FAIR TRANSACTIONS IN SUBCONTRACTING ACT
30333 · 2014-02-14
FAIR TRANSACTIONS IN SUBCONTRACTING ACT
Act No. 12097, Aug. 13, 2013
Act No. 3779, Dec. 31, 1984
Amended by Act No. 4198, Jan. 13, 1990
Act No. 4419, Dec. 14, 1991
Act No. 4514, Dec. 8, 1992
Act No. 4898, Jan. 5, 1995
Act No. 4860, Jan. 5, 1995
Act No. 5234, Dec. 30, 1996
Act No. 5386, Aug. 28, 1997
Act No. 5454, Dec. 13, 1997
Act No. 5507, Jan. 13, 1998
Act No. 5816, Feb. 5, 1999
Act No. 5756, Feb. 5, 1999
Act No. 6198, Jan. 21, 2000
Act No. 6893, May 29, 2003
Act No. 7107, Jan. 20, 2004
Act No. 7315, Dec. 31, 2004
Act No. 7488, Mar. 31, 2005
Act No. 7864, Mar. 3, 2006
Act No. 8539, Jul. 19, 2007
Act No. 9085, Mar. 28, 2008
Act No. 9616, Apr. 1, 2009
Act No. 9971, Jan. 25, 2010
Act No. 10250, Apr. 12, 2010
Act No. 10303, May 17, 2010
Act No. 10475, Mar. 29, 2011
Act No. 10719, May 24, 2011
Act No. 11461, Jun. 1, 2012
Act No. 11842, May 28, 2013
Act No. 11938, Jul. 16, 2013
Act No. 12097, Aug. 13, 2013
법령보기 화면
Article 1 (Purpose)
The purpose of this Act is to contribute to the sound development of the national economy by establishing fair order in subcontract transactions so that the principal contractor and subcontractor may complement each other and develop balance on equal terms.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 2 (Definitions)
(1)
When the prime contractor entrusts the subcontractor with such tasks as manufacturing (including processing, hereinafter the same shall apply), repair, construction, or services or when the prime contractor, who is entrusted with such tasks (hereinafter referred to as "manufacturing, etc.) by another business operator, re-entrusts the subcontractor with what he/she was entrusted, and the subcontractor manufactures, repairs, constructs, or provides services of what was entrusted (hereinafter referred to as the "subject matter") and delivers, transfers, or provides (hereinafter referred to as "deliver, etc.") the subject matter to the prime contractor and receives a consideration in return (hereinafter referred to as "subcontract consideration"), such acts as supplying, delivering, providing the subject matter or receiving a consideration shall be called "subcontract transactions."
(2)
The term "principal contractor" in this Act means a person falling under any of the following subparagraphs:
<Amended by Act No. 10475, Mar. 29, 2011>
1.
Business operators except for small and medium entrepreneurs (referring to those specified in
Article 2 (1) or (3) of the Framework Act on Small and Medium Enterprises
, including small and medium enterprise cooperatives under the
Small and Medium Enterprise Cooperatives Act
; hereinafter the same shall apply), who entrust small or medium business entrepreneurs with manufacturing, etc.;
2.
Small or medium entrepreneurs whose annual sales in the immediately preceding business year (referring to the sum total of the assessed amount of construction capability for the year concerned in cases of a transaction to which the assessed amount of construction capability applies as prescribed in the related Acts, and referring to the total amount of assets in the absence of annual sales or assessed amount of construction capability; hereafter the same shall apply in this subparagraph), or whose number of regular employees is more than that of other small or medium entrepreneurs who are entrusted with manufacturing, etc., and who entrusts other small or medium entrepreneurs with manufacturing, etc.:
Provided
, That when small or medium entrepreneurs whose annual sales are equal to the amount prescribed by Presidential Decree, they shall be excluded.
(3)
The term "subcontractor" in this Act means a small or medium entrepreneur who is entrusted with manufacturing, etc. by a principal contractor under the subparagraphs of paragraph (2).
(4)
Where a business operator entrusts an affiliate company prescribed in subparagraph 3 of
Article 2 of the Monopoly Regulation and Fair Trade Act
with manufacturing, etc., and the affiliate company re-entrusts a third person with whole or considerable part of manufacturing, repair, construction, or services that have been entrusted, and where the third party falls under paragraph (3) if he/she is deemed to have been entrusted with manufacturing, etc. directly from the business operator who has entrusted an affiliate company even though the affiliate company does not fall under any of the subparagraphs of paragraph (2), the affiliate company and the third person shall be deemed a principal contractor and a subcontractor under this Act, respectively.
(5)
Where a company belonging to an enterprise group subject to the limitations on mutual investment under
Article 9 (1) of the Monopoly Regulation and Fair Trade Act
entrusts or is entrusted with manufacturing, etc., it shall be governed by the following subparagraphs:
1.
Even though the company which entrusts manufacturing, etc. does not fall under any of the subparagraphs of paragraph (2), it shall be deemed a principal contractor under this Act;
2.
Even though the company entrusted with manufacturing, etc., falls under paragraph (3), it shall not be deemed a subcontractor under this Act.
(6)
The term "entrustment with manufacturing" in this Act means that a business operator who engages in a business of the act falling under any of the following subparagraphs entrusts another business operator with the manufacturing of goods from such business. In such cases, the scope of goods resulting from such business shall be determined and announced by the Fair Trade Commission:
1.
Manufacturing of goods;
2.
Sale of goods;
3.
Repair of goods;
4.
Construction.
(7)
Paragraph (6) shall apply to the goods prescribed by Presidential Decree, limited to areas, such as a Special Metropolitan City, Metropolitan City, etc. prescribed by Presidential Decree, notwithstanding paragraph (6).
(8)
The term "entrustment with repair" in this Act means that a business operator entrusts another enterprise with all or part of repair where the business operator engages in a business of repairing goods in compliance with an order or of repairing goods that he/she is using.
(9)
The term "entrustment with construction" in this Act means entrustment, by a business operator falling under any of the following subparagraphs (hereinafter referred to as “constructor”), of all or part of construction work from his/her business to another business operator, or entrustment, by a constructor, of the construction work prescribed by Presidential Decree to another business operator: <Amended by Act No. 10719, May 24, 2011>
1.
Constructors under subparagraph 7 of
Article 2 of the Framework Act on the Construction Industry
;
2.
Constructors under subparagraph 3 of
Article 2 of the Electrical Construction Business Act
;
3.
Information and communications construction business operators under subparagraph 4 of
Article 2 of the Information and Communications Construction Business Act
;
4.
Persons who have obtained a registration of fire-fighting system installation business pursuant to
Article 4 (1) of the Fire-Fighting System Installation Business Act
;
5.
Other business operators prescribed by Presidential Decree.
(10)
The term "person ordering" in this Act means a person who gives a contract for manufacturing, repair, construction or services to a principal contractor:
Provided
, That for re-subcontract, it means a principal contractor.
(11)
The term "service entrustment" in this Act means that a business operator (hereinafter referred to as "service provider") who engages in a business of preparing knowledge and information-related products or of supplying services (hereinafter referred to as "services") entrusts all or part of performance of the services to another service provider.
(12)
The term "knowledge and information-related products" in this Act means those falling under any of the following subparagraphs:
<Amended by Act No. 10250, Apr. 12, 2010>
1.
Information programs (referring to software under subparagraph 1 of
Article 2 of the Software Industry Promotion Act
, and those which are a combination of a series of instructions and commands embedded in a device having information processing capability, such as computer and electronic calculator, in order to obtain specific results);
2.
Results comprised of movies, broadcasting programs and other images, voices or sounds;
3.
Results comprised of a combination of characters, diagrams and signs or of a combination of the foregoing and colors (including drawings under subparagraph 3
Article 2 of the Certified Architects Act
and drawings from among the engineering works under subparagraph 1 of
Article 2 of the Engineering Industry Promotion Act
);
4.
Others corresponding to subparagraphs 1 through 3, determined and announced by the Fair Trade Commission.
(13)
The term "service duties" in this Act means an activity corresponding to any of the following subparagraphs:
<Amended by Act No. 10250, Apr. 12, 2010>
1.
Engineering works (excluding design) under subparagraph 1 of
Article 2 of the Engineering Industry Promotion Act
;
2.
Transporting cargo by making use of trucks or intermediating cargo as prescribed by the
Trucking Transport Business Act
;
3.
Maintaining and managing buildings as prescribed by the
Building Act
;
4.
Preventing danger, etc. to facilities, places, goods, etc. or of preventing harm to the life and body of people and protecting them from danger as prescribed by the
Security Services Industry Act
;
5.
Other activities of providing labor to carry through the business entrusted by a principal contractor, which have been determined and announced by the Fair Trade Commission.
(14)
The term "means of payment in place of a bill" in this Act refers to the means of payment that is used in substitution for a bill when a principal contractor pays subcontract consideration, which falls under any of the following subparagraphs:
1.
Exclusive-use card for business purchases: Credit card or debit card that a credit card company under the
Specialized Credit Finance Business Act
issues to a principal contractor for the payment of subcontract consideration, which is not usable at general credit card merchants, but is issued for the sole purpose of payment of subcontract consideration to the relevant subcontractor according to a contract among the principal contractor, subcontractor and credit card company;
2.
Loan against security of credit sales claims: Where the subcontractor lends money from a financial institution by offering the claims on credit sales to the principal contractor as security in order to receive subcontract consideration, and the principal contractor redeems the loan of the subcontractor from the financial institution with the subcontract consideration, in which case money is lent according to the terms and conditions determined by the Governor of the Bank of Korea;
3.
Purchase loan: Where a principal contractor makes a contract of credit line with a financial institution and lends money therefrom, pays subcontract consideration to the subcontractor by means of information processing system, and redeems the loan to the financial institution on the due date;
4.
Other means of payment used in place of a bill in the payment of subcontract consideration, which are determined and announced by the Fair Trade Commission.
