RADIO WAVES ACT

7173 · 2006-07-01

RADIO WAVES ACT  Act No. 7815, Dec. 30, 2005   Wholly Amended by Act No. 6197, Jan. 21, 2000 Amended by Act No. 6315, Dec. 29, 2000 Act No. 6909, May 29, 2003 Act No. 6893, May 29, 2003 Act No. 7265, Dec. 30, 2004 Act No. 7264, Dec. 30, 2004 Act No. 7441, Mar. 31, 2005 Act No. 7559, May 31, 2005 Act No. 7796, Dec. 29, 2005 Act No. 7815, Dec. 30, 2005 CHAPTER I GENERAL PROVISIONS 법령보기 화면  Article 1 (Purpose) The purpose of this Act is to provide matters relating to the efficient utilization and control of radio waves to facilitate the promotion of radio waves and serve to promote public welfare by facilitating the utilization of radio waves and the development of radio-wave technologies. 법령보기 화면  Article 2 (Definitions of Terms) For the purpose of this Act, <Amended by Act No. 7815, Dec. 30, 2005> 1. the term "radio waves" means electromagnetic waves which propagate in space without any artificial guidance and have frequencies within the range determined by the International Telecommunication Union; 2. the term "distribution of frequencies" means determining the use of specified frequencies; 3. the term "allotment of frequencies" means granting specific persons the right to utilize specified frequencies; 4. the term "designation of frequencies" means designating specific frequencies to be used by a wireless station set up by permission or by filing report thereon; 4-2. the term "withdrawal of frequencies" means a withdrawal of whole or part of allotment of frequencies, designation of frequencies or approval for a use of frequencies; 4-3. the term "reallocation of frequencies" means an allotment of frequencies, a designation of frequencies or an approval for use of frequencies after a withdrawal of frequencies and in replacement thereof; 5. the term "wireless facilities and equipment" means electrical facilities and equipment capable of sending or receiving radio waves; 6. the term "wireless station" means the integration of wireless facilities and equipment, and persons who operate such wireless facilities and equipment: Provided , That any wireless station set up only for the purpose of receiving broadcasts shall be excluded; 7. the term "person engaged in the wireless" means any person who operates wireless facilities and equipment or does the work of installing wireless facilities and equipment and holds a technical qualification delivered under the provisions of Article 70 (2); 8. the term "installer" means any person who opens a wireless station after getting permission for opening from, or filing a report on opening with, the Minister of Information and Communication; 9. the term "broadcasting station" means a wireless station opened for the purpose of letting the public receive directly broadcasting signals; 10. the term "space station" means a wireless station opened in a manmade satellite; 11. the term "earth station" means a wireless station opened on earth to communicate with a space station; 12. the term "satellite network" means the integration of the communications networks made up of the space stations and the earth stations; 13. the term "satellite orbit" means the location or track of the space station; 14. the term "electromagnetic disturbance" means that electromagnetic waves emitted by electromagnetic-wave-generating apparatuses (referring to the propagation of electromagnetic energy in space) or conducted by such electromagnetic-wave-generating apparatuses (referring to the flow of electromagnetic energy through power supply lines) disturb the performance of other apparatuses; and 15. the term "electromagnetic compatibility" means when apparatus that causes electromagnetic disturbances (hereinafter referred to as "electromagnetic disturbance apparatus") or apparatus that is affected by electromagnetic waves is in conformity with the standards for the prevention of electromagnetic disturbances under Article 56 and the standards for protection from electromagnetic waves. 법령보기 화면  Article 3 (Facilitation of Utilization of Radio Wave Resources) The Government shall work out and implement policy measures necessary to facilitate the utilization of radio wave resources for the purpose of making the maximum utilization of limited radio wave resources and promoting the public welfare. 법령보기 화면  Article 4 Deleted.<by Act No. 7815, Dec. 30, 2005> CHAPTER II SECURING RADIO WAVE RESOURCES 법령보기 화면  Article 5 (Securing Radio Wave Resources) (1) In order to secure the radio wave resources, the Minister of Information and Communication shall formulate and implement policy measures containing matters falling under each of the following subparagraphs: 1. The development of technologies for utilizing new frequencies; 2. Increasing the efficiency of the utilization of the frequencies in use; 3. The international registration of frequencies; and 4. The removal of radio wave interferences between nations and consultations and coordination to prevent such radio wave interferences. (2) Necessary matters concerning frequencies subject to registration under paragraph (1) 3, registration expenses and registration procedures, etc. shall be prescribed by the Ministerial Decree of Information and Communication. 법령보기 화면  Article 6 (Improvement of Utilization Efficiency of Radio Waves Resource) (1) The Minister of Information and Communication shall, if it is necessary to facilitate fair and efficient utilization of the radio wave resources, implement matters falling under each of the following subparagraphs: <Amended by Act No. 7815, Dec. 30, 2005> 1. Alteration of the distribution of frequencies; 2. Withdrawal of frequency or reallocation of frequencies; 3. Conversion to new technical methods; and 4. Joint use of frequencies. (2) The Minister of Information and Communication may investigate and confirm a current status of use of frequency under the conditions as prescribed by the Presidential Decree, in case where necessary for implementing matters falling under each subparagraph of paragraph (1). <Added by Act No. 7815, Dec. 30, 2005> 법령보기 화면  Article 6-2 (Withdrawal of Frequency or Reallocation of Frequencies) (1) The Minister of Information and Communication may execute the withdrawal of frequencies or reallocation of frequencies under the provisions of Article 6 (1) 2, in case where falling under any of each of the following subparagraphs: 1. Where the distribution of frequencies has been altered; 2. Where a person subject to an allotment of frequencies under the provisions of Article 10 has faced with a cancellation of the license for a key communications business under the provisions of Article 15 of the Telecommunications Business Act , or the license for CATV broadcasting business or the registration of the signal transmission network business has been cancelled under the provisions of Article 18 of the Broadcasting Act ; and 3. Where the actual record of frequency utilization has been inactive or where there exists a necessity for elevating the efficiency of utilization of frequency through a readjustment of frequencies bands. (2) Matters necessary for a withdrawal of frequencies or procedures for reallocation of frequencies under the provisions of paragraph (1), a judgment standard for actual record of frequency utilization, and requisite, etc. for readjustment of frequencies bands shall be prescribed by the Presidential Decree. (3) Where the Minister of Information and Communication withdrawals or reallocates frequencies under the provisions of paragraph (1), he shall go through a deliberation of the Committee of Examination of Radio Waves Policies under the provisions of Article 59-2 . [This Article Added by Act No. 7815, Dec. 30, 2005] 법령보기 화면  Article 7 (Compensation, etc. for Loss) (1) In implementing a withdrawal of frequency or a reallocation of frequency under the provisions of Article 6-2 , the Minister of Information and Communication shall compensate the normally generating loss of relevant installer and a person subject to an approval of frequency use under the provisions of Article 19 (5) (hereinafter referred to as the "installers, etc."); Provided , That the same shall not apply to the case of each of the following subparagraphs: 1. Where following a request of installers, etc.; 2. Where the International Telecommunication Union has altered a distribution of frequency, following an alteration of international distribution of frequency that is to be commonly admitted by all nations; 3. Where using the frequency whose usage is the second-order business (referred to the business for which the first-order business is to be protected in operating the relevant frequency, and which is not to be protected from the first-order business; hereinafter the same shall apply); and 4. Where falling under Article 6-2 (1) 2. (2) The Minister of Information and Communication may collect the compensated amount under the provisions of paragraph (1), where the loss has been compensated under the provisions of main sentence of portions other than each subparagraph of paragraph (1), from the person newly subject to an allotment of frequencies, a designation of frequencies and an approval for a use of frequencies (hereinafter referred to as the "newly-using person") for the relevant frequencies. (3) When the Minister of Information and Communication intends to determine the amount of loss compensation under the provisions of paragraph (1), he shall hear in advance the opinions of relevant installers, etc. (4) The Minister of Information and Communication may have the newly-using person to directly compensate such loss to the installers, etc., notwithstanding the provisions of main sentence of portions other than each subparagraph of paragraph (1). (5) Where the frequencies allocated under the provisions of Article 11 (1) fall under the provisions of Article 6-2 (1) 1 or 2 and the Minister of Information and Communication has withdrawn them, he shall return as prescribed by the Presidential Decree the price for allotment of frequencies corresponding to the remaining period of the utilization period under the provisions of Article 15 (1): Provided , That the same shall not apply to the case of alteration of a distribution of frequencies under the request of persons subject to an allotment of frequencies. (6) For the compensation of losses under the provisions of main sentence of portions other than each subparagraph of paragraph (1) and the return of the price for allotment of frequencies under the provisions of the main sentence of paragraph (5), the financial resources of the information and communication promotion fund under the provisions of Article 33 of the Framework Act on Informatization Promotion (hereinafter referred to as the "Information and Communication Promotion Fund") shall be used and the collection money under the portions of paragraph (2) shall be the revenue of the Information and Communication Promotion Fund. (7) Matters necessary for the main sentence of portions other than each subparagraph of paragraph (1), the computation criteria for loss compensation money and payment procedures under the provisions of paragraph (4), the collection of a collection money under the provisions of paragraph (2), and the return of the price for allotment of frequencies under the provisions of paragraph (5), etc. shall be prescribed by the Presidential Decree. [This Article Wholly Amended by Act No. 7815, Dec. 30, 2005] 법령보기 화면  Article 7-2 (Formal Objection, etc.) (1) Where the installers, etc. have objections to the loss compensation money under the provisions of Article 7 (1), they may file an objection with the Minister of Information and Communication within 30 days from the date of receiving the notice on the loss compensation money. (2) Where the Minister of Information and Communication has received a formal objection under the provisions of paragraph (1), he shall determine whether or not to increase or to decrease the loss compensation money within 30 days from the date of receiving such objection, and notify without delay the installers, etc. who raised the formal objection of the results thereof: Provided , That where there exist any inevitable reasons, he may extend such period within the scope of 30 days. [This Article Added by Act No. 7815, Dec. 30, 2005] 법령보기 화면  Article 8 (Medium-and Long-Term Plan for Utilization of Radio Waves) (1) The Minister of Information and Communication shall draw up a medium-and long-term plan for the utilization of radio waves by going through a deliberation of the Deliberation Committee on Radio Waves Policies under the provisions of Article 59-2 so as to smoothly meet the national demand for radio wave resources. <Amended by Act No. 7264, Dec. 30, 2004> (2) The Minister of Information and Communication shall, when he draws up such medium-and long-term plan for the utilization of radio waves, finalize the plan after seeking opinions through hearings, etc. The same shall apply to the case where he alters important matters contained in the medium-and long-term plan for the utilization of radio waves. (3) The medium-and long-term plan for the utilization of radio waves shall include the following matters: 1. The prospect of medium-and long-term demand for radio wave resources; 2. The use of frequencies by band; 3. The current utilization of frequencies by band; 4. Alteration of the plan for the international utilization of radio wave resources; 5. The current development of new radio wave resources; and 6. Other matters concerning the efficient utilization of radio wave resources. CHAPTER III DISTRIBUTION AND ALLOTMENT OF RADIO WAVE RESOURCES 법령보기 화면  Article 9 (Distribution of Frequencies) (1) The Minister of Information and Communication shall distribute frequencies taking into account matters falling under each of the following subparagraphs: 1. The necessity of the national security, the maintenance of order and the safety of human lives including the national defense, the public security, the rescues of persons in trouble; 2. The current utilization of frequencies and domestic conditions for the utilization of frequencies; 3. Trends of international use of frequencies; 4. Trends of the development of the radio-wave-utilization technology; and 5. The demand for the services utilizing radio waves. (2) Where the Minister of Information and Communication makes a distribution of frequency under the provisions of paragraph (1), he may make a distribution of frequency by dividing the business whose frequency usage is the first order and that whose frequency usage is the second order. <Added by Act No. 7815, Dec. 30, 2005> (3) The Minister of Information and Communication shall, when he distributes frequencies in accordance with paragraph (1), publish their distribution. The same shall apply to the case where he alters the distributed frequencies. 