ACT ON RAILROAD CONSTRUCTION AND RAILROAD FACILITIES MANAGEMENT
64236 · 2023-07-10
ACT ON RAILROAD CONSTRUCTION AND RAILROAD FACILITIES MANAGEMENT
Act No. 19430, Jun. 9, 2023
Act No. 15460, Mar. 13, 2018
Amended by Act No. 16639, Nov. 26, 2019
Act No. 17171, Mar. 31, 2020
Act No. 17460, Jun. 9, 2020
Act No. 17453, Jun. 9, 2020
Act No. 17447, Jun. 9, 2020
Act No. 17458, Jun. 9, 2020
Act No. 18522, Nov. 30, 2021
Act No. 18787, Jan. 18, 2022
Act No. 19430, Jun. 9, 2023
CHAPTER I GENERAL PROVISIONS
법령보기 화면
Article 1 (Purpose)
The purpose of this Act is to prescribe matters concerning railroad construction and railroad facilities management to promptly expand railroad networks and systematically manage railroad facilities, thereby ensuring public safety and contributing to promoting the welfare of the people.
[This Article Wholly Amended on Mar. 13, 2018]
법령보기 화면
Article 2 (Definitions)
The terms used in this Act are defined as follows:
Provided
, That except for those specifically provided for in this Act, definitions included in the
Framework Act on Railroad Industry Development
shall be as follows: <Amended on Apr. 15, 2010; Mar. 23, 2013; Aug. 11, 2015; Mar. 13, 2018; Jun. 9, 2020>
1.
The term "railroad" means a transportation system in which railroad facilities necessary for transporting passengers and freight, rolling stock and an operation and supporting system relevant thereto are comprised organically;
2.
The term "high-speed rail" means a railroad train which runs at a speed of at least 200 kilometers per hour on major sections and the route of which is designated and publicly notified by the Minister of Land, Infrastructure and Transport;
3.
The term "wide-area railroad" means a railroad under subparagraph 2 (b) of
Article 2
of the Special Act on the Management of Intercity Transport in Metropolitan Areas;
4.
The term "general railroad" means railroads other than high-speed rails and urban railroads under the
Urban Railroad Act
;
5.
The term "railroad network" means a railroad transportation network built systematically in order for railroad facilities to function in an interactive manner;
6.
The term "railroad facilities" means any of the following facilities:
(a)
Railroad tracks (including facilities ancillary thereto), station facilities (including distribution facilities, transfer facilities and sales facilities, business facilities, neighboring residential facilities, accommodation facilities, cultural and assembly facilities located in the same building as a station building) and buildings and building facilities necessary for operation of railroads;
(b)
Track repair bases to repair tracks, rolling stock maintenance depots to maintain rolling stock and rolling stock storage facilities;
(c)
Power facilities, information and communication facilities, signaling and train control facilities for railroads;
(d)
Facilities necessary for operations in connection with other railroad routes or for inter-modal operations with other means of transportation;
(e)
Facilities for development, tests and researches of railroad technology;
(f)
Facilities for training on railroad management and education of railroad experts;
(g)
Other facilities prescribed by Presidential Decree, as necessary for construction, maintenance and operation of railroads;
7.
The term "railroad construction project" means any of the following projects, intended for construction of a new railroad, straightening, electrifying and double-tracking of existing railroad lines, construction of railroad depots, new installation, refurbishment, etc. of facilities in railroad stations:
(a)
Construction projects of facilities under each item of subparagraph 6;
(b)
Any project to form foundations for living convenience facilities, including residential facilities, for those who have lost their residence due to construction projects under each item of subparagraph 6;
(c)
Construction projects of public facilities, military facilities or public buildings (railroad facilities shall be excluded) installed pursuant to
Article 15
(1);
(d)
Projects of acquiring land, etc. of the constructed railroad facilities (referring to land, etc. under subparagraph 1 of
Article 2 of the Act on Acquisition of and Compensation for Land for Public Works Projects
) or securing title to use thereof;
8.
The term "railroad facility manager" means the person defined in subparagraph 9 of
Article 2 of the Railroad Safety Act
;
9.
The term "periodic inspection" means routine activities by which a person with experience and skills investigates the safety and performance of railroad facilities using the naked eye, inspection apparatuses, etc. to manage railroad facilities;
10.
The term "emergency inspection" means activities performed to promptly discover physical or functional defects of railroad facilities, where an accident or disaster is likely to occur due to the collapse, fall, disruptions, etc. of such facilities;
11.
The term "precision diagnosis" means the activities of investigating, measuring, and evaluating the physical safety of railroad facilities, cause for performance deterioration thereof, etc. and thereby suggesting repair, reinforcement, or any other method, to discover physical or functional defects of such facilities and take prompt and appropriate measures against such defects;
12.
The term "performance evaluation" means comprehensively evaluating the performance of railroad facilities, such as the safety, durability, and usability thereof, that are required to maintain the safety and functions of such facilities;
13.
The term "management" means routinely inspecting and maintaining railroad facilities, recovering damaged parts, and performing activities necessary for repair, reinforcement, etc. of railroad facilities that are required as time elapses, to preserve the functions of such facilities and enhance the convenience and safety of railroad facility users;
14.
The term "contract" means an agreement under which either of the parties agrees to complete periodic inspections, etc. provided in
Article 44
, as a prime contract, a subcontract, an outsourcing contract, or howsoever named, and the other party agrees to pay the price for the results of such services;
15.
The term "subcontract" means an agreement entered into by and between a contractor and a third party to award a contract for all or part of the services for a contracted periodic inspection, etc. provided in
Article 44
.
[This Article Wholly Amended on Mar. 25, 2009]
법령보기 화면
Article 3 (Relationship to Other Statutes)
Unless otherwise provided by other statutes, provisions prescribed by this Act shall govern construction of railroads (excluding exclusive railroads defined in subparagraph 5 of
Article 2 of the Railroad Service Act
; hereafter the same shall apply) and management of railroad facilities. <Amended on Mar. 13, 2018>
[This Article Wholly Amended on Mar. 25, 2009]
CHAPTER II CONSTRUCTION OF RAILROADS
Section 1 Construction Plans for National Railroad Networks
법령보기 화면
Article 4 (Formulation and Change of Construction Plans for National Railroad Networks)
(1)
The Minister of Land, Infrastructure and Transport shall formulate and implement a construction plan for national railroad networks (hereinafter referred to as "railroad network plan") every 10 years to ensure a balanced national development and the construction of efficient railroad networks. <Amended on Mar. 23, 2013; Jan. 18, 2022>
(2)
Railroad network plans shall be formulated to be in harmony with all the following plans: <Amended on Jun. 9, 2009; Jan. 18, 2022; Jun. 9, 2023>
1.
Comprehensive plans for autonomous decentralization under
Article 6
of the Special Act on Local Autonomy, Decentralization, and Balanced Regional Development;
1-2.
National core transportation network plans under
Article 4 of the National Transport System Efficiency Act
;
2.
Mid-term investment plans in transportation facilities under
Article 6 of the National Transport System Efficiency Act
;
3.
Master plans for metropolitan transport in metropolitan areas under
Article 3
of the Special Act on the Management of Intercity Transport in Metropolitan Areas;
4.
Implementation plans for metropolitan transport in metropolitan areas under
Article 3-2
of the Special Act on the Management of Intercity Transport in Metropolitan Areas.
(3)
Where the Minister of Land, Infrastructure and Transport intends to formulate a railroad network plan, he or she shall undergo deliberation by the Railroad Industry Committee (hereinafter referred to as the "Committee") under
Article 6
of the Framework Act on the Railroad Industry Development after consulting with heads of the relevant central administrative agencies and the relevant Mayor/
Do
Governor:
Provided
, That this shall not apply where minor matters prescribed by Presidential Decree are changed. <Amended on Mar. 23, 2013>
(4)
The Minister of Land, Infrastructure and Transport shall review the feasibility of railroad network plans every five years from the date such plans are formulated, and shall change them, where necessary. <Amended on Mar. 23, 2013; Jun. 9, 2020>
(5)
Where the Minister of Land, Infrastructure and Transport formulates or changes railroad network plans under paragraph (1), he or she shall publicly notify them as prescribed by Ordinance of Ministry of Land, Infrastructure and Transport. <Amended on Mar. 23, 2013>
[This Article Wholly Amended on Mar. 25, 2009]
법령보기 화면
Article 5 (Details of Railroad Network Plans)
(1)
Railroad network plans shall include each of following matters: <Amended on Mar. 23, 2013>
1.
Mid- to long-term construction plans for railroad;
2.
Building of transportation system linked with other means of transportation;
3.
Methods of raising necessary financial resources;
4.
Methods of constructing environment-friendly railroads;
5.
Other matters deemed necessary for systematic construction projects of railroads by the Minister of Land, Infrastructure and Transport.
(2)
Railroad network plans under paragraph (1) shall reflect a wide-area railroad plan (urban railroads under the
Urban Railroad Act
shall be excluded) included in a master plan for metropolitan transport in metropolitan areas and an implementation plan for metropolitan transport in metropolitan areas respectively formulated pursuant to
Articles 3
and 3-2 of the Special Act on the Management of Intercity in Metropolitan Areas.
[This Article Wholly Amended on Mar. 25, 2009]
법령보기 화면
Article 6 (Deliberation on Matters concerning Railroad Construction)
Any of the following matters pertaining to railroad construction shall undergo deliberation by the Committee: <Amended on Mar. 23, 2013>
1.
Formulation and change of railroad network plans;
2.
Approval for implementation plans which include matters specified in
Article 11
(1) 15 (only applicable to where subject matters for deliberation by the Building Committee under
Article 4 of the Building Act
shall be included) or subparagraph 16 of that paragraph;
3.
Other matters concerning railroad construction, referred for deliberation by the Minister of Land, Infrastructure and Transport.
[This Article Wholly Amended on Mar. 25, 2009]
Section 2 System for Construction of Railroads
법령보기 화면
Article 7 (Formulation of Masters Plans for Railroad Construction Projects)
(1)
The Minister of Land, Infrastructure and Transport shall formulate a master plan for railroad construction (hereinafter referred to as "master plan") to conduct railroad construction projects systematically:
Provided
, That this shall not apply to railroad construction projects, such as small-scale railroad construction projects, etc., which are determined by Presidential Decree. <Amended on Mar. 23, 2013>
(2)
Master plans shall include each of following matters:
1.
Demand forecast for future railroad transportation;
2.
Evaluation on economic viability and feasibility of railroad construction and other relevant matters;
3.
Layout planning of schematic routes, depots, etc.;
4.
Details of construction, construction duration, project operators;
5.
Approximate construction costs, resource supply plans;
6.
Annual construction implementation plans;
7.
Matters concerning preservation and management of environment;
8.
Measures against earthquakes;
9.
Other matters determined by Presidential Decree.