(15)
The term "technical data" in this Act means data on the methods of manufacture, repair, construction, or delivery of services, that are kept confidential with due effort, and other data prescribed by Presidential Decree which is useful for business activities and has independent economic value.
<Newly Inserted by Act No. 9971, Jan. 25, 2010>
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 3 (Issuance and Retention of Documents)
(1)
Any principal contractor entrusting a subcontractor with manufacturing, etc. shall issue the subcontractor with a written document (which shall include electronic documents under subparagraph 1 of
Article 2 of the Framework Act on Electronic Documents and Transactions
; the same shall apply hereafter in this Article) stating the matters specified in paragraph (2) by the respective deadline specified as follows:
<Amended by Act No. 9971, Jan. 25, 2010; Act No. 11461, Jun. 1, 2012>
1.
Where manufacturing is entrusted: Before the subcontractor commences any work for delivery of goods;
2.
Where repair is entrusted: Before the subcontractor commences the contracted repair work;
3.
Where construction is entrusted: Before the subcontractor commences the contracted construction work;
4.
Where services are entrusted: Before the subcontractor performs the contracted services.
(2)
The document in paragraph (1) shall include the details of subcontract, such as subcontract consideration and method of payment thereof, and the matters prescribed by Presidential Decree, such as the conditions, method, procedures, etc. of adjusting the subcontract consideration following price changes in raw materials according to
Article 16-2
(1), and the principal contractor and subcontractor shall affix signature (including certified digital signature under subparagraph 3 of
Article 2 of the Digital Signature Act
; hereafter the same shall apply in this Article) or put name and seal thereon.
<Amended by Act No. 9971, Jan. 25, 2010>
(3)
Notwithstanding paragraph (2), the principal contractor may issue a document without stating relevant details on the matters that are difficult to determine as at the time of entrustment, if justifiable causes exist, such as conducting emergency repair work due to a disaster or accident. In such cases, he/she shall state in the document the reason the relevant details have not been determined and the expected date on which such details are to be determined.
<Newly Inserted by Act No. 9971, Jan. 25, 2010>
(4)
Where the principal contractor issues a document without stating some details pursuant to paragraph (3), he/she shall issue, without delay, a new document stating the relevant details as soon as such details are determined.
<Newly Inserted by Act No. 9971, Jan. 25, 2010>
(5)
Where the principal contractor fails to issue a document stating matters referred to in paragraph (2) (including a document that does not contain some details pursuant to paragraph (3)) in entrusting manufacturing, etc., a subcontractor may request the principal contractor to verify the details of subcontract by notifying, in writing, him/her of the matters prescribed by Presidential Decree such as the details of subcontract, subcontract consideration and other relevant matters.
<Newly Inserted by Act No. 9971, Jan. 25, 2010>
(6)
The principal contractor shall send a written reply expressing whether he/she accepts or denies the details to a subcontractor within 15 days from the date on which he/she is notified thereof pursuant to paragraph (5), and if the principal contractor fails to send his/her reply within the said period, it is presumed that entrustment is made as notified by the subcontractor:
Provided
, That this shall not apply if it is impossible to send such a reply due to a natural disaster or other accidents.
<Newly Inserted by Act No. 9971, Jan. 25, 2010>
(7)
The notification under paragraph (5) and a reply thereto under paragraph (6) shall be signed and sealed respectively by the subcontractor and the principal contractor.
<Newly Inserted by Act No. 9971, Jan. 25, 2010>
(8)
Necessary matters concerning the notification under paragraph (5) and a reply thereto under paragraph (6) shall be prescribed by Presidential Decree.
<Newly Inserted by Act No. 9971, Jan. 25, 2010>
(9)
The principal contractor and the subcontractor shall keep documents concerning subcontract transactions, as prescribed by Presidential Decree.
<Amended by Act No. 9971, Jan. 25, 2010>
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 3-2 (Preparation and Use of Standard Form Subcontract)
The Fair Trade Commission may recommend the preparation and use of standard form subcontract to business operators or business associations to which this Act applies.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 3-3 (Entering into Agreements by Principal Contractors and Subcontractors)
(1)
The Fair Trade Commission may recommend that a principal contractor and a subcontractor enter into an agreement stipulating that they comply with subcontract-related Acts and subordinate statutes and provide each other with mutual support and cooperation.
(2)
To encourage a principal contractor and a subcontractor to fulfill an agreement when they enter into such an agreement pursuant to paragraph (1), the Fair Trade Commission shall establish and implement supporting measures, such as reward, etc.
(3)
The Fair Trade Commission shall stipulate necessary matters for the details of agreements under paragraph (1), procedures for entering into such agreements, evaluation of performance, supporting measures, etc.
[This Article Newly Inserted by Amended by Act No. 10475, Mar. 29, 2011]
법령보기 화면
Article 3-4 (Prohibition against Unfair Special Agreements)
(1)
No principal contractor shall attach terms and conditions that unfairly violate or restrict a subcontractor’s interests to a contract (hereinafter referred to as “unfair special agreement”).
(2)
Any of the following agreements shall be deemed an unfair special agreement:
1.
An agreement under which a principal contractor requires a subcontractor to bear expenses incurred when a principal contractor requires the subcontractor to do works not stated in a document prescribed in
Article 3
(1);
2.
An agreement under which a principal contractor requires a subcontractor to bear expenses incurred in relation to the settlement of civil complaints, industrial accidents, etc.;
3.
An agreement under which a principal contractor requires a subcontractor to bear expenses incurred when a principal contractor requires the subcontractor to perform works not specified in the relevant tender documents;
4.
Agreements specified by Presidential Decree, such as an agreement that restricts a subcontractor’s interests, which shall be protected by this Act, or that shifts an obligation imposed upon a principal contractor to a subcontractor.
[This Article Newly Inserted by Act No. 12097, Aug. 13, 2013]
법령보기 화면
Article 4 (Prohibition against Fixing Unreasonable Subcontract Consideration)
(1)
When a principal contractor entrusts a subcontractor with manufacturing, etc., he/she shall not fix an unreasonable consideration for a subcontract at a price lower than the consideration ordinarily paid for a subject matter identical with or similar to the subject matter of the subcontract (hereinafter referred to as "fixing unreasonable subcontract consideration") or compel the subcontractor to accept such subcontract.
<Amended by Act No. 11842, May 28, 2013>
(2)
Any of the following acts conducted by a principal contractor shall be deemed fixing unreasonable subcontract consideration:
<Amended by Act No. 11842, May 28, 2013>
1.
Fixing subcontract consideration by indiscriminately reducing the unit price without any justifiable reasons;
2.
Fixing subcontract consideration by deducting an amount after allotting unilaterally such amount under some pretext, such as a request for cooperation, etc.;
3.
Fixing subcontract consideration by discriminating against a specific subcontractor without any justifiable reasons;
4.
Fixing subcontract consideration by causing a subcontractor to make an error regarding the terms and conditions of a transaction, such as order quantity, etc., or by deceiving a subcontractor in such a way as to show him/her the quotations of another business operator or false quotations to take advantage of it;
5.
Fixing subcontract consideration unilaterally by a principal contractor at a low price;
6.
Fixing subcontract consideration at a price lower than the total amount of direct construction expenses prescribed by Presidential Decree without any justifiable reasons when a private subcontract is concluded;
7.
Fixing subcontract consideration at a price lower than the lowest tender price without any justifiable reasons in concluding a subcontract by competitive bidding;
8.
Fixing subcontract consideration unfavorable to a subcontractor for a subcontract on continuing transactions on the pretext of an event for which no subcontractor shall be held liable, such as a principal contractor’s deficit in business or the fall of sale prices.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 5 (Prohibition of Compelling Purchase of Goods, etc.)
In entrusting a subcontractor with manufacturing, etc, the principal contractor shall not compel the subcontractor, except with justifiable reasons, such as the maintenance, improvement, etc. of the quality of the subject matter, etc., to purchase or use (including utilization; hereinafter the same shall apply) any goods, equipment, supply of service duties, etc. designated by him/her.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 6 (Payment in Advance)
(1)
Where a principal contractor who has entrusted a subcontractor with manufacturing, etc., receives advance payment from the person ordering, he/she shall pay an advance to the subcontractor within fifteen days after he/she received it (the day on which the principal contractor entrusted manufacturing, etc., if he/she had received it before he/she entrusted manufacturing, etc.) so that he/she may undertake manufacturing, repair or construction or service performance in accordance with the contents and ratio of the advance.
(2)
Where a principal contractor pays an advance received from the person ordering after the deadline under paragraph (1), he/she shall pay interest calculated by the interest rate determined and notified by the Fair Trade Commission in consideration of economic circumstances, such as late-payment interest rates, etc. applied by banks under the
Banking Act
, which is within 40/100 per annum for the period that has passed.
<Amended by Act No. 10303, May 17, 2010>
(3)
Article 13
(6), (7), (9) and (10) shall apply
mutatis mutandis
to bill discount charge, payment of fees, bill discount rate and rate of fees where advance payment is made by bill or means of payment in place of a bill. In such cases, "sixty days from the date when such subject matter, etc. have been received" shall be deemed "fifteen days from the date when the principal contractor received advance payment from the person ordering".
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 7 (Opening Local Letters of Credit)
Where a principal contractor entrusts a subcontractor with manufacturing or services of the goods for export, he/she shall open a local letter of credit in favor of the subcontractor, within fifteen days from the date of the entrustment, unless any justifiable reason exists to the contrary:
Provided
, That where the principal contractor entrusts manufacturing or services before he/she receives an original letter of credit in cases of export by letter of credit, he/she shall open a local letter of credit within fifteen days after he/she received an original letter of credit.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 8 (Prohibition of Unreasonable Cancelation of Entrustment)
(1)
No principal contractor shall perform an act falling under any of the following subparagraphs unless any reason attributable to the subcontractor exists after entrusting the subcontractor with manufacturing, etc.:
Provided
, That where the supply of service duties from among the entrustment with services is entrusted, subparagraph 2 shall not apply:
1.