법령보기 화면  Article 10 (Allotment of Frequencies) (1) The Minister of Information and Communication may allot frequencies to be used directly by any person for the business falling under any of the following subparagraphs, which the person intends to run. In this case, the Minister of Information and Communication shall publicly announce the matters as prescribed by the Presidential Decree such as the usage of allocated frequency, technical mode, etc.: <Amended by Act No. 7815, Dec. 30, 2005> 1. The key communications business under Article 4 (2) of the Telecommunications Business Act ; and 2. The CATV broadcasting business under subparagraph 2 (b) of Article 2 of the Broadcasting Act or the signal transmission network business under subparagraph 13 of the same Article of the same Act. (2) Any person who intends to get published frequencies alloted for him under paragraph (1) shall file an application for the allotment of frequencies with the Minister of Information and Communication as prescribed by the Ministerial Decree of Information and Communication. (3) The Minister of Information and Communication may, where he allots frequencies, attach conditions to such allotment as prescribed by the Presidential Decree to prevent any person to be alloted frequencies and any other person in a special relationship as prescribed by the Presidential Decree from dominating radio waves and to facilitate the competition of a proper level. 법령보기 화면  Article 11 (Allotment of Frequencies for Price) (1) The Minister of Information and Communication may, in the event that the frequencies published in accordance with the provisions of Article 10 (1) fall under each of the following subparagraphs, allot such frequencies in return for receiving the price for allotment of frequencies: <Amended by Act No. 7815, Dec. 30, 2005> 1. Where the economic values and technical ripple-effects of the frequencies are expected to be great; 2. Where the existence of a competing demand for the frequencies concerned is recognized; and 3. Where it is deemed necessary to promote radio waves. (2) In making an allotment under the provisions of paragraph (1), if it falls under any of each of the following subparagraphs, the Minister of Information and Communication may make an allotment by examining the influences extended to the key communications business by the relevant allotment of frequencies, and the matters of each subparagraph of Article 12 : <Added by Act No. 7815, Dec. 30, 2005> 1. Where a person already subject to an allotment of frequencies whose allotted frequencies, and usage and technical mode are same thereto, applies for an allotment of frequencies; 2. Where intending to make a reallocation of frequencies under the provisions of Article 16 ; and 3. In addition thereto, where falling under the reasons as prescribed by the Presidential Decree for the efficiency and fairness of allotment of frequencies. (3) The price for allotment of frequencies shall be computed by considering the economic values of frequencies, such as the turnover expected from the business operated by receiving the frequencies allotment, frequencies subject to allotment, and the bandwidth. <Added by Act No. 7815, Dec. 30, 2005> (4) Where the person subject to allotment of frequencies under the provisions of paragraph (1) has failed to pay the price for allotment of frequencies, the Minister of Information and Communication may cancel the allotment of frequencies. <Added by Act No. 7815, Dec. 30, 2005> (5) The Minister of Information and Communication may have the person applying for allotment of frequencies under the provisions of Article 10 (2) to pay the guarantee money prescribed by the Presidential Decree within the scope of 10/100 of the price for allotment of frequencies under the provisions of paragraph (1) at the time of applying for allotment of frequencies. <Added by Act No. 7815, Dec. 30, 2005> (6) The Minister of Information and Communication shall incorporate the guarantee money under the provisions of paragraph (5) into the revenue of the Information and Communication Promotion Fund in case where the person who applied for allotment of frequencies withdraws his application after a completion of the relevant application period for allotment of frequencies or returns the allotted frequencies without using them. <Added by Act No. 7815, Dec. 30, 2005> (7) The price for allotment of frequencies paid by any person who is alloted frequencies under paragraph (1) shall be revenues for the Information and Communications Promotion Fund. <Amended by Act No. 7265, Dec. 30, 2004; Act No. 7815, Dec. 30, 2005> (8) Matters necessary for the computation method of the price for allotment of frequencies, the collection procedures, etc. shall be prescribed by the Presidential Decree. <Added by Act No. 7815, Dec. 30, 2005> 법령보기 화면  Article 12 (Allotment of Frequencies through Examination) With respect to the frequencies published in accordance with Article 10 (1), the Minister of Information and Communication shall, where he does not allot the frequencies as prescribed in Article 11 , allot such frequencies after examining matters falling under each of the following subparagraphs: 1. The efficiency in the utilization of the radio wave resources; 2. The fairness in the utilization of the radio wave resources; 3. The applicant's necessity of the frequencies concerned; and 4. The applicant's technical and financial capability. 법령보기 화면  Article 13 (Disqualification for Allotment of Frequencies) A person falling under any of the following subparagraphs shall not be alloted frequencies: <Amended by Act No. 7815, Dec. 30, 2005> 1. A person who falls under the disqualification for setting up any wireless station under Article 20 (1); 2. A person who falls under the disqualification for the license of a key communications business under Article 5-2 of the Telecommunications Business Act (limited to any person who intends to run the key communications business); or 3. A person who falls under the disqualification for permission for a CATV broadcasting business or registration for a signal transmission network business under Article 13 of the Broadcasting Act (limited to any person who intends to run a CATV broadcasting business or a signal transmission network business). 법령보기 화면  Article 14 (Right for Utilization of Frequencies) (1) Any person who has been alloted frequencies under the provisions of Article 11 shall hold the right to exclusively utilize the frequencies concerned (hereinafter referred to as the "right for the utilization of frequencies"). (2) Any person who has been alloted frequencies under the provisions of Article 11 may transfer or lease the right for the utilization of frequencies after the lapse of the period prescribed by the Presidential Decree: Provided , That in the event that the person who has been alloted the frequencies falls under causes such as bankruptcy, or a drastic change in economic conditions, etc. prescribed by the Presidential Decree, he may transfer or lease his right for the utilization of frequencies prior to the lapse of such period. <Amended by Act No. 7815, Dec. 30, 2005> (3) Any person who has received a transfer or rented the right for the utilization of frequencies under the provisions of paragraph (2) shall get approval from the Minister of Information and Communication as prescribed by the Ministerial Decree of Information and Communication. <Amended by Act No. 7815, Dec. 30, 2005> (4) Where making an approval under the provisions of paragraph (3), the Minister of Information and Communication may put the necessary conditions for the efficient and fair utilization of the electric wave resources. <Added by Act No. 7815, Dec. 30, 2005> (5) Any person who has been granted approval for transfer of the right for the utilization of frequencies under paragraph (3) shall succeed to the status of the person who has been alloted the frequencies under the provisions of Article 11 and of the installer (limited to the case where a person, who has been granted frequencies, has filed a report with respect to the opening of a wireless station). <Amended by Act No. 7815, Dec. 30, 2005> (6) The provisions of Article 13 shall apply mutatis mutandis to the transfer or lease of the right for the utilization of frequencies. <Amended by Act No. 7815, Dec. 30, 2005> 법령보기 화면  Article 15 (Period of Utilization of Allocated Frequencies) (1) The Minister of Information and Communication shall determine a period for utilization within the scope of 20 years the frequencies alloted under the provisions of Article 11 , and within the scope of 10 years for the frequencies alloted under the provisions of Article 12 , taking into account circumstances surrounding the utilization of frequencies, and publish such period. <Amended by Act No. 7815, Dec. 30, 2005> (2) The period for the frequencies transferred under the provisions of Article 14 (2) shall be the remainder of the period determined under paragraph (1). 법령보기 화면  Article 16 (Reallocation) (1) The Minister of Information and Communication may reallocate the frequencies whose period for utilization expires to any frequency utilizers at the time of completion of period for utilization: Provided , That the same shall not apply to the case falling under any of the following subparagraphs: 1. Where the frequency utilize does not want the reallocation; 2. Where there exists any need to use the relevant frequencies for the purposes of the national defense, the public security and the rescue of people in trouble; 3. Where the International Telecommunication Union has distributed the relevant frequencies for other business or usages; or 4. Where the conditions under the provisions of Article 10 (3) have been violated. (2) Where the Minister of Information and Communication intends to make a reallocation under the provisions of paragraph (1), he may have the person related to interests submit their opinions. (3) Where the Minister of Information and Communication intends to put the new conditions on, such as not to make any reallocation as falling under paragraph (1) 2 and 3, or intending to make a reallocation, by receiving the price for allotment of frequencies under the provisions of the same Article as the frequency allocated under the provisions of Article 12 falls under each subparagraph of Article 11 (1), he shall notify thereof to the utilizers of frequency in advance one year before the completion of the period for utilization. (4) The provisions of Article 10 (3) and Article 11 (1) and (3) through (6) shall be applied mutatis mutandis in case where making a reallocation. [This Article Wholly Amended by Act No. 7815, Dec. 30, 2005] 법령보기 화면  Article 17 (Conversion) (1) The Minister of Information and Communication may, in the event that the frequencies alloted in accordance with the provisions of Article 12 are deemed to fall under any subparagraph of Article 11 (1), convert the person who has been alloted the frequencies in question into the person who has been alloted the frequencies under the provisons of Article 11 . (2) With respect to any person who intends to get his alloted frequencies converted under paragraph (1), the Minister of Information and Communication may require him to pay the amount computed according to the standards prescribed by the Presidential Decree. (3) Any wireless station which was opened by any person before he gets his frequencies converted under paragraph (1) shall be deemed the wireless station which he opens after filing a report thereof under the provisions of Article 19 (1) 3 at the time that he gets his frequencies converted. (4) The provisions of Articles 10 (3) and 11 (7) shall apply mutatis mutandis to the conversion referred to in paragraph (1). <Amended by Act No. 7815, Dec. 30, 2005> (5) Matters necessary for the procedures, etc. for the conversion under the provisions of paragraph (1) shall be prescribed by the Presidential Decree. <Added by Act No. 7815, Dec. 30, 2005> 법령보기 화면  Article 18 (Management Ledger of Right for Utilization of Frequencies) (1) The Minister of Information and Communication shall keep and manage a ledger entered with matters relating to the right for the utilization of frequencies (hereinafter referred to as the "management ledger of the right for the utilization of frequencies") to efficiently manage the right for the utilization of frequencies as prescribed by the Ministerial Decree of Information and Communication. (2) Any person who intends to gain access to the management ledger of the right for the utilization of frequencies or to get a copy of the management ledger shall file an application thereof with the Minister of Information and Communication as prescribed by the Ministerial Decree of Information and Communication. CHAPTER IV UTILIZATION OF RADIO WAVE RESOURCES Section 1 Permission for and Operation of Wireless Station 법령보기 화면  Article 19 (Establishment of Wireless Station) (1) Any person who intends to open a wireless station shall get permission from the Minister of Information and Communication as prescribed by the Presidential Decree: Provided , That any person who intends to open a wireless station, which falls under any of the following subparagraphs and is prescribed by the Presidential Decree, shall file a report thereof with the Minister of Information and Communication as prescribed by the Ministerial Decree of Information and Communication: <Amended by Act No. 7815, Dec. 30, 2005> 1. A wireless station which emits weak radio waves or a wireless station having no need for any installation work for wireless equipments; 2. A wireless station which is used exclusively to receive signals; and 3. A wireless station opened by a person who is alloted the frequencies under the provisions of Article 11 for the purpose of rendering telecommunications services, etc. (2) Where a person who intends to open a wireless station prescribed by the Presidential Decree to get telecommunications services under the provisions of subparagraph 7 of Article 2 of the Framework Act on Telecommunications enters into a service contract with other person who renders such telecommunications services, the wireless station concerned shall be deemed to be granted permission by the Minister of Information and Communication notwithstanding the provisions of the main sentence of paragraph (1) with the exception of each subparagraph. In this case, the provisions of Articles 22 , 24 , 26 , 32 , and 69 (1) 2 shall not be applied. <Amended by Act No. 7815, Dec. 30, 2005> (3) Any operator of the telecommunications business shall, when he enters into a service contract with a person who intends to open a wireless station as prescribed in paragraph (2), file a notice thereof with the Minister of Information and Communication as prescribed by the Ministerial Decree of Information and Communication. (4) Any person may open a wireless station which emits weak radio waves and is prescribed by the Presidential Decree without filing a report thereof with the Minister of Information and Communication notwithstanding the provisions of the proviso of paragraph (1) with the exception of each subparagraph, (5) Any person who has got approval for the use of frequencies from the Minister of Information and Communication as prescribed by the Presidential Decree may open a wireless station notwithstanding the provisions of paragraph (1). (6) Services rendered by the wireless station and the classification of the wireless station shall be prescribed by the Presidential Decree. 