(3)
Where the Minister of Land, Infrastructure and Transport intends to formulate a master plan, he or she shall, in advance, consult on it with heads of the relevant central administrative agencies and the Special Metropolitan City Mayor, a Metropolitan City Mayor or a
Do
Governor (hereinafter referred to as the "Mayor/
Do
Governor"):
Provided
, That a master plan for construction of high-speed rails shall be referred to the Committee for deliberation after consultation. <Amended on Mar. 23, 2013>
(4)
Where the Minister of Land, Infrastructure and Transport formulates a master plan, he or she shall publicly notify it, as prescribed by Presidential Decree. <Amended on Mar. 23, 2013>
(5)
Paragraphs (3) and (4) shall apply
mutatis mutandis
where the master plan formulated is subject to change:
Provided
, That this shall not apply where minor matters prescribed by Presidential Decree are changed.
[This Article Wholly Amended on Mar. 25, 2009]
법령보기 화면
Article 8 (Operators of Railroad Construction Projects)
(1)
Railroad construction projects shall be executed by the State, local governments, or the Korea National Railway established pursuant to the Korea National Railway Act (hereinafter referred to as the "KR"):
Provided
, That where a railroad is constructed under the
Act on Public-Private Partnerships in Infrastructure
, such project shall be executed by a person prescribed by that Act. <Amended on Jun. 9, 2020>
(2)
Where the Minister of Land, Infrastructure and Transport deems it necessary to execute railroad construction projects efficiently, he or she may have public institutions under
Article 4 of the Act on the Management of Public Institutions
other than persons designated in paragraph (1) execute such projects fully or partially as prescribed by Presidential Decree. <Amended on Mar. 23, 2013>
[This Article Wholly Amended on Mar. 25, 2009]
법령보기 화면
Article 9 (Approval for Implementation Plans for Each Railroad Construction Project)
(1)
Any person executing a railroad construction project (hereinafter referred to as "project operator") under
Article 8
shall prepare an implementation plan for the railroad construction project (hereinafter referred to as "implementation plan") which includes the scale, details of a project, a project zone, project duration and other matters determined by Presidential Decree and shall obtain approval therefor from the Minister of Land, Infrastructure and Transport. In such cases, the project operator may prepare implementation plans respectively for each section or each facility within the extent of a master plan where deemed necessary for efficient execution of railroad construction projects. <Amended on Mar. 23, 2013>
(2)
Where the Minister of Land, Infrastructure and Transport intends to approve an implementation plan which includes matters specified in
Article 11
(1) 15 (only applicable to where subject matters for deliberation by the Building Committee under
Article 4 of the Building Act
shall be included) or subparagraph 16 of that paragraph, he or she shall undergo prior deliberation by the Committee. <Amended on Mar. 23, 2013>
(3)
Where any implementation plan the Minister of Land, Infrastructure and Transport intends to approve includes matters concerning attribution, transfer and concession of public facilities under
Article 15
(3), he or she shall, in advance, obtain consent from the head of a local government or the managing authority of the relevant public facilities. <Amended on Mar. 23, 2013>
(4)
Where the Minister of Land, Infrastructure and Transport approves an implementation plan under paragraph (1), he or she shall publicly notify them as prescribed by Presidential Decree and forward copies of relevant documents to the head of relevant local governments. <Amended on Mar. 23, 2013>
(5)
Where the Minister of Land, Infrastructure and Transport approves the implementation plan requiring expropriation or use of land, etc. under
Article 12
(1), he or she shall inform a land owner and a person who holds a right to such land, etc. of such fact:
Provided
, That this shall not apply where a project operator has consulted with the land owner and the person who holds a right to land, etc. beforehand when the former applies for approval for the implementation plan. <Amended on Mar. 23, 2013; Jun. 9, 2020>
(6)
Where an implementation plan is publicly notified, a project operator shall make the implementation plan and relevant drawings available for the perusal of interested persons.
(7)
The head of a local government who has received copies of relevant documents under paragraph (4) shall take necessary measures, such as application for approval for and public notice of topographic maps under
Article 32 of the National Land Planning and Utilization Act
where relevant documents include matters determined as urban, gun management planning. In such cases, the project operator shall submit documents necessary for public notice, etc. of topographic maps to the head of a local government. <Amended on Apr. 14, 2011>
(8)
Where a project operator changes matters determined by Presidential Decree among the implementation plan approved under paragraph (1), he or she shall obtain approval from the Minister of Land, Infrastructure and Transport. In such cases, paragraphs (1) through (7) shall apply
mutatis mutandis
. <Amended on Mar. 23, 2013>
(9)
Where a project operator fails to commence a project under the implementation plan within five years from the date of public notice under paragraph (4), the approval for the implementation plan becomes invalid.
[This Article Wholly Amended on Mar. 25, 2009]
법령보기 화면
Article 10 (Access to Land)
(1)
Any project operator may conduct any of the following activities where necessary for investigation and surveying to prepare for an implementation plan or for execution of railroad construction projects:
1.
Access to other person's land;
2.
Temporary use of other person's land as a storage for materials, passageway or temporary roads;
3.
Change or removal of tress, earth, stone or other obstacles.
(2)
Articles 130 (2) through (9) and 131 of the National Land Planning and Utilization Act
shall apply
mutatis mutandis
to cases of paragraph (1).
[This Article Wholly Amended on Mar. 25, 2009]
법령보기 화면
Article 11 (Legal Fiction of Authorization and Permission under Other Statutes)
(1)
Where the Minister of Land, Infrastructure and Transport approves an implementation plan under
Article 9
(1), any consultation, approval, permission, authorization, consent, revocation, decision, reporting, designation, a license, deliberation, disposal, etc. (hereinafter referred to as "authorization, permission, etc.") falling under the following subparagraphs shall be deemed made or obtained. Where approval for an implementation plan is publicly notified pursuant to
Article 9
(4), public notice or announcement of authorization, permission, etc. under the relevant Act shall be deemed given or made: <Amended on Jun. 9, 2009; Jun. 9, 2009; Apr. 15, 2010; May 31, 2010; Apr. 14, 2011; Mar. 23, 2013; May 22, 2013; Jan. 14, 2014; Jan. 17, 2017; Dec. 26, 2017; Mar. 31, 2020; Nov. 30, 2021; Dec. 27, 2022>
1.
Deliberation by the Construction Technology Deliberative Committee under
Article 5 of the Construction Technology Promotion Act
;
2.
Deliberation by the Building Committee under
Article 4 of the Building Act
, building permission under
Article 11
of that Act, building reports under
Article 14
of that Act, building permission for temporary buildings under
Article 20
of that Act, and consultation about construction of buildings for public use under
Article 29
of that Act;
3.
Occupation or use permit of public waters under
Article 8 of the Public Waters Management and Reclamation Act
, authorization for or report on an implementation plan for occupation or use of public waters under
Article 17
of that Act, reclamation license of public waters under
Article 28
of that Act, consultation or authorization for reclamation executed by the State, etc. under
Article 35
of that Act, and authorization for an implementation plan for reclamation of public waters under
Article 38
of that Act;
4.
Deleted; <Apr. 15, 2010>
5.
Permit for access to controlled protection zones, etc. under
Article 9 (1) 1 of the Protection of Military Bases and Installations Act
, and consultations on permission, etc. from administrative agencies under
Article 13
of that Act;
6.
Determination on urban, gun management planning (applicable to only infrastructure under subparagraph 6 of
Article 2
of that Act) under
Article 30 of the National Land Planning and Utilization Act
, permission for development acts under
Article 56
of that Act, designation of an implementer of urban, gun planning facility projects under
Article 86
of the Act, and the preparation of and approval therefor for the implementation plan under
Article 88
of that Act;
7.
Disposition of non-permission for establishing a mining right under
Article 24 of the Mining Industry Act
, and revocation of a mining right and disposition for reduction in mining areas under
Article 34
of that Act;
8.
Permission for or consultation about conversion of farmland under
Article 34 of the Farmland Act
;
9.
Consultation with a road management agency or approval under
Article 107 of the Road Act
(only applicable to matters concerning designation and public notice of routes under
Article 19 of the Road Act
, determination of road zones under
Article 25
of that Act, permission for implementation of road works by a person other than a management agency under
Article 36
of that Act and permission for road occupancy under
Article 61
of that Act);
10.
Permission for or reporting on installation of emission facilities under
Article 23 of the Clean Air Conservation Act
,
Article 33 of the Water Environment Conservation Act
, and
Article 8
of
Noise and Vibration Control Act
;
11.
Permission to open private roads under
Article 4 of the Private Road Act
;
12.
Permission for felling, etc. at erosion-controlled areas under
Article 14 of the Erosion Control Work Act
and revocation of designation of erosion-controlled areas under
Article 20
of that Act;
13.
Approval for establishing factories (only applicable to factories installed during a construction duration as construction facilities directly required for railroad construction projects) under
Article 13 of the Industrial Cluster Development and Factory Establishment Act
;
15.
Permission for the diversion of mountainous districts under
Article 14 of the Mountainous Districts Management Act
, reports on diversion of mountainous districts under
Article 15
of that Act, permission for or reports on temporary use of mountainous districts under
Article 15-2
of that Act, permission for and reports on cutting, etc. of standing timber under
Article 36 (1) and (5) of the Creation and Management of Forest Resources Act
, permission for and reporting on acts in forest protection areas (excluding protection areas of forest genetic resources) under
Article 9 (1) and (2) 1 or 2 of the Forest Protection Act
, and revocation of designation of forest protection areas under
Article 11
(1) 1 of that Act;
15.
Consent to building permission, etc. under
Article 6
(1) of the Act on Installation and Maintenance of Firefighting Systems, reports on fire-fighting system installation under
Article 13 (1) of the Firefighting System Installation Business Act
, and permission for installation of manufacturing plants, etc. under
Article 6
(1) of
Act on the Safety Control of Hazardous Substances
;
16.
Authorization for general waterworks business under
Article 17 (1) of the Water Supply and Waterworks Installation Act
and authorization for private-use waterworks under
Articles 52
and 54 of that Act;
17.
Consultation (only applicable to permission for acts in park areas under
Article 23
of that Act) by a park management authority under
Article 71 (1) of the Natural Parks Act
;
18.
Permission for reinterment of deserted graves under
Article 27 (1) of the Act on Funeral Services
;
19.
Approval or reporting of plans for works for establishing electric installations for private use under
Article 8 of the Electrical Safety Management Act
;
20.
Permission for acts falling under the subparagraphs of
Article 21-2 of the Grassland Act
, including changes, etc. in the form and quality of grassland under that Article and permission for and consultation about conversion of grassland under
Article 23
of that Act;
21.
Approval for or reports on waste disposal facilities under
Article 29 of the Wastes Control Act
;
22.
Permission for construction execution of public sewerage system under
Article 16 of the Sewerage Act
, permission for occupancy of public sewerage systems under
Article 24
of that Act, and reports on installation of private sewerage treatment facilities under
Article 34
of that Act;
23.
Consultation or approval (only applicable to matters concerning permission for execution of river work under
Article 30
of that Act, occupancy permission of rivers under
Article 33
of that Act, and use permission of river water under
Article 50
of that Act) by a river management agency under
Article 6 of the River Act
, occupancy permission of rivers under
Article 33
of that Act, use permission of river water under
Article 50
of that Act, and permission for occupancy of small rivers under
Article 14 of the Small River Maintenance Act
;
24.
