ENFORCEMENT DECREE OF THE INDUSTRIAL SITES AND DEVELOPMENT ACT
13666 · 2000-07-01
ENFORCEMENT DECREE OF THE INDUSTRIAL SITES AND DEVELOPMENT ACT
Presidential Decree No. 16891, Jul. 1, 2000
Presidential Decree No. 13250, Jan. 14, 1991
Amended by Presidential Decree No. 13563, Dec. 31, 1991
Presidential Decree No. 13889, May 26, 1993
Presidential Decree No. 14002, Nov. 6, 1993
Presidential Decree No. 14429, Dec. 16, 1994
Presidential Decree No. 14447, Dec. 23, 1994
Presidential Decree No. 14438, Dec. 23, 1994
Presidential Decree No. 14915, Feb. 15, 1996
Presidential Decree No. 15098, Jun. 29, 1996
Presidential Decree No. 15135, Aug. 8, 1996
Presidential Decree No. 15239, Dec. 31, 1996
Presidential Decree No. 15598, Dec. 31, 1997
Presidential Decree No. 15818, Jun. 24, 1998
Presidential Decree No. 16093, Jan. 29, 1999
Presidential Decree No. 16203, Mar. 26, 1999
Presidential Decree No. 16515, Aug. 6, 1999
Presidential Decree No. 16709, Feb. 14, 2000
Presidential Decree No. 16891, Jul. 1, 2000
법령보기 화면
Article 1 (Purpose)
The purpose of this Decree is to prescribe matters delegated by the
Industrial Sites and Development Act
(hereinafter referred to as the “Act”) and matters necessary for the enforcement thereof.
법령보기 화면
Article 2 (Agricultural and Fishery Areas)
For the purpose of subparagraph 5 (c) of
Article 2 of the Act
, the term agricultural and fishery areas as prescribed by the Presidential Decree means agricultural and fishing villages as referred to in subparagraph 4 of
Article 2 of the Act on the Special Measures for Development of Agricultural and Fishing Villages
.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
법령보기 화면
Article 2-2 (Functions of Industrial Location Policy Deliberation Committee)
The Industrial Location Policy Deliberation Committee as referred to in
Article 3 of the Act
(hereinafter referred to as the “Deliberation Committee”)
shall deliberate the following subparagraphs:
1.
Establishment and alteration of an industrial location supply plan;
2.
Establishment and alteration of industrial location and development guidelines;
3.
Designation, alteration and development of national industrial complexes;
4.
Approval on designation of local industrial complexes;
5.
Adjustment of opinions between related agencies for the designation of local industrial complexes;
6.
Standards for the development of individual factory locations;
7.
Assistance for infrastructure facilities of industrial complexes;
8.
Operation of the working-level committee of the Industrial Location Policy Deliberation Committee under
Article 2-6
; and
9.
Other important matters on industrial location policies.
[This Article Added by Presidential Decree No. 15098, Jun. 29, 1996]
법령보기 화면
Article 2-3 (Composition of Industrial Location Policy Deliberation Committee)
(1)
The Deliberation Committee shall be composed of not more than twenty members, including a chairman and a vice-chairman.
(2)
The Vice-Minister of Construction and Transportation shall be chairman, and the Deputy Minister for Construction and Transportation shall be vice-chairman.
(3)
The members shall be designated by the head of the agency to which the members belong, from among public officials of Grade Ⅱ or Ⅲ belonging to the Office for Government Coordination, the Ministry of Finance and Economy, the Ministry of Home Affairs and Government Administration, the Ministry of Science and Technology, the Ministry of Culture and Tourism, the Ministry of Agriculture and Forestry, the Ministry of Commerce, Industry and Energy, the Ministry of Information and Communication, the Ministry of Health and Welfare, the Ministry of Environment, the Ministry of Labor, the Ministry of Construction and Transportation, the Ministry of Maritime Affairs and Fisheries, the Office of National Budget, and the Small and Medium Business Administration.
<Amended by Presidential Decree No. 15135, Aug. 8, 1996; Presidential Decree No. 15818, Jun. 24, 1998; Presidential Decree No. 16203, Mar. 26, 1999>
(4)
A secretary shall be assigned to the Deliberation Committee to take care of the affairs thereof and the secretary shall be appointed by the chairman from among public officials belonging to the Ministry of Construction and Transportation.
[This Article Added by Presidential Decree No. 15098, Jun. 29, 1996]
법령보기 화면
Article 2-4 (Duties of Chairman and Vice-Chairman)
(1)
The chairman shall represent the Deliberation Committee and exercise overall control and supervision over the affairs of the Deliberation Committee.
(2)
The vice-chairman shall assist the chairman and act as the chairman on his behalf if the chairman is prevented from performing his duties and a member shall act as the chairman on his behalf in the order of members as provided in
Article 2-3
(3) if both the chairman and vice-chairman are prevented from performing their duties.
[This Article Added by Presidential Decree No. 15098, Jun. 29, 1996]
법령보기 화면
Article 2-5 (Convening of Meetings and Quorum for Decision-Making)
(1)
The chairman shall convene the meeting of the Deliberation Committee and preside over it.
(2)
If the chairman wishes to convene a meeting of the Deliberation Committee, he shall notify each member of the date and time, place and matters to be deliberated three days before holding the meeting:
Provided
, That if it is urgent to convene the meeting, this shall not apply.
(3)
Meetings of the Deliberation Committee shall come to order with the attendance of a majority of all the registered members, and decisions shall be made by an affirmative vote of a majority of members present.
[This Article Added by Presidential Decree No. 15098, Jun. 29, 1996]
법령보기 화면
Article 2-6 (Composition of Working-Level Committee of Industrial Location Policy)
The Working-Level Committee of Industrial Location Policy (hereinafter referred to as the “Working Committee”) may be established to operate efficiently the Deliberation Committee and to handle the matters delegated by the Deliberation Committee.
[This Article Added by Presidential Decree No. 15098, Jun. 29, 1996]
법령보기 화면
Article 2-7 (Cooperation of Related Agencies, etc.)
Where it is deemed necessary for deliberation, the Deliberation Committee or the Working Committee may request the related agencies to furnish necessary materials or hear opinions of any public officials of the related agencies.
[This Article Added by Presidential Decree No. 15098, Jun. 29, 1996]
법령보기 화면
Article 2-8 (Detailed Regulations for Operation)
Except as otherwise prescribed by this decree, matters on the operation of the Deliberation Committee and those to be delegated to the Working Committee, and matters necessary for the composition, operation and functions, etc. of the Working Committee shall be determined by the chairman through the resolution of the Deliberation Committee.
[This Article Added by Presidential Decree No. 15098, Jun. 29, 1996]
법령보기 화면
Article 2-9 (Utilization of Service by Experts, etc.)
If it is deemed necessary for the establishment, alteration and execution of industrial location policies, the Minister of Construction and Transportation may ask experts, etc. to give advice or refer to them for investigation and research.
[This Article Added by Presidential Decree No. 15098, Jun. 29, 1996]
법령보기 화면
Article 3 (Detailed Guidelines, etc. for Development of Agricultural and Industrial Complexes)
(1)
The Minister of Construction and Transportation shall prepare the basic guidelines on the designation and development of agricultural and industrial complexes and the Minister of Agriculture and Forestry shall prepare and announce publicly the detailed guidelines on the development of agricultural and industrial complexes after undergoing the deliberation by the Deliberation Committee to promote development assistance for industrial and agricultural complexes and the structural adjustment of agriculture as referred to in
Articles 21 through 27 of the Act on the Special Measures for Development of Agricultural and Fishing Villages
(hereinafter referred to as the “detailed guidelines for development of agricultural and industrial complexes”), under the provisions of the proviso of
Article 5 (1) of the Act
.
<Amended by Presidential Decree No. 14447, Dec. 23, 1994; Presidential Decree No. 15098, Jun.29, 1996; Presidential Decree No. 15135, Aug. 8, 1996>
(2)
The detailed guidelines for development of agricultural and industrial complexes as referred to in paragraph (1) shall include the matters falling under each of the following subparagraphs:
1.
Differentiated assistance to agricultural and fishery areas;
2.
Disbursement of expenses for the development of sites for agricultural and industrial complexes by financing source and assistance related thereto;
3.
Survey and design, work supervision, and subsidy for expenses incidental to the development of sites for agricultural and industrial complexes;
4.
Execution of national subsidies relating to the site development expenses for agricultural and industrial complexes and settlement of accounts related thereto;
5.
Subsidy for expenses for training the manpower employed in agricultural and industrial complexes;
6.
Employment promotion of farmers and fishermen on site; and
7.
Preferential moving into agricultural and industrial complexes by enterprises utilizing endowment of natural resources on site, such as agricultural products.
법령보기 화면
Article 4 (Matters to be Included in Industrial Location Development Guidelines)
For the purpose of
Article 5 (2) 3 of the Act
, the term “other matters as prescribed by the Presidential Decree” means the matters falling under each of the following subparagraphs:
1.
Balanced development between regions;
2.
Preservation of cultural properties; and
3.
Matters necessary for the stabilization of land prices.
법령보기 화면
Article 5 (Alteration of Insignificant Matters to Industrial Location Development Guidelines)
For the purpose of the proviso of
Article 5 (3) of the Act
, the term “alteration of insignificant matters as prescribed by the Presidential Decree” means any alteration of matters as referred to in subparagraphs 2 and 3 of
Article 4
within the limit not to alter the system of industrial location development guidelines as a whole.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
법령보기 화면
Article 6 (Preparation, etc. of Industrial Location Development Guidelines)
(1)
If it is deemed necessary for preparation, the Minister of Construction and Transportation may ask the head of related administrative agencies to furnish materials falling under each of the subparagraphs of
Article 5 (2) of the Act
.
<Amended by Presidential Decree No. 14447, Dec. 23, 1994; Presidential Decree No. 15098, Jun. 29, 1996>
(2)
The industrial location and development guidelines shall be prepared in such a way as to ensure that the industrial locations are properly distributed for the balanced development between regions.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
법령보기 화면
Article 6-2 (Establishment of Industrial Location Supply Plan)
(1)
If the Minister of Construction wishes to establish an industrial location supply plan as referred to in
Article 5-2 (1) of the Act
, he shall take into account related plans such as the comprehensive plans for construction undertakings in the national territory and basic plans for industrial placement.
(2)
A planned period of an industrial location supply plan as referred to in
Article 5-2 of the Act
shall be five years and it may be modified or complemented by analyzing the demand trends and results of industrial locations supply every year.
(3)
For the purpose of
Article 5-2 (2) 5 of the Act
, the term “other matters as determined by the Presidential Decree” means the matters falling each of the following subparagraphs:
1.
A plan for designation of industrial complexes;
2.
Support for major infrastructure facilities;
3.
A plan for reorganization of industrial complexes; and
4.
Other matters necessary for the efficient supply of industrial locations.
[This Article Added by Presidential Decree No. 15098, Jun.29, 1996]
법령보기 화면
Article 6-3 (Operation and Entrustment of Industrial Location Information Networks)
(1)
For the purpose of
Article 5-3
(3), the term “agencies or organizations as prescribed by the Presidential Decree” means agencies or organizations falling under any of the following subparagraphs:
<Amended by Presidential Decree No. 15818, Jun. 24, 1998; Presidential Decree No. 16093, Jan. 29, 1999>
1.