법령보기 화면  Article 20 (Disqualifications for Opening of Wireless Station) (1) Any person falling under any of the following subparagraphs shall be prohibited from opening any wireless station: Provided , That the same shall not apply to the case where wireless stations are opened under the provisions of Article 19 (1) (proviso), (2) and (4): <Amended by Act No. 7815, Dec. 30, 2005> 1. A person who does not hold the nationality of the Republic of Korea; 2. Any foreign government and its representative; 3. Any foreign corporation or any foreign organization; 4. A person who has been sentenced to imprisonment without prison labor or a heavier punishment for committing offenses prescribed by this Act and for whom two years have yet to elapse from the date on which the execution of such sentence was terminated or the execution of such sentence was exempted; 5. A person who is in the period of a stay after having been sentenced to a stay of the execution of imprisonment without prison labor or a heavier punishment for committing offenses prescribed by this Act; and 6. A person who has been sentenced to a punishment for committing the crime concerning insurrection and the crime concerning foreign aggression as provided in the Criminal Act , the crime of serving the interest of the enemy as provided in the Military Criminal Act, or the crime of violating the National Security Act , and for whom 2 years have not passed from the date of the completion of the execution of such punishment or the fixed exemption from its execution. (2) The provisions of paragraph (1) 1 through 3 shall not apply to any wireless station falling under any of the following subparagraphs: <Amended by Act No. 7815, Dec. 30, 2005> 1. An experimental station (referring to a wireless station used exclusively for the conduct of experiment for the development of science or technology; hereinafter the same shall apply); 2. A wireless station operated for ships under Article 14 of the Ship Safety Act ; 3. A wireless station operated for the domestic aviation of aircraft for which permission has been granted under the proviso of Articles 145 (proviso) and 148 of the Aviation Act ; 4. A wireless station falling under any of the following items, for one of which the Republic of Korea grants permission to the government, representatives and citizens of a foreign nation to open in its territory just as such foreign nation does for the government, representatives and citizens of the Republic of Korea in its territory: (a) A wireless station set up in a diplomatic mission such as an embassy in which diplomatic and consular affairs of a foreign nation are carried out in the Republic of Korea for communications between specific points; (b) An amateur wireless station (referring to a wireless station used exclusively for self-training and technical research out of the personal interest in wireless technology; hereinafter the same shall apply); and (c) A wireless station which renders ground mobile services and is prescribed by the Presidential Decree; 5. A wireless station which is permitted by the Minister of Information and Communication to open during a period of international or national events held within the Republic of Korea; 6. An amateur wireless station which is opened by a person falling under each of the following items: (a) A person who has got a technical qualification as an amateur radio engineer of the Republic of Korea granted under the provisions of Article 70 ; and (b) A person who intends to operate a wireless station during his temporary stay in the Republic of Korea after obtaining recommendation from an organization designated by the Minister of Information and Communication (limited to any person who has acquired the qualification of an amateur radio engineer in his country); and 7. A wireless station which is opened within the aircraft or ship for offering an telecommunications services in the relevant aircraft or ship entering into or leaving from the Republic of Korea. 법령보기 화면  Article 21 (Permission for Opening Wireless Station) (1) Any person who intends to get permission for setting up a wireless station shall file an application for such permission with the Minister of Information and Communication as prescribed by the Presidential Decree. (2) The Minister of Information and Communication, upon receiving an application for permission under paragraph (1), shall examine matters falling under each of the following subparagraphs: 1. Whether the designation of frequencies is possible; 2. Whether wireless facilities to be installed and operated are in conformity with the technical standards under Article 45 ; 3. Whether plans for posting persons engaged in the wireless work are in conformity with the standards for the qualification and the posting of the fixed number of persons engaged in the wireless work under Article 71 ; and 4. Whether opening a wireless station is in conformity with the conditions prescribed by the Presidential Decree. (3) The Minister of Information and Communication may, when he deems it necessary to make the examination referred to in paragraph (2), require an applicant to furnish data or listen to his opinion. (4) The Minister of Information and Communication shall, if he deems an application consistent with the provisions of each subparagraph of paragraph (2) as a result of the examination made under the same paragraph, grant the applicant permission for setting up his wireless station and issue a certificate of permission stating a deadline for completing the construction of his wireless station and other matters prescribed by the Presidential Decree to the applicant. (5) The Minister of Information and Communication shall, when he grants permission for setting up a wireless station prescribed by the Ministerial Decree of Information and Communication, publish it under the conditions as prescribed by the Ministerial Decree of Information and Communication. 법령보기 화면  Article 22 (Effective Term of Permission for Setting up Wireless Station and Approval for Use of Frequencies) (1) The effective term of permission for setting up the wireless station under Article 19 (1) shall be prescribed by the Presidential Decree within the limit of not more than five years, and that of approval for use of frequencies under paragraph (5) of the same Article shall be prescribed by the Presidential Decree within the limit of not more than ten years, and when the relevant period has been expired, re-permission or re-approval may be rendered. <Amended by Act No. 7264, Dec. 30, 2004> (2) The effective term of permission for setting up the wireless station in any ship and aircraft, which is mandatory under the provisions of the Ship Safety Act or the Aviation Act , shall be indefinite notwithstanding the provisions of paragraph (1). <Amended by Act No. 7815, Dec. 30, 2005> (3) The effective term of permission and approval under paragraph (1) shall reckon from the date as provided in each of the following subparagraphs: <Amended by Act No. 7264, Dec. 30, 2004> 1. Permission for setting up the wireless station shall be on the date subjected to an issuance of certificate of the inspection of work completion under Article 24 (3): Provided , That permission for setting up the wireless station under each subparagraph of Article 25 (1) shall be on the date subjected to the relevant permission; and 2. Approval for use of frequencies shall be on the date of obtaining the relevant approval. (4) The procedures for re-permission and re-approval under the provisions of paragraph (1) and other necessary matters shall be prescribed by the Presidential Decree. <Added by Act No. 7815, Dec. 30, 2005> 법령보기 화면  Article 23 (Succession of Permission) (1) Any person falling under any of the following subparagraphs shall succeed the status of the installer (excluding any person opening the wireless station under Article 19 (1) 3; hereafter in this Article the same shall apply): 1. The transferee, in case that the installer transfers his wireless station related to his business while transferring his business; 2. A corporation that survives a merger or a corporation that is incorporated by a merger in case that there is a merger involving the installer, that is, a corporation; 3. The heirs, in case that there is an inheritance from the installer; and 4. A person who operates the ship or the aircraft after the change in case that there is a change in the operator of a ship or aircraft equipped with a wireless station due to the transfer of the ownership of, or a lease contract for such ship or such aircraft. (2) Any person falling under paragraph (1) 1 or 2 shall obtain authorization from the Minister of Information and Communication as prescribed by the Ministerial Decree of Information and Communication. (3) Any person who falls under paragraph (1) 3 or 4, or any other person who intends to succeed a wireless station prescribed by the Presidential Decree shall file a report thereof with the Minister of Information and Communication as prescribed by the Ministerial Decree of Information and Communication. (4) The provisions of Article 20 shall apply mutatis mutandis to the authorization under paragraph (2) and the report under paragraph (3). (5) In case that there are not less than two persons who succeed the status of the installer through a corporate merger or inheritance, one person from among them shall be selected as the representative. 법령보기 화면  Article 24 (Inspection) (1) Any person who has been granted permission for setting up a wireless station under the provisions of Article 21 (4) shall, if the installation of wireless facilities and equipment is completed, file a report thereof with the Minister of Information and Communication and then undergo an inspection to determine whether the wireless facilities and equipment installed are in conformity with the technical standards and the standards for the qualification and the posting of the fixed number of persons engaged in the wireless work (hereinafter referred to as the "inspection of completion"). (2) The Minister of Information and Communication may, if he receives an application for extending the time limit for completing the work stated in the certificate issued under Article 21 (4) from a person who has been granted permission for setting up a wireless station under the provisions of the same Article and paragraph, extend such time limit when he deems such application appropriate. In this case the total extended period shall not exceed one year. (3) The Minister of Information and Communication shall, when wireless facilities and equipment are found to be in conformity with the technical standards under the provisions of Article 45 and qualifications and the fixed number of persons engaged in the wireless work are found to be in conformity with the standards for the qualification and the posting of the fixed number of persons engaged in the wireless work under the provisions of Article 71 as a result of the inspection under paragraph (1), issue without delay a certificate of the completion of inspection to the applicant. (4) The Minister of Information and Communication shall conduct the regular inspection of any wireless station that has been granted permission for setting up such wireless station under the provisions of Article 21 (4) for every period prescribed by the Ministerial Decree of Information and Communication for each wireless station within the limit of five years. Necessary matters concerning the time, methods and procedures for the regular inspection shall be prescribed by the Ministerial Decree of Information and Communication. (5) The Minister of Information and Communication may, when any domestic ship or aircraft equipped with the wireless station is about to sail or fly out of the country to any foreign destination or it is deemed especially necessary to efficiently utilize and control the radio waves, inspect the technical standards for wireless facilities and equipment, the qualification and the fixed number of persons engaged in the wireless work and other necessary matters, etc. (6) With respect to the wireless station of any ship or aircraft which is overseas during the regular inspection period and other wireless station which is deemed unnecessary to undergo the regular inspection, the Minister of Information and Communication may extend, exempt or omit such regular inspection notwithstanding the provisions of paragraph (4). 법령보기 화면  Article 25 (Operation of Wireless Station) (1) Any wireless station shall go into operation after undergoing the inspection of completion under the provisions of Article 24 (1): Provided , That this shall not apply to the wireless station falling under any of the following subparagraphs: <Amended by Act No. 7815, Dec. 30, 2005> 1. A wireless station installed in a fishing boat, a small-sized wireless station or an amateur station which is all prescribed by the Presidential Decree; 2. A wireless station, the permission of which is renewed under the provisions of Article 22 (1); 3. A simple wireless station which does not require the work of installing wireless facilities and equipment and is prescribed by the Presidential Decree; 4. The wireless station of a ship or aircraft, which has failed to arrive in a domestic destination after having been acquired overseas; and 5. From among the wireless stations falling under the provisions of Article 20 (2) 7, the wireless station whose installer is a foreigner. (2) Any wireless station shall be operated within the scope of matters entered in the certificate of permission issued under Article 21 (4) and the scope reported under the provisions of proviso in portions other than each subparagraph of Article 19 (1): Provided , That the same shall not apply to the case where communications falling under any of the following subparagraphs are made: <Amended by Act No. 7815, Dec. 30, 2005> 1. Distress communications (referring to wireless communications made after sending out distress signals in case that any ship or aircraft is in a grave and impending crisis; hereinafter the same shall apply); 2. Emergency communications (referring to wireless communications made after sending out emergency signals in case that any ship or aircraft is feared to face a grave and impending danger and a tense situation occurs; hereinafter the same shall apply); 3. Safety communications (referring to wireless communications made after sending out safety signals to prevent any grave danger for any navigating ship and aircraft; hereinafter the same shall apply); 4. Emergency communications (referring to wireless communications made to rescue human lives, give disaster relief, secure traffic communications or maintain order in case that an emergency situation occurs or is feared to occur following earthquake, typhoon, flood, tidal wave or fire, or wire communications are unavailable or it is difficult to utilize such wire communications; hereinafter the same shall apply); and 5. Other communications prescribed by the Presidential Decree. 법령보기 화면  Article 26 (Permission for Alteration) (1) When any person who has been granted permission for setting up a wireless station under the provisions of Article 21 (4) intends to alter the matters prescribed by the Presidential Decree from among the permitted matters, he shall get permission thereof from the Minister of Information and Communication as prescribed by the Presidential Decree. (2) Any person who has been granted permission for the alteration under the provisions of paragraph (1) shall undergo an inspection conducted by the Minister of Information and Communication to determine whether the alteration has been made as permitted. (3) The provisions of Articles 24 (2) and (6) and the main sentence, with the exception of each subparagraph, of Article 25 (1) shall apply mutatis mutandis to the permission granted for the alteration under paragraph (1). In this case, the "wireless station" in Article 24 (2) and the main sentence, with the exception of each subparagraph, of Article 25 (1) shall be deemed the "wireless facilities". 