Permission for land transaction contract referred to in
Article 11 of the Act on Report on Real Estate Transactions
;
25.
Reporting on the commencement, alteration, or completion of a project under
Article 86 (1) of the Act on the Establishment and Management of Spatial Data
.
(2)
Where the Minister of Land, Infrastructure and Transport intends to approve an implementation plan which includes matters falling under any of the subparagraphs of paragraph (1), he or she shall consult with the head of the relevant administrative agency, in advance by preparing for relevant documents submitted by a project operator. <Amended on Mar. 23, 2013; Apr. 5, 2013>
(3)
The head of the relevant administrative agency in receipt of a request for consultation under paragraph (2) shall present his or her opinion to the Minister of Land, Infrastructure and Transport within 30 days from the date he or she is requested for consultation. In such cases, if no opinion is presented within the relevant period, it shall be deemed that an agreement has been reached through consultation. <Added on Apr. 5, 2013; May 21, 2014>
[This Article Wholly Amended on Mar. 25, 2009]
법령보기 화면
Article 12 (Expropriation and Use)
(1)
Where deemed necessary for railroad construction projects, a project operator may expropriate or use land, goods or rights (hereinafter referred to as "land, etc.") under
Article 3 of the Act on Acquisition of and Compensation for Land for Public Works Projects
therefor.
(2)
Where the Minister of Land, Infrastructure and Transport approves and publicly notifies an implementation plan, project approval under
Article 20 (1) of the Act on Acquisition of and Compensation for Land for Public Works Projects
therefor and public notice of project approval under
Article 22
of that Act are deemed to have been made and a project operator's application for a ruling may be made within the project execution duration specified by an implementation plan, notwithstanding
Articles 23
(1) and 28 (1) of that Act. <Amended on Mar. 23, 2013>
(3)
A land expropriation committee governing rulings concerning expropriation and use of land, etc. under paragraph (1) shall be the Central Land Expropriation Committee.
(4)
Except for those specifically provided for in this Act concerning expropriation and use of land, etc. under paragraph (1), the
Act on Acquisition of and Compensation for Land for Public Works Projects
therefor shall apply
mutatis mutandis
.
[This Article Wholly Amended on Mar. 25, 2009]
법령보기 화면
Article 12-2 (Compensation for Use of Underground Part of Land)
(1)
Where a project operator intends to use any underground part of another person's land to construct a railroad, he or she shall make compensation therefor in consideration of the usefulness of the land, the depth below the ground surface, the degree of impediment to the land utilization, etc.
(2)
Matters necessary for the objects to be compensated for use of underground part, standards and methods for compensation, etc. under paragraph (1) shall be prescribed by Presidential Decree.
[This Article Added on Apr. 5, 2013]
법령보기 화면
Article 12-3 (Registration of Creation of Partitioned Surface Right)
(1)
Where any agreement is reached with a land owner or a person who holds a right to land, etc. on the use of the underground part of a land in accordance with the
Act on Acquisition of and Compensation for Land for Public Works Projects
, a project operator shall create or complete the transfer of the partitioned surface right.
(2)
Where a ruling has been made allowing, in its content, the creation or completion of transfer of the partitioned surface right of underground part of land under the
Act on Acquisition of and Compensation for Land for Public Works Projects
, a project operator may apply for the registration for creation or transfer of the partitioned surface right alone by applying
mutatis mutandis
Article 99 of the Registration of Real Estate Act
.
(3)
Matters necessary for the procedures for registration of the partitioned surface right for use of the underground part of land shall be prescribed by the Supreme Court Regulations.
(4)
Notwithstanding
Article 280 or 281 of the Civil Act
, the duration of the partitioned surface right under paragraphs (1) and (2) shall be until the date railroad facilities exist.
[This Article Added on Apr. 5, 2013]
법령보기 화면
Article 13 (Lending of State and Public Property)
(1)
No land owned by the State or a local government while located in a project zone included in an implementation plan and necessary for railroad construction projects shall be sold or transferred for purposes other than railroad construction projects.
(2)
Land owned by the State or a local government while located in a project zone included in an implementation plan may be lent or sold to a project operator through a private contract notwithstanding provisions of the
State Property Act
or the
Public Property and Commodity Management Act
. In such cases, the Minister of Land, Infrastructure and Transport shall consult in advance with the head of the relevant central administrative agency and the head of the local governing about lending or sale of such property. <Amended on Mar. 23, 2013>
(3)
The head of the relevant administrative agency, upon receipt of a request for consultation under the latter part of paragraph (2), shall abolish use, conduct sale or take other necessary measures within 90 days from the date of receiving such request.
(4)
State property, the managing authority of which is unknown among any property intended for sale to a project operator under paragraph (2), shall be managed and disposed of by the Minister of Strategy and Finance notwithstanding the provisions of other statutes or regulations.
[This Article Wholly Amended on Mar. 25, 2009]
법령보기 화면
Article 14 (Entrustment of Land Purchase Projects)
(1)
Any project operator, other than local governments, may entrust the head of the competent local government or public institutions under the
Act on the Management of Public Institutions
with land purchase affairs, loss compensation affairs, relocation planning affairs, etc. for railroad construction projects as prescribed by Presidential Decree.
(2)
Entrustment commission, etc. required when entrusting land purchase affairs, loss compensation affairs, relocation planning affairs, etc. under paragraph (1), shall be prescribed by Presidential Decree.
[This Article Wholly Amended on Mar. 25, 2009]
법령보기 화면
Article 15 (Installation of Substitute Public Facilities)
(1)
Where public facilities, military facilities or public buildings (railroad facilities shall be excluded; hereafter referred to as "public facilities, etc." in this Article) prescribed by Presidential Decree exist in the land to be incorporated into railroad construction projects, the Minister of Land, Infrastructure and Transport may have a project operator install public facilities, etc. substituting for existing public facilities, etc. (hereafter referred to as "substitute public facilities, etc." in this Article) by receiving application by a managing authority or an owner thereof. <Amended on Mar. 23, 2013>
(2)
Where the Minister of Land, Infrastructure and Transport allows a project operator to install substitute public facilities, etc. under paragraph (1), he or she shall describe such fact clearly when granting approval for an implementation plan as prescribed by Presidential Decree. <Amended on Mar. 23, 2013>
(3)
Where substitute public facilities, etc. have undergone completion confirmation under
Article 16, such facilities shall be dealt with according to following classifications notwithstanding the provisions of the State Property Act
and the
Public Property and Commodity Management Act
:
1.
Existing public facilities, etc.: Gratuitously reverted to a project operator;
2.
Substitute public facilities, etc.: Gratuitously reverted to the State, a local government or the owner of existing public facilities, etc.;
3.
Public facilities newly installed: Gratuitously reverted or transferred to a managing authority to manage the facilities in question or gratuitously conceded to a local government to manage the facilities in question.
(4)
When registering substitute public facilities, etc. under paragraph (3), documents evidencing grounds for registration under the
Registration of Real Estate Act
may be replaced by a written authorization for an implementation plan or a modified written authorization and a written confirmation on completion.
[This Article Wholly Amended on Mar. 25, 2009]
법령보기 화면
Article 16 (Completion Confirmation)
(1)
Any project operator shall, when finishing construction work for railroad construction projects, submit a construction completion report to the Minister of Land, Infrastructure and Transport and shall undergo completion confirmation. In such cases, the Minister of Land, Infrastructure and Transport who has received an application for completion confirmation may request for inspections required for completion confirmation to the head of any agency determined by Ordinance of Ministry of Land, Infrastructure and Transport. <Amended on Mar. 23, 2013>
(2)
Upon receiving an application for completion confirmation under paragraph (1), the Minister of Land, Infrastructure and Transport shall publicly notify them if construction at issue is deemed to be executed according to the details approved after conducting completion confirmation. <Amended on Mar. 23, 2013>
(3)
Where the Minister of Land, Infrastructure and Transport makes a public notice under paragraph (2), completion inspection, completion authorization, etc. of the relevant project shall be deemed conducted or obtained with respect to authorization, permission, etc. under each of subparagraphs of
Article 11
(1). <Amended on Mar. 23, 2013>
(4)
No project operator shall use land formed and facilities installed as a result of railroad construction projects before public notice of completion is made under paragraph (2):
Provided
, That this shall not apply where permission for use before completion, is obtained from the Minister of Land, Infrastructure and Transport. <Amended on Mar. 23, 2013>
(5)
A project operator may apply for completion confirmation by classifying a railroad construction project into each section or each facility within the extent of an implementation plan where deemed necessary for efficient execution of such railroad construction project.
[This Article Wholly Amended on Mar. 25, 2009]
법령보기 화면
Article 17 (Reversion of Facilities)
(1)
The land formed and facilities installed through railroad construction projects shall revert to the State as soon as such projects are completed:
Provided
, That the same shall not apply to land and facilities prescribed by Presidential Decree.
(2)
The Minister of Land, Infrastructure and Transport may have a project operator of high-speed rail facilities reverted to the State under paragraph (1) use such facilities gratuitously or make profits with the extent of the total project cost he or she has invested, as prescribed by Presidential Decree. <Amended on Mar. 23, 2013>
(3)
With respect to the reversion of land formed and facilities installed through high-speed rail construction projects, provisions provided by the Korea National Railway Act shall govern where a project operator is KR; and provisions provided by the
Act on Public-Private Partnerships in Infrastructure
shall govern where a project operator is a concessionaire of a private capital investment project under the
Act on Public-Private Partnerships in Infrastructure
. <Amended on Jun. 9, 2020>
(4)
The method of calculating the total project cost and the duration for gratuitous use and profit-making under paragraph (2) shall be prescribed by Presidential Decree.
[This Article Wholly Amended on Mar. 25, 2009]
법령보기 화면
Article 18 (Special Cases for Promotion and Quality Improvement of Railroad Construction Projects)
(1)
Where high-speed rail facilities fall under any of the following subparagraphs,
Articles 49, 50 and 53 of the Building Act
,
Article 5 of the Act on the Safety Control of Hazardous Substances
, and
Article 12
(1) of the Act on Installation and Maintenance of Firefighting Systems shall not apply to relevant high-speed rail facilities: <Amended on Mar. 23, 2013; Nov. 30, 2021>
1.
Where special technology or special equipment acknowledged by the Minister of Land, Infrastructure and Transport through deliberation by the Committee are used;
2.
Where the Minister of Land, Infrastructure and Transport acknowledges, through deliberation by the Committee, that structures and shapes of high-speed rail facilities are equivalent to or higher than the standards concerning fire-fighting, disaster-prevention, fire-proofing, evacuation, etc. under the relevant statutes or regulations.