The Korea Chamber of Commerce and Industry under the
Chambers of Commerce and Industry Act
;
2.
The Korea Land Corporation under the
Korea Land Corporation Act
;
3.
The Korea Research Institute for Human Settlements under
Article 8 of the Act
on the Establishment, Operation and Fosterage of GovernmentInvested Research Institutions, etc.; and
4.
Other agencies or organizations as determined by the Minister of Construction and Transportation in consultation with the Minister of Commerce, Industry and Energy.
(2)
The Minister of Construction and Transportation may designate any agencies or organizations to be entrusted with the operation of the industrial location information networks and entrust the operation to such agencies or organizations individually or jointly, from among agencies or organizations as referred to in paragraph (1), in consultation with the Minister of Commerce, Industry and Energy.
<Amended by Presidential Decree No. 15818, Jun. 24, 1998>
(3)
Any agency or organization which has been entrusted with the business relating to the operation of the industrial location information networks pursuant to paragraph (2) may have a person who uses the relevant industrial location information networks, bear the expenses.
(4)
The Minister of Construction and Transportation may prepare and operate the guidelines on the management of industrial location information networks, input and output of data and operation, etc. of the industrial location information networks, under
Article 5-3 (4) of the Act
:
Provided
, That if he constructs and operates the industrial location information networks jointly with the head of related agency such as the Minister of Commerce, Industry and Energy, he shall prepare such guidelines in consultation with the head of the agency concerned.
<Amended by Presidential Decree No. 15818, Jun. 24, 1998>
[This Article Added by Presidential Decree No. 15098, Jun. 29, 1996]
법령보기 화면
Article 7 (Alteration, etc. of Industrial Complex Development Plan)
(1)
For the purpose of
Articles 6 (3) and 7 (2) of the Act
, the term “important matters as prescribe by the Presidential Decree” means the matters falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 14447, Dec. 23, 1994; Presidential Decree No. 15098, Jun. 29, 1996>
1.
Alteration of 10/100 or more of an industrial complex area;
2.
Alteration of a main category of business to be attracted; and
3.
Alteration of a land utilization plan and major infrastructure installation plan as determined by the Minister of Construction and Transportation.
(2)
For the purpose of
Article 6 (4) 9 of the Act
, the term “other matters as prescribed by the Presidential Decree” means the matters falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996; Presidential Decree No. 15818, Jun. 24, 1998>
1.
An enforcement period of industrial complex development projects;
2.
A support plan for major facilities for the development of industrial complexes;
3.
A placement plan of business to be attracted;
4.
Data on occupancy demand; and
5.
Data necessary for environmental review, which is determined by the Ministerial Decree of Construction and Transportation.
[This Article Wholly Amended by Presidential Decree No. 14002, Nov. 6, 1993]
법령보기 화면
Article 8 (Application for Approval on Designation of Local Industrial Complex)
(1)
If the Seoul Special Metropolitan City Mayor, the Metropolitan City Major or
Do
governor (hereinafter referred to as the “Mayor/
Do
governor”) wishes to grant the approval for the designation of local industrial complexes under
Article 7 (2) of the Act
, he shall submit to the Minister of Construction and Transportation a written application for the approval for the designation of local industrial complexes which shall contain a statement of the matters falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 14429, Dec. 16, 1994; Presidential Decree No. 14447, Dec. 23, 1994; Presidential Decree No. 15098, Jun. 29, 1996>
1.
Name of an industrial complex;
2.
Purpose of designation and necessity of an industrial complex;
3.
Location and size of an area subject to designation;
4.
A period of development for an industrial complex and method of development; and
5.
A major category of business to be attracted.
(2)
A written application for the approval of the designation of local industrial complexes as referred to in paragraph (1) shall be accompanied by the documents falling under each of the following subparagraphs and drawings:
<Amended by Presidential Decree No. 14447, Dec. 23, 1994; Presidential Decree No. 15098, Jun. 29, 1996>
1.
A drawing of location;
2.
Deleted;
<by Presidential Decree No. 15098, Jun. 29, 1996>
3.
Documents regarding an analysis of fundaments such as roads, water, electricity and communications and documents regarding an infrastructure facilities installation plan;
4.
and 5. Deleted;
<by Presidential Decree No. 15098, Jun. 29, 1996>;
6.
Deleted;
<by Presidential Decree No. 14429, Dec. 16, 1994>
7.
Deleted;
<by Presidential Decree No. 15098, Jun. 29, 1996>
8.
Deleted; and
<by Presidential Decree No. 14429, Dec. 16, 1994>
9.
Documents regarding an industrial complex development plan.
(3)
For the purpose of
Article 7 (4) of the Act
, the term “size as prescribed by the Presidential Decree” means three million and three hundred thousand square meters.
<Added by Presidential Decree No. 15098, Jun. 29, 1996; Presidential Decree No. 15818, Jun. 24, 1998 >
[This Article Wholly Amended by Presidential Decree No. 14002, Nov. 6, 1993]
법령보기 화면
Article 8-2 (Consultation about Designation of Industrial Complexes)
(1)
The head of the related administrative agency who has received a request for consultations of an industrial complex development plan, etc. referred to in
Articles 6 and 7 of the Act
shall return his opinions thereon within twenty days form the date:
Provided
, That this shall not apply in cases where matters for consultations are otherwise provided for in other Acts and subordinate statutes in relation to creating industrial complexes.
(2)
The head of the related administrative agency who has received a request for consultations referred to in paragraph (1) shall, if he find it difficult to return his opinions within the consultation period, make notification by specifying grounds therefor and time limit for return and return his opinions with the notified time limit.
[This Article Added by Presidential Decree No. 15818, Jun. 24, 1998]
법령보기 화면
Article 9 (Public Notification, etc. of Designation of Industrial Complexes or Development Plan)
(1)
If the Minister of Construction and Transportation, the Mayor/
Do
governor, or the head of
Si
/
Gun
/autonomous
Gu
(hereinafter referred to as the “authority to designate an industrial complex”) designates industrial complexes or alters the designation under
Article 7-2 (1) 1, or 8 (3) of the Act
, he shall announce publicly the matters falling under each of the following subparagraphs (in the case of an alteration, limited to the altered matters):
Provided
, That if the matters as referred to in subparagraphs 3 and 8 fail to be finally determined at the time of the designation of industrial complexes, such matters may be publicly announced after the contents are finally determined:
<Amended by Presidential Decree No. 14447, Dec. 23, 1994; Presidential Decree No. 15098, Jun. 29, 1996>
1.
Name, location and purpose of an industrial complex;
2.
Purpose of designation of an industrial complex;
3.
An operator executing industrial complex development projects;
4.
A period of development of an industrial development complex and method of development;
5.
A major category of business to be attracted and an placement plan for the attracted category of business;
6.
Land utilization plan and support plan for major infrastructure facilities;
7.
A plan to support the development of industrial complexes;
8.
If there is land, structures and other properties or rights to be expropriated or used, a detailed list of owners, and names and addresses of persons concerned as referred to in
Article 4 (3) of the Land Expropriation Act
;
9.
Deleted; and
<by Presidential Decree No. 15098, Jun. 29, 1996>
10.
A method of inspecting related books.
(2)
If the authority to designate an industrial complex alters an industrial complex development plan as referred to in of
Article 6 (3) of the Act
or
Article 7 (2) of the Act
, he shall announce publicly those matters falling under paragraph (1) 1 through 4, and the altered matters.
<Added by Residential Decree No. 15098, Jun. 29, 1996>
(3)
The head of
Si
/
Gun
/autonomous
Gu
(hereinafter referred to as the “head of
Si
/
Gun
”) who has received related documents under
Article 7-2 (1) of the Act
, shall have the general public inspect such documents for fourteen days or more.
[This Article Wholly Amended by Presidential Decree No. 14002, Nov. 6, 1993]
법령보기 화면
Article 10 (Application for Approval of Designation of Agricultural and Industrial Complexes)
(1)
If the head of
Si
/
Gun
wishes to obtain the approval for the designation of agricultural and industrial complexes under
Article 8 (2) of the Act
, he shall submit to the Mayor/
Do
governor a written application for an approval of the designation of agricultural and industrial complexes which contains a statement of matters falling under each of the subparagraphs of
Article 8
(1).
<Amended by Presidential Decree No. 14002, Nov. 6, 1993>
(2)
A written application for an approval of the designation of agricultural and industrial complexes as referred to in paragraph (1) shall be accompanied by the documents and drawings falling under each of the following subparagraphs:
1.
Drawings of location;
2.
Documents on the current status of land utilization in the area subject to designation;
3.
Documents on the development support by the State or local governments;
4.
Documents on the current status of employable manpower in areas adjacent to an agricultural and industrial complex;
5.
Documents on the expected effect of employment and increased income of farming and fishing households resulting from the development of agricultural and industrial complexes; and
6.
Documents or drawings on the effect which the development will have on the preservation of the agricultural and fishing community environment and cultural property.
(3)
If the Mayor/
Do
governor wishes to grant an approval for the designation of agricultural and industrial complexes under
Article 8 (2) of the Act
, he shall consult with the head of the related administrative agencies, and may hear the opinions of the Urban, Agricultural and Fishing Community Development Deliberation Committee as referred to in
Article 52 of the Act
on the Special Measures for Development of Agricultural and Fishing Villages, if deemed necessary.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(4)
For the purpose of the proviso of
Article 8 (2) of the Act
, the term “alteration of insignificant matters as prescribed by the Presidential Decree” means the alteration of matters other than those as referred to in each of the subparagraphs of
Article 7
(1).
<Amended by Presidential Decree No. 14002, Nov. 6, 1993>
법령보기 화면
Article 11 (Hearing of Opinions of Residents, etc.)
(1)
If the Minister of Construction and Transportation, or the Mayor/
Do
governor wishes to hear the opinions of residents and related experts, etc. in respect of the designation of national or local industrial complexes under
Article 10 (1) of the Act
, he shall send the contents of the draft plan for the designation of national or local industrial complexes to the head of
Si
/
Gun
having jurisdiction over the location of the industrial complex concerned, and the head of
Si
/
Gun
who has received them shall announce publicly the important contents in a daily newspaper published in the region concerned and have the general public inspect them for fourteen days or more.
<Amended by Presidential Decree No. 14447, Dec. 23, 1994; Presidential Decree No. 15098, Jun. 29, 1996>
(2)
If the head of
Si
/
Gun
wishes to hear the opinions of residents and related experts, etc. in respect of the designation of agricultural complexes under
Article 10 (1) of the Act
, he shall announce publicly the important contents of the draft plan for the designation of agricultural and industrial complexes in a daily newspaper published in the region concerned and have the general public inspect them for fourteen days or more.
(3)
A person who has opinions in respect of the contents of the draft plan for the designation of industrial complexes publicly announced under paragraphs (1) and (2), may present a written opinion to the head of
Si
/
Gun
concerned within the period of inspection.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(4)
When the period of inspection as referred to in paragraph (1) expires, the head of
Si
/
Gun
shall present the written opinions of residents and related experts, etc. presented under paragraph (3) and written opinions of review in respect of the presented opinions, to the Minister of Construction and Transportation or the Mayor/
Do
governor.
<Amended by Presidential Decree No. 14447, Dec. 23, 1994>
법령보기 화면
Article 12 (Omission of Hearing of Residents, etc.)
(1)
Deleted.