Arbitrarily cancelling or altering the entrustment with manufacturing, etc.;
2.
Refusing or delaying the receipt or takeover of the delivered, etc. subject matter, etc.
(2)
Where the subject matter, etc. are delivered, etc, the principal contractor shall immediately issue a certificate of receipt to the subcontractor (immediately after the completion of inspection in cases of opening a local letter of credit pursuant to
Article 7
) even before an inspection except for cases of entrustment of supply of service duties:
Provided
, That for entrustment with construction, he/she shall take over the object immediately after the inspection is completed.
(3)
"Receipt" in paragraph (1) 2 means that the principal contractor places the subject matter, etc. under actual control, which have been delivered by the subcontractor:
Provided
, That where it is difficult to move the subject matter, etc., the time when the inspection commences shall be deemed the time of receipt.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 9 (Criteria, Method and Time of Inspection)
(1)
The criteria and method of inspection of the subject matter, etc. delivered by the subcontractor shall be determined objectively, impartially and reasonably by mutual agreement between the principal contractor and the subcontractor.
(2)
Unless any justifiable reason exists to the contrary, the principal contractor shall notify the subcontractor of the result of inspection into the subject matter, etc. in writing within ten days from the date when he/she received such subject matter, etc. (in cases of entrustment with manufacturing, it includes the date when the portion of manufacturing works performed was notified, and in cases of entrustment with construction, it refers to the date when the subcontractor notified the completion of construction works, or the portion of construction works completed). In the absence of such notification within the prescribed period, the subject matter, etc. shall be deemed to have passed the inspection:
Provided
, That where the supply of service duties from among entrustment of services is entrusted, the same shall not apply.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 10 (Prohibition of Unreasonable Return of Goods)
(1)
When a principal contractor has is supplied, etc. with the subject matter, etc. from a subcontractor, he/she shall not return them to the subcontractor, unless any reason attributable to the subcontractor exists (hereinafter referred to as "unreasonable return"):
Provided
, That where the supply of service duties from among entrustment of services is entrusted, the same shall not apply.
(2)
The acts of the principal contractor which fall under any of the following subparagraphs shall be deemed unreasonable return:
1.
Returning the subject matter, etc. by reason of cancellation of order from the other party to the transaction, or any change in economic circumstances, etc.;
2.
Returning the subject matter, etc. by vaguely determining the criteria and method of inspection, and thereby judging unjustly that the subject matter, etc. failed to pass inspection;
3.
Returning the subject matter, etc. although they have been judged to have failed to pass inspection due to the inferior quality of the raw materials supplied by the principal contractor;
4.
Returning the subject matter, etc. by reason of delay in the supply, although it is caused by delay in the supply of raw materials by the principal contractor.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 11 (Prohibition against Reduction)
(1)
No principal contractor shall reduce the subcontract consideration fixed at the time of the entrustment of manufacturing, etc.:
Provided
, That a principal contract may reduce the subcontract consideration if he/she proves any justifiable cause to do so.
<Amended by Act No. 10475, Mar. 29, 2011>
(2)
Any of the following acts conducted by a principal contractor shall not be deemed an act with a justifiable ground:
<Amended by Act No. 10475, Mar. 29, 2011; Act No. 11842, May 28, 2013>
1.
Reducing subcontract consideration by citing unreasonable grounds, such as requests for cooperation, cancellation of an order by the other party to the transaction, change in economic circumstances, etc., after giving entrustment, in which the conditions, etc. for reduction in the subcontract consideration have not been specified at the time of giving entrustment;
2.
Reducing subcontract consideration by applying the terms and conditions of a new agreement retroactively even to a portion already entrusted before an agreement, where the agreement is concluded with a subcontractor with regard to reduction of a unit price;
3.
Reducing subcontract consideration excessively on the pretext that subcontract consideration is paid in cash or earlier than the due date for payment;
4.
Reducing subcontract consideration by reason of a fault on the part of a subcontractor, which does not cause any substantial loss to a principal contractor;
5.
Deducting an amount not less than the proper purchase price or proper rent from the subcontract consideration, where a principal contractor has had a subcontractor purchase from him/her the goods, etc. necessary for the manufacturing, repair, construction or service performance of the subject matter, etc. or use his/her equipment, etc.;
6.
Reducing subcontract consideration on the grounds that the price of commodities or the price of materials, etc. at the time of payment of subcontract consideration has fallen compared with the price at the time of supply, etc.;
7.
Reducing subcontract consideration unfairly for unreasonable reasons, such as loss from operations or reduced sale price, etc.;
8.
Imposing on a subcontractor employment insurance premium, industrial safety and health management expenses, other expenses, etc., which should be borne by a principal contractor under the
Act on the Collection of Insurance Premiums, etc. for Employment Insurance and Industrial Accident Compensation Insurance
, the
Occupational Safety and Health Act
, etc;
9.
Other acts prescribed by Presidential Decree as equivalent to those referred to in subparagraphs 1 through 8.
(3)
Where a principal contactor reduces the subcontract consideration pursuant to the proviso to paragraph (1), he/she shall, in advance, provide the relevant subcontractor with a document stating matters prescribed by Presidential Decree such as the reasons and standards for reduction and other details.
<Newly Inserted by Act No. 10475, Mar. 29, 2011>
(4)
Where a principal contractor pays a reduced price without any justifiable cause after the elapse of at least sixty days from the receipt of subject matter, etc., a principal contractor shall pay interest accrued for the period beyond sixty days in accordance with the interest rate fixed and announced by the Fair Trade Commission by taking into account economic circumstances, such as late-payment interest rates, etc. applied by banks under the
Banking Act
within the limit of 40/100 per annum.
<Amended by Act No. 10303, May 17, 2010; Act No. 10475, Mar. 29, 2011>
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 12 (Prohibition of Unfair Requests for Settlement of Purchase Price, etc.)
Where a principal contractor has had a subcontractor purchase goods, etc. necessary for the manufacturing, repair, construction, or service performance of subject matter, etc. from himself/herself, or use his/her equipment, etc., he/she shall not conduct an act falling under any of the following subparagraphs without justifiable grounds:
1.
Having the subcontractor pay all or part of the purchase price or rent prior to the date of payment of subcontract consideration of the relevant subject matter, etc.;
2.
Having the subcontractor pay the purchase price or rent on condition that is remarkably unfavorable compared with that on which the principal contractor purchases or uses the goods, etc., or supplies the goods, etc. to a third party.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 12-2 (Prohibition of Unfair Requests for Economic Profits)
No principal contractor shall compel a subcontractor to provide money, goods, services or other economic profits to himself/herself or third parties without justifiable grounds.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 12-3 (Prohibition, etc. of Request to Provide Technical Data)
(1)
No principal contractor shall request a subcontractor to provide him/her or any third person with the subcontractor's technical data:
Provided
, That a principal contractor may make such a request if he/she proves any justifiable cause to do so.
<Amended by Act No. 10475, Mar. 29, 2011>
(2)
Where a principal contractor requests any technical data to a subcontractor pursuant to the proviso to paragraph (1), he/she shall consult, in advance, with the relevant subcontractor about matters prescribed by Presidential Decree, such as the purpose of request, confidentiality provisions, reversion of rights, a cost, etc., and provide the relevant subcontractor with a document stating the details thereof.
<Newly Inserted by Act No. 10475, Mar. 29, 2011>
(3)
No principal contractor shall abuse the acquired technical data for himself/herself or any third person.
<Amended by Act No. 10475, Mar. 29, 2011>
[This Article Newly Inserted by Act No. 9971, Jan. 25, 2010]
법령보기 화면
Article 13 (Payment, etc. of Subcontract Consideration)
(1)
Where a principal contractor entrusts a subcontractor with manufacturing, etc., he/she shall pay the subcontract consideration by not later than the earliest date for payment fixed within the extent of 60 days from the date of receipt of subject matter, etc. (in cases of entrustment with construction, it refers to the date of taking over the subject matter, etc.; in cases of entrustment of services, the date when the subcontractor has completed the performance of the services entrusted; and if the principal contractor and subcontractor agree to issue tax invoices on one or more occasions a month on certain days because of frequent delivery of goods, etc., it refers to such days; hereinafter the same shall apply):
Provided
, That this shall not apply to any of the following cases:
1.
Where it is deemed that the principal contractor and subcontractor have fixed the date for payment on equal terms;
2.
Where the date for payment is deemed reasonable in light of the characteristics of the business and economic conditions.
(2)
Where the date for payment of subcontract consideration is not fixed, the date of receipt of subject matter, etc. shall be deemed the date for payment of the subcontract consideration, and where the date for payment is fixed past sixty days from the date of receipt of the subject matter, etc. (excluding cases falling under the proviso to paragraph (1)), the sixtieth day from the date of receipt of the subject matter, etc. shall be deemed the date for payment of the subcontract consideration, respectively.
(3)
Where a principal contractor has entrusted a subcontractor with manufacturing, etc., he/she shall pay the subcontractor the subcontract consideration within 15 days from the date when the work progress payment or amount completed, etc. was received (the date for payment, where the date for payment of the subcontract consideration arrives before then) when the principal contractor has received work progress payment, etc. following the completion of manufacturing, repair, construction or service performance from the person ordering, and he/she shall pay the subcontractor an amount corresponding to the portion of manufacturing, repair, construction or service performance that has been performed within 15 days from the date when the work progress payment or money corresponding to the completed portion of work, etc. was received (the date for payment, where the date for payment of the subcontract consideration arrives before then) when the principal contractor has received the completed portion, etc. according to the progress of manufacturing, repair, construction or service performance from the person ordering.
(4)
When a principal contractor pays the subcontract consideration to a subcontractor, he/she shall not pay less than the proportion of cash which he/she received from the person ordering in connection with the entrustment of the manufacturing, etc. concerned.