법령보기 화면  Article 27 (Communications Methods, etc.) Any wireless station shall be operated as prescribed by the Ministerial Decree of Information and Communication in a manner consistent with the matters relating to the wireless station's calling method, answering method, the hours of operation, the responsibility to listen and other communications methods. <Amended by Act No. 7815, Dec. 30, 2005> 법령보기 화면  Article 28 (Distress Communications, etc.) (1) Conditions that have to be met by any wireless station that is mandatorily installed in a ship or aircraft under the provisions of the Ship Safety Act or the Aviation Act shall be prescribed by the Ministerial Decree of Information and Communication. <Amended by Act No. 7815, Dec. 30, 2005> (2) When any coastal wireless station (referring to a wireless station set up and fixed on the ground to communicate with ship wireless stations; hereinafter the same shall apply), any ship wireless station (referring to a wireless station set up in a ship to communicate with respect to its maritime mobile activities; hereinafter the same shall apply), any aviation wireless station (referring to a wireless station set up and fixed on the ground to communicate with aircraft stations; hereinafter the same shall apply) or any aircraft wireless station (referring to a wireless station set up in aircraft to communicate with respect to its aerial mobile activities; hereinafter the same shall apply) receives any distress signal, it shall immediately answer such emergence call prior to any other wireless communications and take every possible measure to notify a wireless station located most conveniently for rescuing the ship or the aircraft in trouble and when it receives emergency communications or safety communications, it shall take necessary measures as prescribed by the Ministerial Decree of Information and Communication. (3) Any ship wireless station, when it moves into or out of the communications range of a coastal wireless station, shall give a notice thereof to a coastal station as prescribed by the Presidential Decree. (4) Any aircraft wireless station shall, when its aircraft is in the air, communicate with an aviation wireless station as prescribed by the Ministerial Decree of Information and Communication. 법령보기 화면  Article 29 (Prevention of Radio Interference, etc.) Any wireless station shall be operated in a manner that it does not cause any radio interference which impedes or obstructs the operation of other wireless stations: Provided , That the same shall not apply to the communications made under Article 25 (2) 1 through 4. 법령보기 화면  Article 30 (Observance of Communications Security) (1) Any installer, any person who runs the business of wireless communications and any other person who utilizes wireless facilities and equipment shall observe the matters relating to the security of communications as provided by the Ministerial Decree of Information and Communication such as a designation of a person responsible for communication security, and a completion of education for communications security, etc. <Amended by Act No. 7815, Dec. 30, 2005> (2) Necessary matters concerning education for the security of communications, etc. under paragraph (1) shall be prescribed by the Ministerial Decree of Information and Communication. 법령보기 화면  Article 31 (Communications of Experimental Station, etc.) (1) Any experimental wireless station shall be prohibited from communicating with any experimental station of a foreign country. (2) Any experimental wireless station and any amateur wireless station shall be prohibited from using secret codes when they communicate. (3) Any amateur wireless station shall not communicate for any third person: Provided , That the same shall not apply to the communication for an opener of other amateur wireless stations and the communication for emergency disaster rescue. <Amended by Act No. 7815, Dec. 30, 2005> (4) Any amateur station may make relay communications by linking the wire-wireless interfaces to wireless facilities and equipment for the relief of emergency disasters. <Amended by Act No. 7815, Dec. 30, 2005> 법령보기 화면  Article 32 (Close and Suspension of Wireless Station Operation) (1) The installer shall, when he intends to close his wireless station or suspend the operation of his wireless station for not less than one month, or re-operate the wireless station whose operation has been suspended not less than one month, file a report thereof with the Minister of Information and Communication as prescribed by the Ministerial Decree of Information and Communication. <Amended by Act No. 7815, Dec. 30, 2005> (2) When the installer (limited to any person who has been granted permission for setting up a wireless station under the provisions of Article 21 (4)) files a report with respect to the close of his wireless station, the validity of the permission granted for his wireless station shall be extinguished. 법령보기 화면  Article 33 (Applicable Provisions) The provisions of Article 24 , the main sentence, with the exception of each subparagraph, of Article 25 (1), and Article 26 shall apply mutatis mutandis to any wireless station set up under Article 19 (1) 3. In this case, the "permission for alteration" in Article 26 (1) shall be deemed the "report on alteration". Section 2 Permission for Setting Up Broadcasting Station and Its Operation 법령보기 화면  Article 34 (Permission for Setting up Broadcasting Station) (1) Any person who intends to get permission for setting up a broadcasting station shall get recommendation from the Korean Broadcasting Commission as prescribed by the Presidential Decree. (2) The Minister of Information and Communication shall, upon receiving an application for permitting the establishment of a broadcasting station under the provisions of Article 21 (1), examine the matters falling under each of the following subparagraphs in addition to the matters as prescribed in Article 21 (2) 1 through 3: 1. Whether the conditions for opening a broadcasting station under Article 35 are satisfied; and 2. Other matters necessary to run the broadcasting business in a proper manner, which are prescribed by the Presidential Decree. 법령보기 화면  Article 35 (Conditions for Opening Broadcasting Station) (1) Any person who intends to open a broadcasting station shall install such broadcasting station in a manner that it does not cause any radio interferences to the reception of other broadcasts. (2) Necessary matters concerning conditions, such as the location of the station, the height of aerial transmission lines, generating power and directional characteristics, for setting up a broadcasting station for the prevention of radio interferences shall be prescribed by the Presidential Decree. (3) The Minister of Information and Communication may, when details of an application for permission, which is filed by a person who intends to set up a broadcasting station, fail to conform to the conditions for setting up a broadcasting station under paragraph (2), order the place planned for the broadcasting station relocated and the application supplemented. 법령보기 화면  Article 36 (Protection of Reception of Broadcasts) (1) Any person who owns any structure causing impediments to the reception of ordinarily receivable broadcasts shall take necessary measures to remove such impediments. (2) The standards for ordinally receivable broadcasts referred to in paragraph (1) shall be prescribed by the Ministerial Decree of Information and Communication and the matters necessary to remove the impediments to the reception of broadcasts shall be prescribed by the Presidential Decree. 법령보기 화면  Article 37 (Standard Method of Broadcasting) (1) The Minister of Information and Communication shall set the standard method of broadcasting and publish it to ensure the efficient utilization of frequencies used for the broadcasting business and increase conveniences for its users. (2) The Minister of Information and Communication shall, if he sets or alters the standard method of broadcasting in accordance with paragraph (1), listen in advance to the opinion of interested persons. Section 3 Operation of Space Communications 법령보기 화면  Article 38 (Securing of Satellite Orbits and Frequencies) The Minister of Information and Communication shall take policy measures to secure satellite orbits and frequencies (hereinafter referred to as the "satellite orbits, etc.") for space communications. 법령보기 화면  Article 39 (International Registration of Satellite Orbits, etc.) (1) Any person who intends to secure the satellite orbits, etc. to set up a space station shall file an application for the international registration of a satellite network with the Minister of Information and Communication as prescribed by the Ministerial Decree of Information and Communication. (2) The Minister of Information and Communication shall, upon receiving an application for the international registration of a satellite network under paragraph (1), file an application to that effect with the International Telecommunication Union in accordance with the Radio Regulations of the International Telecommunication Union. (3) Any person who has filed an application for the international registration of a satellite network under paragraph (1) shall bear costs involved in the registration of such international satellite network. 법령보기 화면  Article 40 (Adjustment of Satellite Network Interference) (1) The Minister of Information and Communication shall take policy measures necessary to adjust any radio interference with satellite networks under the jurisdiction of foreign countries. (2) The Minister of Information and Communication may require any person who has filed an application for the international registration of a satellite network under Article 39 (1) to furnish data necessary to adjust radio interferences. 법령보기 화면  Article 41 (Allotment of Satellite Orbits, etc.) (1) Where making a person falling under any of subparagraphs of Article 10 (1) utilize the satellite orbits, etc., the allotment shall be made by applying mutatis mutandis the provisions of Articles 10 through 18 . (2) Where making a person other than the persons falling under each subparagraph of Article 10 (1) utilize the satellite orbits, etc., the satellite orbits, etc. shall be designated in the space station when providing a permission for opening the universal station under the provisions of Article 21 . (3) When the satellite orbits, etc. have been secured under the provisions of Article 39 , the Minister of Information and Communication shall allocate under the provisions of paragraph (1) or designate under the provisions of paragraph (2) them preferentially to the relevant requester. [This Article Wholly Amended by Act No. 7815, Dec. 30, 2006] 법령보기 화면  Article 42 (Conditions for Setting up Space Station) Any space station shall have the function of immediately halting the emission of radio waves and changing its orbit in response to the remote control made by the control facilities and equipment. 법령보기 화면  Article 43 (Change of Satellite Orbit) The Minister of Information and Communication may, when he deems it necessary to adjust radio interferences and efficiently utilize radio wave resources, require the installer of a space station to change the satellite orbit to the extent that no serious impediment to attaining the objective arises. 법령보기 화면  Article 44 (Registration of Man-Made Satellite in United Nations) (1) The Minister of Information and Communication shall register a man-made satellite launched by a citizen of the Republic of Korea with the United Nations in accordance with the Convention on Registration of Objects Launched into Outer Space. (2) The Minister of Information and Communication may demand any person who has launched a man-made satellite to submit the data required for a registration of relevant man-made satellite. (3) Where a registration has been made under the provisions of paragraph (1), the Minister of Information and Communication shall notify without delay the Minister of Science and Technology of the results of registration. [This Article Wholly Amended by Act No. 7559, May 31, 2005] CHAPTER V PRESERVATION OF RADIO WAVE RESOURCES 법령보기 화면  Article 45 (Technical Standards) Any wireless facilities and equipment (excluding those used only for the purpose of receiving broadcasts) shall be in conformity with the technical standards prescribed by the Ministerial Decree of Information and Communication. 법령보기 화면  Article 46 (Type Approval Test and Type Registration, etc.) (1) Any person who intends to manufacture or import apparatuses for wireless facilities and equipment shall undergo a type approval test conducted by the Minister of Information and Communication and file a type registration with the Minister of Information and Communication: Provided , That the same shall not apply to the apparatuses for wireless facilities and equipment for experiment and research, or export as prescribed by the Ministerial Decree of Information and Communication. (2) Necessary matters concerning apparatuses for wireless facilities and equipment subject to the type approval test and type registration under paragraph (1), methods and procedures for such type approval test and type registration shall be prescribed by the Ministerial Decree of Information and Communication. In this case if he intends to determine the apparatuses subject to the type approval test and the type registration, consult with the heads of central administrative agencies concerned. (3) The apparatuses subject to the type approval test or the type registration under paragraph (2), for which the type approval test has been passed and the type registration has been filed, shall not be sold, manufactured, displayed, stored or transported for the purpose of selling them or kept in any wireless station before they are affixed a mark of the passing of the type approval test and a mark of the type registration. (4) In conducting the type approval test or the type registration under paragraph (1), the Minister of Information and Communication may get testing institutions designated by the Minister of Information and communication (hereinafter referred to as "designated testing institutions") to conduct performance tests. (5) The provisions of Articles 33-2 and 52 of the Framework Act on Telecommunications shall apply mutatis mutandis to the designation and the revocation of any designated testing institution. <Amended by Act No. 7815, Dec. 30, 2005> (6) Where intending to alter the matters provided by the Ministerial Decree of Information and Communication in relation to the details, etc. of criteria under the provisions of Articles 45 and 47-2 for the apparatuses passing the type approval test or making the type registration under the provisions of paragraph (1), a report thereon shall be made to the Minister of Information and Communication. <Added by Act No. 7815, Dec. 30, 2005> 법령보기 화면  Article 47 (Installation of Safety Facilities) Every wireless facility and equipment shall be installed according to the safety standards prescribed by the Ministerial Decree of Information and Communication so as not to harm human bodies or damage goods. 