(2)
For construction works for railroad facilities having diverse functions and characteristics, such as station facilities, a project operator may place orders separately for architectural, railroad, electrical, signal, and information and communication works:
Provided
, That where it is difficult for a project operator to place orders separately considering the nature of works or technical management and it is prescribed by Presidential Decree, the project operator may place an order by integrating such works. <Amended on Aug. 6, 2013>
(3)
A project operator may newly install, extend or relocate facilities, which are production facilities of various construction materials used for railroad construction projects and deemed directly necessary for railroad construction projects by the Minister of Land, Infrastructure and Transport, in or to a project zone included in an implementation plan designated by the Minister of Land, Infrastructure and Transport or its neighboring area notwithstanding the provisions of
Article 20 of the Industrial Cluster Development and Factory Establishment Act
. In such cases, production facilities of construction materials are only applicable to those installed for the purpose of construction works during a construction period. <Amended on Mar. 23, 2013; Aug. 6, 2013>
[This Article Wholly Amended on Mar. 25, 2009]
[Title Amended on Aug. 6, 2013]
법령보기 화면
Article 19 (Technical Standards for Railroad Facilities)
(1)
An operator of a railroad construction project shall install railroad facilities in compliance with the technical standards prescribed by Ministerial Decree of Land, Infrastructure and Transport. <Amended on Mar. 23, 2013; Mar. 13, 2018>
(2)
A railroad facility manager shall manage railroad facilities in compliance with the technical standards referred to in paragraph (1), as prescribed by Ministerial Decree of Land, Infrastructure and Transport. <Added on Mar. 13, 2018>
(3)
Where any railroad is newly constructed or renovated, the compatibility and safety of railroad facilities shall be ensured so that rolling stock can be operated between interconnected railroad routes, as prescribed by Ministerial Decree of Land, Infrastructure and Transport. <Added on Mar. 13, 2018>
[This Article Wholly Amended on Mar. 25, 2009]
[Title Amended on Mar. 13, 2018]
Section 3 Cost-Bearing for Railroad Construction
법령보기 화면
Article 20 (Principle of Cost-Bearing)
(1)
Except for those specifically provided for in this Act or other Acts, costs for railroad construction shall be borne by the National Treasury in cases of general railroads and shared by the National Treasury and a project operator in cases of high-speed rails.
(2)
The sharing rate of costs for construction of high-speed rails between the National Treasury and a project operator under paragraph (1) shall be prescribed by Presidential Decree.
[This Article Wholly Amended on Mar. 25, 2009]
법령보기 화면
Article 21 (Cost-Bearing by Beneficiaries and Initiators)
(1)
Where any person other than the State makes significant profits through railroad construction projects, a project operator may have such person who has made profits therefrom (hereinafter referred to as "beneficiaries") share, fully or partially the costs for railroad construction projects by obtaining approval from the Minister of Land, Infrastructure and Transport. <Amended on Mar. 23, 2013>
(2)
Costs borne by beneficiaries under paragraph (1) shall be determined through consultations between a project operator and beneficiaries. In such cases, the Committee may mediate upon receiving an application by a project operator or beneficiaries where a consultation has not been held.
(3)
Where a railroad construction project is executed upon request by persons other than the State, the cost required shall be born fully or partially by a requester.
(4)
Where persons other than the State bear fully or partially the costs for railroad construction projects under paragraph (3), the bearing rate shall be prescribed by Presidential Decree.
[This Article Wholly Amended on Mar. 25, 2009]
CHAPTER III DEVELOPMENT OF STATION'S SPHERE OF INFLUENCE
법령보기 화면
Articles 22 Deleted. <Apr. 15, 2010>
법령보기 화면
Articles 23 Deleted. <Apr. 15, 2010>
법령보기 화면
Article 23-2 (Permission for Occupancy)
(1)
The Minister of Land, Infrastructure and Transport may grant occupancy permission by determining kinds, duration, etc. of buildings and other facilities (hereinafter referred to as "facilities") intended to be installed as prescribed by Presidential Decree, notwithstanding
Article 18 of the State Property Act
in the following cases: <Amended on Jan. 30, 2009; Mar. 25, 2009; Mar. 23, 2013; Nov. 26, 2019; Jun. 9, 2020>
1.
Where the KR (including a corporation in which the KR invests) or a project operator under the proviso of
Article 8
(1) and paragraph (2) of that Article intends to install facilities in railroad-related State property (excluding operational property referred to in
Article 22 (1) 1 of the Framework Act on Railroad Industry Development
), such as railroad facilities owned and managed by the State, closed tracks, closed stations (including relevant sites), and unused land, for the purposes of revitalizing railroad facilities and enhancing user convenience;
2.
Deleted. <Apr. 15, 2010>
(2)
Except as provided in this Act concerning occupancy permission under paragraph (1), provisions from
Articles 43 through 46 of the Railroad Service Act
shall apply
mutatis mutandis
.
[This Article Newly inserted on Mar. 25, 2009]
[Title Amended on Nov. 26, 2019]
CHAPTER IV RAILROAD FACILITIES MANAGEMENT
Section 1 Railroad Facilities Management Plans
법령보기 화면
Article 24 (Formulation of Master Plans for Railroad Facilities Management)
(1)
The Minister of Land, Infrastructure and Transport shall formulate a master plan for railroad facilities management (hereinafter referred to as "master plan for management") every five years to ensure the safe management of railroad facilities.
(2)
Each master plan for management formulated pursuant to paragraph (1) shall include the following matters:
1.
Basic objectives of, and direction-setting for, railroad facilities management;
2.
Repair, reinforcement, etc. of railroad facilities required to accomplish the objectives of railroad facilities management;
3.
Expenses incurred in railroad facilities management;
4.
Inspections and performance evaluations of railroad facilities;
5.
Securing of human resources and equipment required for railroad facilities management;
6.
Establishment and operation of an information management system for railroad facilities management;
7.
Research and development of technology necessary for railroad facilities management;
8.
Any other matters prescribed by Presidential Decree concerning railroad facilities management.
(3)
Where deemed necessary to formulate or amend a master plan for management, the Minister of Land, Infrastructure and Transport may require the heads of relevant central administrative agencies, the heads of local governments, or railroad facility managers to submit relevant data.
(4)
Upon formulating or amending a master plan for management, the Minister of Land, Infrastructure and Transport shall publicly notify the plan.
[This Article Added on Mar. 13, 2018]
[Previous Article 24 moved to Article 40 <Mar. 13, 2018>]
법령보기 화면
Article 25 (Formulation of City/Do Railroad Facilities Management Plans)
(1)
Notwithstanding
Article 24
(1), a Mayor/
Do
Governor shall formulate and implement a City/
Do
railroad facilities management plan (hereinafter referred to as "City/
Do
management plan") for railroad facilities under his or her jurisdiction every five years.
(2)
Where deemed necessary to formulate or amend a City/
Do
management plan, the Minister of Land, Infrastructure and Transport may require the heads of relevant central administrative agencies, the heads of local governments, or railroad facility managers to submit relevant data.
(3)
Upon formulating a City/
Do
management plan, a Mayor/
Do
Governor shall submit it to the Minister of Land, Infrastructure and Transport.
(4)
Upon receipt of a City/
Do
management plan under paragraph (3), the Minister of Land, Infrastructure and Transport shall examine whether the plan complies with the relevant master plan for management, etc. and may require the relevant Mayor/
Do
Governor to modify or supplement the City/
Do
management plan, if necessary. In such cases, a person in receipt of a request to modify or supplement the plan shall comply therewith, unless a compelling reason exists not to do so.
(5)
Upon formulating a City/
Do
management plan under paragraph (1) or amending it under paragraph (4), a Mayor/
Do
Governor shall publicly notify it in the official gazette of the relevant City/
Do
and notify the relevant railroad facility manager thereof.
[This Article Added on Mar. 13, 2018]
[Previous Article 25 moved to Article 42 <Mar. 13, 2018>]
법령보기 화면
Article 26 (Formulation of Action Plans for Railroad Facilities Management)
(1)
A railroad facility manager shall formulate and implement an action plan for railroad facilities management (hereinafter referred to as "action plan") each year for railroad facilities under his or her jurisdiction in accordance with the relevant master plan for management:
Provided
, That a railroad facility manager of urban railroad facilities defined in subparagraph 3 of
Article 2 of the Urban Railroad Act
shall formulate and implement an action plan each year in accordance with the relevant master plan for management and City/
Do
management plan.
(2)
Upon formulating an action plan, a railroad facility manager shall submit it to the head of the following relevant administrative agency:
1.
The competent Mayor/
Do
Governor if a railroad facility manager is either a local government-invested public corporation incorporated under the
Local Public Enterprises Act
or a corporation that constructs or operates railroad pursuant to the
Urban Railroad Act
;
2.
The Minister of Land, Infrastructure and Transport if a railroad facility manager is other than the persons specified in subparagraph 1.
(3)
A Mayor/
Do
Governor in receipt of an action plan under paragraph (2) 1 shall submit it to the Minister of Land, Infrastructure and Transport.
(4)
Upon receipt of an action plan under paragraph (2) or (3), the Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor shall examine whether the action plan complies with the relevant master plan for management or City/
Do
management plan, etc. and may require the relevant railroad facility manager to modify or supplement the plan, if necessary. In such cases, a person in receipt of a request to modify or supplement the plan shall comply therewith, unless a compelling reason exists not to do so.
(5)
Any other matters necessary for formulating and implementing an action plan, such as the period for formulating the action plan and details thereof, shall be prescribed by Presidential Decree.
[This Article Added on Mar. 13, 2018]
[Previous Article 26 moved to Article 43 <Mar. 13, 2018>]
법령보기 화면
Article 27 (Life Cycle Management of Railroad Facilities)
(1)
Where a railroad facility manager has installed, inspected, maintained, renovated, etc. any railroad facilities under his or her jurisdiction, he or she shall register the history information of railroad facilities prescribed by Ministerial Decree of Land, Infrastructure and Transport, with the railroad facilities information management system established pursuant to
Article 28
to manage the life cycle of such railroad facilities, and shall preserve such information until the railroad facilities exist.
(2)
A railroad facility manager shall formulate and implement an action plan, considering the life cycle cost of railroad facilities under his or her jurisdiction.
(3)
A railroad facility manager may analyze the history information of railroad facilities registered with the railroad facilities information management system pursuant to paragraph (1), and utilize the results of such analysis to renew the standards for conducting periodic inspections established pursuant to
Article 29
(5).
[This Article Added on Mar. 13, 2018]
[Previous Article 27 moved to Article 45 <Mar. 13, 2018>]
법령보기 화면
Article 28 (Establishment and Operation of Railroad Facilities Information Management System)
(1)
To systematically manage the history information of railroad facilities, such as installation, inspections, maintenance, and renovation, through the entire life cycle of such facilities, a railroad facility manager shall establish and operate a railroad facilities information management system, including the following matters:
1.
An action plan formulated pursuant to
Article 26
(1);
2.
History information of railroad facilities referred to in
Article 27
(1);
3.
Results of periodic inspections conducted pursuant to
Article 29
;
4.
Results of emergency inspections conducted pursuant to
Article 30
;
5.
Results of precision diagnosis conducted pursuant to
Article 31
;
6.