(5)
Where a principal contractor pays the subcontract consideration by a bill, he/she shall not draw a bill, the period of payment of which exceeds the period of payment (issuance date to due date) of the bill that the principal contractor has received from the person ordering in connection with the entrustment of the manufacturing, etc. concerned.
(6)
Where a principal contractor pays the subcontract consideration by a bill, the bill shall be one which can be discounted at any financial institution established by law and the discount commission for the period from the date of delivery and to the due date of the bill shall be paid to the subcontractor on the day on which the bill is delivered:
Provided
, That where the bill is delivered within sixty days after the subject matter, etc. are received (referring to the date for payment where the date for payment is fixed under the proviso to paragraph (1), and to the date referred to in paragraph (3) where work progress payment or money corresponding to the completed portion of work, etc. are received from the person ordering; hereafter the same shall apply in this Article), the discount commission for the period from the date on which sixty days pass after the date when the subject matter, etc. are received to the due date of the bill shall be paid to the subcontractor within sixty days from the date when the subject matter, etc. are received.
(7)
Where a principal contractor pays the subcontract consideration by means of payment in place of a bill, he/she shall pay commission (including interest for loan; hereinafter the same shall apply) on the date for payment for the period from the date for payment (referring to the date of approval of card settlement in cases of exclusive-use card for business purchases, to the date of transmission of details of delivery, etc. of goods in cases of loan against of security of credit card sales claims, and to the date of settlement of purchase funds in cases of purchase loans; hereinafter the same shall apply) to the date of repayment of the subcontract consideration to the subcontractor:
Provided
, That where it is paid by means of payment in place of a bill within sixty days from the date of receipt of subject matter, etc., commission for the period from the day on which sixty days pass from the date of receipt of subject matter, etc. to the due date of the bill shall be paid to the subcontractor within sixty days from the date of receipt of subject matter, etc.
(8)
Where a principal contractor pays the subcontract consideration after sixty days pass from the date of receipt of subject matter, etc., he/she shall pay interest calculated by the interest rate fixed within the limit of 40/100 per annum and announced by the Fair Trade Commission for the days elapsed in consideration of economic circumstances, such as late-payment interest rates, etc. applied by banks under the
Banking Act
.
<Amended by Act No. 10303, May 17, 2010>
(9)
The discount rate applied in paragraph (6) shall be fixed within the limit of 40/100 per annum and announced by the Fair Trade Commission in consideration of the discount rate for commercial bills applied by financial institutions established by law.
(10)
The commission rate applied in paragraph (6) shall be fixed within the limit of 40/100 per annum and announced by the Fair Trade Commission in consideration of the commission rate for the means of payment in place of a bill or interest rate for loan, etc. applied by financial institutions established by law.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 13-2 (Performance of Construction Subcontracts and Guarantees for Payment of Consideration)
(1)
In cases of entrustment with construction, a principal contractor shall provide a guarantee for payment of the consideration of construction in accordance with the following classifications, while a subcontractor shall provide a performance bond equivalent to 10% of the contract value:
Provided
, That where it is deemed that no guarantee is necessary or is inappropriate in consideration of the financial status of a principal contractor or the scale, etc. of construction, which is prescribed by Presidential Decree, this shall not apply:
1.
Where the period of construction is four months or less: Amount calculated by subtracting advance payments from a contract price;
2.
Where the period of construction exceeds four months, and the interval of payments for the completed portion of work does not exceed two months: Amount calculated according to the following formula:
Amount of Guarantee =
Subcontract Price - Agreed Advance Payments
×4
Period of Construction (Months)
3.
Where the period of construction exceeds four months, and the interval of payments for the completed portion of work exceeds two months: Amount calculated according to the following formula:
Amount of Guarantee
=
Subcontract Price-Agreed Advance Payments
×
Interval of Payments for the Completed Portion of Work (Months)
×
2
Period of Construction (Months)
(2)
The guarantee between a principal contractor and a subcontractor under paragraph (1) shall be paid in cash (including by any bank check issued by offices of postal services or banks under the
Banking Act
) or by the delivery of a guarantee certificate issued by any of the following institutions:
<Amended by Act No. 10303, May 17, 2010>
1.
Every mutual-aid association under the
Framework Act on the Construction Industry
;
2.
Insurance companies under the
Insurance Business Act
;
3.
The Korea Credit Guarantee Fund under the
Credit Guarantee Fund Act
;
4.
Financial institutions under the
Banking Act
;
5.
Other guarantee institutions prescribed by Presidential Decree.
(3)
If a subcontractor files a claim with an institution referred to in paragraph (2) for the payment guaranteed pursuant to paragraph (1), along with documents required in the terms and conditions of the relevant guarantee, the institution shall pay it to the subcontractor within 30 days:
Provided
, That if there is a difference in opinions on whether the requirements for the payment guaranteed are satisfied or there is any other event or cause beyond control specified by Presidential Decree, the guarantor shall notify the subcontractor thereof and may defer the payment guaranteed for a period specified by Presidential Decree:
<Newly Inserted by Act No. 12097, Aug. 13, 2013>
1.
If a principal contractor is unable to pay the subcontract consideration due to the suspension of transactions of checking accounts or the suspension of banking transactions;
2.
If a principal contractor is unable to pay the subcontract consideration due to his/her default on checks, bankruptcy, permanent business closure, a petition filed for the commencement of proceedings for corporate rehabilitation, or any other similar event;
3.
If a principal contractor is unable to pay the subcontract consideration because he/she has his/her license, registration, or such for the relevant business revoked and cancelled or has his/her business operations suspended;
4.
If a principal contractor has failed to pay the subcontract consideration payable under
Article 13
to a subcontractor twice or more;
5.
If a principal contractor is unable to pay the subcontract consideration due to a cause or event specified by Presidential Decree as similar to incapability of payment referred to in subparagraph 1 through 4.
(4)
Where a principal contractor delivers guarantee certificates in accordance with paragraph (2), the principal contractor may combine the guarantees for payment of all the construction works entrusted during the period of construction or the guarantees for payment for all the construction works entrusted in one fiscal year into one guarantee certificate for delivery.
<Amended by Act No. 12097, Aug. 13, 2013>
(5)
In addition to matters prescribed in paragraphs (1) through (3), matters necessary for performance bonds for subcontracting and payment guarantees for subcontract consideration shall be prescribed by Presidential Decree.
<Amended by Act No. 12097, Aug. 13, 2013>
(6)
Where a principal contractor fails to guarantee the payment of the construction price under the main sentence of paragraph (1), a subcontractor needs not guarantee the performance of the relevant contract.
<Amended by Act No. 12097, Aug. 13, 2013>
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 14 (Direct Payment of Subcontract Consideration)
(1)
Where a ground falling under any of the following subparagraphs occurs, the person ordering shall pay the subcontract consideration corresponding to the completed portion of manufacturing, repair, construction, or service performance directly to the subcontractor:
1.
When the subcontractor has requested direct payment of the subcontract consideration where payment has been suspended, the principal contractor is bankrupt, or other similar reasons exist, or where the principal contractor has become unable to pay the subcontract consideration as permission, authorization, license, registration, etc. relating to the business have been revoked;
2.
When agreement has been made among the person ordering, principal contractor and subcontractor that the person ordering shall pay the subcontract consideration directly to the subcontractor;
3.
When the subcontractor has requested direct payment of the subcontract consideration where the principal contractor has failed to pay to the relevant subcontractor two or more installments of the subcontract consideration to be paid by the principal contractor as prescribed in
Article 13
(1) or (3);
4.
When the subcontractor has requested direct payment of the subcontract consideration where the principal contractor has failed to perform his/her obligation to guarantee the payment of subcontract consideration as prescribed in
Article 13-2
(1).
(2)
Where a ground prescribed in paragraph (1) occurs, the obligation of the person ordering to pay consideration to the principal contractor and the obligation of the principal contractor to pay the subcontract consideration to the subcontract shall be deemed to have extinguished within such limit.
(3)
Where a principal contractor requires suspension of direct payment of the relevant subcontract consideration with documents evidencing the fact that the subcontractor delays paying wages, price of materials, etc. in connection with the relevant subcontract, the person ordering need not pay the subcontract consideration directly notwithstanding paragraph (1).
(4)
When the person ordering pays the subcontract consideration directly to the relevant subcontractor as prescribed in paragraph (1), he/she shall pay it minus the subcontract consideration that has already been paid by the person ordering to the principal contractor.
(5)
Where confirmation, etc. of a completed portion are necessary for the subcontractor to receive the subcontract consideration directly from the person ordering as prescribed in paragraph (1), the principal contractor shall take necessary measures without delay.
(6)
Matters necessary for the methods, procedures, etc. for payment where the subcontract consideration is paid directly as prescribed in paragraph (1) shall be prescribed by Presidential Decree.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 15 (Payment of Refund of Customs Duties)
(1)
Where a principal contractor entrusts a subcontractor with manufacturing or services for goods to be exported and where he/she has customs duties, etc. refunded under the
Act on Special Cases concerning the Refund of Customs Duties, etc. Levied on Raw Materials for Export
, he/she shall pay the refund to the subcontractor in accordance with terms of the refund received within fifteen days after he/she received it.
(2)
Notwithstanding paragraph (1), the refundable amount of customs duties, etc. shall be paid to the subcontractor within sixty days from the date of receipt of subject matter, etc., unless any fault attributable to the subcontractor exists.
(3)
Where a principal contractor pays the refundable amount of customs duties, etc. after the due date prescribed in paragraphs (1) and (2), he/she shall pay interest for such days overdue, calculated according to the interest rate fixed within the limit of 40/100 per annum in consideration of economic circumstances, such as late-payment interest rates, etc. applied by banks under the
Banking Act
and announced by the Fair Trade Commission.
<Amended by Act No. 10303, May 17, 2010>
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 16 (Adjustment of Subcontract Consideration due to Change in Design, etc.)