법령보기 화면  Article 47-2 (Standards, etc. for Protection of Human Bodies from Electromagnetic Waves) (1) The Minister of Information and Communication shall set standards for protection of human bodies from electromagnetic waves, standards for measuring the intensity of electromagnetic waves, standards for measuring the absorption rate of electromagnetic waves, apparatuses subject to the measurement and measuring methods, etc., taking into account the impact of electromagnetic waves generating from wireless facilities and equipment, etc. on human bodies and publish them. (2) The installer of wireless facilities and equipment or any person who intends to manufacture and import apparatuses for wireless facilities and equipment shall keep the intensity of the electromagnetic waves radiating from the wireless facilities and equipment from exceeding the standards for the protection of human bodies from the electromagnetic waves and shall install safety facilities which prevent any person other than authorized persons from gaining access to any place in which such electromagnetic waves are in excess of such standards. 법령보기 화면  Article 48 (Efficient Utilization of Wireless Facilities and Equipment) (1) The installer of wireless facilities and equipment may, if he deems it necessary to efficiently utilize the wireless facilities and equipment, lease the wireless facilities and equipment of a wireless station, entrust their operation, in whole or part, or operate them in collaboration with other person after getting approval from the Minister of Information and Communication under the conditions as prescribed by the Presidential Decree. (2) The Minister of Information and Communication may, where he deems it necessary to protect the natural environment, order the installer to use the wireless facilities and equipment of a wireless station, in whole or part, jointly with other person. (3) Necessary matters concerning wireless facilities and equipment subject to the joint use and the requisites referred to in paragraph (2) shall be prescribed by the Presidential Decree. 법령보기 화면  Article 49 (Monitoring of Radio Waves) (1) The Minister of Information and Communication shall perform the duty of monitoring radio waves to maintain and protect the order in utilizing radio waves by swiftly removing signal interferences and to facilitate the efficient utilization of radio waves. (2) The duty of monitoring radio waves under paragraph (1) shall be as follows: 1. The measurement of the variation and bandwidth of frequencies as well as the quality of radio waves used by a wireless station; 2. The detection of radio waves causing radio interferences; 3. The detection of radio waves emitted by an unlicensed wireless station; 4. The detection of the orientation of the communications under Article 28 (2) and the radio waves emitted by an unlicensed wireless station, and the radio waves for which a request is filed for a survey in connection with radio interferences, etc.; 5. The determination of whether matters as prescribed in Articles 25 and 27 through 30 are observed; and 6. Other matters prescribed by the Presidential Decree in order to maintain and protect the order in utilizing radio waves. 법령보기 화면  Article 50 (Monitoring of International Radio Waves) (1) The Minister of Information and Communication shall perform the duty of monitoring international radio waves which includes monitoring radio waves emitted by foreign wireless stations, and analyzing and removing radio interferences caused by such foreign wireless stations. (2) The Minister of Information and Communication shall install and operate facilities and equipment necessary for performing the duty referred to in paragraph (1). 법령보기 화면  Article 51 (Investigation of Radio Interferences, etc.) (1) The Minister of Information and Communication shall, when he acknowledges the occurrence of radio interferences or electromagnetic disturbances caused by wireless facilities and equipment, high voltage power transmission lines or other electrical facilities, investigate them. (2) The Minister of Information and Communication may, where he judges the existence of any radio interference or any electromagnetic disturbance as a result of the investigation referred to in paragraph (1), order necessary measures taken to improve, suspend or remove the wireless facilities and equipment in question or ask the heads of the central administrative agencies to order necessary measures taken. 법령보기 화면  Article 52 (Protection of Wireless Direction Finding Device) (1) Any person who intends to construct a building or a structure under the Presidential Decree that is feared to disturb radio waves in the area within one kilometer of the location of wireless direction finding devices installed by the Minister of Information and Communication shall obtain approval thereof from the Minister of Information and Communication. (2) The location of a place where the wireless direction finding devices are installed under paragraph (1) shall be published by the Minister of Information and Communication: Provided , That the Minister of Information and Communication may, when he deems it necessary not to publish such location for the security of communications, notify the heads of administrative agencies concerned of the location in lieu of the publication. 법령보기 화면  Article 53 (Investigation and Measures) (1) The Minister of Information and Communication may, when he finds any person violating the provisions of Article 19 , 25 , 26 , 29 , 45 , 46 , 52 , 57 or 58 , get his officials to investigate him and make tests as prescribed by the Ministerial Decree of Information and Communication. (2) The Minister of Information and Communication may, when the fact of violation is confirmed as a result of the investigation or the tests under paragraph (1), order the installer, owner, or manufacturer of the wireless facilities and equipment in question or any person who has marketed, displayed, stored or transported them to take measures necessary to correct, remove, destruct, take away or discontinue utilizing them, etc. as prescribed by the Ministerial Decree of Information and Communication. 법령보기 화면  Article 54 (Provisions of Data) (1) The installer may, in the event that there is any dispute between installers over the utilization of radio waves, ask the Minister of Information and Communication to provide him with necessary data such as the current utilization of radio waves in the disputed area. In this case, the Minister of Information and Communication shall comply with such request unless there are special reasons for him not to do so. (2) The Minister of Information and Communication shall, where he deems it necessary to provide the data requested under paragraph (1), dispatch his officials to investigate or confirm necessary matters and notify parties involved in the dispute of the results. 법령보기 화면  Article 55 (Measurement, etc. of Radio Wave Environment) (1) The Minister of Information and Communication shall take measures necessary to protect the radio wave environment including measurement of radio wave environment. (2) Necessary matters concerning the measurement of the radio wave environment, etc. under paragraph (1) shall be prescribed by the Ministerial Decree of Information and Communication. 법령보기 화면  Article 56 (Standards for Prevention of Electromagnetic Disturbances) Standards for preventing any electromagnetic disturbance apparatus from emitting electromagnetic disturbances and standards for protecting any apparatus affected by electromagnetic waves from them shall be prescribed by the Ministerial Decree of Information and Communication. 법령보기 화면  Article 57 (Registration of Electromagnetic Compatibility) (1) Any person who intends to manufacture or import any electromagnetic disturbance apparatus or any apparatus affected by electromagnetic waves shall file a registration with respect to the electromagnetic compatibility of the apparatus with the Minister of Information and Communication: Provided , That the same shall not apply to apparatuses for wireless facilities and equipment, which are prescribed by the Ministerial Decree of Information and Communication, for experiment, research or export, and apparatuses falling under any of the following subparagraphs, which have undergone tests, etc. with respect to electromagnetic disturbances and protection from electromagnetic waves corresponding to the registration of electromagnetic compatibility under this Act in accordance with relevant Acts and subordinate statutes: <Amended by Act No. 6315, Dec. 29, 2000; Act Nos. 6893 & 6909, May 29, 2003; Act No. 7441, Mar. 31, 2005; Act No. 7815, Dec. 30, 2005> 1. Items that have been granted the certification of the Korea industrial standard mark under the Industrial Standardization Act ; 2. Safety certification under Article 5 of the Electric Appliances Safety Control Act and safety test under Article 5-2 of the same Act ; 3. Industrial products that have undergone safety tests under the Quality Management and the Safety Control of Industrial Products Act ; 4. Telecommunications machinery and materials that have been granted the type approval under the Framework Act on Telecommunications ; 5. Automobiles that have been granted the type approval under the Automobile Management Act ; 6. Fire-fighting machinery and equipment that have been granted the type approval under the Installation and Maintenance, and Safety Control of Fire-Fighting System Act; 7. Medical appliances that have been granted a permission by item under the Medical Appliances Act. (2) The provisions of Article 46 (2) through (6) shall apply mutatis mutandis to apparatuses subject to the registration of electromagnetic compatibility. In this case, the "mark of the passing of the type approval test" or the "mark of the type registration" as prescribed in Article 46 (3) shall be deemed the "indication of the registration of electromagnetic compatibility", and " Articles 45 and 47-2 " in Article 46 (6) shall be deemed " Article 56 ". <Amended by Act No. 7815, Dec. 30, 2005> 법령보기 화면  Article 58 (Radio Wave Applied Facilities and Equipment, etc. for Industrial, Scientific and Medical Purposes) (1) Any person who intends to operate facilities and equipment falling under any of the following subparagraphs shall get permission from the Minister of Information and Communication: <Amended by Act No. 7264, Dec. 30, 2004; Act No. 7815, Dec. 30, 2005> 1. Facilities and equipment, falling under standards prescribed by the Presidential Decree, which are designed to generate the radio wave energy for industrial, scientific, medical, and housekeeping purposes or other similar purposes in a limited place; and 2. Facilities and equipment whose electric intensity, etc. satisfies the criteria as prescribed by the Presidential Decree, from among the communications facilities and equipment with entire lines having a flow of electric current of in least nine kilohertz. (2) The Minister of Information and Communication shall, upon receiving an application for permission under paragraph (1), grant such permission if he recognizes that such application is in conformity with the technical standards under Article 45 and does not obstruct other communications. (3) The provisions of Articles 21 (4), 24 through 26 , 32 , 45 and 72 shall apply mutatis mutandis to any facilities and equipment that have been granted the permission under paragraph (1). (4) The Minister of Information and Communication may determine and publicly notify the frequency band whose operation is to be restricted, so as to make the communications facilities and equipment, whose entire lines having a flow of electric current of at least nine kilohertz, not to impede other communications. <Added by Act No. 7264, Dec. 30, 2004; Act No. 7815, Dec. 30, 2005> CHAPTER VI PROMOTION OF RADIO WAVES 법령보기 화면  Article 59 (Basic Plan for Radio Waves Promotion) (1) The Minister of Information and Communication shall formulate and execute a basic plan for radio waves promotion by going through a deliberation of the Deliberation Committee on Radio Waves Policies under Article 59-2 and publish it for the purpose of promoting the utilization of radio waves, developing new technology relating to radio waves and developing the broadcasting apparatus industry. <Amended by Act No. 7264, Dec. 30, 2004> (2) The basic plan for radio waves promotion shall include the following matters: 1. Basic direction toward developing the radio wave industry; 2. The development of new radio wave resources; 3. Support for the sophistication of technologies and facilities utilizing radio waves; 4. The development and propagation of the radio-wave media; 5. The development of space communications; 6. The establishment of the order in the utilization of radio waves; 7. The training of the manpower specializing in the radio wave; 8. Matters relating to the standardization of radio waves; 9. The improvement of radio wave environment; and 10. Other matters necessary for the promotion of radio waves. 법령보기 화면  Article 59-2 (Deliberation Committee on Radio Waves Policies) (1) The Deliberation Committee on Radio Waves Policies (hereafter in this Article, referred to as the "Committee") shall be established in the Ministry of Information and Commuciation in order to make a deliberation on the matters of the following subparagraphs, regarding the radio waves: 1. Medium-and long-term plan for the utilization of radio waves under Article 8 ; 2. Basic plan for radio waves promotion under Article 59 ; 3. Matters concerning the distribution of frequencies and the alterations thereof; 4. Matters concerning the criteria for withdrawal and redistribution of frequencies, which are prescribed by the Presidential Decree; and 5. Other matters deemed by the Minister of Information and Communication necessary for the efficient utilization of radio waves and the promotion of development of radio waves technology. (2) The Committee shall be composed of not more than 20 members including the chairman, and the chairman shall be elected from among the members. (3) The Committee members shall be commissioned or designated by the Minister of Information and Communication from among the persons who have profound knowledge and experience in radio waves and fall under any of the following subparagraphs: <Amended by Act No. 7796, Dec. 29, 2005> 1. Public officials of Grade III or higher (including public officials in general service belonging to senior civil service), or who serve or have served in the posts of public institutions equivalent thereto; 2. Persons who serve or have served for not less than ten years in the posts of judges, prosecutors, lawyers or patent attorneys; 3. Persons who serve or have served for not less than five years in the universities or publicly recognized research institutions as higher than assistant professors or posts equivalent thereto, and who have majored in the field of radio waves, electricity or information and communications; 4. Persons who serve or have served for not less than five years in the officers' posts of enterprises relating to radio waves; 5. Persons who serve or have served in the posts of representatives of the organizations or institutions relating to radio waves; and 6. Other persons deemed by the Minister of Information and Communication as having the qualifications similar to the above. (4) Other matters necessary for the composition and operation, etc. of the Committee shall be prescribed by the Presidential Decree. [This Article Added by Act No. 7264, Dec. 30, 2004] 법령보기 화면  Article 60 (Disclosure of Current State of Utilization of Frequencies) (1) The Minister of Information and Communication shall, where it is deemed necessary to facilitate the utilization of radio waves, publish the current state of the utilization of frequencies. (2) Necessary matters concerning scope, procedures and time, etc. with respect to the publication referred to in paragraph (1) shall be prescribed by the Ministerial Decree of Information and Communication. 