Matters concerning safety measures taken pursuant to
Article 32
, such as restrictions on use, prohibition of use, repair, and reinforcement;
7.
Results of performance evaluations conducted pursuant to
Article 33
;
8.
Any other matters concerning railroad facilities management prescribed by Ministerial Decree of Land, Infrastructure and Transport.
(2)
Matters necessary for establishing and operating the railroad facilities information management system pursuant to paragraph (1) shall be prescribed by Presidential Decree.
(3)
A railroad facility manager shall submit the history information specified in the subparagraphs of paragraph (1) to the Minister of Land, Infrastructure and Transport each year.
(4)
The Minister of Land, Infrastructure and Transport shall systematically preserve and manage the history information submitted pursuant to paragraph (3).
[This Article Added on Mar. 13, 2018]
[Previous Article 28 Moved to Article 46 <Mar. 13, 2018>]
Section 2 Inspection and Management System for Railroad Facilities
법령보기 화면
Article 29 (Conducting Periodic Inspections)
(1)
A railroad facility manager shall conduct a periodic inspection in compliance with the standards for conducting periodic inspections established pursuant to paragraph (5) to maintain the safety and performance of railroad facilities under his or her jurisdiction.
(2)
A railroad facility manager shall submit a report on the results of a periodic inspection to the heads of relevant central administrative agencies, as prescribed by Presidential Decree. In such cases,
Article 26
(2) and (3) shall apply
mutatis mutandis
to the procedures for submitting the report on the results of the periodic inspection.
(3)
Where the Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor deems that a periodic inspection has been poorly conducted as a result of examining and analyzing a report on the results of a periodic inspection submitted pursuant to paragraph (2), he or she may conduct an emergency inspection of relevant railroad facilities, as prescribed by Ministerial Decree of Land, Infrastructure and Transport.
(4)
The Minister of Land, Infrastructure and Transport shall formulate and publicly notify guidelines on periodic inspections, such as the timing, method, and procedures for conducting periodic inspections, as prescribed by Presidential Decree.
(5)
A railroad facility manager shall establish the standards for conducting periodic inspections for each railroad facility under his or her jurisdiction, such as the timing to conduct the inspections, inspection items, and inspection criteria, in compliance with the guidelines on periodic inspections formulated under paragraph (4).
[This Article Added on Mar. 13, 2018]
[Previous Article 29 moved to Article 47 <Mar. 13, 2018>]
법령보기 화면
Article 30 (Conducting Emergency Inspections)
(1)
Where a railroad facility manager deems that an accident, such as the collapse or fall of railroad facilities, is likely to occur, he or she shall conduct an emergency inspection in compliance with the standards for conducting emergency inspections referred to in paragraph (8).
(2)
Where the Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor deems that the structure of railroad facilities is likely to significantly affect the safe use by the public, he or she may have a public official under his or her jurisdiction conduct an emergency inspection or require the relevant railroad facility manager to conduct an emergency inspection. In such cases, a person in receipt of such request shall comply therewith, unless there is a compelling reason not to do so. <Amended on Jun. 9, 2020>
(3)
Where the Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor conducts an emergency inspection pursuant to paragraph (2), he or she may do so jointly with any relevant agencies or experts to enhance the efficiency of the inspection.
(4)
A public official who conducts an emergency inspection pursuant to paragraph (2) may ask any relevant person necessary questions or inspect relevant documents, etc.
(5)
A public official who conducts an emergency inspection pursuant to paragraph (2) shall carry an identification certificate indicating his or her authority and present it to the relevant person.
(6)
Where the Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor has conducted an emergency inspection pursuant to paragraph (2), he or she shall notify the relevant railroad facility manager of the results of the inspection; and where deemed necessary to ensure the safety of railroad facilities, he or she may issue an order to take necessary measures, such as precision diagnosis, repair, or reinforcement.
(7)
Where a railroad facility manager or a Mayor/
Do
Governor has conducted an emergency inspection pursuant to paragraph (1) or (2), he or she shall submit a report on the results of the inspection to the Minister of Land, Infrastructure and Transport.
(8)
The standards, method, and procedures for conducting an emergency inspection as well as other matters necessary for conducting the emergency inspection shall be prescribed by Presidential Decree.
[This Article Added on Mar. 13, 2018]
법령보기 화면
Article 31 (Conducting Precision Diagnosis)
(1)
A railroad facility manager shall conduct a regular precision diagnosis for railroad facilities under his or her jurisdiction, for which at least 10 years have passed since the installation thereof, pursuant to paragraph (5). <Amended on Jun. 9, 2020>
(2)
Where deemed necessary to prevent a disaster or accident as a result of conducting a periodic inspection under
Article 29
or emergency inspection under
Article 30
, a railroad facility manager shall conduct a precision diagnosis.
(3)
A railroad facility manager shall submit a report on the results of a precision diagnosis to the heads of relevant central administrative agencies, as prescribed by Presidential Decree. In such cases,
Article 26
(2) and (3) shall apply
mutatis mutandis
to the procedures for submitting the report on the results of the precision diagnosis.
(4)
Where the Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor deems that a precision diagnosis has been poorly conducted as a result of examining and analyzing a report on the results of the precision diagnosis submitted pursuant to paragraph (3), he or she may conduct an emergency inspection of relevant railroad facilities, as prescribed by Ministerial Decree of Land, Infrastructure and Transport.
(5)
The timing to conduct a precision diagnosis, qualification including educational requirements for a person to be eligible to conduct a precision diagnosis, and other matters necessary for conducting a precision diagnosis shall be prescribed by Presidential Decree. <Amended on Jun. 9, 2020>
[This Article Added on Mar. 13, 2018]
법령보기 화면
Article 32 (Safety Measures)
(1)
Where any defect prescribed by Presidential Decree or any other defect that seriously affects the safe use by the public is found through a periodic inspection under
Article 29
, emergency inspection under
Article 30
, precision inspection under
Article 31
, etc., a railroad facility manager shall take necessary measures, such as restrictions on use of railroad facilities and prohibition of use thereof, and shall install a sign indicating danger at the relevant railroad facilities.
(2)
Where it is deemed necessary to take urgent measures because a defect seriously affects the safe use by the public under paragraph (1), a railroad facility manager shall take necessary measures, such as repair or reinforcement of the relevant railroad facilities, without delay.
(3)
Upon taking safety measures pursuant to paragraph (1), a railroad facility manager shall notify the Minister of Land, Infrastructure and Transport and the competent Mayor/
Do
Governor of such fact. In such cases, a railroad facility manager specified in
Article 26
(2) 2 shall notify the Minister of Land, Infrastructure and Transport of such fact.
(4)
Where a railroad facility manager fails to take necessary measures referred to in paragraph (2), such as repair or reinforcement of the relevant railroad facilities, the Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor may issue an order to take necessary measures or corrective order.
[This Article Added on Mar. 13, 2018]
법령보기 화면
Article 33 (Performance Evaluation of Railroad Facilities)
(1)
To maintain the performance of railroad facilities, a railroad facility manager shall conduct a performance evaluation of each railroad facility under his or her jurisdiction at every period prescribed by Presidential Decree in compliance with the performance evaluation guidelines referred to in paragraph (7). <Amended on Jun. 9, 2020>
(2)
Where necessary for the safety and efficient management of railroad facilities, the Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor may conduct a performance evaluation of relevant railroad facilities, as prescribed by Presidential Decree, notwithstanding paragraph (1).
(3)
Upon conducting a performance evaluation pursuant to paragraph (2), the Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor shall notify the relevant railroad facility manager of the results of the evaluation, and may issue an order to take necessary measures, such as repair or reinforcement, where deemed necessary for maintaining the performance of railroad facilities.
(4)
A railroad facility manager shall determine the performance grade of the relevant railroad facility in compliance with the criteria prescribed by Presidential Decree, based on the results of a performance evaluation thereof conducted under paragraph (1).
(5)
A railroad facility manager shall submit a report on the results of a performance evaluation conducted under paragraph (1) to the Minister of Land, Infrastructure and Transport, as prescribed by Presidential Decree. In such cases,
Article 26
(2) and (3) shall apply
mutatis mutandis
to the procedures for submitting the report on the results of the performance evaluation.
(6)
Qualifications including educational requirements for a person to be eligible to conduct performance evaluations shall be prescribed by Presidential Decree. <Added on Jun. 9, 2020>
(7)
The Minister of Land, Infrastructure and Transport shall formulate and publicly notify guidelines on performance evaluation, such as the method and procedures for conducting a performance evaluation, as prescribed by Presidential Decree. <Amended on Jun. 9, 2020>
[This Article Added on Mar. 13, 2018]
법령보기 화면
Article 33-2 (Evaluation of Reports on Results of Precision Diagnoses and Performance Evaluations)
(1)
If necessary to improve technology levels of precision diagnoses and performance evaluations and to prevent poor diagnosis and evaluation, the Minister of Land, Infrastructure and Transport may evaluate reports on the results of precision diagnoses and performance evaluations which are submitted pursuant to
Articles 31
(3) and 33 (5) (hereafter in this Article referred to as "report on results").
(2)
The Minister of Land, Infrastructure and Transport may request a railroad facility manager or a person who has conducted a precision diagnosis and a performance evaluation as an agent under
Article 44
to submit data necessary for the evaluation under paragraph (1). In such cases, a person requested to submit data shall comply with such request unless there is a compelling reason not to do so.
(3)
If necessary according to evaluation of a report on results pursuant to paragraph (1), the Minister of Land, Infrastructure and Transport may request a railroad facility manager or a person who has conducted a precision diagnosis and a performance evaluation as an agent under
Article 44
to correct or supplement the relevant report on results. In such cases, the railroad facility manager or agent shall submit a corrected or supplemented report on results to the Minister of Land, Infrastructure and Transport.
(4)
Matters necessary for methods and procedures for evaluating results reports under paragraph (1) shall be prescribed by Ministerial Decree of Land, Infrastructure and Transport.
[This Article Added on Jun. 9, 2020]
법령보기 화면
Article 34 (Evaluation of Safety and Levels of Convenience of Use of Railroad Stations)
(1)
To ensure the safety of users of railroad stations and enhance the levels of convenience of use, the Minister of Land, Infrastructure and Transport may evaluate the safety of railroad stations and the levels of convenience of use thereof (hereinafter referred to as "evaluation of railroad stations") every five years.
(2)
The Minister of Land, Infrastructure and Transport may take necessary measures, such as issuing an order to improve facilities against the relevant railroad facility manager, based on the results of evaluation of railroad stations.
(3)
Upon receipt of an order to improve railroad station facilities under paragraph (2), a railroad facility manager shall formulate a plan to improve railroad station facilities and submit it to the Minister of Land, Infrastructure and Transport or the competent Mayor/
Do
Governor.
(4)
Where necessary to establish an efficient railroad station evaluation system, the Minister of Land, Infrastructure and Transport may entrust relevant specialized institutions, etc. prescribed by Presidential Decree to conduct a survey, evaluation, research, etc. on the safety of railroad stations and levels of convenience of use thereof.