(1)
Where a principal contractor falls under both of the following cases after entrusting manufacturing, etc., he/she shall increase subcontract considerations in accordance with the contents and rate of the increase in the contract value he/she has received from the person ordering:
Provided
, That the principal contractor may decrease the subcontract considerations if the person ordering has decreased the contract value, in accordance with the contents and rate of the decrease:
<Amended by Act No. 9971, Jan. 25, 2010>
1.
Where the contract value is increased due to any change in design or economic situation or other reasons;
2.
Where additional costs are incurred in completing or finishing subject matter, etc. for the reasons referred to in subparagraph 1.
(2)
Where subcontract considerations are increased or decreased pursuant to paragraph (2), the principal contractor shall notify the relevant subcontractor of the reasons for and details on such increase or decrease within 15 days from the date on which he/she receives an increase or decrease of the contract value from the person ordering:
Provided
, That this shall not apply where the person ordering directly notifies the relevant subcontractor of such reasons and details.
<Newly Inserted by Act No. 9971, Jan. 25, 2010>
(3)
An increase or decrease in the contract value under paragraph (1) shall be made within thirty days after the person ordering has increased or decreased such consideration.
<Amended by Act No. 9971, Jan. 25, 2010>
(4)
If additional subcontract consideration is paid after 15 days from the date on which the principal contractor receives additional money from the person ordering in accordance with the increase in the contract value under paragraph (1),
Article 13
(8) shall apply
mutatis mutandis
to the interest, and if additional subcontract consideration is paid with a bill or means of payment in place of a bill,
Article 13
(6), (7), (9) and (10) shall apply
mutatis mutandis
to the bill discount commission, payment of commission, discount rate for bill and commission rate. In such cases, "sixty days from the date when such subject matter, etc. have been received" shall be deemed "fifteen days from the date when the additional money has been received".
<Amended by Act No. 9971, Jan. 25, 2010>
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 16-2 (Adjustment of Subcontract Consideration due to Fluctuations in Prices of Raw Materials)
(1)
Where adjustment of subcontract consideration is inevitable because the price of raw materials necessary for the manufacturing, etc. of subject matter, etc. has changed after a subcontractor is entrusted with manufacturing, etc., the subcontractor may request the principal contractor to adjust subcontract consideration.
(2)
Where it is inevitable for a small and medium enterprise cooperative defined under
Article 3 (1) 1 or 2 of the Small and Medium Enterprise Cooperatives Act
(hereinafter referred to as "cooperative") to adjust subcontract consideration to be paid to any of its members as a subcontractor due to sharp fluctuations in the price of raw materials, the cooperative may negotiate with a principal contractor specified by Presidential Decree on the adjustment of the subcontract consideration upon receipt of an application therefor from the subcontractor:
Provided
, That the foregoing shall not apply where both the principal contractor and the subcontractor are members of one and the same cooperative.
<Amended by Act No. 11842, May 28, 2013>
(3)
Upon receipt of an application under the main sentence of paragraph (2), a cooperative shall request a principal contractor to adjust the subcontract consideration within seven days from the filing date of the application.
<Amended by Act No. 11842, May 28, 2013>
(4)
If a subcontractor who has made a request for the adjustment of subcontract consideration pursuant to paragraph (1) files an application for negotiations under paragraph (2), the request made under paragraph (1) shall be deemed suspended, and if the negotiations for adjustment under paragraph (1) or (3) are completed, neither subcontractor nor cooperative may request negotiations for adjustment under any provision of paragraphs (1) through (3) on the basis of the same cause, unless there is a fundamental change of circumstances.
<Amended by Act No. 11842, May 28, 2013>
(5)
Upon receipt of an application under paragraph (2), no cooperative shall resolve to discontinue the supply of goods, place any unreasonable restriction on competitions, or unfairly restrict the relevant business operator’s scope of business or business activities.
<Amended by Act No. 11842, May 28, 2013>
(6)
Matters necessary for events beyond control referred to in the main sentence of paragraph (2) and the requirements, procedures, and methods for filing an application by a subcontractor and for exercising a cooperative’s power to negotiate shall be prescribed by Presidential Decree.
<Newly Inserted by Act No. 11842, May 28, 2013>
(7)
A principal contractor shall commence negotiations for the adjustment of subcontract consideration with a subcontractor or cooperative who has made a request for adjustment or the competent cooperative within ten days from the date of a request under paragraph (1) or (3) and shall not reject or neglect consultations without any justifiable ground.
<Newly Inserted by Act No. 11842, May 28, 2013>
(8)
A principal contractor or subcontractor (including a cooperative in the case of negotiations for adjustment under paragraph (3); hereafter the same shall apply in this Article) may file an application for mediation with the Subcontract Dispute Mediation Council under
Article 24
in any of the following cases:
Provided
, That no cooperative under paragraph (3) shall file an application for adjustment with the Subcontract Dispute Mediation Council established in the Korea Federation of Small and Medium Business under the
Small and Medium Enterprise Cooperatives Act
:
<Newly Inserted by Act No. 11842, May 28, 2013>
1.
Where a principal contractor fails to commence negotiations for the adjustment of subcontract consideration even after the lapse of ten days from the date when a request under paragraph (1) or (3) is made;
2.
Where parties fail to reach an agreement on the adjustment of subcontract considerations within 30 days from the date when a request under paragraph (1) or (3) is made;
3.
Where either the principal contractor or the subcontractor manifests his/her intention to discontinue negotiations after negotiations are commenced in response to a request made pursuant to paragraph (1) or (3) or where parties are obviously anticipated to fail to reach an agreement due to a cause specified by Presidential Decree.
[This Article Newly Inserted by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 17 (Prohibition against Unreasonable Payment in Kind)
(1)
No principal contractor shall pay the subcontract consideration in kind, contrary to the intention of a subcontractor.
<Amended by Act No. 12097, Aug. 13, 2013>
(2)
A principal contractor shall present to a subcontractor documents with which the subcontractor can verify rights and obligations on the goods to be delivered for payment in kind, such as ownership and whether offered as security, before making payment in kind as referred to in paragraph (1).
<Newly Inserted by Act No. 12097, Aug. 13, 2013>
(3)
Documents that shall be presented for each type of goods, the method and procedure for the presentation of documents, and other necessary matters shall be prescribed by Presidential Decree.
<Newly Inserted by Act No. 12097, Aug. 13, 2013>
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 18 (Prohibition of Unreasonable Intervention in Management)
No principal contractor shall intervene in the management of the subcontractor by means of regulating the volume of subcontract transactions.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 19 (Prohibition against Retaliatory Measures)
No principal contractor shall limit a subcontractor’s opportunities to receive an order, suspend transactions with a subcontractor, or unfavorably treat a subcontractor on the pretext that the subcontractor or the competent cooperative conducted any of the following acts:
<Amended by Act No. 10475, Mar. 29, 2011; Act No. 11842, May 28, 2013>
1.
Reporting to the competent authority, etc. that a principal contractor has violated this Act;
2.
Requesting a principal contractor under
Article 16-2
(1) or (2) for mediation of subcontract consideration or applying for mediation to the Subcontract Dispute Mediation Council under paragraph (8) of the same Article.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 20 (Prohibition of Evasion of this Act)
No principal contractor shall perform any act to evade the actual application of this Act relating to a subcontract transaction.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 21 (Matters to be Observed by Subcontractors)
(1)
Where a subcontractor has been entrusted with manufacturing, etc. by a principal contractor, the subcontractor shall fulfill the details of the entrustment in good faith.
(2)
No subcontractor shall cooperate with the principal contractor in any offense against this Act.
(3)
A subcontractor shall, upon making a report as prescribed by this Act, present documentary evidence, etc. to the Fair Trade Commission without delay.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 22 (Reporting, etc. on Violations)
(1)
When a violation of this Act is deemed to have occurred, anyone may report it to the Fair Trade Commission.
(2)
When a report has been made under paragraph (1), or a violation of this Act is deemed to have occurred, the Fair Trade Commission may make a necessary investigation.
(3)
When the Fair Trade Commission has notified a principal contractor of a violation reported by a subcontractor, peremptory notice under
Article 174 of the Civil Act
shall be deemed to have been given:
Provided
, That where the reported case is rejected, dismissed or withdrawn, this shall not apply.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 22-2 (Documentary Fact-Finding Investigations on Subcontract Transactions)
(1)
The Fair Trade Commission shall conduct a documentary fact-finding investigation on any subcontract transaction and announce the results thereof to establish fair order in subcontract transactions.
<Amended by Act No. 10475, Mar. 29, 2011>
(2)
Where the Fair Trade Commission intends to conduct the documentary fact-finding investigation pursuant to paragraph (1), it shall prepare a plan covering the scope of persons to be investigated, the period and details of, and methods and procedures for investigations, the scope of announcement on investigation results, and other relevant matters, and may request the persons to be investigated to present necessary materials for the investigation, such as a document on the current status of subcontract transactions.
<Amended by Act No. 10475, Mar. 29, 2011>
(3)
Where the Fair Trade Commission requests the presentation of materials pursuant to paragraph (2), it shall notify, in writing, the person to be investigated of the scope of and details on such materials, the reason for request, the deadline for presentation, and other relevant matters.
[This Article Newly Inserted by Act No. 9971, Jan. 25, 2010]
법령보기 화면
Article 23 (Limitation on Transactions subject to Investigation)
(1)
Subcontract transactions subject to the investigation by the Fair Trade Commission as prescribed in
Article 22
(2) shall be limited to those for which three years have not passed from the date on which the transaction was completed:
Provided
, That where a subcontract transaction is reported within three years from the date on which the transaction was completed, an investigation may be made even after three years have passed from the date on which the transaction was completed.