<by Presidential Decree No. 15098, Jun. 29, 1996>
(2)
If the authority to designate an industrial complex wishes to designate industrial complexes by omitting the hearings of opinions of residents and related experts, etc. under the proviso of
Article 10 (1) of the Act
, he shall consult in advance with the head of the related administrative agencies.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
법령보기 화면
Article 13 (Request, etc. for Designation of Industrial Complexes by Private Enterprises, etc.)
(1)
For the purpose of
Article 11 (1) of the Act
, the term “person who meets the requirements as prescribed by the Presidential Decree” means persons falling under any of the following subparagraphs:
<Amended by Presidential Decree No. 14002, Nov. 6, 1993; Presidential Decree No. 14915, Feb. 15, 1996; Presidential Decree No. 15098, Jun. 29, 1996>
1.
The Korea Land Corporation Under the
Korea Land Corporation Act
;
2.
The Korea Water Resources Corporation under the
Korea Water Resources Corporation Act
;
3.
The Rural Development Corporation under the
Rural Development Corporation and Farmland Management Fund Act
;
4.
The Urban Development Corporation of the Seoul Special Metropolitan City, the Metropolitan City and
Do
among local public corporations under the
Local Public Enterprises Act
;
5.
The Small and Medium Enterprise Promotion Corporation under the
Promotion of Small and Medium Enterprises and Encouragement Purchase of Their Products Act
;
6.
Small and Medium Enterprise Cooperatives under the
Small and Medium Enterprise Cooperatives Act
;
6-2.
The Industrial Complex Management Corporation under the
Industrial Placement and Factory Construction Act
; and
7.
A person falling into any of the subparagraphs of
Article 19
(2).
(2)
A person who intends to request for the designation of industrial complexes pursuant to
Article 11 (1) of the Act
shall submit a written request for the designation of industrial complexes, stating any of the following subparagraphs of
Article 8
(1), accompanied by the following documents and drawings to the Minister of Construction and Transportation through the Mayor/
Do
governor for national industrial complexes and to the Mayor/
Do
governor through the head of
Si
/
Gun
for local industrial complexes. In this case, the Mayor/
Do
governor or the head of
Si
/
Gun
who has received a request for the designation of industrial complexes shall review the written request for the designation of industrial complexes and send it without delay to the Minister of Construction and Transportation or the Mayor/
Do
governor:
<Amended by Presidential Decree No. 15818, Jun. 24, 1998>
1.
Drawing of location;
2.
Documents on the analysis of fundaments such as roads, water, electricity and communications, and documents on the infrastructure facilities installation plan; and
3.
Documents on the industrial complex development plan.
(3)
The authority to designate an industrial complex who has received the request for the designation of industrial complexes as referred to in paragraph (2), shall designate the area concerned as an industrial complex only if it is deemed feasible after making a comprehensive review of industrial location development guidelines and relations with other industrial complexes development plans. In this case, where the Mayor/
Do
governor receives a written request for the designation of industrial complexes from the head of
Si
/
Gun
, he may compose a committee made up of related public officials of Special Metropolitan City, Metropolitan City or
Do
and
Si
/
Gun
and have it review the designation of industrial complexes.
<Amended by Presidential Decree No. 14002, Nov. 6, 1993; Presidential Decree No. 15098, Jun. 29, 1996; Presidential Decree No. 15818, Jun. 24, 1998>
(4)
The authority to designate an industrial complex who has received the request for the designation of industrial complexes as referred to in paragraph (2), may designate an industrial complex by decreasing or expanding the area of the industrial complex concerned, hearing the opinions of the person who have requested the designation of an industrial complex, if it is deemed necessary after making a comprehensive review of the adequate supply of industrial locations, expansion of infrastructure facilities, environmental impact, employment problems, demand and supply of manpower, and relations with hinterland cities.
<Amended by Presidential Decree No. 14002, Nov. 6, 1993; Presidential Decree No. 15098, Jun. 29, 1996>
(5)
If it is deemed inappropriate to designate the area requested to be designated as an industrial complex under paragraph (2), the authority to designate an industrial complex shall notify the reason to the person who has requested such designation or select an appropriate substitute location from among other industrial complexes being developed by the State or local governments and notify him thereof.
<Amended by Presidential Decree No. 14002, Nov. 6, 1992; Presidential Decree No. 15098, Jun. 29, 1996>
(6)
The size of an industrial complex which may be designated as an industrial complex under
Article 11 (4) of the Act
, shall be 150, 000 square meters or more:
Provided
, That in the case of the Seoul Metropolitan Area under the
Seoul Metropolitan Area Readjustment Planning Act
and the region which the authority to destinate an industrial complex deemed necessary in terms of areas and locations, it may be less than 150,000 square meters.
<Amended by Presidential Decree No. 14002, Nov. 6, 1993; Presidential Decree No. 15048, Jun. 29, 1996>
법령보기 화면
Article 14 (Restriction, etc. on Acts within Designated Industrial Complexes)
(1)
For the purpose of
Article 12
(1), the term “other acts as prescribed by the Presidential Decree” means acts falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098 Jun. 29, 1996>
1.
Planting of bamboo trees:
Provided
, That provisional planting of decorative plants in lands other than the arable land shall be excluded;
2.
Excavation of the earth:
Provided
, That excavation of the earth to such extent that does not impede the development of industrial complexes, nor damages the natural landscape, shall be excluded;
3.
Installation of facilities and structures designed to catch or breed aquatic animals and plants; and
4.
Installing or piling up items which are not easy to move:
Provided
, That installing or piling up items which weigh less than five tons and each part of which may be easily subdivided into not more than 3 tons shall be excluded.
(2)
For the purpose of
Article 12 (1) of the Act
, the term “to alter the form and nature of land” means any alteration other than those falling under each of the following subparagraphs:
<Amended by the Act No. 15098, Jun. 29, 1996>
1.
Alteration of the form and nature of land for cultivation; and
2.
Alteration of the form and nature of land to such extent that does not impede the development of industrial complexes, nor damages the natural landscape.
(3)
For the purpose of
Article 12 (1) of the Act
, the term “to build a structure” means a new construction, reconstruction or extension of structures.
(4)
For the purpose of
Article 12
(1), the term “to erect installations” means erection of structures as prescribed by the Ministerial Decree of Construction and Transportation which are directly used for the production of agricultural, forestry and fishery goods other than provisional structures.
<Amended by Presidential Decree No. 14447, Dec. 23, 1994>
(5)
For the purpose of
Article 12 (1) of the Act
, the term “to extract earth, stones, or sand” means any extraction of earth, stones, or sand other than extraction to such extent that does not impede the development of industrial complexes, and does not damage the natural landscape.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(6)
The Seoul Special Metropolitan City Mayor, the Metropolitan City Mayor or the head of
Si
/
Gun
who has received an application for the permission as referred to in
Article 12 (1) of the Act
, shall grant the permission within the limit of not creating obstacles to the designated purpose of the industrial complex concerned and to the execution of industrial complex development projects, and shall, if an operator executing industrial complex development projects as referred to in
Article 16 of the Act
(hereinafter referred to as the “project operator”) has been designated, hear opinions of the project operator in advance.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
법령보기 화면
Article 15 (Cancellation of Designation of Industrial Complexes)
(1)
For the purpose of
Article 13 (1) of the Act
, the term “period as prescribed by the Presidential Decree” means a period falling under the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
1.
National industrial complex: five years;
2.
Local industrial complex: three years; and
3.
Agricultural and industrial complex: two years.
(2)
If the authority to designate an industrial complex wishes to cancel the designation of any industrial complex under
Article 13 (2) of the Act
, he shall consult with the head of the relevant administrative agency by specifying the reasons for the cancellation, detailed statement, or matters as to whether the use zoning under the
Act on the Utilization and Management of the National Territory
or the area under the
Urban Planning Act
should be returned).
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(3)
At the time of cancellation of the designation of any industrial complex under
Article 13 (3) and (5) of the Act
, the authority shall announce publicly the matters falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
1.
Name of industrial complexes;
2.
Location and area of industrial complexes to be cancelled;
3.
Reasons for cancellation of an industrial complex;
4.
Whether the use zoning under the
Act on the Utilization and Management of the National Territory
or the area under the Urban Planning Act should be returned; and
5.
A method of inspecting related books.
법령보기 화면
Article 19 (Project Operator)
(1)
Deleted.
<by Presidential Decree No. 14002, Nov. 6, 1993>
(2)
For the purpose of
Article 16 (1) 3 of the Act
, the term “persons who meet the requirements as prescribed by the Presidential Decree” means persons falling under any of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996; Presidential Decree No. 15239, Dec. 31, 1996; Presidential Decree No. 15818, Jun. 24, 1998>
1.
A person who wishes to move into an industrial complex by installing appropriate facilities according to the industrial complex development plan and who falls under any of the following items: and
(a)
Where he wishes to develop directly land for the facilities as referred to in each of the items of subparagraph 6 of
Article 2 of the Act
; and
(b)
Where he wishes to develop an industrial complex and to use part of a land for the facilities (hereinafter referred to as the “industrial facilities land”) as referred to in subparagraph 6 (a) of
Article 2 of the Act
as an end-user of industrial facilities land and supply the remaining area to those who wish to move into an industrial complex;
2.
A person who is deemed to have the capabilities to develop industrial complexes which conform to an industrial complex development plan and who falls under each of the following items:
(a)
A person who has obtained a license for a general construction business (limited to an engineering work business and engineering construction work business) under the
Framework Act on the Construction Industry
and whose amount of contract ceiling for construction business for the then-current year is not lower than an average annual project cost (excluding cost of compensation) as determined under an industrial complex development plan ; and
(b)
A person who is capable of constructing apartment-type factories under the
Industrial Placement and Factory Construction Act
and who wishes to develop directly, the land necessary for the construction of apartment-type factories in the industrial complex.
(3)
For the purpose of
Article 16 (1) 4 of the Act
, the term “juristic person who meets the requirements as prescribed by the Presidential Decree” means any juristic person falling under
Article 16 (1) 1 and 2 of the Act
, who holds an investment ratio of not less than 20/100.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(4)
A person who wishes to execute industrial complex development projects under of
Article 16 (1) of the Act
, shall submit to the authority to designate an industrial complex a written application for the designation of a project operator which contains a statement of the matters falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
1.
Name (in the case of a juristic person, the title of the juristic person and name of its representative and address);
2.
Name, location and size of an industrial complex for which a project is to be executed:
(a)
Name of the projects;
(b)
Purpose of executing the projects;
(c)
Type and outline of the projects;
(d)
Period of executing the projects; and
(e)
Method of executing the projects;
3.
Outline of a project execution plan.
(5)
A written application for the designation of a project operator as referred to in paragraph (4) shall be accompanied by the documents and drawings falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
1.
Drawings of location;
2.
Business plan; and
3.
Financing plan.
(6)
Matters necessary for the designation, etc. of a project operator other than those as referred to in paragraphs (2) through (5) shall be prescribed by the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 14002, Nov. 6, 1993; Presidential Decree No. 14438, Dec. 23, 1994; Presidential Decree No. 15098, Jun. 29, 1996>
법령보기 화면
Article 20 (Vicarious Execution of Development Projects)
A person who wishes to execute vicariously part of industrial complex development projects under
Article 16 (3) of the Act
, shall submit to a project operator a written application for vicarious execution of industrial complex development projects, which contains a statement of the matters falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 14002, Nov. 6, 1993; Presidential Decree No. 15098, Jun. 29, 1996>
1.