(5)
In conducting an evaluation, etc. of railroad stations, the Minister of Land, Infrastructure and Transport or a person entrusted with evaluation, etc. pursuant to paragraph (4) may require any railroad facility manager to submit, etc. relevant data or his or her opinion, or may conduct on-site investigations of the safety of railroad stations or levels of convenience of use thereof.
(6)
A railroad facility manager in receipt of a request to submit data or his or her opinion under paragraph (5) shall comply with such request, unless a compelling reason exists not to do so.
(7)
Matters necessary for the items of evaluation of railroad stations and procedures for conducting such evaluation under paragraph (1) as well as for conducting on-site investigations, shall be prescribed by Ministerial Decree of Land, Infrastructure and Transport.
[This Article Added on Mar. 13, 2018]
법령보기 화면
Article 35 (Repair, Reinforcement, and Replacement of Railroad Facilities)
To maintain the safety of railroad facilities under his or her jurisdiction, a railroad facility manager shall take necessary measures therefor, such as repair, reinforcement, and replacement, in accordance with the relevant action plan.
[This Article Added on Mar. 13, 2018]
법령보기 화면
Article 36 (Corrective Order)
(1)
Where a railroad facility manager or a person who has conducted a periodic inspection, etc. as an agent under
Article 44
fails to faithfully conduct a periodic inspection, emergency inspection, precision diagnosis, or performance evaluation, in violation of
Article 29
(1), 30 (1), 31 (1) or (2), or 33 (1), the Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor may order such railroad facility manager or agent to make corrections within a specified period. <Amended on Jun. 9, 2020>
(2)
Upon receiving a corrective order under paragraph (1), a railroad facility manager or a person who has conducted a periodic inspection, etc. as an agent under
Article 44
shall comply therewith, unless there is a compelling reason not to do so. <Amended on Jun. 9, 2020>
[This Article Added on Mar. 13, 2018]
법령보기 화면
Article 37 (Suspension of Business)
(1)
The Minister of Land, Infrastructure and Transport may issue an order to suspend business for a given period not exceeding six months, if:
1.
The railroad facility manager fails to conduct a periodic inspection under
Article 29
(1), emergency inspection under
Article 30
(1), or precision diagnosis under
Article 31
(1) or (2);
2.
The railroad facility manager fails to conduct an emergency inspection without just cause, or fails to comply with an order to take necessary measures, in violation of
Article 30
(2) or (6);
3.
The railroad facility manager fails to take safety measures, in violation of
Article 32
(1);
4.
The railroad facility manager fails to take necessary measures, such as repair or reinforcement, or fails to comply with an order to take necessary measures or corrective order, in violation of
Article 32
(2) or (4).
(2)
Standards and procedures for suspending business pursuant to paragraph (1) and other necessary matters shall be prescribed by Ministerial Decree of Land, Infrastructure and Transport.
[This Article Added on Mar. 13, 2018]
법령보기 화면
Article 38 (Penalty Surcharges)
(1)
Where a disposition of suspending business must be taken against a railroad facility manager pursuant to
Article 37
(1) and such disposition is likely to cause severe inconvenience to users of railroad services provided by such railroad facility manager or to significantly harm the public interests, the Minister of Land, Infrastructure and Transport may impose and collect a penalty surcharge not exceeding 100 million won in lieu of the disposition of suspending business.
(2)
Types of offenses for which a penalty surcharge is imposed pursuant to paragraph (1), the criteria and method for imposing penalty surcharges, and other necessary matters shall be prescribed by Presidential Decree.
(3)
Where a person liable to pay a penalty surcharge pursuant to paragraph (1) fails to pay the penalty surcharge by the payment deadline, the Minister of Land, Infrastructure and Transport shall collect it in the same manner as delinquent national taxes are collected.
[This Article Added on Mar. 13, 2018]
법령보기 화면
Article 39 (Subsidization for Railroad Facility Managers)
To ensure the health and safety of the public, the State and local governments may partially subsidize railroad facility managers with expenses incurred in repairing or reinforcing dilapidated railroad facilities and railroad stations, within budgetary limits.
[This Article Added on Mar. 13, 2018]
CHAPTER V SUPPLEMENTARY PROVISIONS
법령보기 화면
Article 40 (Reporting and Inspections)
(1)
Where necessary for the enforcement of this Act, the Minister of Land, Infrastructure and Transport may order any project operator to make report or to submit data on railroad construction projects and have public officials under his or her control inspect affairs relevant to railroad construction projects by entering a project operator's office, place of business or other necessary places. <Amended on Mar. 23, 2013>
(2)
Public officials who inspect affairs relevant to railroad construction projects under paragraph (1) shall carry with them a certificate indicating their authority and produce it to the interested persons.
(3)
Matters necessary for a certificate under paragraph (2) shall be determined by Ministerial Decree of Land, Infrastructure and Transport. <Amended on Mar. 23, 2013>
[This Article Wholly Amended on Mar. 25, 2009]
[Moved from Article 24 <Mar. 13, 2018>]
법령보기 화면
Article 41 (Fact-Finding Inspections of Railroad Facilities Management)
(1)
The Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor may conduct a fact-finding inspection on railroad facilities management.
(2)
The Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor may recommend necessary matters or request rectification to a railroad facility manager, based on the results of a fact-finding inspection conducted under paragraph (1). In such cases, a person in receipt of such request shall comply therewith, unless a compelling reason exists not to do so.
(3)
If necessary to conduct a fact-finding inspection pursuant to paragraph (1), the Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor may require a railroad facility manager to submit relevant data. In such cases, a person in receipt of such request shall comply therewith, unless a compelling reason exists not to do so.
(4)
If necessary to enhance the efficiency of fact-finding inspections conducted under paragraph (1), the Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor may conduct joint field investigations with relevant institutions and experts.
(5)
If necessary, the Minister of Land, Infrastructure and Transport and a Mayor/
Do
Governor may publish the results of fact-finding inspections, as prescribed by Ministerial Decree of Land, Infrastructure and Transport.
[This Article Added on Mar. 13, 2018]
법령보기 화면
Article 42 (Supervision)
(1)
Where a project operator falls under any of the following subparagraphs, the Minister of Land, Infrastructure and Transport may revoke approval for an implementation plan or order suspension or change of construction work, or rebuilding or change, relocation, etc. of facilities or buildings: <Amended on Mar. 23, 2013>
1.
Where a project operator obtains permission or approval under this Act by fraud or other improper means;
2.
Where a project operator violates this Act, or any order or disposition under this Act;
3.
Where a project operator becomes unable to continue to execute a railroad construction project due to a change of situation.
(2)
Where the Minister of Land, Infrastructure and Transport has made or issued disposition or an order under paragraph (1), he or she shall publicly notify them, as prescribed by Presidential Decree. <Amended on Mar. 23, 2013>
[This Article Wholly Amended on Mar. 25, 2009]
[Moved from Article 25 <Mar. 13, 2018>]
법령보기 화면
Article 43 (Hearings)
The Minister of Land, Infrastructure and Transport shall hold a hearing if he or she intends to render any of the following dispositions: <Amended on Mar. 23, 2013; Mar. 13, 2018; Jun. 9, 2020>
1.
Revoking approval of an implementation plan under
Article 42
;
2.
Revoking registration of an institution specializing in safety inspection of railroad facilities under
Article 44-6
.
[This Article Wholly Amended on Mar. 25, 2009]
[Moved from Article 26 <Mar. 13, 2018>]
법령보기 화면
Article 44 (Periodic Inspections by Agents)
A railroad facility manager may require an institution specializing in safety inspection of railroad facilities registered under
Article 44-3
(hereinafter referred to as "institution specializing in safety inspection of railroad facilities") to conduct a periodic inspection under
Article 29
, an emergency inspection under
Article 30
, a precision diagnosis under
Article 31
, and a performance evaluation under
Article 33
(hereinafter referred to as "periodic inspection, etc.") as an agent: <Amended on Jun. 9, 2020>
1.
Deleted; <Jun. 9, 2020>
2.
Deleted; <Jun. 9, 2020>
3.
Deleted; <Jun. 9, 2020>
4.
Deleted. <Jun. 9, 2020>
[This Article Added on Mar. 13, 2018]
법령보기 화면
Article 44-2 (Restriction on Subcontracting)
(1)
No institution specializing in safety inspection of railroad facilities, to whom a contract for a periodic inspection, etc. is awarded by a railroad facility manager, shall subcontract the periodic inspection, etc.:
Provided
, That in cases prescribed by Presidential Decree, such as where any specialized technology is required, a subcontract for each field of works may be awarded only once, to the extent not exceeding 50/100 of the total contract price.
(2)
A person who awards a subcontract pursuant to the proviso of paragraph (1) shall notify the railroad facility manager thereof, as prescribed by Presidential Decree.
(3)
Where there are reasonable grounds to suspect that an institution specializing in safety inspection of railroad facilities has awarded a subcontract in violation of paragraph (1), a railroad facility manager may request the Minister of Land, Infrastructure and Transport or the competent Mayor/
Do
Governor to conduct a fact-finding investigation.
(4)
Upon receipt of a request under paragraph (3), the Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor shall conduct a necessary fact-finding investigation, and shall notify a railroad facility manager of the investigation findings.
(5)
Where the Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor finds in a fact-finding investigation under paragraph (4) that a contractor has awarded a subcontract in violation of paragraph (1), he or she shall take necessary measures, such as dispositions or requests for dispositions under
Article 44-6
.
(6)
If deemed necessary for conducting a fact-finding investigation under paragraph (4), the Minister of Land, Infrastructure and Transport or a Mayor/
Do
Governor may request an institution specializing in safety inspection of railroad facilities and other relevant persons to submit necessary data, and may require public officials under his or her jurisdiction to enter the office or place of business of such institution to inspect books, documents, or other data or articles.
(7)
A relevant public official entering the office or place of business to conduct an inspection under paragraph (6) shall carry identification indicating his or her authority and present it to relevant persons.
[This Article Added on Jun. 9, 2020]
법령보기 화면
Article 44-3 (Registration of Institutions Specializing in Safety Inspection of Railroad Facilities)
(1)
A person who intends to conduct periodic inspections, etc. of railroad facilities as an agent shall meet the standards for registration prescribed by Presidential Decree, such as capital and technical workforce, and file for registration of an institution specializing in safety inspection of railroad facilities with the Mayor/
Do
Governor.
(2)
The Mayor/
Do
Governor shall issue a certificate of registration upon registering an institution specializing in safety inspection of railroad facilities pursuant to paragraph (1).
(3)
When any of the registered matters prescribed by Presidential Decree changes, a relevant institution specializing in safety inspection of railroad facilities shall report the change to the competent Mayor/
Do
Governor within 30 days from the date of such change.
(4)
If an institution specializing in safety inspection of railroad facilities loses its certificate of registration issued under paragraph (2) or if such certificate is defaced, the institution may obtain the reissuance of the certificate.
(5)
When an institution specializing in safety inspection of railroad facilities intends to suspend its business for at least one year, resume its business, or close its business, it shall file a report thereon with the competent Mayor/
Do
Governor.