<Amended by Act No. 9971, Jan. 25, 2010>
(2)
"Date on which the transaction was completed" in paragraph (1) means; the date on which a subcontractor delivers and hands over the subject matter, etc. to a principal contractor in cases where the preparation of knowledge and information-related products is entrusted among manufacturing, repair and service entrustment; the date on which a subcontractor completes the supply of the entrusted service duties to a principal contractor in cases where the supply of service duties is entrusted among service entrustment; and the date on which the construction work is completed in cases where construction is entrusted to a subcontractor by a principal contractor:
Provided
, That if a subcontract is revoked before completion or a subcontract transaction is suspended, it means the date of the revocation or suspension.
<Newly Inserted by Act No. 9971, Jan. 25, 2010>
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 24 (Establishment and Composition of Subcontract Dispute Mediation Council)
(1)
The Korea Fair Trade Mediation Agency under
Article 48-2 of the Monopoly Regulation and Fair Trade Act
(hereinafter referred to as the "Mediation Agency") and every business association designated by Presidential Decree shall establish a Subcontract Dispute Mediation Council (hereinafter referred to as the "Council").
<Amended by Act No. 10475, Mar. 29, 2011>
(2)
The Council shall be comprised of not more than nine members, including one Chairperson, and members representing the public interest, members representing the principal contractor and members representing the subcontractor, with the number of members for each representation being equal.
(3)
The Chairperson shall be selected by the Council from among the members representing the public interest and shall represent the relevant Council.
(4)
The term of office of the Chairperson shall be two years.
(5)
Members of the Council established under the Mediation Agency shall be appointed by the Chairman of the Fair Trade Commission from among the persons recommenced by the President of the Mediation Agency and the following persons:
<Newly Inserted by Act No. 10475, Mar. 29, 2011>
1.
A person who majored in jurisprudence, economics or business administration in college or university, and holds or has ever held the position of associate professor or a higher position, or any position equivalent thereto in any university, college or accredited research institute under subparagraph 1, 2 or 5 of
Article 2 of the Higher Education Act
;
2.
A person who holds or has ever held the position of judge or prosecutor, or a person who is qualified as an attorney;
3.
A person who has experience in monopoly regulation and fair trade affairs, and holds or has ever held the position of Grade Ⅳ or higher public official (including any public official in general service of the Senior Civil Service).
(6)
Members of the Council established under any business association shall be appointed by the head of each business association that has established the Council, and a report shall be filed prior to the appointment with the Fair Trade Commission:
Provided
, That where business associations jointly establish the Council, members shall be jointly appointed by the relevant business associations.
<Amended by Act No. 10475, Mar. 29, 2011>
(7)
The members representing the public interest shall be appointed from among those who have much knowledge and experience in subcontract transactions, but a person who runs a business that belongs to the category of businesses of subcontract transactions that are covered by the Council or who is an executive or employee of such a business may not become the member representing the public interest.
<Amended by Act No. 10475, Mar. 29, 2011>
(8)
If a person appointed as a member representing the public interest becomes a person who runs a business that belongs to the category of businesses of subcontract transactions that are covered by the Council or becomes an executive or employee of such a business, the Chairperson of the Fair Trade Commission or the head of the business association that has established the Council shall immediately dismiss him/her.
<Amended by Act No. 10475, Mar. 29, 2011>
[This Article Wholly Amended by Act No. 9971, Jan. 25, 2010]
법령보기 화면
Article 24-2 (Exclusion, Challenge and Abstention of Members)
(1)
Members are excluded from mediating a case in any of the following cases:
1.
Where a member, or a person who is or was his/her spouse becomes a disputing party or is a joint title holder or co-obligor of the case;
2.
Where a member has or had kinship with a disputing party;
3.
Where a member or a corporation to which the member belongs acts as a consultant or an advisor to a disputing party for legal affairs, business administration, etc.;
4.
Where a member or a corporation to which the member is or was involved in the case as an agent of a party, or has given a testimony or appraisal in connection with the case.
(2)
When a member's circumstances make it difficult to be fair in the mediation, a disputing party may file with the Council an application to challenge the member.
(3)
Where a member falls under any of the cases referred to in paragraph (1) or (2), he/she may voluntarily abstain from the mediation of the relevant case.
[This Article Newly Inserted by Act No. 9971, Jan. 25, 2010]
법령보기 화면
Article 24-3 (Meetings of Council)
(1)
The Chairperson shall convene and preside over the meetings of the Council.
(2)
A majority of the incumbent members shall be present to begin a meeting and the affirmative vote by a majority of those present shall be necessary to pass a resolution.
(3)
Where the Chairperson is unable to perform his/her duties for any inevitable reason, the member appointed by the Chairperson among members representing the public interest shall act for him/her.
[This Article Newly Inserted by Act No. 9971, Jan. 25, 2010]
법령보기 화면
Article 24-4 (Mediation, etc. of Disputes)
(1)
At the request of the Fair Trade Commission or any of the following parties to a dispute, the Council shall examine facts relevant to the dispute between a principal contractor and a subcontractor over a subcontracting transaction or shall mediate in the dispute:
Provided
, That where at least two Councils have been requested respectively by parties to a dispute to mediate in the dispute, the Council to which the subcontractor or the cooperative under subparagraph 3 requested for mediation in the dispute shall have jurisdiction over the dispute:
<Amended by Act No. 10475, Mar. 29, 2011; Act No. 11842, May 28, 2013>
1.
The principal contractor;
2.
The subcontractor;
3.
The cooperative under
Article 16-2
(8).
(2)
Where the Council receives a request for mediation of any dispute from any disputing party, it shall report the details of such request to the Fair Trade Commission without delay.
(3)
When a dispute is mediated, the Council shall prepare a written record of mediation signed or sealed by members who have participated in the mediation and disputing parties, and then report the outcomes of the mediation along with a copy of the written record to the Fair Trade Mediation.
(4)
When the Council fails to mediate a dispute within 60 days from the date on which it is requested to do so, it shall provide details to the Fair Trade Commission along with related documents.
(5)
If necessary for mediation, the Council may conduct an investigation, request disputing parties to submit materials, or summon requesting parties as long as it is necessary for verifying the facts of the relevant dispute, and the disputing parties may state their opinions or submit materials at a meeting of the Council.
(6)
When the Council receives a report pursuant to paragraph (2), it shall not recommend or order the principal contractor who is a party to the dispute to take a corrective measure referred to in
Article 25
(1):
Provided
, That this shall not apply to cases that the Fair Trade Commission is investigating pursuant to
Article 22
(2).
[This Article Newly Inserted by Act No. 9971, Jan. 25, 2010]
법령보기 화면
Article 24-5 (Preparation of Written Record of Mediation and Validity thereof)
(1)
When a case is mediated, the Council shall prepare a written record of the mediation signed or sealed by the members who have participated and the disputing parties. In such cases, it shall be deemed that the disputing parties have agreed as described in the written record.
(2)
If the disputing parties have voluntarily settled their dispute and requests for the preparation of the written record of mediation before the mediation process begins, the Council may prepare the written record of mediation.
[This Article Newly Inserted by Act No. 9971, Jan. 25, 2010]
법령보기 화면
Article 24-6 (Operational Rules of Council)
If not provided for in this Act, matters necessary for the operation and organization of the Council shall be determined by the Council subject to the approval from the Fair Trade Commission.
[This Article Newly Inserted by Act No. 9971, Jan. 25, 2010]
법령보기 화면
Article 25 (Corrective Measures)
(1)
The Fair Trade Commission may recommend or order a person placing an order and a principal contractor who violated any provision of
Articles 3
(1) through (4) and (9),
3-4
,
4 through 12
,
12-2
,
12-3
,
13
,
13-2
,
14 through 16
,
16-2
(7), and
17 through 20
to pay subcontract consideration, to stop unlawful conduct, to delete or modify special terms and conditions, and to take other measures necessary for preventing recurrence of violations or rectifying violations.
<Amended by Act No. 9971, Jan. 25, 2010; Act No. 10475, Mar. 29, 2011; Act No. 11842, May 28, 2013; Act No. 12097, Aug. 13, 2013>
(2)
Where the Council mediates a dispute as prescribed in
Article 24
(4) 1, it shall be deemed that the Fair Trade Commission has taken measures necessary for the correction under paragraph (1) as the Council has mediated the dispute, except in extenuating circumstances.
<Amended by Act No. 9971, Jan. 25, 2010>
(3)
Where the Fair Trade Commission has ordered corrective measures (excluding cases in which it is deemed to have placed such order as prescribed in paragraph (2); hereafter the same shall apply in this paragraph) as prescribed in paragraph (1), it may order a principal contractor who has been ordered to announce the fact that he/she has been so ordered.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 25-2 (Deposit)
Where a subcontractor does not receive repayment or is unable to receive repayment, a principal contractor against whom corrective measures have rendered prescribed in
Article 25
(1) or (2) may be relieved of the obligation to perform the corrective measures by depositing the object of repayment in favor of the subcontractor. This shall also apply where it is impossible for the principal contractor to identify the subcontractor without fault on his/her part.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 25-3 (Penalty Surcharges)
(1)
The Fair Trade Commission may impose upon any of the following persons placing an order, principal contractors or subcontractors a penalty surcharge not exceeding the subcontract consideration for the manufacturing, etc. entrusted to a subcontractor or a penalty surcharge not exceeding double the subcontract consideration for the manufacturing, etc. entrusted by the person placing an order or principal contractor:
<Amended by Act No. 9971, Jan. 25, 2010; Act No. 10475, Mar. 29, 2011; Act No. 11842, May 28, 2013; Act No. 12097, Aug. 13, 2013>
1.
A principal contractor who violates
Article 3
(1) through (4);
2.
A person who fails to preserve documents in violation of
Article 3
(9), or a principal contractor or subcontractor who prepares and issues false documents concerning subcontract transactions;
3.
A principal contractor who violates any provision of
Articles 3-4
,
4 through 12
,
12-2
,
12-3
,
13
and
13-2
;
4.
A person placing an order, who violates
Article 14
(1);
5.
A principal contractor who violates
Article 14
(5);
6.