Name (in the case of a juristic person, the title of the juristic person and name of its representative) and address of a person who wishes to execute vicariously development projects;
2.
Name, location and size of an industrial complex for which a development project is to be executed vicariously; and
3.
Outline of an execution plan for the vicarious execution of development projects:
(a)
Purpose of the projects;
(b)
Type and outline of the projects; and
(c)
Period of executing the projects.
(2)
A written application for the vicarious execution of industrial complex development projects as referred to in paragraph (1) shall be accompanied by the documents and drawings falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
1.
Drawing of location;
2.
Business plan; and
3.
Financing plan.
(3)
If it is deemed necessary to develop a building site in parallel with the installation of industrial facilities for the efficient execution of industrial development projects, a project operator who has received the application as referred to in paragraph (1) may have an applicant execute vicariously a project for the development of a building site for industrial facilities to be used by the applicant from among the industrial complex development projects.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(4)
If a project operator wishes to have an applicant execute vicariously a project for development of a building site for industrial facilities under paragraph (3), he shall enter into a contract on the vicarious execution of industrial complex development projects. In this case, a project operator shall make a report to the relevant authority to designate an industrial complex regarding the vicarious execution of an industrial complex development project accompanied by a copy of the written contract within fourteen days from the date on which the contract was entered into.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(5)
A project operator shall control and supervise a vicarious operator of industrial complex development projects who has concluded the contract under paragraph (4) in such a way that such vicarious operator may execute the projects faithfully under the contract.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
법령보기 화면
Article 21 (Execution Plan for National Industrial Complexes)
(1)
If a project operator of a national industrial complex wishes to file an application for the approval of the execution plan for a national industrial complex development (hereinafter referred to as the “execution plan for national complexes”) as referred to in
Article 17 (1) of the Act
, he shall submit to the Minister of Construction and Transportation a written application for the approval of the execution plan for a national industrial complex development, which contains a statement of the matters falling under each of the following subparagraphs within 18 months from the date on which he was designated as a project operator of a national industrial complex:
<Amended by Presidential Decree No. 14447, Dec. 23, 1994; Presidential Decree No. 15098, Jun. 29, 1996>
1.
Name (in the case of a juristic person, the title of the juristic person, and name of its representative) and address of a project operator;
2.
Name of the project;
3.
Purpose of the project;
4.
Location and size of the project to be executed;
5.
Method and period of executing the project;
6.
Current status of the land utilization in the project execution area; and
7.
Land utilization plan and infrastructure facilities installation plan.
(2)
A written application for the approval of the execution plan for a national industrial complex development as referred to in paragraph (1) shall be accompanied by the documents and drawings falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996; Presidential Decree No. 16203, Mar. 26, 1999>
1.
Drawings of location;
2.
Copies of a land register map; and
3.
A ground plan of the project and execution design drawings (including an explanatory note on the reclamation work as referred to in
Article 14-2 (2) 4 of the Enforcement Decree of the Public Waters Reclamation Act
, if the reclamation of public waters is included);
4.
Project costs and financing plan (including an annual investment plan);
5.
A plan for the management and disposal of developed lands or installations;
6.
A detailed statement of existing factories and structures, etc. desired to be retained in a project execution area;
7.
Documents on the purchase of and compensation for land, buildings or rights, etc. in a project execution area and measures for relocation of residents;
8.
A plan for the free reversion and replacement of public facilities and land, etc.;
9.
A statement of installation expenses of public facilities to be reverted to the State or local governments and a written evaluation of the public facilities to be reverted or transferred to a project operator;
10.
A plan for the vicarious execution of industrial complex development projects (limited to the case where a relevant plan is available);
11.
Related documents and drawing plan necessary for decision-making on urban planning;
12.
A land substitution plan for former landowners (limited to the case where a land substitution plan is available);
13.
Documents regarding the effect on conservation of cultural properties; and
14.
A survey report on damage impact (limited to the reclamation of public waters).
(3)
If a project operator requests an extension of the period of application for the approval as referred to in paragraph (1) for unavoidable reasons, the Minister of Construction and Transportation may extend it to the extent of six months.
<Amended by Presidential Decree No. 14447, Dec. 23, 1994>
(4)
For the purpose of the proviso of
Article 17 (2) of the Act
, the term “alteration of insignificant matters as prescribed by the Presidential Decree” means alterations falling under any of the following subparagraphs:
1.
Alteration of the address of a project operator;
2.
Alteration of a representative of a project operator which is a juristic person;
3.
Correction of the size of an execution area due to any mistake, etc. to the extent that a project execution area is not altered; and
4.
Alteration of the size of area in a case where the project is divided up and executed within the limit not exceeding the size of a project execution area.
(5)
Deleted.
<by Presidential Decree No. 14002, Nov. 6,1993>
법령보기 화면
Article 22 (Execution Plan for Local Complexes)
(1)
If a project operator of a local industrial complex wishes to file an application for the approval of an execution plan for a local industrial complex development (hereinafter referred to as the “execution plan for local complexes”) as referred to in
Article 18 (1) of the Act
, he shall submit to the Mayor/
Do
governor (this refers to the Minister of Maritime Affairs and Fisheries, in the case of a port construction project) a written application for the approval of an execution plan for a local industrial complex development, which contains a statement of the matters falling under each of the subparagraphs of
Article 21
(1), within one year from the date on which he was designated as a project operator of a local industrial complex.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996; Presidential Decree No. 15135, Aug. 8, 1996>
(2)
A written application for the approval of an execution plan for a local industrial complex development as referred to in paragraph (1) shall be accompanied by the documents and drawings falling under each of the subparagraphs of
Article 21
(2).
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(3)
If a project operator requests an extension of the period of application for the approval as referred to in paragraph (1) for unavoidable reasons, the Mayor/
Do
governor may extend it to the extent of six months.
(4)
For the purpose of the proviso of
Article 18 (2) of the Act
, the term “alteration of insignificant matters as prescribed by the Presidential Decree” means any alteration falling under each of the subparagraphs of
Article 21
(4).
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(5)
Deleted.
<by Presidential Decree No. 14002, Nov. 6, 1996>
법령보기 화면
Article 23 (Execution Plan for Agricultural and Industrial Complexes)
(1)
If a project operator of an agricultural and industrial complex wishes to file an application for the approval of an execution plan for agricultural and industrial complexes as referred to in
Article 19 (1) of the Act
(hereinafter referred to as the “execution plan for agricultural and industrial complex”), he shall submit to the head of
Si
/
Gun
a written application for the approval of an execution plan for an agricultural and industrial complex development, which contains a statement of the matters falling under each of the subparagraphs of
Article 21
(1) within one year from the date on which he was designated as a project operator of the agricultural and industrial complex.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(2)
A written application for the approval of the execution plan for agricultural and industrial complexes as referred to in paragraph (1) shall be accompanied by the documents and drawings falling under each of the subparagraphs of
Article 21
(2).
(3)
If a project operator requests an extension of the period of application for the approval as referred to in paragraph (1) for unavoidable reasons, the head of
Si
/
Gun
may extend it to the extent of six months.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(4)
Deleted.
<by Presidential Decree No. 15098, Jun. 29, 1996>
(5)
Deleted.
<by Presidential Decree No. 14002, Nov. 6, 1993>
법령보기 화면
Article 23-2 (Public Notification of Approval for Execution Plan)
Matters to be publicly notified under
Article 19-2 (1) of the Act
, shall include the matters falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996; Presidential Decree No. 16891, Jul. 1, 2000>
1.
Name of the project;
2.
Name (in the case of a juristic person, the title of the juristic person and name of its representative) of the project operator;
3.
Purpose and outline of the project;
4.
Location and size of the project execution area;
5.
The period for executing the project (including the starting date and scheduled date of completion); and
6.
Matters falling under each of subparagraphs of
Article 24 (5) of the Enforcement Decree of the Urban Planning Act
, on the decision-making on urban planning.
[This Article Added by Presidential Decree No. 14002, Nov. 6, 1993]
법령보기 화면
Article 24 (Entrusted Execution of Industrial Complex Development Projects)
(1)
For the purpose of
Article 20 (1) of the Act
, the term “public facilities as prescribed by the Presidential Decree” means water supply facilities, railroads, common ditches, sewerage, terminal plant of wastewater disposal, wastes disposal facilities (including recycling facilities; hereinafter the same shall apply), collective energy supply facilities, dikes, embankments, sea dikes, mouth of river banks and green facilities.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(2)
If a project operator wishes to entrust the state, local governments or government-invested institutions to execute part of the industrial complex development projects under
Article 20 (1) of the Act
, he shall consult with a person who will execute it under entrustment with respect to the matters falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
1.
An operator of the entrusted project;
2.
A type, size and amount of the entrusted project, and other matters to be the standards for construction design;
3.
Execution period of the entrusted project (including the stating date and scheduled date of completion, and process plan);
4.
Matters on the payment method of expenses required for the entrusted project and management of the fund;
5.
If a person entrusting a project supplies real estate, machines and equipment or laborers, matters on the management thereof;
6.
Other matters necessary for bearing the risks; and
7.
Other matters necessary for making the contents of the entrusted project clear.
(3)
If a project operator wishes to entrust the Mayor/
Do
governor or the head of
Si
/
Gun
with the tasks on land purchase and compensation for loss under of
Article 20 (2) of the Act
, he shall consult with them concerning the conditions for the entrustment.
(4)
Standards for rate of entrustment, in executing the development project or the tasks on land purchase and compensation for loss under entrustment as referred to in paragraphs (2) and (3), shall be prescribed by the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 14447, Dec. 23, 1994>
법령보기 화면
Article 24-2 (Development of Industrial Complex under Trust)
(1)
If a project operator desires to conclude a trust contract for an industrial complex development with a real estate trust company under
Article 20-2 (1) of the Act
, the written contract shall state the following matters:
1.
Name (in the case of a juristic person, its title and the name of its representative) and address of truster and trustee;
2.
Name, location, and size of an industrial complex; and
3.
Outline of an execution plan for development under trust including the following matters:
(a)
Purpose of the project;
(b)
Type and outline of the project; and
(c)
Period of execution of the project.
(2)
If a project operator concludes a trust contract under paragraph (1), he shall submit a copy of the written contract to the agency with the authority to designate an industrial complex within fourteen days from the date on which he concludes the contract together with the following documents:
1.
Drawings of location;
2.
Business plan;
3.
Financing plan; and
4.
Disposal plan.
(3)
A real estate trust company which concludes a trust contract under paragraph (1) shall faithfully conduct the project according to the trust contract.
[This Article Wholly Amended by Presidential Decree No. 16203, Mar. 26, 1999]
법령보기 화면
Article 24-3 (Land Substitution for Landowners)
(1)
A landowner, who is entitled to the substitution of land under
Article 24 (1) of the Act
, shall be a person who owns land exceeding a minimum supply area as determined by the industrial complex development plan, as of the date of public notice of the designation of the industrial complex.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(2)
A person, who wishes to receive substituted land under paragraph (1), shall submit to a project operator a written application for land substitution accompanied by a plan for the installation of industrial facilities.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(3)
A project operator shall file an application for the substitution of land as referred to in paragraph (2) within the period of the consultation as specified in the public notice of compensation for loss resulting from the relevant industrial complex.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(4)
A project operator shall determine the method and procedures, etc. of land substitution in an execution plan for an industrial complex development according to the criteria falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
1.
