and guidance for improvement of management.
(2)
The Minister of Trade, Industry and Energy may, where necessary for the management and supervision under paragraph (1), request a project implementer to submit data concerning the management status and the creation and operation of the Technopark or to report thereon.
(3)
Where a project implementer or any executive or employee of a project implementer falls under any of the following cases, the Minister of Trade, Industry and Energy may order the project implementer to take corrective measures within a prescribed period of up to two months:
1.
Where he/she violates any Act or subordinate statute or the articles of incorporation;
2.
Where he/she engages in any conduct that is likely to incur a significant loss to the property of the project implementer.
(4)
The Minister of Trade, Industry and Energy may withdraw the approval for appointment of the president in any of the following cases:
1.
Where the board of directors of the project implementer has requested the withdrawal of the approval for appointment of the president under
Article 22-4
(4);
2.
Where the project implementer has failed to take corrective measures within a period referred to in paragraph (3).
(5)
Where a project implementer falls under any of the following cases, the Minister of Trade, Industry and Energy may issue an order to suspend all or part of the relevant business:
1.
Where the income of the corporation has been used for business other than those prescribed in
Article 4-2
(1) and (2);
2.
Where the continuation of the relevant business is deemed to be against purposes of the establishment of the corporation.
(6)
Where has committed any of the following violations, The Minister of Trade, Industry and Energy may request the relevant project implementer to take disciplinary measures against an executive or employee of the project implementer if the executive or employee:
1.
Violates this Act, any Act or subordinate statutes, regulations, etc. related to his/her the duty;
2.
Engages in wrongful conduct incurring any loss to the property of the project implementer;
3.
Performs, or tries to perform, any business other than those prescribed in
Article 4-2
(1) and (2);
4.
Obstructs or evades a request for correction.
[This Article Added by Act No. 12606, May 20, 2014]
CHAPTER VI SUPPLEMENTARY PROVISIONS
법령보기 화면
Article 23 Deleted. <by Act No. 12606, May 20, 2014>
법령보기 화면
Article 24 (Delegation and Entrustment of Authority)
The Minister of Trade, Industry and Energy may, as prescribed by Presidential Decree, delegate part of his/her authority under this Act to the heads of its affiliated agencies or the Special Metropolitan City Mayor, a Metropolitan City Mayor, the Mayor of a Special Self-Governing City, a
Do
Governor, or the Governor of a Special Self-Governing Province, or entrust it to the heads of other administrative agencies or institutions or organizations prescribed by Presidential Decree.
<Amended by Act No. 11690, Mar. 23, 2013; Act No. 12606, May 20, 2014>
[This Article Wholly Amended by Act No. 10589, Apr. 14, 2011]
법령보기 화면
Article 25 (Deemed Public Officials in Application of Penal Provisions)
Executives and employees of a project implementer shall be deemed public officials in the application of
Articles 129 through 132 of the Criminal Act
. [This Article Added by Act No. 11830, May 28, 2013]
ADDENDA
Article 1 (Enforcement Date)
This Act shall enter into force three months after the date of its promulgation.
Article 2 (Transitional Measures concerning Establishment of Corporation)
Any person already designated as a technology research cluster pursuant to Article 10 of the
Industrial and Energy Technology Infrastructure Development Act
as at the time this Act enters into force shall establish a corporation pursuant to
Article 5
(2) through (4) within three months from the enforcement date of this Act.
Article 3 Omitted.
ADDENDA <Act No. 6406, Jan. 29, 2001>
Article 1 (Enforcement Date)
This Act shall enter into force on July 1, 2001.
Articles 2 and 3 Omitted.
ADDENDA <Act No. 6642, Jan. 26, 2002>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 8 Omitted.
ADDENDA <Act No. 6841, Dec. 30, 2002>
Article 1 (Enforcement Date)
This Act shall enter into force nine months after the date of its promulgation.
Articles 2 through 12 Omitted.
ADDENDA <Act No. 6842, Dec. 30, 2002>
Article 1 (Enforcement Date)
This Act shall enter into force on July 1, 2003.
Articles 2 through 8 Omitted.
ADDENDA <Act No. 7604, Jul. 21, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 7 Omitted.
ADDENDUM <Act No. 7749, Dec. 23, 2005>
This Act shall enter into force on the date of its promulgation.
ADDENDUM <Act No. 8188, Jan. 3, 2007>
This Act shall enter into force six months after the date of its promulgation.
ADDENDA <Act No. 8337, Apr. 6, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 9 Omitted.
ADDENDA <Act No. 8345, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 10 Omitted.
ADDENDA <Act No. 8352, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 16 Omitted.
ADDENDA <Act No. 8852, Feb. 29, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 7 Omitted.
ADDENDA <Act No. 8974, Mar. 21, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 14 Omitted.
ADDENDA <Act No. 9071, Mar. 28, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 2009. (Proviso Omitted.)
Articles 2 through 11 Omitted.
ADDENDA <Act No. 9401, Jan. 30, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 11 Omitted.
ADDENDUM <Act No. 9500, Mar. 18, 2009>
This Act shall enter into force six months after the date of its promulgation.
ADDENDUM <Act No. 9979, Jan. 27, 2010>
This Act shall enter into force six months after the date of its promulgation.
ADDENDA <Act No. 10220, Mar. 31, 2010>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 20011.
Articles 2 through 5 Omitted.
ADDENDUM <Act No. 10589, Apr. 14, 2011>
This Act shall enter into force on the date of its promulgation.
ADDENDA <Act No. 11690, Mar. 23, 2013>
Article 1 (Enforcement Date)
(1)
This Act shall enter into force on the date of its promulgation.
(2)
Omitted.
Articles 2 through 7 Omitted.
ADDENDUM <Act No. 11830, May 28, 2013>
This Act shall enter into force three months after the date of its promulgation.
ADDENDA <Act No. 12606, May 20, 2014>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Article 2 (Applicability to Inspection, Management, Supervision, etc.)
(1)
The amended provisions of
Article 22-7
(3) shall apply to the acts of a project implementer or executives and employees of a project implementer done after this Act enters into force.
(2)
The amended provisions of
Article 22-7
(5) shall apply to the acts of a project implementer done after this Act enters into force.
(3)
The amended provisions of
Article 22-7
(6) shall apply to the acts of executives and employees of a project implementer done after this Act enters into force.
Article 3 (Transitional Measures concerning Approval of Articles of Incorporation)
Notwithstanding the amended provisions of
Article 22-2
(1), a person designated as a project implementer under
Article 4
(1) as at the time this Act enters into force, shall obtain approval of the articles of incorporation of the relevant project implementer from the Minister of Trade, Industry and Energy within three months after this Act enters into force.
Article 4 (Transitional Measures concerning Organization of Executives)
A person designated as a project implementer under
Article 4
(1) as at the time this Act enters into force shall organize executives to satisfy the amended provisions of
Article 22-3
(1) by no later than December 31, 2014.
Last updated : 2015-12-23