법령보기 화면  Article 61 (Research on Radio Waves) (1) The Minister of Information and Communication shall conduct various researches necessary to facilitate and protect the utilization of radio waves. (2) The researches conducted under paragraph (1) shall be as follows: 1. Research on the technical standards; 2. Research on the analysis of the propagation of radio waves and the technique of allotting frequencies; 3. Research on the standards for adjusting radio interferences of satellite networks; 4. Research on electromagnetic disturbances and harms caused by radio waves on human bodies; 5. Research on the measurement of the absorption rate of electromagnetic waves; 6. Research on the measuring method and technology for radio wave apparatus; 7. Research on the technology for receiving space radio waves and analysis of the received data; 8. Observation of geomagnetism and ionosphere; 9. Observation of solar spots; and 10. Analysis of the results of the observations under subparagraphs 8 and 9, and forecasts and warnings. 법령보기 화면  Article 62 (Facilitation of Technology Development) The Minister of Information and Communication shall take matters falling under each of the following subparagraphs to push for the research, development and utilization of technologies to build an infrastructure for the radio wave industry and the broadcasting equipment industry: 1. Survey of technological levels, research and development, and evaluation and utilization of developed technologies; 2. Cooperation, guidance and transfer of technologies; 3. Smooth distribution of technical information; 4. Joint research and development by industrial, academic and research circles; and 5. Other matters necessary for developing technologies. 법령보기 화면  Article 63 (Standardization) (1) The Minister of Information and Communication shall promote the matters falling under each of the following subparagraphs on standardizing the radio-wave utilization technologies in order to facilitate the efficient utilization of radio waves, maintain the order in the utilization of radio waves and protect the utilizers, etc.: Provided , That the matters which the Korean Industrial Standards under Article 10 of the Industrial Standardization Act prescribe shall be governed by such Standards: <Amended by Act No. 7815, Dec. 30, 2005> 1. Setting and propagation of standards for radio waves; 2. Certification of conformity to the standards for radio waves; and 3. Other matters necessary for standardization. (2) Necessary matters concerning the promotion of the standardization of technologies utilizing radio waves under paragraph (1) shall be prescribed by the Ministerial Decree of Information and Communication. 법령보기 화면  Article 64 (Training of Manpower) The Minister of Information and Communication shall work out and implement policy measures falling under each of the following subparagraphs to train the manpower specializing in radio waves: 1. Support for radio wave education conducted at the schools of various levels and educational institutions; 2. Support for projects designed to train the manpower specializing in radio wave and broadcasting technologies; 3. Development and propagation of and support for radio-wave educational programs; and 4. Other matters necessary for training the manpower specializing in radio wave. 법령보기 화면  Article 65 (Facilitation of International Cooperation) The Minister of Information and Communication may support international cooperation projects designed for international personnel and technological exchanges, international standardization and international joint research and development, etc. to upgrade radio-wave utilization technologies. 법령보기 화면  Article 66 (Korea Radio Wave Promotion Agency) (1) The Korea Radio Promotion Agency (hereinafter referred to as the "Promotion Agency") shall be established to perform the work for efficient management and promotion of radio wave and that entrusted by the Government. (2) The Promotion Agency shall be a corporation. (3) The Promotion Agency shall be constituted by making an establishment registation at the location of its main office. (4) The Promotion Agency shall perform the work falling under each of the following subparagraphs: 1. Research on promotion of the radio wave utilization; 2. Collection, investigation and analysis of information on the technology inside and outside of the country related to radio wave and broadcasting; 3. Support to research, and education on radio wave and broadcasting; 4. Work incidental to subparagraphs 1 through 3; and 5. In addition thereto, the works provided as the business of the Promotion Agency in this Act or other Acts and subordinate statutes, and the entrusted business, or the business entrusted by the Minister of Information and Communication. (5) The Government may subsidize, within the scope of its budgets, in order to appropriate to the expenses necessary for a performance of the business of Promotion Agency. (6) Matters necessary for the business, operation, etc. of the Promotion Agency shall be prescribed by the Presidential Decree. (7) Except as provided in this Act concerning the Promotion Agency, the provisions concerning the incorporated foundation as referred to in the Civil Act shall apply mutatis mutandis . [This Article Wholly Amended by Act No. 7815, Dec. 30, 2005] 법령보기 화면  Article 66-2 (Korea Radio Promotion Association) (1) The Korea Radio Wave Promotion Association (hereinafter referred to as the "Association") may be established in order to promote a putting of the new technology for radio wave utilization to the practical use and dissemination, and to efficiently perform the business of efficient utilization of radio wave resources, and the business concerning a creation of basis for development of radio wave industry, and the business, etc. concerning the standardization of radio wave utilization technology. (2) The Association shall be a juridical person. (3) The telecommunication business operator, installer, manufacturer of apparatus, systems and parts relating to radio wave, and other persons provided by the articles of Association may become a member of the Association. (4) Matters necessary for the business, operation, etc. of the Association shall be prescribed by the Presidential Decree. (5) Except as provided in this Act concerning the Association, the provisions concerning the corporation as referred to in the Civil Act shall apply mutatis mutandis . [This Article Added by Act No. 7815, Dec. 30, 2005] 법령보기 화면  Article 67 (Radio Wave Fees) (1) The Minister of Information and Communication may impose and collect fees from the installer (excluding the person who has opened an wireless station for exclusive use for reception) for radio waves used by his wireless station (hereinafter referred to as "radio wave fees"): Provided , That the radio wave fees shall be exempted for the installer of a wireless station falling under subparagraphs 1 through 3, and such radio wave fees may be reduced or exempted, in whole or part, for the installer of a wireless station falling under subparagraphs 4 through 6 under the conditions as prescribed by the Presidential Decree: <Amended by Act No. 7264, Dec. 30, 2004; Act No. 7815, Dec. 30, 2005> 1. Any wireless station set up by the State or a local government; 2. Any broadcasting station which does not pursue profit-making as its purpose from among the broadcasting stations, and any broadcasting station of the ground broadcasting business operator that pays the broadcasting development fund under the provisions of Article 37 (2) of the Broadcasting Act ; 3. Any wireless station under the provisions of Article 19 (2); and 4. Any broadcasting station of the satellite broadcasting business operator and CATV broadcasting business operator that pays the broadcasting development fund under the provisions of Article 37 (3) of the Broadcasting Act ; 5. Any wireless station providing the telecommunication services by utilizing the allotted frequencies under the provisions of Article 11 ; 6. Any wireless station prescribed by the Presidential Decree from among the wireless stations set up not to pursue profit making but to promote public welfare without seeking profits. (2) Radio wave fees shall be used for meeting expenses necessary to manage and promote radio waves. 법령보기 화면  Article 68 (Standards for Imposing Radio Wave Fees) (1) Radio wave fees imposed to any installer shall be computed based on the frequency band, the range of radio waves and the power of aerial lines, etc. used by the wireless station concerned under the conditions as prescribed by the Presidential Decree: Provided , That in the event that the relevant installer is a key telecommunications business operator who provides the telecommunication services to the subscribers by utilizing the frequencies allotted under the provisions of Article 10, it may be computed under the standard of the number of subscribers provided with relevant telecommunication services. <Amended by Act No. 7815, Dec. 30, 2005> (2) The Minister of Information and Communication shall, when any person liable for the payment of his radio wave fees fails to make such payment by the payment time limit, collect the amount equivalent to the percentage prescribed by the Ministerial Decree of Information and Communication within the limit of not exceeding 5/100 of radio wave fees in arrears as additional dues. (3) In the event that the radio wave fees and the additional dues referred to in paragraph (2) are in arrears, such radio wave fees and additional dues shall be collected according to the example of a disposition taken to collect national taxes in arrears. 법령보기 화면  Article 69 (Fees) (1) Any person falling under any of the following subparagraphs shall pay fees as prescribed by the Ministerial Decree of Information and Communication: <Amended by Act No. 7815, Dec. 30, 2005> 1. A person who applies for a perusal of the management ledger of the right for the utilization of frequescies or for a copy of the ledger under the provisions of Article 18 ; 2. A person who applies for permission, renewed permission or permission for modification under Article 19 , 22 (1) or 26 (including the cases where the provisions are applied mutatis mutandis under the provisions of Article 58 (3)); 3. A person who undergoes the inspection under Articles 24 and 26 (including the case where the provisions are applied mutatis mutandis under the provisions of Article 58 (3)); 4. A person who applies for, or reports on the apparatus alteration, the type approval or the type registration under Article 46 , and for the registration of electromagnetic compatibility under Article 57 ; and 5. A person who intends to apply for the technical qualification examination or who is granted the certificate of technical qualification under Article 70 . (2) The fees referred to in paragraph (1) may, in the event that it is deemed necessary for promoting public welfare, be reduced or exempted as prescribed by the Ministerial Decree of Information and Communication. CHAPTER VII PERSONS ENGAGED IN WIRELESS WORK 법령보기 화면  Article 70 (Qualifications of Persons Engaged in Wireless Work) (1) Any person who intends to engage in the wireless work shall pass the technical qualification test conducted as prescribed by Acts and subordinate statutes governing the national technical qualifications or the Ministerial Decree of Information and Communication (hereinafter referred to as the "qualification test"). (2) The Minister of Information and Communication shall issue a certificate of technical qualification to any person who has passed the qualification test under paragraph (1) as prescribed by the Ministerial Decree of Information and Communication. (3) Qualification items for persons engaged in the wireless work and the scope of engagement in the wireless work by qualification item shall be prescribed by the Presidential Decree. (4) The wireless facilities and equipment of a wireless station shall be installed and operated only by persons engaged in the wireless work: Provided , That the same shall not apply to the case where persons engaged in the wireless work are not available for any navigating ship or aircraft and other cases prescribed by the Presidential Decree. 법령보기 화면  Article 71 (Posting of Persons Engaged in Wireless Work) The installer shall post the persons engaged in the wireless work at his wireless station according to the standards for the qualification and the posting of the fixed number of persons engaged in the wireless work under the Presidential Decree: Provided , That a person falling under any of the following subparagraphs shall not be posted at any wireless station: <Amended by Act No. 7815, Dec. 30, 2005> 1. An incompetent person or a quasi-incompetent person; and 2. A person who has been sentenced to imprisonment without prison labor or a heavier punishment for committing the crime of insurrection or foreign aggression under the Criminal Act , the crime of serving the interest of the enemy under the Military Criminal Act , or the crime of violating the National Security Act and for whom five years have yet to elapse from the date on which the execution of such sentence was terminated or the exemption of such execution was made definite. CHAPTER VIII SUPPLEMENTARY PROVISIONS 법령보기 화면  Article 72 (Revocation of Permission for Setting up Wireless Station) (1) In the event that the installer who falls under the disqualification under Article 20 (1) 1 through 3 or the installer who is subject to allotment of frequencies under the provisions of Article 10 fails to receive any reallocation under the provisions of Article 16 (1), the permission granted for setting up his wireless station and the report on opening shall lose the validity. <Amended by Act No. 7815, Dec. 30, 2005> (2) The Minister of Information and Communication may, when the installer falls under any of the following subparagraphs, revoke the permission for setting up his wireless station or order the operation of the wireless station suspended and the permitted operational hours, frequencies or aerial lines of the wireless station limited for a fixed period not exceeding 6 months: 1. When he falls under the provisions of Article 20 (1) 4 and 5; 2. When he has got the permission for setting up the wireless station under Article 21 or the permission for modification under Article 26 falsely or in other unlawful manners; 3. When he fails to complete the work of setting up his wireless station by the lapse of 30 days from the date on which a deadline for completing the construction under Article 21 (4) lapsed (referring to the extended time limit if extended under Article 24 (2)); 4. When he fails to file a report under Article 23 (3); 5. When he rejects or obstructs the inspection under Article 24 (4) and (5) (including the case where the provisions are applied mutatis mutandis under Article 58 (3)); 6. When he puts his wireless station into operation without undergoing the inspection of completion in contravention of the provisions of the main sentence, with the exception of each subparagraph, of Article 25 (1) (including the case where the provisions are applied mutatis mutandis under the provisions of Articles 26 (3) and 33 ); 7. When he has continuously suspended the operation of his wireless station for not less than six months without any justifiable reasons; 8. When he fails to pay radio wave fees; and 9. When he violates this Act, or an order given or a disposition taken under and by this Act. (3) The Minister of Information and Communication may, where the case falls under any of the following subparagraphs arises, revoke the permission for setting up a wireless station or order wireless agency modified, or its operation limited or suspended: <Amended by Act No. 7815, Dec. 30, 2005> 1. When a contingency situation is declared; 2. When it is necessary to prevent radio interferences; and 3. Where a withdrawal of frequency or a reallocation of frequency has been made under the provisions of Article 6-2 . (4) The Minister of Information and Communication shall notify in writing the installer of a loss of validity in the case of paragraph (1) and of the details of a disposition and reasons thereof in the case of the disposition taken under paragraphs (2) and (3). 