The value of the former land subject to land substitution shall be in the amount of compensation for consultation offered by a project operator at the time of the public notice concerning the compensation for loss, and the value of the land to be substituted shall be based on the parcelling-out price of land for industrial facilities of the relevant industrial complex as referred to in
Article 40
;
2.
Any substitute land size shall be based on the former land size, and may be increased or decreased, taking into account the regional conditions and demand and supply conditions, etc. of land for industrial facilities; and
3.
The difference between the former land value and the substitute land value shall be settled in cash.
[This Article Added by Presidential Decree No. 14002, Nov. 6, 1993]
법령보기 화면
Article 24-4 (Scope of Public Facilities)
The scope of public facilities as referred to in
Article 26 of the Act
shall be the facilities falling under each of the following subparagraphs from among urban planning facilities as referred to in subparagraph 7 of
Article 3 of the Urban Planning Act
, and ditches as referred to in of
Article 5 (1) of the Cadastral Act
:
Provided
, That in a case where a single enterprise has moved into an industrial complex, the public facilities exclusively used by such enterprise shall be excluded:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996; Presidential Decree No. 16891, Jul. 1, 2000>
1.
Roads;
2.
Parks;
3.
Squares;
4.
Deleted;
<by Presidential Decree No. 15239, Dec. 31, 1996>
5.
Rivers;
6.
Green areas;
7.
Deleted;
<by Presidential Decree No. 15239, Dec. 31, 1996>
8.
Waterworks (limited to pipelines in the case of the waterworks installed by the Korea Water Resources Corporation);
9.
Sewerage; and
10.
Reservoir facilities.
[This Article Added by Presidential Decree No. 14002, Nov. 6, 1993]
법령보기 화면
Article 25 (Consultation, etc. of Disuse)
(1)
If the authority to approve an execution plan of an industrial complex requests the head of the relevant administrative agency for consultation about the disuse and transfer of the properties owned by the state or local
governments under the provisions of the latter part of
Article 27 (2) of the Act
, he shall attach the documents falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
1.
A statement of the property subject to consultation;
2.
Documents which contain a statement of the contents of consultation (disuse, transfer and appraisal method, etc. of property);
3.
Copies of a transcript of cadaster (forest);
4.
Copies of the registry;
5.
Transcripts of a land register map and drawings of location; and
6.
A written confirmation of non-registration (limited to an unregistered property).
(2)
The Minister of Finance and Economy may have any person entrusted with the management and disposal tasks under
Article 32 (3) of the State Properties Act
, manage and dispose of the property managed and disposed of under
Article 27 (4) of the Act
.
<Amended by Presidential Decree No. 14438, Dec. 23, 1994; Presidential Decree No. 15818, Jun. 24, 1998>
법령보기 화면
Article 26 (Subsidy for Expenses)
(1)
The category of expenses which the State or the local governments may subsidize under the provisions of the proviso of
Article 28
(1), shall fall under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
1.
Construction expenses for main roads in an industrial complex;
2.
Construction expenses for green facilities in an industrial complex;
3.
Construction expenses for water supply facilities and sewerage;
4.
Project expenses for relocation measures;
5.
Land purchase expenses for an industrial complex developed for the purpose of leasing land or facilities, etc.;
6.
Land purchase expenses for the construction of apartment-type factories; and
7.
Site development expenses for the creation of agricultural and industrial complexes, infrastructure installation expenses and land purchase expenses for access roads, electric power, communications facilities, etc.
(2)
The State or local governments may subsidize the expenses within the limit of 50 percent of the expenses falling under each of the subparagraphs of paragraph (1):
Provided
, That if it is deemed especially necessary for the development of any backward area, it may subsidize the whole of the expenses after going through the deliberation of the Deliberation Committee.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
법령보기 화면
Article 27 (Assistance for Infrastructure Facilities)
The infrastructure facilities preferentially supported by the State, local governments and a person who provides the relevant facilities under
Article 29 (1) of the Act
, shall fall under each of the following subparagraphs:
<Amended by Presidential Decree No. 14447, Dec. 23, 1994; Presidential Decree No. 15098, Jun. 29, 1996>
1.
Ports, roads and railroads;
2.
Water supply facilities, electric power and communications facilities and gas facilities;
3.
Sewerage and wastewater terminal disposal facilities, and wastes disposal facilities;
4.
Common ditches in an industrial complex;
5.
Collective energy supply facilities; and
6.
Other public facilities as determined by the Minister of Construction and Transportation especially necessary for the development of an industrial complex.
법령보기 화면
Article 27-2 (Installation of Electric Equipment in Industrial Complexes)
Electric equipment to the roads determined as urban planning equipment in an execution plan for an industrial complex shall be in advance installed by the Korea Electric Power Corporation.
[This Article Added by Presidential Decree No. 15818, Jun. 24, 1998]
법령보기 화면
Article 28 (Retention of Existing Factories, etc.)
The scope of existing factories, constructions or other structures (hereinafter referred to as the “factories, etc.”) which can be retained in an industrial complex under
Article 30 of the Act
, shall fall under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
1.
Existing factories, etc. for which it is deemed unnecessary to execute a new development project as a result of the good conditions and the previous use of the factories;
2.
Existing factories, etc. used for the proper purpose of land utilization plan under the industrial complex development plan; and
3.
Existing factories, etc. which do not impede the execution of the development project according to the execution plan for the industrial development.
법령보기 화면
Article 29 (Mutatis Mutandis Application to Projects Other Than Industrial Complexes)
(1)
For the purpose of
Article 31 of the Act
, the term “projects directly related to an industrial complex development project” means projects falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 14002, Nov. 6, 1993; Presidential Decree No. 15098, Jun. 29, 1996>
1.
Projects for ports, roads, railroads, water supply facilities, sewerage, wastewater terminal disposal facilities, wastes disposal facilities or telecommunications facilities projects;
2.
Project for gas or oil supply facilities;
3.
Projects for the exploitation of earth extraction and stone quarries and stony hills adjacent to the industrial complex for the development of an industrial complex; and
4.
Dredging projects for the reclamation of land for an industrial complex.
(2)
The provisions of
Articles 12, 17 through 29, 32 through 38 and 47 through 52 of the Act
shall apply
mutatis mutandis
in a case where the projects falling under each of the subparagraphs of paragraph (1) are executed in the area adjacent to an industrial complex. In this case, the term “area designated and publicly notified as an industrial complex” shall be regarded as the term “area for which the approval of an execution plan for the projects other than an industrial complex is publicly notified”.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
법령보기 화면
Article 30 (Advance Payment)
(1)
A project operator who desires to receive an advance payment under
Article 32 of the Act
shall obtain the approval of an execution plan for the relevant industrial complex, and then shall meet the requirements according to the classification falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996; Presidential Decree No. 16203, Mar. 26, 1999>
1.
Any project operator who falls under
Article 16 (1) 1, 2, and 4, of the Act
: he shall secure the ownership of land equal to 30/100 or more of a project execution land area for which the approval of the execution plan has been obtained, and commence the industrial complex development project;
2.
Any project operator who falls under
Article 16 (1) 3 and 5 of the Act
: he shall meet the requirements falling under each of the following items:
(a)
He shall secure the ownership of land which he wishes to parcel out and cancel the mortgage created on the land concerned:
Provided
, That if he fails to secure the land ownership or cancel the mortgage for unavoidable reasons, a project operator, landowner or mortgagee shall submit a notarized joint agreement specifying the following matters to the authority to approve an execution plan under
Article 21 (2) of the Act
(hereinafter referred to as the “authority to approve an execution plan”):
(ⅰ)
The landowner shall not transfer the relevant land or furnish it as security to a third party;
(ⅱ)
If a person who has paid an advance payment uses the relevant land after obtaining the approval for completion or the permission for the use prior to the approval for completion, the landowner and the mortgagee shall transfer without delay, the ownership and cancel the mortgage.
(b)
The work progress ratio of the development project in respect of the land which he wishes to parcel out, shall have reached 10/100; and
(c)
He shall furnish a surety or a written guarantee, etc. (this refers to written guarantees, insurance policies, time deposit certificates, beneficiary certificates as referred to in
Article 37 (2) of the Enforcement Decree of the Act
on the Contracts to which the State is a Party), which contains a statement of the guarantee, insurance amount and period, etc. of the following contents, to the authority to approve an execution plan, to guarantee the refund of the advance payment in a case where the contract for prior parcelling out of the land fails to be performed:
(ⅰ)
The guarantee or insurance amount shall be in the amount of the advance payment, added to the amount exceeding the amount equivalent to an agreed interest (this refers to the amount calculated by a bill loan interest rate level applied by commercial banks except local banks) accrued during the period corresponding to the guarantee or insurance period for the amount; and
(ⅱ)
The starting date of guarantee or insurance period shall precede the date of receipt of the advancement payment and the expiration date shall be not less than 30 days from the scheduled date of completion:
Provided
, That if he extends the project period, he shall submit a written guarantee, etc. to the effect that the period of the initial guarantee or insurance period shall be added to the intended period of extension.
(2)
A project operator shall not furnish the relevant land as a security after he has parcelled out such land in advance or provided the facilities for the use under paragraph (1).
(3)
If a project operator fails to carry out the project or is deemed to have no capacity to carry it out according to the advance parcelling-out contract, the authority to approve an execution plan may use a written guarantee, etc. to refund the advance payment before the completion of the relevant industrial complex.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
[This Article Wholly Amended by Presidential Decree No. 14429, Dec. 16, 1994]
법령보기 화면
Article 31 (Installation Charges)
(1)
For the purpose of
Article 33
(1), the term “public facilities as prescribed by the Presidential Decree” means facilities falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 14002, Nov. 6, 1993; Presidential Decree No. 15098, Jun. 29, 1996; Presidential Decree No. 16891, Jul. 1, 2000>
1.
Approach roads to and main roads of an industrial complex;
2.
Green areas and parks to be preserved in an industrial complex (this refers to those determined as urban planning facilities as referred to in subparagraph 7 of
Article 3 of the Urban Planning Act
);
3.
Water supply facilities, sewerage facilities, electric power, telecommunications facilities, wastewater terminal disposal facilities and wastes disposal facilities; and
4.
Public facilities which revert gratuitously to the State or local governments under
Article 26 of the Act
.
(2)
The construction expenses for public facilities as referred to in paragraph (1), shall be the total amount of construction expenses, survey expenses, design expenses, compensation expenses and other expenses calculated on the basis of the criteria as referred to in
Article 40
(5).
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(3)
The installation charges to be paid by the owner of the retained installations or a person who receives them under the parcelling-out after the development thereof under
Article 33 of the Act
, shall be the amount obtained by dividing the construction expenses for public facilities as referred to in paragraph (2) by the total area parcelled-out after the development thereof (including the total site area of the existing factories, etc.) and then multiplying such divided expenses by the site area owned by a person liable to pay the installation charges.
<Amended by Presidential Decree No. 14002, Nov. 6, 1993>
(4)
If there are two or more project operators in applying the provisions of
Article 33 (1) of the Act
, the expenses of public facilities installed in the relevant industrial complex shall be borne by respective project operators in shares in proportion to the individually available area parcelled out to the project operator of the total available area (including the total site area of the existing factories, etc.) of the relevant industrial complex.