(6)
Upon receipt of a report on the closure of business pursuant paragraph (5), the Mayor/
Do
Governor shall cancel the registration.
(7)
When a Mayor/
Do
Governor registers an institution specializing in safety inspection of railroad facilities or receives a report on a change in registered matters, suspension of business, resumption of business, or closure of business, from an institution specializing in safety inspection of railroad facilities under paragraph (1), (3), or (5), the Mayor/
Do
Governor shall notify the Minister of Land, Infrastructure and Transport of such registration or report.
(8)
Matters necessary for registration of institutions specializing in safety inspection of railroad facilities, issuance and reissuance of certificates of registration, and reports on changes in registered matters under paragraphs (1) through (4), and the methods, procedures, etc. for filing reports under paragraph (5) shall be prescribed by Ministerial Decree of Land, Infrastructure and Transport.
[This Article Added on Jun. 9, 2020]
법령보기 화면
Article 44-4 (Grounds for Disqualification)
Any of the following persons shall be disqualified from registering as an institution specializing in safety inspection of railroad facilities:
1.
A person under adult guardianship;
2.
A person declared bankrupt and not yet reinstated;
3.
A person for whom two years have not passed from the date its registration was revoked under
Article 44-6
:
Provided
, That a person whose registration was revoked for falling under subparagraph 8 of that Article shall be excluded;
4.
A person for whom two years have not passed since his or her imprisonment without labor or heavier punishment declared by a court for violation of this Act was completely executed (including where the execution of such sentence is deemed complete) or the non-execution of such sentence became final;
5.
A person who is under suspension of the execution of his or her imprisonment without labor or heavier punishment declared by a court for violation of this Act;
6.
A corporation, whose executive officer falls under any of subparagraphs 1 through 5.
[This Article Added on Jun. 9, 2020]
법령보기 화면
Article 44-5 (Prohibition against Lending of Names)
No institution specializing in safety inspection of railroad facilities shall allow other persons to conduct a periodic inspection, etc. by using its name or trade name, or lend its certificate of registration of an institution specializing in safety inspection of railroad facilities.
[This Article Added on Jun. 9, 2020]
법령보기 화면
Article 44-6 (Revocation of Registration)
Where an institution specializing in safety inspection of railroad facilities falls under any of the following subparagraphs, a Mayor/
Do
Governor may revoke its registration or order the institution to suspend its business for a specified period not exceeding one year:
Provided
, That the Mayor/
Do
Governor shall revoke such registration in cases falling under any of subparagraphs 1 through 3, 8, 9, or 14:
1.
Where it files for registration by fraud or other improper means;
2.
Where it commits again an act subject to a disposition of business suspension after receiving such disposition twice within the last two years;
3.
Where it enters into a new agency contract to perform a periodic inspection, etc. during the period of business suspension after receiving the disposition of business suspension;
4.
Where the Minister of Land, Infrastructure and Transport finds that an institution specializing in safety inspection of railroad facilities has provided false diagnosis and evaluation of the status of railroad facilities or otherwise performed its affairs poorly, according the Minister's evaluation of the reports on results of precision diagnoses and performance evaluations conducted by the institution;
5.
Where it fails to faithfully perform its affairs including periodic inspections, thereby causing damage or serious defect to railroad facilities;
6.
Where it subcontracts a periodic inspection, etc., in violation of
Article 44-2
;
7.
Where it ceases to meet the standards for registration under
Article 44-3
(1):
Provided
, That this shall not apply to cases prescribed by Presidential Decree, such as where it ceases to meet the standards for registration temporarily;
8.
Where it falls under any of the subparagraphs of
Article 44-4
:
Provided
, That this shall not apply where a corporation falling under subparagraph 6 of
Article 44-4
replaces the relevant executive officer within six months;
9.
Where it allows another person to conduct business by using his or her name or trade name, or lends a certificate of registration to another person, in violation of
Article 44-5
;
10.
Where it has a reason to be subject to a new corrective order after having received corrective orders under
Article 36
twice for the last two years;
11.
Where it allows a person, other than those qualified to conduct a precision diagnosis or performance evaluation, to perform the duties of a precision diagnosis or performance evaluation;
12.
It assigns a periodic inspection, etc. required to be performed by an engineer among its executive officers and employees, to any engineer who is neither its executive officer nor employee;
13.
Where there is a request for suspension of its business, etc. from another administrative agency under statutes or regulations;
14.
Where the Minister of Land, Infrastructure and Transport, the head of the competent authority, or the head of a relevant local government verifies the fact of business closure of an institution specializing in safety inspection of railroad facilities.
[This Article Added on Jun. 9, 2020]
법령보기 화면
Article 44-7 (Conducting Affairs after Administrative Dispositions)
(1)
An institution specializing in safety inspection of railroad facilities subject to the revocation of registration or the suspension of business pursuant to
Article 44-6
may continue to conduct the relevant affairs limited to agency contracts for periodic inspections, etc. entered into before such disposition is rendered. In such cases, the institution specializing in safety inspection of railroad facilities shall, without delay, notify the details of such disposition in writing to the railroad facility manager who has entered into the agency contract for periodic inspections, etc.
(2)
A railroad facility manager may terminate a relevant contract within 30 days from the date he or she receives notice under paragraph (1) or becomes aware of the relevant fact.
(3)
A person who continues to conduct the affairs pursuant paragraph (1) shall be deemed an institution specializing in safety inspection of railroad facilities with regard to such affairs until he or she completes such affairs.
[This Article Added on Jun. 9, 2020]
법령보기 화면
Article 44-8 (Transfer of Business by Institutions Specializing in Safety Inspection of Railroad Facilities)
(1)
Where an institution specializing in safety inspection of railroad facilities intends to transfer its business to another person or to merge with another institution, it shall report the transfer or merger to the competent Mayor/
Do
Governor.
(2)
A business transferee or a surviving or resulting corporation following merger shall succeed to the status of an institution specializing in safety inspection of railroad facilities upon filing a report under paragraph (1).
(3)
Paragraphs (1) and (2) shall apply
mutatis mutandis
to inheritance of the business of an institution specializing in safety inspection of railroad facilities.
[This Article Added on Jun. 9, 2020]
법령보기 화면
Article 44-9 (Entrustment of Authority)
The Minister of Land, Infrastructure and Transport may entrust the affairs of evaluating the reports on results of precision diagnoses and performance evaluations under
Article 33-2
to a relevant specialized institution or organization, as prescribed by Presidential Decree.
[This Article Added on Jun. 9, 2020]
CHAPTER VI PENALTY PROVISIONS
법령보기 화면
Article 45 (Penalty Provisions)
(1)
Any of the following persons shall be punished by imprisonment with labor for not more than two years or by a fine not exceeding 20 million won: <Amended on Jun. 9, 2020>
1.
A person who fails to conduct, or unfaithfully conducts, a periodic inspection under
Article 29
(1), emergency inspection under
Article 30
(1), or precision diagnosis under
Article 31
(1) or (2), thereby causing serious damage to any railroad facilities;
2.
A person who fails to conduct an emergency inspection without just cause or fails to comply with an order to take necessary measures, in violation of
Article 30
(2) or (6), thereby causing serious damage to any railroad facilities;
3.
A person who fails to take safety measures, in violation of
Article 32
(1), thereby causing serious damage to any railroad facilities;
4.
A person who fails to take necessary measures, such as repair or reinforcement, or fails to comply with an order to take necessary measures or corrective order, in violation of
Article 32
(2) or (4), thereby causing serious damage to any railroad facilities.
(2)
Any of the following persons shall be punished by imprisonment with labor for not more than one year or by a fine not exceeding 10 million won:
1.
A person who fails to take safety measures, in violation of
Article 32
(1);
2.
A person who fails to take necessary measures, such as repair or reinforcement, or fails to comply with an order to take necessary measures or corrective order, in violation of
Article 32
(2) or (4).
(3)
Any of the following persons shall be punished by a fine not exceeding five million won:
1.
A person who refuses, interferes with, or evades an emergency inspection referred to in
Article 30
(2);
2.
A person who fails to comply with a corrective order issued under
Article 36
;
3.
A person who refuses, interferes with, or evades a fact-finding inspection referred to in
Article 41
(1);
4.
A person who fails to submit data without just cause, in violation of
Article 41
(3), or submits false data.
(4)
A person who fails to comply with an order issued under
Article 42
shall be punished by a fine not exceeding three million won.
[This Article Wholly Amended on Mar. 13, 2018]
[Moved from Article 27 <Mar. 13, 2018>]
법령보기 화면
Article 46 (Joint Penalty Provisions)
If a representative of a corporation or an agent, employee or any other person employed by a corporation, or an individual commits any violation falling under the provisions of
Article 45
in connection with affairs of the corporation or the individual, not only shall such offender be punished accordingly, but the corporation or the individual shall be also punished by a fine under the relevant Articles:
Provided
, That the same shall not apply to cases where the corporation or the individual has paid due attention to or conscientiously supervised the relevant affairs in order to prevent such violation. <Amended on Mar. 13, 2018>
[This Article Wholly Amended on Mar. 25, 2009]
[Moved from Article 28 <Mar. 13, 2018>]
법령보기 화면
Article 47 (Administrative Fines)
(1)
Any of the following persons shall be subject to an administrative fine not exceeding 20 million won:
1.
A person who fails to conduct an emergency inspection referred to in
Article 30
(1);
2.
A person who fails to conduct a precision diagnosis referred to in
Article 31
(1) or (2).
(2)
Any of the following persons shall be subject to an administrative fine not exceeding 10 million won:
1.
A person who fails to formulate an action plan referred to in
Article 26
(1) or fails to submit an action plan referred to in
Article 26
(2);
2.
A person who fails to preserve the history information of railroad facilities referred to in
Article 27
(1);
3.
A person who fails to install a sign indicating danger referred to in
Article 32
(1);
4.
A person who fails to give notification referred to in
Article 32
(3);
5.
A person who fails to conduct a performance evaluation referred to in
Article 33
(1);
6.
A person who fails to comply with an order to improve facilities issued under
Article 34
(2).
(3)
Any of the following persons shall be subject to an administrative fine not exceeding five million won: <Amended on Jun. 9, 2020>
1.
A person who fails to register the history information of railroad facilities referred to in
Article 27
(1) with the railroad facilities information management system referred to in
Article 28
;
2.
A person who fails to submit a report on the results of an emergency inspection referred to in
Article 30
(7);
3.
A person who fails to submit data under
Article 33-2
(2) or submits false data;
4.
A person who fails to submit a revised or supplemented report on results, in violation of
Article 33-2
(3);
5.
A person who fails to comply with a request for correction without good cause, in violation of
Article 41
(2);
6.
A person who fails to give notice of subcontracting, in violation of
Article 44-2
(2);
7.
A person who fails to report changes in registered matters under
Article 44-3
(3);
8.
A person who fails to report business suspension, resumption, or closure under
Article 44-3
(5);
9.