A principal contractor who violates any provision of
Articles 15
,
16
,
16-2
(7), and
17 through 20
.
(2)
Articles 55-3 through 55-7
under the
Monopoly Regulation and Fair Trade Act
shall apply
mutatis mutandis
to penalty surcharges under paragraph (1).
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 25-4 (Publication of Lists of Habitual Violators)
(1)
Notwithstanding
Article 62 of the Monopoly Regulation and Fair Trade Act
which is applied
mutatis mutandis
pursuant to
Article 27
(3), the Chairperson of the Fair Trade Commission shall publish a list of the business operators (hereinafter referred to as "habitual violator") whose penalty points under
Article 26
(2) exceed the standard prescribed by Presidential Decree, out of those who have violated this Act and received three times or more of the warnings or orders for corrective measures from the Fair Trade Commission in accordance with
Article 25
for the past three years from the immediately preceding year:
Provided
, That any corrective measure shall be excluded from the foregoing if an objection is raised to the measure or any other petition of dissatisfaction is filed.
(2)
The Chairperson of the Fair Trade Commission shall additionally disclose the list of persons falling under both of the following cases upon the completion of the petition of dissatisfaction referred to in the proviso to paragraph (1):
1.
A person in whose case a warning or corrective measure is not revoked;
2.
A person who would have been a habitual violator if he/she had not filed the petition of dissatisfaction against the warning or corrective measure.
(3)
The Deliberative Committee on Publication of Lists of Habitual Violators (hereafter referred to as "Deliberative Committee" in this Article) shall be established in the Fair Trade Commission to deliberate on whether to publish the lists of habitual violators under paragraphs (1) and (2).
(4)
The Fair Trade Commission shall notify any business operator on whom the Deliberative Committee has deliberated that he/she is to be included in the list of habitual violators so that he/she will have the opportunity to vindicate himself/herself, and one month after such notification, the Fair Trade Commission shall order the Deliberative Committee to re-deliberate on whether to publish the list and thereby select those to be included in the list.
(5)
Publications under paragraphs (1) and (2) shall be posted in the Official Gazette or on the Internet homepage of the Fare Trade Commission.
(6)
Other necessary matters concerning the publication of the lists of habitual violators shall be prescribed by Presidential Decree.
[This Article Newly Inserted by Act No. 9971, Jan. 25, 2010]
법령보기 화면
Article 26 (Cooperation from Heads of Relevant Administrative Agencies)
(1)
When it is deemed necessary for enforcement of this Act, the Fair Trade Commission may hear the opinions of, or request provision of human resources for investigation or other necessary cooperation from, the heads of relevant administrative agencies.
(2)
The Fair Trade Commission shall impose penalty points prescribed by Presidential Decree on a principal contractor or subcontractor who violates any provision of
Articles 3
(1) through (4) and (9),
3-4
,
4 through 12
,
12-2
,
12-3
,
13
,
13-2
,
14 through 16
,
16-2
(7), and
17 through 20
in consideration of the severity of the violation and damage and shall request the heads of relevant administrative agencies to place limitations on participation in bidding, suspend business operations under
Article 82 (1) 7 of the Framework Act on the Construction Industry
, or take other measures necessary to ensure fairness in subcontracting transactions, if penalty points exceed standards prescribed by Presidential Decree.
<Amended by Act No. 9971, Jan. 25, 2010; Act No. 10475, Mar. 29, 2011; Act No. 10719, May 24, 2011; Act No. 11842, May 28, 2013; Act No. 12097, Aug. 13, 2013>
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 27 (Monopoly Regulation and Fair Trade Act to be Applied Mutatis Mutandis)
(1)
Articles 42
,
43
,
43-2
,
44
,
45
and
52 of the Monopoly Regulation and Fair Trade Act
shall apply
mutatis mutandis
to the deliberation and decision of the Fair Trade Commission under this Act while
Articles 53
,
53-2
,
53-3
,
54
,
55
and
55-2 of the same Act
shall apply
mutatis mutandis
to the exclusive jurisdiction over raising an objection, filing a lawsuit, or filing an objection to any disposition of the Fair Trade Commission.
(2)
Articles 50
,
50-2
,
50-3
and
51 of the Monopoly Regulation and Fair Trade Act
shall apply
mutatis mutandis
to the investigation, hearing of opinion, recommendation for correction, etc. of the Fair Trade Commission necessary to implement this Act.
(3)
Article 62 of the Monopoly Regulation and Fair Trade Act
shall apply
mutatis mutandis
to persons falling under the following subparagraphs:
1.
Members or public officials of the Fair Trade Commission who perform or have performed the duties prescribed by this Act;
2.
Persons who are or have been in charge of dispute mediation of subcontract transactions at the Council.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 28 (Relation to Monopoly Regulation and Fair Trade Act)
Article 23 (1) 4 of the Monopoly Regulation and Fair Trade Act
shall not apply to matters concerning subcontract transactions to which this Act applies.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 29 (Penal Provisions)
Any person who violates
Article 62 of the Monopoly Regulation and Fair Trade Act
, which shall apply
mutatis mutandis
pursuant to
Article 27
(3), shall be punished by imprisonment for not more than two years or by a fine not exceeding ten million won.
<Amended by Act No. 11842, May 28, 2013>
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 30 (Penal Provisions)
(1)
Any of the following principal contractors shall be punished by a fine not exceeding the amount equivalent to double the subcontract consideration for the manufacturing, etc. entrusted to a subcontractor by a principal contractor:
<Amended by Act No. 9971, Jan. 25, 2010; Act No. 10475, Mar. 29, 2011; Act No. 11842, May 28, 2013; Act No. 12097, Aug. 13, 2013>
1.
A person who violates any provision of
Article 3
(1) through (4) and (9) and
Articles 3-4
,
4 through 12
,
12-2
,
12-3
, and
13
;
2.
A person who fails to guarantee the payment of the construction price in violation of
Article 13-2
(1);
3.
A person who violates any provision of
Articles 15
, 1
6
(1), (3) and (4), and
17
;
4.
A person who rejects consultations without any justifiable ground, in violation of
Article 16-2
(7).
(2)
Any person who falls under subparagraph 1 shall be punished by a fine not exceeding 300 million won, and any person who falls under subparagraph 2 or 3 shall be punished by a fine not exceeding 150 million won:
<Amended by Act No. 11842, May 28, 2013>
1.
A person who takes an unfavorable measure against another person, in violation of
Article 19
;
2.
A person who violates
Article 18
or
20
;
3.
A person who does not comply with an order issued under
Article 25
.
(3)
Any person who makes a false appraisal under
Article 50 (1) 2 of the Monopoly Regulation and Fair Trade Act
applied
mutatis mutandis
pursuant to
Article 27
(2) shall be punished by a fine not exceeding thirty million won.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 30-2 (Fines for Negligence)
(1)
In any of the following cases, business operators or business associations shall be punished by a fine for negligence not exceeding 100 million won, and executives or employees of a business operator or business association or any other persons interested shall be punished by a fine for negligence not exceeding ten million won:
<Amended by Act No. 9971, Jan. 25, 2010>
1.
If they fail to appear without justifiable grounds, in violation of
Article 50 (1) 1 of the Monopoly Regulation and Fair Trade Act
applied
mutatis mutandis
pursuant to
Article 27
(2);
2.
If they fail to report or submit necessary materials or things, or reports or submits false materials or things prescribed in
Article 50 (1) 3 or (3) of the Monopoly Regulation and Fair Trade Act
applied
mutatis mutandis
pursuant to
Article 27
(2);
3.
Deleted.
<by Act No. 9971, Jan. 25, 2010>
(2)
Business operators or business associations shall be punished by a fine for negligence not exceeding 200 million and executives, employees of a business operator or business association, or any other persons interested shall be punished by a fine for negligence not exceeding 50 million won, if they reject, interfere with or evade investigations under
Article 50 (2) of the Monopoly Regulation and Fair Trade Act
applied
mutatis mutandis
pursuant to
Article 27
(2).
<Newly Inserted by Act No. 9971, Jan. 25, 2010>
(3)
A principal contractor who fails to present materials in accordance with
Article 22-2
(2) or present false materials shall be punished by a fine for negligence not exceeding five million won.
<Newly Inserted by Act No. 9971, Jan. 25, 2010>
(4)
Any person who fails to comply with the orders to maintain good order prescribed in
Article 43-2 of the Monopoly Regulation and Fair Trade Act
applied
mutatis mutandis
pursuant to
Article 27
(1) shall be punished by a fine for negligence not exceeding one million won.
<Amended by Act No. 9971, Jan. 25, 2010>
(5)
Fines for negligence under paragraphs (1) through (4) shall be imposed and collected by the Fair Trade Commission.
<Amended by Act No. 9971, Jan. 25, 2010>
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 31 (Joint Penal Provisions)
Where a representative of a juristic person, or an agent, employee or other servant of a juristic person or individual commits an offence under
Article 30
in connection with the business of the juristic person or individual, in addition to the punishment of such offender, the juristic person or individual shall be punished by a fine under each relevant Article:
Provided
, That where such juristic person or individual has not been negligent in giving due attention and supervision concerning the relevant duties to prevent such offence, this shall not apply.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 32 (Complaints)
(1)
Public prosecution against a crime prescribed in
Article 30
may be initiated only when there is a charge by the Fair Trade Commission.
<Amended by Act No. 10475, Mar. 29, 2011>
(2)
When the Fair Trade Commission acknowledges that the severity of any crime referred to in
Article 30
is objectively obvious and grave enough to considerably hamper orderly subcontract transactions, it shall lodge a complaint with the Prosecutor General.
<Newly Inserted by Act No. 10475, Mar. 29, 2011>
(3)
The Prosecutor General may notify the Fair Trade Commission that there exist facts fulfilling the requirements for lodging a compliant under paragraph (2) and request it to lodge a complaint.