<Added by Presidential Decree No. 14002, Nov. 6, 1993; Presidential Decree No. 15098, Jun. 29, 1996>
(5)
If the public facilities are installed for the exclusive use of any particular project operator notwithstanding the provisions of paragraph (4), the authority to approve an execution plan may have the relevant project operator who will use the public facilities bear all or part of the installation expenses, taking into account comprehensively the location, the purpose of installation, utilization status and regional conditions of such public facilities.
<Amended by Presidential Decree No. 14002, Nov. 6, 1993>
(6)
If a project operator or the authority to approve an execution plan of an industrial complex wishes to impose installation charges under
Article 33 (1) or (2) of the Act
, he shall specify the name of the public facilities, the total amount of installation charges, the amount to be paid, payment method and time limit for payment, etc. and notify in writing the person liable to bear such charges thereof.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
법령보기 화면
Article 32 Deleted. <by Presidential Decree No. 15818, Jun. 24, 1998>
법령보기 화면
Article 33 (User Charges)
(1)
If a project operator wishes to impose the user charges under
Article 35 (1) of the Act
, he shall specify the name of the supporting facilities, the total amount of construction expenses, the amount to be paid, payment method and time limit for payment and notify in writing, a person liable to bear such charges thereof.
(2)
A project operator shall consult in advance with a person liable to bear such charges regarding the basis for calculation and payment method of user charges as referred to in paragraph (1). In this case, if an agreement is not reached, the project operator may determine the amount of such charges, taking into account the degree, etc. of use for the supporting facilities by a person liable to bear such charges.
(3)
The total amount of expenses as referred to in paragraph (1) shall be calculated by the criteria as referred to in
Article 31
(2).
법령보기 화면
Article 34 (Charges to be Borne by Liable Person)
(1)
If a project operator wishes to impose the charges to be borne under
Article 35 (2) of the Act
, he shall notify in writing a person liable to bear such charges, accompanied by a design drawing or a document underlying the basis for the calculation of expenses.
(2)
The provisions of
Article 33
(2) and (3) shall apply
mutatis mutandis
to the calculation and payment method of charges to be borne by a liable person as referred to in paragraph (1).
법령보기 화면
Article 35 (Employment of Migrants)
(1)
If it is deemed necessary for the stable living of migrants or residents of neighboring areas under
Article 36 (2) of the Act
, a project operator may make a list of job-seekers and a list of job-offers by occupant enterprisers in the industrial complex, respectively, and make an application for job-seeking and job-providers to the head of the competent local labor office or the head of
Si
/
Gun
.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(2)
The head of the local labor office or the head of
Si
/
Gun
who has received the application for job-seeking and job-offering under paragraph (1) shall offer good offices actively by providing job-providers with a list of job-seekers meeting the job-offering requirements and job-seekers with a list of job-offerers meeting the job-seeking requirements.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(3)
Deleted.
<by Presidential Decree No. 15098, Jun. 29, 1996>
법령보기 화면
Article 36 (Approval of Completion)
(1)
If a project operator wishes to obtain the approval of completion under
Article 37 (1) of the Act
, he shall submit a written application for the approval of completion, which contains a statement of the matters falling under each of the following subparagraphs to the authority to approve an execution plan for an industrial complex:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
1.
Name (in the case of a juristic person, its title and name of its representative) and address of a project operator;
2.
Name of the project;
3.
Location and size of the project execution area;
4.
The period of execution of the project;
5.
The land utilization plan; and
6.
Financing plan.
(2)
A written application for the approval of completion as referred to in paragraph (1) shall be accompanied by the documents and drawing plans falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996; Presidential Decree No. 16515, Aug. 6, 1999>
1.
Design documents of completion of work (including photographs of completion of work);
2.
A land register survey performance map issued by the head of
Si
/
Gun
;
3.
A disposal plan for the land and facilities, etc. developed under
Article 38 of the Act
;
4.
A reversion protocol and drawing of public facilities and land, etc. as referred to in
Article 26 of the Act
(including the appraisal protocol of the land by a certified public appraiser under the
Public Notice of Values and Appraisal of Lands, etc. Act
in respect of disused public facilities and lands, etc. and a detailed statement of the basis for calculation of construction expenses of newly installed public facilities in the case of a project operator under
Article 16 (1) 2 through 5 of the Act
);
5.
A land substitution plan and an old and new land register comparison diagram (limited to the case of land substitution under
Article 24 of the Act
); and
6.
A detailed statement of lands, etc. to be acquired by a project operator under
Articles 26 and 38 (4) the Public Waters Reclamation Act
, and
Article 20
of the Enforcement Decree of the same Act and lands, etc. to be reverted to the State or local governments (limited to the case of reclaiming the public waters).
(3)
If the authority to approve an execution plan has received an application for the approval of completion of work as referred to in paragraph (1), the authority shall inform the head of the national agency or local government who will take over or manage of the public facilities included in the contents of an application for the approval of completion of work by specifying the schedule for inspection on completion of work five days prior to the inspection date, and the head of the national agency or local government who wish to participate in the inspection on completion of work shall ask for participation prior to the date of inspection on completion of work.
<Added by Presidential Decree No. 15098, Jun. 29, 1996>
(4)
The authority to approve an execution plan who has received an application for the approval of completion of work as referred to in paragraph (1) shall deliver a certificate of completion of work, if it is deemed that the relevant industrial complex development project has been completed according to the approved execution plan under
Articles 17 through 19 of the Act
by conducting the inspection on completion of work.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(5)
Matters to be publicly announced under
Article 37 (5) of the Act
shall fall under each of the following subparagraphs:
<Amended by Presidential Decree No. 14002, Nov. 6, 1993; Presidential Decree No. 15098, Jun. 29, 1996>
1.
Name of the project;
2.
Name (in the case of a juristic person, its title and name of its representative) and address of a project operator;
3.
Location and size of the project execution area;
4.
Date of the approval on completion of work; and
5.
Management and disposal plan of public facilities and lands, etc.
(6)
Where a project operator has obtained the approval on completion of work as referred to in paragraph (4), he shall notify the contents falling under each of the subparagraphs of paragraphs (1) and (2) to the industrial complex management agency concerned as referred to in
Article 30
(2) of the Industrial Placement and Factory Construction Act within one month.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
법령보기 화면
Article 37 (Use of Land before Authorization for Completion of Work)
(1)
Where a person who purchases land for industrial facilities in lots desires to use the land or facilities before obtaining authorization for the completion of work under the proviso of
Article 37 (7) of the Act
, he shall submit a written application for use before authorization for the completion of work to the project operator by specifying the scope of such use under the conditions prescribed by the Ministerial Decree of Construction and Transportation.
(2)
The project operator who has received an application under paragraph (1) shall, if he deems that such use will not obstruct the future execution of the industrial complex development project, allow the applicant to use the relevant land or facilities without delay. In this case, if the land or facilities to be used before authorization for the completion of work include public or national property, the applicant shall acquire the ownership of the relevant property prior to its use.
[This Article Wholly Amended by Presidential Decree No. 16203, Mar. 26, 1999]
법령보기 화면
Article 38 (Transfer of Exploited Lands and Facilities, etc.)
If a project operator wishes to transfer the exploited lands or facilities, etc. under
Article 38 (1) of the Act
, he shall prepare a protocol on the transfer in which a list and the value of the property is indicated, and send such protocol to the prospective transferee.
[This Article Wholly Amended by Presidential Decree No. 14002, Nov. 6, 1993]
법령보기 화면
Article 39 (Parcelling-Out of Exploited Lands and Facilities, etc.)
(1)
If a project operator wishes to parcel out exploited lands or facilities, etc. to a person who wishes to move into the relevant industrial complex and carry on a business under
Article 38 (1) of the Act
, he shall prepare a parcelling-out plan and parcel them out according to the plan.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(2)
The parcelling-out plan as referred to in paragraph (1) shall include the matters falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
1.
A detailed statement of lands or facilities, etc. to be parceled out;
2.
Qualifications of those eligible for the parcelling out;
3.
Time, method and conditions of parcelling out;
4.
Method of determining the parcelling-out price; and
5.
Matters on the advance payment and its payment.
법령보기 화면
Article 40 (Determination of Parcelling-Out Price)
(1)
If a project operator parcel out the exploited lands or facilities, etc. under
Article 38
(1), the parcelling-out price shall be based on the development cost:
Provided
, That if the project operator falls under
Article 16 (1) 3 through 5 of the Act
, the amount obtained by adding reasonable profits to the development cost, may be determined as the parcelling-out price.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(2)
If it is deemed necessary, notwithstanding the provisions of paragraph (1), a project operator may determine the parcelling-out price not higher than the development cost.
(3)
If it is deemed particularly necessary, in view of regional conditions supply and demand and of industrial facilities sites, the Minister of Construction and Transportation may determine a parcelling-out price separately, notwithstanding the provisions of paragraph (1).
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(4)
The parcelling-out price for the sites supplied for the use other than sites for industrial facilities as referred to in paragraph (1), shall be the amount appraised by a certified public appraiser as referred to in
Article 2 of the Public Notice of Values and Appraisal of Lands, etc. Act
, and may be determined not higher than such appraised amount if a project operator deems it necessary:
Provided
, That any parcelling-out price for sites, directly needed to support the production activities of those who move into an industrial complex may be based on the development costs if such sites are used for physical distribution such as common freight terminals, goods collection and delivery complexes, and vocational training facilities may be based on the development costs, and any parcelling-out price for sites for school facilities, housing relocation, national housing, rental houses and research facilities may be based on the development costs or lower than such development costs.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(5)
The development costs as referred to in paragraphs (1) and (4) shall be the total amount of construction expenses, research expenses, design expenses, compensation expenses and other expenses calculated on the basis of the criteria falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
1.
Construction expenses: This refers to the total amount of expenses for materials, labor expenses, expenditure, general management expenses and profits as referred to in
Article 9 of the Enforcement Decree of the Act
on the Contracts to Which the State is a Party;
2.
Research expenses: This refers to survey expenses and other research expenses for the relevant industrial complex development project, which are not included in the net construction expenses, and shall be based on the price for engineering projects as referred to in
Article 10 of the Engineering Technology Promotion Act
;
3.
Design expenses: This refers to expenses for the design of the relevant industrial complex development project and shall be based on the price for engineering projects as referred to in
Article 10 of the Engineering Technology Promotion Act
;
4.
Compensation expenses: This refers to the total amount obtained by adding the purchase price paid for the land for the relevant industrial complex development project, compensation expenses for the rights, such as buildings, standing trees and good will, etc. other than the land ownership, which are not included in the land value, and expenses for relocation measures; and
5.
Other expenses: This refers to the total amount obtained by adding insurance premium under the
Industrial Accident Compensation Insurance Act
, general administrative expenses calculated in proportion to a general management ratio according to the criteria for determining an estimated price under
Article 9 of the Enforcement Decree of the Act
on the Contracts to Which the State is a Party, capital costs incurred until the project period (including the extended period where the planned execution period is extended due to a frustration of the government assistance plan and other compelling causes as determined by the Ministerial Decree of Construction and Transportation) determined in an initial execution plan, the amount of damage caused by natural disasters and expenses required under the conditions, etc. for the approval of the relevant industrial complex development project such as charges paid to the State or local governments under other Acts and subordinate statutes or under the conditions for the approval of the relevant industrial complex development project.