A person who fails to notify the railroad facility manager with whom he or she has entered into an agent contract for periodic inspections, etc. of the fact that registration has been revoked or a disposition of business suspension has been imposed, in violation of the latter part of
Article 44-7
(1);
10.
A person who fails to report a transfer, merger, or inheritance of business in accordance with
Article 44-8
.
(4)
Any of the following persons shall be subject to an administrative fine not exceeding three million won:
1.
A person who refuses or interferes with any act of a project operator referred to in
Article 10
without just cause;
2.
A person who fails to submit a report or data referred to in
Article 40
(1); submits a false report or data; or refuses, interferes with, or evades the relevant inspection.
(5)
Administrative fines referred to in paragraphs (1) through (4) shall be imposed and collected by the Minister of Land, Infrastructure and Transport, as prescribed by Presidential Decree.
[This Article Wholly Amended on Mar. 13, 2018]
[Moved from Article 29 <Mar. 13, 2018>]
ADDENDA <Act No. 7304, Dec. 31, 2004>
Article 1 (Enforcement Date)
This Act shall enter into six months after the date of its promulgation.
Article 2 (Repeal of other Acts)
The
High-Speed Railroad Construction Promotion Act
and the
Public Railroad Construction Promotion Act
are hereby repealed.
Article 3 (Applicability concerning Deliberations on Railroad Network Planning by Deliberative Committee)
Deliberations by the Deliberation Committee with regards to the provision of
Article 4
(3) shall apply, beginning with a railroad network plan to be drafted after this Act enters into force.
Article 4 (Applicability concerning Deliberations on Approval for Implementation Plans by Deliberative Committee)
The provision of
Article 9
(2) shall apply, beginning with an implementation plan to be applied for approval after this Act enters into force.
Article 5 (General Transitional Measures)
Disposition, acts or various reports conducted by administrative agencies (including project operators) and other Acts against such administrative agencies under the provisions of the
High-Speed Railroad Construction Promotion Act
and the
Public Railroad Construction Promotion Act
shall be deemed acts by or against administrative agencies under this Act corresponding thereto.
Article 6 (Transitional Measures concerning Legal Fiction Provisions)
Legal fiction provisions under
Article 8 of the High-Speed Railroad Construction Promotion Act
and
Article 6 of the Public Railroad Construction Promotion Act
shall apply respectively, where an application for approval for an implementation plan under
Article 7 of the High-Speed Railroad Construction Promotion Act
and
Article 3 of the Public Railroad Construction Promotion Act
is filed at the time this Act enters into force.
Article 7 (Transitional Measures concerning Plans)
Master plans and implementation plans for a railroad construction project determined under the
High-Speed Railroad Construction Promotion Act
and the
Public Railroad Construction Promotion Act
as at the time this Act enters into force shall be deemed plans under this Act.
Article 8 (Transitional Measures concerning Penal Provisions, etc.)
The application of penal provisions and fines for negligence for any act violating the previous
High-Speed Railroad Construction Promotion Act
and the
Public Railroad Construction Promotion Act
before this Act enters into force shall be governed by the previous provisions.
Article 9 (Relationships with other Acts)
Where the previous
High-Speed Railroad Construction Promotion Act
or the previous
Public Railroad Construction Promotion Act
and the provisons thereof are cited in other Acts and subordinate statutes as at the time this Act enters into force, and where corresponding provisions exist in this Act, this Act or the corresponding provisions in this Act shall be deemed to have been cited in lieu of the previous provisions.
Article 10 Omitted.
ADDENDA <Act No. 7459, May 31, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA <Act No. 7678, Aug. 4, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 12 Omitted.
ADDENDA <Act No. 7796, Dec. 29, 2005>
Article 1 (Enforcement Date)
This Act shall enter into force on July 1, 2006
Articles 2 through 6 Omitted.
ADDENDA <Act No. 8014, Sep. 27, 2006>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 11 Omitted.
ADDENDA <Act No. 8251, Jan. 19, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force three months after the date of its promulgation.
Articles 2 through 4 Omitted.
ADDENDA <Act No. 8338, Apr. 6, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 17 Omitted.
ADDENDA <Act No. 8352, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 16 Omitted.
ADDENDA <Act No. 8355, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA <Act No. 8369, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 16 Omitted.
ADDENDA <Act No. 8370, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 20 Omitted.
ADDENDA <Act No. 8371, Apr. 11, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 10 Omitted.
ADDENDA <Act No. 8404, Apr. 27, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 14 Omitted.
ADDENDA <Act No. 8466, May 17, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 5 Omitted.
ADDENDA <Act No. 8733, Dec. 21, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force nine months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 11 Omitted.
ADDENDA <Act No. 8819, Dec. 27, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 9 Omitted.
ADDENDA <Act No. 8820, Dec. 27, 2007>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 9 Omitted.
ADDENDA <Act No. 8852, Feb. 29, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 7 Omitted.
ADDENDA <Act No. 8974, Mar. 21, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 14 Omitted.
ADDENDA <Act No. 8976, Mar. 21, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
Articles 2 through 10 Omitted.
ADDENDA <Act No. 9313, Dec. 31, 2008>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation.
Articles 2 and 3 Omitted.
ADDENDA <Act No. 9401, Jan. 30, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 11 Omitted.
ADDENDA <Act No. 9547, Mar. 25, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force three months after the date of its promulgation:
Provided
, That the amended provisions of
Article 28
shall enters into force on the date of its promulgation and
Article 4
(2) of the Addenda shall enter into force on July 31, 2009, respectively.
Article 2 (Transitional Measures concerning Committees)
Any act done by or in relation to the Deliberation Committee for railroad construction and by or in relation to the Promotion Committee concerning high-speed rail construction under the previous provisions as at the time this Act enters into force shall be deemed acts by or in relation to Committees under this Act corresponding thereto.
Article 3 (Transitional Measures concerning Penal Provisions)
The application of penal provisions for any act performed before this Act enters into force shall be governed by the previous provisions.
Article 4 Omitted.
ADDENDA <Act No. 9763, Jun. 9, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force nine months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 8 Omitted.
ADDENDA <Act No. 9770, Jun. 9, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force on July 1, 2010. (Proviso Omitted.)
Articles 2 through 7 Omitted.
ADDENDA <Act No. 9772, Jun. 9, 2009>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA <Act No. 10266, Apr. 15, 2010>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Article 2 Omitted.
ADDENDA <Act No. 10272, Apr. 15, 2010>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 14 Omitted.
ADDENDA <Act No. 10331, May 31, 2010>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 13 Omitted.
ADDENDA <Act No. 10599, Apr 14, 2011>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 9 Omitted.
ADDENDA <Act No. 11690, Mar. 23, 2013>
Article 1 (Enforcement Date)
(1)
This Act shall enter into force on the date of its promulgation.
(2)
Omitted.
Articles 2 through 7 Omitted.
ADDENDA <Act No. 11752, Apr. 5, 2013>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Article 2 (Applicability concerning Deemed Agreements on Legal Fiction of Authorization, Permission, etc.)
The amended provisions of
Article 11
(3) shall apply to matters on which the Minister of Land, Infrastructure and Transport requests consultations to the head of the relevant administrative agencies after this Act enters into force.
Article 3 (Applicability concerning Compensation for Use of Underground Part of Land)
The amended provisions of
Article 12-2
shall apply where the underground part of another person's land is used with approval for the implementation plan for a railroad construction project after this Act enters into force.
Article 4 (Applicability concerning Duration of Partitioned Surface Right)
The amended provisions of
Article 12-3
(4) shall apply where the partitioned surface right for use of underground part of another person's land is created or transferred with approval for the implementation plan for a railroad construction project after this Act enters into force.
ADDENDA <Act No. 11794, May 22, 2013>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 26 Omitted.
ADDENDA <Act No. 12023, Aug. 6, 2013>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Article 2 (Applicability concerning Special Cases for Promotion, Quality Improvement, etc. of Railroad Construction Projects)
The amended provisions of
Article 18
(2) shall apply to railroad construction projects implemented after this Act enters into force.
ADDENDA <Act No. 12248, Jan. 14, 2014>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 25 Omitted.
ADDENDA <Act No. 12647, May 21, 2014>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Article 2 (Applicability)
The amended provisions of
Article 11
(3) shall apply where any request for consultations is received after this Act enters into force.
ADDENDUM <Act No. 13490, Aug. 11, 2015>
This Act shall enter into force six months after the date of its promulgation.
ADDENDA <Act No. 13797, Jan. 19, 2016>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 11 Omitted.
ADDENDA <Act No. 14532, Jan. 17, 2017>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation:
Provided
, That among the Acts amended pursuant to
Article 6
of the Addenda, the amended parts of the acts which were promulgated before this Act enters into force but the enforcement date of which have not yet arrived shall enter into force on the enforcement dates of the respective Acts.
Articles 2 through 7 Omitted.
ADDENDA <Act No. 15323, Dec. 26, 2017>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 (Applicability to Legal Fiction of Authorization, Permission, etc. under other Acts)
The amended provisions of
Article 11
(1) 25 shall apply, beginning with the first approval of an implementation plan after this Act enters into force.
ADDENDA <Act No. 15460, Mar. 13, 2018>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Article 2 Omitted.
Article 3 (Relationship with other Statutes and Regulations)
Any citation of the former
Railroad Construction Act
, or of any provisions thereof, in any other statutes or regulations as at the time this Act enters into force, shall be deemed a citation of this Act or the corresponding provisions of this Act in lieu of the previous provisions, if such corresponding provisions exist herein.
ADDENDUM <Act No. 16639, Nov. 26, 2019>
This Act shall enter into force one month after the date of its promulgation.
ADDENDA <Act No. 17171, Mar. 31, 2020>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 7 Omitted.
ADDENDA <Act No. 17447, Jun. 9, 2020>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 7 Omitted.
ADDENDUM <Act No. 17453, Jun. 9, 2020>
This Act shall enter into force on the date of its promulgation. (Proviso Omitted.)
ADDENDA <Act No. 17458, Jun. 9, 2020>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Article 2 (Applicability to Report on Results of Precision Diagnoses and Performance Evaluations)
The amended provisions of
Article 33-2
shall begin to apply to precision diagnoses or performance evaluations conducted under
Article 31
or 33 after this Act enters into force.
Article 3 (Applicability to Restriction on Subcontracting)
The amended provisions of
Article 44-2
shall begin to apply to contracts for periodic inspections, emergency inspections, precision diagnosis, or performance evaluations conducted after this Act enters into force.
ADDENDA <Act No. 17460, Jun. 9, 2020>
Article 1 (Enforcement Date)
This Act shall enter into force three months after the date of its promulgation.
Articles 2 through 4 Omitted.
ADDENDA <Act No. 18522, Nov. 30, 2021>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 15 Omitted.
ADDENDUM <Act No. 18787, Jan. 18, 2022>
This Act shall enter into force six months after the date of its promulgation.
ADDENDA <Act No. 19117, Dec. 27, 2022>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 and 3 Omitted.
ADDENDA <Act No. 19430, Jun. 9, 2023>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 22 Omitted.
Last updated : - -