<Newly Inserted by Act No. 10475, Mar. 29, 2011>
(4)
Irrespective of a ruling made by the Fair Trade Commission that a case does not meet the requirement for filing a complaint under paragraph (2), the Chairperson of the Board of Audit and Inspection or the Administrator of the Small and Medium Business Administration may request the Fair Trade Commission to file a complaint on any other ground, such as ripple effects to the society or the degree of damage to a subcontractor.
<Newly Inserted by Act No. 11938, Jul. 16, 2013>
(5)
Upon receipt of a request for filing a complaint under paragraph (3) or (4), the Chairperson of the Fair Trade Commission shall file a complaint with the Prosecutor General.
<Newly Inserted by Act No. 11938, Jul. 16, 2013>
(6)
The Fair Trade Commission may not withdraw a complaint once the pubic prosecution is initiated.
<Newly Inserted by Act No. 10475, Mar. 29, 2011; Act No. 11938, Jul. 16, 2013>
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 33 (Contributory Negligence)
Where a subcontractor is responsible for any offense against this Act committed by a principal contractor, it may be taken into consideration when taking corrective measures, filing a complaint, or applying penal provisions under this Act.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 34 (Relationship to other Acts)
Where any provision of the
Act on the Promotion of Collaborative Cooperation between Large Enterprises and Small-Medium Enterprises
, the
Electrical Construction Business Act
, the
Framework Act on the Construction Industry
, and the
Information and Communications Construction Business Act
is contrary to this Act, such provision shall be governed by this Act.
[This Article Wholly Amended by Act No. 9616, Apr. 1, 2009]
법령보기 화면
Article 35 (Liability to Compensate for Damages)
(1)
A principal contractor shall be liable to compensate a person who sustains an injury or loss as a consequence of a principal contractor’s violation of any provision of this Act for the injury or loss inflicted upon the person:
Provided
, That the foregoing shall not apply where the principal contractor proves that such injury or loss has not been caused by an intentional act or negligence of the principal contractor.
<Amended by Act No. 11842, May 28, 2013>
(2)
If a principal contractor inflicts an injury or loss upon a person by violating
Article 4
,
8
(1),
10
,
11
(1) or (2), or
12-3
(3), the principal contractor shall be liable to compensate the injury or loss to the extent not exceeding three times the injury or loss inflicted on the person:
Provided
, That the foregoing shall not apply where the principal contractor proves that such injury or loss has not been caused by an intentional act or negligence of the principal contractor.
<Amended by Act No. 11842, May 28, 2013>
(3)
A court shall take the following matters into consideration when it determines damages under paragraph (2):
<Newly Inserted by Act No. 11842, May 28, 2013>
1.
The degree of perception of intention or possibility of causing an injury or loss;
2.
The severity of the damage inflicted upon a subcontractor and third parties by the violation;
3.
Economic benefit that the principal contractor acquired by the violation;
4.
The fine and penalty surcharge imposed for the violation;
5.
The duration and frequency of relevant violations;
6.
The principal contractor’s financial standing;
7.
The degree of the principal contractor’s efforts to remedy injuries and losses.
(4)
Articles 56-2
and
57 of the Monopoly Regulation and Fair Trade Act
shall apply
mutatis mutandis
to a lawsuit filed for seeking damages pursuant to paragraph (1) or (2).
<Amended by Act No. 11842, May 28, 2013>
[This Article Newly Inserted by Act No. 10475, Mar. 29, 2011]
ADDENDUM
This Act shall enter into force three months after the date of its promulgation.
ADDENDA <Act No. 4198, Jan. 13, 1990>
Article 1 (Enforcement Date)
This Act shall enter into force on April 1, 1990.
Articles 2 through 5 Omitted.
ADDENDA <Act No. 4419, Dec. 14, 1991>
Article 1 (Enforcement Date)
This Act shall enter into force on July 1, 1992. (Proviso Omitted.)
Articles 2 through 8 Omitted.
ADDENDA <Act No. 4514, Dec. 8, 1992>
(1)
(Enforcement Date) This Act shall enter into force on April 1, 1993.
(2)
(Transitional Measures) The amended provisions of
Articles 6
,
7
,
13
and
15
shall not apply to any subcontract already concluded at the time this Act enters into force.
(3)
Omitted.
ADDENDA <Act No. 4860, Jan. 5, 1995>
(1)
(Enforcement Date) This Act shall enter into force on April 1, 1995.
(2)
(Transitional Measures) Notwithstanding the revised provisions of
Articles 2
,
13
(4) and
16
(2), any subcontract already concluded at the time this Act enters into force shall be governed by the previous provisions.
ADDENDA <Act No. 4898, Jan. 5, 1995>
Article 1 (Enforcement Date)
This Act shall enter into force on July 1, 1995.
Articles 2 through 11 Omitted.
ADDENDA <Act No. 5234, Dec. 30, 1996>
(1)
(Enforcement Date) This Act shall enter into force on April 1, 1997.
(2)
(Transitional Measures for Subcontract Transactions under Conclusion of Subcontracts) If a subcontract was already concluded at the time this Act entered into force, the former provisions of this Act shall apply not- withstanding the amended provisions of
Articles 13-2
and
25-3
.
ADDENDA <Act No. 5386, Aug. 28, 1997>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 1998. (Proviso Omitted.)
Articles 2 through 8 Omitted.
ADDENDUM <Act No. 5454, Dec. 13, 1997>
This Act shall enter into force on January 1, 1998. (Proviso Omitted.)
ADDENDA <Act No. 5507, Jan. 13, 1998>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation.
Article 2 Omitted.
ADDENDA <Act No. 5756, Feb. 5, 1999>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 7 Omitted.
ADDENDA <Act No. 5816, Feb. 5, 1999>
(1)
(Enforcement Date) This Act shall enter into force on April 1, 1999.
(2)
(Transitional Measures concerning Subcontract Transaction under Conclusion of Subcontract) Notwithstanding the amended provisions of
Article 13
, the previous provisions shall apply to a subcontract transaction for which a subcontract has already been concluded at the time when this Act enters into force.
ADDENDA <Act No. 6198, Jan. 21, 2000>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 7 Omitted.
ADDENDA <Act No. 6893, May 29, 2003>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA <Act No. 7107, Jan. 20, 2004>
(1)
(Enforcement Date) This Act shall enter into force three months after the date of its promulgation.
(2)
(Applicability to Penal Provisions) The amended provisions of
Article 30
(1) 3-2 shall apply to the first subcontract concluded after this Act enters into force.
ADDENDA <Act No. 7315, Dec. 31, 2004>
Article 1 (Enforcement Date)
This Act shall enter into force on April 1, 2005. (Proviso Omitted.)
Articles 2 through 10 Omitted.
ADDENDA <Act No. 7488, Mar. 31, 2005>
(1)
(Enforcement Date) This Act shall enter into force three months after the promulgation of this Act.
(2)
(Applicability to Subcontract Transactions of Service Entrustment) The amended provisions of
Article 2
(1) and (11) shall apply starting from the first subcontract transaction for which the contract for subcontract of service entrustment is concluded after this Act enters into force.
(3)
(Applicability to Additional Payment for Refund of Penalty Surcharges) The amended provisions of
Article 25-3
(2) shall apply starting from the first penalty surcharges refunded after this Act enters into force.
(4)
(Transitional Measures concerning Subcontract Transaction for which Subcontract has been Concluded) The previous provisions shall govern the subcontract transaction for which a subcontract has already been concluded at the time when this Act enters into force, notwithstanding the amended provisions of
Articles 2
(1) and (11),
12-2
and
13-2
(5).
ADDENDA <Act No. 7864, Mar. 3, 2006>
Article 1 (Enforcement Date)
This Act shall enter into force three months after the promulgation of this Act.
Articles 2 through 11 Omitted.
ADDENDUM <Act No. 8539, Jul. 19, 2007>
This Act shall enter into force three months after the promulgation of this Act.
ADDENDUM <Act No. 9085, Mar. 28, 2008>
This Act shall enter into force six months after the promulgation of this Act.
ADDENDUM <Act No. 9616, Apr. 1, 2009>
This Act shall enter into force on the date of its promulgation.
ADDENDA <Act No. 9971, Jan. 25, 2010>
(1)
(Enforcement Date) This Act shall enter into force six months after the promulgation of this Act.
(2)
(Applicability to Issuance of Documents and Requests, etc. for Verification of Details of Entrustment) The amended provisions of
Article 3
shall apply starting from the first entrustment of manufacturing, etc. after this Act enters into force.
ADDENDA <Act No. 10250, Apr. 12, 2010>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the promulgation of this Act.
Articles 2 through 9 Omitted.
ADDENDA <Act No. 10303, May 17, 2010>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the promulgation of this Act. (Proviso Omitted.)
Articles 2 through 10 Omitted.
ADDENDA <Act No. 10475, Mar. 29, 2011>
(1)
(Enforcement Date) This Act shall enter into force three months after the promulgation of this Act.
(2)
(Applicability to Amendment of Definitions) The amended provisions of
Article 2
(2) shall apply starting from the first concluded subcontract after this Act enters into force.
ADDENDA <Act No. 10719, May 24, 2011>
Article 1 (Enforcement Date)
This Act shall enter into force six months after its promulgation. (Proviso Omitted.)
Articles 2 through 6 Omitted.
ADDENDA <Act No. 11461, Jun. 1, 2012>
Article 1 (Enforcement Date)
This Act shall enter into force three months after its promulgation.
Articles 2 through 10 Omitted.
ADDENDA <Act No. 11842, May 28, 2013>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Article 2 (Applicability to Liability for Damages)
The amended provisions of
Article 35
shall apply to violations committed after this Act enters into force.
ADDENDUM <Act No. 11938, Jul. 16, 2013>
This Act shall enter into force six months after the date of its promulgation.
ADDENDUM <Act No. 12097, Aug. 13, 2013>
This Act shall enter into force six months after the date of its promulgation.
Last updated : 2015-10-01