(6)
The reasonable profits as referred to in the proviso of paragraph (1) shall be determined by a project operator, taking into account the regional conditions such as demand for moving into the relevant industrial complex and promotion of balanced development between regions, within the limit not exceeding 5/100 of the amount obtained by excluding the total amount of capital costs, construction expenses for vicarious execution of development as referred to in
Article 16 (3) of the Act
and advance payment as referred to in
Article 32 of the Act
, from the development cost calculated under paragraph (5).
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(7)
If a project operator parcels out the sites for industrial facilities at a price not higher than the development costs under the proviso of paragraph (2) or (4), he may compensate for the losses by sales proceeds of sites other than those for industrial facilities of the relevant industrial complex or sales proceeds of sites for industrial facilities of other industrial complexes.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(8)
If a project operator parcels out the sites for industrial facilities before the approval of completion of work, he may settle the accounts on the basis of the total project expenses disbursed for the relevant industrial complex development project plus reasonable profits, after the approval of completion of work.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(9)
A person who has parcelled out lands, etc. may demand a project operator to terminate the contract without paying any penalty if the amount to be settled under paragraph (8) has increased by 15/100 or more in excess of the advance payment:
Provided
, That this shall not apply in a case where the authority to approve an execution plan deems that such amount has increased by 15/100 or more as a result of the enactment and amendment of the relevant Acts and subordinate statutes or changes in government policy leading to increase factors in the parcelling-out price.
(10)
In settling the accounts in respect of a person who has made the advance payment, the amount equivalent to the interest rate of a time deposit with one-year maturity of a commercial bank accrued from the advance payment date to the settlement date, shall be deducted from the amount to be settled.
(11)
Where a person who purchases the sites for industrial facilities in an industrial complex parcelled out by the project operator referred to in
Article 16 (1) 1 and 2 of the Act
has inevitable causes that it is difficult to maintain the initial contract due to failure of his business, managerial difficulty or other causes as determined by the Ministerial Decree of Construction and Transportation, he may request to reduce the parcelling-out area or cancel the parcelling-out contract without paying a penalty in whole (limited to causes where the parcelling-out area is reduced and where the reduced area is not more than 30/100 of the initial parcelling-out area) or without paying a penalty equivalent to 30/100 of the initial parcelling-out area (limited to cases where the parcelling-out area is reduced and where the reduced area exceeds 30/100 of the initial parcelling-out area and the parcelling-out contract is cancelled) prior to the completion of the industrial complex:
Provided
, That this shall not apply to the following cases:
<Added by Presidential Decree No. 15818, Jun. 24, 1998>
1.
Where it is difficult for him to supply sites reduced or cancelled due to the reduction in parcelling-out area or cancellation of parcelling-out contract as sites for industrial facilities; and
2.
Where he obtains use permission prior to the completion approval forthe parcelled-out land.
[This Article Wholly Amended by Presidential Decree No. 14429, Dec. 16, 1994]
법령보기 화면
Article 40-2 (Public Tender, etc. for Long-term Unparcelled Out Sites)
(1)
A project operator may conduct a public tender under the Act on Contracts to which the State is a Party to promote parcelling-out where a year has passed since the completion of industrial complex development project and the sites for industrial facilities are not parcelled out.
(2)
A public tender referred to in paragraph (1) shall be conducted for only once:
Provided
, That this shall not apply as the project operator deems necessary to promote parceling-out.
(3)
Where the amount of a successful tender falls short of the creation cost as a result of a public tender referred to in paragraph (1), the local government may subsidize, in part, the amount of loss.
(4)
Where the project operator deems necessary for a smooth public tender, he may entrust the Korea Asset Management Corporation, the Korea Land Corporation or the Korea Industrial Complex Corporation under the Industrial Placement and Factory Construction Act to offer a tender.
<Amended by Presidential Decree No. 16709, Feb. 14, 2000>
(5)
The commission fees shall not, if a public tender is entrusted pursuant to paragraph (4), exceed 1/100 of the parcelling-out price.
(6)
the project operator may, where the sites for industrial facilities are not parcelled out notwithstanding a public tender referred to in paragraph (1), convert the sites into those for rent.
[This Article Added by Presidential Decree No. 15818, Jun. 24, 1998]
법령보기 화면
Article 41 (Rent of Exploited Lands and Facilities, etc.)
(1)
If a project operator wishes to directly rent out exploited lands or facilities to a person who wishes to move into the relevant industrial complex and carry on a business under
Article 38 (1) of the Act
, he shall prepare a project plan on the lease and submit it to the authority to approve an execution plan.
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
(2)
The project plan on the lease as referred to in paragraph (1) shall include the matters falling each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
1.
A detailed statement of lands and facilities, etc. to be rented out;
2.
The timing and method of renting out and eligibility of those who may rent such lands and facilities;
3.
The category of business and its size to be attracted;
4.
Criteria for calculation of lease deposit and rent; and
5.
Follow-up management and operational plan.
(3)
and (4) Deleted.
<by Presidential Decree No. 15098, Jun. 29, 1996)>
(5)
Matters necessary for the management of lands and facilities, etc. rented out according to the project plan as referred to in paragraph (1) shall be prescribed the Ministerial Decree of Construction and Transportation.
<Amended by Presidential Decree No. 14447, Dec. 23, 1994>
법령보기 화면
Article 42 (Criteria for Calculation of Rent, etc.)
(1)
If a project operator rents out exploited lands and facilities under
Article 41
, the criteria for the lease deposit and rent shall fall under each of the following subparagraphs:
1.
A lease deposit : 10/100 of the parcelling-out price determined under
Article 40
;
2.
An initial rent of lands and facilities to be rented out: the amount obtained by multiplying the parcelling-out price determined under
Article 40
by the rate of rent as prescribed by the Ministerial Decree of Construction and Transportation; and
3.
The rent in the case of renewal of a contract due to its expiry, etc. of the lease period : the amount obtained by multiplying the land price calculated under
Article 10 (2) of the Public Notice of Values and Appraisal of Lands, etc. Act
by the rate of rent as prescribed by the Ministerial Decree of Construction and Transportation.
(2)
The lease period for lands and facilities as referred to in paragraph (1) shall be not more than ten years, and if the lessee wishes to renew the lease contract after the expiry of the lease period, the lessor shall comply therewith unless there exist special reasons to the contrary.
[This Article Wholly Amended by Presidential Decree No. 15098, Jun. 29, 1996]
법령보기 화면
Article 42-2 (Disposal Procedures of Exploited Lands and Facilities, etc.)
(1)
If a project operator wishes to parcel out or rent out exploited lands or facilities, etc., he shall announce publicly the important contents such as criteria for prices, eligibility and method of selecting those eligible for the lease in a daily newspaper published in the capital city or the district concerned under the conditions as determined by the parcelling-out plan and rental business plan (hereinafter in this Article referred to as the “disposal plan”) as referred to in
Articles 39
and
41
.
(2)
A person, who wishes to be parcelled out exploited lands and facilities, etc. or lease them under paragraph (1), shall submit to a project operator a written application for the parcelling-out and lease thereof.
(3)
A project operator shall select those eligible for the parcelling out or the lease from among applicants as referred to in paragraph (2) according to the qualifications and method of selecting those eligible therefor as specified in the disposal plan:
Provided
, That in the case of the sites for industrial facilities, he may select a person, preferentially, who falls under any of the following subparagraphs:
1.
A person who wishes to relocate from any overpopulation control region as referred to in
Article 6 of the Seoul Metropolitan Area Readjustment Planning Act
;
2.
A person who wishes to construct apartment-type factories as referred to in subparagraph 5 of
Article 2
of the Industrial Placement and Factory Construction Act;
3.
A person who wishes to buy sites for industrial facilities and carry on the rental business;
4.
A person who wishes to obtain the approval for the cooperation action plan and execute such plan under
Article 19
of the Promotion of Small and Medium Enterprises and Encouragement Purchase of Their Products Act;
5.
A person who is required to relocate according to the industrial complex readjustment plan as referred to in
Article 38-3 of the Act
; and
6.
A person who owns factories required to relocate under the relevant Acts.
(4)
If a project operator has parcelled out or rented out exploited lands and facilities, etc. he shall notify the authority to manage the relevant industrial complex of the contents thereof within fifteen days.
[This Article Added by Presidential Decree No. 15098, Jun. 29, 1996]
법령보기 화면
Article 43 (Entrustment of Parcelling-Out and Renting Out Business)
(1)
If a project operator wishes to entrust the business of parcelling-out or renting out exploited lands and facilities under the proviso of
Article 38
(1), he shall enter into an entrustment contract with the Industrial Complex Management Corporation.
(2)
A written entrustment contract as referred to in paragraph (1) shall include the matters falling under each of the following subparagraphs:
1.
Scope of business to be entrusted;
2.
A plan to implement the entrusted business;
3.
The method of price payment; and
4.
Matters on conditions of entrustment and termination thereof.
[This Article Wholly Amended by Presidential Decree No. 15098, Jun. 29, 1996]
법령보기 화면
Article 43-2 (Alteration of Industrial Complex Readjustment Plan)
(1)
For the purpose of the proviso of
Article 38-3 (1) of the Act
, the term “insignificant matters as prescribed by the Presidential Decree” mean any alteration of matters other than those falling under each of the subparagraphs of
Article 7
(1) to the extent that the whole system of the industrial complex readjustment plan are not altered.
(2)
For the purpose of the proviso of
Article 38-3 (1) of the Act
, the term “to modify any insignificant matters as prescribed by the Presidential Decree” means the matters falling under each of the subparagraphs of
Article 21
(4).
[This Article Added by Presidential Decree No. 15098, Jun. 29, 1996]
법령보기 화면
Article 44 Deleted. <by Presidential Decree No. 15098, Jun. 29, 1996>
법령보기 화면
Article 45 (Preparation of Criteria for Designation and Development of Locations)
(1)
The criteria for the designation and development of locations as referred to in
Article 40 (1) of the Act
shall include the matters falling under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
1.
The criteria for selection of individual factory locations;
2.
The criteria for the proper use of sites for industrial facilities;
3.
Installation and maintenance of infrastructure facilities;
4.
Matters necessary for the proper industrial layout and balanced development between regions;
5.
Matters necessary for the preservation of environment and cultural properties;
6.
Matters necessary for the stabilization of land price; and
7.
Other matters necessary for harmonization with other plans.
(2)
For the purpose of the proviso of
Article 40 (2) of the Act
, the term “to modify and insignificant matters as prescribed by the Presidential Decree” means any alteration falling under subparagraphs 4 through 7 of paragraph (1).
법령보기 화면
Article 46 Deleted. <by Presidential Decree No. 16203, Mar. 26, 1999>
법령보기 화면
Article 47 (Alternative Plan for Areas Attracting Enterprises)
(1)
Matters to be included in an alternative plan for the appropriateness of the areas subject to the designation of areas attracting enterprises as referred to in
Article 44 (1) of the Act
and methods, etc. of development thereof, shall fall under each of the following subparagraphs:
<Amended by Presidential Decree No. 15098, Jun. 29, 1996>
1.
An analysis of propriety of locations;
2.
A determination of the proper type of industrial complexes;
3.
A leading development project operator and methods of development;
4.
Relevancy to other plans; and
5.
Effects on the balanced development between regions.