법령보기 화면  Article 73 (Imposition and Collection of Penalty Surcharge) (1) The Minister of Information and Communication may, in the event that an order he has to give to suspend the operation of a wireless station or limit the use of frequencies, etc. in accordance with the provisions of Article 72 (2) is feared to cause inconveniences to the users of such wireless station or harm the public interest, impose and collect a penalty surcharge not exceeding thirty million won in lieu of such suspension or such limit. (2) The categories of the act of violation subject to the imposition of a penalty surcharge in accordance with paragraph (1), the amount of a penalty surcharge determined according to the extent of the act of violation and other necessary matters shall be prescribed by the Presidential Decree. (3) The Minister of Information and Communication shall, when a person liable for the payment of a penalty surcharge under paragraph (1) fails to pay such penalty surcharge, urge him to make the payment by a given period, and, if he fails to pay the penalty surcharge within the given period, collect the penalty surcharge in question according to the example of a disposition taken to collect national taxes in arrears. (4) The provisions of Article 72 (4) shall apply mutatis mutandis to the imposition and collection of penalty surcharge under paragraph (1). 법령보기 화면  Article 74 (Revocation of Type Approval Test and Type Registration) (1) The Minister of Information and Communication may, when a person, who has passed the type approval test or completed the type registration under Article 46 (1), falls under any of the following subparagraphs, revoke the passing of the type approval test or the type registration of the apparatus concerned or order necessary measures taken to suspend the production, etc. as prescribed by the Ministerial Decree of Information and Communication: <Amended by Act No. 7815, Dec. 30, 2005> 1. When he has got the type approval test passed or the type registration made in any false or other unlawful manner; 2. When his apparatus, for which the type approval test has been passed and the type registration has been made, is found not to be in conformity with the passing standards for the type approval test or the type registration standards; 3. When he has failed to mark the passing of the type approval test and the type registration in his apparatus or falsely marked them in his apparatus; and 4. When he has failed to make a report under the provisions of Article 46 (6). (2) Any person, who has been subjected to the revocation of the passing of the type approval test or the type registration under paragraph (1), shall be prohibited from filing an application for the type approval test or the type registration with respect to his apparatuses for wireless facilities and equipment during a period not exceeding 6 months from the date of revocation, which is prescribed by the Ministerial Decree of Information and Communication. 법령보기 화면  Article 75 (Revocation of Registration of Electromagnetic Compatibility) The provisions of Article 74 shall apply mutatis mutandis to the revocation of the registration of electromagnetic compatibility under Article 57 (1). In this case, the "type approval test" or the "type registration" shall be deemed the "registration of electromagnetic compatibility". 법령보기 화면  Article 76 (Revocation of Technical Qualification for Persons Engaged in Wireless Work) The Minister of Information and Communication may, when any person engaged in the wireless work falls under any of the following subparagraphs, revoke his technical qualification or order him not to be engaged in the wireless work for a prescribed period of not less than 6 months to not more than 2 years as prescribed by the Ministerial Decree of Information and Communication: 1. When he has got his technical qualification for the wireless work in any false or other unlawful manner; and 2. When he has violated this Act or an order given or a disposition taken by or under this Act. 법령보기 화면  Article 77 (Hearings) The Minister of Information and Communication shall, if he intends to take a disposition falling under any of the following subpragraphs, hold hearings: <Amended by Act No. 7815, Dec. 30, 2005> 1. The revocation of the permission for setting up a wireless station under Article 72 (2); 2. The revocation of the passing of the type approval test or the type registration under Article 74 (1); 3. The revocation of the registration of electromagnetic compatibility under Article 75 ; 4. The revocation of the technical qualification under Article 76 ; and 5. The withdrawal of frequency or the reallocation of frequency under the provisions of Article 6-2 . 법령보기 화면  Article 78 (Delegation and Entrustment of Authority) (1) The Minister of Information and Communication may delegate part of his authority under this Act to the heads of organs under his supervision as prescribed by the Presidential Decree. (2) The Minister of Information and Communication may entrust part of his duties as prescribed in Articles 18 , 24 (1), (4) and (5) (including the case where the provisions are applied mutatis mutandis under the provisions of Articles 33 and 58 ), 26 (2) (including the case where the provisions are applied mutatis mutandis under the provisions of Articles 33 and 58 ), 32 (1) (including the case where the provisions are applied mutatis mutandis under the provisions of Article 58 ), 46 , 57 , 63 through 65 , 69 , and 70 (1) and (2) to the Promotion Agency, the Association or key telecommunications business operators as prescribed in the Telecommunications Business Act under the conditions as prescribed by the Presidential Decree. <Amended by Act No. 7815, Dec. 30, 2005> 법령보기 화면  Article 79 (Mutatis Mutandis Application of Other Acts) (1) The provisions of Article 33-3 of the Framework Act on Telecommunications shall apply mutatis mutandis to the type approval test or the type registration under Article 46 and the registration of electromagnetic compatibility under Article 57 . (2) The provisions of Articles 33-3 , 39 through 41 , 44 , 45 , 47 , and 51 , subparagraph 6 of Article 70 , and subparagraphs 2 and 3 of Article 73 of the Telecommunications Business Act shall apply mutatis mutandis to the construction or repairs of the aerial lines and facilities attached thereto, which are used for controlling radio waves: Provided , That when it is intended to construct or repair them on a road under the Road Act , on a river under the River Act , or on a designated harbor under the Harbor Act , prior consultations shall be made with the competent management agency. <Amended by Act No. 7815, Dec. 30, 2005> CHAPTER IX PENAL PROVISIONS 법령보기 화면  Article 80 (Penal Provisions) (1) Any person who has sent communications making use of wireless facilities and equipment or the communications facilities and equipment with entire lines having a flow of electric current of at least nine kilohertz (referring to the communications facilities and equipment excluding the cable carrier facilities and equipment and the balanced 2-line system spiral carrier facilities and equipment), which advocate the destruction of the Constitution of the Republic of Korea and State institutions established by the Constitution by violence, shall be punished by imprisonment or imprisonment without prison labor for a limited term of not less than three years. <Amended by Act No. 7264, Dec. 30, 2004; Act No. 7815, Dec. 30, 2005> (2) Any criminal attempt of paragraph (1) shall be punished. (3) Any person who has prepared or conspired to commit the crime of paragraph (1) shall be punished by imprisonment or imprisonment without prison labor for a limited term of not less than two years. 법령보기 화면  Article 81 (Penal Provisions) (1) Any person falling under any of the following subparagraphs shall be punished by imprisonment for a limited term of not less than one year: 1. The captain of a ship or aircraft, who has failed to give a necessary order in the face of a situation requiring the need to send distress and emergency signals or safety signals, and any person engaged in the wireless work, who has received an order to send such signals but has failed to do so without delay; 2. A person engaged in the wireless work who has failed to take measures to send distress signals under Article 28 (2) or delayed sending such signals; and 3. A person who has obstructed measures taken to send distress signals. (2) The criminal attempt of paragraph (1) 2 and 3 shall be punished. 법령보기 화면  Article 82 (Penal Provisions) (1) Any person who has damaged wireless facilities and equipment of a wireless station, which are used for telecommunications services, broadcasting services, public security services, meteorological services, power supply services or the operational services of rails, ships and aircraft or obstructed wireless communications by causing impediments to the functions of wireless facilities and equipment by means of touching them or other means shall be punished by imprisonment for not more than ten years or by a fine not exceeding fifty million won. (2) Any person who has committed the act falling under paragraph (1) to wireless facilities and equipment other than those of paragraph (1) shall be punished by imprisonment for not more than five years or by a fine not exceeding thirty million won. (3) The criminal attempts of paragraphs (1) and (2) shall be punished. 법령보기 화면  Article 83 (Penal Provisions) (1) Any person who has sent false communications making use of the wireless facilities and equipment or the communications facilities and equipment with entire lines having a flow of electric current of at least nine kilohertz (referring to the communications facilities and equipment excluding the cable carrier facilities and equipment and the balanced 2line system spiral carrier facilities and equipment) for the purpose of benefiting himself and other person or inflicting damages to any other person shall be punished by imprisonment for not more than three years or by a fine not exceeding twenty million won. <Amended by Act No. 7264, Dec. 30, 2004> (2) Any person who has sent distress signals making use of wireless facilities and equipment despite the nonexistence of any ship or aircraft in distress shall be punished by imprisonment for not more than five years. (3) Any person engaged in the wireless work shall, when he commits the act falling under paragraph (1), be punished by imprisonment for not more than five years or by a fine not exceeding twenty million won. If he commits the act falling under paragraph (2), he shall be punished by imprisonment for a limited term of not less than one year. 법령보기 화면  Article 84 (Penal Provisions) Any person falling under any of the following subparagraphs shall be punished by imprisonment for not more than three years or by a fine not exceeding twenty million won: <Amended by Act No. 7815, Dec. 30, 2005> 1. A person who has set up or operated a wireless station under Article 19 (1) 3 without getting the permission under the main sentence of the same paragraph with other than each subparagraph or filing a report thereof under the proviso of the same paragraph other than each subparagraph; 2. A person who has manufactured or imported apparatus for which the type approval test has not been passed or the type registration has not been made under the main sentence of Article 46 (1) or other apparatus for which the registration of electromagnetic compatibility has not been made under the main sentence of Article 57 (1) with the exception of each subparagraph for the purpose of marketing them; 3. A person who has remodeled, altered or replicated the performance of apparatus for which the type approval test has been passed or the type registration has been made under Article 46 or the perfor mance of other apparatus for which the registration of electromagnetic compatibility has been made under Article 57 ; and 4. A person who has installed or operated communications facilities and equipment under Article 58 (1) 2 without getting the permission under the same paragraph. 법령보기 화면  Article 85 (Penal Provisions) Any person who has sent obscene communications making use of wireless facilities and equipment or the communications facilities and equipment with entire lines having a flow of electric current of at least nine kilohertz (referring to the communications facilities and equipment excluding the cable carrier facilities and equipment and the balanced 2line system spiral carrier facilities and equipment) shall be punished by imprisonment for not more than two years or by a fine not exceeding ten million won. <Amended by Act No. 7264, Dec. 30, 2004> 법령보기 화면  Article 86 (Penal Provisions) Any person falling under any of the following subparagraphs shall be punished by imprisonment for not more than one year or by a fine not exceeding five million won: 1. A person who has refused or obstructed the inspection, investigation and test under Article 24 (4) and (5) (including the case where the provisions are applied mutatis mutandis under the provisions of Article 58 (3)) or Article 53 (1); 2. A person who has sold, or displayed, transported or stored apparatus for the purpose of selling them, for which the type approval test has not been passed or the type registration has not been made in violation of Article 46 (3) or other apparatus for which the registration of electromagnetic compatibility has not been made in violation of Article 57 (2); 3. A person who has constructed structures or installations without getting the approval under Article 52 (1); 4. A person who has failed to execute an order given under Article 53 (2); and 5. A person who has operated a wireless station or wireless facilities and equipment which have been ordered to suspend their operation under the provisions of Article 72 (2) or (3) (including the case where the provisions are applied mutatis mutandis under the provisions of Article 58 (3)) or communications facilities and equipment under Article 58 (1) 2. 