(2)
If it is deemed particularly necessary to review the proposal for the designation of areas attracting enterprises as referred to in
Article 44 (1) of the Act
, the Minister of Construction and Transportation may conduct a basic investigation as referred to in
Article 4 (1) of the Act
.
<Amended by Presidential Decree No. 14447, Dec. 23, 1994>
법령보기 화면
Article 47-2 Deleted. <by Presidential Decree No. 15598, Dec. 31, 1997>
법령보기 화면
Article 48 (Public Notification Consequent upon Supervisory Dispositions)
Matters to be publicly notified under
Article 48 (3) of the Act
shall fall under each of the following subparagraphs:
<Amended by Presidential Decree No. 14002, Nov. 6, 1993>
1.
Name of the project;
2.
Name (in the case of a juristic person, its title and name of its representative) and address of a project operator;
3.
Location and size of the project area; and
4.
Contents of and reasons for supervisory dispositions.
법령보기 화면
Article 49 (Delegation of Powers)
(1)
The Minister of Construction and Transportation shall delegate the powers falling under each of the following subparagraphs regarding a national industrial complexes as referred to in Appendix to the Mayor/
Do
governor under
Article 49 of the Act
:
<Amended by Presidential Decree No. 15598, Dec. 31, 1997; Presidential Decree No. 15818, Jun. 24, 1998>
1.
Alteration of the development plan (excluding case where a plan for land use is established for an area where no plan for land use on a development plan is establish and an area is altered) as referred to in
Article 6 (3) of the Act
;
2.
Public notification of the designation, etc. of the industrial complexes as referred to in
Article 7-2 of the Act
;
3.
Designation of the project operator as referred to in
Article 16 of the Act
;
4.
Approval of the execution plan as referred to in
Article 17 (1) of the Act
;
5.
Public notification of the approval of the execution plan and dispatch of copies of the relevant documents as referred to in
Article 19-2 (1) of the Act
;
6.
Deleted;
<by Presidential Decree No. 16203, Mar. 26, 1999>
7.
Consultation, etc. on the approval of the execution plan as referred to
Article 21 (2) of the Act
;
8.
Hearing on the reversion and transfer of public facilities as referred to in
Article 26 (3) of the Act
;
9.
Consultation on the disuse and transfer of national and public properties as referred to in
Article 27 (2) of the Act
;
10.
Approval of completion of work, inspection on completion of work and request for the inspection on completion of industrial complex development projects as referred to in
Article 37 (1) and (2) of the Act
;
11.
Public announcement and notification of industrial complex development projects as referred to in
Article 37 (5) of the Act
;
12.
Deleted;
<by Presidential Decree No. 16203, Mar. 26, 1999>
13.
Order issued to a project operator to report or to submit materials and inspection under
Article 47 (1) of the Act
; and
14.
Supervisory dispositions and hearing for the project operator and public notification, as referred to in
Article 48 of the Act
.
(2)
The Minister of Construction and Transportation shall delegate the powers on the designation of a project operator, excluding the cases falling under each of the following subparagraphs, with respect to an industrial complex other than a national industrial complex as referred to in Appendix, and the powers falling under subparagraphs 4 through 14 of paragraph (1) on national industrial complex development projects executed by the designated project operator to the Mayor/
Do
governor:
1.
Where a port construction project from among projects falling under subparagraph 6 (f) of
Article 2 of the Act
is executed;
2.
Where the Minister of Construction and Transportation designates a project operator at the time of establishing an industrial complex development plan as referred to in
Article 6 of the Act
; and
3.
Where a person who wishes to execute a project falls under
Article 16 (1) 1 and 2 of the Act
.
(3)
The Minister of Construction and Transportation shall delegate the powers falling under paragraph (1) 4 through 14 for national industrial complex development projects executed by a project operator as referred to in paragraph (2) 2 and 3, to the Administrator of the Regional Construction and Management Office.
[This Article Wholly Amended by Presidential Decree No. 15098, Jun. 29, 1996]
ADDENDA
Article 1 (Enforcement Date)
This Decree shall enter into force on January 14, 1991.
Article 2 (Repealed Acts and Subordinate Statutes)
The
Enforcement Decree of the Industrial Base Development Promotion Act
and the
Enforcement Decree of the Local Industrial Development Act
shall be repealed, respectively.
Article 3 (Transitional Measures for Approval of Execution Plan)
If a person wishes to expropriate the land in an area where an industrial complex development project is executed, from among industrial development encouragement districts under the previous
Local Industrial Development Act
, areas attracting enterprises under the previous
Industrial Layout Act
and agricultural and industrial districts under the previous
Act on Promotion of Income Source Development for Agricultural and Fishing Villages
, he shall obtain the approval of the execution plan for the industrial complex development project under the procedures as prescribed by the Act and this Decree.
Article 4 (Transitional Measures for Cancellation of Designation of Industrial Complexes)
If the period as referred to in
Article 13 (1) of the Act
and
Article 15
(1) of this Decree applies to industrial complexes, etc. composed of national industrial complexes, regional industrial complexes, agricultural or fishery and specialized districts under
Article 3 (1) and (2) of the Addenda of Article 3 (1) and (2) of the Act
, the period shall be calculated from the enforcement date of this Decree.
Article 5 (Transitional Measures for Delegation of Powers)
With respect to projects for which the Mayor/
Do
governor has designated a project operator and approved the execution plan under
Article 31-2
of the previous
Enforcement Decree of the Industrial Base Development Promotion Act
, notwithstanding the provisions of
Article 49
of this Decree, the relevant Mayor/
Do
governor shall take necessary actions such as direction, supervision and approval of the completion of work, etc.
Article 6 (Relation with Other Acts and Subordinate Statutes)
In a case where other Acts and subordinate statutes cite the previous
Enforcement Decree of the Industrial Base Development Promotion Act
and the previous
Enforcement Decree of the Local Industrial Development Act
or the provisions thereof at the time when this Decree enters into force, if this Decree contains any provisions corresponding to them, this Decree or the corresponding provisions of this Decree shall be deemed to be cited.
ADDENDA <Presidential Decree No. 13563, Dec. 31, 1991>
Article 1 (Enforcement Date)
This Decree shall enter into force on the date of its promulgation.
ADDENDA <Presidential Decree No. 13889, May 26, 1993>
Article 1 (Enforcement Date)
This Decree shall enter into force on May 26, 1993.
ADDENDA <Presidential Decree No. 14002, Nov. 6, 1993>
(1)
(Enforcement Date) This Decree shall enter into force on the date of its promulgation.
(2)
(Transitional Measures on Size of Industrial Complexes) With respect to the designation requested at the time when this Decree enters into force, the previous provisions shall be applied notwithstanding the amended provisions of
Article 13
(6).
(3)
(Transitional Measurers on Parcelling-Out Price) Any parcelling-out price for industrial sites and their facilities which had already been parcelled out or publicly notified for the parcelling-out under the previous provisions before this Decree entered into force, shall be governed by the previous provisions notwithstanding the amended provisions of
Article 40
.
ADDENDA <Presidential Decree No. 14429, Dec. 16, 1994>
Article 1 (Enforcement Date)
This Decree shall enter into force on the date of its promulgation.
Article 2 (Applicable Examples on Period for Calculation of Capital Costs)
In applying the amended provisions of
Article 40
(5) 5 in respect of the calculation of capital costs for the calculation of the development costs, the project period of the industrial complex for which the approval of the execution plan had been obtained under
Articles 17
through
19
before this Decree entered into force, shall be deemed as the project period as specified in the initial execution plan.
Article 3 (Applicable Examples on Cancellation of Parcelling-Out Price)
In applying the amended provisions of
Article 40
(9), with respect to the lands and facilities which had already been parcelled out before this Decree entered into force, the amount of the advance parcelling-out price at the time when this Decree enters into force, shall be regarded as the amount of the advance payment.
Article 4 (Transitional Measures on Requirements for Advance ParcellingOut)
If the approval of the execution plan for the industrial complex development project has been obtained under
Articles 17
through
19
at the time when this Decree enters into force, the previous provisons shall be applied, notwithstanding the amended provisions of
Article 30
.
Article 5 (Transitional Measures on Parcelling-Out Prices)
(1)
With respect to any parcelling-out prices for factory sites for which the permission for use has been obtained before the approval of completion of work under
Article 37
or such price for factory sites whose boundary has been finally fixed after completion of the development of sites from among the sites which had already been parcelled out, the previous provisions shall be applied notwithstanding the amended provisions of
Article 40
(1).
(2)
With respect to any parcelling-out price for sites for physical distribution such as freight terminal sites, and collection and delivery complexes already parcelled out before this Decree entered into force, the previous provisions shall be applied, notwithstanding the amended provisions of
Article 40
(4).
ADDENDA <Presidential Decree No. 14438, Dec. 23, 1994>
Article 1 (Enforcement Date)
This Decree shall enter into force on the date of its promulgation. (Proviso is Omitted.)
ADDENDA <Presidential Decree No. 14915, Feb. 15, 1996>
Article 1 (Enforcement Date)
This Decree shall enter into force on the date of its promulgation.
ADDENDA <Presidential Decree No. 15098, Jun. 29, 1996>
Article 1 (Enforcement Date)
This Decree shall enter into force on June 30, 1996.
Article 3 (Relation with Other Acts and Subordinate Statutes)
In a case where other Acts and subordinate statutes cite the previous provisions at the time when this Decree enters into force, if this Decree contains the provisions corresponding to them, this Decree or the corresponding provisions of this Decree shall be deemed to be cited.
ADDENDA <Presidential Decree No. 15135, Aug. 8, 1996>
Article 1 (Enforcement Date)
This Decree shall enter into force on the date of its promulgation.
ADDENDUM <Presidential Decree No. 15239, Dec. 31, 1996>
This Decree shall enter into force on the date of its promulgation.
ADDENDUM <Presidential Decree No. 15598, Dec. 31, 1997>
This Decree shall enter into force on January 1, 1998.
ADDENDA <Presidential Decree No. 15818, Jun. 24, 1998>
(1)
(Enforcement Date) This Decree shall enter into force on the date of its promulgation.
(2)
(Examples of Application on Consultation of Designation of Industrial Complexes) An amendment to
Article 8-2
shall apply to a request for consultations first made after the entry into force of this Decree.
(3)
(Examples of Application on Payment of Penalty) An amendment to
Article 40
(11) shall apply to industrial complexes for which a parcelling-out contract is concluded (excluding cases where parcelling-out contracts are already altered or cancelled) and where the creation work for industrial complexes is not completed at the time of entry into force of this Decree.
ADDENDA <Presidential Decree No. 16093, Jan. 29, 1999>
Article 1 (Enforcement Date)
This Decree shall enter into force on the date of its promulgation.
ADDENDUM <Presidential Decree No. 16203, Mar. 26, 1999>
This Decree shall enter into force on May 6, 1999.
ADDENDA <Presidential Decree No. 16515, Aug. 6, 1999>
Article 1 (Enforcement Date)
This Decree shall enter into force on August 9, 1999.
ADDENDA <Presidential Decree No. 16709, Feb. 14, 2000>
Article 1 (Enforcement Date)
This Decree shall enter into force on the date of its promulgation.
ADDENDA <Presidential Decree No. 16891, Jul. 1, 2000>
Article 1 (Enforcement Date)
This Decree shall enter into force on July 1, 2000. (Proviso Omitted.)
Last updated : 2009-07-26