법령보기 화면  Article 87 (Penal Provisions) Any person falling under any of the following subparagraphs shall be punished by a fine not exceeding one million won: 1. A person who has set up or operated a wireless station under Article 25 (1) 1 through 3 without getting permission in violation of Article 19 ; 2. Deleted; and <by Act No. 7264, Dec. 30, 2004> 3. A person who has operated facilities and equipment under Article 58 (1) 1 whose operation has been suspended under the provisions of Article 72 (3) (including the case where the provisions are applied mutatis mutandis under the provisions of Article 58 (3)). 법령보기 화면  Article 88 (Joint Penal Provisions) When the representative of a corporation or an agent, employee or the employed of a corporation or an individual commits the act falling under Article 84 or 86 in connection with the business of the corporation or the individual, such corporation or such individual shall be fined according to each corresponding Article in addition to the punishment of the actor. 법령보기 화면  Article 89 (Legal Fiction as Public Official in Application of Penal Provisions) Any person engaged in the duties entrusted by the Minister of Information and Communication under the provisions of Article 78 (2) shall be deemed a public official in the application of Articles 129 through 132 of the Criminal Act . <Amended by Act No. 7815, Dec. 30, 2005> 법령보기 화면  Article 90 (Fine for Negligence) Any person falling under any of the following subparagraphs shall be punished by a fine for negligence not exceeding three million won: <Amended by Act No. 7264, Dec. 30, 2004> 1. A person who has failed to notify the fact of having entered into a utilization contract in violation of Article 19 (3); 2. A person who has operated wireless facilities and equipment in violation of the main sentence of Article 25 (1) with the exception of each subparagraph (including the case where the provisions are applied mutatis mutandis under the provisions of Article 26 (3)); 3. A person who has operated a wireless station in violation of the main sentence of Article 25 (2) with the exception of each subparagraph; 3-2. A person who has manufactured, displayed, kept or transported or set up in the wireless station the apparatus without affixing the mark of the passing of the type approval test, the mark of the type registration or the mark of the registration of electromagnetic compatibility for the purpose of sales, in violation of the provisions of Article 46 (3) (including the case where the provisions are applied mutatis mutandis under the provisions of Article 57 (2)); 4. A person who has operated a wireless station in violation of an order given under Article 51 (2); 5. A person who has operated facilities and equipment without getting permission under Article 58 (1) 1; and 6. A person who has violated the restrictions on operation under Article 72 (2) or (3) (including the case where the provisions are applied mutatis mutandis under the provisions of Article 58 (3)). 법령보기 화면  Article 91 (Fine for Negligence) Any person falling under any of the following subparagraphs shall be punished by a fine for negligence not exceeding two million won: 1. A person who has failed to perform his responsibility with respect to urgency communications, safety communications or emergency communications in violation of Article 28 (2); 2. A person who has operated a wireless station in violation of the main sentence of Article 29 ; 3. A person who has failed to observe the matters relating to the security of communications in violation of Article 30 (1); 4. A person who has operated wireless facilities and equipment which are not in conformity with the technical standards for wireless facilities and equipment or the standards for safety facilities in violation of Articles 45 and 47 ; 5. A person who has operated or installed wireless facilities and equipment in violation of the main sentence of Article 70 (4); and 6. A person who has operated or installed wireless facilities and equipment during a period for which he has been subjected to the suspension of his business under the provisions of Article 76 . 법령보기 화면  Article 92 (Fine for Negligence) Any person falling under any of the following subparagraphs shall be punished by a fine for negligence not exceeding one million won: <Amended by Act No. 7815, Dec. 30, 2005> 1. A person who has failed to get approval in violation of Article 14 (3); 2. A person who has failed to file a report in violation of Article 19 (1) 1 and 2 and Article 23 (3); and 3. A person who has failed to file a report on apparatus alteration in violation of Article 46 (6) (including a case of application mutatis mutandis under the provisions of Article 57 (2)). 법령보기 화면  Article 93 (Imposition and Collection of Fine for Negligence) (1) The Minister of Information and Communication shall impose and collect the fine for negligence under Articles 90 through 92 as prescribed by the Presidential Decree. (2) Any person who is dissatisfied with a disposition taken to impose a fine for negligence on him under paragraph (1) may raise an objection to the Minister of Information and Communication within thirty days from the date on which a notice with respect to such disposition was served on him. (3) When a person subjected to a disposition taken to impose a fine for negligence on him under paragraph (1) raises an objection under paragraph (2), the Minister of Information and Communication shall promptly notify the competent court of the fact and the competent court, upon receiving the notice, shall put the case on trial in accordance with the Non-Contentious Case Litigation Procedure Act . <Amended by Act No. 7815, Dec. 30, 2005> (4) When no objection is raised and the fine for negligence is not paid within the period prescribed in paragraph (2), the fine for negligence in question shall be collected according to the example of a disposition taken to collect national taxes in arrears. ADDENDA Article 1 (Enforcement Date) This Act shall enter into force on April 1, 2000. Article 2 (Transitional Measures concerning Structures Impeding Reception of Broadcasts) The provisions of Article 36 shall apply to the structures which are subject to the application of the structures impeding the reception of broadcasts under Article 74-4 of the Radio Waves Act amended by Act No. 4193 at the time that this Act enters into force. Article 3 (Transitional Measures concerning Allotment of Frequencies) The frequencies alloted by the Minister of Information and Communication to a person, at the time that this Act enters into force, who has been granted permission as a key communications business operator under the provisions of Article 5 of the Telecommunications Business Act shall be deemed the frequencies allotted under the provisions of Article 12 . Article 4 (Transitional Measures concerning Permission for Setting up Wireless Station) A person who files an application for the permission of setting up a wireless station under the previous provisions at the time that this Act enters into force shall be governed by the previous provisions notwithstanding the provisions of Articles 21 (2) and 34 (2). Article 5 (Transitional Measures concerning Apparatus Undergoing Electromagnetic Disturbance Test) Any apparatus that underwent the electromagnetic disturbance test at the time that the Radio Waves Act amended by Act No. 5218 was enforced shall be deemed to have been registered for the electromagnetic compatibility under the provisions of Article 57 . Article 6 (Transitional Measures concerning Qualification Certificate for Person Engaged in Wireless Work) Any qualification certificate for a person engaged in the wireless work, which is granted at the time that this Act enters into force, shall be deemed the technical qualification certificate under Article 70 (2). Article 7 (Transitional Measures concerning Area for Prevention of Radio Wave Disturbances) The area for the prevention of radio wave disturbances, which was designated under the previous provisions at the time that the Radio Wave Act amended by Act No. 5637 entered into force shall be governed by the provisions prior to the enforcement of the same Act until the time set and published by the Minister of Information and Communication notwithstanding the provisions of Articles 74-2 and 74-3 of the same Act. Article 8 (Transitional Measures concerning Penalty Surcharge, Penal Provisions and Fine for Negligence) The application of penalty surcharge, penal provisions and fine for negligence to any act committed prior to the enforcement of this Act shall be governed by the previous provisions. Article 9 Omitted. Article 10 (Relation to Other Acts and Subordinate Statutes) In case where previous provisions are cited in other Acts or subordinate statutes at the time when this Act enters into force, and there are corresponding provisions in this Act, the corresponding provisions of this Act shall be considered to be cited in substitution for the previous provisions. ADDENDA<Act No. 6315, Dec. 29, 2000> Article 1 (Enforcement Date) This Act shall enter into force on July 1, 2001. Articles 2 through 7 Omitted. ADDENDA<Act No. 6893, May 29, 2003> Article 1 (Enforcement Date) This Act shall enter into force one year after the date of its promulgation. Articles 2 through 6 Omitted. ADDENDA<Act No. 6909, May 29, 2003> Article 1 (Enforcement Date) This Act shall enter into force one year after the date of its promulgation. Articles 2 through 6 Omitted. ADDENDA<Act No. 7264, Dec. 30, 2004> (1) (Enforcement Date) This Act shall enter into force six months after the date of its promulgation. (2) (Transitional Measures concerning Reckoning Date of Effective Period of Approval for Use of Frequencies) Any person who has obtained an approval for use of frequencies under Article 19 (5) before the enforcement of this Act shall be deemed that he has obtained an approval for use on the enforcement date of this Act. (3) (Transitional Measures concerning Penal Provisions) The previous provisions shall govern the application of penal provisions to the acts taken before the enforcement of this Act. ADDENDA<Act No. 7265, Dec. 30, 2004> Article 1 (Enforcement Date) This Act shall enter into force on January 1, 2005. Articles 2 and 3 Omitted. ADDENDA<Act No. 7441, Mar. 31, 2005> Article 1 (Enforcement Date) This Act shall enter into force six months after the date of its promulgation. Articles 2 through 5 Omitted. ADDENDUM<Act No. 7559, May 31, 2005> This Act shall enter into force six months after the date of its promulgation. ADDENDA<Act No. 7796, Dec. 29, 2005> Article 1 (Enforcement Date) This Act shall enter into force on July 1, 2006. Articles 2 through 6 Omitted. ADDENDA<Act No. 7815, Dec. 30, 2005> Article 1 (Enforcement Date) This Act shall enter into force six months after the date of its promulgation. Article 2 (Transitional Measures concerning Frequency Utilization Period) A person subject to an allotment of frequencies under the provisions of Article 12 before the enforcement of this Act shall be deemed to be endowed with the utilization period of 5 year from the enforcement date of this Act, notwithstanding the amended provisions of Article 15 (1). Article 3 (Special Example of Reallocation) In the case of making a reallocation, as the frequency utilization period is completed, to a key telecommunication business operator who was subject to a permission under Article 5 of the Telecommunications Business Act in order to provide the telecommunication services as provided by the Ministerial Decree of Information and Communication before the enforcement of this Act, who is a person deemed to have been endowed a utilization period of 5 years from the enforcement of this Act under the provisions of Article 2 of the Addenda, the allotment of frequencies for price shall be made under the amended provision of Article 11 . Article 4 (Establishment Registration of Korea Radio Promotion Agency, and Transitional Measures, etc.) (1) The head of the Korea Radio Wave Management Business Group (hereinafter referred to as the "Business Group") established under the provisions of previous Article 66 shall prepare the articles of association of the Korea Radio Promotion Agency under the amended provisions of Article 66 without delay after the enforcement of this Act, and obtain an approval of the Minister of Information and Communication. (2) When the head of the Business Group has obtained an approval under the provisions of paragraph (1), he shall make an establishment registration of the Promotion Agency without delay. (3) When the establishment registration of the Promotion Agency has been completed under the provisions of paragraph (2), the Business Group shall be deemed to have been dissolved, notwithstanding the provisions of dissolution and liquidation of a juristic person of the Civil Act . (4) Where the head of the Business Group obtains an approval under the provisions of paragraph (1), when he has obtained an approval of the Minister of Information and Communication through a resolution of the board of directors concerning the package succession of the Business Group's property, rights and obligations, the property, rights and obligations of the Business Group shall be package-succeeded by the Promotion Agency on the establishment registration date of the Promotion Agency. In this case, the value of the succeeded property shall be the book value on the previous day of the establishment registration date. (5) The name of the Business Group indicated on the register for the property, rights and obligations to be succeeded by the Promotion Agency at the time of completion of establishment registration under the provisions of paragraph (2), and in other official books, shall be deemed to be the name of the Promotion Agency. (6) When the establishment registration under the provisions of paragraph (2) has been completed, the acts taken by the Business Group before the enforcement of this Act shall be deemed to be the acts taken by the Promotion Agency, and the acts taken with respect to the Business Group shall be deemed the acts taken with respect to the Promotion Agency. (7) When the establishment registration under the provisions of paragraph (2) has been completed, the officers and staff members of the Business Group shall be deemed to be selected or appointed as the officers and staff members of the Promotion Agency under this Act. In this case, the terms of the Promotion Agency's officers shall be reckoned from the time of selection as the officers of the Business Group under the previous provisions. (8) The head of the Business Group may, in the case necessary for a preparation for the establishment of the Promotion Agency, take the acts for a preparation of establishment, such as the preparation, etc. of the articles of association under the provisions of paragraph (1), even before the enforcement date of this Act. Article 5 (Transitional Measures concerning Penal Provisions) The application of penal provisions to the acts taken before the enforcement of this Act shall be governed by the previous provisions. Article 6 Omitted. Last updated : 2009-07-26